Change Order Request
Project Name:I Westside 2 to Weslside 3 Pressure Plane Transfer Project I City Sec No.: I 56185 i
Project No,(s):i C01466 1 DOE No. I N/A i Cily Proj, No,: I C01468 i
Project Descriplion;l Water system improvements on the west side of Fort Worth to allevlale low water pressure Issues, These improvements Include multiple pressure reducing
valve stations to allow the transfer of portions of WS2 pressure plane to the WS3 pressure piano.
Conlraclor I William J Schultz Inc. dba Circle C Construction Co, Change Order # I 1 i Dale; 1/25/2023
City Project Mgr.I Liam Conlon I City Inspector: I John Robinson i
Phone Number:I 817-392-6824 I Phone Number:I 817-879-9818 i
Dept,
Original Contract Amount
Extras to Date
Credits to Data
Pending Change Orders (in M&C Process)
Contract Cost to Dale
!Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Water Sewer
,M, 24,=.25
$7,72012.25
$0.00
$7,724,012.26
$239,427.00
$239,427.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 259o)
JUSTIFICATION (REASONS) FOR CHANGE'ORDER
Totals Contract Time
(Calendar days)
$7,724,012,26 - 540
47,7241012,26 540
$7,710.00 300
4,012.26 840
$239,427.00
$239,427.00
0,00%
$9,655,015.31
Change Order No.1 will provide for the following:
• Revisions to five PRV electrical cabinets and site to accomodate current city standards. The old standards
were applicable at the time the project was advertised for bid,
• Adjustments) Replacements of manhole collars, valve collars and concrete meter boxes that were
encountered during construction.
I • Replacement of bollards at Z. Boaz Part(
I
Increased quantities of milling, 2-inch asphalt pavement and cement to accomodate additional pavement
i replacement on the project.
i
i • Deletion of pay item quantities that are no longer needed on the project
Staff concurs with the contractors request for 300 additional calendar days on the project for part delivery and
i for the electrical subcontractor to make the necessary revisions to the pressure reducing valves in order to meet
current city standards,
)t is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
In full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name Contraotor Name _--.Contractor Signature Date
pv I I
�Wllllam J Schultz Inc, dba Circle C Construction Co, Teri Skelly %a I f_ - zG - Z 3
Inspeotor
Dale I
ProjectMappger
Date_
Director(Wolef Dept)
DEtle
Ccllon Supervisor
Da�
Jan 27, 2023
(. t
1—) - 23
Senior Assistant Clty. Attorney
pate
I
Assistant CJity, Manager
pate
tom„
Jan 27, 2023
T�Qir2 8i�eosTiteLL
Jan 27, 2023
Councll Action (If Reduirad)-
M&C Number
NIA i
M&C Date Approved NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Ft R']C WC� H
City of Fort Worth
Change Order Additions
Project Name I Westside 2 to Wes(side 3 Pressure Plane Transfer Project
I
City Sac No,;
1 56185 1
Project No,(s): I C01468
I
DOE No,1 N/A I
City Proj. No,:
I C01468
YYGIGI J�'Jl\II11 II 11'IIVVvI11U111J UII IYIG
Protect
-
I�uJI JIU�i VI I Vll YY V, Ili lV GIIGYI❑IG IVYY
-
YYGl01 'IIGJJUIG IJJuvU.
-
IIIGJV III I�IIVYC"iI11VIItJ
I Include multiple pressure reducing valve stations to allow the transfer of portions
Description �1
of WS2 pressure plane to the WS3
Contractor I William J Schultz Inc, dba Circle C Construction Co, I Change Order:['
Date:1 1/25/2023 1
City Project Mgr. I Liam Conlon
City Inspector I John Robinson
ADDITIONS
I'(kM UESUhIf ,C1Uly
DEPT
4ty Unit
Unit Cost
l Total
84 2" Surface Milling
Water
575.00 SY
$3.60
$2,012.50
85 2" Asphalt Pvmt Type D
Water
575.00 SY
$14.60
$8,337.60
98 Cement 26#ISY
Water
40.00 TN
$450.00
$18,000.00
99 Concrete Collar (Valve)
Water
10.00 EA
$350.00
$3,500,00
100 Concrete Collar (Manhole)
Water
35.00 EA
$700.00
$24,500.00
101 Concrete Meter Box Replacement
Water
16.00 EA
$200.00
$3,200.00
102 Shoulder -Up Edge Joyce
Water
720.00 LF
$5.00
$3,600,00
103 Z Boaz Park - Bollards
Water
12.00 EA
$1,200,00
$14,400.00
104 Electrical Panel Changes
Water
5.00 EA
$6,703.20
$33,516,00
105 Electrical Panel Concrete Pad Modifications
Water
5.00 EA
$1,500.00
$7,500.00
106 Electrical Panel Post Depth Adjustment
Water
5.00 EA
$2,000.00
$10,000.00
I I
I
I I I
I I I
I
I I I
Water �$128,566.00
Sewer
Page 2 of 4 Additions Sub Total 1$126,566.00
FORT' WOR'FH City of Fort Worth
Change Order deletions
Project Name Westside 2 to Weslside 3 Pressure Plane Transfer Project ! City Sec No.: 56185
Project No,(s): C01468 I DOE No, I N/A City Proj, No.: 001468
Project Description Water system improvements on the west side of Fort Worth to alleviate low water pressure issues. These
Improvements include multiple pressure reducing valve stations to allow the transfer of portions of WS2 pressure
Contractor I William J Schultz Inc, dba Circle C Construction Co. I Change Order: F-1 ] Date I 1125/2023
City Project Mgr, Liam Conlon City Inspector: I John Robinson
DELETIONS
ITEM DESCRIPTION DEPT City Unit UnitCost Total
86 2" Asphalt Pvmt Type B Water 3,175.00 SY $14.00 $44,450.00
87 Pavement Pulverization Water 3,175.00 SY $12.75 $40,481.25
97 Contingency Water 0.2908984 LS $160,000.00 $43,634.75
Water $128,666.00
Sewer
Page 3 of 4 Deletions Sub Total $12.8,566.00
MWBE Sub
Same as original Contract
MIWBE Breakdown for this Change Order
Type of Service
Miscellaneous
Amount for this CO
$26,400.00
Total $25,400.00
Previous Change Orders
CO# DATE AMOUNT
1 -
2
3
Total $0.00
Page 4 of 4
1/26/2023
Westside 2 to Westside 3 Pressure Plane Transfer Project
CPN 01468
Change Order 1 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
.Contract Compliance Manager
By signing 1 acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Q `'1'
Signature
Liam Conlon
Name of Employee
Project Manager
Title