HomeMy WebLinkAboutContract 56483-A1CSC No. 56483-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 56483
WHEREAS, the City of Fort Worth (CITY) and Teague Nall & Perkins,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 56483,
(the CONTRACT) which was authorized by M&C 21-0756 on the 28th day of
September, 2021 in the amount of $456,745.00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Historic Southside Improvements; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $10,440.00 (Water).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $467,185.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Historic Southside Improvements]
Page 1 of 2 [CPN 102932]
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Dana Burghdoff (Se[ GMEDT)
Dana Burghdoff
Assistant City Manager
DATE: Sep 5, 2023
APPROVAL RECOMMENDED:
Christopher Harder (Sep 1, 2023 08:49 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
of the date subscribed by the City's
ENGINEER
Teague Nall & Perkins, Inc.
E
Jonathan Bengfoyt,P.E.
Director of Engineering
Services, Associate Principal
DATE: 8/29/23
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Preeti KC, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
p I
Mack (Sep 5, 2023 12:52 CDT)
Douglas W. Black
Senior Assistant City Attorney
aIl
e.pa P�
I.g
ATTEST:
PaaIl �EXP5o44
Jannette S. Goodall
City Secretary
M&C : N/A
Date: N/A
Form 1295: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Historic Southside Improvements]
Page 2 of 2 [CPN 102932]
Contract Amendment No. 1
To: Jose Orozco, PE — City of Fort Worth
From: Jonathan Bengfort, CFM, PE
CC: Jessica Hilscher, PE; Ryan Jones, PE
Date: August 11, 2023
RE: Additional Professional Services
Historic Southside Improvements (Project No. 102932)
�tnp
1W I Iwww.tnpinc.com
engineers
surveyors
landscape architects
TEXAS
FORT WORTH
DENTON
ALLEN
HEATH
KATY
GEORGIA
BLAIRSVILLE
Jose, per the City's request, we offer this contract amendment for additional water and paving design
services associated with the Historic Southside Improvements project. The City has requested TNP to
expand the scope of the project to include additional water line replacement for locations along Arizona
Ave & New York Ave. The additional efforts associated with this contract amendment include the
following:
WATER - 1,420 LF
1. Arizona Ave: Final (90% & 100%) Design and plan preparation for approximately 1 160 LF of
8" water line from Maddox Ave to Magnolia Ave. ($7,685)
2. New York Ave: Final (90% & 100%) Design and plan preparation for approximately 210 LF
of 8" of water line from Daggett Ave to south of Vickery Blvd. (STA 8+84 to STA 10+92), and
50 LF of 8" water at the intersection with Terrell Ave. ($2,755)
FEE ADJUSTMENT
Based on the additional effort identified above, TNP is requesting a contract fixed fee amendment
amount of $10,440:
ORIGINAL CONTRACT AMOUNT:
CONTRACT AMENDMENT #1 AMOUNT:
TOTAL REVISED CONTRACT AMOUNT:
Sincerely,
tnp
League nail & perkins
Jonathan Beng ort, P.E.
$456,745.00
Lump Sum Services
$10,440.00
Lump Sum Services
$467,185.00
Lump Sum Services
TNP Firm * Registrations
Texas Board of Professional Engineers and Land Surveyors I Engineering Firm No. F-230 I Surveying Firm No. 1001 1600 1 101 94381 1 10011601
Georgia Board of Professional Engineers Firm No. PEF007431 I Texas Board of Architectural Examiners Firm No. BR 2673
Level of Effort Spreadsheet
AMENDMENT 1 - TASK/HOUR BREAKDOWN
Water Department Additional Design Services for (Arizona Ave, New York Ave)
HISTORIC SOUTHSIDE IMPROVEMENTS
City Project No. 102932
Labor(hours)
Task Description Project Project Survey Survey
Task No. Principal eels EIT CARD RPLS SUE Crew Total Labor
Mana er Engineer Tech Crew
rand $250 $175 $160 $135 $125 $195 $140 $200 $200
4.0 Final Design 0 5 9 25 38 0 0 0 0 $10,4
Water Design Final (100%) Plans and Specs
4.2 Arizona Ave 8" W L (260 F) ' f fif 2 2 J $
42 New York Ave 8"WL(,16 LF) 1 6 5 id $.
Totals 0 51 0 01 0 0 1
Design Services
Subconsultanf Expense
Subconsultant Total Expense Task Sub Total %Complete Remaining
Reproduction costBudget
MWBE INon-MWBEI
$7,686 0A
$7,685
$2.75"
0%
$2,755
10,4401
0%
T0,440
ject Summary
Total Hours
77
Total Labor
$10,440
Total Expense
$0
M/WBE Subconsultanf
$0
Non-M/WBE Subconsultanf
$0
5% Sub Markup
$0.00
MBE/SBE ParOmpebonn
0.0%
Total Project r:osr
$101440
LOE Spreadsheet - Amendment 1