NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Silver Dollar Self -Storage
City Project No.: 103088
Improvement Type(s): M Paving
Original Contract Price:
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
Nicholas Bergmann (Aug 2, 02311:08 CDT)
Contractor
C00
Title
Capco
Company Name
dAf-
Curtis Hol ne orth(Au¢2.202311:09 CDT)
Project Inspector
C 2w"., P. �.
Project Manager
Rebecca Diane Owen (Aue 3.2023 08:13 CDT)
CFA Manager
A .?
Lauren Prieur (Au2 3.2023 08:50 CDT)
TPW Director
William Inhncnn lAi 3. 202311:09 CDT)
Asst. City Manager
❑ Drainage N Street Lights ❑ Traffic Signals
$234,286.25
-$174,718.18
$59,568.07
$59,568.07
Aug 2, 2023
Date
Aug 2, 2023
Date
Aug 2, 2023
Date
Aug 3, 2023
Date
Aug 3, 2023
Date
Aug 3, 2023
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX Page 1 of 2
Notice of Project Completion
Project Name: Silver Dollar Self -Storage
City Project No.: 103088
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
0 Affidavit of Bills Paid
Statement of Contract Time
Contract Time 60 WD
Work Start Date: 4/25/2022
Completed number of Soil Lab Test: 44
Completed number of Water Test: 2
Days Charged: 121
Work Complete Date 10/17/2022
Page 2of2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SILVER DOLLAR SELF -STORAGE
Contract Limits
Project Type PAVING & ST LIGHT
City Project Numbers 103088
DOE Number 3088
Estimate Number 1 Payment Number 1 For Period Ending 6/23/2023
CD
City Secretary Contract Number
Contract Date
Project Manager NA
Contractor CAPCO STELL, INC.
9828 LORENE LANE
SAN ANTONIO, TX 78216
Inspectors WATSON / HOLLINGSWORT
Contract Time 6111)
Days Charged to Date 121
Contract is 100.00 Complete
Friday, June 30, 2023 Page 1 of 5
City Project Numbers 103088
Contract Name SILVER DOLLAR SELF -STORAGE
Contract Limits
Project Type PAVING & ST LIGHT
Project Funding
PAVING
DOE Number 3088
Estimate Number 1
Payment Number 1
For Period Ending 6/23/2023
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
SAWCUT & REMOVE EXISTING CURB &
80 LF
$12.70
$1,016.00
80
$1,016.00
GUTTER (CO # 1)
2
REMOVE CONCRETE PAVEMENT (CO #1)
336 SY
$13.53
$4,546.08
336
$4,546.08
3
CONC PVMT REPAIR
315 SY
$97.68
$30,769.20
315
$30,769.20
4
BARRIER FREE RAMP, TYPE P-1 (CO #1)
2 EA
$1,250.00
$2,500.00
2
$2,500.00
5
4" CONC SIDEWALK (CO #1)
25 SY
$70.54
$1,763.50
25
$1,763.50
6
9" CONC PVMT (CO #1)
52 SY
$85.35
$4,438.20
52
$4,438.20
7
8" LIME TREATMENT (CO #1)
69 SY
$11.60
$800.40
69
$800.40
9
HYDRATED LIME @ 32LB/SY (CO #1)
1.11 TN
$316.54
$351.36
1.11
$351.36
10
4.5" ASPHALT BASE TYPE B (CO #1)
0 SY
$42.80
$0.00
0
$0.00
11
1.5" ASPHALT PVMT TYPE D (CO #1)
0 SY
$20.95
$0.00
0
$0.00
12
VALVE BOX ADJUSTMENT (CO #1)
0 EA
$230.00
$0.00
0
$0.00
13
UTILITY SERVICE SURFACE RESTORATION
0 SY
$37.44
$0.00
0
$0.00
SODDING (CO #1)
14
UTILITY SERVICE SURFACE RESTORATION
0 SY
$4.00
$0.00
0
$0.00
SEEDING (CO #1)
15
UTILITY SERVICE SURFACE RESTORATION
60 SY
$10.83
$649.80
60
$649.80
HYDROMULCH (CO #1)
-------------
Sub -Total of Previous Unit
$46,834.54
$46,834.54
ST LIGHT
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
FURNISH/INSTALL SINGLE MAST ARM (CO #1)
0 EA
$2,000.00
$0.00
0
$0.00
2
FURNISH/INSTALL LED LIGHTING FIXTURE
0 EA
$1,650.00
$0.00
0
$0.00
(CO #1)
Sub -Total of Previous Unit
$0.00
$0.00
--------------------------
EROSION CONTROL
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
---------------------------------------
1
SILT FENCE
1765 LF
$1.75
$3,088.75
1765
$3,088.75
2
INLET PROTECTION
2 EA
$357.50
$715.00
2
$715.00
Friday, June 30, 2023 Page 2 of 5
City Project Numbers 103088
Contract Name SILVER DOLLAR SELF -STORAGE
Contract Limits
Project Type PAVING & ST LIGHT
Project Funding
DOE Number 3088
Estimate Number I
Payment Number I
For Period Ending 6/23/2023
3
WEIGHTED WADDLES
78 LF
$5.51
$429.78
78
$429.78
-------------------
Sub -Total of
Previous Unit
$4,233.53
$4,233.53
SIGNAGE
& PAVEMENT MARKINGS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
REMOVE RAISED MARKER (CO #1)
0 EA
$8.33
$0.00
0
$0.00
2
LANE LEGEND ONLY (CO #1)
0 EA
$150.00
$0.00
0
$0.00
3
LANE LEGEND ARROW (CO #1)
0 EA
$125.00
$0.00
0
$0.00
4
6" SLD PVMT MARKING HAS (CO #1)
0 LF
$2.75
$0.00
0
$0.00
5
24" SLD PVMT MARKING HAE (CO #1)
0 LF
$8.25
$0.00
0
$0.00
6
REFL RAISED MARKER (CO #1)
0 EA
$7.00
$0.00
0
$0.00
7
4" BRK PVMT MARKING HAS (CO #1)
0 LF
$1.50
$0.00
0
$0.00
8
YIELD MARKINGS (CO #1)
0 EA
$150.00
$0.00
0
$0.00
9
CROSS HATCH STRIPING FOR LANE
0 LF
$2.75
$0.00
0
$0.00
MERGE/SHIFT (CO #1)
10
CROSS WALK STRIPING (CO #1)
0 LF
$8.25
$0.00
0
$0.00
11
TYPE I BARRICADES (CO #1)
0 EA
$125.00
$0.00
0
$0.00
12
TRAFFIC CONTROL
I MO
$8,500.00
$8,500.00
1
$8,500.00
13
FURNISH/INSTALL ALUM SIGN GROUND
0 EA
$250.00
$0.00
0
$0.00
MOUNT CITY (CO #1)
14
STREET NAME BLADES (CO #1)
0 EA
$115.90
$0.00
0
$0.00
15
4" SLD PAV MARKING (CO #1)
0 LF
$1.50
$0.00
0
$0.00
Sub -Total of
Previous Unit
$8,500.00
$8,500.00
Friday, June 30, 2023 Page 3 of 5
City Project Numbers 103088
Contract Name SILVER DOLLAR SELF -STORAGE
Contract Limits
Project Type PAVING & ST LIGHT
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number
Change Order Number 1
Change Order Number 1
Total Contract Price
DOE Number 3088
Estimate Number 1
Payment Number 1
For Period Ending 6/23/2023
$234,286.25
($8,600.00)
($166,118.18)
$59,568.07
Total Cost of Work Completed $59,568.07
Less % Retained $0.00
Net Earned $59,568.07
Earned This Period $59,568.07
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$59,568.07
Friday, June 30, 2023 Page 4 of 5
City Project Numbers 103088
Contract Name SILVER DOLLAR SELF -STORAGE
Contract Limits
Project Type PAVING & ST LIGHT
Project Funding
Project Manager NA
Inspectors WATSON / HOLLINGSWORT
Contractor CAPCO STELL, INC.
9828 LORENE LANE
SAN ANTONIO, TX 78216
DOE Number 3088
Estimate Number 1
Payment Number 1
For Period Ending 6/23/2023
City Secretary Contract Number
Contract Date
Contract Time 60 CD
Days Charged to Date 121 CD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $59,568.07
Less % Retained $0.00
Net Earned $59,568.07
Earned This Period $59,568.07
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$59,568.07
Friday, June 30, 2023 Page 5 of 5
REVIEWED
By Andrew Goodman at 2:35 pm, May 30, 2023
10/20/2022
PROJECT NAME:
I CONTRACT:
ICFA #
CITY PROJECT #
IDOE #
I WATER PROJECT #
SEWER PROJECT #
FILE #
INSPECTOR:
PROJECT MANAGER:
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Silver Dollar - Self Storage
A - Paving
CFA21-0048
103088
N/A
30114-0200431-103088-EO7685
;E:> I
Curtis Hollingsworth
Andrew Goodman
WATER
Developer
Cost
Ci
IORIGINAL CONTRACT
$20,484.75
IEXTRAS TO DATE
$0.00
ICREDITS TO DATE
$0.00
ICONTRACT TO DATE
$20,484.75
(AMOUNT OF PROP. CHANGE ORDER
($3,750.00)
(REVISED CONTRACT AMOUNT
$16,734.75
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$16,734.75
REVISED COST SHARE
Dev. Cost:
TOTAL REVISED CONTRACT
CHANGE
ORDER No:
CITY PARTICIPATION:( NO
Al
Phone No: 817-392-8306
Phone No: (817) 727 - 5702
CONTRACT UNIT
SEWER
PAVING
DRAINAGE
STREET LIGHTS
Cost
Developer Developer Developer
Cost City Cost Cost City Cost Cost City Cost
$144,358.35 I $221,452.72 $4,233.53
$0.00 I $0.00 $0.00
$0.00 I $0.00 $0.00
$144,358.35 $0.00 I $221,452.72 $0.00 $4,233.53 $0.00
($166,118.18)
$144,358.35 $0.00 I $55,334.54 $0.00 $4,233.53 $0.00
$144,358.35 $55,334.54 I $4,233.53
$220,661.17 City Cost: $0.00
Developer
Cost City Cost
$8,600.00
$0.00
$0.00
$8,600.00 $0.00
($8,600.00)
$0.00 $0.00
$0.00
.00
.00
$220,661.17
CONTRACT
DAYS
60
60
Revised: 10-12-2011 Page 1
Doc ID: 51294fOa16206360816ca296a041904cc8a1d7d9
REVIEWED
l By Andrew Goodman at 2:35 pm, May 30, 2023
You are directed to make the following changes in the contract documents
CITY BID ITEM
PAY ITEM # # QUANTITY
5 3312.0001 1
24 241.13 294
25 241.1 ill
27 3213.0506 2
28 3213.0301 150
29 3213.0104 1183
30 3211.0502 1241
31 3211.04 18.54
32 3212.0504 183
33 3212.0302 183
34 3305.0105 2
35 3292.0101 120
36 3292.0201 120
37 3292.0401 60
35-A 3441.1625 1
36-A 3441.33201 4
40 3217.4307 45
41 3217.1004 3
42 3217.1004 5
43 3217.0101 324
44 3217.0501 36
45 3217.2104 11
46 3217.0003 120
47 999.0003 4
48 999.0004 635
49 999.0005 100
50 999.0006 2
52 3441.4004 8
53 9999.0007 2
54 9999.0008 181
REASONS FOR CHANGE ORDER
Revised: 10-12-2011
UNIT
ITEM DESCRIPTION
UNIT PRICE
TOTAL
EA
Fire Hydrant
$3,750.00
$3,750.00
..
LF
Sawcut and Remove Existing Curb and Gutter
$12.70
$3,733.80
SY
Remove Concrete Pavement
$13.53
$1,501.83
EA
Barrier Free Ramp, Type P-1
$1,250.00
$2,500.00
SY
4" Concrete Sidewalk
$70.54
$10,581.00
SY
9" Concrete Pavement
$85.35
$100,969.05
SY
8" Lime Treatment
$11.60
$14,395.60
TN
Hydrated Lime @ 32lb/sy
$316.54
$5,868.65
SY
4.5" Asphalt Base Type B
$42.80
$7,832.40
SY
1.5 Asphalt Pvmt Type D
$20.95
$3,833.85
EA
Valve Box Adjustment
$230.00
$460.00
SY
Utility Service Restoration Soding
$37.44
$4,492.80
SY
Utility Service Restoration Seeding
$4.00
$480.00
rn
SY
Utility Service Restoration Hydromulch
$10.83
$649.80
C
EA
Furnish/Install Single Mast Arm (Match Ex.)
$2,000.00
$2,000.00
0
EA
Furnish/Install LED Lighting Fixture (Update Ex.)
$1,650.00
$6,600.00
0
EA
Remove Raised Marker
$8.33
$374.85
-0
EA
Lane Legend Only
$150.00
$450.00
N
EA
Lane Legend Arrow
$125.00
$625.00
0
LF
6" SLID Pvmt Marking HAS (W)
$2.75
$891.00
LF
24" SLID Pvmt Marking HAE (W)
$8.25
$297.00
EA
REFL Raised Marker TY II-C-R
$7.00
$77.00
LF
4" BRK Pvmt Marking HAS (W)
$1.50
$180.00
EA
Yield Markings
$150.00
$600.00
LF
Cross Hatch Striping For Lane Merge/Shift
$2.75
$1,746.25
LF
Cross Walk Striping
$8.25
$825.00
EA
Type I Barricades
$125.00
$250.00
EA
Furnish/Install Alum Sign Ground Mount City STd.
$250.00
$2,000.00
EA
Street Name Blades (Install on Exist. Light Pole)
$115.90
$231.80
LF
4" SLID PAV. MIRK HAW (W)
$1.50
$271.50
TOTAL
$178,468.18
1 Removing all quantities above except for the Risinger Driveway, Removing Brewer Paving and lighting From Plans as Brewer is being constructed by another
developer.
Page 2
Doc ID: 51294fOa16206360816ca296a041904cc8a1d7d9
REVIEWED
l By Andrew Goodman at 2:35 pm, May 30, 2023
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
Dunaway
(C suiting Engineer)
By: Z( /
Name: Darrell Howard
Title: Project Manager
Date: 10/20/2022
Revised: 10-12-2011
APPROVED:
(Developer)
By:
Name: Kate Heartsill
Title: Owner/Developer
APPROVED:
Capco Steel, Inc. dba Capco General Contracting
(Contractor) q
✓Y[C1D�it,S 1ltJlL��rla�t�t
By: O
Name: Nicholas Bergmann
Title: COO/Partner
Page 3
Doc ID: 51294fOa16206360816ca296a041904cc8a1d7d9
THE CITY OF FORT WORTH, TEXAS
Plans for the Construction of
PAVING, WATER, SEWER
& STREET LIGHT IMPROVEMENTS
To Serve
SILVER DOLLAR SELF -STORAGE
BETSY PRICE
MAYOR
DAVID COOKE
CITY MANAGER
MICHAELOWEN, P.E.
CITY ENGINEER, DIRECTOR, TRANSPORTATION AND
PUBLIC WORKS DEPARTMENT
CHRISTOPHER P. HARDER, P.E.
DIRECTOR, WATER DEPARTMENT
c
IPRC RECORD NO.
E
CITY PROJECT NO.
9
aa= FID NO.
liglas FILE NO.
20-0147
103088
30114-0200431-103088— E 07685
K-2819
ENGINEER: VICINITY MAP OWNER/
DUNAWAY ASSOCIATES L.P.
1303 LOOP 306
5508AIEEY AVENUE STE. 400 NOT TO SCALE
ELL, TEXAS
SA03LOOP O,TEXAS
FDRT WORTH, TEXAS 76207 MAPSCO PG. 102 SEC. U
)6904
PRONE: 53
PHONE: (817) 335-1121 COUNGL 0/57NlCT /6
FAX:(817)335-7437
CONTACT: DARRELL HOWARD
DUNAWAY
550 Bailey Avenue - Suite 400 - Fort Worth, Texas 76107
R.RRD, x4e......^...
Tel: 817.335.1121
(TXREG. E-1114)
i
July 12, 2021
DALP JOB NO 8005062003
JULY 2021
SHEET INDEX
Sheet NunRWr Sheet ire
UNR I WAIERASANRARY SEWER IMPROVEMENTS
1 aaVER
2 HORROMAL CONTROL PUN
3 GENERAL NOTES
DEMOURON PLAN
5 wA1ER _ur
w I
7 WATERRDETA1.2
WATER
9 WATER Mus4
10 SAVER 14 1
ER EWP4P2
12 SEWER DETAILS
I u � SEWER OEInlls2
DRIVEwnr PLAN
m I PAVING Of1uL5
21 PAVING DAAIB 2
22 PAVING DE1NL53
m AVING DE ml
2. PAVING DET.'a
a I s�En�xloaws
as
Eaosax o ma
X-26738
Ornined 3/25/2022
fREVIEWED n,,,�z as„�, .,r,o, eoe/
VG�O� V TD��16Y0 J�, ivy
J u 113, 2021
Victor V. Tornero Jr., P.E. (Jul 13, 2021 16:45 CDT)
DIRECTOR'S DESIGNEE FOR CONSTRUCTION
DATE
PLAN APPROVAL
RESOLUTION 01�-10-2020
qN�O.
G,.,,&, A I? 4 -
Jul 13, 2021
REVIEWED:
DATE
Project Manager
X-26738
BLOCK i I I 0.EVISIONS
PRIMROSE CROSSING
L LCD
NO 0213227542
F PR TCT
ROW _ _ ' _
TP=821.�9 BECI �A o ALT TRANSITION---
STA 2+63 78 0 00 R \
N 6909050 64 69 4 36 EWER B L V D. TC=820 22 (ME)�s SA
✓ / E 2302383 56
5TA 0+50.00 (0 00') _ 3 END Wi IST? •1 _ x r
EI CURB (SEE NOTE J) - - N 69jJ 4.3] N 690911t%4� (11�I WI__M0,F PUBLIC_ RIGHT-OF-WAY) E 23023723] \� CONTRACTOR TO n
IN 6908945.14 _ -- - j CONNECT TO EXISTING \ x x
N 690904]58 238 396 znrvz�s Oc TC 32049 PROPOSED CURB NSTALL TOP OF
r1' " N 6909268 49 AVEMENT TO MATC \
V- #ATCH- EXISTING TP m 4 e PC TC = 819.93.
CC ,� � END'TRANSITIO�I -- TC=820.81 III - E 29 60,38 N 6TC = ID h EXISTNG PAVEMENT, uralrr vacs vouiu vac ` w
/rWEE IrciFs. Em ARE Io Mwm
LE2,£P2ECG.SlelPn N 6909 6909j.�8. �'8 a 690 N 6009247 q E icvNc ro eF rx avq. r
Tom-'}�' E 2"7023] q 3023]i4K "302372.1 _ / E 230y3y2 q0�_ 'A CUT
IJNE - E 2302359.48 � av vuxs rxe cdvmacmacsw�nuW c� ra�
—ri� 81927 („11sxauavary
T LT BRE I EnSENG CURB N.590934498 avr/aen nu si nuncs
II PROER TO BC 1 �'� •� �/ 11 �BLYtJ. 'CgU B \ -�1 ri0 BE REMOVED R15��36514 - -
0 111--d2+95
TC-B2233 000 p K 2+00 SAWGUT LINE PC 8192J
N 6908 9Y58 } _ - - -- ADJUST GATEf m j a 'N 6909344 90 L.L Rncaur, eEFaeE rxE cavuENCEMENr a`
E-23038333 I 1 STA i+50. 00 (000") VALVE TO GRADE F. 230236800
I/ ADJUST GATE 1 BEGIN CURB TRANSITION 'ti g'y0 IT STA 2+ 97 0.00" Q axr corvsmucnox
g2 a TC-820.45/
UAL VE TO GRADE PI STA 0+8264 (000' IN IN 2902376. IS gy0 N 69092]383 PC TC 87950 -
TP= 5 E 23023521] N 6909 5�(1-
00 RT BRENER 907948 E p_i CR STA 1+2314 (0.0 -- / E 23 1+04 _ _ _ rr Drc�> W' oR
.'w' �� E 2302418191 ER TC=82064 _ -
PC STA-0100,00 h • . % I' ' SHEE E 230211989 -- w LD U pvawncs oEwcn„c Exncr Loc ws moFw �nL�rEiEps a+
TC=821.8] 'll - -
N 690899774 q ROPOSED PH 1+00 J macron aoursaer
E 230240733 - - -- -_---- - ---- �- - - ... _ --°.�-.3q..00 _ �819� m
------- ram.-.-r-i.,-r_.s f-. xr rs (sue cav ) a
RE
HYDROMULCHING, n w .. .............. •. • �' I _ 9S 1 \�_ xs'
.. r.�r
SEEDING &----------- -- -- -----_ /`•rr I aim sr>a
_ _ N L \ _ Vi
SODDING PER / i+31. JO (000') Y - RO. :-• �� /S ` _ L1
CawR CI RI a
DETAIL SHEET 22 / / \ TC 6 i �_--L- I +65.0 0 +
accuRacv or rnmE p cavma vu�rzv su �ircac�ix we
HOC STA o'=653�l LIMILY
(a Bu'T t ----- ------ - - ---- - - TG=819
tC=82O52 RAMP P E 23024 p W o Z HKIROMULCHIN , N 6909261.6N� - rN xarM m r�E M R -BA l rar wEcava I nav
` _ '� wsOVEvarvaEs rounp er Ixc cav TAIT, Allt eE R[wRrzn
/ N 6909066�3 DE IL \ PC STA 1+13 0') 2 e V Z SEEDING & 0 23024204,
- 821- - - E 2502415 60 \ TP=820 23 b ti o ¢ W e S000/NC. N - j _ p
�+r SHE 22 \ N 6909110.66 �W._ EXISTING 4'
W a o PER DETAIL
rc T E 2302420 39- "' j o p SHEET SIDEWALK
J 2 R 5TA 1+135 68' R
STA 0+34.4 (12.38 R) ( ) `^ WIF
OR STA O+J ]9i(0 00') TC=82123 8z0 _ =821 00 Z rxE NalrxEnnua T curza RE- race AT
rxE vrzorcRn uNE
�C-821. 12 y,IF'
-820- - - N 90907L75 N 69090]940 69091,039 / \ / r V sM[[vAnou ara ig
E 2302416 79 2302430. ]i 29024�0 08 \�\ N
PROFIIESALE **OMITTED*"`
L ITI- A.A,L �a�p=,WaaW�P�r�
REVIEWED
an�*xP
830 „oR830 x By ArMrew Goodman ae z:lspm, May.3D, -
�r m PAVING LEGEND
tio E%ISTRIG CONTOUR
825 �I II6." �' „ �"' ll825 820 PROPOSED CONTOUR
PROPOSED S O'CONCRETEDE
PAXEMNTWxEETS3DGRA ,
LT TC 0.13% M\TCH -STING
TjB PRO POSEDI.S"A V AS
820 820 N WT ETAIL- E & 6' GRAPHIC IN FEET
_ SUBGMDE PER DETAIL -SHEET
23 __
X\IING (' �� � E%ISTN NCONC0.ETE
U qL PAVEMENT -SEE CItt OF FORT
WORrH PROIELT%-16121
�I FW /ECs AND OR PROPOSED SIDEWALK S f
815 ` ` 815 HYDROMULCHING, SEEDING&
SODDING PE0.DETAIL-SHEET ZPM1'
-0+30 0+00 0+50 1+ 1+50 2+00 2+50 2+95 23
830 8S0
p PROFILE SME nRR;L �nfdt
' oN f " ��� lO�o Nn� i•- January 26, 2021
825 �I .. I� .p I Bz5 NOTES:
J I CURBSOINSTADLCPER DAR S OLI H10
-� IGHr TG �J - FORT WORTH
2. INSTALL 8" OF LIME STABILIZED 8A
32LB/SY
r T TL-:16I/i 3 DIMENSIONS ARE ST BACK OF CURB
820 - = - ��` 820 4 MINIMUM GUTTER SLOPE SHALL 0509
NG ?COUN) ®l
rr 1OOR�� -
5 S EIETL23A NNG SECTI0 PER DETAIL
DUNAWA
F�
6. CONTRACTOR SHALL SAWGUT TO FULL
PAVEMENT DEPTH, PARALLEL &
C W S Ge5 /E✓uh1 JD/�7
-�+„
_ _ _ _
PERPENDICULAR TO EXISTING JOINT
I�
li
7 CURB AT MEDIAN (LEFT) SHALL END AT
4+�
815
J~
815
STA 50+00 & BEGIN AGAIN AT STA
I+50.00 FOR TEMPORARY THRU TRAFFIC.
8 REFER TO DETAIL (SHEET 23) FOR
TEMPORARY ASPHALT PAVEMENT DEPTHS
BREWER EVAR
BREWER P
o
ro u
m
z m l
o� „Ep
„ s000"sosz.00a
BID
ti ti _ ��� BIG
-0+30
0+Do 0+50
1+00 1+50
2+00 2+50 2+95
1ae«eo
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
July 21, 2023
Capco Steel, Inc.
9829 lorene Ln
San Antonio TX, 78216
RE: Acceptance Letter
Project Name: Silver Dollar Seld Storage
Project Type: Water, Sewer and Paving
City Project No.: 103088
To Whom It May Concern:
On October 17, 2022 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on October 17, 2022,
which is the date of the final inspection and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-6251.
Sincerely,
C,),, �� , P. 4 .
Andrew Goodman P.E., Project Manager
Cc: Curtis Hollingsworth, Inspector
Donald Watson, Inspection Supervisor
Aaron Ybarra, Senior Inspector
Victor Tornero P.E., Program Manager
Dunaway, Consultant
Capco Steel Inc., Contractor
SDS#,LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
DocuSign Envelope ID: 911 DACOA-1 B76-42DE-81 E8-D4C2EOBk911
GENERAL CONTRACTING
07/24/2023
City of Fort Worth
CFA Administration
200 Texas St.
Fort Worth, TX 76102
RE: Silver Dollar Self Storage
CFA# 21-0048 City Project # 103088 IPRC# 20-0147
COMPONENTS: (Water, Sewer, Concrete Paving, Erosion Control)
The purpose of this letter is to acknowledge that Capco Steel, Inc. dba Capco General
Contracting have been paid in full by SDS3, LLC for the public improvements constructed to
serve Silver Dollar Self Storage in Fort Worth, Texas. As a result, we hereby waive, release and
relinquish all rights to assert any claim or demand for lien in connection with this project.
Please feel free to contact me with any questions you may have.
Sincerely,
EDt3tocuSigned by:
,vrMAIVU
4EDA8C8E08E4E3...
Nicholas Bergmann
COO/Partner