HomeMy WebLinkAboutContract 58612-CO1.o.� po'j 44;,
'a°O� °°` ko°da
Coo �9d0
Attest:
Facility and Project) Swat Storage
Description:
FORT WORTH,,
City Of Fort Worth
Change Order Request
Funding (FID) No.(s)136001-0350420--5740010-101921-000980-9999
CSC#: 58612-COI
City Sec No. 158612
City Proj. No. 1 101921
Contractor: I Westfork Construction I
Change Order# 0 Date: 1
8/1/2023 1
City Project Mgr.JAlphonzo Meza I
City Inspector: JJason Buchanan
Phone Number:1(817) 392-8274 1
Phone Number: 1(817) 812-9595
1
Contract Time
(CD)
Original Contract Amount --------------------------------------------------------------A $1,420,679.00
195
Extras to Date---------------------------------------------------
--------------1 0.00
0 1
Credits to Date ------------------------------------------------------
----------1 0.00
0 1
Pending Change Orders (in M&C Process) -
----------------1 0.00
0 1
Contract Cost to Date------------------------------------------------------
1 $1,420,0 .00
195
Amount of Proposed Change Order -----------------------------------------------------
($39,562.99)
19
Revised Contract Amount----------------------------------------------------
1 $1, 81,116.01
214
Original Funds Available for Change Orders ------------------------------------------------------
0.00
Remaining Funds Available for this CO ---------------------------------------------------------
1 0.00
Additional Funding (if necessary) ---------------------------------------------------
1 0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
-0.0 %
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$1,775,848.75
Final calculation of contract amount and duration. The General Contingency Allowance for the project was $80,004.84. There was a total of $40,441.85 that
was expended from the allowance. This resulted in a deduction in the contract amount of $39,562.99 due to not using all of the General Contingency
Allowance. There will be a total of $39,562.99 added to the contract through Change Order #1. The final contract amount is $1,381,116.01. A-0.027%
decrease from the original contract amount of $1,420,679.00. The additional 19 days were added to the contract through previously approved General
Contingency Allowances (#006 and #007) due to added Scope of Work per sponsoring departments requests.
It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both
Contractor's Company Name Contractor Name Contractor Signature I Date
WestFork Construction Michael Graham lAug 16, 2023
PMD Inspector
Date
Architecural Services Manager
Date
•
Aug 16, 2023
Aug 16, 2023
PMD Superintendent
Date
Director/Property Management Department
Date
Wit-
Aug 16, 2023
�y 4,
Aug 16, 2023
Project Manager Ah
Date
Assistant City Attorney
Date
q�' W�.
Aug 16, 2023
- 5 4
Aug 24, 2023
Project Archi OF
Date
Aug 16, 2023
1 Oana b r
Darte
Aug 24, 2023
M&C Number I N/A
M&C Date Approved
N/A
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and adminstration of this contract, including OFFICIAL RECORD
CITY SECRETARY Nikki Watts
ensuring all performance and reporting requirements. Senior Capital Projects Manager
FT. WORTH, TX
7/29/23, 11:22 AM
RedTeam Project Console
West Fork Construction, LLC
0 1 Powered by RedTeam
07/29/2023
Alfonso Meza
City of Fort Worth
401 West 13th St
Ft Worth, Texas 76102
FIXED PRICE CHANGE
Re: Our Change Proposal 1270001-12 for PCO 08 Contract Extension Days
Project: Bob Bolen SWAT Vehicle Storage Bldg.
Bob Bolen SWAT Complex
Bob Bolen SWAT Complex, 505 W. Felix St., Ft Worth, Texas 76115
Consultant's Project #: 19-1025.00
PROPOSAL
This Proposal is for the Change referenced above and more particularly defined by the Scope of Work
comprised of this Proposal, its Attachments, and other Contract Documents incorporated by reference.
Therefore, we propose to change the following:
This change order is to formalize the City of Fort Worth approved request for (19) calendar days added
to the contract.
Price: $ 0.00 Zero Dollars and Zero Cents
Time: The duration of the Work to achieve Substantial Completion will be INCREASED by
19 days.
Clarification(s): - None.
Expiration: This Proposal shall remain open for 30 calendar day(s).
Please contact me at or via e-mail cwitt@wfbuilt.com if you have any questions or require additional
information.
Regards,
West Fork Construction, LLC
Chris Witt
Project Manager
ACCEPTANCE OF PROPOSAL
The Scope of Work described above supersedes any and all prior communication about this Change.
Customer Signature: Date:
City of Fort Worth
https://flex.redteam.com/rts/app/asp/tpl.projectconsoleintern.asp?p=Y29udGVudHZpZXdsbms9c3RhbmRhcmRfcHJpbnRwem9wb3NhbF9sLmFzcCZDb250YWNOS... 1/1
7/29/23, 11:30 AM
RedTeam Project Console
West Fork Construction, LLC
0 1 Powered by RedTeam
07/29/2023
Alfonso Meza
City of Fort Worth
401 West 13th St
Ft Worth, Texas 76102
FIXED PRICE CHANGE
PROPOSAL
Re: Our Change Proposal 1270001-13 for PCO 09 Contingency Credit
Project: Bob Bolen SWAT Vehicle Storage Bldg.
Bob Bolen SWAT Complex
Bob Bolen SWAT Complex, 505 W. Felix St., Ft Worth, Texas 76115
Consultant's Project #: 19-1025.00
This Proposal is for the Change referenced above and more particularly defined by the Scope of Work
comprised of this Proposal, its Attachments, and other Contract Documents incorporated by reference.
Therefore, we propose to change the following:
This deductive change order is to provide a credit of (-$39,562.99) for the owner's remaining
contingency balance.
Price: $ (39,562.99) Negative Thirty Nine Thousand Five Hundred Sixty Two Dollars and
Ninety Nine Cents
Time: The duration of the Work to achieve Substantial Completion will be UNCHANGED.
Clarification(s): - None.
Expiration: This Proposal shall remain open for 30 calendar day(s).
Please contact me at or via e-mail cwitt@wfbuilt.com if you have any questions or require additional
information.
Regards,
West Fork Construction, LLC
Chris Witt
Project Manager
ACCEPTANCE OF PROPOSAL
The Scope of Work described above supersedes any and all prior communication about this Change.
Customer Signature: Date:
City of Fort Worth
https://flex.redteam.com/rts/app/asp/tpl.projectconsoleintern.asp?p=Y29udGVudHZpZXdsbms9c3RhbmRhcmRfcHJpbnRwem9wb3NhbF9sLmFzcCZDb250YWNOS... 1/1