Loading...
HomeMy WebLinkAboutContract 27064 "I"I"Y SECRETARY �--)NTRAC T NO SECOND AMENI)MENITO CITY SECRETARY CON'I'R ACT NO. 17207 CITY Of�, Wf I FIT SETITEMENT Wf IOLESALE WATER CONIRACT WI]ERF"AS, on the I I"' day ot'April, 1989, the City of Fort Worth and. the City of White Settlement entered into City of' Fort Worth City Secretary Contract No. 17207 (the "Contract"), 1'(..)r the sale of treated water by the City of Fort Worth to the City of White Settlement; arid WHEREAS, on the 2"°`j July, 1991, the City of Fort Worth and the City of White Settlement amended the Contract by entering into City of Fort Worth City Secretary Contract No. 18595, said contract amendment being related to the assessment and collection of system access fees; arid WHEREAS, the City of Fort Worth and the City of White Settlement desire to I'Lit-ther amend the Contract in order for the City of White Settlerneul to obtain -in additional point of connection to the Fort Worth System: and WHEREAS, the City of`Dort Worth has SLIffeient capacity in the water main where the additional point of' connection is to be installed and there is no need to construct new water mains in order to allow the additional point of connection. NOW, Tl IFIREFORE", KNOW ALL BY 111I SE PRESENTS: I. City of 1',oiq, Worth City Secretary Contract No. 17207 is amended by adding a, new paragraph 24 which shall be and read as follows: 4'24. Additional point of(,"orinection ............... ..........---l-1111,11.1111-...........................-.11,1111- 24.1 Customer is granted au additional point of connection to the Fort Worth System, such point, of connection to be located at the approximate location as shown on F'Ahibit "A" attached hereto. 24.2 Customer, at its sole cost and expense, shall be responsible for the design and construction of the meter Vault and the installation of all metering equipment, which shall be Subject to the review and approval of [',ort Worth. The metering equipment shall be in compliance with paragraph 3.1 of City of Fort Wortti City Secretary Contract No. 17207, All construction Shall be inspected by and acceptable to Fort Worth. Upon completion arid acceptance of the meter vault and metering equipment, the operation arid maintenance of sarrie shall be the responsibility of F'ort Worth, the cost thercof'being a System Cost. (41, 611-�E�,,,,,ic�� 24.3 Customer, at its sole cost and expense, shall be responsible for const it 7j the water main extension from the Fort Worth water main to the meter station 10 24.4 LlStOrner, at its sole cost and expense, shall design and construct, install a backflow prevention device, together with any necessary housing therefore, which shall be SUject to the review and approval of"ff I ort Worth. Customer, at its sole cost and expense, shall be responsible for the operation and maintenance of such backflow prevention device and housing. 24.5 In the event Customer desires to have a larger meter installed at a time where the six-inch (6") meter is not otherwise in need of replacement, CAlstorner shall make written request to Fort Worth for its consideration. If Foil Worth, in its sole discretion, approves the installation of the larger meter, Customer, at its sole cost and expense, will be responsible for the design of'the larger meter, Such design being SUbJect to Fort Worth's written approval. The installation of the, larger meter will be at CAIStOrner's sole cost and expense. Ay All other terms, conditions, and covenants contained in City of F'ort Worth City Secretary '-, Contract 17207 n effpe ot amended herein shall continue in ftill force and t. C11 I T A"f"T'EST.- '/4 F w ....... By: . ............... ............ Gloria"/ea2 Mike Groomer Assistant City Manager Approved as to Form and -'ontract huthorization Legality: ATTESJ CITY OF WHITE SETT'Ll.1MIENT By: ........................ City Secreta;,y Approve It : as to -aITT) Legallt (...lity t1orney JUM 1B 'ol 03:02PM KIMLEY-HORN FT WORTH P.212 EXISTING FORT WORTH WATER DEPARTMENT SAN. SWR. MANHOLE SSMH PROPOSED SANITARY SEWER MANHOLE (METER LOCATION) PROPOSED 8" PROPOSED SAN, SWR. LINE COMMERCIAL DEVELOPMENT PROPOSED METER VAULT PROPOSED LINE PR POSED 12" WATER LINE EXISTING FORT WORTH WATER FEET 2(M DEPT. 12" WATER UNE Mayor and Counc i 1 1 � 1 0WHITC 1 of 1 o ..._.m..........__......_...w... ..............__...._.._..._ . ..._._._....__..._..................__....... _.. ._......_.__.._w...............�_....... ._.._...._..._.._....._.._..w....._.._..�._._.....—._....�....___._ WATER AND WASTEWATER UNIFORM CONTRACT AMENDMENTS WITH THE CITY OF WHITE SETTLEMENT RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute contract amendments with the City of White Settlement providing for the construction of an additional wholesale water meter connection and wastewater connection to ttie Fort Worth system. DISCUSSION: The uniform wholesale water and wastewater contracts require that additional points of connection to the Fort Worth system be mutually agreed upon by the wholesale customer and the City of Fort Worth. The City of White Settlement has requested an additional water and wastewater connection at the location of Alta Mere Drive and Green Oaks Boulevard to serve an area in White Settlement that was formerly part of Carswell Air Force Base. Under the terms of the contract, the City of White Settlement will pay the cost of the new metering facilities and any cost associated with connection to the Fort Worth system. Staff has reviewed the requested meter locations and capacity issues with the City of White Settlement and have no objection to approval of these connections. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that this action will have no material effect on City funds,. CB* _..�._. ._w__._.. _ _....__. _�. Y...... (1 11 )C �3 fI � f 1h .ARY salaattec [aa City Manager's It C Office ay: (t0) _............. __... ,_._._............._..._..___._......._...____........................._....._._........... _.._. _. Charles 13oswell 8511 __._w --. _....__._._._........_.. _._..._ _......_.. ._._.. __._.__ ........_., .__..._ 6' 1"g-iaa ataaal,Department Ileacl: Kam kaurar f12 5 (fw°c Naa) �PF'1tf7VED7/17/01 Additional information contact: Kara Shuror 8245