HomeMy WebLinkAboutContract 60021CSCO NO. (0bbo1-,A
TRANSPORTATION IMPACT FEE CREDIT AGREEMENT
THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the
"Agreement") is made and entered into effective as of the Effective Date (as defined below), by and
among THE CITY OF FORT WORTH, TEXAS (the "City"), a Texas home rule municipal
corporation, and Bloomfield Homes, LP, a Limited Partnership company authorized to do business
in Texas (the "Owner") (the City and the Owner a "Party", and collectively, the "Parties").
RECITALS
WHEREAS, the Owner is the owner of approximately 280.597 acres in Tarrant County,
Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the
corporate boundaries of the City. A map of the Property showing its location is attached hereto as
Exhibit "B". and
WHEREAS, the Owner desires to proceed with development of the Property as described
or illustrated on the Development Plan, attached hereto as Exhibit "C" which identifies the on -site
and/or off -site transportation facilities necessary for serving full development of the Property; and
WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas
Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, et seq., as
amended, under which impact fees are imposed on new development for impacts to the City's
transportation facilities as a result of said development; and
WHEREAS, transportation impact fees are collected and must be spent by the City on impact
fee eligible transportation facilities identified within the City's adopted Transportation Improvements
Plan ("TIP"), as amended, within the service area(s) in which the new development is located; and
WHEREAS, the Impact Fee Program provides for credits against impact fees for dedication
of right-of-way and/or construction of transportation improvements identified as impact fee eligible
on the adopted TIP; and
WHEREAS, the Property is located within service area Y; and
WHEREAS, the City has determined the maximum transportation impact fees to be assessed
against new development within service area Y to be $3,750 per service unit (vehicle -miles of demand);
and
WHEREAS, certain transportation facilities depicted on Exhibit "D" are identified as
impact fee eligible within the City's adopted TIP and therefore eligible for impact fee credit; and
WHEREAS, Owner has agreed to dedicate the right-of-way and/or constructed the
transportation improvements shown on Exhibit "D" for which credits against transportation impact
fees shall be granted; and
WHEREAS, the Owner has received concept plan approval for Hulen Trails, Phase 1, FP-
19-073; and
Transportation Impact Fee Credit Agreement - CA-22-008 OFFICIAL RECORD Page 1 of 17
Hulen Trails CITY SECRETARY Updated 2/17/2023
FT WORTH, TX
WHEREAS, the Owner has received preliminary plat approval for Hulen Trails, Phase 1, PP-
18-054; and
WHEREAS, the Owner has dedicated 69,850 square feet of right-of-way for Hulen Street
with FP-19-073, recorded as Instrument D221180343, June 23, 2021; and
WHEREAS, the Owner has received approval for construction plans IPRC20-0001 and
executed a Community Facilities Agreement CFA20-0075, and obtained final acceptance by the City
for Hulen Trails Phase 1, City Project Number 102565.
NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and
conditions contained herein, and other good and valuable consideration, the City and the Owner
hereby covenant and agree as follows:
1. Recitals. The recitals contained in this Agreement are true and correct as of the
Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement.
2. Transportation Improvements. Owner agrees to dedicate the rights -of -way for and/or
construct the system facilities identified in Exhibit "D". For any transportation improvement which
has been previously dedicated or constructed by Owner on the Property and accepted by the City
prior to execution of this Agreement, the improvement shall be identified as completed on Exhibit
"D»
3. Credits. The Parties agree that the estimated value of the credits for each
transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The
value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee
associated with any lot for which a building permit has previously been issued, and the net value of
credits shown on Exhibit "E" shall be considered as exact.
4. Phasing. The Parties acknowledge that, where it is anticipated that the project will be
developed in phases, the anticipated construction of improvements by phase shall be as depicted in
Exhibit "D", which is attached hereto and incorporated herein by reference.
5. Allocation of Credits by Phase. The general allocation of credits to each phase of the
development shall be as shown on Exhibit "F", which is attached hereto and incorporated herein by
reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have
been created until the system facility for which credit is to be granted has been dedicated and accepted
(in the case of right-of-way) or constructed through an executed Community Facilities Agreement and
final acceptance by the City has been obtained. The Parties further agree that, prior to the application
of a credit against transportation impact fees otherwise due for any unit of development; the following
events shall take place:
(a) The number of credits resulting from such improvement has been valued; and
(b) Concurrent with final plat approval, a credit allocation shall be provided by the
developer for the phase of development to which the credit is to be applied, which allocation may
either assign the credit, expressed in dollars, to each finally platted lot or may create a credit -pool to
be utilized by that phase of development.
Transportation Impact Fee Credit Agreement - CA-22-008 Page 2 of 17
Hulen Trails Updated 2/17/2023
Term and Effective Date. The term of this Agreement shall be ten (10) years from
its Effective Date.
7. Assignment. Owner shall have the right to assign this Agreement to any person or
entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is in
writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement
by reference and binds the Owner's Assignee to perform (to the extent of the obligations assigned) in
accordance with this Agreement. Each Owner's Assignee shall become a Party to this Agreement
upon the execution of such assignment. In no event may this Agreement be construed to authorize
assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for
use outside the boundaries of the Property.
8. Amendment. This Agreement shall not be modified or amended except as follows:
(a) Any amendment or modification to this Agreement or any Exhibit or schedule hereto
shall be in writing and signed by the Parties.
(b) Any revision, amendment, or modification to this Agreement, the Development Plan,
or any Exhibit or schedule thereto, shall become effective on the date executed by the
Parties or, as applicable, upon the date of approval by the City Council or designated
city official.
9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this
Agreement for all purposes as if set forth in full in the body of this Agreement.
(Remainder of Page Intentionally Left Blank)
Transportation Impact Fee Credit Agreement - CA-22-008 Page 3 of 17
Hulen Trails Updated 2/17/2023
IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be
effective as of the date subscribed by the City's Assistant City Manager.
CITY OF FORT WORTH, TEXAS OWNER
Bloomfield Properties INC
a Texas Corporation
Dana Burghs; ( 20, 20 41 CDT) By: Bloomfield Properties, INC
Dana Burghdoff A Texas Corporation, General Partner
Assistant City Manager
Date:
Recommended By:
.�'` —
DJ Harrell (Mar 10, 202313:13 CST)
DJ Harrell
Director, Development Services
Approved as to Form and Legality:
Douglas Black
Assistant City Attorney
M&C: None required
Form 1295: None required
ATTEST:
Jannette Goodall
City Secretary
v'L...�_
Donald J Dyksfra (Mar 7, 202311:14 CST)
Donald J. Dykstra
President
City Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Y /in[suYr
J fer Rob s (Mar[, 202310:24 CST)
Jennifer Roberts
Assistant Director, Development Coordination
Development Services Department
Transportation Impact Fee Credit Agreement - CA-22-008 Page 4 of 17
Hulen Trails Updated 2/17/2023
EXHIBIT LIST
"A" Description of the Property
"B" Map of Property
"C" Development Plan
"D" Eligible Transportation Improvements
"B" Credits Against Transportation Impact Fees
"F" Allocation of Credits
Transportation Impact Fee Credit Agreement - CA-22-008 Page 5 of 17
Hulen Trails Updated 2/17/2023
EXHIBIT A
Description of Property
All that certain lot, tract, or parcel of land, situated in a portion of the Antonio Castello Survey,
Abstract No. 271, the W. H. Colthorp Survey, Abstract No. 286, Antonio Fernandes Survey,
Abstract No. 506, John Korticky Survey, Abstract No. 914, and the International and Great
Northern Railroad Company Survey, Abstract No. 826, Tarrant County, Texas, being all of those
certain called 78 1/3 acre, 20 acre, 74 1/2 acre, and 100 acre tracts described in a deed to
Crowley 272 Joint Venture recorded in Volume 12621, Page 1596 of the Deed Records of
Tarrant County, Texas (DRTCT), and being more completely described as follows, to -wit:
BEGINNING at a 1" iron pipe found for the Northeast corner of said 100 acre tract, the
Southeast corner of a called 40.004 acre tract described in a deed to Sharon Lynn Sankary
recorded in Instrument No. D204323827 (DRTCT), and being in the West line of said 78 1/3
acre tract;
THENCE North 00 deg. 46 min. 54 sec. West along the West line of said 78 1/3 acre tract, the
East line of said 40.004 acre tract, the East line of a called 1.000 acre tract described in a deed to
DTH REO Inc. recorded in Instrument No. D215152949 (DRTCT), the East line of a called
2.000 acre tract described in a deed to 0. F. Bush, Sr., et al recorded in Volume 4777, Page 308
(DRTCT), and the approximate centerline of West Cleburne Road (County Road No. 1035), a
distance of 753.71 feet to a P.K. nail set with washer stamped "GOODWIN & MARSHALL",
hereinafter referred to as P.K. nail set with washer, for the Northwest corner of said 78 1/3 acre
tract;
THENCE North 89 deg. 37 min. 03 sec. East departing said centerline and continue along the
North line of said 78 1/3 acre tract, the South line of a called 40.006 acre tract described in a
deed to Jerry Savelle Ministries, Inc. recorded in Volume 13436, Page 290 (DRTCT), and the
South line of Lot 1, Block 1 of Heritage of Faith Christian Center recorded in Cabinet A, Slide
11818 of the Plat Records of Tarrant County, Texas (PRTCT), at 24.44 feet pass a 1/2" iron rod
found for the Southwest corner of a said 40.006 acre tract, continue a total distance of 2776.07
feet to a P.K. nail set with washer for the Northeast corner of said 78 1/3 acre tract and being in
the approximate centerline of West Old Cleburne Crowley Junction (County Road No. 1079);
THENCE South 00 deg. 34 min. 39 sec. East along the East line of said 78 1/3 acre tract, the
East line of said 20 acre tract, the East line of said 74 1/2 acre tract, and said approximate
centerline, a distance of 2837.06 feet to a 1/2" capped iron rod set stamped "GOODWIN &
MARSHALL", hereinafter referred to as 1/2" capped iron rod set, for the Southeast corner of
said 74 1/2 acre tract and being the projected centerline of said West Old Cleburne Crowley
Junction and West Cleburne Crowley Road (County Road No. 1018);
THENCE South 89 deg. 39 min. 30 sec. West along the South line of said 74 1/2 acre tract, the
South line of said 100 acre tract, and along the approximate centerline of said West Cleburne
Crowley Road, a distance of 4878.91 feet to a 1/2" capped iron rod set for the Southwest corner
of said 100 acre tract;
Transportation Impact Fee Credit Agreement - CA-22-008 Page 6 of 17
Hulen Trails Updated 2/17/2023
THENCE North 00 deg. 28 min. 21 sec. West along the West line of said 100 acre tract and
along said centerline, a distance of 2060.33 feet to a P.K. nail set with washer for the Northwest
corner of said 100 acre tract, from which a 1/2" capped iron rod found stamped "4277" for the
Northeast corner of Lot 21 of Garden Arbors Estates recorded in Cabinet A, Slide 6031 (PRTCT)
bears South 30 deg. 28 min. 19 sec. West — 58.34 feet;
THENCE North 89 deg. 05 min. 03 sec. East along the North line of said 100 acre tract and
along said centerline, a distance of 2101.76 feet to the POINT OF BEGINNING, containing
12,222,802 square feet or 280.597 acres of land, more or less.
Transportation Impact Fee Credit Agreement - CA-22-008 Page 7 of 17
Hulen Trails Updated 2/17/2023
EXHIBIT B
Map of Property
BED
I
r.1�R •rrr eu Y � �*
N
W G
S
M CLMLOW ant.-E., (b
LONOt I
VHCIN 111
h&&P
SCAUS: 1 of = 5,0009
Transportation Impact Fee Credit Agreement - CA-22-008 Page 8 of 17
Hulen Trails Updated 2/17/2023
w
� M
holism N
PaN 3 a15 o N
MUaq raa nwaru rsNtWN%r� N
.,.w. ..Y...c n.aawr..«wwa•- - a5�!' GO
MI L
Fu
•�Q .n .n �4 Y � rr is - " � - t. ae -.x' � ..°,# c' i
Ttior
-4T77� �TE .. n.+•war . �yw+.
s Zi
,�;�. �, �T «• ::�y1��C, �.�sa��E .j.;'s��':�%�• :%_ � ? T
•�;�r'.—",C ���a��'�r ��`�� : ' Ep
M r.,`11i•. roan ! a1 �♦ . e�1�Jja*;. 00
(.'i ��*�,s'•`3.� �! � ���};.��� ' 4 �`-!`: ,. ='sic. , ,u-L-„x, r-o:^�`� M - -, � � r �: ! I`P 3. N
1�k,'r'•. �•�!�A -�', : ���'• z. `s� •E$i .a..,�w �.��.kl�`.��'Q;.�;�r`-�z` vE;;: �+�4..=c��;i � � U
s
•.ii 1, .,-.Y ` �,. :_i�'-""`_^,'- =Y- 77 ; " �++� }.,
RIB• .. 7!' - �_ _ _ •- -}-�y` Jj ,., •.-- _*..- }'.� ma x. f � 1T �C1)
;'�.• ww.+vi` r/ ,y 1 wsa�� �I IL UMAT U
s I ur
panwn
xis14xw" nnc n a 1n 1&X as anti ~ y
s i amx+a�. avm x tms l.n aa. au":,. (sy
• �esrip .....--. ° ; atm+-u.awaa+nc.amt,aaaxn
wx ara �'x MAO 71tA11S. nun ITi.w ACM
t �
(
aan AMMM IWaa1D IV Y.M. CbL7lgRral�YEY. A867�AC[141M
�-�— GOODMN1 waaaomtnaam[saamcT,aaettACTaa.ao >~
mc.aas �i MAL r w�oRtKxrar��r,resnuc�t+..� vaonE ° ^v
ax n .,1.�.-.�.� ovlo�vAmvuAlmog6.T an svMauaaeauo �y .
xoF�.s, tr �ver. NSI� ArrwK. . O
•••••••,�� 4r„w� .�.,+� cmaanacrYvaamtTAluAwrNT cwAmT.iExet
EXHIBIT D
Transportation Improvements
Y �f'p CJ ,,,'+u, ,SASSAFRAS'
e'_'- *,g + � � , e Jv'? EXHIBIT D
Hulen Trails
Vi
_ t3 C,: x; - i3 BOXFLDER •Eligible for Credit Against
} +s .'�k�+; •+fx "4 . fib- +!O r,. Transportation Impact Fees
;�7_
• �� �►=- }RANCHO VERDE, Y ® Right -of -Way
t.' _# pl*`�" �- Dedication & Construction
S rDO
-Al
.{ J,w ,� t r �8 QRE �...._ �- -- • Z. -IV
POGArA'
C �
Uj
WEIL
• ` 1, + . � ',j2 .i � � 1fi�AL _LPp'1:� raEJYTfIiOGE luV
FE
W
-
Ll
- + r . CLEBURI49
HfTCHING POST.."
�vtt• � � • .9' ' o
WA71 fR LILY p
u,
BtU WST
w " r COPPER POINT
BRENTFIELD
NORCROS S
CLEBURNE CROWLEY
u�
LONQHORN
Limits
i .� El ibie Improvements _.....
Hulen Street ROW Dedication (FP-19-M)
. Hulen Street ROW Construction (CPN 102565 )
Transportation Impact Fee Credit Agreement - CA-22-008 Page 10 of 17
Hulen Trails Updated 2/17/2023
EXHIBIT E
Credits Against Transportation Impact Fees
Hulen Trails
Transportation Impact Fee Credit Overview
Value of ROW Dedication
Instrument # Plat Case # Eligible Arterial Value
D2200332858 FP-19-073 Hulen S 569,847.46
Value of Capacity Provided
City Project# Plat Case# E;igibleArterial Value
CPN 102565 FP-19-073 Hulen S 707,666.27
Total Transportation Impact fee credit S 1,277,51172
Value of Existing Demand
Building Permits in review 1 $
Net Credit available S
?,75'
1,273,763.72 1
Transportation Impact Fee Credit Agreement - CA-22-008 Page 11 of 17
Hulen Trails Updated 2/17/2023
Right-cf-Woy Valuation for Hulerc Trails
Valuation Method 1- Precentage of TIP Project Cost
Eligible Arteri.i Hulen
2022 Transpor :tion Improvements Plan Project Wunbe Y-d8
Estimated tan.-tructionCosa from 2017Tramportation $1,733,000
V21Ue of Total Proiect Itght-ol-Way i2ft of Constructia $347,600
Total Project Length (LF)
1 270
Arterial Cross -Section Width M
55
Additional ROW needed 'or Roundabout (SF)
0
Total Project Right -of -Way (91
69,350
I
Right -of -Way Value Per Square Foot
$418
Valuation Method 2 - Precen age of Construction Project
Cost
Eiicible Arterial
Ruler:
City Project Number
CPN 102565
Construction Total of Ctty Project 102565
$539,722
tiralue of Total Project Right aFWay (24'!L of Censtruutic
$117,9AA
Total Project Length (LF)
1,792
Arterial Cross -Section Width (LF)
40
Additional ROW needed for Roundabout (Sf)
0
Toal Project Rtht-of-Way (SF)
71,669
Right-ofWay Value Per Square Foot
51.65
Valuation Method 3 -TAD appraised value
TAD 4'21ue as of 1/15/3021
TAD Acaou nt
42252731
Total Area {SF)
104,980
Appraised Vat ue
$10419g0.00
Value per Square Foot
$1.00
Right -of -Way Ded+mtion
"Ulan
Recording instrunnerut Number
D221180343
Final Plat Number
FP-19.073
Retsarding Date
1ZIS12020
Too( area oFROW dedicated (5Fj
114A27
Vahmper SF
S4.98
Credit
$569,1147."
Total Credit Available
$569,647.A6
Esisting Demand
$0.00
Net Credit Available
$569,947A6
Transportation Impact Fee Credit Agreement - CA-22-008 Page 12 of 17
Hulen Trails Updated 2/17/2023
apacity Provided by Hulen Street Improvements
Paving
Item
Description
No.
1 REMOVE ASPHALT PVMT
2 HYDRATED LIME
3 HYDRATED LIME
4 HYDRATED LIME
5 6" LIME TREATED SUBGRADE
6 6" LIME TREATED SUBGRADE
7 6" LIME TREATED SUBGRADE
8 6" CONCRETE PAVEMENT
9 7" CONCRETE PAVEMENT
10 9" CONCRETE PAVEMENT
11 5" CONC SIDEWALK
12 6" CONC SIDEWALK
13 R-1 RAMP
14 R-1 RAMP
15 FURNISH/INSTALL ALUM SIGN GROUND
MOUNT CITY STD
16 REMOVE SIGN PANEL AND POST
17 TRAFFIC CONTROL
18 INSTALL END OF ROAD BARRICADE
19 REMOVE END OF ROAD BARRICADE
20 CONCRETE HEADER
21 CONNECT TO EXISTING PAVEMENT
22 SAWCUT 2 FOOT & DISPOSE OF CONCRETE
CURB & GUTTER
23 R1-1 STOP SIGN
24 ST MARKER BLADE
25 24" THERMOPOLY STOP STRIPE
26 DEMO, REMOVE AND REPAIR EXISTING
GRAVEL DRIVE
27 10" CONC SIDEWALK
28 REMOVE & REPLACE HMAC CO#2
29 8" FLEXBASE SUBGRADE CO#2
30 DRIVEWAY OFF HULEN ST CO#3
31 DRIVEWAY DIRTWORK CO#3
CPN 102565
Completed
Eligible
Unit
�
Que"M
Unit Price
Credit Available
SY
2,245
2,245
$
10.00
$
22,450.00
TN
199
$
165.00
$
-
TN
358
$
165.00
$
-
TN
102
102
$
165.00
$
16,830.00
SY
5,639
5,639
$
2.40
$
13,533.60
SY
13,258
$
2.40
$
-
SY
23,828
$
2.40
$
-
SY
22,372
$
33.80
$
-
SY
12,600
$
35.50
$
-
SY
5,332
5,332
$
41.70
$
222,344.40
SF
1,622
$
4.95
$
-
SF
1,705
$
4.95
$
-
EA
12
$
1,750.00
$
-
EA
16
2
$
1,500.00
$
3,000.009
EA
16
$
250.00
$
-
EA
1
$
105.00
$
-
LS
1
1
$
5,250.00
$
5,250.00
EA
4
$
875.00
$
-
EA
1
$
750.00
$
-
LF
121
$
10.00
$
-
EA
3
$
750.00
$
-
LF
77
$
18.50
$
-
EA
14
$
82.50
$
EA
64
$
27.00
$
EA
3
$
245.00
$
-
SY
21
21
$
50.00
$
1,050.00
SF
12,679
12,679
$
4.75
$
60,225.25
SY
488
$
102.50
$
-
SY
165
$
31.22
$
-
SY
73
$
49.39
$
-
DA
2
$
2,350.00
$
-
Transportation Impact Fee Credit Agreement - CA-22-008
Hulen Trails
na" subtotal S 344„68325 1
Page 13 of 17
Updated 2/17/2023
Storm Drain
kern
Completed
Eligible
Description
Unit
Unit Price
No.
O91Lrtiw
Oun tier
CraidiltAvsilksbie
1
LARGE STONE RIPRAP
SY
976
O
S
102-BD
$
-
2
MEDIUM RIPRAP
SY
86
48
S
93.50
$
4,488,00
3
TRENCH SAFETY
LF
4.743
$
0.37
$
-
4
CONCRETE COLLAR
EA
3
$
446.17
$
-
5
21" RCP
LF
269
64
$
59.-%
$
3,835.52
6
24" RCP
LF
496
a
S
68.21
S
544.88
7
27' RCP
LF
417
$
77.92
S
-
B
30" RCP
LF
229
$
88.03
$
-
9
33" RCP
LF
27
$
105.49
$
-
10
3E' RCP
LF
589
$
122.31
$
-
11
39" RCP
LF
78
S
149.72
$
-
12
42" RCP
LF
443
443
$
167.67
$
74,277.81
13
49' RCP
LF
1,029
412
S
204.32
$
84,179.84
14
4X2 BOX CULVERT
LF
91
S
220.45
S
-
15
SX4 BOX CULVERT
LF
427
$
306.31
$
-
16
10K6BOX CULVERT
LF
444
S
598,82
S
-
17
10X7 BOX CULVERT
LF
204
S
653.29
$
-
18
4' STORM JUNCTION BOX
EA
6
$
4,422.46
S
-
19
S'STORM JUNCTION BOX
EA
5
2
S
5,6393E
S
11,278.76
22
HEADWALL BOX CULVERT
CY
152
$
77171
$
-
23
27' SET
EA
1
S
2,077.67
S
-
24
36" SET
EA
1
S
2,730.65
$
-
25
42" SET
EA
1
1
$
3,08682
S
3,086,82
26
48" SET
EA
2
1
S
3,383.63
S
3,383.63 g
27
10 CURB INLET
EA
11
4
S
5,22385
S
2DA%.40
28
15' CURB INLET
EA
14
$
6,58917
$
-
29
PEDESTRAIN RAIL CO#2
LF
227
S
171109
S
-
30
4X2 SET
EA
2
$
3,561.72
S
-
31
SX4 SET
EA
1
$
6,979.65
S
-
32
MBGF 31" TIMBER WITH SINGLE GUARDRAIL
LF
200
$
162.50
5
-
TE RMI NAL CO#2
33
ADDITIONAL CONCRETE FOR HEADWALL
LS
1
S
19,500.00
S
-
HEIGHT INCREASE CO#2
Subtotal
$
2C6,970.66
Storm Drain Ratio for Arterial Streats
IM6
Storm Drain Subtotal
$
20%970.66
Transportation Impact Fee Credit Agreement - CA-22-008 Page 14 of 17
Hulen Trails Updated 2/17/2023
Street Uot improvements
Item
Eltib
Description
Unit
Quantity
Unit Price
Na
Quantit
cfeIitAvaiabla`
1
2" 00 N_DT PVC SCH 40
LF _
4571
1,214
$
_ _9.39
$
11,395.4b
2
NO 6INSULATED ELEC CDNDR
LF
13713
3.642
$
1.06
S
3MS2
3
TYPE 338 ARM
_ EA
38
8
$
17CLOD
_$_
1,36CLOO
4
LED LIGHTING FIXTURE
EA
34
8
25&OD
2,064.OD
5
LIGHTING FIXTURE
EA
4
0
5
25ROD
-
6
_LED
ILWM FOUNDATION
_
_ EA
_
38 _
9
$_
1.067.00
*�
_- 8,53&00
7
_RDWY
RDWY ILWM
EA
38
8
$
1,481.00
$
11,848.00
Street Cghi s Subtatal S 39,W.98
PavingSubtAal $ 344,653.35
Storm Drain Subtotal $ 205,9M-66
Street LkhtsSubtntal S 39D67.98
Othef Elizible Items
Engineering, Surveying and Material Testing 2096 Df Paving & Storm Drain $ - 117,944. U
Tatal Valee of Capacity ProvWW 707,6663T
Transportation Impact Fee Credit Agreement - CA-22-008 Page 15 of 17
Hulen Trails Updated 2/17/2023
Existing Demand (Build ing Permits in Review) CPN 102565
Number of Permits
Street
140
4524 Mill Falls Dr
Existing Demand
1 $1,277,513.72
Street Permit No. Colle tion Rate I
Credit Available
PB23 00233 $ 3,75-D.X 1,273,763.72
Credit Remaining 5 1,273,7fi3.72
Transportation Impact Fee Credit Agreement - CA-22-008
Hulen Trails
S3,757.77 I
Page 16 of 17
Updated 2/17/2023
EXHIBIT F
Allocation of Credits
First-come/First-served within the boundaries of FP-19-073
.., ram.A xr r7A
- 0059-
r- ♦rj '. -'r'� �I ~.•:H -� ;i- .�� a 3 i : i � g � `y! 7 � � g � � t F i
4.1
U.
7r ^Y'." r » e .. r .. .
01.
IA
i , ♦ , � ♦ 1' • : � � ...,. ..,y Vic_ , � �r �' i
- :. 4C I; _ 1•�
°. ;� �"'.._-�-- '�. , -,ram^ -�• ;"1 � Sy
:. Li
i�
.Jim V r o f .S,' EI e , �^+ tie ♦ ♦ ,n' . I � •/ -��, - Agh
G y r^ � ._ -.1' °e' ^ e/ j'�: './• '� LI a �' ih• - tosir
.�c--��
+C) 6 'mil-°- rY-ry<r-.-' -'i` ram_ ��"' �g,� .� �q• - - ' � ..'1..,,>
��1 _--T-",• i }��. •'ten-- -� y�._— -' -y`�.
�MMIrMrF Nrw
max'
=S3r �r
ZVI
�.
G
�y Y ygo!
fag u
W
.W
Transportation Impact Fee Credit Agreement - CA-22-008 Page 17 of 17
Hulen Trails Updated 2/17/2023