HomeMy WebLinkAboutContract 58373-A1CSC No. 58373-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 58373
WHEREAS, the City of Fort Worth (CITY) and Pacheco Koch Consulting
Engineers, LLC, (ENGINEER) made and entered into City Secretary Contract
No. 58373, (the CONTRACT) which was authorized by M&C 22-0846 on the Iltn
day of October, 2022 in the amount of $ 236,049.00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Bryant Irvin Road and Oakmont Boulevard Intersection Improvements
Project, CPN 103307; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $49,800.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $285,849.00.
OFFICIAL RECORD
CITY SECRETARY
3. FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas [Bryant Irvin Road and Oakmont Boulevard Intersection Improvements]
Prof Services Agreement Amendment Template [City Project Number 103307]
Revision Date: November 23, 2021
Page 1 of 5
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
William Johnson (J 28, 202310:28 CDT)
William Johnson
Assistant City Manager
DATE: Jul 28, 2023
APPROVAL RECOMMENDED:
Pacheco Koch Consulting
Engineers, LLC
Chl-irtoeha- Clla
Christopher C a (Jul 18, 2023 15:44 CDT)
Christopher J. Cha
Public Infrastructure Market
Leader
DATE: Jul 18, 2023
,2r.—
Lauren Prieur (Jul 24, 202317:07 CDT)
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Panda. Kaba,
Fanta Kaba, P.E.
Professional Engineer
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas [Bryant Irvin Road and Oakmont Boulevard Intersection Improvements]
Prof Services Agreement Amendment Template [City Project Number 103307]
Revision Date: November 23, 2021
Page 2 of 5
APPROVED AS TO FORM AND LEGALITY:
t
DBlack (Jul 27, 2023 16:08 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ATTEST:
A
Jannette Goodall
City Secretary
M&C: N/A
Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas [Bryant Irvin Road and Oakmont Boulevard Intersection Improvements]
Prof Services Agreement Amendment Template [City Project Number 103307]
Revision Date: November 23, 2021
Page 3 of 5
FUNDING BREAKDOWN SHEET
City Secretary No. 58373
Amendment No. 1
Department Fund -Account -Center Amount
TPW 34027-0200431-5330500-103307-003930-9999- $ 49,800.00
22010204
Total: $ 49,800.00
City of Fort Worth, Texas [Bryant Irvin Road and Oakmont Boulevard Intersection Improvements]
Prof Services Agreement Amendment Template [City Project Number 103307]
Revision Date: November 23, 2021
Page 5 of 5
FORT WORTH.
ATTACHMENT "A"
Scope for Enaineerina Desian Related Services for Intersection Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of Amendment 1 to the Bryant Irvin Road and Oakmont Boulevard
Intersection Project is project is to improve capacity of the Oakmont Boulevard and
Harris Drive Intersection. This will be accomplished through median work,
construction of an additional WB left turn lane, upgrade traffic signals, detection, and
communications, signing, and striping.
WORK TO BE PERFORMED
Taak 1. DQ6igR MaRagemeRt — Not Included
Taolc ?. GGRGOptual P9SmgR 6) — Not Included
Task 3. Preliminary Design (60%)
Task 4. Final Design (90% and 100%)
T&\9k 5. Rid Phase SeFViGes — Not Included
Task . GGRStFWGtiE)R Phrase oeFViees— Not Included
Task . ROVVTEaseMeRt SeFViGes — Not Included
Task 8. Survey and Subsurface Utility Engineering Services
Taok 9. Permitting — Not Included
Task 10. Quality Control/ Quality Assurance
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. The Preliminary Design Drawings and Specifications shall include the following:
• Preliminary cover and index of sheets including project limits, area location map
and beginning and end station limits.
• SUE Plan sheets sealed by a licensed professional engineer registered in the
State of Texas.
• Quantity Summary page and each design sheet shall include a quantity take off
table.
• Preliminary iSWM Checklist in accordance with the current CITY iSWM Criteria
Manual for Site Development and Construction.
• Traffic Control Plan utilizing CoFW Standard Details including all construction
signage and pavement markings which will be in accordance with the latest edition
of the Texas Manual on Uniform Traffic Control Devices.
• A Project Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument #8901, PK
Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base. Z coordinate on City Datum only; descriptive location
(i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street).
• Updated existing and proposed typical section sheets.
• Updated roadway plan and profile sheets displaying station and coordinate data for
all horizontal alignment P.C.'s, P.T.'s, P.I.'s; station and elevation data of all
vertical profile P.C.'s, P.T.'s, P.I.'s, low points, and high points; lengths of vertical
curves, grades, K values, e, and vertical clearances where required.
• No less than two bench marks plan/profile sheet.
• Bearings given on all proposed centerlines, or baselines.
• Station equations relating utilities to paving, when appropriate.
• Overall project easement layout sheet(s).
• Intersection layout sheets including ROW lines, horizontal alignments, utilities,
curbs, sidewalks, driveways, lane dimensions and arrows, and existing and
proposed contours (0.25' intervals)
City of Fort Worth, Texas Page 2 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 2 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
• Preliminary traffic signal and roadway details to include curbs, curb expansion
joints, driveways, sidewalks, and pavement details.
• Preliminary signing, pavement marking, illumination and signal layouts.
• Documentation of key design decisions.
• Estimates of probable construction cost.
3.2. Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager and
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY's comments from the field visit and submit this information to the CITY in
writing.
3.3. Utility Clearance
• ENGINEER will develop the design of CITY facilities to avoid or minimize
conflicts with existing utilities, and where known and possible consider potential
future utilities in designs. Where conflicts cannot be avoided, coordination of
Utility Conflicts will be identified at the Conceptual phase and begin at the
Preliminary Design phase.
• In the case of a public utility conflict, the ENGINEER will design CITY facilities to
avoid or minimize conflicts with existing utilities, and where known and possible
consider potential future utilities in designs.
In the case of a private Utility Conflict, the ENGINEER will provide a PDF set of
plans with the utility conflicts highlighted and a Utility Conflicts Table of those
conflicts to be included in a Utility Clearance Letter for coordination at each
design milestone. The ENGINEER may need to coordination directly with the
private utility provider if that provider needs to undertake design to adjust their
utility's location.
• The ENGINEER shall upload a PDF file of the approved preliminary plan set to
the designated project folder in the City's document management system (BIM
360) for forwarding to all utility companies which have facilities within the limits of
the project. The PDF file should be created directly from the CAD files.
• ENGINEER to obtain utility as-builts and/or do field visits to confirm relocation is
complete and that the utility has been relocated in accordance with the plans,
report any discrepancies found, and provide documentation to support findings.
• ENGINEER to upload all utility as-builts in the City's document management
system (BIM 360)
City of Fort Worth, Texas Page 3 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 3 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
ASSUMPTIONS
Three (3) sets of 11"x17" size plans will be delivered for the 60% design for
review coordination.
• One (1) set of specifications will be delivered for the 60% design.
• PDF files created from design CAD drawings will be uploaded to the designated
project folder in the City's document management system (BIM 360).
• All submitted documents and checklists will be uploaded to the designated
project folder in the City's document management system (BIM 360).
• The CITY's front end and technical specifications will be used. The ENGINEER
shall supplement the technical specifications if needed.
• One (1) Public Meeting is assumed.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications including QC/QA documentation
B. Utility Conflict Coordination Package
C. Preliminary iSWM Checklist
D. Estimates of probable construction cost
E. Public Meeting exhibits
City of Fort Worth, Texas Page 4 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 4 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
• Upon — be sure to track changes. approval of the Preliminary plans, ENGINEER will
prepare construction plans as follows:
• Final draft construction plans (90%) including specifications shall be submitted to CITY
per the approved Project Schedule.
• The ENGINEER will provide a PDF set of plans with the utility conflicts highlighted and a
Utility Conflicts Table of those conflicts to be included in a Utility Clearance Letter for
final coordination.
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Final Plans (100%) to the CITY per the approved Project Schedule. Each plan
sheet shall be stamped, dated, and signed by the ENGINEER registered in State of
Texas.
• Final iSWM Checklist in accordance with the current iSWM Criteria Manual for Site
Development and Construction.
• A Quantity Summary page will be included in both the 90% and 100% design packages.
Each design sheet of those package shall include a quantity take off table.
• The ENGINEER shall submit an estimate of probable construction cost with both the
90% and 100% design packages. This estimate shall use standard CITY or TxDOT bid
items, as applicable.
ASSUMPTIONS
• Three (3) sets of 11"xl7" size drawings and one (1) set of specifications will be delivered
for the 90% Design package.
• A PDF and DWF file for the 90% Design will be created from design CAD drawings and
will be uploaded to the project folder in the City's document management system (BIM
360).
• Ten (10) sets of 11"xl7" size drawings and two (2) set of specifications will be delivered
for the 100% Design package.
• A PDF and DWF file for the 100% Design will be created from design CAD drawings and
will be uploaded to the project folder in City's document management system (BIM 360).
DELIVERABLES
A. 90% construction plans and specifications including QC/QA documentation.
B. Utility relocation documentation.
C. Final iSWIM plan (Final check list)
D. 100% construction plans and specifications including QC/QA documentation.
E. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's or TxDOT's standard bid items and format, as applicable
City of Fort Worth, Texas Page 5 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 5 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
F. Original 11 "x17" size cover mylar for the signatures of authorized CITY officials.
City of Fort Worth, Texas Page 6 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 6 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
ENGINEER will perform field surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the
project. Information gathered during the survey shall include topographic data,
elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of
buried utilities, structures, trees (measure caliper, identify overall canopy, and have
qualified arborist identify species of trees), and other features relevant to the final
plan sheets. Existing drainage at intersections will be verified by field surveys. Spot
elevations will be shown on intersection layouts with cross slope to fit intersecting
grade lines.
• The minimum survey information to be provided on the plans shall include the
following:
— A Project Control Sheet, showing ALL Control Points, used or set while
gathering data. Generally on a scale of not less than 1:400:
— The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Main Street).
— Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the
same coordinate system, as the Control.
— No less than two horizontal bench marks, per line or location.
— Bearings given on all proposed centerlines, or baselines.
— Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall coordinate with the City's project
manager to identify, mail and obtain Temporary Right of Entry from landowners.
• The documentation shall be provided in conformance with the checklists and
templates available on the City's document management system resources
folder.
8.3. Subsurface Utility Engineering
Provide Subsurface Utility Engineering (SUE) to Quality Level D, C, B, and A, as
described below. The SUE shall be performed in accordance with Cl/ASCE 38-02.
City of Fort Worth, Texas Page 7 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 7 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
Qualitv Level D
• Conduct appropriate investigations (e.g., owner records, County/CITY records,
personal interviews, visual inspections, etc.), to help identify utility owners that
may have facilities within the project limits or that may be affected by the project.
• Collect applicable records (e.g., utility owner base maps, "as built" or record
drawings, permit records, field notes, geographic information system data, oral
histories, etc.) on the existence and approximate location of existing involved
utilities.
• Review records for: evidence or indication of additional available records;
duplicate or conflicting information; need for clarification.
• Develop SUE plan sheets and transfer information on all involved utilities to
appropriate design plan sheets, electronic files, and/or other documents as
required. Exercise professional judgment to resolve conflicting information. For
information depicted, indicate: utility type and ownership; date of depiction;
quality level(s); end points of any utility data; line status (e.g., active, abandoned,
out of service); line size and condition; number of jointly buried cables; and
encasement.
Qualitv Level C (includes tasks as described for Qualitv Level D)
• Identify surface features, from project topographic data and from field
observations, that are surface appurtenances of subsurface utilities.
• Include survey and correlation of aerial or ground -mounted utility facilities in
Quality Level C tasks.
• Survey surface features of subsurface utility facilities or systems, if such features
have not already been surveyed by a professional surveyor. If previously
surveyed, check survey data for accuracy and completeness.
• The survey shall also include (in addition to subsurface utility features visible at
the ground surface): determination of invert elevations of any manholes and
vaults; sketches showing interior dimensions and line connections of such
manholes and vaults; any surface markings denoting subsurface utilities,
furnished by utility owners for design purposes.
• Exercise professional judgment to correlate data from different sources, and to
resolve conflicting information.
• Update (or prepare) plan sheets, electronic files, and/or other documents to
reflect the integration of Quality Level D and Quality Level C information.
• Recommend follow-up investigations (e.g., additional surveys, consultation with
utility owners, etc.) as may be needed to further resolve discrepancies.
• Provide Quality Level C to identify overhead utilities on the project and provide
the overhead utility information on the SUE plan sheets.
City of Fort Worth, Texas Page 8 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 8 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
Level B (includes tasks as described for Qualitv Level C)
• Select and apply appropriate surface geophysical method(s) to search for and
detect subsurface utilities within the project limits, and/or to trace a particular
utility line or system.
• Based on an interpretation of data, mark the indications of utilities on the ground
surface for subsequent survey. Utilize paint or other method acceptable for
marking of lines.
• Unless otherwise directed, mark centerline of single -conduit lines, and outside
edges of multi -conduit systems.
• Resolve differences between designated utilities and utility records and surveyed
appurtenances.
• Recommend additional measures to resolve differences if they still exist.
Recommendations may include additional or different surface geophysical
methods, exploratory excavation, or upgrade to Quality Level A data.
• As an alternative to the physical marking of lines, the ENGINEER may, with
CITY's approval, utilize other means of data collection, storage, retrieval, and
reduction, that enables the correlation of surface geophysical data to the project's
survey control.
Level A
• Expose and locate utilities at specific locations.
• Tie horizontal and vertical location of utility to survey control.
• Provide utility size and configuration.
• Provide paving thickness and type, where applicable.
• Provide general soil type and site conditions and such other pertinent information
as is reasonably ascertainable from each test hole site.
ASSUMPTIONS
Up to three (3) Level A test holes are included.
DELIVERABLES
A. Drawing of the project layout with dimensions and coordinate list.
B. SUE plan drawings sealed by a professional engineer registered in the State of
Texas.
City of Fort Worth, Texas Page 9 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 9 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
TASK 10. QUALITY CONTROL / QUALITY ASSURANCE
ENGINEER to provide to the City a Quality Control/ Quality Assurance Plan (QC/QA Plan)
outlining the ENGINEER's method of ensuring the highest levels of design and accuracy are
incorporated into the calculations, plans, specifications, and estimates.
ENGINEER is responsible for and shall coordinate all subconsultant activity to include
quality and consistency of plans.
If, at any time, during the course of reviewing a submittal of any item it becomes apparent to
the CITY that the submittal contains errors, omissions, and inconsistencies, the CITY may
cease its review and return the submittal to the ENGINEER immediately for appropriate
action. A submittal returned to the ENGINEER for this reason may be rejected by the CITY
Project Manager.
10.1. QC/QA of Survey and SUE Data
• The ENGINEER's Surveyor shall perform Quality Control/ Quality Assurance on
all procedures, field surveys, data, and products prior to delivery to the CITY. The
CITY may also require the ENGINEER's Surveyor to perform a Quality
Assurance review of the survey and/or subsurface utility engineering (SUE) work
performed by other surveyors and SUE providers.
• ENGINEER's Surveyor shall certify in writing via a letter that the survey
information provided has undergone a Quality Control/ Quality Assurance
process.
• ENGINEER's Subsurface Utility Engineering provider shall certify in writing via a
letter that the SUE information provided has undergone a Quality Control/ Quality
Assurance process.
10.2. QC/QA of Design Documentation
• ENGINEER shall perform a QC/QA review of all documents being submitted for
review at all stages of the design including the 30%, 60%, and 90% and Final
Document design review submittals. QA should be performed by an individual
within the firm who is not on the design team.
ENGINEER is to acknowledge that each item on the Detailed Checklist has been
included by checking "done" on the checklist. If a particular checklist item is not
applicable, this should be indicated by checking "N/A". If an entire checklist is
not applicable, this should be indicated by checking every item on the list as
"N/A" and still included with the submittal. The ENGINEER shall use the Detailed
Checklist provided by CITY.
• A Comment Resolution Log must be used to document conflicting comments
between reviewers and to highlight comments made by the CITY that the
ENGINEER is not incorporating into the design documents along with the
associated explanation. The ENGINEER shall use the Comment Resolution Log
provided by CITY.
• The documentation of a QC/QA review includes (1) a copy of the color -coded,
original marked -up document (or "check print") developed during the QA
City of Fort Worth, Texas Page 10 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 10 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
checking process and/or review forms which sequentially list documents and
associated comments; and (2) a QC sign -off sheet with signatures of the
personnel involved in the checking process. Mark-ups may also be documented
using the Comment Resolution Log.
• Evidence of the QC/QA review will be required to accompany all submittals.
Documentation shall include, but is not limited to, the following items:
- PDF of the completed Detailed Checklists
- PDF of the QC/QA check print of the calculations, plans, specifications, and
estimates demonstrating that a review has been undertaken;
- PDF of previous review comments (if any) and the ENGINER's responses to
those comments in the Comment Resolution Log.
• If any of the above information is missing, is incomplete or if any comments are
not adequately addressed; the CITY may contact the ENGINEER and request
the missing information. If the ENGINEER does not respond to the request
within 24 hours, the CITY shall reject the submittal. No additional time will be
granted for a returned submittal.
• If the ENGINEER has not adequately addressed the comments, the submittal
shall be rejected and returned to the ENGINEER immediately to address the
issues.
ASSUMPTIONS
• All submittals to the City will be Quality checked prior to submission.
• A PDF of the QC/QA documentation will be uploaded to the project folder in
Buzzsaw.
DELIVERABLES
A. QC/QA documentation
City of Fort Worth, Texas Page 11 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 11 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon — be sure
to track changes. the CITY's written request. Any additional amounts paid to the ENGINEER
as a result of any material change to the Scope of the Project shall be agreed upon — be sure
to track changes. in writing by both parties before the services are performed. These
additional services include the following:
• Negotiation of easements or property acquisition.
• Geotechnical Investigation or Boring
• Utility Design with exception of adjustment to manholes or lids
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort Worth, Texas Page 12 of 12
Attachment A
PMO Release Date: 02.06.2015
Page 12 of 12
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
ATTACHMENT B
COMPENSATION
Design Services for
Bryant Irvin Road and Oakmont Boulevard Intersection Improvements
Amendment 1
City Project No. 103307
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
2023 Rate
($/hour)
Project Director
280
Project Manager
220
Project Engineer
200
EIT
155
CADD
125
Administrative
100
2-Person Field Crew
235
3 Person Field Crew
270
Survey Technician
180
Graduate Surveyor
155
Surveyor/Field Manager
230
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
B-1
ATTACHMENT B
COMPENSATION
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
B-2
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm
Primary Responsibility
Prime Consultant
Pacheco Koch
Civil Engineering and Survey —
Consulting Engineers,
Original Agreement
LLC
Pacheco Koch
Civil Engineering and Survey —
Consulting Engineers,
Amendment 1
LLC
Proposed MWBE Sub -Consultants
The Rios Group, Inc.
SUE — Original Agreement
GRAM NTX
Traffic Collection/Traffic Counts
— Original Agreement
The Rios Group, Inc.
SUE —Amendment 1
Non-MWBE Consultants
K+K Associates, LLP TDLR — Original Agreement
AMENDMENT 1 TOTAL
ORIGINAL AGREEMENT
TOTAL (ORIGINAL AGREEMENT + AMENDMENT 1)
Project Number & Name
103307 Bryant Irvin Road and Oakmont Blvd
Intersection Improvements —Amendment 1
103307 Bryant Irvin Road and Oakmont Blvd
Intersection Improvements — Original
Agreement
103307 Bryant Irvin Road and Oakmont Blvd
Intersection Improvements — Total (Original
Agreement + Amendment 1)
City MBE/SBE Goal = 9%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
Fee Amount
$211,574.00 74.0
$44,800.00 15.7
$18,475.00 6.5
$3,500.00 1.2
$5,000.00 1.7
$2,500.00 0.9
$49,800.00
$236,049.00
$285,849.00
Total Fee
MWBE Fee
MWBE %
$49,800.00
$5,000.00
10.0%
$236,049.00
$21,975.00
9.3%
$285,849.00 $26,975.00 9.4%
Consultant Committed Goal = 9 %
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
B-3
EXHIBIT "13-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
B-4
Professional Services Payment Request Project Manager:IFanta Kaba, PE Summary
Project: B ant Irvin Road and Oakmont Boulevard Intersectiol
City Project #: 110307 1 Supplier Instructions:
Purchase Order: FW020-0000008818 Fill in green cells including Invoice Number, From and To Dates and the included Worksheets
City Sec Number: 58373 1 When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: IPacheco Koch Consulting Engineers, LLC
Supplier's PM:
Christopher J. Cha, PE email:
Christopher. Cha@Westwoodps.
Supplier Invoice #:
Office Address:4060
Bryant Irvin,
Fort Worth, TX
76109-4113
Payment Request #:
Telephone:
817-412-7155
Service Date:From
Fax:
817-412-7156
Service Date:To
Invoice Date:
Remit Address:
7557 Rambler Road, Suite 1400, Dallas,
TX 75231
Agreement
Agreement
Amendment
Amount to
Sheet
FID and Work Type Description
Amount
Amount
Date
Work Type 1
Project Management 34027-0200431-5330500-103307-003930-9999-2201C
$12,720.00
$12,720.00
Work Type 2
Conceptual Design (30 Percent) 34027-0200431-5330500-103307-003930-!
$74,934.00
$74,934.00
Work Type 3
Preliminary Design (60 Percent) 34027-0200431-5330500-103307-003930-;
$51,850.00
$27,520.00
$79,370.00
Work Type 4
Final Design 34027-0200431-5330500-103307-003930-9999-22010204
$35,990.00
$14,925.00
$50,915.00
Work Type 5
Bid Phase 34027-0200431-5330500-103307-003930-9999-22010204
$5,810.00
$5,810.00
Work Type 6
Construction Phase Services 34027-0200431-5330500-103307-003930-99S
$21,060.00
$21,060.00
Work Type 7
ROW/Easement Services 34027-0200431-5330500-103307-003930-9999-2
$9,000.00
$9,000.00
Work Type 8
Survey 34027-0200431-5330500-103307-003930-9999-22010204
$15,000.00
$5,500.00
$20,500.00
Work Type 9
Permitting 34027-0200431-5330500-103307-003930-9999-22010204
$2,625.00
$2,625.00
Work Type 10
Quality Control/Quality Assurance 34027-0200431-5330500-103307-00393(
$7,060.00
$1,855.00
$8,915.00
Totals This Invoice
$236,049.00
$49,800.00
$285,849.00
LTD
Completed ($) Invoiced Current
Remaining
Amount Percent Spent Previously Invoice
Balance
$12,720.00
$74,934.00
$79,370.00
$50,915.00
$5,810.00
$21,060.00
$9,000.00
$20,500.00
$2,625.00
$8,915.00
Overall Percentage Spent:
$285,849.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Pacheco Koch Consulting Enginel817-412-7155
4060 Bryant Irvin, Fort Worth, TX 7557 Rambler Road, Suite 1400, Dallas,
76109-4113 TX 75231
Invoice
Consultant Project No.
CFW Project Manager
Fanta Kaba, PE 58373
Proj. Invoice No.
Invoice date:
Consultant's Project Manager:
lChristopher J. Cha, PE
Consultants PM email:
Christopher.Chana.Westwoodps.com
Period Service Date:From
Service Date:To
Name of Project:
Bryant Irvin Road and Oakmont
City Secretary Contract #: 58373
Boulevard Intersection Improvements
P.O. Number: FW020-0000008818
I ahnr (�a}cnnni Namc
14-irc Rw4n /4/hrl
Project Director
280.00
Project Manager
220.00
Project Engineer
200.00
EIT
155.00
CADD
125.00
Administrative
100.00
2 Person Field Crew
235.00
3 Person Field Crew
270.00
Survey Technician
180.00
Graduate Surveyor
155.00
Surveyor/Field Manager
230.00
Total Labor 0.0
Subcontract Service
The Rios Group
GRAM Traffic North Texas, Inc.
Subcontractor Subtotal
5 Percent Markup on Subcontract Services
Nonlabor Expenses
Nonlabor Expense Subtotal
Total Expenses (Subcontract Services+Markup+Nonlabor Expenses)
TOTAL DUE THIS INVOICE
Amount
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
N�M
$0.00
$0.00
$0.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Intersectic
City Project #: 103307
Work Type Desc: Pro))'ect Managqement Supplier Instructions:
FI D: 34U27-0200431-5330500-103307-0
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engineen
Supplier's PM: Christopher J. Cha, PE
email:
Christopher.cha@Westwoodps.com
Supplier Invoice #:
Office Address:
4060 Bryant Irvin, Fort Worth, TX 76109-4113
Payment Request #:
Telephone:
817-412-7155
Service Date:From
Fax:
817-412-7156
Service Date:To
Invoice Date:
Remit Address:
7557 Rambler Road, suite 1400, Dallas, TX 75231
Pay Items Agreement LTD
Agreement Amendment Amendment Amount to Completed
Description Amount Number Amount Date Amount
30 - Design Project Management $12,720.00 $12,720.00
Totals This Unit: $12,720.00 $12720.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
Current Remaining
Invoice Balance
$12,720.00
$12,720.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Inter:
City Project #: 103307
Work Type Desc: Conceptual Design f(30 Percentl Supplier Instructions:
FID: 34027-0200431-M30500-103307
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engine(
Supplier's PM: Christopher J. Cha, PE email: Chrlstopher.Cha@Westwoodps.com
Supplier Invoice #: Office Address:4060 Bryant Irvin, FortWorth, TX 76109-4113
Payment Request #: Telephone: 817-412-7155
Service Date:From Fax: 817-412-7156
Service Date:To
Invoice Date: Remit Address: 7557 Rambler Road, Suite 1400, Dallas, TX 75231
Pay Items Agreement LTD
Agreement Amendment Amendment Amount to Complete
Description Amount Number Amount Date Amount
30 - Desiqn Conceptual Desiqn (30 Percent) $74,934.00 $74,934.00
Totals This Unit: $74,934.00 $74,934.00
Overall Percentage Spent:
Percent ($) Invoiced
Spent Previously
Current Remaining
Invoice Balance
$74,934.00
$74,934.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Inter
City Project #: 103307
Work Type Desc: (Preliminary Desi_gp (60 Percenil Supplier Instructions:
FID: 134027-0200431-5330500-1033011
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: I FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engine
Supplier's PM: Christopher J. Cha, PE email: Christopher.Cha@Westwoodps.com
Supplier Invoice #: 0 o Office Address: 4060 Bryant Irvin, Fort Worth, TX 76109-4113
Payment Request #: Telephone: 817-412-7155
Service Date:From Fax: 817-412-7156
Service Date:To
Invoice Date: Remit Address: 7557 Rambler Road, suite 1400, Dallas, TX 75231
Pay Items
Agreement LTD
Agreement
Amendment Amendment
Amount to Complete
Description
Amount
Number Amount
Date Amount
30 - Design Preliminary Design (60 Percent)
$51,850.00
$51,850.0
30 - Design Preliminary Design (60 Percent)
1 $27,520.00
$27,520.0
Totals This Unit:
$51,850.00
27,520.0
$79,370.00 0.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
0.0000 i
0.00
Current Remaining
Invoice Balance
$0.00 $51,850.0C
$0.00 $27,520.00
0.00 $79,370.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Inter
City Project #: 103307
Work Type Desc: I Final Design Supplier Instructions:
FID: 134027-0200431-5330500-10330I
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: I FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engine
Supplier's PM: Christopher J. Cha, PE
Supplier Invoice #: 0
Payment Request #: 0
Service Date:From
Service Date:To
Invoice Date:
Pay Items
Description
30 - Design Final Design
30 - Design Final Design
email: Christopher.Cha@Westwoodps.com
o Office Address: 4060 Bryant Irvin, Fort Worth, TX 76109-4113
Telephone: 817-412-7155
Fax: 817-412-7156
Remit Address: 7557 Rambler Road, Suite 1400, Dallas, TX 75231
Agreement
LTD
Agreement Amendment Amendment
Amount to
Complete
Amount Number Amount
Date
Amount
$35,990.00
$35,990.0
1 $14,925.00
$14,925.0
Totals This Unit: $35,990.00 14925.0o 50915.00 0.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
0.0000 i
0.00
Current Remaining
Invoice Balance
$0.00 $35,990.012
$14,925.00
0.00 $50,915.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Inter
City Project #: 103307
Work Type Desc: IBid Phase Supplier Instructions:
FID: 134027-0200431-5330500-10330I
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: I FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engine
Supplier's PM: Christopher J. Cha, PE
Supplier Invoice #: 0
Payment Request #: 0
Service Date:From
Service Date:To
Invoice Date:
Pay Items
Description
30 - Design Bid Phase
email: Christopher.Cha@Westwoodps.com
o Office Address: 4060 Bryant Irvin, Fort Worth, TX 76109-4113
Telephone: 817-412-7155
Fax: 817-412-7156
Remit Address: 7557 Rambler Road, Suite 1400, Dallas, TX 75231
Agreement LTD
Agreement Amendment Amendment Amount to Complete
Amount Number Amount Date Amount
$5,810.00 $5,810.0
Totals This Unit: $5.810.00 0.00 $5,810.00 0.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
0.0000 i
0.00
Current Remaining
Invoice Balance
$0.00 $5,810.0c
0.00 $5,810.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Inter
City Project #: 103307
Work Type Desc: (Construction Phase Services I Supplier Instructions:
FID: 134027-0200431-5330500-1033011
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: I FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engine
Supplier's PM: Christopher J. Cha, PE email: Christopher.Cha@Westwoodps.com
Supplier Invoice #: 0 o Office Address: 4060 Bryant Irvin, Fort Worth, TX 76109-4113
Payment Request #: 0 Telephone: 817-412-7155
Service Date:From Fax: 817-412-7156
Service Date:To
Invoice Date: Remit Address: 7557 Rambler Road, Suite 1400, Dallas, TX 75231
Pay Items Agreement LTD
Agreement Amendment Amendment Amount to Complete
Description Amount Number Amount Date Amount
30 - Design Construction Phase Services $21,060.00 $21,060.0
Totals This Unit: $21,060.00 0.00 $21,060.00 0.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
0.0000 i
0.00
Current Remaining
Invoice Balance
$0.00 $21,060.00
0.00 $21,060.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Inter
City Project #: 103307
Work Type Desc: I ROW/Easement Services I Supplier Instructions:
FID: 134027-0200431-5330500-1033011
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: I FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engine
Supplier's PM: Christopher J. Cha, PE
Supplier Invoice #: 0
Payment Request #: 0
Service Date:From
Service Date:To
Invoice Date:
Pay Items
email: Christopher.Cha@Westwoodps.com
o Office Address: 4060 Bryant Irvin, Fort Worth, TX 76109-4113
Telephone: 817-412-7155
Fax: 817-412-7156
Remit Address: 7557 Rambler Road, Suite 1400, Dallas, TX 75231
Description
42 - Negotiations/Easements/Legal Fees ROW/Easement Services
Totals This Unit:
Agreement LTD
Agreement Amendment Amendment Amount to Complete
Amount Number Amount Date Amount
$9,000.00 $9,000.0
9 000.00 0.00 $9,000.00 0.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
0.0000 i
0.00
Current Remaining
Invoice Balance
$0.00 $9,000.0c
0.00 $9.000.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Intel
City Project M 103307
Work Type Desc: ISurvel1(( Supplier Instructions:
FID: I34027-0200431-5330500-10330
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: I FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engine
Supplier's PM: Christopher J. Cha, PE email: Christopher.Cha@Westwoodps.com
Supplier Invoice M Office Address 4060 Bryant Irvin, Fort Worth, TX 76109-4113
Payment Request M Telephone: 817-412-7155
Service Date:From Fax: 817-412-7156
Service Date:To
Invoice Date: Remit Address, 7557 Rambler Road, Suite 1400, Dallas, TX 75231
Pay Items
Agreement LTD
Agreement
Amendment Amendment
Amount to Completed
Description
Amount
Number Amount
Date Amount
51 - Preliminary Survey Survey
$15,000.00
$15,000.0
51 - Preliminary Survey Survey
1 $5,500.00
$5,500.00
Totals This Unit:
$15,000.0
$5,500.00
20500.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
Current Remaining
Invoice Balance
$15,000.00
$5,500.00
20 500.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice Fanta Kaba, PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Inter
City Project M 103307
Work Type Desc: 1Permittin-q supplier Instructions:
FID: 134027-0200431-5330500-10330
City Sec Number: 58373 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: 1 FW020-0000008818 I When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engine
Supplier's PM: Christopher J. Cha, PE
Supplier Invoice M
Payment Request M
Service Date:From
Service Date:To
Invoice Date:
Pay Items
30 - Design
Description
email: Chrislopher.Cha@Westwoodps.com
Office Address 4060 Bryant Irvin, Fort Worth, TX 76109-4113
Telephone: 817-412-7155
Fax: 817-412-7156
Remit Address', 7557 Rambler Road, Suite 1400, Dallas, TX 75231
Permitting
Totals This Unit:
Agreement
LTD
Agreement Amendment Amendment
Amount to
Completed
Amount Number Amount
Date
Amount
$2,625.00
$2,625.0
2 625.0
$2,625.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
Current Remaining
Invoice Balance
$2,625.00
2 625.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Professional Services Invoice FantaKaba,PE Fanta Kaba, PE
Project: Bryant Irvin Road and Oakmont Boulevard Inter
City Project M
103307
Work Type Desc:
Qualit1( Control/Qualit�(Assura
Supplier Instructions:
FID:
340271200431-5330500-103307
City Sec Number:
58373
Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order:
FW020-0000008818 I
When your Invoice is complete, save and close. Add your invoice to the
Consultant folder within Project's folder.
Company Name: Pacheco Koch Consulting Engines
Supplier's PM: Christopher J. Cha, PE
Supplier Invoice M
Payment Request M
Service Date:From
Service Date:To
Invoice Date:
Pay Items
email: Christopher.Cha@Westwoodps.con
Office Address! 4060 Bryant Irvin, Fort Worth, TX 76109-4113
Telephone: 817-412-7155
Fax: 817-412-7156
Remit Address; 7557 Rambler Road, Suite 1400, Dallas, TX 75231
Description
30 - Design Quality Control/Quality Assurance
30 - Design Quality Control/Quality Assurance
Totals This Unit:
Agreement LTD
Agreement Amendment Amendment Amount to Completed
Amount Number Amount Date Amount
$7,060.00 $7,060.00
1 $1,855.00 $1,855.00
7 060.00 $1 855.0 $8915.00
Overall Percentage Spent:
Percent ($) Invoiced
Spent Previously
Current Remaining
Invoice Balance
$7,060.00
$1,855.00
8 915.00
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
FORT WORTH
ATTACHMENT "D"
PROJECT SCHEDULE
A. ENGINEER Project Schedule Development
ENGINEER shall prepare a project schedule for the services to be provided in fulfilling
the requirements of the Agreement and encompassing the Scope of Work defined in
Attachment A to the Agreement.
ENGINEER shall prepare and maintain project schedule throughout the life of the project
as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule.
ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for
planned sequencing of the work activity and timing of the work.
B. Schedule "Tier" Selection
City has identified three "Tier" levels for project schedules as defined in City's
Specification 00 31 15, to align with the size and complexity of the project as a basis for
schedule development. City's Project Manager will determine the "Tier" level for the
ENGINEER's project schedule as part of the negotiation of the Agreement.
C. Project Baseline Schedule
ENGINEER will produce an initial project schedule and submit as a "baseline" for review
and acceptance by City's Project Manager as defined in City's Specification 00 31 15
which will be referred to as the Project Baseline Schedule. Updates to the baseline
schedule follow the requirements of City's Specification 00 31 15.
D. Project Progress Schedule
ENGINEER will provide to the City, monthly updates to their project schedule indicating
progress of the Work in compliance with the requirements of City's Specification 00 31
15 and said schedule will be referred to as the Project Progress Schedule.
E. Master Project Schedule
City will develop and maintain a master project schedule for the overall project.
ENGINEER's project baseline and progress schedule submittals will be an integral part
of the development and updating process of City's Master Project Schedule.
City of Fort Worth, Texas
Attachment D
Revision Date: 07.20.2018
Page 1 of 1
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
Task Name
Duration
Start
Finish
3ryant Irvin Road and Oakmont Blvd Intersection
205 days
Mon 11/14/22 Fri 8/25/23
mprovement
Notice to Proceed (NTP)
0 days
Mon 11/14/22
Mon 11/14/22
Topographic Survey including SUE
40 days
Mon 11/14/22
Fri 1/6/23
Design -Kickoff Meeting
10 days
Mon 1/9/23
Fri 1/20/23
Conceptual Design (30%)
25 days
Mon 1/23/23
Fri 2/24/23
Submit to City for Review (30%)
0 days
Fri 2/24/23
Fri 2/24/23
City Review (30%)
15 days
Mon 2/27/23
Fri 3/17/23
30% Review Meeting
5 days
Mon 3/20/23
Fri 3/24/23
Preliminary Design (60%)
35 days
Mon 5/15/23
Fri 6/30/23
Submit to City for Review (60%)
0 days
Fri 6/30/23
Fri 6/30/23
City Review (60%)
10 days
Mon 7/3/23
Fri 7/14/23
Constructability Review
3 days
Mon 7/17/23
Wed 7/19/23
60% Review Meeting
3 days
Mon 7/17/23
Wed 7/19/23
Final Design (90%)
10 days
Thu 7/20/23
Wed 8/2/23
Submit to City for Review (90%)
0 days
Wed 8/2/23
Wed 8/2/23
City Review (90%)
10 days
Thu 8/3/23
Wed 8/16/23
90% Review Meeting
2 days
Thu 8/17/23
Fri 8/18/23
Finalize Plans (100%)
5 days
Mon 8/21/23
Fri 8/25/23
Submit Final (100%)
0 days
Fri 8/25/23
Fri 8/25/23
ryant Irvin Road and Oakmont Boulevard
Intersection Improvements
City Project No. 103307
2023
Oct Nov Dec Jan I Feb Mar ADr Mav
r
11/� PKCE
City & PK
PKCE
a 2/24
City of Fort Worth
City & PK
Task
Inactive Milestone
Start -only
Split
................. Inactive Summary
I Finish -only
Milestone
• Manual Task
External Tasks
Date: Wed 6/21/23
Summary
Duration -only
External Milestone
Project Summary
Manual Summary Rollup
Deadline
Inactive Task
Manual Summary r
r Critical
Page 1
Critical Split
7 Progress
Manual Progre!
e
a
J4Pacheco Koch
Jun Jul Aua I Seo Oct
PKCE
6/30
City of Fort Worth
City & PK
City & PK
PKCE
t ' 8/2
City of Fort Worth
City & PK
PKCE
8/25
Bryant Irvin Road and Oakmont Blvd. Intersection Improvements
City Project No. 103307
103307-EPAM-Bryant Irvin Rd & Oakmont Blvd
Intersection Improvements Amendment #1
Interim Agreement Report 2023-08-08
Created: 2023-07-17
By: Andrea Munoz (Andrea. Munoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAAHXIZOFQfV4ZIvEjlp2DTdSJMbliAQ28A
Agreement History
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"103307-EPAM-Bryant Irvin Rd & Oakmont Blvd Intersection Im
provements Amendment #1" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2023-07-17 - 8:05:32 PM GMT- I address: 204.10.90.100
Document emailed to ann.estes@fortworthtexas.gov for filling
2023-07-17 - 8:34:44 PM GMT
Document emailed to fanta.kaba@fortworthtexas.gov for signature
2023-07-17 - 8:34:44 PM GMT
Document emailed to christopher.cha@westwoodps.com for signature
2023-07-17 - 8:34:44 PM GMT
Email viewed by fanta.kaba@fortworthtexas.gov
2023-07-17 - 8:35:18 PM GMT- I address: 204.10.90.100
Signer fanta.kaba@fortworthtexas.gov entered name at signing as Fanta Kaba
2023-07-17 - 8:37:33 PM GMT- I address: 204.10.90.100
Document e-signed by Fanta Kaba (fanta.kaba@fortworthtexas.gov)
Signature Date: 2023-07-17 - 8:37:35 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by ann.estes@fortworthtexas.gov
2023-07-17 - 9:21:18 PM GMT- I address: 204.10.90.100
FORT WORTHS 1 Powered t'y
Adobe
Acrobat Sign
Signer ann.estes@fortworthtexas.gov entered name at signing as Ann Estes
2023-07-17 - 9:28:34 PM GMT- IP address: 204.10.90.100
Form filled by Ann Estes (ann.estes@fortworthtexas.gov)
Form filling Date: 2023-07-17 - 9:28:36 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by christopher.cha@westwoodps.com
2023-07-18 - 8:44:02 PM GMT- IP address: 12.52.8.126
Signer christopher.cha@westwoodps.com entered name at signing as Christopher Cha
2023-07-18 - 8:44:31 PM GMT- IP address: 12.52.8.126
Document e-signed by Christopher Cha (christopher.cha@westwoodps.com)
Signature Date: 2023-07-18 - 8:44:33 PM GMT - Time Source: server- IP address: 12.52.8.126
Document emailed to Chad.Allen@fortworthtexas.gov for filling
2023-07-18 - 8:44:35 PM GMT
Signer Chad.Allen@fortworthtexas.gov entered name at signing as Chad Allen
2023-07-21 - 6:28:20 PM GMT- IP address: 204.10.90.100
Form filled by Chad Allen (Chad.Allen@fortworthtexas.gov)
Form filling Date: 2023-07-21 - 6:28:22 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Lissette.Acevedo@fortworthtexas.gov for filling
2023-07-21 - 6:28:24 PM GMT
Email viewed by Lissette.Acevedo@fortworthtexas.gov
2023-07-22 - 1:46:09 AM GMT- IP address: 204.10.90.100
Signer Lissette.Acevedo@fortworthtexas.gov entered name at signing as Lissette Acevedo, RE
2023-07-22 - 1:46:22 AM GMT- IP address: 204.10.90.100
Form filled by Lissette Acevedo, RE (Lissette.Acevedo@fortworthtexas.gov)
Form filling Date: 2023-07-22 - 1:46:24 AM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to patricia.wadsack@fortworthtexas.gov for filling
2023-07-22 - 1:46:26 AM GMT
Email viewed by patricia.wadsack@fortworthtexas.gov
2023-07-24 - 9:41:46 PM GMT- IP address: 204.10.90.100
Signer patricia.wadsack@fortworthtexas.gov entered name at signing as Patricia L. Wadsack
2023-07-24 - 9:44:05 PM GMT- IP address: 204.10.90.100
Form filled by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov)
Form filling Date: 2023-07-24 - 9:44:07 PM GMT - Time Source: server- IP address: 204.10.90.100
FORTWORTH. 1 Powered 'y
Adobe
Acrobat Sign
Document emailed to Lauren.Prieur@fortworthtexas.gov for signature
2023-07-24 - 9:44:09 PM GMT
Email viewed by Lauren.Prieur@fortworthtexas.gov
2023-07-24 - 10:06:56 PM GMT- IP address: 108.209.194.42
Signer Lauren.Prieur@fortworthtexas.gov entered name at signing as Lauren Prieur
2023-07-24 - 10:07:18 PM GMT- IP address: 108.209.194.42
Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
Signature Date: 2023-07-24 - 10:07:20 PM GMT - Time Source: server- IP address: 108.209.194.42
Document emailed to Priscilla.Ramirez@fortworthtexas.gov for approval
2023-07-24 - 10:07:23 PM GMT
Email viewed by Priscilla.Ramirez@fortworthtexas.gov
2023-07-25 - 2:26:47 PM GMT- IP address: 204.10.90.100
Signer Priscilla.Ramirez@fortworthtexas.gov entered name at signing as Priscilla Ramirez
2023-07-25 - 2:27:52 PM GMT- IP address: 204.10.90.100
Document approved by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov)
Approval Date: 2023-07-25 - 2:27:54 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Douglas.Black@fortworthtexas.gov for signature
2023-07-25 - 2:27:56 PM GMT
Email viewed by Douglas.Black@fortworthtexas.gov
2023-07-27 - 9:07:08 PM GMT- IP address: 204.10.90.100
Signer Douglas.Black@fortworthtexas.gov entered name at signing as DBlack
2023-07-27 - 9:07:59 PM GMT- IP address: 204.10.90.100
Document e-signed by DBlack (Douglas.Black@fortworthtexas.gov)
Signature Date: 2023-07-27 - 9:08:01 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to William.Johnson@fortworthtexas.gov for signature
2023-07-27 - 9:08:03 PM GMT
Email viewed by William.Johnson@fortworthtexas.gov
2023-07-28 - 3:27:48 PM GMT- IP address: 204.10.90.100
Signer William.Johnson@fortworthtexas.gov entered name at signing as William Johnson
2023-07-28 - 3:28:39 PM GMT- IP address: 204.10.90.100
Document e-signed by William Johnson (William.Johnson@fortworthtexas.gov)
Signature Date: 2023-07-28 - 3:28:41 PM GMT - Time Source: server- IP address: 204.10.90.100
FORTWORTH. 1 Powered 'y
Adobe
Acrobat Sign
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Bryant Irvin Rd & Oakmont Blvd Intersection
Improvements Engineering Contract
Amendment #1
M&C: 22- CPN: 103307 CSO: 58373 DOC#:
0846
Date:
To:
Name
Department
Initials
Date Out
1.
Ann Estes
TPW - initial
AEfi4
Jul 17, 2023
2.
Fanta Kaba
TPW - signature
�:K
Jul 17, 2023
3.
Christopher J. Cha, Consultant
Consultant
'j,
J u 118, 2023
4.
Chad Allen
TPW - initial
J u 121, 2023
5.
Lissette Acevedo
TPW -initial
Jul 21, 2023
6.
Patricia Wadsack
TPW - initial
PLW
Jul 24, 2023
7
Lauren Prieur
TPW - signatures
Jul 24, 2023
8
Doug Black
Legal - signature
d4W
Jul 27, 2023
9
William Johnson
CMO - signature
W
Jul 28, 2023
10.
Jannette Goodall
CSO - signature
s
Aug 8, 2023
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE:
All documents
received from any
and all City Departments requesting City
Manager's signature for approval
MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed
the routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
❑ Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a,FortWorthTexas.izov at ext. 7233 or 8363, for pick up when
coma_ leted. Thank you!
Updated 08.22.2022, mdhm