HomeMy WebLinkAboutContract 56834-A1CSC No. 56834-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 56834 WHEREAS, the City of Fort Worth (CITY) and Gresham Smith, (ENGINEER) made and entered into City Secretary Contract No. 56834, (the CONTRACT) which was authorized by M&C 21-0925 on the 30th day of November, 2021 in the amount of $318,160.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2020, WSM-M; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $I8, 026. 00 (Water: $9, 013. 00; Sewer: $9,013.00). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $336,186.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [W&SS Repl. 2020 WSM—M] Page 1 of 2 [CPN 1034131 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth 067na FarandoAc Dana Burghdoff (Aug 2' 202312:25 CDT) Dana Burghdoff Assistant City Manager DATE: Aug 23, 2023 APPROVAL RECOMMENDED: CG��rftobl�e� tfa��feY Christopher Harder (Aug 18, 202316:22 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's ENGINEER Gresham Smith Timothy O'Brien, P.E. Senior Vice President DATE: 8/17/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Pam. K( Preeti KC, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: PaG I Mack (Aug 23, 2023 09:39 CDT) Douglas W. Black Senior Assistant City Attorney aIl FORtIl➢P 4'A da ATTEST: ono �C-eta. % �` danIlTEop9.oa II//11 Jannette S. Goodall City Secretary M&C : N/A Date: N/A Form 1295: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 [W&SS Repl. 2020 WSM—M] [CPN 1034131 'Gresham � Smith August 9, 2023 Preeti KC, P.E. Sr. Professional Engineer City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Subject: Proposal for Amendment Fort Worth 2020 WSM-M Project 103413 Gresham Smith Project No. 45497.00 Dear Ms. Preeti: The purpose of this letter proposal is to present the additional services required to meet TPW's request for the Harvey Avenue Rebuild design. The additional scope for the services required relates to TPW request, in light of deteriorated condition of the existing asphalt street, that the existing asphalt pavement on Harvey between 1-35 and Mississippi be replaced with new concrete, including all street, curb and gutters, To complete this work, our firm will develop a centerline profile for the existing street, then develop a spatial model to allow for review of each driveway extending into the street, to establish construction limits that will result in a new street without impacting existing driveway access. 1. After additional communication with TPW, we proposed preparing both right and left top of curb profiles with new plan sheets for this reach which will be presented in six new construction plan sheets; 2. We recognize that in this residential neighborhood many driveways are present that must be accounted for during the design. Once the 3D model of the proposed road is developed, each driveway section must be checked to ensure maximum and minimum driveway slopes, as well as acceptable changes in grade along the driveways are met. While we will not provide sections as part of the deliverable per direction from TPW, sections need to be developed and checked to minimize the risk of issues with new road such as cars bottoming out when using driveways. 3. Lastly, the street addition will result in replacement of some driveway and curb entries extending back to the City sidewalks. 500 N Akard Street GreshamSmith.com Suite 3210 Gennine 111nenuit Dallas, TX 75201 214.350.1500 To support this request a revised Level of Effort has been prepared and is described as follows: ORIGINAL CONTRACT AMOUNT $318,160.00 CONTRACT AMENDMENT #1 AMOUNT TOTAL REVISED CONTRACT AMOUNT Ms. Preeti KC August 9, 2023 $18,026.00 (Water $9,013.00: Sewer $9,013.00) $336,186.00 We appreciate this opportunity to continue to serve the city of Fort Worth. If there are any questions or additional information needs associated with this request, please advise. Sincerely, %�- , P.E. Wayne Hunter, P.E. Timothy O'Brien, P.E. Project Manager Senior Vice President, Authorized Signatory for Firm ,Gresham Smith Gresham Smith HW Attachments: Original LOE, Proposed Amendment LOE Page 12 TASKMOUR BREAKDOWN Water Department Design Services for Water and Sanitary Sewer Replacement Contract- 2020 WSM-M City Project No. 103413 Proposed Amendment to Services 6/21/23 Task No. Task Description Labor (hours) Hunter Shealy Diaz Strobl Flske Nakib (JI Project Project Survey Survey Admints Principal Manager Engineer En ADD OAOC Tech Crew rstive I Iotal Labor Co �. SubconsultantE Subconsu8ant MWBE Non-MWBE Rnse Reproduction Total Expense Cost Task Sub Total %Complete Remaining Budget Rate $242 $151 $105 $142 $183 162 9.0 Additional City Directed Services 0 40 80 40 0 0 0 0 $ 18,026.00 $ $ $ $ $ 18,026.00 9.1 Proposed Street Rebuld Desrin Harvey Ave (1-35 to Mississippi) $ $ 9.1.a. Develop Top of Curb Profiles and Corridor Model 20 10 0 9.1.1b. Verify Cross -Sections 10 20 0 9.1.c. Plan and Profile Sheets 10 25 30 9.1.d. Compile Additional CFW Details 5 10 Totals 0 0 r 40 60 40 0 0 0 0 $ 18,026.00 1 $ $ $ $ $ 18,026.00 Project Summary Total Hours 140 Total Labor $ 18,026.00 Total Expense $ MBE/SBE SubconsultaM $ - Non-MBE/SBE Subconsultant $ - 5% Sub Markup $ - MBE/SBEParticipation 0.0% Total Project Cost $ 18,026.00 Original Contract Amount $ 318,160.00 Net Amount of Amendment) $ 336,186.00