HomeMy WebLinkAboutContract 53594-CO4CSC No. 53594-CO4
FORT WORTH. City of Fort Worth
Change Order Request
Project Namel 2020 Paving and Sidewalk Improvements Unit Price Construction Contract
Client Project #(s)I Various
City Sec # I 53594
Project Description) Unit Price Construction Contract for paving and sidewalk improvements
Contractorl The Fain Group I Change Order #I 4 1 Datel
City Project Mgr.l Shweta Rao, RE I City Inspector
Enter Department(s) to the Right and
Contract Day Type
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$5,000,000.00
N/A
Contract Time
Totals (CD)
$5,000,000.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALL0INABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $6,250,000.00
Additional Bid items that were not included in the original unit price contract is needed in order to construct the sidewalk, paving and railroad improvements for project
CPN C00705, 103278,101863 and 101866. Prices for these line items have been verified and compared to the recent paving contract awarded by the City( CPN 102918
and CPN 102980). Some of the line items for CPN C00705 are unique to the project and hence, the prices provided by the contractor were reviewed by the engineer and
considered fair and reasonable based on current market conditions.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
Contractor's Company Name I Contractor (Name Contract Signature Date
The Fain Group, Inc. I Larry Frazier P„„„SC Aug3, 2023
n Supervisor
Date
Project and Contract Compliance Manager
Date
':SA—
Aug 3, 2023
Fista(Dept)E7Date
S er
Date
Aug 21, 2023
Aug 23, 2023
Date
Director, Contracting Department (Dept) in
Date
P L. N d�
Aug 29, 2023�
Aug 29, 2023
Assistant City Attorney
Date
Assistant City Manager
Date
Aug 30, 2023
Sep 1, 2023
Council Ac
M&C Number
ATTEST:
Jannette Goodall, City Secretary
Q.oauvopL
�fORT A
P�`e o'p10
�P* o
aQ 5 as
bn�ExA 9a
M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH
City of Fort Worth
Change Order Additions
Project Name 1 2020 Paving and Sidewalk Improvements Unit Price Construction Contract City Sec # 1 53594
Client Project # I Various
Contractorl The Fain Group I PMI Shweta Rao, P.E Inspectorl NIA
Change Order Submittal # ® Date
ADDITIONS
ITEM
DESCRIP ION DEP I
Oly
Unit
Unit Cost I otal
/1b
Remove Concrete Median
J.UUUUuUJ�I
SY
$41.3 $U.UUl
716
Remove concrete wall
0.0000000
LF
$53.4 I $0.001
717
Remove Inlet Top
0.00000000
EA
$1,110.3 ( $0.001
718
Fumish/Install Inlet Top
0.00000000
EA
$3,512.0 $0.001
719
Black Vinyl Coated Galvanized Chain Link Fence
0.00000000
EA
$122.01J' $0.001
720
Fumish/Install Tree Well
0.00000000
EA
$250.01J$0.001
Remove Plastic Delineators
0.00000000
LF
$4.00 $0601
722
Remove Plastic Nail Down Curb
0.00000000
LF
$10.52 $0.001
723
Remove 6" Slotted Drain
0.0000000E
LF
$25.19` $0.001
724
8" Doweled -In Concrete Curb
0.0000000E
LF
$32.14 $0.001
725
3" Mountable Doweled -In Concrete Curb
0.0000000E
LF
$23.84 $0.001
726
Yellow Thermo Paint (8" Concrete Curb)
0.00000004
LF
$13.5T $0.001
6" SLID Pvmt Marking HAS (Y)
0.00000004
LF
$2.74 $0.00I
728
6" SLID Pvmt Marking HAS (W)
0.00000004
LF
$2.70 $0.001
729
6" BRK Pvmt Marking HAS (W)
0.00000009
LF
$2.70 $0.001
730
18" SLD Pvmt Marking HAS (Y)
0.00000000
LF
$9.54 $0.001
731
18" SLID Pvmt Markingg HAS f(Wt
0.00000000
LF
$9.54 $0.001
732
Fumish/Install 6" SLCIPvmt Marking HAS (Y)
0.00000000
LF
$6.20 $0.001
$S�
Furnish/Install Monolithic Median Nose
0.00000000
EA
$3,750.01 1 $0.60�
734
Fumish/Install Integral Colored Concrete Median
0.00000000
SF
$36.011 $0.001
/it,
rumisnnnstan Meoian nose Paint (Yellow)
u.uuuuuuuu
rw
$42b.Ur i $u.uuj
738
Remove Metal Post
0.00000000
EA
$225.0c f $0.001
$S�
Remove Inlet Top
0.00000000
EA
$2,200.0r 1 $0.00�
740
Remove and Replace Conic Box Culy (12'x5')
0.00000000
LF
$6,852.00 $0.001
743
Furnish/Install 6.5" Asphalt Pvmt Type B
0.00000000
SY
$116.0d $0.001
744
Fumish/Install6" Gravel Driveway
0.00000000
SF
$7.25 $0.001
Furnish/Install 3" Conic Curb and Gutter
0.00000000
LF
$35.0
746
Fumish/Install 8" Conic Curb and Gutter
0.00000000
LF
$38.0 I $0.001
747
Furnish/Install Metal Post
0.00000000
EA
$225.0d $0.001
748
Fumish/Install Pipe Gate Fence
0.00000000
LF
$225.0d $0.001
749
Furnish/Install Black Vinyl Coated Galvanized Chain Link Fence
0.00000000
EA
$135.0 $0.001
750
Fumish/Install 18" Corrugated Metal Pipe
0.00000000
LF
$195.0 f $0.001
$5f_7ree
Protection
0.00000000
EA
$350.0
752
Fumish/Install 36" Corrugated Metal Pipe
0.00000000
LF
$245.0 f $0.001
753
Starburst Prep (Powerwasning)
0.00000000
L5
$4,263.0 $0.0ul
754
Barricades
0.00000000
MO
$10,153.0( $0.001
755
Marking Installation
0.0000000U
LS
$13,256.0((( $0.001
756
Pavement Marking Material
0.00000000
LS
$17,596.5`' $0.001
�57
-purveying
0.00000000
LS
$4,185.0 �00�
758
Supervision
0.00000000
LS
$3,223.00 $0.001
759
OH&P
0.00000000
LS
$6,093.47 $0.001
Sub Total Additions $0.001
Change Order Additions Page 2 of 5
I tM
FOx�a�Tx_ City of Fort Worth
Change Order Deletions
Project Name 1 2020 Paving and Sidewalk Improvements Unit Price Construction Contract I City Sec # 1 53594
Client Project # I Various I
Contractol The Fain Group I PMI Shweta Rao, P.E I Inspectorl NIA
Change Order Submittal # ® Date I
DELETIONS
IJEbL;fIF'IIUN JI F'1 Uty unit unit host Iotal 1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
I
I
I
I
Sub Total Deletions $0.001
Change Order Deletions Page 3 of 5
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
11 /3/2021
$0.00
4/18/2022
$0.00
11 /23/2021
$0.00
Total I $0.00 1
SUPPORTING BID TABS FROM RECENTLY OPENED BIDS
BID ITEM
NO.
55
3212.05036"Asphalt Base TypeB
89
3217.0101 6" SLD Pvmt Marking HAS (W)
90
321].0102 6" SLD Pvmt Marking HAS (Y)
91
3217.0103 6" BRK Pvmt Marking HAS (W)
491
01111-1 COLORED TEXTURED CONC(4")
497
05296005 CO NCCURB(MONO)(TYII)
498
05296007 CORB&GUTTER(TY I)
499
05296008 CONC CURB &GUTTER(TY II)
519
05361-1 CONC MEDIAN(MONO NOSE)
BID TAB
CPN Various 2022 Traffic Signal and Street
Lighting Improvements Unit Price Construction Contract
ENGINEER'S ESTIMATE Bidder 1: EARTC
Bidder 2: Bean Electrical,
Inc.
Unit of
quantity
%Difference
%Difference
Description
Measure
Range
Bid quantity
Unit Price
Bid Value Unit Price Bid Value
from Engineer's
Estimate
Unit Price Bid Value
from Engineer's
Estimate
SY
500
1 $
107.Do $
107.00 $ 54.00 $ 54.00
-50%
$ 151.50 $ 151.50
42%
LF
800
1 $
2.75 $
2.75 $ 5.00 $ 5.00
82%
$ 2.15 $ 2.15
-22%
LF
800
1 $
2.]5 $
2.]5 $ 5.00 $ 5.00
82%
$ 2.15 $ 2.15
-22%
LF
400
1 $
2.75 $
2.75 $ 5.00 $ 5.00
82%
$ 2.15 $ 2.15
-12%
SY
100
1 $
80.00 1
80.00 $ 95.00 $ 95.00
19%
$ 206.50 $ 206.50
158%
LF
500
1 $
70.00 $
70.00 $ 7.00 $ 7.00
-90%
$ 87.00 $ 87.00
24%
LF
500
1 $
70.00 $
70.00 $ 42.00 $ 42.00
-40%
$ 144.00 $ 144.00
106%
LF
500
1 $
78.00 $
78.00 $ 37.00 $ 37.00
-53%
$ 159.00 $ 159.00
104%
SY
100
1 $
400.00 $
400.00 $ 3,500.00 $ 3,500.00
775%
$ 477.00 1 477.00
19%
Base Bid
T MTltems - I $
1,777,632.75 $ 2,329,638.00
31%
$ 2,906,489.97
64%
TOTAL
BASE BIDI $
2,936,297.85 - $ 3,893,487.65
33%
$ 4,620,363.52
57%
HFUR
2020 TrargC Signal and Street Lighting Improvements Unit Price Con-dion Conrad
SUPPORTING BID TABS FROM RECENTLY OPENED BIDS
r of
City oP Fort Worth
Transportation and Public Works
Bid Tabulations
Adverfised
1/26/2023
M/{VBE Goal
15%
2022 Bond Year 1 - Contract 1
A&,ftised
V2/2023
Construction
430 Calevdar
City Project Number 10291E
Pre -Bid Con@rence
2/7/2023
Days
Days
Bid Opeptpg
2/23/2023
Bidder
�MaClwdon Constrnenon FNH Constrnenon, IC
Smbile&Winn, Nc
darken. C—, LTD
Reyes Gronp, LTD
Engineer's Hstimate
Address
POBox999 5WN C-1 EVy STE 105
PO Box 79380
5112 Sw Valley Dr
1520 Parker Bond
Pachrco KOch
%D--
�BurlesogTX76097 Plano, TX]5074
Saginaw, TX 76179
Fort Wonh,-76119
Orsad Pnme,TX]5050
Between Low
Awrege ofLowesei
G.— BE Bid Bed Caeaamar, Chk c C-Cen c k
IBe BE
Be
BB
BB
Bdde<and
2 Bmd—
Addenda Aclmowledged
hoject Manager lose DIOuo, PE
I &2 1 & 2
1 &2
1 & 2
1 &2
Eiigmeefs a..'
Descnphon
Spxificaaon $ecaon No.
Mee'swef
Unit Pnce Hid Velae —Pnce Bid Value
Unn Pnce
Hid Value Unit Pnce
Hid I—
Umt Pnce
Bid Value
-IPnce
Hid Value
Um[Pnce
Unn Pnce
,.,dlNo
Q6�dty
Unit 1- Wnter Improvements
61334 5005
49,014.00
12
7500
618000
Remo
I
I 250
1],35000
.25
4]
3349.5006 Band Replacle Inlet Top, 10'
334920
A
$ 7,350.00 S S 12,50000 $ 12,500.00
$ 11,000.00 $
11'�ddd $ 10,50000 $
10,50000
$ 9,0'400 $
S 2,500.00 $
$ 9,92500
FORT WORTH."i.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2020 Paving and Sidewalk Unit Price Contract -Change Order 4
M&C: CPN: N/A CSO: 53594 DOC#: 1
Date: 7/11/2023
To:
Name
Department
Initials
Date Out
1.
Michelle McCullough
TPW - initial*
Aug 8, 2023
2.
Larry Frazier, Fain Group Contractor-
Signature
#P_
Aug 3, 2023
3.
Shweta Rao, PM
TPW - Signature41�__
Aug 3, 2023
4.
Chad Allen, PgM
TPW -initial
Aug 21, 2023
5.
Lissette Acevedo, Sr. CPO
TPW -initial
9�v
Aug 23, 2023
6.
Patricia Wadsack, AD
TPW - initials'
Aug 29, 2023
7.
Lauren Prieur, Director
TPW - signature
Aug 29, 2023
8.
Doug Black
Legal - signature
d
Aug 30, 2023
9.
William Johnson
CMO - signature
LVI
w
Sep 1, 2023
10.
Jannette Goodall
CSO - signature
77Aa-
Sep 1, 2023
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE:
All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed
the routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: []YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a)FortWorthTexas.aov at ext. 7233 or 8363, for pick up when
completed. Thank you!
Updated 12.07.2022, mdhm