AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 58452
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and
Associates, Inc., (ENGINEER) made and entered into City Secretary
Contract No. 58452, (the CONTRACT) which was on the 8TH day of November,
2022 in the amount of $ 391,553.00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Camp Bowie Boulevard and Bryant Irvin Road Intersection
Improvements, CPN 103305; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $21,835.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $413,388.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Camp Bowie Boulevard and Bryant Irvin Road Intersection Improvements
Prof Services Agreement Amendment Template CPN 103305
Revision Date: November 23, 2021
Page 1 of 4
APPROVED:
City of Fort Worth
William Johnson (ALk30, 2023 11:32 CDT)
William Johnson
Assistant City Manager
DATE: Aug 30, 2023
ENGINEER
Kimley-Horn and Associates, Inc.
�Af 4*jWj
Scott Arnold, P.E.
Vice President
DATE: Aug 51 2023
APPROVAL RECOMMENDED:
^14�
Lauren Prieur, P.E.
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
1 leas
Shweta Rao, P.E.
Senior Professional Engineer
City of Fort Worth, Texas Camp Bowie Boulevard and Bryant Irvin Road Intersection Improvements
Prof Services Agreement Amendment Template CPN 103305
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
DBlack (Aug 30, 202311:19 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ATTEST:
Qom, j� as
Jannette Goodall
City Secretary
M&C: N/A
Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Camp Bowie Boulevard and Bryant Irvin Road Intersection Improvements
Prof Services Agreement Amendment Template CPN 103305
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 58452
Amendment No. 1
Department Fund -Account -Center Amount
TPW 34027- 0200431-5330500-103305-003930- 9999- 2010204 $21, 835. 00
nnnniRti7tiR
Total: $21,835.00
City of Fort Worth, Texas Camp Bowie Boulevard and Bryant Irvin Road Intersection Improvements
Prof Services Agreement Amendment Template CPN 103305
Revision Date: November 23, 2021
Page 4 of 4
Kimley»>Horn
July 31th, 2023
Lissette Acevedo, P.E., PTOE, PMP
Transportation and Public Works
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Re: Amendment #1 — Camp Bowie Blvd at Bryant Irvin Rd Intersection Improvements
City Project No. 103305
City Secretary Contract No. 58452
Dear Lissette:
Kimley-Horn and Associates, Inc. ("Kimley-Horn" or "Consultant') is pleased to submit Amendment #1
in the amount of $21,835.00 to the City of Fort Worth (City) for the Task Order design contract (CSN
58452) for Camp Bowie Blvd at Bryant Irvin Rd Intersection Improvements.
This amendment is to cover additional services beyond the original scope:
• Adding 150 linear feet of additional sidewalk with potential sidewalk wall along Donnelly Ave to
make the sidewalk continuous
• Additional survey for the proposed sidewalk along Donnelly Ave
A detailed scope of services for the additional services will be included in separate Task Order
Authorizations.
We appreciate the opportunity to provide these services to you. Please contact me if you have any
questions.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
V
By: Trenton D. Tidwell, P.E.
Project Manager
FORT WORTH.
ATTACHMENT "A"
Scope for Engineerina Design Related Services for
Camp Bowie Blvd and Brvant Irvin Rd Intersection Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in completing
the project. Both the CITY and ENGINEER have attempted to clearly define the work to be
performed and address the needs of the Project.
OBJECTIVE
The objection of this project is to design intersection improvements to improve operations and
safety for vehicular and pedestrian traffic at this intersection. This scope of services has been
prepared to design the improvements identified in the attached conceptual layout, dated April
2021.
WORK TO BE PERFORMED
Task 1. Additional Paving Design
Task 2. Survey and Subsurface Utility Engineering
City of Fort Worth, Texas Camp Bowie Blvd and Bryant Irvin Rd Intersection Improvements
Attachment A CPN 103305
Release Date: 07.22.2021
Page 1 of 3
FORT WORTH.
TASK 1. ADDITIONAL PAVING DESIGN
ENGINEER will develop the preliminary and final of the infrastructure as follows.
1.1 Sidewalk with Retaining Wall on Donnelly Avenue
• Project Management
• Lead, manage and direct design team activities
• Ensure Quality Control / Quality Assurance (QC/QA) is practiced in
performance of the work
• Communicate internally among team members
• Task and allocate team resources
• Design the 150 linear feet of sidewalk with potential sidewalk wall for the
sidewalk gap along Donnelly Avenue.
• Update 60%, 90%, and final sheets to include the addition of sidewalk with
retaining wall.
TASK 2. SURVEY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
2.1 Design Survey
ENGINEER will perform field surveys to collect horizontal and vertical elevations
and other information needed by ENGINEER in design and preparation of plans
for the project. Information gathered during the survey will consist of topographic
data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations,
location of buried utilities, structures, trees (measure caliper, identify overall
canopy, and have qualified arborist identify species of trees), and other features
relevant to the final plan sheets. Existing drainage at intersections will be verified
by field surveys. Spot elevations will be shown on intersection layouts with cross
slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans will consist of the
following:
• A Project Control Sheet, showing ALL Control Points, used or set while
gathering data. Generally, on a scale of not less than 1:400:
— The following information about each Control Point;
a. Identified (Existing. CITY Monument#8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Main Street).
City of Fort Worth, Texas Page 2 of 3
Attachment A Camp Bowie Blvd and Bryant Irvin Rd Intersection Improvements
Release Date: 07.22.2021 CPN 103305
Page 2 of 3
FORT WORTH.
— Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same
coordinate system, as the Control.
— No less than two horizontal bench marks, per line or location.
— Bearings given on all proposed centerlines, or baselines.
— Station equations relating utilities to paving, when appropriate.
ASSUMPTIONS
A. Need an additional 200 linear feet of survey along Donnelly for the proposed
sidewalk with potential sidewalk wall.
DELIVERABLES
A. CADD drawing of the additional survey limits.
City of Fort Worth, Texas Page 3 of 3
Attachment A Camp Bowie Blvd and Bryant Irvin Rd Intersection Improvements
Release Date: 07.22.2021 CPN 103305
Page 3 of 3
Design Services for
Camp Bowie Boulevard and Bryant Irvin Road
Task Order Contract
City Project No. 103305
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated in an amount not -to -exceed $21,835.00 for
personnel time, non -labor expenses, and subcontract expenses in performing
services enumerated in Attachment A as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work.
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
Rate ($/hour)
Senior Project Manager / Project Director
$280
Senior Professional / Senior Project Engineer
$260
Project Manager
$220
Professional / Project Engineer
$185
Analyst III / EIT III
$165
Analyst II / EIT II
$155
Analyst I / EIT 1
$150
Administrative
$105
Intern
$90
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
City of Fort Worth, Texas Camp Bowie Blvd and Bryant Irvin Rd Intersection Improvements
Attachment A CPN 103305
Release Date: 12.9.2022
Page 1 of 3
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior to
such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas Camp Bowie Blvd and Bryant Irvin Rd Intersection Improvements
Attachment A CPN 103305
Release Date: 12.9.2022
Page 2 of 3
IV. Summary of Total Project Fees
Firm Primary Responsibility I Fee Amount I %
Prime Consultant
Kimley-Horn and Associates, Engineering Services $20,035.00 91.7%
Inc.
Non-MBE/SBE Consultants
Spooner and Associates, Inc. I Topographic Survey 1 $1,800.00 I 8.3%
Project Number & Name
CPN 103305 — Camp Bowie Boulevard
and Bryant Irvin Road
City MBE/SBE Goal = 8 %
City of Fort Worth, Texas
Attachment A
Release Date: 12.9.2022
Page 3 of 3
Total Fee MBE/SBE MBE/SBE %
Fee
$21,835.00 $1,800.00 8.3%
Consultant Committed Goal = 8 %
Camp Bowie Blvd and Bryant Irvin Rd Intersection Improvements
CPN 103305
Task No. Task Description
Rat4
1.0 Additional PavingDesign
1.1 Sidewalk with Retaining Wall on Donnelly Avenue
1.1.1?roject Management
1.1.7 Design
1.1.3 60%, 90% and Final Sheet Updates
2.0 Survey Engineering
2.1 Design Survey (Additional Sidewalk on Donnelly Avenue)
Totals
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
Design Services for
Intersection Improvements at Camp Bowie Blvd and Bryant Irvin Road
City Project No. 103305
Labor(hours
Senior Project Senior Professional) Professiona I
Project Analyst III I Analyst III Analyst I I
Manager) Senior Project Project
Manager EIT III EIT II EIT I
Project Director Engineer Engineer
$280 $260 $220 $189 E7 $1 $150
0 0 17 0 46 55 0
10
40 40
2 6 11
0 0 0 0 0 J
61 I
Admin Total Labor
Cost
$105
0 $19,85
$0
$2,200
$13,900
$3,755
01 $0
$0
$19,855
Expense
Subconsultant Travel
MWBE Non-MWBE
$0 $0
EO E1,800
$1,800
S I 51,80 I
Total Expense
Task Sub Total
Reproduction
cost
$
$0
$19,855
$0
$0
$0
$2,200
$0
$13,900
$0
$3,755
A
$1,800
$1,800
$1,810
$1,800
$ 4
$1,80 (
$21,655
Project Summary
Total Hours
118
Total Labor
$19,855
Total Expense
$1,800
MBE/SBE Subconsultanf
$0
Non-MBE/SBE Subconsultanf
$1,800
10% Sub Markup
$180
MBE/SBE Participation
0.0%
Total Project Cost
$21,835
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012 1 of 1
Camp Bowie and Bryant Irvin Rd Intersection Improvements
CPN 103305
FORT WORTH,,;
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Camp Bowie Blvd at Bryant Irvin Rd Engineering Agreement
Amendment #1
M&C: CPN: 103305 CSO: 58452 DOC#: 1
Date: 07/25/2023
To:
Name Michelle McCullough
Department
Initials
Date Out
1.
Scott Arnold, Consultant
Signature
SR�
Aug 5, 2023
2.
Shweta Rao, PM
TPW - Signature
sAdf—_
Aug 2, 2023
3.
Chad Allen, PgM
TPW -initial
CA -
Aug 21, 2023
4.
Lissette Acevedo, Sr. CPO
TPW -initial
Aug 29, 2023
5.
Patricia Wadsack, AD
TPW - initial
RAW I_w
Aug 29, 2023
6.
Lauren Prieur, Director
TPW - signature
Aug 29, 2023
7.
Doug Black
Legal - signature
wclwb
Aug 30, 2023
8.
William Johnson
CMO - signature
=
Aug 30, 2023
9.
Jannette Goodall
CSO - signature
JSG
Aug 30, 2023
10.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE:
All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the
routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a,FortWorthTexas.�-,ov at ext. 7233 or 8363, for pick up when
completed. Thank you!
Updated 12.07.2022, mdhm