HomeMy WebLinkAboutContract 27574-A7 AMENDMENT NO. 7
STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 2,-(5-1 -A-7
(M&C not required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and TranSystems
Corporation d/b/a TranSystems Corporation Consultants (Engineer)
made and entered into City Secretary Contract No. 27574, (the
Contract) which was authorized by the City Council by M&C C-18999
on the 19th day of March 2002 and subsequently revised by six
previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Trinity Boulevard Water Main Extension from Greenbelt
Road to State Highway 360.
WHEREAS, it has become necessary to execute Amendment No. 7
to said Contract to include an increased scope of work and revised
mum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated August 27, 2010, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $33,995.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $780,309.00.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the _� day of , 2011, in Fort Worth,
Tarrant County, Texas.
a�b�vbt�nn
ATTEST: 'FOR y`k��
V
cA¢
Marty Hendrix
a
City Secretary ° o dd
0000000000 �Ay
a�n*X �b
APPROVAL RECCbtUMZD: PROVED:
Frank S. Crumb, P.E. , Director Fernando Costa
Water Department Assistant City Manager
TRANSYSTEMS CORPORATION d/b/a
TRANSYSTEMS CORPORATION CONSULTANTS
Engineer ��"QUIRED
� .
By:
Name: Joseph C. Masterson, P.E.
Vice President
500 W. 7t" Street, Suite 600
Fort Worth, Texas 76102-4773
APPROVED AS TO FORM AND LEGALITY:
1
Assistant City Attorney
-2-
OFFICIAL RECORD
CITY SECRETARY
FT. WORTHv TX
TranSystems
,to jIs Bank of America Building
500 West 7"Street
Suite 1 100
Fort Worth,TX 76102
Tel 817 339 8950
Fax 817 336 2247
www.tmnsystems.com
AMENDMENT NO. 7
SUMMARY OF DESIGN FEE
August 27,2010
Rakesh Chaubey,P.E.
Department of Engineering
City of Fort Worth
1000 Thmckmorton Street
Fort Worth,TX 76102-6311
RE: Amendment No.7
Trinity Boulevard Water Main Extension
Part 4—Tarrant Main to SH 360 and Trinity Boulevard
Water Project No.P265-605140035287
36'Water Main and Grand Prairie Metering Station Relocation
Dear Mr.Chaubey,
We appreciate the opportunity to present this proposal for your consideration. Per the request of the Water
Department,this amendment revises the previously approved 36'water main design plans and contract
documents. Spedficalty,this amendment Includes the provision of field investigation and design for the
relocation of the proposed water metering station,serving the City of Grand Prairie. Relocation of the
proposed metering station is required to remove the facility from the existing property owned by Huf fines
Communities so that the property may remain available for futum development.
The proposed metering station is tD be shifted to the south and onto the THE right-of-way,adjacent and
immediately south of the existing Oncor electrical substation. These revisions are noted on Exhibit A,
attached. Coordination with the City of Fort Worth Real Property Department tail be necessary to secure
license agreement for the station from TRE. Additional engineering services are required for the
relocations. It is noted do#this work wIM not be kWeted unto cornspoo ft"sanwnts from
Huth►►CommunNes,and tlw Trinity River Audw ity as ouWmd In Anwn*mt Noe a dated June
10,2010,have boar procured by OW City of Fort Worth.
TranSystems will provide civil engineering design for the metering station. We will contract directly with
Gojer-McCreary&Associates,Inc.for the provision of electrical engineering services associated with the
antenna signal path evaluation and electrical service components for the station.
Wsyl,stell Is Mr. Rakesh Chaubey, P.E.
August 27, 2010
Page 2 of 2
The cost for this work as described are listed below. Corresponding personnel and hourly charges for the
specific tasks are attached.
Metering Station Civil Design(TSC) $ 7,995.00
Metering Station Electrical Service Design(Gojer-McCreary—MWBE) S 26,000.
Total Additional Costs: $ 33,995.00
LUMP SUM TOTAL
Original Contract Fee: $379,195.00
Amendment No.1: $ 51,600.00
Amendment No.2: $ 24,800.00
Amendment No.3: $145,324.00
Amendment No.4: $ 94,205.00
Amendment No.5: $ 35,200.00
Amendment No.6: $ 15,990.00
Amendment No.7. 33,995.00
TOTAL CONTRACT $780,309.00
The above work effort will be accomplished for the total lump sum fee of$33,995.00. This amount includes
76%being provided to our MWBE sub consultant Please contact me should you require any additional
information.
Sincerely,
TranSystems Corporation Consultants
Cog P.Schellbach,P.E.
Municipal Services Manager
G FfflI126431Vrg9C" 7ft WOW-RI 2010 -27.doc