NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Northpointe Phase 8
City Project No.: 103273
Improvement Type(s): Water ❑x
Original Contract Price:
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
Jacob Gatemod (Aug 24, 2023 08:34 CDT)
Contractor
Manager
Title
Conatser Construction
Company Name
'C'-kl_
oonaId Watson (Aue24. 202313:14CDT)
Project Inspector
C'J' P.Q.
Project Manager
Rabecca Dine Owen (Aua 7R 2023 08:24 CDT)
CFA Manager
TPW Director
William Johnson (AL 28.202317:11CDV
Asst. City Manager
Sewer ❑x
$1,684,958.50
-$137,448,50
$1,547,510.00
$1,547,510.00
Aug 24, 2023
Date
Aug 24, 2023
Date
Aug 28, 2023
Date
Aug 28, 2023
Date
Aug 28, 2023
Date
Aug 28, 2023
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: Northpointe Phase 8
City Project No.: 103273
City's Attachments
Final Pay Estimate 0
Change Order(s): 0 Yes ❑ N/A
Pipe Report: ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 180 WD Days Charged: 221
Work Start Date: 6/21/2022 Work Complete Date: 6/2/2023
Completed number of Soil Lab Test: 585
Completed number of Water Test: 14
Page 2of2
FORT WORT 11
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name NORTHPOINTE PHASE 8
Contract Limits
Project Type WATER & SEWER
City Project Numbers 103273
DOE Number 3273
Estimate Number I Payment Number I For Period Ending 7/25/2023
WD
City Secretary Contract Number Contract Time 18WD
Contract Date 3/17/2022 Days Charged to Date 221
Project Manager NA Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors WATSON, D / GILBERT, C
Tuesday, August 22, 2023 Pagel of 5
City Project Numbers 103273
Contract Name NORTHPOINTE PHASE 8
Contract Limits
Project Type WATER & SEWER
Project Funding
UNIT I: WATER IMPROVEMENTS
Item Description of Items Estimated Unit
No. Quanity
1 8" WATER PIPE 4929 LF
2 16" PVC C905 WATER PIPE 1035 LF
3 FIRE HYDRANT ASSEMBLY W / 6" GATE 12 EA
VALVE BOX
4 DUCTILE IRON WATER FITTINGS
4.3 TN
W/RESTRAINT
5 8" GATE VALVE
18 EA
6 16" GATE VALVE W/ VAULT
2 EA
7 2" COMBINATION AIR VALVE ASSEMBLY FOR
1 EA
WATER
8 1" WATER SERVICE
101 EA
9 4"-12" WATER ABANDONMENT PLUG
1 EA
10 TRENCH SAFETY
5964 LF
11 CONNECTION TO EXISTING 4"-12" WATER
MAIN
1 EA
12 CONNECTION TO EXISTING 16" WATER LINE
2 EA
13 AUTOMATIC FLUSHING DEVICE
5 EA
14 FLUSHING DEVICE TO PROPOSED SEWER
2 EA
MANHOLE
15 CONNECT FLUSHING DEVICE TO INLET
1 EA
16 CONNECT FLUSHING DEVICE TO SEWER MAIN
1 EA
Sub -Total of Previous Unit
- - - - - - - - - - - - - - - - - - -
UNIT II: SANITARY SEWER IMPROVEMENTS
Item Description of Items
No.
--------------
1 8" SEWER PIPE (CO #1) (CO #2)
2 8" SEWER PIPE CLSM BACKFILL
3 8" SEWER PIPE CSS BACKFILL
4 EPDXY MANHOLE LINER
5 4' MANHOLE (CO #1)
6 4' DROP MANHOLE
7 4' MANHOLE WATER TIGHT MANHOLE
DOE Number 3273
Estimate Number I
Payment Number 1
For Period Ending 7/25/2023
Unit Cost Estimated Completed Completed
Total Quanity Total
$42.00 $207,018.00 4929 $207,018.00
$126.00 $130,410.00 1035 $130,410.00
$4,400.00 $52,800.00 12 $52,800.00
$5,000.00 $21,500.00 4.3 $21,500.00
$1,350.00 $24,300.00 18 $24,300.00
$18,500.00 $37,000.00 2 $37,000.00
$6,500.00 $6,500.00 1 $6,500.00
$1,000.00 $101,000.00 101 $101,000.00
$1,000.00 $1,000.00 1 $1,000.00
$2.00 $11,928.00 5964 $11,928.00
$1,000.00 $1,000.00 1 $1,000.00
$2,000.00 $4,000.00 2 $4,000.00
$4,500.00 $22,500.00 5 $22,500.00
$2,500.00 $5,000.00 2 $5,000.00
$2,500.00 $2,500.00 1 $2,500.00
$1,500.00 $1,500.00 1 $1,500.00
----------------
$629,956.00 $629,956.00
Estimated Unit
Unit Cost
Estimated
Completed
Completed
Quanity
Total
Quanity
Total
-------------------------
7823 LF
$62.00
$485,026.00
7823
$485,026.00
160 LF
$85.00
$13,600.00
160
$13,600.00
120 LF
$95.00
$11,400.00
120
$11,400.00
55 VF
$395.00
$21,725.00
55
$21,725.00
34 EA
$4,200.00
$142,800.00
34
$142,800.00
5 EA
$6,200.00
$31,000.00
5
$31,000.00
1 EA
$7,200.00
$7,200.00
1
$7,200.00
Tuesday, August 22, 2023 Page 2 of 5
City Project Numbers 103273
Contract Name NORTHPOINTE PHASE 8
Contract Limits
Project Type WATER & SEWER
Project Funding
8
9
10
11
12
13
13
14
15
16
17
18
EXTRA DEPTH MANHOLE (CO #1)
72.8 VF
4" SEWER SERVICE
101 EA
MANHOLE VACUUM TESTING
42 EA
CONCRETE COLLAR
4 LF
TRENCH SAFETY
8183 LF
POST -CCTV INSPECTION
8183 LF
8" SEWER ABANDONMENT PLUG (CO #2)
0 EA
12" LARGE STONE RIPRAP DRY
458 SY
CONNECT TO EXISTING MANHOLE
1 EA
DEEP TRENCH BACKFILL
508 LF
REMOVE PLUG AND CONNECT TO EXISTING
0 EA
8" SEWER LINE (CO #1)
8" SEWER ABANDONMENT PLUG (CO #1)
1 EA
Sub -Total of Previous Unit
DOE Number 3273
Estimate Number I
Payment Number 1
For Period Ending 7/25/2023
$185.00
$13,468.00
72.8
$13,468.00
$750.00
$75,750.00
101
$75,750.00
$150.00
$6,300.00
42
$6,300.00
$250.00
$1,000.00
4
$1,000.00
$2.00
$16,366.00
8183
$16,366.00
$3.00
$24,549.00
8183
$24,549.00
$1,000.00
$0.00
0
$0.00
$105.00
$48,090.00
458
$48,090.00
$1,500.00
$1,500.00
1
$1,500.00
$35.00
$17,780.00
508
$17,780.00
$1,000.00
$0.00
0
$0.00
$1,000.00
$1,000.00
1
$1,000.00
$918,554.00
$918,554.00
Tuesday, August 22, 2023 Page 3 of 5
City Project Numbers 103273
Contract Name NORTHPOINTE PHASE 8
Contract Limits
Project Type WATER & SEWER
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number 2
DOE Number 3273
Estimate Number 1
Payment Number 1
For Period Ending 7/25/2023
$1,684,958.50
($125,288.50)
($12,160.00)
Total Contract Price $1,548,510.00
Total Cost of Work Completed $1,548,510.00
Less % Retained $0.00
Net Earned $1,548,510.00
Earned This Period $1,548,510.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$1,548,510.00
Tuesday, August 22, 2023 Page 4 of 5
City Project Numbers 103273
Contract Name NORTHPOINTE PHASE 8
Contract Limits
Project Type WATER & SEWER
Project Funding
Project Manager NA
Inspectors WATSON, D / GILBERT, C
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
DOE Number 3273
Estimate Number 1
Payment Number 1
For Period Ending 7/25/2023
City Secretary Contract Number
Contract Date
3/17/2022
Contract Time
180 WD
Days Charged to Date
221 WD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,548,510.00
Less % Retained $0.00
Net Earned $1,548,510.00
Earned This Period $1,548,510.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$1,548,510.00
Tuesday, August 22, 2023 Page 5 of 5
REVIEWED
By Andrew Goodman at 8:26 am, Jun 02, 2023
PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT #
I PRC#
X-NUMBER
FILE #
FID #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Northpointe Phase 8 CHANGE
Water, Sewer, Paving/Street Signs, Storm Drain and Street Lights ORDER No:
22-0002 I CITY PARTICIPATION:I NO
103273
21-0102
1
X-27054
W-2792
FID# 30114-0200431-103273-EO7685
Fabian Diaz-Aguinaga Phone No:
817-392-8306
Drew Goodman Phone No:
817-392-2237
CONTRACT UNIT
WATER
I SEWER
I PAVING I
DRAINAGE
STREET LIGHTS
CONTRACT
Developer
Devel
DAYS
Cost
City Cost
Developer Cost
City Cost
Developer Cost
City Cost Developer
Cost
City Cost
Cost
City Cost
$629,956.00
$1,055,002.50
I $1,280,370.00 I I
$379,205.00
$188,630.00
180
$629,956.00
$0.00
$1,055,002.50 $0.00
I $1,280,370.00 I $0.00 I
$379,205.00
$0.00
$188,630.00
$0.00
180
$ (124,288.50)1
I I I
0
$629,956.00
$0.00
$930,714.00 I $0.00
I $1,280,370.00 I $0.00 I
$379,205.00
L. $0.00
$188,630.00
180
$629,956.00
$930,714.00
$1,280,370.00
$379,205.00
$188,630.00
Dev. Cost: $3,408,875.00
City Cost:
$3,408,875.00
Revised: 10-12-2011 Page 1
DocuSign Envelope ID: E96D4FBE-5Fl33-4683-l341 F-BF0190092CDO
You are directed to make the following changes in the contract documents:
CITY BID ITEM
PAY ITEM #
I I
QUANTITY
1
3331.4115
-180
5
3339.1002
-2
8
3339.1003
566.1
9
9999.0.0006
-1
13
241.2103
1
UNIT
ITEM DESCRIPTION
UNIT 1: SANITARY
SEWER IMPROVEMENTS
LF
8" Sewer Pipe
EA
4' Manhole
VF
Extra Depth Manhole
EA
Remove Plupp and Connect to Existing 8" Sewer Line
EA
8' Sewer Abandonment Plug
REASONS FOR CHANGE ORDER Remove previous sewer infrastructure necessary for crossing Heritage Trace
REVIEWED
lBy Andrew Goodman at 8:26 am, Jun 02, 2023
UNIT PRICE I TOTAL
$
62.00
$ i11,160.001
$
4,200.00
$ t8,400.001
$
185.00
$ (104,728.50)
$
1,000.00
$ {1,000.00)
$
1,000.00
$ 1,000.00
TOTAL CHANGE ORDER NO.1
$ f124,288.50j1
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST
AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED:
APPROVED:
DocuSigned by:
Kimley Horn Lennar Home fo��e�as nd_and Construction
Cortafser C uc on TX LP
BY By.,
By:::
�raJJ5H400 c tivv...
Name: Bryce Eckeberqer Name: Jennifer Eller
Name: Adam ms
Title: Project Manager Title: Authorized Agent
Title: Manager
Revised: 10-12-2011 Page 2
REVIEWED
By Andrew Goodman at 12:48 pm, Jul 18, 2023
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME:
Northpointe Phase 8
CHANGE
CONTRACT:
Water, Sewer, Pavinq/Street Siqns, Storm Drain and Street Liqhts
ORDER No:
CFA #
22-0002 CITY PARTICIPATION: NO
CITY PROJECT #
103273
IPRC#
21-0102
I 2
X-NUMBER
X-27054
FILE #
W-2792
FID #
FID# 30114-0200431-103273-EO7685
INSPECTOR:
Fabian Diaz-Aguinaga Phone No: 817-392-8306
PROJECT MANAGER:
Drew Goodman Phone No: 817-392-2237
CONTRACT UNIT
WATER I SEWER I PAVING
DRAINAGE
STREET LIGHTS
Leloper
CONTRACT
Developer
I
I
I
DAYS
Cost
City Cost
Developer Cost
City Cost
Developer Cost
City Cost Developer
Cost
City Cost Cost
City Cost
ORIGINAL CONTRACT
$629,956.00 I I $1,055,002.50 I I $1,280,370.00
$379,205.00 I I
$188,630.00 I I
180
EXTRAS TO DATE
CREDITS TO DATE
I I $124,288.50
CONTRACT TO DATE
$629,956.00 I $0.00 I $930,714.00 I $0.00 I $1,280,370.00
$0.00
$379,205.00 I $0.00 I
$188,630.00 I $0.00 I
180
AMOUNT OF PROP. CHANGE ORDER
I I$ (12,160.00)1 I
I I
I I
0
REVISED CONTRACT AMOUNT
$629,956.00 I $0.00 I $918,554.00 I $0.00 I $1,280,370.00
$0.00
$379,205.00 I $0.00 I
$188,630.00 F $0.00 I
180
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$629,956.00
$918,554.00
$1,280,370.00
$379,205.00
$188,630.00
REVISED COST SHARE
Dev. Cost: $3,396,715.00 City Cost:
$0.0
TOTAL REVISED CONTRACT
$3,396,715.00
Revised: 10-12-2011 Page 1
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BI#D ITEM QUANTITY I UNIT ITEM DESCRIPTION
UNIT II: SANITARY SEWER IMPROVEMENTS
1 3331.4115 -180 LF 8" Sewer Pipe
13 241.2103 -1 EA 8" Sewer Abandonment Plug
REASONS FOR CHANGE ORDER Remove previous sewer infrastructure constructed and then removed.
REVIEWED
By Andrew Goodman at 12:47 pm, Jul 18, 2023
UNIT PRICE I TOTAL
$ 62.00 $ (11,160.00)
$ 1,0.0.00 $ (1,000.00)
TOTAL CHANGE ORDER NO. 1 $ (12,160.00)
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST
AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
Kimley-Hom
By BrBr Eckeber er Dig wily,,g-d by Bryce Eck,b,lge'
yce 9 D-:202306.020:37:58-05'00'
Name: Bryce Eckebemer
Title: Proiect Manager
APPROVED:
DocuSigned by:
Lennar Home f
e as Lany(�nd Construction
By �obaHvebczcvoa...
Name: Jennifer Eller
Title: Authorized Aaent
APPROVED:
Conatser C uc ion TX LP
By:
Name: Adam mr
Title: Manager
Revised: 10-12-2011 Page 2
14+9033 LINE SS—K >s
>ez iN: 23003Z2 03
ANHOI 4.30
S Y 5—'— _ � STA' 11+2B03 LINE 55—K _TBT 4 MANHOL E —
1+DO DO LINE SS—J —
/ -- _— N 70116049691 >s ---_ ----_
E. 2300045.2513
/ --- CONSTRUCT
4' MANHOLE ---_ _
--- ---
__ BLOCK 7788---
�''' S.S.E
NE
- _ Jayz _?E 55-K1uos-
rI BLOCK A _----- 71-y
XEo
O to
6
fr
3
0
e C
'oA
�b
_ ONSITE KEY MAP
S
§gg 780
'ce -
-
N
U
775 F
8o W
9 770 W FA m
FTIIIC"
STOP I I
765
W Ii
s ? 760
1
C
I7E A
y` 755 I
x .
xS
wf
m � 750
10+00 11+00 12+
ALTERNATE LOT SERVICE DETAIL
S S. SERVICE TO BE LOCATED 10' FROM DOWNSTREAM
LOT
E AN
IATEI
LOT LINE (SEWER MAIN STEEPER THA N 3%SLOPE) FF
4 4 Q
ROW UN[ toles I
I I I I
I I I I
-41 � t=
1i'SSE
LSE
- �
J `Im BLOCK A 1
14
FUTURE NORTH LANES
OF HERITAGE TRACE
STA 1+o 04 LINE SSR
STA TA S+ LINE SS—H
PAV STA 16+56 86 (10 60' RT)
BRAINERD DRIVE
CONSTRUCT EXPO%Y LINED I
4' MANHOLE
I
I
I I
I I
1
1 I
1 I
I, I
I
I I
I I
I I .
I I
I 1
I I
I I
I I
I y
HERITAGE TRACE ROW
DEDICATION (WITH
THIS PHASE)
REVIEWED
By ARtl Goodmanat12:47Pm,Jx1T8, 2823
PR
ED
NO(R ynPONTESPHASE 9
(FORT REFERENCE 6ONLY)
SEWER GENERAL NOTES
1. WATERANDSANITARY SEWER SEPARATION (VERTICAL AND
HORIZONTAL)
OOK ZOOEMENTS
)�LL BE MAINTAINED IN ACCORDANCE WITH TCEO
2 CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING UTILITIES PRIOR
TO CONSTRUCTION
3 ALLSPNRARY SEWER LINES PRE B' SDR-26 PVC UNLESS OTHERWISE
NOTED
4 ADJUSTED SERVICES DUE TO CONFLICTS DE MANHOLES, INLETS,
TRENCH CONFLICTS OR NON-STANDARD PLACEMENT)6 R SERVICE INSTALLED WITH PREVIOUS PHASE =
7, SANITARY SEWER SERVICES WITHIN T OFF VERTICAL SEPARATION AT
STORM LINE CROSSINGS TO BE INCASED WITH DUCTILE IRGN PIPE
8 MAN HOLES PRE REQUIRED TO BE EPDXY COATED ON WASTEWATER_'Nl 1 'INCH" OR GREATER IN DIAN R AND WHERE E ENTERING
OR E%ITING WASTEWATER MAIN5 SLOPE 5 3%OR GREATER
UTILITY LEGEND
® PaoRoeRue/a R� lRMARR"—
FIRE
E� RRIcsnorvsx XWxrEavuvE
IRTIHR FIRE
O 11 we seN•N 1- sNAxxale
TYPICAL UTILITY A LOCATION
P lHT'H
3 WATER voRArvT
��WED
!!WARNING!!
ER TY
R� 7Er"SAMINFORIF ,ES IERA sxo,R.
owFARIEXI
xA IF I
ax
PROFILE SCALE
1 0' HORIZONTAL
1" = 4' VERTICAL
SEWER NOTES
A EMBED 1 JOINT OF SEWR MAIN CONTROLLED LOW STRENGTH IN
MATERIAL (CLSM) PER CITY OF FORT
WORTH
B EMBED IJOINT OF SEWR MAIN IN
S
CEMENTSS 11.12ED SAND PER TCEa
STANDARD
BENCHMARKS
a
w S
2 -
�a�oEW
W
L'i—�WLLi
BR10E ECICEBEROE�
� 13zz13
�So84L EHO f
�N �N
Y j B
ZNY
D_ U)
W_ W
W Z
J W
W
LL
� J
Qp
H
zQa
� °u
SHEET NUMBER
C-25
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Northpointe Ph 8
CITY PROJECT NUMBER: 103273
WATER
PIPE LAID SIZE TYPE OF PIPE
8" Water Pipe 8" PVC
16" PVC water pipe 16" PVC
FIRE HYDRANTS: 7
PIPE ABANDONED
DENSITIES:
NEW SERVICES:
I
PIPE LAID
8" Sewer Pipe
PIPE ABANDONED
DENSITIES:
NEW SERVICES:
VALVES (16" OR LARGER)
SIZE TYPE OF PIPE
All Densities Passed
1" WaterService Copper
LF
LF
4929
1035
101 EA
SEWER
SIZE TYPE OF PIPE LF
8" PVC 8283
SIZE TYPE OF PIPE LF
All Densities Passed
4" Sewer Service PVC
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
101 EA
(817) 392 - 7941 • Fax: (817) 392 - 7845
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
June 15, 2023
Conatser Construction TX, LP
5327 Wichita Street
Fort Worth, TX 76119
RE: Acceptance Letter
Project Name: Northpointe Ph 8
Project Type: Water,Sewer,Storm Drain, Paving, Streetlights
City Project No.: 103273
To Whom It May Concern:
On July 25, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on August 17, 2023. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on August 17, 2023, which is the date of
the punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
727-5702.
Sincerely,
G"'b' A ,P �.
Andrew Goodman, Project Manager
Cc: Fabian Diaz, Inspector
Donald Watson, Inspection Supervisor
Oscar Aguillon, Senior Inspector
Victor V. Tornoro Jr, Program Manager
Kimley Horn Engineering, Consultant
Conatser Construction Tx, LP, Contractor
Lennar Homes of Texas Land & Construction, Ltd, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX. LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
NORTHPOINTE PH. 8
WATER, SANITARY SEWER, DRAINAGE,
PAVING, & STREET LIGHT IMPROVEMENTS
CFA PRJ #: 22-0002
CITY PROJECT #: 103273
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
J'
Brock Hugg
Subscribed and sworn to before me this 191h day of June, 2023.
Ri?v?i.. KATHERINEROSE
NOTARY PUBLIC Notary Public in Tarrant County, Texas
Pq' State off Texas
Comm. Exp. 11.30.2025
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
PROJECT:
(name, addresS)Northpointe, Phase 8
Fort Worth, TX
TO (Owner)
OWNER
❑
ARCHITECT
❑
CONTRACTOR
❑
SURETY
❑
OTHER
CITY OF FORT WORTH AND LENNAR HOMES OF
TEXAS LAND AND CONSTRUCTION, LTD.
1707 Market Place Blvd., Suite 100
Irving TX 75063 ___I
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
Bond No 0243958
ARCHITECT'S PROJECT NO: CFA NO22-0002
CONTRACT FOR:
Water, Sanitary Sewer Drainage, Paving, & Street Lighting
Improvements for Nort�pointe,Phase 8
CONTRACT DATE:
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
there insert name and address of Surety Company)
BERKLEY JNSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
CITY OF FORT WORTH AND LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD.
1707 Market Place Blvd., Suite 100
Irving TX 75063 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
Attest:
(Seat):
16th day of June, 2023
BERKLEY INSURANCE COMPANY
Surety Company
Signature of Authorized Representative
RWO Morales
Title
Attorney -in -Fact
NOTE: This form is to be used as a companion document to ALA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No. BI-7280k
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning. found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted.
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Sophinie blunter;
Robbi Morales, Kelly A. Westbrook; Tina McEtvau; Joshua Saunders; Tonie. Petranek; or Mikaela Peppers of Aon Risk
Services Southwest, Inc. of Dallas, TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below
and to execute, seal, acknowledge and deliver any and .all bonds and undertakings, with the exception of Financial Guaranty
Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the.
same extent as if such bonds had been duly executed and .acknowledged by the regularly elected officers .of the Company at its
principal office in their own proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25, 2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
.Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing .and qualifying the attorney -in -fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney -in -fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company; and such signature and seal when so used shalt have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
IN VATNESSS INTIEREOF, the Company has caused these presents to. be sided, and attested by its appropriate officers -and its
corporate, seal here -unto affiied this jrclay of M�� lra0.
Attest Bcrkl Insurance Company
(Seal) By � BY
fray_: ederroaa le T r
Executive Vice President & Secretary "N" i '_ >>ce; "dent
WARNING: TTIIS:1'OWER.RN'VALID i NOT YRRgTEII ON BLUE " BERKL Y" SECiTItITY PA.PERi
STATE OF CONNECTICUT )
) ss:
COIjNTY OF FATRFI I LD )
Sworn to beforeme, a Notary Public in the State of Connecticut; this l day of. McL, a01D_ by Ira S. Lederman
and Jetircy 10. Hafter who are sworn t„ .me to be the Executive Vice President- IfSecretary, and Senior Vice - .President,
respectively,ofRerkleyInstrrance:Company. tiANOTARYPONIC0
COWIECTICUT.
MYCOMriiS5=0N EXPIRES /ctiti:Aiblicj State pfL`OIIIleChCIIt
CFRTIF. ICATE.
J, the undersigned; Assistant Secretary -of BERKLEY 1SURANCE COMPANY, DO HEREBY CERTIFY that the foreggoing is a
true, correct and complete copy of the original.Power of Attorney; that said Power of Attorney has not been revoked or rescinded
and that the authority of the Anomcy4n-1`act.set forth therein, who executed_ .the: bond or undertaking to which. this Tower of
Attorney is attached:-isin full force and effect as of this date.
CiiYen urder.rny`liand<atid seal of the Company, thisl6 th day ofJurt e 2023
(Seal) _
Vincent P. Forte
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX. LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
NORTHPOINTE PH. 8
WATER, SANITARY SEWER, DRAINAGE,
PAVING, & STREET LIGHT IMPROVEMENTS
CFA PRJ #: 22-0002
CITY PROJECT #: 103273
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
J'
Brock Hugg
Subscribed and sworn to before me this 191h day of June, 2023.
Ri?v?i.. KATHERINEROSE
NOTARY PUBLIC Notary Public in Tarrant County, Texas
Pq' State off Texas
Comm. Exp. 11.30.2025
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
PROJECT:
(name, addresS)Northpointe, Phase 8
Fort Worth, TX
TO (Owner)
OWNER
❑
ARCHITECT
❑
CONTRACTOR
❑
SURETY
❑
OTHER
CITY OF FORT WORTH AND LENNAR HOMES OF
TEXAS LAND AND CONSTRUCTION, LTD.
1707 Market Place Blvd., Suite 100
Irving TX 75063 ___I
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
Bond No 0243958
ARCHITECT'S PROJECT NO: CFA NO22-0002
CONTRACT FOR:
Water, Sanitary Sewer Drainage, Paving, & Street Lighting
Improvements for Nort�pointe,Phase 8
CONTRACT DATE:
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
there insert name and address of Surety Company)
BERKLEY JNSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
CITY OF FORT WORTH AND LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD.
1707 Market Place Blvd., Suite 100
Irving TX 75063 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
Attest:
(Seat):
16th day of June, 2023
BERKLEY INSURANCE COMPANY
Surety Company
Signature of Authorized Representative
RWO Morales
Title
Attorney -in -Fact
NOTE: This form is to be used as a companion document to ALA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No. BI-7280k
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning. found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted.
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Sophinie blunter;
Robbi Morales, Kelly A. Westbrook; Tina McEtvau; Joshua Saunders; Tonie. Petranek; or Mikaela Peppers of Aon Risk
Services Southwest, Inc. of Dallas, TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below
and to execute, seal, acknowledge and deliver any and .all bonds and undertakings, with the exception of Financial Guaranty
Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the.
same extent as if such bonds had been duly executed and .acknowledged by the regularly elected officers .of the Company at its
principal office in their own proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25, 2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
.Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing .and qualifying the attorney -in -fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney -in -fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company; and such signature and seal when so used shalt have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
IN VATNESSS INTIEREOF, the Company has caused these presents to. be sided, and attested by its appropriate officers -and its
corporate, seal here -unto affiied this jrclay of M�� lra0.
Attest Bcrkl Insurance Company
(Seal) By � BY
fray_: ederroaa le T r
Executive Vice President & Secretary "N" i '_ >>ce; "dent
WARNING: TTIIS:1'OWER.RN'VALID i NOT YRRgTEII ON BLUE " BERKL Y" SECiTItITY PA.PERi
STATE OF CONNECTICUT )
) ss:
COIjNTY OF FATRFI I LD )
Sworn to beforeme, a Notary Public in the State of Connecticut; this l day of. McL, a01D_ by Ira S. Lederman
and Jetircy 10. Hafter who are sworn t„ .me to be the Executive Vice President- IfSecretary, and Senior Vice - .President,
respectively,ofRerkleyInstrrance:Company. tiANOTARYPONIC0
COWIECTICUT.
MYCOMriiS5=0N EXPIRES /ctiti:Aiblicj State pfL`OIIIleChCIIt
CFRTIF. ICATE.
J, the undersigned; Assistant Secretary -of BERKLEY 1SURANCE COMPANY, DO HEREBY CERTIFY that the foreggoing is a
true, correct and complete copy of the original.Power of Attorney; that said Power of Attorney has not been revoked or rescinded
and that the authority of the Anomcy4n-1`act.set forth therein, who executed_ .the: bond or undertaking to which. this Tower of
Attorney is attached:-isin full force and effect as of this date.
CiiYen urder.rny`liand<atid seal of the Company, thisl6 th day ofJurt e 2023
(Seal) _
Vincent P. Forte