HomeMy WebLinkAboutContract 27574-A8 CRY SECRETARY
CONTIRA►CT NO.
AMENDMENT No. 8
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and TranSystems
Corporation d/b/a TranSystems Corporation Consultants, (ENGINEER) made
and entered into City Secretary Contract No. 27574, (the CONTRACT) which
was authorized by M&C C-18999 on the 19th day of March, 2002 in the
amount of $379,195 . 00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment
Number 1 in the amount of $51,600.00 which was authorized by M&C C-19500
on March 26, 2003, Amendment Number 2 in the amount of $24,820.00 which
was administratively authorized on November 17, 2005, Amendment Number 3
in the amount of $145,323.00 which was authorized by M&C C-21414 on May
3, 2006, Amendment Number 4 in the amount of $94,205.00 which was
authorized by M&C C-21944 on April 3, 2007, Amendment Number 5 in the
amount of $35,200 .00 which was authorized by M&C C-22372 on October 8,
2007, Amendment Number 6 in the amount of $15, 990.00 which was
administratively authorized on July 7, 2010, Amendment Number 7 in the
amount of $33,995. 00 which was administratively authorized on January
28, 2011; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Trinity Boulevard Water Main Extension from Greenbelt Road to State
Highway 360; and
WHEREAS, it has become necessary to execute Amendment No. 8 to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated March 21, 2012 , a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be pe neer
totals $21,547 .00 . OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Page -1-
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $807, 072 . 00 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth ENGINEER
TranSystems Corporation d/b/a
TranSystems Corporation Consultants
Fernando Costa C. Masterson, P.E.
Assistant City Manager tse6h
ce President
DATE: S /,Z DATE:
APP RECD ED-
PP
Frank Crumb, P.E.
Director, Water Department pp ��J
APPROVED AS TO FORM AND LEGALITY: M&C: IV/A
Date:
Do glas W. Black
Assistant City Attorney ,p�aatlnn
Ay 00000,04
ATTEST: -----
pro° ����
d�..o 0 o
�zC �o
Mary �
City Secretary oo°o Q �00000 r
a44 -ex O' OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -2-
LL- f, TranSystems
' Svste'Il1S ' Bank of America Building
500 West 7'" Street
Suite 1 100
Fort Worth,TX 76102
Tel 817 339 8950
Fax 817 336 2247
www.transystems.com
AMENDMENT NO. 8
SUMMARY OF DESIGN FEE
March 21,2012
Rakesh Chaubey, P.E.
Water Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102-6311
RE: Amendment No.8
Trinity Boulevard Water Main Extension
Part 4—Tarrant Main to SH 360 and Trinity Boulevard
Water Project No. P265-605140035287
36"Water Main Modifications and Sanitary Sewer Relocation
Dear Mr.Chaubey,
We appreciate the opportunity to present this proposal for your consideration. Per the request of the Water
Department,this amendment revises the previously approved 36"water main design plans and the
relocation of the M-398. Specifically,this amendment includes water line plan profile modificafions to
previously bid plans,sewer plan profiles,and coordination to re-start construction.
The cost of services is listed below. Corresponding personnel and hourly charges for the specific tasks are
attached.
DESIGN
A. Coordination
1. City of Grand Prairie meter station and pipe agreements $ 548
This includes assisting the City of Fort Worth with a Meter Station vault
usage agreement,and the transfer of the Grand Prairie 24'water line
and associated easement.
2. TXDOT Utility Construction Permit $ 548
This includes updating the permit and coordinating the relocation of a valve
along FM 157 near Trinity Blvd.
3. Meeting $ 3,248
This includes meeting with the City(3),Contractor(2),and Trinity River
Express and Grand Prairie(2)
Lisy,tf?IIIS Mr. Rakesh Chaubey, P.E.
March 21, 2012
Page 2 of 3
B. Water Line Design Revisions for Sign Plans
1. Modify bid plans $ 3,060
Revisions include changing slopes,research and plan modification for
new meter, modifying butterfly and meter vault for 24"meter station loop,
reviewing customer connections along Trinity Blvd, and adding general
comments and Trinity Blvd.and FM 157 valve replacement.
2. Detailed quantity breakout $ 411
3. Shop drawing review with City Project Manager $ 548
4. Construction Assistance—Assist answering City questions $ 928
since the project has been put on hold for an extended period.
C. Sanitary Sewer Relocation
1. Relocation of the 350 linear feet of 18"sanitary sewer(M-398R)within $ 5,418
the proposed Grand Prairie water meter facility. This includes one plan
profile sheet, two standard detail sheets and Opinion of Construction Cost.
2. THE coordination-Provide exhibit, plans and assistance. $ 1,186
MISCELLANEOUS
A. Reproduction $ 540
MBE Sub Consultant(ANA)
1. Water Line Plan Design $ 4,500
2. Sub Consultant Fee $ 338
LUMP SUM TOTAL S2
Breakout of Amendment 9 by Work Phase
Water Sewer Total
Survey
51 -Design Survey $ 0 $ 0 $ 0
Engineering
31 -Concept Design $ 0 $ 0 $ 0
32-Preliminary Design $ 0 $ 0 $ 0
33-Final Design $ 14,669 6,878 21,547
Engineering Totals $ 14,669 $ 6,878 $21,547
Total(Survey and Engineering) $ 14669 $ 8,878 $21,547
GA Fw01 126431Pm0cNgmllContr"lamend wd 8 mvise"amm*wL8 031912.doc
S�St�Il1S� Mr. Rakesh Chaubey, P.E.
March 21, 2012
Page 3 of 3
Original Contract Fee: $379,195.00
Amendment No. 1: $ 51,600.00
Amendment No.2: $ 24,800.00
Amendment No.3: $145,324.00
Amendment No.4: $ 94,205.00
Amendment No.5: $ 35,200.00
Amendment No.6: $ 15,990.00
Amendment No. 7. $ 33,995.00
Amendment No.8. 21547.00
TOTAL CONTRACT $801,856.00
The above work effort will be accomplished for the total lump sum fee of$21,547.00. This amendment has
a 26°x6 MWBE participation. Please contact me should you require any additional information.
The scope does not include:
1. Metes and bounds description of the Trinity Blvd undeveloped ROW
2. Construction Management
3. Meeting with THE
4. Legal boundary exhibit or metes and bounds for THE Documents
5. Change order coordination
6. Construction assistance beyond hours provided in breakout
Sincerely,
TranSystems Corporation Consultants
Kent Lunski,P.E.
Project Manager
Attachments
GAFW0I1M31Pm*cftiMl"ncftWrendmerd 8 mvMdUttr amendment_8 031912.doc