HomeMy WebLinkAboutContract 50627-FP1AC Coded 08.15.23
Vendor Name: WILLIAM J SCHULTZ INC
Vendor ID: 7744 FORTWORTH
CSC No. 50627-FP1
Invoice No. 50627 - FP
Invoice Date: 08/14/23
PO#: FW060-11067
Earned: $61,088.69 WATER DEPARTMENT
FID: 59601-2060000-100261-RETAIN ENGINEERING AND FISCAL SERVICES
$304,720.10 NOTICE OF PROJECT COMPLETION 59601-100261
CS 50627
Regarding contract 50627 for Northside II 30-inch Water Transmission Main as required by the Water
Department as approved by City Council on 9/23/2019 through M&C C-28653 the Director of the Water Department,
upon the recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery, Water Department, has accepted
the project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Other Deductions(see comments):
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
0i1t, � l) /L. L
Rec6mme ded for Acceptance
Assistant Director, Water Department
chi,&tovher f cider
Christopher Harder (Aug 29, 2023 15.56 CDT)
Accepted
Director, Water Department
Dana Burandoff (Au 1. 202.36446 CDT)
City Manager
$5,910,255.00
$348,185.80 Ns 1-5
$6,258,440.80
$6,155,484.70
0 Days @ $630.00/ Day
$0.00
$6,155,484.70
$5,789,675.91
$365,808.79
/ q /2,3
—0 / Date
Date
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Project Name: Northside II 30-inch Water Transmission Main DOE. Ns:
Comments:
59601-100261
CS 50627
City Project Numbers 100261
Contract Name Northside II 30-Inch Water Transmission Main
Contract Limits From N Beach St. along SHI70 East to US377
Project Type Water
Project Funding
Project Manager Fu
Inspectors Johnson / Gieger
Contractor CIRCLE C CONSTRUCTION COMPANY
PO BOX 40328
FORT WORTH, TX 76140
DOE Number 0003
Estimate Number 52
Payment Number 52
For Period Ending 6/1/2023
City Secretary Contract Number 50627
Contract Date
4/3/2018
Contract Time
700 CD
Days Charged to Date
963 CD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $6,155,484.70
Less 0 % Retained $0.00
Net Earned $6,155,484.73
Earned This Period $365,808.81
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$5,789,675.92
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$365,808.81
Friday, August 11, 2023 Page 7 of 7
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name
Northside H 30-Inch Water Transmission Main
Contract Limits
From N Beach St. along SH170 East to US377
Project Type
Water
City Project Numbers 100261
DOE Number
0003
Estimate Number 52 Payment Number 52 For Period Ending
City Secretary Contract Number 50627
Contract Date 4/3/2018
Project Manager Fu
Contractor CIRCLE C CONSTRUCTION COMPANY
PO BOX 40328
FORT WORTH, TX 76140
Inspectors Johnson / Gieger
Contract Time
Days Charged to Date
Contract is 99.000
6/1/2023
CD
Mal)
963
Complete
Friday, August 11, 2023 Page I of 7
City Project Numbers 100261
Contract Name Northside II 30-Inch Water Transmission Main
Contract Limits From N Beach St. along SH170 East to US377
Project Type Water
Project Funding
Phase I
Item Description of Items
No.
-----------------
IA 30" DIP Water Pipe (Pressure Class 2
113 30" Steel AWWA C200 Water Pipe (Pres
1C 30" Concrete AWWA C303 Water Pipe (P
2A 30" DIP Water Carrier Pipe (Pressure
2B 30" Steel AWWA C200 Water Carrier Pi
2C 30" Concrete AWWA C303 Water Carrier
3A Ductile Iron Water Fittings w/ Restr
3B Steel Fittings
3C C303 Fittings
4A Cathodic Protection System for Ducti
4B Cathodic Protection System for Steel
4C Cathodic Protection System for Bar W
5 54" Tunnel Liner Plate By Other Than
6 30" x 24" Tapping Sleeve & Valve w/
7 Connection to Existing 30" Water Mai
8 30" Gate Valve w/ Vault
9 16" Gate Valve w/ Vault
10 4" Combination Air Valve Assembly fo
11 8" Blow Off Valve w/ Vault
12 Concrete Collar for Water Vault
13 imported Embedment/Backfill, Accepta
14 imported Embedment/Backfill, Crushed
15 Imported EmbedmentBackfill, CLSM
16 Temporary Fence,
17 Barbed Wire Fence, Metal Posts
18 Utility Markers
19 Trench Safety
20 Exploratory Excavation of Existing U
21 Seeding, Hydromulch
22 Post -CCTV Inspection
23 SWPPP >_ 1 acre LS
DOE Number 0003
Estimate Number 52
Payment Number 52
For Period Ending 6/1/2023
Estimated Unit
Unit Cost
Estimated
Completed
Completed
Quanity
Total
Quanity
Total
----------------------
5080 LF
$155.00
$787,400.00
5022
$778,410.00
5080 LF
5080 LF
670 LF
$200.00
$134,000.00
670
$134,000.00
670 LF
670 LF
1 LS
$110,000.00
$110,000.00
1
$110,000.00
1 LS
1 LS
1 LS
$70,000.00
$70,000.00
1
$70,000.00
1 LS
1 LS
670 LF
$690,00
$455,600.00
670
$455,600.00
1 EA
$38,000.00
$38,000.00
1
$38,000.00
1 EA
$10,000.00
$10,000.00
1
$10,000.00
3 EA
$42,000.00
$126,000.00
3
$126,000.00
2 EA
$12,000,00
$24,000.00
2
$24,000.00
3 EA
$18,000.00
$54,000.00
3
$54,000.00
2 EA
$15,000.00
$30,000.00
2
$30,000.00
10 EA
$450.00
$4,500.00
10
$4,500.00
100 CY
$25.00
$2,500.00
100 CY
$25.00
$2,500.00
100 CY
$180.00
$18,000.00
3100 LF
$10.00
$31,000.00
3100
$31,000.00
3600 LF
$10.00
$36,000.00
3600
$36,000.00
1 LS
$1,500.00
$1,500.00
1
$1,500.00
5100 LF
$1.00
$5,100.00
5022
$5,022.00
4 EA
$1,000.00
$4,000.00
4
$4,000.00
6000 SY
$5.00
$30,000.00
6000
$30,000.00
5750 LF
$3.00
$17,250.00
5750
$17,250.00
1 LS
$10,000.00
$10,000.00
1
$10,000.00
Friday, August 11, 2023 Page 2 of 7
City Project Numbers 100261
Contract Name Northside 11 30-Inch Water Transmission Main
Contract Limits From N Beach St. along SH170 East to US377
Project Type Water
Project Funding
24 Traffic Control 1 LS
25 Construction Staking 1 LS
26 Construction Survey 1 LS
27 Construction Contingency Allowance (CO#1) 0.74125 LS
28 16" DIP Water Carrier Pipe installed in tunnel(CO#1) 207 LF
----------------------
Sub-Total of Previous Unit
Phse II
DOE Number 0003
Estimate Number 52
Payment Number 52
For Period Ending 6/l/2023
$8,500.00 $8,500.00
$7,500.00 $7,500.00
$5,000.00 $5,000.00
$100,000.00 $74,125.00
$125.00 $25,875.00
$2,122,350.00
1 $8,500.00
1 $7,500.00
1 $5,000.00
234 $29,250.00
$2,019,532.00
Item Description of Items
Estimated Unit
Unit Cost
Estimated
Completed Completed
No.
---------------------------------------
Quanity
Total
Quanity
Total
lA
30" DIP Water Pipe (Pressure Class 2)CO#1,3)
8853 LF
$155.00
.,372,215.00
8976
.1,391,280.00
1B
30" Steel AWWA C200 Water Pipe (Pres
9685 LF
1C
30" Concrete AWWA C303 Water Pipe (P
9685 LF
2A
30" DIP Water Carrier Pipe (Pressure
1000 LF
$200.00
$200,000.00
1832
$366,400.00
2B
30" Steel AWWA C200 Water Carrier Pi
1000 LF
2C
30" Concrete AWWA C303 Water Carrier
1000 LF
3A
Ductile Iron Water Fittings w/ Restr
I LS
$110,000.00
$110,000.00
1
$110,000.00
3B
Steel Fittings
1 LS
3C
C303 Fittings
I LS
4A
Cathodic Protection System for Ducti
I LS
$85,000.00
$85,000.00
1
$85,000.00
4B
Cathodic Protection System for Steel
1 LS
4C
Cathodic Protection System for Bar W
1 LS
5
54" Tunnel Liner Plate By Other Than (CO#5)
874 LF
$650.00
$568,100.00
874
$568,100.00
6
48" Casing By Open Cut (CO#5)
0 LF
$300.00
$0.00
7
12" DIP Water Pipe Installed in Tren
20 LF
$80.00
$1,600.00
20
$1,600.00
8
16" DIP Water Pipe Installed in Tren(CO#3)
91 LF
$100.00
$9,100.00
91
$9,100.00
9
Connection to Existing 30" Water Mai
l EA
$10,000.00
$10,000.00
1
$10,000.00
10
Connection to Existing 16" Water Mai(CO#3)
2 EA
$5,000.00
$10,000.00
11
30" Gate Valve w/ Vault
10 EA
$42,000.00
$420,000.00
6
$252,000.00
12
16" Gate Valve w/ Vault (CO#3)
2 EA
$10,000.00
$20,000.00
2
$20,000.00
13
12" Gate Valve w/ Box
2 EA
$2,000.00
$4,000.00
2
$4,000.00
14
4" Combination Air Valve Assembly fo
5 EA
$18,000.00
$90,000.00
5
$90,000.00
15
8" Blow Off Valve w/ Vault
3 EA
$15,000.00
$45,000.00
3
$45,000.00
16
Concrete Collar for Water Vault (CO#3)
21 EA
$450.00
$9,450.00
18
$8,100.00
Friday, August 11, 2023 Page 3 of 7
City Project Numbers 100261
DOE Number
0003
Contract
Name Northside R 30-Inch Water Transmission Main
Estimate Number
52
Contract
Limits From N Beach St. along SH170 East to
US377
Payment
Number
52
Project Type Water
For Period Ending 6/1/2023
Project Funding
17
Concrete Collar for Water Valve Box
2 EA
$250.00
$500.00
2
$500.00
18
Imported EmbedmentBackfill, Accepta(CO#3)
0 CY
$25.00
$0.00
(CO#5)
19
Imported EmbedmentBackfill, Crushed (CO#5)
0 CY
$25.00
$0.00
20
Imported EmbedmentBackfill, CLSM (m(CO#3)
0 CY
$180.00
$0.00
(CO#5)
21
Cement Modification (13 lbs / SY) (CO#5)
35 TN
$150.00
$5,250.00
22
RoadbondENI Soil Stabilizer
130 GA
$120.00
$15,600.00
23
8" Cone Pvmt Repair, Arterial/Indust(C0#1,3)
2460 SY
$65.00
$159,900.00
2397.1
$155,811.50
24
Temporary Fence
2100 LF
$10.00
$21,000.00
4230
$42,300.00
25
Barbed Wire Fence, M
2100 LF
$10.00
$21,000.00
2100
$21,000.00
26
6" Cone Curb and Gutter (CO#1)
180 LF
$35.00
$6,300.00
401.5
$14,052.50
27
Remove and Replace 2 1 " RCP Class III
25 LF
$250.00
$6,250.00
24
$6,000.00
28
Remove and Replace 24" RCP Class ID
50 LF
$250.00
$12,500.00
60
$15,000.00
29
Remove and Replace 30" RCP Class III
25 LF
$250.00
$6,250.00
24
$6,000.00
30
Utility Markers
1 LS
$1,000.00
$1,000.00
1
$1,000.00
31
Exploratory Excavation of Existing U
20 EA
$1,000.00
$20,000.00
24
$24,000.00
32
Seeding, Hydromulch (CO#3)
3045 SY
$5.00
$15,225.00
3045
$15,225.00
33
Trench Safety
9685 LF
$1.00
$9,685.00
9259
$9,259.00
34
Post -CCTV Inspection
10690 LF
$3.00
$32,070.00
9087.9
$27,263.70
35
SWPPP >_ 1 acre LS
1 LS
$15,000.00
$15,000.00
1
$15,000.00
36
Traffic Control
1 LS
$5,500.00
$5,500.00
1
$5,500.00
37
Construction Staking
1 LS
$10,000.00
$10,000.00
1
$10,000.00
38
Construction Survey (CO#3)
1.4 LS
$5,000,00
$7,000.00
1.4
$7,000.00
39
Construction Contingency Allowance(CO#1,3)
0 LS
$125,000.00
$0.00
40
48" Wood Box Tunnelw/3o" DIP(CO#1)
850 LF
$450.00
$382,500.00
958
$431,100.00
41
36-Inch Casing BOTOC (CO#2)
207 LF
$600.00
$124,200.00
207
$124,200.00
A42
30"X30" DIP MJ Tee (CO#3)
I EA
$8,600.00
$8,600.00
1
$8,600.00
A43
30"X30" DIP MJ Cross (C043)
1 EA
$12,700.00
$12,700.00
1
$12,700.00
A44
30"X24" DIP MJ Reducer (CO#3)
2 EA
$3,000.00
$6,000.00
2
$6,000.00
A45
30"X16" DIP MJ Reducer (CO#3)
1 EA
$4,000.00
$4,000.00
1
$4,000.00
A46
16"X16" DIP MJ Tee (CO#3)
I EA
$2,000.00
$2,000.00
1
$2,000.00
A47
Relocation of 20" Waterline and Valve Vault (CO#3)
1 LS
$5,000.00
$5,000.00
1
$5,000.00
A48
20" DIP Water Pipe( Pressure Class 200) Installed
60 LF
$150.00
$9,000.00
60
$9,000.00
(CO#3)
Friday, August 11, 2023
Page 4 of 7
City Project Numbers 100261 DOE Number 0003
Contract Name Northside II 30-Inch Water Transmission Main Estimate Number 52
Contract Limits From N Beach St. along SH170 East to US377 Payment Number 52
Project Type Water For Period Ending 6/1/2023
Project Funding
A49
Demoliton of Existing Sign (CO#3)
1 LS
$1,500.00
$1,500.00
1
$1,500.00
A50
Tree Removal per Cliper inch (CO#3)
14 EA
$1,000.00
$14,000.00
14
$14,000.00
A51
Union Pacific Railroad Flagman (CO#4)
1 LS
$88,390.00
$88,390.00
1
$88,390.00
52
Install of city supplied 30-inch gate valve w/ vault
1 EA
$18,000.00
$18,000.00
1
$18,000.00
(CO#5)
53
PVC Service Line for Hillwood Property Cattle
1 LS
$19,240.00
$19,240.00
1
$19,240.00
(CO#5)
54
Green Scaping Irrigation for bore pit in median
1 LS
$22,609.00
$22,609.00
1
$22,609.00
(CO#5)
55
Track Monitoing during BOTOC under UPPR tracks
1 LS
$13,682.00
$13,682.00
1
$13,682.00
(CO#5)
56
Production of Bore Monitoring plan as requested by
1 LS
$1,200.00
$1,200.00
1
$1,200.00
Rail Pros (CO#5)
57
— —
Temporary HDPE line for Westlake Station (CO#5)
— — — — — — — — — — — — — — — —
1 LS
— — — —
$19,240.00
— — — —
$19,240.00
— — — — — —
1
— —
$19,240.00
— — — —
—
Sub -Total of Previous Unit
34-,R
5�5:d0
$4,135,952.70
—
— — — — — —— — — — — — —
— — — —
— —— —-----------
f,%i3G,090-f
Friday, August 11, 2023 Page 5 of 7
City Project Numbers 100261
Contract Na me Northside 1130-Inch Water Transmission Main
Contract Limits From N Beach St. along SH170 East to US377
Project Type Water
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number I
Change Order Number 2
Change Order Number 3
Change Order Number 4
Change Order Number 5
?? �jl
Date
Contractor
Inssp��ecti��on Supervisor
PAJect Manager
Date 40/1 d2-3
Asst. Direcloa 1W
chnsfion> f'ardev
Christopher Harder(Aug 29, 20231556 COT)
Date
Director/ Contracting Department
DOE Number 0003
Estimate Number 52
Payment Number 52
For Period Ending 6/1/2023
$5,910,255.00
$0.00
$97,175.00
$124,200.00
($0.20)
$88,390.00
$38,42t.00
Total Contract Price £6 19R 2�
� asap yyo.�
Total Cost of Work Completed $6,155,484.70
Less 0 % Retained
$0.00
Net Earned
$6,155,484.73
Earned This Period $365,808.81
RetainageThis Period $0.00
Less Liquidated Damages
Days @ / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$5,789,675.92
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$365,808.81
Friday, August 11, 2023 Page 6 of 7
FORTWORTH rev03/05107
WATER ENGINEERING & FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENTNO.:52
NAME OF PROJECT: North Side Il 30 Inch Water Trammission Main
PROJECT NO.:
100261
CONTRACTOR: Circle "C" Construction
CITY PROJECT 100261
PERIOD FRONT 07r16'33
TO: 07!31/23 FINAL, INSPECTION
DATE: 1i28/2021
WORK ORDER EFFECTIVE: 6;11'2018
CONTRACT
TIME: 700 0 WD Q CD
DAPS
DAY OF
CIIARGED
REASON FOR DAYS
DAPS
DAY OF REASON FOR DAYS
MONTH
DURING
CREDITED
MONTH CHARGED CREDITI-A)
DURING
1.
16.
2.
17.
3.
18.
4.
19.
5.
20,
6.
2I.
7,
22
8.
23.
9.
24,
I0.
25
11.
26.
12.
27
H.
28.
14.
29.
15.
30.
31.
SAT, SUN,
RAIN, TOO WET,
UTILITIES
Dt
TOTAL
& HOLIDAYS
& TOO COLD
RELOCATIONS
IOTHERS-
C
DAYS
THIS
PERIOD
88
PREVIOUS
PERIOD
875
TOTALS
TO DATE
963
963
*DrfL1ItD W -;:
CONTRACTOR DATE INSPECTOR '
DATE
Capital Projects Deliven,, Water Department
The City of Fort Worth • 200 Texas Street • Fort Worth, TX 76012-6311
(817) 392 4477 • Fax: (817) 392 8460
2
FORTWORTHREV: 02/20/07
Capital Projects Delivery, Water Department
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR & PROJECT DATA
Name of Contractor
Project Name
Circle "C" Construction Company
North Side I130
Inch Water Transmission Main
Water Engineering Inspector
DOE Number
Paul L. Gieger
100261
Water Engineering Inspector
Project Manager
Water ❑ Waste Water ❑ Storm Drainage 0 Pavement
John Kaswavich
Initial Contract Amount
Project Difficulty
$5,910,255.00
0 Simple
0 Routine
Q Complex
Contract Amoual
Dale
18J712023
1Final
$6,155,494.70
11) PERFORMANCE EVALUATION
1 0 - Inadequate I - Deficient 2-Standard 3-Good
4-Excellent
ELEMENT
WEIGHT (x)
APPLICABLE (Y / N) RATING (0 - 4)
IMAX SCORE
SCORE
1 Submission of Documents
2
Y
3
8
6
2 Public Notifications
5
Y
3
20
15
3 Plans on Site
I
5
Y
4
20
20
4 Field Supervision
I
15
Y
3
60
45
5 Work Performed
15
I
Y
3
60
45
16 Finished Product
I
15
I
Y
3
60 1
45
17 Job Site Safety
15
Y
3
60
45
18 Traffic Control Maintenance
15
Y
4
60
60
19 Daily Clean Up
5
Y
'
3
20
15
110 Citizen's Complaint Resolution
I
5
Y
I
3
20
15
Property Restoration
+
5
Y +
3
20 1
15
111
12 After Hours Response
5
Y
3
20 1
15
13 Project Completion
5
Y
3
20
15
TOTAL ELEMENT SCORE (A)
356
BONUS POINTS (25 Maximum) (B)
TOTAL SCORE (TS)
356
111) CONTRACTOR'S RATING
Maximum Score (MS) = 448 or sum of applicable element
score maximums which =
448
Rating ( (T5 / MS] * 100%) 356 1 448
= 79%
Performance Category Good
<20% = Inadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good >80% = Excellent
Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature Inspector , { r/ Signature Contractor I-e,�, S`r
Signature Inspector's Supervisor�--
CONTRACTOR'S COMMENTS
Capital Projects Delivery, Water Department
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 4477 - Fax: (817) 392 - 8460
FoRTWORTH
Capital Projects Delivery, Water Departrnent
CONTRACTOR'S EVALUATION OF CITY
I) PROJECT INFORMATION
Nance of Contraclor
Circle "C" Construction Company
Water Engineering Inspector
Paul L. Gieger
DOE Number Project Dryficulty
100261 O Simple Q Routine QQ Complex
Initial Contract Amount
$5,910,255.00
II) PERFORMANCE EVALUATION
0 - Inadequate 1 - Deficient 2 - Standard
ELEMENT
INSPECTION EVALUATION
I Availability of Inspector
12 Knowledge of Inspector
13 Accuracy of Measured Quantities
14 DispIay Of Professionalism
15 Citizen Complaint Resolution
16 Performance - Setting up Valve Crews, Labs
JADMINISTRATION
I Change Order Processing Time
12 Timliness of Contractor Payments
13 Bid Opening to Pre -Con Meeting Timeframe
III) COMMENTS & SIGNATURES
COMMENTS
Signature Contractor
Signature Inspector
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
REV: 02/22/07
Date: 17-Aug-23
Project Nance
North Side lI 30 Inch Water Transmission Main
Project Manager
John Kasavich
Type of Contract
F] Water ❑ Waste Water ❑ Storm Drainage []✓ Pavement
Final Contract Amount
$6,155,484.70
3 - Good 4 - Excellent
RATING ELEMENT
l (0-4)
RATING
(0 - 4)
PLANS & SPECIFICATIONS
4/
1
Accuracy of Plans to Existing Conditions
Y
�f
r�
12
13
Clarity & Sufficiency of Details
Applicability of Specifications
AV
S/
14
Accuracy of Plan Quantities
y
PROJECT MANAGER EVALUATION
1
Knowledge And/Or Problem Resolution
y
2
Availability of Proiect Manager
S�
3
Communication
y
4
Resolution of Utility Conflicts
1/
Capital Projects Delivery, Water Department
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 4477 • Fax: (817) 392 - 8460
FORTWORTH
WATER ENGINEERING & FISCAL SERVICES
PIPE REPORT FOR:
PROJECT NAME:
North Side II 30 Inch Water Transmission Main
PROJECT NUMBER:
100261
DOE NUMBER:
100261
WATER
PIPE LAID
SIZE
TYPE OF PIPE
DIP
30"
DIP
DIP
20"
DIP
DIP
16 "
DIP
DIP
12 "
DIP
FIRE HYDRANTS:
VALVES (16" OR LARGER)
PIPE ABANDONED
SIZE
TYPE OF PIPE
0
DENSITIES: Yes
NEW SERVICES: 0
SEWER
PIPE LAID SIZE TYPE OF PIPE
0
PIPE ABANDONED SIZE TYPE OF PIPE
0
DENSITIES: 0
NEW SERVICES: 0
WATER ENGINEERING & FISCAL SERVICES
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 4477 • Fax: (817) 392 - 8460
LF
16,500 '
60'
325
20'
14
LF
0
LF
LF
0
0
CONSENT OF SURETY OWNER
TO FINAL PAYMENT ARCHITECT ❑
AIA Document G707 CONTRACTOR ❑
SURETY ❑
OTHER ❑
Bond No. TXC608555
TO OWNER:
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX
PROJECT:
(name, address)
Northside II 30-Inch Water Transmission Main
in the City of Fort Worth, TX
ARCHITECT'S PROJECT NO.:
City Project No. 100261
CONTRACT FOR: Utilities
CONTRACT DATED: 2018
In accordance Frith the provisions of the Contract between the Owner and the Contractor as indicated above, the
(Insert name and address ofSuren)
Merchants Bonding Company (Mutual)
6700 Westown Parkway
West Des Moines, IA 50266 SURETY
on bond of
(Insert name and address of Contractor)
William J. Schultz, Inc., dba Circle C Construction Company
P. O. Box 40328
Fort Worth, TX 76140 CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety
of any of its obligations to
(Insert name and address of Owner)
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102 , OWNER,
as set forth in the said Surety's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand this date: May 26, 2023
(Insert in writing the month followed by the numeric date and year.)
Merchants Bonding Company (Mutual)
(Surety)
i
(Signature ofautho,d representative)
Attest: WTEess as to Surety: Sheryl A. Klutts, Attorney -in -Fact
(Seal): � i � /� �`-- (Printed name and title)
John A.'Wler
Note: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND
CLAIMS, Current Edition
AIA DOCUMENT G707 0 CONSENT OF SURETY COMPANY TO FINAL PAYMENT • April 1970 Edition • AIA® One Page
01970 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 New York Ave., NW, Washington, D.C. 20006
MERCHANT
BONDING BONDING COMPANY
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the
"Companies") do hereby make, constitute and appoint, individually,
John A Miller; Sheryl A Klutts
their true and lawful Attomey(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of
persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions
or proceedings allowed by law.
This Power-of-Attomey is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board
of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of
Merchants National Bonding, Inc., on October 16, 2015.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attomeys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto,
bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the
Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 20th day of March 2023 .
•``�t1OA1 '. • • ' •. MERCHANTS BONDING COMPANY (MUTUAL)
P 'q< p�NG.Cr7�A. MERCHANTS NATIONAL BONDING, INC.
FLPOR e0 ; O� �tPO 9'• d/b!a MERCHANTS NATIONAL INDEMNITY COMPANY
-o- O':0- rn.
2003 : `,? : y : 1933� By
• J
•.......:iJ�• �•.�� 'L�a•• President
STATE OF IOWA �'•.��� • .•`•
COUNTY OF DALLAS ss.
On this 20th day of March 2023 before me appeared Larry Taylor, to me personally known, who being by me duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards of Directors.
o 3". t:o�mrrn i+J3s�• �2i37
I�iy Gontmrsaion txp:�
IbINN
?.,; 14, 2LI24
(Expiration of notary's commission does not invalidate this instrument) Notary Public
1, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby
certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full
force and effect and has not been amended or revoked.
In Witness Whereof, I hav
POA 0018 (10/22)
e hereunto set my hand an
AZ...........
a2�R o R,q�v �s
iv 2003
..�y''•'� ••' Sao'
d affixed the seal of the Companies on this 26th day of May, 2023.
.Z.
' Q.- 1933
:3s
: c• Secretary
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county
aforesaid, on this day personally appeared TERESA S SKELLY, PRESIDENT
of CIRCLE C CONSTRUCTION, known to me to be a credible person, who being by
me duly sworn, upon his oath deposed and said;
That all person, firms, associations, corporations or other organizations
furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or property damage;
On Contract described as;
Northside II 30- Inch Water Transmission Main
Project Number 100261
MICHELE S LANKFOR p /
Namy Public BY
STATE OF TEXAS
Notary ID # 117594666
"••n,�,r P�,r Aty Carnet. E1q�. October 3.2023
Subscribed and sworn before me on this fill Day of mcv l , 2023.
to uc9r1.n9-. C-)�n TUC1'�
Notary Public in Tarrant Count TX
FORTWORTH,
August 08, 2023
Circle C Construction Company
500 W. Trammel Ave.
Fort Worth, TX 76140
Re: Acceptance Letter
Project Name: Northside H 30-inch Water Transmission Main
Project Type: Water
Project Ns?: 100261
DOE. Ns: 0003
Contract Ns: 50627
Gentleman:
Dated: 8/8/2023
On January 28, 2021 a final inspection was made on the subject project. There were punch list items identified
at the time. The punch list items were completed on February 04, 2021. The final inspection and the corrected
punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by
the City. The warranty period will start on February 04, 2021, which is the date of punch list completion and will
extend for (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at (817) 392-6054
Yours Truly,
it S �lp u
Tony Sholola, P.E., Assistant Director, Water Department
TS /
cc: Chris Harder, P.E., Director, Water Department
Laura Wilson, P.E., Deputy Director, Water Department
Captain Michael Skains, Fire Department
Luke Coffman, Sanitary Sewer Systems Superintendent, Water Department
Cesar Zavala, Water Systems Superintendent, Water Department
John Kasavich PE, Project Manager, Water Department Capital Projects Delivery
David R Johnson, Inspection Supervisor, Water Department Capital Projects Delivery
Paul Gieger, Inspector, Water Department Capital Projects Delivery
, Consultant
Keegan Jonkers Circle C, Contractor
File
Fort Worth
All edcaCRY' WATER DEPARTMENT
1 I I I lo' THE CPCY OF FORT WORTH * 200 TEXAS STREET * FORT WORTH, TEXAS 76102
817-392-8240 * FAx 817-392-8195
1964.1993.2011
_S Printed on recycled paper