HomeMy WebLinkAboutContract 53807-A1CSC No. 53807-Al AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 53807 WHEREAS, the City of Fort Worth (CITY) and Burgess & Niple, Inc., (ENGINEER) made and entered into City Secretary Contract No. 53807, (the CONTRACT) which was authorized by M&C 20-0176 on the 7tn day of April, 2020 in the amount of $ 322,000.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2019, WSM-G; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $25,287.00 (Water). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $347,287.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [WGSS Repl. 2019 67SM-G] Prof Services Agreement Amendment Template [1023031 Revision Date: November 23, 2021 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth a� a� Dana Burghdoff (Aug 1, 2023 2 CDT) Dana Burghdoff Assistant City Manager DATE: Aug 31, 2023 APPROVAL RECOMMENDED: Christopher Harder (Aug 25, 2023 08:58 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Burgess & Niple, Inc. W • 6. William D. Wendland, P.E. Vice President DATE: 812.2.1202-3 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. vl/dw NCWKJ� Walter Norwood, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A N/A I Date: DBIack (Aug 30, 2023 09:18 CDT) N/A Douglas W. Black 1295: Sr. Assistant City Attorney Val ATTEST: poF FORTAa �s� odp �op.�o a°gig PVo o=a° x- O�a� nE�As6bod I\\/�LFA�lli11� OFFICIAL RECORD Jannette Goodall CITY SECRETARY City Secretary FT. WORTH, TX City of Fort Worth, Texas [W&SS Repl. 2019 WSM-G] Prof Services Agreement Amendment Template [1023031 Revision Date: November 23, 2021 Page 2 of 2 BURGESS & NIPLE 395o Fossil Creek Blvd. I Suite 23.0 1 Fort Worth, TX 76137 1 83-7•3o6.1444 August 9, 2023 Mr. Walter Norwood, PE Senior Professional Engineer City of Fort Worth — Water Department 200 Texas Street Fort Worth, TX 76102 Re: Scope of Work Revision Reauest Water & Wastewater Replacement Contract 2019, WSM-G City Project No. 102303; B&N No. PR58702 Proposed Amendment No. 1 ►Till■► . 0 $I.p This letter is our formal request for a Scope of Work Revision for engineering services. Justification The City has requested that Burgess & Niple (B&N) provide additional engineering services beyond the original scope of work. These services are identified below as four separate tasks. Task 101.0 Southside Water CO Packaae The current B&N southside water line design is affected by easement acquisition issues, which necessitate shifting the water line design into TxDOT right-of-way. B&N is to meet and coordinate with TxDOT and revise the southside water lines in a manner that is acceptable to TxDOT and the City. B&N will provide separate 90% complete plans and Final 100% complete plans for water improvements south of Jacksboro Highway. The lump sum fee for Task 101.0 is $3,028.00. Task 102.0 Construction Phase Services B&N shall provide increased construction phases services through additional coordination with TxDOT than was anticipated in the original scope of work. B&N will respond to TxDOT questions regarding the Southside Water CO Package and will provide record drawings at the conclusion of construction activities. The lump sum fee for Task 102.0 is $1,390.00. Task 201.0 Love Circle Fire Hvdrant Relocation B&N will add additional water improvements along Love Circle, to the current City Project referenced above and constructed in the current City Misc. Construction Contract. The fire hydrant currently in conflict with proposed TxDOT construction will be relocated to an appropriate location per conversations with TOOT at coordination meetings held at 10:30 AM on 10/19/22 and 9:00 AM on 6/28/23. B&N will design the relocation of the fire hydrant at the end of Love Circle including a 6" tee, gate valve, and 6" water line to not burgessniple.com August 9, 2023 Water & Wastewater Replacement Contract 2019, WSM-G Proposed Amendment No. 1 Page 2 conflict with future ongoing TxDOT construction along Love Circle while still allowing for adequate flushing by City Staff. The plan sheet will be a stand-alone plan set for the City's usage in the Fort Worth Water Department's Misc. Contract. B&N will coordinate with TxDOT and the City and will provide a Final 100% plan sheet of this design. The lump sum fee for Task 201.0 is $1,145.00. Task 301.0 Northside Bid Package Due to changes to Culvert B by TxDOT, which affect the current B&N northside water line designs, B&N is to meet and coordinate with TxDOT and revise the northside water lines in a manner that is acceptable to TxDOT and the City. B&N will provide new 90% complete plans and Final 100% complete plans and specifications. These plans will also include the southside sanitary sewer that is not included in the Southside Water CO Package. The lump sum fee for Task 301.0 is $19,724.00. Based upon this revised scope of work, the additional design cost proposed for Amendment No. 1 is $25,287.00. See the attached Level of Effort spreadsheet. PROJECT FEE DETAILS Contract Item Description Fee Original Contract W&WW Replacement Contract 2019, WSM-G $322,000.00 Proposed Amendment No. 1 Additional Scope of Work as described above $25.287.00 REVISED TOTAL PROJECT FEE $347.287.00 Please let me know if you have any questions or need additional information concerning this request. Respectfully submitted, Burgess & Niple TBPE FIRM REGISTRATION NO. F-10834 oz;wv 6, William D. Wendland, P.E. Vice President Director, Fort Worth District Attachment P:\PR58702\PM\Contract\CO\CO-1\58702 W&SS Replacement Contract 2019, WSM-G Amendment 1.docx Task No. Task Description 2023 Rate Amendment 101.0 Southside Water CO Packa eOT 101.1 Meeting & Coordination with T 101.2 Final Draft (90%) Construction Plans 101.3 Final (100%) Plans 102.0 Construction Phase Services 102.1 Assistance DudnSS�, Construction 102.2 Record Drawings/As Built 201.0 i Love Circle Fire Hydrant Relocation I 201.1 Site Visit & Coordination with TxDOT 201.2 (Final (100%) Plan Sheet 301.0 1 INorthside Bid Package 1 301.1 ITxDOT coordination on Culvert B CO 301.2 (Site Visit & As-builts from TxDOT 301.3 (Update Outdated Details 1 301.4 (Final Draft (90%) Plan/Profile Sheets 1 301.5 TxDOT Coordination & Permit on Revision 301.6 lFinal (100%) Plan/Profile Sheets 301.7 1 Specifications I 1 301.8 1 Construction Estimate I I Amendment 1 Totalsl EXHIBIT B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract, WSM-G Amendment 1 City Project No. 102303 Labor hours) EWense Principal Project Project EIT I Senior Graduate Total Labor Subconsultant Manager Engineer Designer Engineer Cost $340 $285 I $19Ei $164 I $155 $133 SBE Non-SBE 0 11 Ci 121 5 0 $3,028 $0 $0 1 31 1 $492 l I 6 51 $1.759 I 11 1 31 1 $777 1 01 21 01 51 01 0 $1,390 $01 $01 1 I 31 $777 I I 1 zl I I $613 I 01 11 01 51 0 01 $1,1051 $01 $01 1 1 1 11 I $1641 I 1 1 11 1 4 1 $9411 1 1 01 171 291 56 01 01 $19,684 $01 $01 I 6 1 151 1 1 $4,1701 I I I I 1 11 1 1 $1641 1 1 1 1 21 1 1 $3281 1 1 1 41 8 I 161 1 1 $5,3241 1 1 1 11 11 2 I I $8081 I I 1 21 41 61 I $z,6sz1 I I 2 161 81 I I $5,0021 1 I 1 21 1 41 1 1 $1,2261 1 1 01 211 291 781 SI 61 $25,2071 $W1 $0l Southside Water Line Footage 1,719 100.0 % Sewer Line Footage 0 0.0% 1.7191 100% Love Circle I Water Line Footage 501 100.0% I Sewer Line Footage 0 0.0% 50 100% City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 1 of 2 Total Expense Task Sub Total Travel Reproduction Cost $0 $0 $0 $3,028 $0 5492 $0 $1.759 1 $0 $777 $01 $o $0 $1,390 I $0 $777 I $0 $613 $40I $01 $40 $1,145 $201 1 $201 5184 $201 1 $201 $961 $40i $oi $401 $19,724 1 1 $01 $4,170 $201 1 $201 $184 1 1 $01 $328 1 1 $01 $5,324 $201 1 $201 $828 1 1 $01 $2,662 I I $01 $5,002 I 1 $01 $1,226 $801 $OI $801 $25,287 $347,287.00 Amendment Summary Total Hours 133 Total Labor $25.207 Total 6cpense $80 MBE/SE $0 Non-MBE/SBE Subconsultantl $0 10% Sub Markupl $0 MBE/SBE Participation) 0.0% Total Project Cost1 $25,287.00 8/16/2023 4:43 PM EXHIBIT B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract, WSM-G Amendment 1 City Project No. 102303 Labor hours) I E ense Task No. Task Description ct principal 7o CI s=bor Subconsultant ectr EIT TotalExpenseTask Sub Total Desiq'(terJ EngGra.` Manager Engineest Travel Reproduction 2023 Rate $340I $286 $1s 1 $164 51 BSI $133 SBE I NonSBE Northside I Water Line Footage 4.368 53.1 I Sewer Line Footage 3, 862 46.9% 6,230 100 % (A) Total Fee $25,287 (B) Survey Fee $0 C) Total Fee ((- survey Fee $25,287 () Water Fee (6�.4% of C) I Sewer Fee (36.6% of C) II $16.0 0.00 $9,29i.00 I DescRption WP Water Sewer Southside (Task 101 & 102� $4,418.00 $0.00 I Love Circle Fire H drant ( ask 01) $1.145.00 $0.00 I Northside (`task 301) $10.467.00 I $9,257.00 Survey 51 $0.00 $0.00 I I Subtotal I $16,030.00I $9,257.00 I Total I $25,287.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 2 of 2 8/16/2023 4:43 PM