HomeMy WebLinkAboutContract 55455-CO4CSC No. 55455-CO4 Fox_ T�W�oRTH .. City of Fort Worth Change Order Request Project Namel Hulen Street and Granbury Road Intersection Improvements Client Project #(s)l 101017 l City Sec # l 55455 Project Reconstruction of approximately 500 linear feet in all directions from the Hulen Street and Granbury Road intersection. The major items of work consist Description of widening the intersection to construct double left turn lanes, new traffic signals and street lights. Contractorl Reyes Group, LTD l Change Order #1 City Project Mgr. I Alejandra Ayala Date 7/17/2023 City Inspectorl Brian McGill/Edward Davila Dept. TPW Contract Time Totals (CD) Original Contract Amount $1,895,849.50 $1,895,849.50 240 Extras to Date $82,651.70 $82,651.70 79 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1,978,501.20 $1,978,501.20 319 lGo to ADD & DEL Tabs to Enter CO Backup $19,292.77 $19,292.77 92 Revised Contract Amount $1,997,793.97 $1,997,793.97 411 Original Funds Available for Change Orders $719,020.50 $719,020.50 Remaining Funds Available for this CO $636,368.80 $636,368.80 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 5.38% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $2,369,811.88 JUSTIFICATION (REASONS) FOR CHANGE ORDER This is a reconciliation change order to balance contract quantities. This change order adds quantities for work items that had been overrun during the course of the construction contract which caused the contract amount to be exceeded and deletes quantities which were not used. This change order also reconciles contract time. Covid-19 impacted labor, operations and progress a total of 42 days. The final inspection was conducted on 6-17-2022 and contractor completed the punch list on 6-27-2022 (within the alloted time). The TDLR inspection scheduling took longer than usual and was conducted on August 2, 2022, beyond the end of contract time. The TDLR deficiencies were completed by Reyes again within the allotted 10 business days. Staff agrees to grant the contractor a total of 92 days for delay impacts caused by Covid-19, the longer than anticipated TDLR inspection scheduling and the standard 10 business days (14 CD) afforded to contractor to correct the deficiencies found on the TDLR report. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. contractor's Company Name W I � Contractor (Name Contract Siqnature ate Reyes Group, LTD I Marcos G Reyes I4AL44—&°' I Jul 25, 2023 Inspector/Inspection Supervisor Date Project and Contract Compliance Wanager Date `r '4J0** Jul 25, 2023 - ,, -.-:, -�- Jul 25, 2023 Program Manager Date Senior Capital Project Officer Date Sir� Aug 7, 2023 �Qd Aug 9, 2023 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date Patricia / wadcack Aug 9, 2023 iY , 7— Aug 9, 2023 Assistant City Attorney Date JAssistant City Manager Date 9 1 Aug 15, 2023 —Pxqj— Aug 15, 2023 ATTEST: ooaO nnbU Jannette Goodall, City Secretary p_o °. 0. dvo o °-If TEXA5o4 ��bnavvo4 Council ction (if required) M&C Number I 23-0578 I M&C Date Approved 1 6/27/2023I OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX R FORTW _ TH City of Fort Worth "7°a Change Order Additions Project Name I Hulen Street and Granbury Road Intersection Improvement: I City Sec # 1 55455 1 Client Project # 1 101017 1 Contractorl Reyes Group, LTD I PMI Alejandra Ayala Inspectorl...... nl ul Change Order Submittal # ® Date 1 7117/2023 1 ADDITIONS II EM UESCRIPIION UEPI Uty Unit Unit Cost local 1 135.0102 Railroad Flagmen TPW 0.56706250 LS $60,000.0U I $34,023.751 9999.0018 4" Cone Pvmt for Medians (Sidewalk Specification) TPW 1,065.60000000 SF $7.51J $7,992.001 3213.0203 8" Cone Pvmt HES TPW 330.41000000 BY $112.011 $37,005.921 3213.0301 4" Cone Sidewalk TPW 409.80000000 SF $10.011 $4,098.001 3216.0102 7" Cone Curb and Gutter TPW 265.10000000 LF $32.011 $8,483.201 3217.0001 4" SLD Pvmt Marking HAS W1 TPW 403.00000000 LF $1.5d $604.501 3217.0002 4" SLD Pvmt Marking HAS TPW 121.00OOOOOG LF $1.51J' $181.501 3217.0003 4" BRK Pvmt Marking HAS TPW 115.0000000(7 LF $1.51J' $172.501 3217.0104 6" DOT Pvmt Marking HAS ) TPW 11.0000000(7 LF $3.01J, $33.001 3217.1001 Lane Legend RR TPW 1.0000000" EA $839.511 $839.501 3217.1003 Lane Legend DBL Arrow TPW 1.00000006 EA $274.511 $274.501 3217.2104 REFL Raised Marker TY II-C-H TPW 11.00000000 EA $6.01J $66.001 3217.4306 Remove 24" Pvmt Marking TPW 80.00000000 LF $4.51J $360.001 3217.4401 Remove Lane Legend RR TPW 3.00000001111111 EA $305.011 $915.001 3292.0100 Block Sod Placement TPW 261.0000000(1 SY $6.01J $1,566.001 3305.0103 Explortory Excavation of Existing Utilities TPW 19.0000000(1 EA $805.011 $15,295.001 3471.0001 Traffic Control TPW 3.00000001111111 MO $2,661.5U� $7,984.501 3471.0002 Portable Message Sign TPW 23.0000000(1 WK $2,208.OU� $50,784.001 9999.0023 6' Concrete Flume TPW 5.3000000111111 LF $350.011 $1,855.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 TF W $172,533.871 1 1 1 Sub Total Additions $172,533.871 Change Order Additions Page 2 of 4 FORTWORTH City of Fort Worth Change Order Deletions Project Name I Hulen Street and Granbury Road Intersection Improvements City Sec # I 55455 Client Project # 1 101017 Contractorl Reyes Group, LTD I PMI Alejandra Ayala Inspector Change Order Submittal # ® Date 1 5/24/2023 I DELETIONS I I EM UL6UKII I IUN UEP I Uty Unit unit Cost I otal 1 241.0100 Remove Sidewalk TPW 0.7520000U SF $2.5U I $1.881 241.0401 Remove Concrete Drive TPW 132.000000OU SF $3.51J $462.U01 241.111U0 Remove Conic Pvmt TPW 480.75111111 SY $21.0(Y $10,095.771 241.1100 Remove Asphalt Pvmt TPW 21.360000OU SY $17.5V $373.801 241.1300 Remove Conic Curb & Gutter TPW 216.70000UUU LF $6.5(f $1,408.551 241.3013 Remove 18" Storm Line TPW 6.00000000 LF $36.0U' $216.U01 3123.UlUl Unclassified Excavation by Plan TPW 28.30000000 GY $33.00 $933.901 3123.0103 Borrow by Plan TPW 16.0000000U CY $85.50 $1,368.001 3211.0113 8" Flexible Base, Type A, GR-1 TPW 3U4.57111111 SY $24.50 $7,461.991 3212.0302 2" Asphalt Pvmt Type D TPW 276.53333333 SY $25.50 $7,051.601 3212.0503 6" Asphalt Base Type B TPW 179.53333333 SY $52.51_ 1 $11,220.831 3212.0401 HMAC Transition TPW 4.950000OU TN $419.501 $2,076.531 3213.0201 6" Conc Pvmt HES TPW 151.00000UUU SY $101 A(_ 1 $15,251.001 3213.0402 7" Concrete Driveway TPW 390.00000000 SF $14.5(l $5,655.001 3213.0505 Barrier Free Kamp, Type P-1 TPW 1.000DU00U EA $3,733.51 l $3,733.501 3213.0507 Barrier Free Ramp, Type P-2 TPW 2.0000000U EA $3,866.0(1 $7,732.001 9999.0007 8" Conc Curb and Gutter TPW 333.000000UU LF $25.011 $8,325.001 3217.0201 8" SLD Pvmt Marking HAS (W) TPW 100.00000000 LF $2.5(j $250.001 3217.0202 8" SLD Pvmt Marking HAS f l�I TPW 307.000000UU LF $2.51 j $767.501 3217.0501 24" SLD Pvmt Marking HAE W) TPW 6.00000000 LF $9.0(1 $54.OUj 3217.1002 Lane Legend Arrow TPW 3.000UUOOU EA $168.U(r $504.001 3217.1004 Lane Legend Only TPW 1.00000000 EA $191.06 $191.001 3217.2101 KEFL Raised Marker TY I -A TPW 8.000U000U EA $7.5U $6U.001 3217.2102 REFL Raised MarkerTY I-C TPW 16.000000OU EA $7.5U' $120.UOj 3217.4201 Fire Lane Marker TPW 95.0000000U LF $1-5 Y, $142.501 3217.4301 Remove 4" Pvmt Marking TPW 3,061.000000OU LF $1.0/ $3,061.001 3217.4307 Remove Raised Marker TPW 72.0000000U EA $1.0 $72.001 3217.4402 Remove Lane Legend Arrow TPW 4.0000000U EA $76.5, $306.U01 3217.44U4 Remove Lane Legend Unly TPW 1.000U000U EA $76.51 $76.501 3232.0100 Conc Rat Wall with Sidewalk, Face TPW 278.0000000U SF $50.511 $14,039.001 3232.0 101 Gonc Rat Wall with Sidewalk, Sidewalks TPW 841.00000UUU SF $36.515' $30,696.501 3291.0100 Topsoil TPW 5.42592593 GY $59.0U $320.131 3349.5003 2U' Curb Inlet TPW 1.0000000U EA $10,335.UU $10,335.001 9999.0164 Temporary Traffic Signal TPW 1.00000000 EA $6,748.6Z $6,748.621 9999.019U TxDUT Standard Pedestrian Handrail PRU-13 (Ty E) TPW 2U.000000UU LF $106.5U $2,13U.UU1 T(-W $153,241.101 1 1 1 Sub Total Deletions $153,241.101 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service T, Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT 1 10/19/2021 $0.00 4/6/2022 $94,700.50 2/28/2023-$12,048.80 Total I $82,651.70 6/28/23, 4:04 PM M&C Review CITY COUNCIL AGENDA Create New From This M&C DATE: 6/27/2023 REFERENCE NO.. CODE: C TYPE: Official site of the City of Fort Worth, Texas FoR� T H **M&C 23- 20HULEN STAT 0578 LOG NAME: GRANBURY RD CHANGE ORDER 4 CONSENT PUBLIC NO HEARING: SUBJECT: (CD 6) Authorize Execution of Change Order No. 4 in the Amount of $19,292.77 and the Addition of 92 Days to a Contract with Reyes Group, LTD for the Hulen Street at Granbury Road Intersection Improvements Project for a Revised Contract Amount of $1,997,793.97 (2018 Bond Program) RECOMMENDATION: It is recommended that the City Council Authorize execution of Change Order No. 4 in the amount of $19,292.77 to City Secretary Contract No. 55455 with Reyes Group, LTD for the Hulen Street at Granbury Road Intersection Improvements Project for a revised contract amount of $1,997,793.97 (City Project No. 101017). DISCUSSION: On January 21, 2021, Mayor and Council Communication (M&C 21-0043) authorized a contract with Reyes Group, LTD (City Secretary Contract No. 55455), in the amount of $1,895,849.50 for the Hulen Street at Granbury Road Intersection Improvements project. Change Order No. 4 is a reconciliation change order to balance contract quantities and to reconcile Line Item 9999.0164 Temporary Traffic Signal, which Bean Electric billed in September 2021. The billing for this line item was needed due to the partial removal of the existing traffic signal and the need to temporarily operate the new traffic signal. The current signal was partially left in place because it contained the power source to the existing traffic signal, which was not ready to be removed. This change order also reconciles contract time. The following table summarizes previous contract actions and change orders: M&C Amount Justification Date Initial Contract $1,895,849.50 Construction of 1/12/2021 M&C 21-0043 Project Change Order Change order to No. 1 $0.00 install double mast 10/19/2021 Administratively arm traffic signal Approved poles. Change order to Change Order 9 include remaining line No. 2 $94,700.50 items needed to 4/6/2022 Administratively construct the double Approved mast arm traffic signal poles. Change Order $(12,048.80) Change order to paint 2/28/2023 No. 3 the traffic signal and Administratively pedestrian poles black Approved apps.cfwnet.org/counci l_packet/mc_review.asp? I D=31205&councildate=6/27/2023 1/3 6/28/23, 4:04 PM Change Order No. 4 Contract Total M&C Review to comply with new city standards. $19,292.77 See above. $1,997,793.97 The funding for the project is summarized in the table below: Fund 2018 Bond Program - 34018 TaxNote 2017 - 34017 Project Total Existing Funding $5,170,000.00 $500,000.00 $5,670,000.00 Additional Funding Sim $0.00 $0.00 Project Total $5,170,000.00 $500,000.00 $5,670,000.00 Funding is budgeted in the TPW Dept Highway & Streets Department's 2018 Bond Program Fund for the purpose of funding the Hulen Street at Granbury Road project, as appropriated. This project is included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until the debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 23209-05-2018) and subsequent actions taken by the Mayor and Council. Business Equity: Reyes Group, LTD agrees to maintain its initial MBE commitment of 5\% that it made on the original contract and extend and maintain that same MBE commitment of 5\% to all prior change orders up to and inclusive of this Change Order No. 4. Therefore, Reyes Group, LTD remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 6. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the 2018 Bond Program Fund for the Hulen St @ Granbury Rd project to support the approval of the above recommendation and execution of the contract change order. Prior to any expenditure being incurred, the Transportation and Public Works Department have the responsibility to validate the availability of funds. TO Fund Department Account Project ' Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project ID ID Submitted for Citv Manager's Office bv: Originating Department Head: Additional Information Contact: Program Activity Budget Reference # Amount Year (Chartfield 2) William Johnson (5806) Lauren Prieur (6035) Monty Hall (8662) apps.cfwnet.org/cou nci l_packet/mc_review.asp? I D=31205&councildate=6/27/2023 2/3 6/28/23, 4:04 PM M&C Review ATTACHMENTS 101017 1295 forms 6.1.23 2.pdf (CFW Internal) 101017 H&G Map.PDF (Public) 20HULEN STAND GRANBURY RD CHANGE ORDER 4 funds availabilitvpdf (CFW Internal) Entitvinformation-20230607-015121.pdf (CFW Internal) FID Table 101017.xlsx (CFW Internal) Reves Group MBE 6.7.23 GVEdits encntpted .pdf (CFW Internal) apps.cfwnet.org/cou nci l_packet/mc_review.asp? I D=31205&councildate=6/27/2023 3/3 101017-CNCO-Change Order #4 Hulen at Granbury Road Intersection Improvements Final Audit Report 2023-07-27 Created: 2023-07-25 By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAA6e8ixdyelDNKpCANsFUwJpMmAOCTWnJ1 "101017-CNCO-Change Order #4 Hulen at Granbury Road Inter section Improvements" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2023-07-25 - 1:39:31 PM GMT- IP address: 204.10.90.100 Document emailed to marcosg@reyesgroup.com for signature 2023-07-25 - 1:44:06 PM GMT Document emailed to wendi.hedlund@fortworthtexas.gov for filling 2023-07-25 - 1:44:06 PM GMT Document emailed to Brian. McGill@fortworthtexas.gov for signature 2023-07-25 - 1:44:06 PM GMT Document emailed to Alejandra.Ayala@fortworthtexas.gov for signature 2023-07-25 - 1:44:06 PM GMT Email viewed by Brian. McGill@fortworthtexas.gov 2023-07-25 - 1:50:07 PM GMT- IP address: 204.10.91.100 Go Signer Brian.McGill@fortworthtexas.gov entered name at signing as Brian McGill 2023-07-25 - 1:51:02 PM GMT- IP address: 204.10.91.100 Document e-signed by Brian McGill (Brian.McGill@fortworthtexas.gov) Signature Date: 2023-07-25 - 1:51:04 PM GMT - Time Source: server- IP address: 204.10.91.100 Email viewed by marcosg@reyesgroup.com 2023-07-25 - 2:05:19 PM GMT- IP address: 173.165.87.241 Email viewed by wendi.hedlund@fortworthtexas.gov 2023-07-25 - 2:07:46 PM GMT- IP address: 204.10.90.100 FORTW❑RTHg I Paw m"Y Adobe Acrobat Sign - Signer marcosg@reyesgroup.com entered name at signing as Marcos G Reyes 2023-07-25 - 2:30:18 PM GMT- IP address: 173.165.87.241 Document e-signed by Marcos G Reyes (marcosg@reyesgroup.com) Signature Date: 2023-07-25 - 2:30:20 PM GMT - Time Source: server- IP address: 173.165.87.241 Email viewed by Alejandra.Ayala@fortworthtexas.gov 2023-07-25 - 4:33:51 PM GMT- IP address: 204.10.90.100 Signer Alejandra.Ayala@fortworthtexas.gov entered name at signing as Alejandra Ayala 2023-07-25 - 4:34:16 PM GMT- IP address: 204.10.90.100 Document e-signed by Alejandra Ayala (Alejandra.Ayala@fortworthtexas.gov) Signature Date: 2023-07-25 - 4:34:18 PM GMT - Time Source: server- IP address: 204.10.90.100 Document declined by wendi.hedIund@fortworthtexas.gov Decline reason: Please correct Bid items on Additions as follows: 1st line should be 135.0102; last line should be 9999.0023Please correct bid item on Deletions as follows: 9th line should be 3211.0113.Thank you!Wendi 2023-07-27 - 4:58:52 PM GMT- IP address: 204.10.90.100 FORTW❑RTHg I P°He1� Y Adobe Acrobat Sign FORT WORTH Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Change order#4 Hulen at Granbury Road Intersection Improvements M&C 23-0578 CPN 101017 CSO # 55455 DOC# DATE: TO: INITIALS DATE OUT 1 Marcos Reyes — Contractor - Signature MGN' Jul 25 2023 MarcosG@reyesgroup.com MGR 2. Wendi Hedlund — Bus. Support - initial iie- Jul 31, 2023 3. Brian McGill— Inspector - signatures Jul 25, 2023 4. Alejandra Ayala — PM - signature A4 Jul 25, 2023 5. Raul Lopez — Prog. Manager - signature C (v Aug 7, 2023 6. Lissette Acevedo — Sr. CPO - signature o�v Aug 9, 2023 7. Patricia Wadsack — Asst. Director - signature PLW i-w Aug 9, 2023 8. Lauren Prieur — Director - signatures Aug 9, 2023 9. Doug Black — City Attorney - signature wolwb ib Aug 15, 2023 10. William Johnson — ACM - signature v- Aug 15, 2023 11. Jannette Goodall — City Secretary - signature ,SGTSG Aug 16, 2023 TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑ Yes ❑ No RUSH: ❑ Yes ❑ No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No ROUTING TO CSO: ❑ Yes ❑ No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File