Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 26011
c�a CITY SECRETARY CONTRACT NO. 12?b CONTRACT FOR THE REPLACEMENT OF THE FOAM LINE FOR THE FIRE SUPPRESSION SYSTEM AT HANGAR 39N, MEACHAM INTERNATIONAL AIRPORT THE STATE OF TEXAS § COUNTY OF TARRANT § THIS CONTRACT, made,and entered into June 12, 2000 by and between the City of Fort Worth, a home-rule municipal corporation located in Tarrant County, Texas, acting through its City Manager thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER", and Architectural Utilities, Inc. of the City of Fort Worth, County of Tarrant and State of Texas, Party of the Second Part, hereinafter termed "CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second Part (Contractor) hereby agrees with the said Party of the First Part (Owner) to commence and complete certain improvements described as follows: REPLACEMENT OF THE FOAM LINE FOR THE FIRE SUPPRESSION SYSTEM AT HANGAR 39N, MEACHAM INTERNATIONAL AIRPORT and all extra work connected therewith, under the terms as stated in the Contract Documents, and at his (their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirements of the Contract Documents, which include all maps, plats, blueprints and other drawings and printed or written explanatory matter thereof, and the specifications thereof, as prepared by Carter and Burgess, Inc., Engineers, under a three way agreement between Carter and Burgess, Inc., the Owner and Contractor, of which has been identified by the endorsement of the Contractor and the Engineers G-1 offlCC�aL ,SEC OO PD CNN�ICV� AVDN �Un UL�\/�)U OIIA �ISWo thereon, together with the Contractor's Written Proposal dated June 6, 2000 and the other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contract Documents and General Specifications, all of which are made a part hereof and collectively evidence and constitute the entire contract. The Contractor hereby agrees to commence work on June 19, 2000, and .to substantially complete the work within the time stated in the proposal. The Owner agrees to pay the Contractor in current funds for the performance of the contract in accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the Contract Documents and all approved modifications thereof, and to make payment on account thereof as provided therein. The total cost of the work as stated in its proposal is $51,080. The cost to Owner shall not exceed one- third (1/3) of the total cost of the work ($17,027), unless either written change orders executed by the Owner change the total cost of the work or the Owner is determined to have been a party to the failure of the fire suppression line being replace under this contract. IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in sextuplicate in the year and day first above written. City of Fort Worth, Texas (Owner) ATTEST: Party of the First Part 1 Vv Ramon Guajardo, Assistant City Manager Gloria earson, City Secre ary (SEAL) contract Authorization Date -2 1 VVIC AG VRE00 RD �� Wui RAlp VEXA Party of the Second Part B. Doug lumbaugh ice President Architectural Utilities, Inc. WITNESSES: Jane Ratliff B �� Y Approved for Fort Worth Department of Aviation is Pyle4ct APPROVED: Approved as to Form and Legality: A. Douglas Rademaker, P.E., Director Assistant City Attorney Department of Engineering G-3 L �GSA E CC:0R.D C T1,11rNARY IV "NATE ACRD,,, CERTIFICATE ®F LIABILITY INSU NCE 06/14/2 00 PRODUCER (23L4)691-5721 (214)691-4961 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION K & S Group, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR Southwest Assurance Group, Inc ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 9400 N Central Expwy. , #950 Dallas, TX 75231-5044 INSURERS AFFORDING COVERAGE INSURED Architectural Utilities, Inc. dba INSURER A7. Amerisure Insurance Company AUI General Contractors INSURER B: Great American Insurance Co. P.O. Box 11586 INSURER C: Michigan Mutual Insurance Company Fort Worth, TX 76110 INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFOEDCTIVE POLICY EXPIRATION LIMITS GENERAL LIABILITY CPP1299755 05/01/2000 05/01/2001 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY FIRE DAMAGE(Any one fire) $ 300,000 CLAIMS MADE ®OCCUR MED EXP(Any one person) $_ 10,000 A PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 1,000,000 POLICY M PRO- LOC JECT AUTOMOBILE LIABILITY CA1299754 05/01/2000 05/01/2001 COMBINED SINGLE LIMIT X ANY AUTO (Ea accident) $ 1,000,000 ALL OWNED AUTOS BODILY INJURY SCHEDULED AUTOS (Per person) $ A X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC.•$_....,__.._..._._._ AUTO ONLY: AGG $ EXCESS LIABILITY CU1299756 05/01/2000 05/01/2001 EACH OCCURRENCE_ $ 10,000,000 X OCCUR CLAIMS MADE AGGREGATE _. _..,.,, -$..._:_..10, _— 000,OOO C .. _ -_. .10,$ DEDUCTIBLE $ X RETENTION $ 10,00 $ WORKERS COMPENSATION AND C129975705 05/01/2000 05/01/2001 X ToRYUMrrS ER EMPLOYERS'LIABILITY A E.L.EACH ACCIDENT $_ 500,000 E.L.DISEASE-EA EMPLOYEE $ 500,000 E.L.DISEASE-POLICY LIMIT $ 500.000 ai�lRders Risk - All IM893837407 05/01/2000 05/01/2001 Any One Location-$6,000,000 B isk Flood/Quake - $250,000 DESCRIPTION OF OPERATIONS ILOCATIONSNEHICLESIEXCLUSIONS ADDED BY ENDORSEMENTISPECIAI,PROVISIONS Project: Replacement of Foam Line for the Fire Suppression System at Hangar 39N, Meacham International irport. R,D CERTIFICATE HOLDER ADDITIONAL INSURED;INSURER LETTER CANCELLATION h �'� = p L5✓�c SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING COMPANY WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, City of Fort Worth BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY 1000 Throckmorton Street OF ANY KIND UPON THE COMPANY,ITS AGENTS OR REPRESENTATIVES. Fort Worth, TX 76102 AUTHORIZED REPRESENTATIVE ^� h David Oxford/DAVID _jW�QJJ ACORD 26—S(7/97) ©ACORD CORPORATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 26S(7/97) City of Fort Worth, Texas q?%1101r and coun"I n; a 'on DATE REFERENCE NUMBER LOG NAME PAGE G-1 3149 1 of 2 2/6/01 30AUI&CB SUBJECT AUTHORIZE PAYMENT TO ARCHITECTURAL UTILITIES, INC. AND CARTER & BURGESS, INC. FIRE SUPPRESSION SYSTEM EVALUATION AND IMPROVEMENTS AT MEACHAM INTERNATIONAL AIRPORT (HANGAR 39N) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Capital Projects Reserve Fund by $69,067 from available funds; and 2. Authorize the transfer of $69,067 from the Capital Projects Reserve Fund to the Airports Capital Projects Fund for architectural and engineering services related to the fire suppression system at Meacham International Airport (Hangar 39N); and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Airports Capital Projects Fund by $69,067 from available funds; and 4. Authorize the City Manager to approve compensation to Architectural Utilities, Inc. in the amount of $49,067 for work performed on Meacham International Airport (Hangar 39N) fire suppression system; and 5. Authorize the City Manager to approve compensation to Carter & Burgess, Inc. in the amount of $20,000 for engineering, services performed on Meacham International Airport (Hangar 39N) fire suppression system. DISCUSSION: On May 9, 2000, staff briefed the City Council on the history of problems related to leakage in an existing 24-foot waterline and 6-foot aqueous film forming foam line comprising the fire suppression system serving Hangar 39N at Meacham International Airport. Hangar 39N, formerly known as the PageAvjet Hangar, is located near the north end of Meacham International Airport. It was originally constructed approximately ten years ago. The fire system was designed by Carter & Burgess, Inc. (C&B) and constructed by Architectural Utilities, Inc. (AUI). On December 19, 2000, and January 9, 2001, staff updated the City Council on progress made to eliminate the problems associated with the waterline and foam line. Subsequent to the May 9, 2000 briefing, C&B prepared a remediation plan for the foam line and AUI was scheduled to perform the remediation work. However, prior to starting construction, additional problems were discovered relating to maintenance of the pumps that could contribute to, and possibly explain, the leakage in the waterline. In addition, an apparent foam line leak was discovered under the terminal itself. Iii City of Fort Worth, Texas 10 04 Whaffor and COU00 'e" UMMUMCatiOn %NOW kftw DATE REFERENCE NUMBER LOG NAME PAGE 2/6/01 G-13149 30AUI&CB 2 of 2 SUBJECT AUTHORIZE PAYMENT TO ARCHITECTURAL UTILITIES, INC. AND CARTER & BURGESS, INC. FIRE SUPPRESSION SYSTEM EVALUATION AND IMPROVEMENTS AT MEACHAM INTERNATIONAL AIRPORT (HANGAR 39N) Valve seats in the pumps were leaking, accounting for the loss of pressure in the waterline. These valves were examined on two previous occasions by in-house maintenance using electronic listening devices and no internal leakage was discovered. An independent leak detection company was hired by AUI and it discovered the leak. It was also determined that the packing glands for the pumps were leaking excessively. The rate of leakage was measured and it was determined that the loss of water was very close to the loss amount measured from the storage tanks. The leakage in the packing glands and the valves are both maintenance issues and are the responsibility of the tenant occupying Hangar 39N under the terms of the lease. AUI, C&B, and City staff evaluated these issues and determined that correction of these problems would bring the fire suppression system to acceptable operating standards. All of these conditions are areas outside of either C&B or AUI's responsibility and contractually would be under the responsibility of the tenant leasing Hangar 39N. AUI was authorized by staff to repair the foam line under the hangar and the tenant has been advised of its responsibility to maintain the pumps. C&B and AUI have been fully cooperating with the City to resolve this matter. No evidence has been discovered to date that would show either C&B or AUI to be negligent in the original design or installation. Staff has negotiated with C&B and AUI to install access points along the existing underground water and foam lines to allow listening devices to easily monitor for leakage should further problems arise. Staff also negotiated with C&B and AUI in order to compensate them for efforts made to resolve this matter. The amounts recommended are the result of those negotiations. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of the above recommendations and adoption of the attached supplemental appropriation ordinances, funds will be available' in the current capital budget, as appropriated, of the Airports Capital Projects Fund. Upon completion of this recommendation, the cask balance in the Capital Projects Reserve Fund will be $1,297,897. MGA Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) 1) GC10 472001 013010001000 $69,067.00 Mike Groomer 6140 1) GC10 538070 013010001000 $69,067.00 Originating Department Head: 20) GC24 472010 055240438240 $69,067.00 3)GC24 539120 055240438240 $69,067.00 A.Douglas Rademaker 6157 (from) APPROVED 2-6-01 2) GC10 538070 013010001000 $69,067.00 ORDINANCE NO. 14508 Additional Information Contact: 4&5) GC24 539120 055240438240 $69,067.00 ORDINANCE NO. 14509 A. Douglas Rademaker 6157