Loading...
HomeMy WebLinkAboutContract 48211-A3AMENDMENT No . 3 CSC No. 48211-A3 TO CITY SECRETARY CONTRACT No. 48211 WHEREAS, the City of Fort Worth (CITY) and MV Engineering, Inc., (ENGINEER) made and entered into City Secretary Contract No. 48211, (the CONTRACT) which was authorized by M&C C-27916 on the 13th day of September, 2016 in the amount of $263,877.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $19,725.00 administratively authorized on September 2, 2020 and Amendment No. 2 in the amount of $62,256.00 administratively authorized by M&C on October 11, 2020; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 96; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $123,187.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $469,045.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [SS Rehab., Contract 961 Page 1 of 2 [CPN CO26921 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth 'Dalra 6191-ahk# Dana Burghdoff (AugY2023 11�V CDT) Dana Burghdoff Assistant City Manager DATE: Aug 31 2023 APPROVAL RECOMMENDED: ch.vistooher Hader Christopher Harder (Aug 2, 2023 07:02 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER MV Engineering, Inc. David Hosseiny, P.E. Vice President DATE: 7/3/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. y-� /on ID o LrLiam Conlon Professional Engineer APPROVED AS TO FORM AND LEGALITY: 1 Mack (Aug 3, 2023 10:09 CDT) Douglas W. Black Senior Assistant City Attorney bQ4 Upn�Il � 40F FORT��O ATTEST: ;o� Pam° P PVo o=d C\�c#st, � P��4 dEXA?oO Z Jannette S. Goodall City Secretary M&C . 23-0496 Date: 06/13/2023 Form 1295: 2023-1008022 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 [SS Rehab., Contract 961 [CPN CO26921 -ni Ft MV Engineering, Inc. Committed to Excellence February 7, 2023 Tony Sholola Assistant Director City of Fort Worth Water Department 200 W. Texas Street, Fort Worth TX, 76102 Subject: Amendment No.3 to the City Secretary Contract No. 48211 (SS96 Contract) Dear Mr. Sholola, MV Engineering Inc. is requesting Amendment number three to the City secretary contract Number 48211 for additional design services as describe below: Replacement of various cast iron 2-inch to 16-inch water mains located within the Westcreek Central and Hallmark -Camelot Highland Terrace Neighborhoods, including preparation of specifications, estimates and contract documents for pavement rehabilitation (POL). Does not include drainage design if needed (see attached exhibit). Original Contract Amount $263,877.00 Amendment No.1 Amount $19,725.00 Amendment No. 2 Amount $62,256.00 Amendment No. 3 Amount $123,187.00 Total Contract Amount to date $469,045.00 Please contact George Behmanesh should you have any questions or need additional information abehmaneshnmv-enaineerina.com Sincerely, David Hosseiny P.E. Vice President 14850 Quorum Drive, suite 120 Dallas Texas 75254 Phone: (972) 733-3618; Email: info@mv-engineering.com Task I'd Task Description Hat 1.0 Project Management 1.1 Managing the Team 1.1.2 CA/QC 1.2 Cgmreunic�tiQns ar)� Reporting [ 1.2.1 re- e&gn oor ination Meeting I 1.2.2 Design Submittal Review Meetings 1 1.2.3 Prepare Baseline Schedule I 1.2.4 Prepare Monthly Progress Reports with Schedule 1.2.5 Prepare Monthly MBE/SBE Reports 20-onceptual uesrgn (su-Percent) 1 2.1 Data Collection 1 2.2 (Conceptual Design Package 1 2.2.1 I Cover Sheet 1 2.2.2 1 Exhibits and Summary 1 2.2.31 Phasing 2.2.4 1 Construction Estimate 2.3 IPOL Conceptual Design 3.0 11--relimmary uesrgn (bu Percent) 3.1 (Preliminary Design Package 3.1.11 Cover 3.1.21 Overall Layout 3.1.31 Plan and Plan/Profile Sheets 3.1.41 Specifications 3.1.51 Construction Estimate 3.2 IPOL $peci(catiorls and Estimate 3.3 [Cons ruc a i t eview 3.4 [Public Meeting at 60 % 3.5 1 Utility Clearance 4.0 11-mal uesrgn (Final Draft (90%) Construction Plans and 4.1 Specifications 4.2 (Final (100%) Plans and Specifications 4.3 (Construction Estimates (90% and 100%) 4.4 IPOL Specifications and Estimate (90 % and 100%) City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Contract 96 Additional Water Line Replacement Various Locations Supplemental City Project No. 02692 e Labor (hours) Project Principal Project EIT Man QQ r a5�40 Engineer $241 $128 $101 4 181 0 0 1 41 1 1 1 1 21 I 1 1 a4�1 I 4 I I I I I I 1 41 I I 1 221 401 1041 1 11 21 121 1 161 241 401 1 1I I 21 I 41 I I I I I 1 21 I 41 I a1 I 1 21 81 40l 1 1 19 681 150 I 1 I 21 1 41 1 81 241 501 I 41 61 e1 I 11 al 61 1 21 161 481 I I I 21 1 21 I I I 11 61 21 21 201 541 941 81 241 401 1 81 161 161 I 1 21 4I 4I 1 21 2l t0 34 ense CADD IE>S Administrative Total Labor Subconsultant Total Expense R Remaining Task Sub Total %Complete Cost Travel Reproduction Cost Budget $8 $60 SBE/MWBE Non-MWBE- 0 0 $5,287 $0 $0 $d $0 $0 $5,287 1 $956 $0 $966 I 1 $480 I $0 $480 I $960 $0 $960 I $960 1 $0 $960 I $960 1 $0 $960 1 0 $960 $0 $960 881 0 $27,977 Sol $0 s0 $100 $100 $28,077 1 $1,712 1 $0 $1,712 801 $17,364 I l $100 $100 $17,464 al $1,541 I $0 $1,541 1 $0 I so $0 I so I l $0 so $1,802 I I $0 $1,802 $5,557 1 $0 $5,557 130 0 $38,859: $01 $0 $01 $100 $100 $38,959 1 I $0 $0 I Sol I I Sol $0 81 $1,5411 1 I 1 Sol $1,541 1201 $22,6981 1 I $100 $1001 $22,798 I $2,7941 I Sol $2,794 I I $2,0741 I I I $01 $2,0741 I f $7,3911 1 I 1 1 $0 $7,3911 I I Sol 1 1 1 Sol sot I I $7361 I I I 1 2 1 S1,6261 I I 1 $01 $1,6261 80 11 $28,1761 $Ol $01 $01 $2001 $2001 $28,3761 1 56 11 $13,5841 I I $1001 $100 $13,6a41 24 1 $7,5031 1 I $1001 $100 $7,6081 1 I $1,3971 I I 1 s0 $1,3971 1 I I $5,6881 I I 1 s0 $5,6881 1 Labor (hours) Expense Task No. Task Description Principal Project Projecta EIT CADD I Administrative Total Labor Subconsultant Total Expense Task Remaining Sub Total %Complete Man QQ r M Engineer Cost Travel Reproduction Cost p Budget Rate $241 0 $128 $101 $80 $60 SSEIMWBE Non-MWBE 5.0 Bid Phase 0 0 0 0 01 0 $0 $0 $0 SO $Sod $500 $500 5.1 Bid Support 1 5.1.1 Upload Documents to AutoDesk I $0 $0 $0 Sell Contract Documents and Maintain Plan Holders 5.1.2 List $0 $500 $500 $500 5.1.3 Issue Addenda $p $0 $0 5.1.4 Attend Bid Opening I 1 $0 $0 $0 5.1.5 Tabulate Bids and Recommend Award $0 $0 $0 5.2 Mylar Drawings $0 $0 $0 6.0 uonstructlon Phase Services 0 i 4 8 81 1 $2,502 $0 $0 $0 $250 $250 $2,752 6.1 Construction Support 1 6.1.1 Attend Preconstruction Conference 1 $0 $0 $0 6.1.2 Attend Public Meeting I 1 $a $0 SO 6.1.3 Site Visit with reports I I $o I 6.2 Record Drawings/As Built 2 41 8 el 1 $2,502 $250 $250 $2,752 , 7.0 RCYWkasement Services d 0 41 $ of 0 $1,322 $ol $01 $0 $0 $0 $1,322 1 7.1 Right -of -Entry Documents 0 41 8 of $1,322 1 1 $0 $1,322 I 8.0 0 6 61 12 1211 0' $4,384 $123001 $01 $01 $0 $12,300 $16,6848.1 uesign Survey By isononoona 0 1 $0 $12:3001 1 $p I 1.urvey 8.2 Penn. And Temp Esmis. I I $01 I I 8.3 Review and apply survey info by MVE 61 61 12 121 $4,384 1 I 1 S0 $4.384 1 Totals 6 871 1761 3761 3181 2 $108,507 $12,3001 ul $01 $1,150 $13,45a $121,957.41 ) For Additional 4,358 LF of Water Line Replacement I Project Summary (A) Total Fee $123,187 I Total Hours 965 (8) Survey Fee -$13,530 ToalLabor $ (C) Total Fee (-) survey Fee $109,657 Total E50 13l $13,450, I MBEISBE Subconsultant $12,300 1 Description WP Water I I Non-MBEISBE Subconsultant $0 1 Conceptual Design (30%) 31 $32,897.10 I I 10% Sub Markyy $1,230 Preliminary uesign w-/.) 32 $65,794.20 1 I MBE/SBE Participation 10.0% anal uesign (1 /) 33 $10,965.70 I I Total Project Cost $123,187.00 Survey 51 $13,530.001 Total $123,187.001 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 13, 2023 LOG NAME: 60SSRC96A3-MVE REFERENCE NO.: **M&C 23-0496 SUBJECT: (CD 8) Authorize Execution of Amendment No. 3 in the Amount of $123,187.00 to an Engineering Agreement with MV Engineering, Inc. for Sanitary Sewer Rehabilitation Contract 96 Project for a Revised Contract Amount of $469,045.00 and Adopt an Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 3 in the amount of $123,187.00 to an engineering agreement with MV Engineering, Inc., for Sanitary Sewer Rehabilitation Contract 96 project for a revised contract amount of $469,045.00; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $123,187.00, from available funds, for the purpose of funding the Sanitary Sewer Rehabilitation Contract 96 project (City Project No. CO2692) to effect a portion of Water's contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: On September 13, 2016, Mayor and Council Communication (M&C) C-27916, the City Council authorized an engineering agreement in the amount of $263,877.00 with MV Engineering, Inc. (City Secretary Contract No. 48211) and an additional $131,123.00 for related expenses for a project total of $395,000.00 for the Sanitary Sewer Rehabilitation Contract 96. The contract was subsequently revised by Amendment No. 1 in the amount of $19,725.00, administratively authorized September 2, 2020, that provided for additional survey and design on the project and Amendment No. 2 in the amount of $62,256.00, authorized by the City Council on October 11, 2022, that provided design for the replacement of deteriorated water and sanitary sewer mains on Hallmark Drive. Amendment No. 3 will provide for the replacement of deteriorated cast iron water mains located in the immediate vicinity of the project on the following streets: Street Highland Terrace Rockdale Road Sheridan Road Sheridan Road Lenor Street Cairn Circle I.H. 20 Frontage Road From To Dupont Circle Sheridan Roac Highland Terrace (Alden Drive Highland Terrace North 450 feet Alta Mesa Boulevard ISouth 350 feet Edgecliff Road North 400 feet Basil Avenue IlEdgecliff Road McConnell Drive 1I0dell Drive It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows: 60SSRC96A3-MVE Capital project FY2023 CIP Budget Change Revised Fund Name Appropriations Authority (Increase/Decrease) FY2023 Name Budget Fund CO2692 — 56002 Sanitary — W&S Sewer $0.00 This M&C $123,187.00 $123,187.00 Capital Projects Rehabilitation Funding is budgeted in the Unspecified -All Funds project within the Water & Sewer Capital Projects Fund for the purpose of funding the Sanitary Sewer Rehabilitation Contract 96 project. Appropriations for Sanitary Sewer Rehabilitation Contract 96 project are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total* W&S Capital Projects — Fund $62,256.00 $123,187.00 $185,443.00 56002 Sewer Capital Fund - 59607 $395,000.00 $0.00 $395,000.00 Project Total $457,256.00 $123,187.00 $580,443.00 *Numbers rounded for presentation purposes. Business Equity: MV Engineering, Inc., is in compliance with the City's Business Equity Ordinance by committing to 100 percent MWBE participation on this project. The City's MWBE goal on this project is 8 percent. Additionally, MV Engineering, Inc. is a certified M/WBE firm. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the Unspecified -All Funds project within the W&S Capital Projects Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the Sanitary Sewer Rehabilitation project to support the approval of the above recommendations and execution of the contract amendment. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs).: TO Fund Department Account Project Program ctivity Budget Reference # mount ID ID Year (Chartfield 2) r FROM Fund Department (Account Project Programl�4ctivity Budget Reference # �4mount ID I ID I Year (Chartfield 2) CERTIFICATIONS: Submitted for Citv Manaqer's Office bv: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Liam Conlon (6824) ATTACHMENTS 1. 60SSRC96A3-MVE 1295.pdf (CFW Internal) 2. 60SSRC96A3-MVE Compliance Memo.pdf (CFW Internal) 3. 60SSRC96A3-MVE FID Table (WCF 04.11.23).xlsx (CFW Internal) 4. 60SSRC96A3-MVE funds availabilitv.pdf (CFW Internal) 5. 60SSRC96A3-MVE MAP.pdf (Public) 6. Entitylnformation-MVE.pdf (CFW Internal) 7. ORD.APP 60SSRC96A3-MVE 56002 A023(r2).docx (Public) 8. PBS CPN CO2692.pdf (CFW Internal) 60SSRC96A2MVEFUNDING FID Table 2 56002 0600430 4956001 UNSPEC 2023 ($123,187.00) 2 56002 0600430 CO2692 2023 $123,187.00 2 56002 0600430 UNSPEC 2023 ($123,187.00) 1 2 56002 0600430 4956001 CO2692 001730 9999 ($123,187.00)