HomeMy WebLinkAboutContract 55271-A2CSC No. 55271-A2
AMENDMENT No. 2
TO CITY SECRETARY CONTRACT No. 55271
WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates,
LLC, (ENGINEER) made and entered into City Secretary Contract No.
55271, (the CONTRACT) which was authorized by M&C 21-0050 on the 12th day
of January, 2021 in the amount of $214,130.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1
in the amount of $99,435.00 authorized by M&C 22-0173 on March 8, 2022;
and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2019 WSM-H; and
WHEREAS, it has become necessary to execute Amendment No. 2 to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE , CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer totals $49,992.00 (Water:
$14,515.00; Sewer: $14,515.00; TPW: $20,962.00).
2.
Article II of the CONTRACT is amended to provide for an increase
in the fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City
for all work and services shall be an amount of $363,557.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [W&SS Repl. Contract 2019, WSM-H]
Page 1 of 2 [CPN 102780]
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
bard 8UPAv
Dana Burghd off (Aug9,2029CDT)
Dana Burghdoff
Assistant City Manager
DATE: Aug 29, 2023
APPROVAL RECOMMENDED:
Christopher H der(Aug 25, 202315:35 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Dunaway Associates, LLC
Kei•vin Campbell, PE
Regional Executive I Principal
DATE: August 23, 2023
By signing, I acknowledge that I am the person responsible for
the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
r
/reda �Oropeza
Project Manager
APPROVED AS TO FORM AND LEGALITY:
P1Gg�
Mack (Aug 29, 2023 13:19 CDT)
Douglas W. Black
Senior Assistant City Attorney
ao � Abu
p o� pORt��d
Fg
ATTEST:
�n,ns�. % asap nEXp54
Jannette S. Goodall
City Secretary
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 2 of 2
M&C : 23-0650
Date: 08/8/23
Form 1295: 2023-1041485
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
[W&SS Rep] . Contract 2019, WSh1-11)
[CFid 10"'7t?41j
DUNAWAY
Dunaway No. 2695.001
May 23, 2023
Ms. Brenda Oropeza
City of Fort Worthen
200 Texas St, Fort Worth, TX 76102
Reference: Water and Sanitary Sewer Rehabilitation, Contract 2019 WSM-H Scope
Adjustments
Dear Ms. Oropeza:
As noted in email correspondences and phone calls and documented on the reviewed plan
set, the city requests a number of changes be made relative to the scope from Contract
Amendment #1. It is our understanding that the intent of these changes is to finish any and all
sanitary sewer work that may need to be performed in this area of town. Major changes
include providing new alignments for the sewer that currently utilizes M-1-1-1, and the
relocation of line segments to the street that would require new easements. In addition, the
city would like to add the replacement of a sanitary sewer line on Locust Street. These
changes require additional topographic survey. However, these changes also eliminate the
need for all 28 easements identified in Amendment #1. In December, an additional request
was made by TPW for Greer Street. As a final change, a second bid phase for M-1-1-1 and
Baldemer has been requested in order to expedite the construction of the plans as they have
been designed to date. A full detailed description of each project modification is described
below:
1. Due to topographic challenges, 1109 and 1117 Samuels will be served from a
sanitary sewer main within the right-of-way of Baldemar Street. A new plan sheet
shall be added for a Baldemar Street sanitary sewer.
2. As M-1-1-1, a 36" sanitary sewer main, is no longer needed, and as this line crosses
through a Cargill facility, approximately 1,300 linear feet of replacement sewer line
will be designed within an existing easement along the west side of Cargill, and
within a private road and railroad easement north of Cargill. This effort will include
up two easements to secure the rights to place the sanitary sewer within the private
roadway easement and adjacent property.
3. Reversal (redesign) of the 131h Street Sanitary Sewers to a new sewer under design
by another firm in Samuels Avenue,
dunaway.com
DUNAWAy
Water and Sanitary Sewer Rehabilitation, Contract 2019 WSM-H Scope Adjustments
May 23, 2023
Page 2
4. Addition of a replacement sanitary sewer line on 10th Street. This line will be
designed to connect to the sanitary sewer in Woods Street and allow for the
discontinued use of M-1-1-1.
5. The addition of Locust Street - from Woods Street Westward for 370 linear feet.
6. The evaluation of L-534, L-5812, L-539 to determine whether and how to relocate,
and the subsequent re -design of these lines,
7. The addition of a paving plan for Greer Street, funded by TPW. The work will include
a plan and profile sheet, typical section, paving details, and additions to the
specifications, bid tab and OPCC.
Additional Topographic Survey:
1. Baldemar Street -Topographic survey for an apparent 50-foot swath for appx.
200 feet behind houses. This is a public right-of-way.
2. Cargill -Topographic survey from a manhole at the southern end of the
alignment shown, for a length of appx. 675 feet to a manhole on the northwest
end of this alignment. A public utility easement already exists per plat.
3. Northpark Drive - 590 linear feet along the northern property line offhe Cargill
facility. This alignment is within the apparent Northpark Drive private roadway
easement.
4. Locust Street - 370 linear feet of public right-of-way from Wood Street westward.
The intent is to bid the project that has been designed to date as one bid package, and
to bid the work that requires new topographic and boundary survey as a second
package later.
Dunaway has substantially completed the markups provided on August 22nd for those line
segments where we have completed survey. In reviewing the changes to scope as described
above and reserving some of the remaining budget for work completed and work
anticipated under the original contract and under Amendment # 1, the net change required
to complete all work as described is $49,991.17.
dunaway.com
DUNAWAY
Water and Sanitary Sewer Rehabilitation, Contract 2019 WSM-H Scope Adjustments
May 23, 2023
Page 3
A summary of the total project is as follows:
Contract
Description (Water)
TPW
Fee
original Contract
$ 214,130.00
0.00 $
214,130.00
Amendment No. 1
$ 99,435.00 $
0,00 $
313,565.00
Amendment No. 2
$ 29,030.00 $
20,962.00 $
363,557.00
TOTAL PROJECT
$
363,557.00
Sincerely,
7�
�ycut _ �1cd �ttl�,
Bryan Sherrieb, P.E.
DUNAWAY ASSOCIATES, LLC
a Texas limited liability company
BES/BES
dunaway.com
.tti i EK Lac
WSM-R -LOE for Finat Contmct Adfuctmori
1 Labor jnoam)
Exoans.
1
Task
Task Dosalp0on
Project
Pro)oct Pre]oct EnOlnoor Profoa
Enginoor
Total Labor
�
Total
Amtmnl
Hudgot
No.
Dlmaor
Manager II
I
I EIT
Admin
Cost beonsulWnt
Tmvol
R.Pro
Exponcv
coat
Task Sub Tool
I
%Wmplom
Eamod
Rolllalning
R.I. 5220
_-$210 5160
5150 $130
$95
I MWBE
.e-MWBE
11.0 Adlustmonta
- I 10.0 t46.0
4.1
$25,040 50
$0
$01
SDI
$01
525,0401
I
1 Baltlemcr Ro-Raul.
I f 1�
52,570I
I
0
52,570(
OAO J
i I
$2510
I M-7-L1 AdlusknonL
I
1
ID
S15A401
OAO%I
1- I
275440
1 M-1-F1Align mnlAdluslmonl-Wo of Cargill
1 40
I 36.5101 I
I
S01
$10,1101
0.00%1
S- I
310110
I M-14-1 Alignment- North arcargBl
I 1 401
I
$0.810: I
I
I
30
S10,t 10
OAO%(
Z I
510110
I RaOroad Slaluc RosaalchlProPony Ow .or Coor .on a el
I 522201 1
I
30
3.7
OAO%I
5• I
57690
1 10m St (Shoot Atl).1-UM-14-1 Abadonmonl
el
I S1$6OI
50
$1200
O.DO%I
5- I
11260
I Le 1Sanitary S
I 1 40
I 36,670
( I
f
56610
0.00%1
S- 1
58610(
Ir .'
I' Bid Phno
..I
0
51 O
1
6
4I $4,1 G5 5-
5- I I
5700
57001
,_.I':'.::,.
S4,0G5
5-
14,11 I
15.1 Bids omrt
I
1 I I I
I
15 ad Scll Conkaci Dommonls and MaNLlln
Plan
11 I
2
11
111 57251 I I I
12001
12001
$9251
D.Dj
S-
sus I
pn�
15 L^wc Add.nda fTwo)
I I 2I I
31
3
I 51.20I I I I
1
S01
S1 RB01
0.0
3-
S12WI
I S Mond Prv.bld Cod m(V-W)
I I I
11
1 $1501
I
SO J
$1501
0.00XI
5•
SiS01
S lAlland al
I
SO
I
��
W I
D.oD%I
5-
301
?..In
S ITa wle Land Rocommontl Awnrtl
11
I
3
11 5755
I
I
I
SO
$7551
D.00%I
I•
57551
� 5 Izmo Conformed C-1-D-1s,^
11
71
dl
11 57275
I
a„� I
551f 1
51.775
0.00%I
3-
517751
6.0 IConatruca.. Ph-S.rvlcos
01 6I al
24I
a
o' SS=
S- I S.
5-
3-
Sol
SS.DOD
I
S-
S5.6oD1
0.1 1 Cer -l" S..Pen
I I
I
I
I
1
I
1 6 PromnslniWon Carrara-
I I
21
I 5300
I
SDI
5000
OAO%I
S- 1
53001
:XIond
16 AOond Publk--i.. rV'vtuall
I 11
I
11
1 335DI I
I
SO
A60f
0.00%I
3-
53001
I6
Pro oC Slly VISIL•rA•mmo 2vachl
I's I
el
I 5155DI
SO
51,5
0.00%I
i
515301
10
Sa Comoatlion Anal))sL^
I
I
1DI
I
31.5001
I I
SD
21.500
0.00%1
S.
$15001
I0 IR
ari for lnfortna0oNCnanao Ortlar RoNvw
I
1
31
I
SBWI
SO
5680
OAM
5- I
56601
62
Rvmrtl Dmwln.s
tl I
2I
B
I
S1.S5DI I I
1 i
57.530
O.OD%
3- 1
315501
I
I
101 I
I
11
0
I I
I
/SD
TOTALS: - 14301 146.00
120o
Engln000Ang Tom[:I - - -
700.00I
5-c
$36,605,LC
Now Survey- B.M.M.r, Cargill Wast Property Llno (M-id-1
Roplacomont), Northpark Drtve, LOCUstSVOCt
IB35 LF
:.S,
W __,_ _1 �R1@@:G �
13asomenis 0 of S1000 En.h
Nodhpark-ovodayodvalo cl-. NoMOarkoffste-aewormnnocllon.
T=P omvaeforoemssio 0lNur.0no
S
31000.90
Tool Profoct:
S
56.305.00
Co.-. b Dot.:
Fu0y Amandod Contract
S
313,565.00
Invoiced m Oats:
S
210.929A2
Work alnm last Invoke:
S
20,558.25 Inciudo. vortl ovalallon and rolc=Uon of L-934, L-5812, L-539, 13M Slroot 11mral
C.ntmatR nnalntlor..
S
82,077.33
Tasks to by complmd:
0100 WaIW 07 Bld/Cmnancdon Phase
S
7. 16.00
0101 S-I"' S-09 Bld
1
6,419.00
01.1 SoNlary Sawur lD construction Phase
S
0.04200
Rosemo for90Y.1100%Completion
S
24,OM50 Efforts lndudo adding pavomelllroplammont. UPd3MZ b=Od
on city mfllrnorl
Mal mmmant
roviow m00lings and l=Ing plans for bid.
,
Park Comomfon
$
7.040, 0 'Park Convaml.n-notyotdolormined
Not Conlrad Remalndvr
S
27.775.63I
CM:
S
36.605.00
Top. Survey.
J___I],201L00
Ea:menls
S
3.000.00
R.qulrad 1. Complete No Prol-
S
--
?�i, �3cr �U
DUNAvAr Y
Level of Effort Spreadsheet _
TASK/HOUR BREAKDOWN j PW 4— C 1
Design Services for
City of Fort Worth, WSM-H Contract 19 - Greer St. Water Line Replacement
City Project No. 102780
DALP Project No. 200155.00
= Labor (hours) Expense I
= Task Description Projec[ Project Project Graduate civil Designer Admin. Subwnwltant Total Expense
Task No. Director Manager Engineer Engineer Total Labor Cost I I Travel Reproduction Cost Task Sub Total
Rate 5240 $2D7 S165 $135 $110 $110 MWBE Non-MWB�
-4.0
Final Design
2
11
48
38
0
2
$
16,027.00
$
-
S - I $ - Is
4.1
-coal Draft (90%) Construction Plan and Profile Sheet
11
61
25
151
2
S
7,852.00
1 1 $
4.2
typical Section and Construction Details
1
I
8
81
S
2,607.00
1 I S
4-35
Construction Estimates (90% and 100%)
1
11
121
S
2,892.00
I 1
4.4
Coordination Meeting
11
11
S
372.00
I I I
4.5
Final (100%) Plans and Specifications
1
2
91
31
s
2,304.00
1
I I
I
IS 0
Bid Phase
I
01
1
31
1
71
1
0
I 1
01 0
$
2,776.00 IS
- 1 S - I S
5.1
IBid support I
I I
I
I
I I
5.1.1
ISell Contract Documents and Maintain Plan Holders List I
I
5.1.2
Ilssue Addenda 1
1 21
4
1
1
Is
1.074.00 1 1
5.1.3
(Attend Pre -bid Conference I
I
I
1
- I 1
5.1.4
IAttend Bid Opening I
I
I
1
I$
$
- 1
S.3-5
ITabulate Bids and Recommend Award I
1
11
I
Is
165.00 I
5.1.6
Ilssue Conformed Contract Documents I
1 11
21
1
1
IS
S37.00 I
16.0
I
Construction Phase Services 1
I
01 45
.11
I
al
I
01
I
01 $
I I
3,159.00 1 $
I 6.1
Construction Support I
I 1
1
I 1
6.1.1
IAttend Preconstroction Conference
6.1.2
IAttend Public Meeting
Ij
I
1
I
I
I $
6.13
I Project Site Visits
1
I 21
41
1
$
1,074.00 1
6.1-4
Submittal Review I
I 1
2
I
330.001 1
6.L5
Request for Information/Change Order Review I
1 2
6I
I
is
$
1,404.001 I
6.1.6
IFinal Walk Through and Punch List
1
1
6.2
jI
1Record Drawings I
I 0SI
151
I
Is
351*00
'-7.0
I
ROW/Easement Services 1
I
0
I
01
0
I
01
I
01
0
5
1 S
I I
•8.0
I
Survey 1
0
I
01
01
I
01
I
01
DI
_ is - $
.
Totalsl
2
18SI
6851
381
01
2I $
20,962.00 1 $ - I $
$
is
I
_
Is
I
s Is
I
$ Is
$ 1$
$ is
I
Is Is
I
I I
I
I
Is
I
Is Is
Is
Is Is
Project Summary
Total Hours
Total Labor
Total Expense
MBE/SBE Subconsultant
I Non-MBE/SBESubconsultantl
I 10% Sub Markup)
I MB-c/SBE Participation)
I Total Project eostl
26,027.00
7,852.00
2,607.00
2,992.00
372.00
2,304.00
1,776.00
1,074.00
16S.00
537.00
3,1S9.00
1,074.00
330.00
1,404.00
351.00
20,962.00
129
S20,962
so
�
$0
s0
$0
0.0%
S20,962
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, August 8, 2023
LOG NAME: 6019WSMHA2-DUNAWAY
REFERENCE NO.: **M&C 23-0650
SUBJECT:
(CD 9) Authorize Execution of Amendment No. 2 In the Amount of $49,992.00 to an Engineering Agreement
with Dunaway Associates, LLC, for the Water and Sanitary Sewer Replacement Contract 2019 WSM-H,
and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to and Amend the Fiscal
Years 2023-2027 Capital Improvement Program (2022 Bond Program)
RECOMMENDATION:
It is recommended that the City Council:
Authorize execution of Amendment No. 2 in the amount of $49,992.00, to City Secretary Contract
No. 55271, an engineering agreement with Dunaway Associates, LLC for the Water and Sanitary
Sewer Replacement Contract 2019, WSM-H project for a revised contract amount of $363,567,00;
Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of $29,030.00, transferred from available
funds within the Water and Sewer Fund, for the purpose of funding the Water and Sanitary Sewer
Replacement Contract 2019 WSM-H project (City Project No. 102780) and to effect a portion of
Water's contribution to the Fiscal Years 2023-2027 Capital Improvement Program;
Adopt the attached appropriation ordinance adjusting appropriations in the 2022 Bond Program
Fund by increasing appropriations in the Water and Sanitary Sewer Contract 2019, WSM-H project
(City Project No. 102780) in an amount of $40,000.00 and decreasing appropriations in the Street
Improvements -Deteriorating Streets programmable project (City Project No. P130019) by the same
amount; and
Amend the Fiscal Years 2023-2027 Capital Improvement Program.
DISCUSSION:
On January 12, 2021, Mayor and Council Communication (M&C) 21-0050, the City Council authorized an
engineering agreement in the amount of $214,130.00 with Dunaway Associates, LLC (City Secretary
Contract No. 55271) for the Water and Sanitary Sewer Replacement Contract 2019 WSM-H project. The
agreement was subsequently revised by Amendment No. 1, in the amount of $99,435.00 authorized
administratively on 02/04/2021 and funded by (M&C) 22-0173 on March 8, 2022, that provided for
additional survey and design for the replacement of the deteriorated water and sanitary sewer mains.
Amendment No. 2 will provide for the re -alignment of two laterals, paving design for Greer Street and the
separation of the project into two bidding phases. Greer Street from Samuels Avenue to Woods Avenue is
part of the 2022 Bond Year 3- Contract 15 project. Due to the close proximity to the Water Department's
Contract 2019, WSM-H project, the street will be included in this project for design and construction.
The Transportation & Public Works Department's (TPW) share on this contract is $20,962,00. The Water
Department's share on this contract is $29,030.00 and will be available in the Water & Sewer Capital
Projects Fund for the project (City Project No. 102780).
In addition to the contract amount, $19,038.00 is required for project management, utility coordination, and
material testing. This project will have no impact on the Transportation and Public Works' annual operating
budget nor on the Water Department's operating budget when completed.
The action in this M&C will amend TPW's contribution to the Fiscal Years 2023-2027 Capital Improvement
Program as follows:
Capital
Fund
Name
2022
Bond
Program
Project FY2023 CIP Budget Change Revised
Name Appropriations Increase/Decrease FY2023
Budget
Street $28,981,678.00 $(40,000.00)$28,941,678.00
Imprv-
— Fund Deteriorating
�34027 liSts-PBOO1911
It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of
within the annual budget ordinance, as projects commence, additional funding needs are identified, and to
comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's
portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows:
6019WSMHA2-DUNAWAY
Capital
project FY2023 CIP
Budget Change Revised
Fund
Name Appropriations Authority
(Increase/Decrease) FY2023
Name
Budget
Fund
Water &
56002 -
S
W&S
REPL
$564,115.00 This M&C
$29,030.00 $593,145.00
Capital
Contract
Projects
2019
`WSM-H
Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for
the purpose of funding the Water and Sanitary Sewer Replacement Contract 2019 WSM-H project within
the Water & Sewer Capital Projects Fund and Street Imprv-Deteriorating Sts programmable project within
the 2022 Bond Program Fund.
Appropriations for the Water and Sanitary Sewer Replacement Contract 2019, WSM-H project are as
depicted below:
Fund Existing Additional Project 1
_ Appropriations Appropriations Total*
W&S Capital
Projects - Fund $564,115.00 $29,030.00 $593,145.00
56002
2022 Bond
Program -Fund $0.00 $40,000.00 $40,000.00
34027
Project Total $564,115.00 $69,030.001$633,145.001
*Numbers rounded for presentation purposes.
This project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION 1 CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and in the
Street Imprv-DeterioratingSts project within the 2022 Bond Program Fund and upon approval of the above
recommendations and adoption of the attached appropriation ordinances, funds will be available in the
W&S Capital Projects and 2022 Bond Program Funds for the Water & SS REPL Contract 2019 WSM-H
project. Prior to any expenditure being incurred, the Transportation & Public Works and Water Department
has the responsibility to validate the availability of funds.
FUND IDENTIFIERS (FIDs):
TO
Fund Department I ccount Project Program ctivity Budget Reference # mount
ID I ID I I Year I (Chartfield 2) I
FROM
Fund Department ccount Project Programl ctivity Budget Reference # mount
ID ( ID I Year I (Chartfield 2)
CERTIFICATIONS:
Submitted for Citv Manager's Office bv: Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Brenda Oropeza (8271)
ATTACHMENTS
1. 6019WSM H2-DUNAWAY.xlsx (CFW Internal)
2. 6019WSMHA2-DUNAWAY Form 1295.pdf (CFW Internal)
3. 6019WSMHA2-DUNAWAY Map.pdf (Public)
4. 6019WSMHA2-DUNAWAY.docx (CFW Internal)
5. Entitvinformation-20230715-120815.pdf (CFW Internal)
6.ORD.APP_6019WSMHA2-DUNAWAY_34027_A023(r3).docx (Public)
7.ORD,APP_6019WSMHA2-DUNAWAY_56002_AO23(r2).docx (Public)
8. PBS CPN 102780.pdf (CFW Internal)
6019WSMA2-DUNAWAY
2
56002
0600430
102780
I
2
56002
0700430
495600.1 102780
2
56002
0700430
102780
3
34027
0200431
PB0019
3
34027
0200431
102780
2023
2023
2023 22010199
2023 22010299
2
56001
0609020
5956001
2
56002
0600430
4956001
102780 001730 9999
2
I 5600.1 I
0709020
1595600.1
2
156002 I
0700430
14956001 I
102780 I 001730 I 9999
;:und Dept 4 Account [PrUjTMM I [Activity
.-
1 56002 0600430 5330500 102780 001730 9999
1 l 56002 I 0700430 15330500 102780 I 001730 9999
1 34027 I 0200431 15330500 102780 I 002430 I 9999 I 220101991
3 34027 0200431 15330500 I 102780 I 002430 I 9999 220101991
$14,515.00
$14,515.00
($40,000.00) 1
$40,000.00 1
$14,515.00
($14,515.00)
$14,515.00
($14,515.00)
$14,515.00 To pay contract
$14,515.00 To pay contract
$20,962.00 ITo pay contract
$19,038.00