Loading...
HomeMy WebLinkAboutContract 27572 �b I jd ' COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.��� WHEREAS, LaGrave Reconstruction Company, Inc., hereinafter called "Developer", desires to make certain improvements to 6th Street and drainage to the LaGrave Field, located at in the vicinity of 6th Street, between N. Commerce Street and N. Calhoun Street, Fort Worth, Texas; and . WHEREAS, the Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements, NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through W. Scott Berry, its duly authorized secretary and general counsel, and the City, acting herein by and through Bridgette Garrett, its duly authorized Interim Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: � ^GEC ply COMMUNITY FACILITIES AGREEMENT to install STREET AND STORM DRAINAGE IMPROVEMENTS FOR LAGRAVE FIELD A. The Developer, at its sole cost and expense, agrees to retain the services of an engineering firm to repare the plans, specifications and construction documents for improvements to 6tr Street, between N. Commerce Street and N. Calhoun Street, and drainage, as shown on Exhibit "A", attached hereto, such improvements hereinafter referred to collectively as the Public Infrastructure". In addition the Developer shall prepare the plans and specifications necessary for parking lot improvements. B. It is agreed the Developer will manage the design and construction of the Public Infrastructure. Developer shall award any professional services contract in compliance with Chapter 2254, Texas Government Code. It is understood and agreed that the award of the professional services contract to Dunaway Associates, Inc., as contemplated herein, is deemed to be in compliance with Chapter 2254, Texas Government Code. Developer shall be required to award any construction contracts for the Public Improvements in accordance with the laws of the state of Texas, including but not limited to Chapter 252, Texas Local Government Code. C. Attached hereto is the Minimum Wage Rates as established by the City Council of the City of Fort Worth. Developer shall be responsible for assuring its contractors pay no less than the attached Minimum Wage Rates for the construction of the Public Infrastructure. D. Any deviation from the scope of work or change order for the Public Infrastructure that would result in an increase in the cost of the Public Infrastructure must be approved in writing by the City of Fort Worth prior to such deviation being made or change order being issued. E. The estimated total cost of the Public Infrastructure and related support services specified in this agreement, excluding design, is estimated to be $113,012.' In accordance with this agreement as shown in the Cost Summary and in accordance with a separate agreement between the Developer and Dunaway Associates, Inc., the Developer shall be responsible for paying for all engineering services related to the Public Infrastructure to be constructed under this agreement. The City shall contribute the sum of $113,012.00 for the construction of the Public Infrastructure. The City shall be responsible for making all payments to the contractor(s) of the Public Infrastructure. COMMUNITY FACILITIES AGREEMENT LA GRAVE FIELD Page 2 of 6 F. City personnel shall be responsible for the inspection of the Public Infrastructure as they are being constructed. The city inspector shall be responsible for the preparation of all payment documents. G. One (1) reproducible set of as-built record drawings and specifications shall be furnished to the City of Fort Worth upon completion of the Public Infrastructure. H. It is further agreed and understood by the parties hereto that upon acceptance by the City, title to all the Public Infrastructure shall be vested in the City after such acceptance, and Developer hereby relinquishes any right, title, or interest in and to said facilities or any part thereof. I. For all Public Infrastructure included in this agreement for which the Developer awards its own construction contract, Developer agrees to follow the following procedures: 1. The construction contract must be advertised, bid and awarded in accordance with State statutes prescribing the requirements for the letting of contracts for the construction of public work. This includes advertising in a local newspaper at least twice in one or more newspapers of general circulation in the county or counties in which the work is to be performed. The first publication must be on or before the fifteenth (15th) day before the first date bids may be submitted. The bids shall be opened by an officer or employee of the City at or in an office of the City. 2. To employ a construction contractor who is approved by the Director of the Department having jurisdiction over the Public Infrastructure to be constructed, said contractor(s) to meet City's requirements for being insured, licensed and bonded to do work in public streets. 3. To require the contractor(s) to furnish to the City a payment and performance bond in the names of the City and the Developer and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Public Infrastructure, said bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. The surety company on all bonds shall be reasonably acceptable to the City. 4. Developer further shall require the contractor(s) to provide public liability insurance equal to or in excess of the amounts required by the City's specifications covering that particular work. 5. Developer shall give 48 hours notice to the City's Department of Engineering, Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install any storm drain pipe unless a responsible City inspector is COMMUNITY FACILITIES AGREEMENT LA GRAVE FIELD Page 3 of D[8S8Dt and gives COOG8Of to p[DC88d. and to 02k8 such l8bO[8tO[V tests Of materials being used 8S may b8required b«the City. J. During the OOU[Ge of construction, Developer further covenants and 8gP8BS to, and by these D[8G8OtG does hereby fully indemnify, hold harmless and defend the City, its officers, 8g8O|S' and 8DlplOy88S from and 8g8iOSf any and all Cl8iOlS, SUifG or causes Of action, Of any nature whatsoever, brought for, O[OO account Of any injuries or damages to p8FSOOS or pR]p8[fy' including death, OD 8CCOUDf OJany negligent 8Cf OF intentional misconduct OfDeveloper. K. Developer will fU[fh8[ [BQUiPB its CODƒF8CtOR3 /DOf including []UD8VV2V ASGOCi8f8S, Inc.) to iOdeDlOif«, hold h@0Ole88 and defend the City, its officers, agents and employees from and Bg8iDSf any and all claims, SUifG or causes of action of any whatsoever,�8fgOBV8�. whether FB8l or 8S8e[f8d, brought for or On @CCOUDt Of any injuries or damages to persons or property, including de8th. resulting from, O[ iOany VV8\( cOOO8CfBd with, the CODGt[UCtiOD Of the Public IDfraSt[UCfU[B, whether or not caused, in whole or in part by the negligence of officers, agents employees, licensees, or invitees of the City. L. Developer covenants and agrees that it diGCri[OiO8f8S against no individual involving 8OlD|OVODeDf 88 prohibited by the fB[0G of Ordinance NO. 7278 /8S 8DleOd8d by Ordinance No. 7400\, 8O ordinance prohibiting discrimination iO employment practice b8c2UG8 of race, CF88d. COlO[. religion, D2tiOD8l origin (except for illegal 8li8OS\, Sex or age, UnlGSS sex or age is 8 bDO@fid8 OCCUp8fiOO8l qU8lifiC8fiOD' and that any SUbCOOfF8CfO[ or 8DlDlOyDl8Df @g8Ooy' 8ifhB[ furnishing DF referring 8ppiiC8DtS to []8VelOp8[, and any agent-of Developer, will also be prohibited from discriminating against BOV individual involving eDOplOyDlBDf as prohibited by the f8rDOG Of such Ordinance No. 7278 (as amended by Ordinance No. 7400). M. The Ol@OS, SDeCifiC8fODG and COOGtDJCtiOn dOCUrO8OfS for the Public IOfr8SfMJ[tU[8 pFOdUC8d pursuant to the G8D8[8t8 8gFe8DleDf b8ƒw88O Developer and [)UM@VV@V Associates, Inc. are GUh|eCf to the written 8Op[OV@l of the City. /\DOFOV8l by the City shall not constitute D[ be deemed tOb88 release Of the responsibility and liability of Dunaway Associates, Inc., its SUbCODGUlt8Dt8 and BQeD{S. Such 8DOPDV8l Shall not b8 deemed tOb88O assumption Of such responsibility and liability bV the City for any defect in the designs, Sp8CifiC8tiODS and CODf[3[t dOCUDlBOfS p[8D8rBd by []UD8VV8y Associates, IDC.. its SUbCOOSUlt8OtS and agents, if being the intent Of the parties that 8pOFOV8l by the City signifies the City's approval OD only the general design concept Of the iDOpPOV8DO8OtS to be CODSt[U[t8d' ID this COOD8CtiOD, the []8V8lOpe[ will include in its contract with Dunaway Associates, Inc. @ requirement that DUO8VV8V /\SGOCi8teS, Inc. will, for 8 period of five (5) years after the 8CC8Dt@OO8 by the City Of the CODlDlet8d COOSt[UCtiOO project indemnify and hold the City and all of its OffiC8[8, 8gGVfG, Ge[V3OtS and 8DlplOVB8S h@[0Ol8SS from BDV lOSS' d8Dl8g8. liability or eXp8OSe' OD 8CCOUOt of damage to pnOD8[fV and injuries, including death, to all D8FSOOG which may 8[iS8 out Of any defect, d8fiCi8DCV or negligence Of the 8OgiD88['G designs and GD8CifiC8tiOOS iDCOrOOr8t8d into any irOp[OVe[D8DfG COMMUNITY FACILITIES AGREEMENT L»GRAVE FIELD Page^»/« constructed in accordance therewith, and further require Dunaway Associates, Inc. to defend at its own expense any suits or other proceedings brought against the City and its officers, agents, servants and employees, or any of them on account thereof, to pay all expenses and satisfy all judgments which may be incurred by or rendered against them or any of them in connection therewith. N. Venue of any action brought hereunder shall be in Fort Worth, Tarrant County, Texas. O. The City's Policy for the Installation of Community Facilities, as adopted by the City Council on March 20, 2001, is hereby incorporated herein by reference, and Developer covenants and agrees to comply with said Policy as a condition of this contract. P. The following descriptions of work apply, as appropriate, to the areas included in the Community Facilities Agreement: 1. STREETS Street improvements as shown in Exhibit A will be in accordance with plans and specifications prepared by the Developer's engineer and approved by the Director of Transportation and Public Works. 2. STORM DRAINAGE Storm drain improvements as shown in Exhibit A will be in accordance with plans and specifications prepared by the Developer's engineer and approved by the Director of Transportation and Public Works. 3. OTHER WORKS In the event that other work is required it will be included as a specific requirement to this Community Facilities Agreement. 4. COST SUMMARY (Exhibit B) Public Drainage Improvements $ 36,297.14 Paving Improvements 76.714.96 Total Project Cost $113,012.00 The above is based upon the following project scope: ❑ Reconstruction of one block of NE 6th Street between N. Commerce Street and N. Calhoun Street, inclusive of the intersections, and drainage. COMMUNITY FACILITIES AGREEMENT LA GRAVE FIELD Page 5 of IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this the day of March' 2002. APPROVED AS TO FORM AND RECOMMENDED: LEGAUT-Y: Assistant Cif Attorney Hug alanga, P.E. Director,' Transportation and Public Works Department ATTEST: CITY OF FORT WORTH, TEXAS B MjQU6 A ------------------ " Gloria Pear on BridgJi&Garre V City Secre at a Assistant City Manager DEVELOP ATTEST: LaGrave Recons ru4afiyn Company, L. L. C. By: A- 4 'r 0 SVrarnVe &Val Coun I Contract Authorization Date CITY 5E1�E A1Q1y COMMUNITY FACILITIES AGREEMENT LA GRAVE FIELD woo E-11H Va. Page 6 of 6 03/18/2092 16:53 8173357437 DUNAWAY ASSOC. PAGE 03 NE RL Lzi 1 ' _ i�iil i. .f' s• r �� _,.....=Sara.......__ �.. _.. ..... �.li {•,,yr{� x,-;":��... 1I®11 {µ / it fir•... �1,,e. w ,f��. '•/ '� ... . /� // },/% ''�:L:7,•1�,�!J't `re5y��;ry`�F}.'fir7^ ••�P———-,.,...-. —..�.....�._._ r I/ '•p`^ rte'�:rr' i r,-;:r.;.,YSi. ,...—..-...-.-..._-., ,,.,, — �/JJ r„`v.�.. +�'ir., ..t�:ov.Far�':.k lM": �- ........�..,...._...•..—..`.�•..... `_�J...�..,r..,� J •'r'^L":.�!�Fa.vfn'l:'tir:•:4:j'rb�': .' Gl; i `� •�`/y�i�r si q ` Lai ilya•r �i:;� cF, CS 4 a;ra; gi,�w•ryf ' �, 4 V Q 1+. �t i Yet•'f lti• 1 -4,/ uj LL 4.� U ! ;;• �:;�����rw' � '' •;i��: :. �try O � � '{ Y�`'. �7�'•'H.#�11 �tit • ' `—,r--. �T .�:•"v' ?G,rf�;:.•ia.'i� #�y}:r��f,'r ,;.::;;.,, —.._ ,-,r. __,„ _ ,;L•�^;t;�:l-;ic}.iE",fli'i•. �,;;�iy.t�t :fr'�!.°•.:� r;r•,.i "` ... W �'�•��""^`.L�'C'aAJ -- 'r:d"„�rv'• �.i+-1{ 'v.T� •k,;'t�:l•N/.M��J• ...r...r—.--^.r.�`•• Q w�'_�..;=_^:.^.�—` _. h,>�.:i yt11•y ' ! •7 rf• ..y,•Y '�''S�'• '—..._'�"'TM�d!_..=_'• � �._ •� ! ....•.. sr..., Cx,�� 03/18/2002 16:53 B173357437 DUNAWAY ASSOC. PAGE 04 {{ � i iii., '�,.: �' ' ,..X;•';I•,`', ::j�.� � �� // ,/ r�ir a:. 'r4f'1:?!•i:.J,(tn„iliht, a.""".'_�`+- FI ut i5 1. tiy.." ^�:� L'S.^•l.o•i'yr,-,::,i,:'.s.:t, '-G-. _. _.-.,...__ ......,.. + ...�,rti •.,a r,'.:}t,. -,�_!1i°•"�" /+/// ►*�y� ! +�fir" �'�7Y,•'t.''::• ! �" Q ` Err fJ IL Ix �rt �Ji y •:,,•r 1� 1 °ap'•+�51Tt't''���� 1 Z 4411 ;K:f2! '•',+S. .—_�__..-._. ..., --,..,... :,hF,;t�ar:.,:..;;,t•.„' .4•.�--_.:.W.•"'�-- =-- ice' ,.... �.rs• _.._ •.�. rrBrM'rf.`"1 ':i.•.l:E.: H. /4R 1P'.IM:Ri' ....,��...- _�"..,k.`.1�-- 1,yt.G ,: t,. e'::s ,•. , .,r,.i 14" arks � "'---r• Z i:.�fir,/.t`:`i!^:• Ll=� !"'. '..'''•,' :ay;.Ga...Y` ...-_ _ww �..n.—�_ - •' tw..i C!'� ii. `:Gt';,f:n'•i':i,jfiy�, 'f I�''•'�••';%'�M ."��` •.. to � .^.,�•�«MA"!'.ill J,�+`, r�••'f,,,/���.Ir:'ii.� .�•��.,.�4��„ •�.�„`...�� _ __ �ilrm®�r�rt 9,p ii'FR � 't•Y7ti`�'1XY�"• 'r � wwwiq�,R ,.., /• ',-..w..__._�. � rr ®IM: I Lo I 03/18/2002 16:53 8173357437 DUNAWAY ASSOC. PAGE 02 Dunaway Amociates,Inc. 311812002 ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Unit 11:Paying&Storm Drain Improvements To nerve: Fort Worth Cats Stadium T/pw Pmjen ro.: DOE He. Unit II-Settio x A:Public Storm Drain Im r ements e SW BID UNIT ITEM UANTITY UNIT DESCRIP'T'ION PRICE COST 1 5 EA Demolish and Remove Existing 5'Curb Into $750.00 $3.750.00 2 1 EA Demolish and Remove Existing l0'Curb Inlet $950.00 $950.00 3 6 EA Install 10.5.Standard Curb Inlet $2A00,00 S13.200.00 4 265 SY Dcmotish and Remove Existing Concrete Pavment $9.00 $2,385.00 5 84 LF Pinch emolish and Remove Existing Reinforced Concrete Curb $1.50 $126.00 6 265 SY inch reinforced concrete avement full panel concrete avementre air $22.00 $5,830.00 7 65 LF reintorced concrete curb $2.50 $162.50 8 265 SY 6-inch lime stabilized sub de $2,00 $530.00 9 3,5775 TN Lime 7N/SY $105.00 $375.64 10 1 LS 7-foot X 7-foot Storm Drain Manhol 9.5-foot depth $1,500.00 $3 500.00 11 33 LF 30"CL III RCP $52.00 $1,71 .00 12 69 LF 21"CL III RCP $40,00 $2,760.00 13 32 LF Remove exiatin 15"RCP $16.00 $512.00 L--J4 i EA flug for 30"RCP $500,00 5500.00 SUBTOTAL: S36,297.I4 Unit ll-Section B:PaybIlt Im rovem6nts BID BID UNIT ITEM QUANTrTY UNIT DESCRIPTION PRICE _ COST_ 1 ;,192 SY Demolish and Remove Existing Concrete Pavement $9.00 S19,728.00 .2. 226 LF Demolish and Remove Existing Reinforced Concrete Curb $1.50 _ $339.00 3 195 LF Demolish and Remove Existing Railroad Track Includes both rails $15,00 $2.925.00 4 11915 Sy 6-inch reinforced concrete payernent $22.00 $42,130.00 5 11 375 LF 7-inch reinforced concrete curb $2.75 S1,031.25 6 210 LF d-inch reinforced concrete la-down curb $2.50 $525.00 7 2 055 SX 6-inch lime stabilized sub ads 1 $225 S4 623,75 8 27.743 TN Lime 74/SY $105.00 $2,912.96 9 1 LS IPavernent Marking var City requirements $2,000.00 S2 000.00 10 500 Sy ISceding by h dromulch 1.00 $500,00 SUBTOTAL SECTION B: $76,714.96 TOTAL UNIT II: $113,012.10 UNIT2_006T 031102 dee R01.xie City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 3/26/02 C-19027 20LAGRAVET � 1 of I � i SUBJECT COMMUNITY FACILITIES AGREEMENT —AIITH LAGRAVE RECONSTRUCTION COMPANY; L.L.C. FOR THE DESIGN AND CONSTRUCTION OF STREET AND STORM DRAINAGE IMPROVEMENTS IN LAGRAVE FIELD AREA RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a Community Facilities Agreement with LaGrave Reconstruction Company, L.L.C. for the design and construction of street and storm drainage improvements in the LaGrave Field area at an estimated cost to the City of $113,012. DISCUSSION: In December 2000, the City Council authorized the issuance of$45,000,000 in Certificates of Obligation to address critical capital projects, which includes $2,500,000 in new development funds to supplement the 1998 Capital Improvement Project new development funds. LaGrave Reconstruction Company, L.L.C., the developer of LaGrave Field (Developer), has executed a proposed Community Facilities Agreement (Agreement) to make certain street paving and storm drainage improvements in the LaGrave Field area. Under the terms of this Agreement, the Developer will retain and fund the services of an engineering firm to prepare the plans, specifications and construction documents for the improvements to 6th Street between North Commerce Street and North Calhoun Street and the necessary storm drainage improvements. The Developer will also competitively bid and award the construction contract. The City of Fort Worth will fund the construction at an estimated cost of $113,012 and do the inspection of the project during construction. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Critical Capital Projects Fund. BG:n Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Bridgette Garrett(Acting) 6140 Originating Department Head: Hugo Malanga 7801 (from) APPROVED 03/26/02 C116 541200 020116136357 $113,012.00 Additional Information Contact: George Behmanesh 7913 Tom Higgins 6192