Loading...
HomeMy WebLinkAboutContract 52902-FP1Dept FW060 AC Received 08.02.23 Vendor ID # 36412 Vendor Name: FLOW LINE CONSTRUCTION INC. Invoice No.: 52902-FP1 Invoice Date: 08/01/2023 F I D: 56017-2060000-100888-R ETAI N Amount $412,286.15 FORT WORTH WATER DEPARTMENT ENGINEERING AND FISCAL SERVICES NOTICE OF PROJECT COMPLETION CSC No. 52902-FP1 56017-100888 CSC 52902 Regarding contract 52902 for Churchill Road Water and Sanitary Sewer Improvements as requested by the Water Department as approved by City Council on 9-24-2019 through M&C 19-0197 the Director of the Water Department, upon the recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery, Water Department, has accepted the project as complete. Original Contract Price: $8,136,955.00 Amount of Approved Change Orders: 1-4 $742,493.18 Revised Contract Amount: $8,879,448.18 Total Cost Work Completed: $8,245,725.05 Less Previous Payments: $7,833,438.90 Less Deductions: Subtotal: $412,286.25 Liquidated Damages: 0 Days @ $730.00/Dav Other Deductions (see comments): $0.00 Amount of Retainage @ 5% $412,286.15 Total Deduction Amount: $0.00 Final Payment Due: $412,286.15 Note: Pursuant to settlement agreement issued July,7 2023, $340,000.00 will be paid by the City of Fort Worth, upon City Council approval 401N .Sh 0 0 43 23 Recommended for Acceptance Date Assistant Director, Water Department Christopher H der(Aug 3, 202310:35 CDT) Accepted Date Director, Water Department Data EGdYgi' k# Dana Burghd off (Aug '3'2023 11:'L CDT) City Manager Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Project Name: Churchill Road Water and Sanitary Improvements DOE No: COMMENTS: NONE City Project Numbers 100888 Contract Name Churchill Road Water and Sanitary Sewer Improvements Contract Limits Council district 2 Project Type Water & Sewer Project Funding 56017-100888 CS 52902 DOE Number 1008 Estimate Number 45 Payment Number 45 For Period Ending 5/31/2023 Project Manager Brown City Secretary Contract Number 52902 Inspectors Johnson, D / Drake, C Contract Date 9/24/2019 Contractor Flow -Line Construction, Inc. Contract Time 906 CD PO Box 600881 Days Charged to Date CD Dallas, TX 75360 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $8,245,725.05 Less 0 % Retained $0.00 Net Earned $8,245,725.05 Earned This Period $412,286.25 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $7,833,438.80 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $412,286.25 Tuesday, August 1, 2023 Page 8 of 8 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name Churchill Road Water and Sanitary Sewer Improvements Contract Limits Council district 2 Project Type Water & Sewer City Project Numbers 100888 DOE Number 1008 Estimate Number 45 Payment Number 45 For Period Ending City Secretary Contract Number 52902 Contract Date 9/24/2019 Project Manager Brown Contractor Flow -Line Construction, Inc. PO Box 600881 Inspectors Dallas, TX 75360 Johnson, D / Drake, C Contract Tim Days Charged to Dati Contract is 93.000 5/31/2023 CD e 906D Complete Tuesday, August 1, 2023 Page] of 8 City Project Numbers 100888 DOE Number 1008 Contract Name Churchill Road Water and Sanitary Sewer Improvements Estimate Number 45 Contract Limits Council district 2 Payment Number 45 Project Type Water & Sewer For Period Ending 5/31/2023 Project Funding Water Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 33 — — — — — 8" PVC C900 DR 14 Sewer Pipe With 20 — — — — — — 3 EA — — — — $3,000.00 — — — — $9,000.00 — — — — 2 — — -- $6,000.00 34 12" PVC C900 DR 14 Sewer Pipe With 2 3 EA $8,000.00 $24,000.00 35 Fire Hydrant 8 EA $4,000.00 $32,000.00 8 $32,000.00 36 Connection to Existing 4"-12" Water 13 EA $5,000.00 $65,000.00 18 $90,000.00 37 3" Combination Air Valve Assembly fo(CO#2) 0 EA $30,000.00 $0.00 0 $0.00 38 1" Water Service, Meter Reconnection 130 EA $60.00 $7,800.00 117 $7,020.00 39 1" Water Service 130 EA $1,200.00 $156,000.00 117 $140,400.00 40 2" Water Service, Meter Reconnection I EA $130.00 $130.00 7 $910.00 41 2" Water Service 1 EA $3,100.00 $3,100.00 7 $21,700.00 42 6" Gate Valve 10 EA $1,300.00 $13,000.00 10 $13,000.00 43 8" Gate Valve 33 EA $2,000.00 $66,000.00 31 $62,000.00 44 16" Gate Valve WITHOUT Vault I EA $8,000.00 $8,000.00 1 $8,000.00 45 20" Gate Valve WITHOUT Vault 2 EA $25,000.00 $50,000.00 2 $50,000.00 46 24" Gate Valve w/ Vault 3 EA $40,000.00 $120,000.00 3 $120,000.00 47 12" x 8" Tapping Sleeve & Valve 2 EA $10,000.00 $20,000.00 1 $10,000.00 48 8" Blow Off Valve 6 EA $20,000.00 $120,000.00 6 $120,000.00 49 Traffic Control 24 MO $2,700.00 $64,800.00 25.5 $68,850.00 50 Portable Message Sign 104 WK $400.00 $41,600.00 26 $10,400.00 51 Replace/Reconstruction of Mailbox 3 EA $1,000.00 $3,000.00 3 $3,000.00 52 Water Line Grouting 70 CY $200.00 $14,000.00 32 $6,400.00 53 Cement(CO#3) 591.5 TN $275.00 $162,662.50 465 $127,875.00 54 3" Asphalt Pavement, Type D 44100 SY $18.00 $793,800.00 43474.65 $782,543.70 55 HMAC Transition 200 TN $144.00 $28,800.00 81.83 $11,783.52 56 6" Concrete Driveway 1700 SF $15.00 $25,500.00 2056.99 $30,854.85 57 6" Concrete Curb and Gutter (Match E 1400 LF $35.00 $49,000.00 1520 $53,200.00 58 11" Pulverization (and mix with 26# 44100 SY $7.00 $308,700.00 43474.65 $304,322.55 59 Imported EmbedmentBackfill, Select 800 CY $35.00 $28,000.00 0 $0.00 60 Imported EmbedmentBackfill, CLSM, A 800 CY $100.00 $80,000.00 170 $17,000.00 61 ADA Ramp 4 EA $1,700.00 $6,800.00 1 $1,700.00 62 Curb Address Painting 40 EA $50.00 $2,000.00 63 Miscellaneous Allowance for Irrigati 1 LS $10,000.00 $10,000.00 Tuesday, August 1, 2023 Page 2 of 8 City Project Numbers 100888 DOE Number 1008 Contract Name Churchill Road Water and Sanitary Sewer Improvements Estimate Number 45 Contract Limits Council district 2 Payment Number 45 Project Type Water & Sewer For Period Ending 5/31/2023 Project Funding 64 Pavement Markings, Stop Bar 165 LF $9.00 $1,485.00 65 12-inch Solid Pavement Marking (Cros 120 LF $9.00 $1,080.00 66 Construction Allowance 1 LS $200,000.00 $200,000.00 67 8" Water Line Lowering (Not Called F 10 EA $4,400.00 $44,000.00 68 6" - 12" Tree Removal 2 EA $500.00 $1,000.00 69 12" - 18" Tree Removal 2 EA $750.00 $1,500.00 70 18" - 24" Tree Removal 2 EA $1,000.00 $2,000.00 71 24" & Larger Tree Removal 2 EA $1,400.00 $2,800.00 72 7' Wide Asphalt Pavement Repair, Ind 70 SY $60.00 $4,200.00 67 $4,020.00 73 Asphalt Pavement Repair Beyond Defin 10 SY $60.00 $600.00 74 CSS Encasement for Utility Pipes (No 100 CY $98.00 $9,800.00 507.05 $49,690.90 75 Connection to Existing 20" Water Mai I EA $10,000.00 $10,000.00 1 $10,000.00 76 Connection to Existing 36" Water Mai 1 EA $15,000.00 $15,000.00 1 $15,000.00 77 Manhole Adjustment, Minor (INC. STOR 11 EA $300.00 $3,300.00 7 $2,100.00 78 Valve Box Adjustment 80 EA $135.00 $10,800.00 87 $11,745.00 79 Asphalt Driveway (4" HMAC on 6" CTB) 170 SY $150.00 $25,500.00 117 $17,550.00 1-A 24" PVC C900 Water Pipe (Restrained (CO#2) 7405 LF $175.00 .,295,875.00 7124 1,246,700.00 2-A 24" DIP Water (Restrained Joints) 140 LF $200.00 $28,000.00 196 $39,200.00 1-13 24" DIP Water (Restrained Joints) 7640 LF 1-C 24" Concrete AWWA C303 Water Pipe (R 7640 LF 1-D 24" Steel AWWA C200 Water Pipe (Rest 7640 LF 3-13 Cathodic Protection system, includin 1 LS 4 20" Concrete AWWA C303 Water Pipe (R 40 LF $785.00 $31,400.00 40 $31,400.00 5 16" PVC C900 Water Pipe (Restrained 20 LF $240.00 $4,800.00 6 16" DIP Water (Restrained Joints) 20 LF $200.00 $4,000.00 30 $6,000.00 7 8" PVC Water Pipe (CO#2) 11401 LF $65.00 $741,065.00 10660 $692,900.00 8 8" DIP Water 250 LF $100.00 $25,000.00 230 $23,000.00 9 6" PVC Water Pipe 120 LF $60.00 $7,200.00 140 $8,400.00 10 Construction Staking 1 LS $40,000.00 $40,000.00 1 $40,000.00 11 Red Line As -Built Survey 1 LS $5,000.00 $5,000.00 1 $5,000.00 12 36" Water Abandonment Plug 3 EA $1,000.00 $3,000.00 2 $2,000.00 13 4"-12" Water Abandonment Plug 33 EA $200.00 $6,600.00 5 $1,000.00 14 Salvage 6" Water Valve 8 EA $100.00 $800.00 15 Salvage 8" Water Valve 2 EA $100.00 $200.00 Tuesday, August 1, 2023 Page 3 of 8 City Project Numbers 100888 Contract Name Churchill Road Water and Sanitary Sewer Improvements Contract Limits Council district 2 Project Type Water & Sewer Project Funding 16 Salvage 12" Water Valve 17 Salvage Fire Hydrant 18 SWPPP>_ 1 Acre 19 Temporary Asphalt Paving Repair (2" 20 Utility Service Surface Restoration 21 Temporary Water Service 22 Exploratory Excavation of Existing U 23 Trench Safety 24 12" Split Steel Casing By Open Cut 25 16" Split Steel Casing by Open Cut 26 20" Split Steel Casing By Open Cut 27 Installation of 8" Water Carrier Pip(CO#2) 28 Installation of 16" Water Carrier Pi (CO#2) 29 Installation of 24" Water Carrier Pi (CO#2) 30 Ductile Iron Water Fittings ,Y/Restr 31- Ductile Iron Water Fittings w/Restr 31- Ductile Iron Water Fittings w/Restr 31- C303 Fittings (for 24") 31- Steel Fittings (for 24") 32 C303 Fittings (for 20") 80 Installation of 8" DIP Carrier Pipe in 24" Casing (CO#2) 81 Installation of 16" DIP Carrier Pipe in 36" Casing (CO#2) 82 Installation of 24" DIP Carrier Pipe in 42" Casing (CO#2) 83 2" Conbination Air Valve Assembly for Water (CO#2) 84 Remove Exisiting Water Meter (CO#2) 85 Relocate Existing Water Meter (CO#2) 86 Claim #4 Incurred Cost Associated w/waterline @ USACE levee(CO#2) 87 Additional excavation /backfill bore pits 4 VF(CO#2) 88 PCO-19 Technology Bld. Rent on Shoring(CO#2) 89 PCO-19 Re-Excate Receiving pit (CO#2) 90 Claim #3 CLSM backfill as Directed (CO#2) DOE Number 1008 Estimate Number 45 Payment Number 45 For Period Ending 5/31/2023 6 EA $100.00 $600.00 7 EA $300.00 $2,100.00 1 LS $50,000.00 $50,000.00 1 $50,000.00 19600 LF $10.00 $196,000.00 18016 $180,160.00 400 SY $12.00 $4,800.00 400 $4,800.00 1 LS $212,000.00 $212,000.00 1 $212,000.00 10 EA $1,700.00 $17,000.00 14 $23,800.00 15200 LF $5.00 $76,000.00 14509 $72,545.00 60 LF $250.00 $15,000.00 30 $7,500.00 80 LF $280.00 $22,400.00 80 LF $300.00 $24,000.00 20 $6,000.00 0 LF $650.00 $0.00 0 $0.00 0 LF $1,000.00 $0.00 0 $0.00 0 LF $1,300.00 $0.00 0 $0.00 6 TN $12,000.00 $72,000.00 6.51 $78,120.00 18 TN $12,000.00 $216,000.00 24.34 $292,080.00 18 TN 1 LS I LS 1 LS $6,000.00 $6,000.00 1 $6,000.00 249 LF $691.52 $172,188.48 249 $172,188.48 160 LF $1,047.55 $167,608.00 160 $167,608.00 325 LF $1,344.93 $437,102.25 325 $437,102.25 6 EA $26,677.08 $160,062.48 6 $160,062.48 4 EA $1,200.00 $4,800.00 4 $4,800.00 4 EA $1,000.00 $4,000.00 4 $4,000.00 1 LS $121,276.51 $121,276.51 1 $121,276.51 1 LS $9,642.86 $9,642.86 1 $9,642.86 1 LS $19,161.09 $19,161.09 1 $19,161.09 1 LS $20,251.52 $20,251.52 1 $20,251.52 1 LS $48,532.90 $48,532.90 1 $48,532.90 Tuesday, August 1, 2023 Page 4 of 8 City Project Numbers 100888 DOE Number 1008 Contract Name Churchill Road Water and Sanitary Sewer Improvements Estimate Number 45 Contract Limits Council district 2 Payment Number 45 Project Type Water & Sewer For Period Ending 5/31/2023 Project Funding 91 Modification to Phase 2A Pulveriz & Paving (C093) I LS $31,215.50 $31,215.50 1 $31,215.50 92 Modification to Phase 2B Pulveriz & Paving (CO#3) I LS $21,199.18 $21,199.18 1 $21,199.18 95 Replace BH Meter @ Meeker w/2 std 1" meters 1 LS $12,779.53 $12,779.53 1 $12,779.53 (CO#3) Sub -Total of Previous Unit $6,982,417.80 $6,467,490.82 ---------------------------------- Sewer Item Description of Items No. -------------- 12 Temporary Asphalt Paving Repair (2" 13 Misc. Conc Remove & Replace (Steps) 14 6" Concrete Driveway 15 6" Concrete Curb and Gutter (Match E 16 7" Conc Valley Gutter, Residential 17 Utility Service Surface Restoration 18 Pre -CCTV Inspection 19 Post -CCTV Inspection 20 Manhole Vacuum Testing 21 Exploratory Excavation of Existing U 22 Trench Safety(CO#1) 23 Concrete Collar (CO#4) 24 4" Server Service 25 Epoxy Manhole Liner 26 4' Manhole 27 4' Drop Manhole (CO#4) 28 4' Extra Depth Manhole(CO#1) 29 4' Shallow Manhole 30 Traffic Control (CO#4) 31 Portable Message Sign 32 2' Concrete Gutter 33 Construction Allowance(CO#1) 34 6" - 12" Tree Removal 35 24" & Larger Tree Removal 36 CSS Encasement for Utility Pipes (No 37 Manhole Adjustment, Minor Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total ------------------------ 7500 LF $10.00 $75,000.00 8678 $86,780.00 70 SF $15.00 $1,050.00 70 $1,050.00 2300 SF $15.00 $34,500.00 2352.09 $35,281.35 1700 LF $35.00 $59,500.00 1611.5 $56,402.50 120 SY $110.00 $13,200.00 216.9 $23,859.00 600 SY $12.00 $7,200.00 600 $7,200.00 6800 LF $1.00 $6,800.00 972.5 $972.50 6800 LF $4.00 $27,200.00 7185 $28,740.00 35 EA $200.00 $7,000.00 14 $2,800.00 4 EA $1,700.00 $6,800.00 4 $6,800.00 8823 LF $2.00 $17,646.00 7332 $14,664.00 65 EA $750.00 $48,750.00 65 $48,750.00 120 EA $1,300.00 $156,000.00 80 $104,000.00 260 VF $250.00 $65,000.00 127 $31,750.00 28 EA $9,000.00 $252,000.00 32 $288,000.00 5 EA $10,000.00 $50,000.00 5 $50,000.00 42 VF $215.00 $9,030.00 75 $16,125.00 3 EA $8,000.00 $24,000.00 3 $24,000.00 12 MO $3,100.00 $37,200.00 18 $55,800.00 24 WK $400.00 $9,600.00 20 $8,000.00 270 LF $35.00 $9,450.00 0.2 LS $70,000.00 $14,000.00 4 EA $500.00 $2,000.00 1 EA $1,400.00 $1,400.00 100 CY $98.00 $9,800.00 20 $1,960.00 58 EA $220.00 $12,760.00 65 $14,300.00 Tuesday, August 1, 2023 Page 5 of 8 City Project Numbers 100888 DOE Number 1008 Contract Name Churchill Road Water and Sanitary Sewer Improvements Estimate Number 45 Contract Limits Council district 2 Payment Number 45 Project Type Water & Sewer For Period Ending 5/31/2023 Project Funding 38 Asphalt Driveway (4" HMAC on 6" CTB) 160 SY $150.00 $24,000.00 16 $2,400.00 1 10" Sewer Pipe PVC (SDR 26) 500 LF $66.00 $33,000.00 443 $29,238.00 2 8" Sewer Pipe PVC (SDR 26) (CO# 1) 6323 LF $65.00 $410,995.00 5986 $389,090.00 3 10" PVC (C900 DR18) (Sewer Pipe) 30 LF $205.00 $6,150.00 20 $4,100.00 4 8" PVC (C900 DR18) (Sewer Pipe) (CO#4) 883 LF $200.00 $176,600.00 883 $176,600.00 5 Construction Staking(CO#1) 1.0869 LS $40,000.00 $43,476.00 1.0869 $43,476.00 6 Red Line As -Built Survey 1 LS $5,000.00 $5,000.00 0.93 $4,650.00 7 Replace/Reconstruction of Mailbox 3 EA $1,000.00 $3,000.00 6 $6,000.00 8 Remove 6" Sewer Line 2100 LF $20.00 $42,000.00 353 $7,060.00 9 Remove 4' Sewer Manhole(CO#1) 20 EA $1,000.00 $20,000.00 22.5 $22,500.00 10 Concrete Encase Sewer Pipe 10 CY $125.00 $1,250.00 5 $625.00 11 SWPPP> 1 Acre(CO#1) 1.06 LS $50,000.00 $53,000.00 1.06 $53,000.00 39 6" Sewer Pipe PVC (SDR26) w/fittings con.to 77 LF $117.83 $9,072.91 77 $9,072.91 exist(CO# 1) 40 6" Sanitary Sewer Two Waty Cleanout(CO#1) 2 EA $3,173.67 $6,347.34 2 $6,347.34 41 4' Drop MH Relo(out of Levee)(CO# 1) 1 EA $8,000.00 $8,000.00 1 $8,000.00 42 Grout/ Abandon Exist 6" PVC Sewer Pipe(in Levee) 5 CY $300.00 $1,500.00 5 $1,500.00 (CO# 1) 43 Import& Install Special Levee backfill (CO#1) 289 CY $142.63 $41,220.07 289 $41,220.07 44 Re -Route 4" Sewer Service @ 800 Churchill 1 LS $3,118.38 $3,118.38 1 $3,118.38 Rd.(CO# 1) 92 Modification to Phase 2A Pulverizing Paving (CO#3) I LS $31,215.50 $31,215.50 1 $31,215.50 94 Modification to Phase 2B Pulverizing Paving (CO#3) 1 LS $21,199.18 $21,199.18 1 $21,199.18 53 ----------------------------------------- Cement(CO#4) 38.5 TN $275.00 $10,587.50 38.5 $10,587.50 -------------------------------------- Sub-Total of Previous Unit $1,907,617.88 $1,778,234.23 Tuesday, August 1, 2023 Page 6 of 8 City Project Numbers 100888 Contract Name Churchill Road Water and Sanitary Sewer Improvements Contract Limits Council district 2 Project Type Water & Sewer Project Funding Contract Information Suminary Original Contract Amount ChanEe Orders Change Order Number 1 Change Order Number 2 Change Order Number 3 Change Order Number 3 Change Order Number 4 DigUly signed by Eduardo M. Hernandez DN: C=US, E=edU.dohernandez@kb-fneon,Wcb.n..o , Eduardo M. Hernandezo=71--LIneD�nsw9nn.,n ,DN_EdeardoM. Hernandez Date: 2Q2ff8B Te13:00A9-05'C0' CC Contractor1111 Date P /—',� Inspection Supervisor P/ �N", q� Date Pro ct Manager ((^^ �1JIJ14 I I rr�� Date Asst. DirectorlFCC�f� �Christopher Ha der (AuR 3, 202310:35 CDT) Date Director/ Contracting Department DOE Number 1008 Estimate Number 45 Payment Number 45 For Period Ending 5/31/2023 $8,136,955.00 $22,705.70 $405,066.09 $54,606.71 $41,827.18 $218,287.50 Total Contract Price $8,890,035.68 Total Cost of Work Completed $8,245,725.05 Less 0 % Retained $0.00 Net Earned $8,245,725.05 Earned This Period $412,286.25 Retainage This Period $0.00 Less Liquidated Damages Days n / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $7,833,438.80 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $412,286.25 Tuesday, August 1, 2023 Page 7 of 8 FORTWORTH rev 03/05/07 WATER ENGINEERING & FISCAL SERVICES FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.45 NAME OF PROJECT: Churchill Road Water and Sewer Improvements PROJECT NO.: 100888 CONTRACTOR: Flow Line CITY PROJECT 100888 PERIOD FROM 07/01/23 TO: 07/10/23 FINAL INSPECTION DATE: 3/27/2023 WORK ORDER EFFECTIVE 12/2/2019 CONTRACT TIME 885 O WD OO CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. x 16. x 2. x 17. x 3. x 18. x 4, x 19. x 5. x 20. x 6. x 21. xx 7. x 22. x 8. x 23, x 9. x 24. x 10. x 25. x 11, x 26, x 12. x 27. x 13. x 28. x 14, x 29. x 15. x 30. x 31. x SAT, SUN, RAIN, TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS OTHERS* & TOO COLD RELOCATIONS CHARGED DAYS THIS PERIOD 0 0 PREVIOUS PERIOD 1082 1082 ITOTALS TO DATE 1082 1082 *REMARKS All major work as been as 11/17/2022 (1082 Days) Digitally signed by Eduardo M. Hernandez ON: C=US, / _ E=eduardo.hernandez(c_Dllow-lineconsimclion.com, Eduardo M. Hernandez 0=71ow-line Construction, Inc', CN=Eduardo M. rrmn— Date: 2023.08.01 13:00:1 "T0d CONTRACTOR DATE ECTOR _ DXTE Capital Projects DelivelT, Water Department The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, T176012-6311 (817) 392 - 4477 • Fax: (817) 392 - 8460 FORTWORTHREV: 02/20/07 Capital Projects Delivery, Water Department PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR & PROJECT DATA Name of Contractor Project Name FLOW LINE Churchill Road Water and Sanitaary Improvements Water Engineering Inspector DOE Number Carmen Drake Water Engineering Inspector Project Manager O Water i] Waste Water ❑ Storm Drainage 0 Pavement L.Hamilton bitlial Contract Amount Project Difficulty $8,136,955,00 OO Simple !'haul Contract Amomtt Date $8,890,035.68 7/10/2023 II) PERFORMANCE EVALUATION 0 - Inadequate I - Deficient 2 - Standard 3 - Good 4 - Excellent ELEMENT WEIGHT (x) APPLICABLE(YIN) I Submission of Documents 2 Y 12 Public Notifications 5 Y 13 Plans on Site 5 Y 14 Field Supervision 15 Y 15 Work Performed 15 Y 16 Finished Product 15 Y 17 Job Site Safety 15 Y 8 Traffic Control Maintenance 15 Y 9 Daily Clean Up 5 Y 10 Citizen's Complaint Resolution 5 Y I 1 Property Restoration 5 Y 112 After Hours Response 5 Y 113 Project Completion 5 Y O Routine O Complex RATING (0 - 4) MAX SCORE SCORE 3 8 6 2 20 10 1 20 5 1 60 15 1 60 15 1 60 15 1 60 15 l 60 15 1 20 5 2 20 10 2 20 10 2 20 10 2 20 10 TOTAL ELEMENT SCORE (A) 141 BONUS POINTS (25 Maximum) (B) TOTAL SCORE (TS) 141 III) CONTRACTOR'S RATING Maximum Score (MS) = 448 or sum of applicable element score maximums which = 448 Rating ( ITS / MSI * 100%) 141 / 448 = 31% Performance Category Deficient <20% = Inadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good Inspector's Cmnments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature Inspector Signature � Signature Contractor Signature Inspector's Supervisor CONTRACTOR'S COMMENTS >_80% = Excellent Dig My s'g,e by Ed,,,d, K H-dez ON: F'N5, E=eRa L neCan fiann,lne, N=Eddao,Me , Eduardo M. Hernandez a. ea �p mtl;ery,pc, CN=Edua de 6,. Hernandez Da1e: 2023.03.01 13.00:04-03'00' Capital Projects Delivery, Water Department The City of Fort Worth • 1000 Throckmorton Sheet • Fort Worth, TX 76012-6311 (817) 392 - 4477 • Fax: (817) 392 - 8460 FORT WORTH Capital Projects Delivery, Water Department CONTRACTOR'S EVALUATION OF CITY I) PROJECT INFORMATION Name of Contractor Flow -Line Water Engineering Inspector Carmen Drake DOE Number Pimple ject Di�culry • Routine Initial Contract Amount $8,136,955.00 II) PERFORMANCE EVALUATION 0 - Inadequate 1 - Deficient 2 - Standard I ELEMENT REV: 02/22/07 Date: 110-Jul-23 Project Name Churchill Road Water and Sanitary Sewer Improvements Project Manager P. Hamilton Tj pe of Contract 0 Complex 0 Water m Waste Water 11 Storm Drainage ua Pavement Final Contract Amount $8,890,035.68 3 - Good 4 - Excellent RATING ELEMENT (0-4) INSPECTION EVALUATION 1 Availability of Inspector 3 12 Knowledge of Inspector 2 13 Accuracy of Measured Quantities 2 4 Display Of Professionalism 2 5 Citizen Complaint Resolution 2 6 Performance - Setting up Valve Crews, Labs 2 ADMINISTRATION 11 Change Order Processing Time 1 �2 Timliness of Contractor Payments 1 3 Bid Opening to Pre -Con Meeting Timeframe 4 III) COMMENTS & SIGNATURES COMMENTS Eduardo M. Hernandez Signature Contractor Signature Inspector Signature Inspector's Supervisor INSPECTOR'S COMMENTS PLANS & SPECIFICATIONS 1 Accuracy of Plans to Existing Conditions 1 RATING (0-4) 2 Clarity & Sufficiency of Details 1 3 Applicability of Specifications 2 4 Accuracy of Plan Quantities 2 PROJECT MANAGER EVALUATION I Knowledge And/Or Problem Resolution 1 2 Availability of Project Manager 2 3 Communication 2 4 Resolution of Utility Conflicts 1 geewa,rx,wwmss Capital Projects Delivery, Water Department The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 4477 • Fax: (817) 392 - 8460 PROJECT NAME: PROJECT NUMBER: DOE NUMBER: PIPE LAID PVC C 900 Ductile Iron Concrete C 303 Ductile Iron PVC C 900 Ductile Iron PVC C 900 FIRE HYDRANTS: 8 PIPE ABANDONED 12" Abandoned DENSITIES: NEW SERVICES: PIPE LAID 8 PVC C 900 DR 26 PVC C 900 (SDR 26) PVC CC900DR18 PVC C C 900 DR 18 PIPE ABANDONED DENSITIES: NEW SERVICES: FORTWORTH WATER ENGINEERING & FISCAL SERVICES PIPE REPORT FOR: Churchill Road Water and Sanitary Improvements 100888 WATER SIZE TYPE OF PIPE LF 24 Water 7124 24 Water 196 20 Water 40 16 Water 30 8 Water 10660 8 Water 230 6 Water 140 VALVES (16" OR LARGER) 6 SIZE TYPE OF PIPE LF 12 Water 198 Passed for the entire project yes SEWER SIZE TYPE OF PIPE LF 8 5986 10 443 10 20 8 SIZE TYPE OF PIPE LF PASSED WATER ENGINEERING & FISCAL SERVICES The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 4477 • Fax: (817) 392 - 8460 CONTRACTOR'S AFFIDAVIT OF BILLS PAID STATE OF TEXAS COUNTY OF DALLAS Personally, before me the undersigned authority, on this day appeared Eduardo M. Hernandez who, being duly sworn, on oath, says that he is a legal representative of Flow -Line Construction, Inc. and that the contract for the construction of the project, designated as CHURCHILL ROAD WATER AND SANITARY SEWER IMPROVEMENTS (CITY PROJECT NO. 100888, CITY SECRETARY CONTRACT NO.52902) has been satisfactorily completed and that all bills for materials, apparatus, fixtures, machinery, subcontractors, and labor used in connection with the construction of this project have, to the best of my knowledge and belief, been fully paid. Title Sworn to and subscribed before me this 1 day of FRANCISCO DOSE BRUNET Notary Public, State of Texas Comm. Expires 03-21-2026 ID 131498404 Notary .20 Z Notary Public in and for \\u County, Texas . . �.�......�, _.r� ...�. SURETEC INSURANCE COMPANY 2103 CityWest Boulevard, Suite 1300 Houston, TX 77042 OWNER ❑ ARCHITECT ❑ CONSENT OF SURETY CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ OTHER ❑ BOND NO.: 4425613 TO OBLIGEE: City of Fort Worth (NameandAddressn000 Throckmorton St. CONTRACT FOR: Churchill Road Fort Worth, TX 76102 PROJECT: Churchill Road CONTRACT DATED: 09/24/2019 (Name and Address) council district 2 and within the City of River Oaks PRINCIPAL: Flow -Line Construction, Inc., PO Box 600881, Dallas, TX 75360 At the request of the Obligee and the Principal indicated above, (Insert name and address of Surety) SureTec Insurance Company, 2103 CityWest Boulevard, Suite 1300, Houston, TX 77042, SURETY, on bond of (insert name and address of contractor) Flow -Line Construction, Inc., PO Box 600881, Dallas, TX 75360 , CONTRACTOR, and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final payment under the Contract have been satisfied by Principal as of the date of final payment, and that no claims by Obligee or any third party are known or believed by Obligee or its representatives to exist as of the date of final payment, representations as to the truth and accuracy of the foregoing conditions being deemed to have been made by Obligee in connection with this request for Consent of Surety, hereby approves of the final payment to the Principal, and agrees that final payment in accordance with the terms hereof shall not relieve the Surety of its obligations to (Insert name and address of Obligee) City of Fort Worth 1000 Throckmorton St. Fort Worth, TX 76102 ,OBLIGEE, as set forth In said Surety's bond. I IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: (Insert in writing the month followed by the numeric date and year.) SureTec su a ce Co any .5 rety) r . c (Signature of authorized representative) Lawrence Wesson, Jr. , Attorney -in -Fact SIC COS Final Payment rev 10 2021 Page 1 of 1 Ponth 4221060 SureTec Insurance Company LIMITED POWER OF ATTORNEY Kno ivA I[Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a c o rpo ration duly organized and existing underthe laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make, constitute and appoint Frank Swingle, Warren Gravely, Jr., Ed Veale, Matthew B. Elmore, Kirk D. Dreyer, John M. Huff, Stacey Healy, DeAnna Hansford Crombie, Lynsie DeCet, Lawrence Wesson, Jr., Katie Hunt, Crystal Carlson its true and lawful Attomey-in-fact, with fullpowerand authority hereby conferred in its name, place and stead, to execute, acknowledge anddeliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for, providing the bond penalty does not exceed Five Million and 00/100 Dollars ($5,000,000.00) and to bind the Company thereby as fully a nd to the same extent as if such bond were signed by the President, sealed with the corpora t e seal of the Company and duly attestedby its Secretary, hereby ratifying and confirming a R that the said Attomey-in-Fact may do in the premises. Said appointment is madeunderand by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall beand is hereby vested with full power and authority to appoint anyone or more suitable persons as Attorneys) -in -Pact to representand act for an d o n behalf of the Company subject to the following provisions: Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional orobligatory undertakings and any and at i notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be bindingupon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be if Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile s eal shall be v a I i d and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held o n 201h of April, 1999.) In Witness Whereof, SURETEC INSURANCECOMPANYhas caused these presents to be signed by its President, andits corporate seal to be hereto affixed this 6th day of July , A.D. 2022 . AN SURE'TECINSURANCE COMPANY o�s Xc�°O By: q :ge atw I>1 emu,'•. 1 : f MichaelC.Keimig,Pre siden State of Texas ss: ••••••-••••" County of Harris On this 6th day of July A.D. 2022 before me personally came Michael C. Keimig, tome known, who, being by me duly sworn, did dep o s e and say, that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said Company; and that he signed his name thereto by like order. XENIA RIVAS Notary Public State of Texas '<"> Commission # 129117659 °�F•' Commission Expires 9/10/24 4,1v�144, VL_ Xenia s,NotaryPublic My commission expires September 10, 2024 1, M. Brent Beaty, Assistant Secretary ofSURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set out in the Power of Attorney are in full force and effect. 0-t Given undermyhand and theseal of said Company a t Houston, Texas this /—n day of (� f � , A.D. �/ 'M. B'r"entBi eaty;Assisfan Secretary Any instrument issued in excess ofthe penalty stated above is totally void and without any validity. 4221060 For verification ofthe authority of this power you may call (713)812.0800 anybusiness daybetween 8:30 amend 5,00 pm CST. SureTec Insurance Company IMPORTANT NOTICE Statutory Complaint Notice/Filing of Claims To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at: SureTec Insurance Company 9500 Arboretum Blvd., Suite 400 Austin, TX 78759 You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252- 3439. You may write the Texas Department of Insurance at: PO Box 149104 Austin, TX 78714- 9104 Fax#:512-490-1007 Web: httD://www.tdi.state.t>(.us Email: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance. SIC TX Rider TDI Required Notices rev 07_2022 Page 1 of 1 SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Limitation on Bond Penalty Increase Notwithstanding any provision in the bonds or subcontract to the contrary, the penal sum of this Bond shall automatically be adjusted to reflect the additive or deductive amounts of all change orders issued to the Subcontract; provided, however, that Obligee shall notify Surety if an individual change order increases the Subcontract Price by more than 10%, and, if at any point the aggregate amount of all change orders increases the Subcontract Price by more than 35% of the Subcontract Price, the Surety's consent shall be required to increase the penal sum of this Bond in excess of 35% of the Subcontract Price, such consent not to be unreasonably withheld. The failure to provide the required notice shall not release Surety from its obligations to the extent of the bond penalty in force prior the change that required such notice. Texas Rider 010106 CSC No. 52902-CO4 r' cn, P T WO R, n City of Fort Worth Change Order Request Project Name:1 Churchill Rd Water and Sanitary Sewer Improvements City Sec No.: 1 52902 Project No,(s):1 100888 1 NTP 1 12/2/2019 I City Pro]. No.:1 100888 Project Description:I Installation of Water and Sanitary Sewer Improvement on Churchill Rd between White Settlement Rd and River Oaks Blvd.1 Contractor] Flow -Line Construction, Inc. I Change Order# 1 4 1 Dale: 1 4/12/2023 City Project Mgr.1 Lawrence Hamilton City Inspector. I Carmen Drake Phone Number: 817-392-2626 Phone Number: 817-392-8347 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $6,522,745.00 $1,614,210.00 $8,136,955.00 720 Extras to Dale $459,672.80 $64,632.88 $524,205.68 0165 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Dale $6,982``417.80 $1,678 742.88 i $8tt661]]160.68 $218,287.50 885 021 Amount of Proposed Change Order $0,00 $218,�87.50 Revised Contract Amount $6,982,417.80 $1,897,030.38 I $8,879,448.18 906 Original Funds Available for Change Orders $130,455.00 $48,426.00 $178,881.00 Remaining Funds Available for this CO $0.00 $0.00 1 Additional Funding (if necessary) $210,787.60 $210,787.50 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 9.12% MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) �$10,171,193.75 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 4 will provide for the replacement of a deteriorated sanitary sewer main that was encountered during construction, the replacement of additional concrete collars that were removed during paving activities, additional traffic control, and the Installation of an additional drop manhole. Staff recommends the addition of 21 calendar days for the change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name I Contractor Name - n �/ Cdnlr tor.og'-Nature Dote Flow -Line Construction, Inc. Eduardo Hernandez rintc c�®r . Date ProjectManager / Dale ii Director (Wat�f Dept) Dale on tructlon Supe Isor (Water Dept) baste �/u tfv�/ar t/ r7ar n- Apr 21, 2023 V��! / /` `(� �/ —,23 Senior Assistant City Attorney Date Assistant City Manager Dale A r 24, 2023 p � a"�`/ A r 24, 2023 P Council Action (If Required) M&C Number j 23-0253 M&C Dale Approved 411112023 lF 0IR-F Wo I-,,Iu 1-H City of Fort Worth Change Order Additions Project Name Churchill Rd Water and Sanitary Sewer Improvements City Sec No,: 1 52902 Project No.(s): 100888 I D0=- No,1 43801 1 City Proj, No.: 1 100888 Project I Installation of Water and Sanitary Sewer Improvement on Churchill Rd betwee i While Settlement Rd and River Oaks Description Blvd. Contractor Flow -Line Construction, Inc, Change Grder:® Dale: 1 4/12/2023 City Project Mgr, Lawrence Hamilton City Inspect Carmen Drake ADDITIONS 1 ITEM DESCRIPTION I DEPT lQty Unit Unit Cost Total 4 8" PVC (C900 DR18) (Sewer Pipe) Sewer 783 LF $200.00 $156,600.00 23 Concrete Collar Sewer 30 EA $750.00 $22,500.00 27 4' Drop Manhole Sewer 1 EA $10,000.00 $10,000.00 30 Traffic Control Sewer 6 EA $3,100.00 $18,600.00 53 Cement Sewer 38.50 TN $275.00 $10,587.50 'Water Sewer $218,287.50 Page 2 of 4 lAddltions Sub Total $218,287.50 Fo-RT VVO R m City of Fort Worth Change Order Deletions Project Name Churchill Rd Water and Sanitary Sewer Improvements City Sec No.: 52902 Project No.(s): I 100888 DOE No. 43801 City Proj. No.: 100888 Project Description I Installation of Water and Sanitary Sewer Improvement on Churchill Rd betw1en White Settlement Rd and River Oaks Blvd. Contractor I Flow1ine Construction, Inc. Change Orderl ® Dale I 4/12/2023 City Project Mgr. Lawrence Hamilton ( City Inspector: I Carmen Drake DELETIONS ITEM DESCRIPTION DEPT Q Unit Unit Cost Total I Water Sewer Page 3 of 4 Deletions Sub Total MWBE Sub cog MIWBE Breakdown for this Change Ord)r , Type of Service Amount for ffiis CO 'rotat $0.00 Previous Change Orders DATE - AMOUNT t ti i S ti 1 I Total $0.00 Page 4 of 4 .Contract Compliance Manager By signing l acknowledge thatl am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. dw-wo- A' ", Signature Lawrence Hamilton Name of Employee Senior Professional Engineer Title ATTEST: p Jannette Goodall City Secretary Gi�y of Vo rr�t Wor gh, Texas Mwyor and o uncH oommun"Ho-Toon DATE: Tuesday, April 11, 2023 REFERENCE NO.: **M&C 23-0253 LOG NAME: 60CHURCHILLROADC04-FLOWLINE SUBJECT: (CD 2 / Future CD 2 and City of River Oaks) Authorize Execution of Change Order No. 4 in the Amount of $218,287.50 to a Contract with Flow -Line Construction, Inc. for the Churchill Road Water and Sanitary Sewer Improvements for a Revised Contract Amount of $8,879,448.18, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: Authorize execution of Change Order No. 4, in the amount of $21 B,287.50, to City Secretary Contract No. 52902, a contract with Flow -Line Construction, Inc. for the Churchill Road Water and Sanitary Sewer Improvements project for a revised contract amount of $8,879,448.18; and Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water & Sewer Bond 2017A Fund, in the amount of $218,288.00, from available funds, for Churchill Road Water and Sanitary Sewer Improvements (City Project No.100888) to effect a portion of Water's contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: On September 24, 2019, Mayor and Council Communication (M&C) 19-0197 authorized a contract with Flow -Line Construction, Inc., (City Secretary Contract No. 52902) in the amount of $8,136,955.00 for the Churchill Road Water and Sanitary Sewer Improvements project. The agreement was subsequently revised by Change Order No. 1 with a net total amount of $22,705.70, administratively authorized on September 3, 2021, that provided for installation of special levee backfill material, relocation of a manhole at the levee and an additional storm water pollution prevention plan. Change Order No. 2 in the amount of $405,066.09 authorized on April 26, 2022 (M&C 22-0318) that provided for the installation of additional backfill material that was installed at the levee crossing as required by the United States Army Corps of Engineers, the installation of 8, 16, and 24-inch ductile iron pipe encasing pipes instead of 8, 16, and 24- inch PVC pipe encasing pipes as specified at the time of bid opening, additional excavation and backfill of bore pits in order to clear a gas main conflict, and additional backfill material that was necessary on the project due to unstable material that was encountered during construction and Change Order No. 3 in the amount of $96,433.89, administratively authorized September 27, 2022, that provided additional pavement quantities and the installation of additional 1-inch meters on the project. Change Order No. 4 will provide for the replacement of a deteriorated sanitary sewer main that was encountered during construction, the replacement of additional concrete collars that were removed during paving activities, additional traffic control, and the installation of an additional drop manhole. Staff has reviewed and verified the quantities for the additional work under this Change Order No. 4. It is the practice of the Water Department to appropriate its Capital Improvement Program plan throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows: 60CHURCHILLROADC04-FLOWLINE Capital Project FY202 & Aut ority Budget Revised Fund Name Appropriations Change FY2023 Name Budget ► (Increase/ Decrease) Fund 56011 — 100888 — Water & Churchill Sewer RD WL & $0.00" This M&C I $218,288.00 $218,288.00 Bond SS Improv 2017A Funding for the Churchill Road Water and Sanitary Sewer Improvements project is depicted in the table below: Fund Existing Additional project Total* Appropriations Appropriations W&S Capital Projects — Fund 56002 Water and Sewer Bond 2017A- Fund 56011 W&S Water & Sewer Bond 2020A - Fund 56017 $35,400.00 $0.00 $35,400.00 $1,058,871.00 $218,288.00 $1,277,159.00 $8,903,938,00 Project Total $9,998,209.00 *Numbers rounded for presentation purposes. $0.00 $8,903,938.00 $218,288.00 $10,216,497,00 Funding is currently available in the Unspecified -All Funds project within the Water & Sewer Bond 2017A fund for the purpose of funding the Churchill RD WL & SS Improv project. Business Equity: Flow -Line Construction, Inc. agrees to maintain its initial M/WBE commitment of four percent that it made on the original contract and extend and maintain that same M/WBE commitment of four percent to all prior change orders up to and inclusive of this Change Order No. 4. Therefore, Flow - Line Construction, Inc, remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICT 2/FUTURE COUNCIL District 2 and CITY OF RIVER OAKS. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified - All Funds project within the Water & Sewer Bond 2017A Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water & Sewer Bond 2017A Fund for the Churchill RD WL & SS Improv project to support the approval of the above recommendation and execution of the change order. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department ccount Project Program�P+ctivityI Budget Reference # mount! ID ID _ j _ Year -__(Chartfield 2)____�_- FROM_ Fund Department �Accountl Project Programr�lvityj Budget I Reference # �mounb ID --...-.. I _ ... _._�.....�D. - -Year. _ { _(Chartfield 2)__J ......... CERTIFICATIONS: Submitted for Citv Manager's Office by Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Lawrence Hamilton (2626) ATTACHMENTS 1.60CHURCHILLROADC04-FLOWLINE UPDATE,odf (CFW Internal) 2. 60CHURCHILLROADC04-FLOWLINE 1295..pdf (CFW Internal) 3.60CHURCHILLROADC04-FLOWLINE APC Form pdf (CFW Internal) 4. 50CHURCHILLROADC04-FLOWLINE FID Table !WCF 02.24.23).xlsx (CFW Internal) 5.60CHURCHILLROADC04-FLOWLINE FID Table (WCF 03.13.23).xlsx (CFW Internal) 6.60CHURCHILLROADC04-FLOWLINE Ma.R,p_1 (Public) 7. 60CHURCHILLROADC04-FLOWLINE SAM,pdf (CFW Internal) 8.ORD.APP 60CHURCHILLROADC04-FLOWLINE 56011 A023(r2).docx (Public) 9. PBS CPN 100888,pdf (CFW Internal) 60CHURCHILLROADC04-FLOWLINE FID Table 1&2) 56011 0600430 4905135 UNSPEC 2023 22 1&2) 56011 I 0700430 4905135 100888 2023 I $228,288.00' 1&2) 56011 0600430 UNSPEC 2023 ($21?,2SSD0) 1&2) 56011 0700430 100888 2023 $218,288.00 1&2) 56011 1 0700430 4905135 100888 001780 9999 (S21c,28°.u0 FORTWORTHO July 31, 2023 Flow -Line Construction, Inc. PO Box 600881 Dallas, TX 75360 Re: Acceptance Letter Project Name: Curchill Road Water and Sanitary Sewer Improvements Project Type: Sewer/Water Project Nq: 100888 DOE. Ns: 1008 Contract Ns: 52902 Gentleman: Dated: 7 / 31 /2023 On March 27, 2023 a final inspection was made on the subject project. There were punch list items identified at the time. The punch list items were completed on March 27, 2023. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 27, 2023, which is the date of punch list completion and will extend for (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at (817) 392-6054 Yours Truly, -7'-o'l P � � Tony Sholola, P.E., Assistant Director, Water Department TS / cc: Chris Harder, P.E., Director, Water Department Laura Wilson, P.E., Deputy Director, Water Department Captain Michael Skains, Fire Department Luke Coffman, Sanitary Sewer Systems Superintendent, Water Department Cesar Zavala, Water Systems Superintendent, Water Department Lawrence Hamilton PE, Project Manager, Water Department Capital Projects Delivery David R Johnson, Inspection Supervisor, Water Department Capital Projects Delivery Carmen Drake, Inspector, Water Department Capital Projects Delivery , Consultant Eduardo Hernandez, Contractor File Fort Worth 11•AmedcaC V WATER DEPARTMENT I I THE CITY OF FORT WORTH * 200 TEXAS STREET * FORT WORTH, TEXAS 76102 817-392-8240 * FAX 817-392-8195 1964.1993.2011 �„ Printed on recycled paper