HomeMy WebLinkAboutOrdinance 26375-08-2023ORDINANCE NO.26375-08-2023
AN ORDINANCE ADJUSTING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE WATER & SEWER BOND 2015A FUND, BY
INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE
COMMUNITY FACILITIES AGREEMENT BUCKET PROGRAMMABLE
PROJECT (CITY PROJECT NO.P00001) IN THE AMOUNT OF $717,000.00 AND
DECREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE
UNSPECIFIED -ALL FUNDS PROJECT (CITY PROJECT NO. UNSPEC) BY THE
SAME AMOUNT; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING
THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL
ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE
DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS:
SECTION 1.
That in addition to those amounts allocated to the various City departments for Fiscal Year 2022-2023 in the
Budget of the City Manager, there shall also be adjusted estimated receipts and appropriations in the Water &
Sewer Bond 2015A Fund, by increasing estimated receipts and appropriations in the Community Facilities
Agreement Bucket programmable project (City Project No.P00001) in the amount of $717,000.00 and
decreasing estimated receipts and appropriations in the Unspecified -All Funds project (City Project No.
UNSPEC) by the same amount.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair
the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall
be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance 25773-09-2022 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance are in
direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of
said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
APPROVED AS TO FORM AND LEGALITY:
Richard A. McCracken (Aug 25, 202316:58 CDT)
Assistant City Attorney
ADOPTED AND EFFECTIVE: August 22, 2023
CITY SECRETARY
Jannette S. Goodall°o° °°°lyad�
City Secretary �o °0
0
0
P n o1�
°
A5ora-* r
THE E CITY OF FORT WORTH, TEXAS
PLANS FOR CONSTRUCTION OF
FORTWORTH BREWER BOULEVARD
24 INCH WATER MAIN
MATTIE PARKER
MAYOR
DAVID COOKE
CITY MANAGER
MICHAEL OWEN, P.E.
CITY ENGINEER, TRANSPORTATION AND
PUBLIC WORKS DEPARTMENT
CHRISTOPHER P. HARDER, P.E.
DIRECTOR, WATER DEPARTMENT
PRC RECORD NO. 22-0242
CITY PROJECT NO. 104634
FID NO. 30114-0200431-104634—EO7685
FILE NO: w—xxxx
I
N
Mp s� I
I(U■, /r�s M \
/ BL�
ROP NCREEN \ 1 —
PROJECT
& LOCATION
9
LOCATION MAP
I"=2000'
MAPSCO NO. 102U
COUNCIL DISTRICT 6
OCTOBER 2022
OWNED/DEVELOPED BY:
MERITAGE HOMESOFTEXAS, LLC PREPARED BY. `�
DAVID AUGHINBAUGH LJA Engineering, Inc. !/
A840 CYPRESS WATERS BLVD, SUITE100 6060 North Central FxpreRSwW Phone 469621,0710
DALLAS, TEXAS 751114 Sulle "I
e72-580-6D1 Dallas, Texas 75206 FRN - F-1386
X-27648
CURRENT CONSTRUCTION STANDARDS FOR
DEVELOPMENTS JUNE 10, 2022. SHALL
GOVERN ON THIS PROJECT.
UWT I —
WATER & SEWER IMPROVEMENTS
SHEET NO
DESCRIPTION
1.
COVER SHEET
2
GENERAL NOTES
3GENERAL
NOTES
4
',-NERAL NOTES
5.
OVERALL WATER 'LAN
6_
WATER PI AN & PROHIE - WI - 9
7
WATER DETAILS
B
WATER DETAILS
9
TER DETAILS
10
EROSION CONTROL
11
12,
tROSION CONINOL UL AILS
ixpET DETAILS
DIRECTORS DESIGNEE FOR CONSTRUCTION DATE:
PLANAPPROVAL
RESOLUTION NO. III-10-2020
REVIEWED
PROJECT MANAGER
DATE:
X— 27648
NOTES.
ALL EXISTING MED-s/ROW$ DISTURBED DURING
CONSTRUCTION — BE RETURNED TO THEIR
ORIGINAL STATE OR BETTER UPON COMPLETION OF
THE PROTECT IN THE EVENT THAT GRASS HAS BEEN
l z DISTRIBUTED. GRASS SHAM BE ESTABLISHED AT 100x
8Y CONTRACTOR - PRIOR TO SOD OR SEEDING,
REMOVE ALL ROCKS GREATER iWJI 1' 3 92
13-BODDN`T"` SEED MAY 13, REVISED
OR 32 92
ALL NON NATME SEEOALL -REVISED MAY 12, 2021),
ALL DIRT MOUNDS SHALL BE REMOVED FROM
50 200 MEDIAN S.ROWS
PRIOR i0 SEEDING AFTER
® CONSTRUCTION IS COMPLETED.
REMOVE PLUG h CONNECT TO
TO BE CONSTRUCTED 24' PVC WATERUNE
REFERENCE GIN —OB
X-27288, W-2829
NOTE' THE CONTRACTOR GT— CONTRACT THE FOLL—C AT LEAST
48 HOURS PRIOR TO EXCAVATING IN THIS AREA
FORT WORTH WATER DEPARTMENT 817-392-8296
FORT WORTH TRANSPORTATION/PUBLIC WORKS 817-392-81N
FOR ALL OTHER FACIUTIE$ rwv.tevaa0l,.or9 or 1-BOD-545-6005
CONTRACTORS YOU ARE TO CALL THE TvOOT INSPECTOR 48 HOURS PRIOR
TO START OF CONSTRUCTION (SEE SPECS FOR CONTACT
NUMBERS).
CONNECT TO TO -BE CONSTRUCTED
Wi x4'W1 ATER LING ,
Flp 3 t-0200a31-103826-EC7685 a
FILE N00 W-2B2% x-2126E
r.P 'B>6 w,oWwnnrsbelow.
CONNECa40
T TO EXISTING 24" PVC WATER LINE Dnllheforc you tllB
W2 FILE ND 0%-24
CPN 1 1 32
TO BE CONSTRUCTED 24'
GATE VALVE k VAULT
REFERENCE
CPN-103826. %-272BB
TO BE CONSTRUCTED
FIRE HYDRANT
CEEERENCE
PN-103B26R %1-27209 I
1
\
BREWER BOULEVAR
I�
a
WT
—
20 2 23 24 25
NOTES
1. ALL CLEANING WYES TO BE REMOVED WHEN CONNECTING TO EXISTING
LEGEND
WATERLINES.
PROPp5E0 SANRARf 2
2 THE WATER SYMBOLS ARE GRAPHIC IN NATURE. ALL STATIONS CALLOUT
SEWER LINE
THE EXACT LOCATION OF WATERLINE FEATURES
PROPOSED SANITARY T
SEWER MANHOLE
3 ALL WATERLINES ARE 24' AWWA C-900 DR-14 CLASS 200 UNLESS
MARKED OTHERWISE.
EXISTING SANITARY SEWER LINE — ss—
EIEWERKLINAKI Q
4 THIS PROJECT IS LOCATED ENTIRELY WTHIN THE SOUTH SIDE III PRESSURE
MANHOLE
SEWER MANHOLE 3
PINE
PROPOSED WATER LINE
TLINGS ARE MECHANICAL JOINTS, UNLESS OTHERWISE NOTED
5. ALL FITTINGS
GATE VALVE
z
PROPOSED FIRE i 2
6. TOTAL NUMBER OF DOM WATER SERVICES TO BE INSTALLED 0.
LINE
E%STINC WATER LINE
7. IRRIGATION SERVICES TO BE INSTALLED � 0
I
EXLVE STING GATE VAa
8 SEE SHEET 7 FOR TYPICAL FIREHYDRANT ASSEMBLY INSTALLATION AND
EXISTFIRE HYDRANT
Q C
GATE VALVE LOCATION DETAIL
DETAIL
PROPOSED STORM DRAIN �
DISTRIBUTION SYSTEM CONSTRUCTED IN
E%ISTINC STORM DRAIN
9 THIS WATER MUST
ACCORDANCE WITH THE CURRENT TEXASS CDMMI951Du ON
EXISTING STREET LIGHT
ENVIRONMLNTAL QUALITY (TCEO) RULES AND REGULATIONS FOR PUBLIC
-
WATER SYSTEMS 3D TEXAS ADMINISTRATIVE CODE (TAG) CHAPTER 290
SUBCHAPTER D WHEN CONFLICTS ARE NOTED WITH LOLL STANDARDS, THE
FIRE HYDRANT 500'
FIRENADH COVER 20' C
�� Of
MORE STRINGENT REQUIREMENT SHALL BE APPLIED. CONSTRUCTION FOR
PUBLIC WATER SYSTEMS MUST ALWAYS, AT A MINIMUM, MEET TEED,S
INSERT X - INSERT POLY PIG
DC
'RULES AND REGULATONS FOR PUBLIC WATER SYSTEMS
REMOVE 8 - REMOVE POLY PIG 4
3
10. REFER TO SHEET 9 FOR WATER LOWERING DETAILS
INSTALL CLEANING WYE
REMOVE CI£ANING AYE AFTER L`
COMPLETION OF PIPE CLEWING
11 REFERENCE WATER STUDY WSS-2021-1563
15. RADIUS OF CURVATURE/JOINT DEFLECTION - MINIMUM RADIUS OF CLIWE
AND MAXIMUM DEFLECTION ANGLE OF PIPE JOINTS WILL BE RESTRICTED TO
50% OF MANUFACTURER'S RECOMMENDATION AFTER WHICH THE USE OF
HORIZONTAL OR VERTICAL BENDS WILL BE REQUIRED
BENCHMARKS.
CITY OF FORT WORTH BENCHMARK NO 87172
rvQ S
u
LOCATED ON WEST CLEBURNE ROAD D.6
MILES SOUTH OF COLUMBUS TRAIL AT SMALL
IR
CULVERT UNDER THE ROAD AND 70' NORTH OF 90
DEGREE BEN. IN THE ROAD TO THE WEST IN THE
KK
z
CENTER DF THE HEADWALL, Lh.VEL WITH ASPHALT
INSERT POLY PIG #,
ROAD, SEi IN THE TOP OF THE HEADWALL
EXISTING 24'
CIE y GATE VALVE k VAULT
ELEV - 838265
REFERENCE
CPN-101032, X-2444C
CtIY OF FORT WORTH BENCHMARK ND 07170
LOCATED ON OLD GRANDBURY ROAD 0 2 OF A
MILE SOUTH OF COLUMBUS TRAIL AT A CULVERT
UNDER THE ROAD ON THE NORTH END OF THE
26 27
s
WEST HEADWALL
ilil
\ \ CHISHOUA TRAIL RANCH \ \F�
\ \ PHASE 2 REMOVE POLY PIG NI I III
i NNRE
DE ROAD CHISHOLM TRAIL RANCH
- - - PHASE 3
III
REMOVE PLUG AND CONNECT TO '
EXISDNG 24' C905 DR-18 WATERLINE /
REFERENCE CPN 101052
X-24440 /
NMsnber of Water S.—II.2 Table
Yam' Mw writ,
Nmltes of 5-1
1
3... LF of PI
1
EA
21
Dead End Main
0
EA
3)
!Ru ed0HThe MMn LnnerThaR2DUF
0
EA
A
Fin.
0
EA
5
not
0
EA
Subtotal
1
EA
Tatty Sam le Tef[ed (2 Cw"OuDw Paul, :
2
EA
Toth Estimated Castfm Water Sam In $3NEacfl)
$ 60M
aNRlmMm 4Water Sam le Testin s
LOCATION
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 08/22/23 M&C FILE NUMBER: M&C 23-0695
LOG NAME: 60BREWER BLVD 241NCH WATER LINE
SUBJECT
(CD 6) Authorize Execution of a Community Facilities Agreement with Meritage Homes of Texas, LLC, with City Participation in the Amount Not to
Exceed $626,739.99 for Oversizing an 8-Inch Water Main to a 24-inch Water Main for Brewer Boulevard Located in Southwest Fort Worth, and
Adopt Appropriation Ordinances to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
Authorize the execution of a community facilities agreement with Meritage Homes of Texas, LLC, with City participation in the amount not to
exceed $626,739.99 for oversizing an 8-inch water main to a 24-inch water main located in southwest Fort Worth; and
Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water & Sewer Bond 2015A fund by
increasing estimated receipts and appropriations in the Community Facilities Agreement Bucket programmable project (City Project
No.P00001) in the amount of $717,000.00 and decreasing estimated receipts and appropriations in the Unspecified -All Funds project (City
Project No. UNSPEC) by the same amount for the purpose of funding the Community Facilities Agreement — CFA Brewer Boulevard 24in
Wtr project (City Project No.104634) and to effect a portion of Water's contribution to the Fiscal Years 2023-2027 Capital Improvements
Program.
DISCUSSION:
Meritage Homes of Texas, LLC, (Developer) is constructing the Brewer Boulevard development project located west of Chisholm Trail Parkway
and south of McPherson Boulevard. The developer is responsible for constructing approximately 800 linear feet of 8-inch water main for the
development. The City is participating in the project to oversize the 8-inch water main to a 24-inch water main for anticipated future growth in the
area. The construction cost for the project is estimated to be allocated at 7.9% for the Developer and 92.1 % for the City. Brewer Boulevard project
is assigned City Project No. 104634 and Accela System Record IPRC22-0242.
The project has been publicly bid. The City's cost participation in oversizing of the water main is estimated to be in an amount not to exceed
$626,739.99 as shown in the table below. Payments to the Developer are estimated to be $598,301.86 for construction costs, and $11,966.04 for
material testing costs. The City's cost participation also includes $16,472.09 to cover the City's portion of construction inspection service fees,
administrative material testing fees, and water lab fees. An additional $89,745.28 in the contingency funds will cover the City's portion of any
change orders.
The following table shows the cost sharing breakdown for the project between all parties:
A. 24" WL Construction
Developer
Cost (7.9%)
City Cost
(92.I %)
Total Cost
1. Water
$51,320.14
$598,301.86
$649,622.00
Contingency
$0.00
$89,745.28
$89,745.28
2. Sewer
$0.00
$0.00
$0.00
3. Drainage
$0.00
$0.00
$0.00
4. Paving
$0.00
$0.00
$0.00
5. Street Lights
$0.00
$0.00
$0.00
B. Inspections & Testing
1. Construction Inspection Fee
$1,343.00
$15,657.00
$17,000.00
2. Admin Material Testing Fee
$58.07
$676.94
$735.00
3. Water Lab Fee
$11.85
$138.15
$150.00
4. Material Testing Cost
$0.00
$11,966.04
$11,966.04
Total Project Cost
$52,733.05
$716,485.27
$769,218.32
*Numbers will be rounded up for accounting purposes.
The reimbursement of the City participation, excluding inspection and material testing fees, is not a lump -sum amount and may be less than the
stated amount depending upon the actual quantities and unit prices from the Notice of Final Completion package, commonly referred to as the
Green Sheet package.
It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of within the annual budget ordinance, as
projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the Mayor & Council
Communication (M&C) will appropriate funds in support of the Water Department's portion of the City of Fort Worth's Fiscal Years 2023-2027
Capital Improvements Program, as follows:
60 Brewer Blvd Upsizing
Capital[
!
I
Project [
FY2023 CIP
Budget Change
Revised
Fund
Name
Appropriations
Authority
(Increase/Decrease)
FY2023
Name I
Budget
Water
&
104634 —
Sewer
CFA-
Bond
Brewer i
$0.001
This M&C
$717,000.00
$717,000.00
2015A-
Boulevard'
Fund
24in Wtr
56007
Funding is available in the Unspecified -All Funds project within the Water & Sewer Bond 2015A Fund for the purpose of funding the CFA-Brewer
Boulevard 24in Wtr. project.
Funding for the Community Facility Agreement (CFA) — Brewer Boulevard 24in Wtr as depicted in the table below:
Existing
Appropriations
Fund
Additional
Project
Appropriations
Total*
Water & Sewer
$0.00
$717,000.00
$717,000.00
Bond 2015A —
Fund 56007
$0.00
$717,000.00
$717,000.00
Project Total
*Numbers rounded for presentation purposes.
BUSINESS EQUITY- A goal is not required under Business Equity Ordinance 25165-10-2021 when City spending participation on Community
Facilities Agreements are less than $1,000,000.00 dollars.
This project is located in COUNCIL DISTRICT 6
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified - All Funds project within the Water & Sewer Bond 2015A
Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in Water &
Sewer Bond 2015A Fund for the CFA-Brewer Boulevard 24in Wtr project to support the approval of the above recommendations and execution of
the agreement. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds.
Submitted for City Manager's Office by; Dana Burghdoff 8018
Originating Business Unit Head: Chris Harder 5020
Additional Information Contact: Suby Varughese 8009
Expedited