HomeMy WebLinkAboutContract 27574-A8 CRY SECRETARY CONTIRA►CT NO. AMENDMENT No. 8 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation d/b/a TranSystems Corporation Consultants, (ENGINEER) made and entered into City Secretary Contract No. 27574, (the CONTRACT) which was authorized by M&C C-18999 on the 19th day of March, 2002 in the amount of $379,195 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $51,600.00 which was authorized by M&C C-19500 on March 26, 2003, Amendment Number 2 in the amount of $24,820.00 which was administratively authorized on November 17, 2005, Amendment Number 3 in the amount of $145,323.00 which was authorized by M&C C-21414 on May 3, 2006, Amendment Number 4 in the amount of $94,205.00 which was authorized by M&C C-21944 on April 3, 2007, Amendment Number 5 in the amount of $35,200 .00 which was authorized by M&C C-22372 on October 8, 2007, Amendment Number 6 in the amount of $15, 990.00 which was administratively authorized on July 7, 2010, Amendment Number 7 in the amount of $33,995. 00 which was administratively authorized on January 28, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: Trinity Boulevard Water Main Extension from Greenbelt Road to State Highway 360; and WHEREAS, it has become necessary to execute Amendment No. 8 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 21, 2012 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be pe neer totals $21,547 .00 . OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Page -1- 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $807, 072 . 00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER TranSystems Corporation d/b/a TranSystems Corporation Consultants Fernando Costa C. Masterson, P.E. Assistant City Manager tse6h ce President DATE: S /,Z DATE: APP RECD ED- PP Frank Crumb, P.E. Director, Water Department pp ��J APPROVED AS TO FORM AND LEGALITY: M&C: IV/A Date: Do glas W. Black Assistant City Attorney ,p�aatlnn Ay 00000,04 ATTEST: ----- pro° ���� d�..o 0 o �zC �o Mary � City Secretary oo°o Q �00000 r a44 -ex O' OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- LL- f, TranSystems ' Svste'Il1S ' Bank of America Building 500 West 7'" Street Suite 1 100 Fort Worth,TX 76102 Tel 817 339 8950 Fax 817 336 2247 www.transystems.com AMENDMENT NO. 8 SUMMARY OF DESIGN FEE March 21,2012 Rakesh Chaubey, P.E. Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102-6311 RE: Amendment No.8 Trinity Boulevard Water Main Extension Part 4—Tarrant Main to SH 360 and Trinity Boulevard Water Project No. P265-605140035287 36"Water Main Modifications and Sanitary Sewer Relocation Dear Mr.Chaubey, We appreciate the opportunity to present this proposal for your consideration. Per the request of the Water Department,this amendment revises the previously approved 36"water main design plans and the relocation of the M-398. Specifically,this amendment includes water line plan profile modificafions to previously bid plans,sewer plan profiles,and coordination to re-start construction. The cost of services is listed below. Corresponding personnel and hourly charges for the specific tasks are attached. DESIGN A. Coordination 1. City of Grand Prairie meter station and pipe agreements $ 548 This includes assisting the City of Fort Worth with a Meter Station vault usage agreement,and the transfer of the Grand Prairie 24'water line and associated easement. 2. TXDOT Utility Construction Permit $ 548 This includes updating the permit and coordinating the relocation of a valve along FM 157 near Trinity Blvd. 3. Meeting $ 3,248 This includes meeting with the City(3),Contractor(2),and Trinity River Express and Grand Prairie(2) Lisy,tf?IIIS Mr. Rakesh Chaubey, P.E. March 21, 2012 Page 2 of 3 B. Water Line Design Revisions for Sign Plans 1. Modify bid plans $ 3,060 Revisions include changing slopes,research and plan modification for new meter, modifying butterfly and meter vault for 24"meter station loop, reviewing customer connections along Trinity Blvd, and adding general comments and Trinity Blvd.and FM 157 valve replacement. 2. Detailed quantity breakout $ 411 3. Shop drawing review with City Project Manager $ 548 4. Construction Assistance—Assist answering City questions $ 928 since the project has been put on hold for an extended period. C. Sanitary Sewer Relocation 1. Relocation of the 350 linear feet of 18"sanitary sewer(M-398R)within $ 5,418 the proposed Grand Prairie water meter facility. This includes one plan profile sheet, two standard detail sheets and Opinion of Construction Cost. 2. THE coordination-Provide exhibit, plans and assistance. $ 1,186 MISCELLANEOUS A. Reproduction $ 540 MBE Sub Consultant(ANA) 1. Water Line Plan Design $ 4,500 2. Sub Consultant Fee $ 338 LUMP SUM TOTAL S2 Breakout of Amendment 9 by Work Phase Water Sewer Total Survey 51 -Design Survey $ 0 $ 0 $ 0 Engineering 31 -Concept Design $ 0 $ 0 $ 0 32-Preliminary Design $ 0 $ 0 $ 0 33-Final Design $ 14,669 6,878 21,547 Engineering Totals $ 14,669 $ 6,878 $21,547 Total(Survey and Engineering) $ 14669 $ 8,878 $21,547 GA Fw01 126431Pm0cNgmllContr"lamend wd 8 mvise"amm*wL8 031912.doc S�St�Il1S� Mr. Rakesh Chaubey, P.E. March 21, 2012 Page 3 of 3 Original Contract Fee: $379,195.00 Amendment No. 1: $ 51,600.00 Amendment No.2: $ 24,800.00 Amendment No.3: $145,324.00 Amendment No.4: $ 94,205.00 Amendment No.5: $ 35,200.00 Amendment No.6: $ 15,990.00 Amendment No. 7. $ 33,995.00 Amendment No.8. 21547.00 TOTAL CONTRACT $801,856.00 The above work effort will be accomplished for the total lump sum fee of$21,547.00. This amendment has a 26°x6 MWBE participation. Please contact me should you require any additional information. The scope does not include: 1. Metes and bounds description of the Trinity Blvd undeveloped ROW 2. Construction Management 3. Meeting with THE 4. Legal boundary exhibit or metes and bounds for THE Documents 5. Change order coordination 6. Construction assistance beyond hours provided in breakout Sincerely, TranSystems Corporation Consultants Kent Lunski,P.E. Project Manager Attachments GAFW0I1M31Pm*cftiMl"ncftWrendmerd 8 mvMdUttr amendment_8 031912.doc