HomeMy WebLinkAboutContract 52651-A1AMENDMENT No. 1
TO CITY SECRETARY CONTRACT No. 52651
CSC No. 52651-Al
WHEREAS, the City of Fort Worth (CITY) and The Fain Group, Inc.,
(CMAR) made and entered into City Secretary Contract No. 52651, (the
CONTRACT) which was authorized by M&C C-29125 on the 14th day of May,
2019 for preconstruction services in the amount of $25,000.00 and
construction services in the estimated amount of $5,000,000.00,
inclusive of the CMAR's construction phase fee of 7% of the Cost of
Work; and
WHEREAS, the CONTRACT calls for pre -construction and
construction services for the following project:
Alliance Park Phase I & II (CPN 100333, & 101630); and
WHEREAS, pursuant to Article 4 of the Contract, the parties
desire to execute Amendment No. 1 to the CONTRACT to establish the
Guaranteed Maximum Price (GMP) for the construction phase of the
Project;
NOW THEREFORE, CITY and CMAR, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
The construction budget is amended to be increased by the
amount of $28,000.00, thereby increasing it from $5,000,000.00 to
$5,028,000.00; and
2.
The Guaranteed Maximum Price for construction of the Project
shall be the amount not to exceed $5,028,000.00, inclusive of the
CMAR's 7% fee, as specified in the original agreement. The GMP
proposal attached hereto is within the project budget, and the Staff
finds that the fees and costs are fair and reasonable for the work
proposed.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
City of Fort Worth
CMAR Agreement Amendment
Page 1 of 3
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth CMAR
The Fain Group, Inc
Jesica L. McEachern
Assistant City Manager
DATE: Aug 31, 2023
APPROVAL RECOMMENDED:
IF La Qzier ( g 18, 2023 16:34 CDT)
Larry Frazier
President
DATE: Aug 18, 2023
JM`�
SP
Dave Lewis
Acting Director, Park & Recreation Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring
all performance and reporting requirements.
Fop
(/ !/ .�
Carlos M Gonzalez, Park Planner
Park & Recreation Department
APPROVED AS TO FORM AND LEGALITY:
Jeremy Anato-Mensah
Assistant City Attorney I
M&c: N\A
Date: N\A
ATTEST:
ter � Q Rp$
Jannette S Goodall
City Secretary
City of Fort Worth
CMAR Agreement Amendment
Page 2 of 3
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
GUARANTEED MAXIMUM PRICE PROPOSAL
City Secretary No. 52651
Amendment No. 1
Fund -Account -Center
Amount
PRE -CONSTRUCTION PHASE SERVICES:
34018-0800450-5740010--100333-005080
$25,000.00
SUBTOTAL PRE -CONSTRUCTION PHASE SERVICES =
$25,000.00
CONSTRUCTION PHASE SERVICES (GMP):
34014-0800450-5740010--100333-004280-9999-14020101
$28,000.00
34018-0800450-5740010--100333-004280
$975,000.00
30100-0800450-5740010--101630-004280
$1,000,000.00
34018-0800450-5740010--101630-004280-9999-18020104
$3,000,000.00
SUBTOTAL CONSTRUCTION PHASE SERVICES (GMP) =
$5,003,000.00
Total =
$5,028,000.00
City of Fort Worth
CMAR Agreement Amendment
Page 3 of 3
AMEDMENT No.1 ATTACHMENT
Alliance Phase I & II GMP PROPOSAL
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Item No.
Description
Spec. Section
No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
ALLIANCE PARK - PRE -CONSTRUCTION
1 PRE -CONSTRUCTION SERVICES LS 1.00 $ 25,000.00 $25,000.00
PRE -CONSTRUCTION TOTAL
$25,000.00
ALLIANCE PHASE I - NORTH FIELDS: PREPARATION, PLAYGROUND, PAVING, VEGETATION
1
SWPPP/EROSION
LS
1.00
$ 26,610.00
$26,610.00
2
BMP'S
LS
1.00
$ 41,914.43
$41,914.43
3
WATER LINE
LS
1.00
$ 106,273.50
$106,273.50
4
ROADWAY LIME
LS
1.00
$ 6,323.15
$6,323.15
5
ROADWAY PAVING (30' road)
LS
1.00
$ 96,633.00
$96,633.00
6
NORTH PARKING LOT LIME
LS
1.00
$ 8,400.92
$8,400.92
7
NORTH PARKING LOT
LS
1.00
$ 128,331.00
$128,331.00
8
JOINT SEALANTS
LS
1.00
$ 16,928.25
$16,928.25
9
PAVEMENT MARKINGS
LS
1.00
$ 14,773.00
$14,773.00
10
PARKING WHEELSTOPS
LS
1.00
$ 4,792.50
$4,792.50
11
NORTH FIELD FINE GRADING
LS
1.00
$ 45,000.00
$45,000.00
12
NORTH FIELD IRRIGATION
LS
1.00
$ 97,500.00
$97,500.00
13
NORTH FIELD SOD
LS
1.00
$ 116,220.00
$116,220.00
14
NORTH CONCRETE TRAIL
LS
1.00
$ 155,836.00
$155,836.00
15
NORTH FIELD BLEACHER PADS
LS
1.00
$ 7,278.00
$7,278.00
16
PAVILLION CONCRETE
LS
1.00
$ 14,585.00
$14,585.00
17
PAVILLION STRUCTURE
LS
1.00
$ 42,637.00
$42,637.00
18
PAVILLION PICNIC TABLES
LS
1.00
$ 2,681.51
$2,681.51
19
DRINKING FOUNTAIN
LS
1.00
$ 9,437.39
$9,437.39
20
PLAYGROUND DRAINAGE
LS
1.00
$ 12,144.22
$12,144.22
21
PLAYGROUND BORDER
LS
1.00
$ 6,352.00
$6,352.00
22
PLAYGROUND EQUIPMENT
LS
1.00
$ 143,099.18
$143,099.18
23
NORTH FIELD BLEACHERS
LS
1.00
$ 36,474.08
$36,474.08
24
NORTH FIELD GOALS
LS
1.00
$ 16,612.18
$16,612.18
25
BENCHES
LS
1.00
$ 8,921.60
$8,921.60
26
TRASH RECEPTACLE
LS
1.00
$ 2,765.27
$2,765.27
27
LANDSCAPING
LS
1.00
$ 18,895.00
$18,895.00
28
HYDROMULCH
LS
1.00
$ 54,740.00
$54,740.00
29
TEMPORARY WATERING
LS
1.00
$ 11,500.00
$11,500.00
30
NORTH PARKING LOT LIGHTING
LS
1.00
$ 33,333.33
$33,333.33
ALLIANCE PHASE I - TOTAL
$1,286,991.51
ALLIANCE PARK PHASE II - SOUTH FIELDS: PREPARATION, COURTS, PAVING, VEGETATION
31
P&P & MAINTENANCE BONDS
LS
1.00
$ 80,106.00
$80,106.00
32
SURVEYING
LS
1.00
$ 49,560.00
$49,560.00
33
SITE DEMO
LS
1.00
$ 135,000.00
$135,000.00
34
MASS EXCAVATION
LS
1.00
$ 200,000.00
$200,000.00
35
ROADWAY LIME
LS
1.00
$ 6,323.15
$6,323.15
36
SOUTH PARKING LOT LIME
LS
1.00
$ 18,952.78
$18,952.78
37
TOPSOIL REPLACEMENT
LS
1.00
$ 60,000.00
$60,000.00
38
STORM DRAIN
LS
1.00
$ 39,578.00
$39,578.00
39
ROAD CULVERT/HEADWALLS
LS
1.00
$ 55,010.00
$55,010.00
40
WATER LINE
LS
1.00
$ 106,273.50
$106,273.50
41
ROADWAY PAVING (30' road)
LS
1.00
$ 96,633.00
$96,633.00
42
SOUTH PARKING LOT
LS
1.00
$ 289,397.00
$289,397.00
43
HANDRAIUGUARDRAIL
LS
1.00
$ 12,524.00
$12,524.00
AMEDMENT No.1 ATTACHMENT
Alliance Phase I & II GMP PROPOSAL
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Item No.
Description
Spec. Section
No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
44
JOINT SEALANTS
LS
1.00
$ 16,928.25
$16,928.25
45
PARKING WHEELSTOPS
LS
1.00
$ 4,792.50
$4,792.50
46
PAVEMENT MARKINGS
LS
1.00
$ 14,773.00
$14,773.00
47
MULTI -USE COURT
LS
1.00
$ 81,795.00
$81,795.00
48
MULTI -USE COURT FENCE
LS
1.00
$ 22,353.16
$22,353.16
49
MULTI -USE COURT AMENITIES (GOALS and ?)
LS
1.00
$ 21,100.00
$21,100.00
50
SOUTH FIELD FINE GRADING
LS
1.00
$ 45,000.00
$45,000.00
51
SOUTH FIELD IRRIGATION
LS
1.00
$ 97,500.00
$97,500.00
52
SOUTH FIELD CONCRETE TRAIL
LS
1.00
$ 155,654.00
$155,654.00
53
SOUTH FIELD BLEACHER PADS
LS
1.00
$ 7,278.00
$7,278.00
54
SOUTH FIELD FENCING MOW STRIP
LS
1.00
$ 29,024.00
$29,024.00
55
SOUTH FIELD FENCING
LS
1.00
$ 69,907.88
$69,907.88
56
SOUTH FIELD SOD
LS
1.00
$ 116,220.00
$116,220.00
57
SOUTH FIELD BLEACHERS
LS
1.00
$ 36,474.08
$36,474.08
58
SOUTH FIELD GOALS
LS
1.00
$ 24,918.07
$24,918.07
59
DRINKING FOUNTAIN
LS
1.00
$ 9,437.39
$9,437.39
60
BENCHES
LS
1.00
$ 8,921.60
$8,921.60
61
LANDSCAPING
LS
1.00
$ 21,909.33
$21,909.33
62
HYDROMULCH
LS
1.00
$ 54,740.00
$54,740.00
63
TEMPORARY WATERING
LS
1.00
$ 11,500.00
$11,500.00
64
ELECTRICAL SERVICE
LS
1.00
$ 49,225.00
$49,225.00
65
UTILITY SPOIL HAULOFF
LS
1.00
$ 9,000.00
$9,000.00
66
ROADWAY LIGHTING
LS
1.00
$ 33,333.34
$33,333.34
67
SOUTH PARKING LOT LIGHTING
LS
1.00
$ 33,333.33
$33,333.33
68
IRRIGATION CONTINGENCY
LS
1.00
$ 150,000.00
$150,000.00
69
RETAINING WALL MASONRY
LS
1.00
$ 26,500.00
$26,500.00
70
SELECT FILL AT MULTIPURPOSE COURT
LS
1.00
$ 43,092.00
$43,092.00
71
ADDITIONAL LIME STABILIZATION
LS
1.00
$ 68,422.50
$68,422.50
72
ADDITIONAL 90 30" CALIPER TREES
LS
1.00
$ 56,400.00
$56,400.00
73
ADDITIONAL 10 6" CALIPER TREES
LS
1.00
$ 9,792.00
$9,792.00
74
ALTER DRAINAGE SWALE SOD TO BUFFALO
LS
1.00
$ 60,474.50
$60,474.50
75
CHANGE HYDROMULCH TO THUNDERTURF
LS
1.00
$ 101,563.44
$101,563.44
76
LIGHT POLE RELOCATION
LS
1.00
$ 4,354.90
$4,354.90
77
TEMPORARY WATERLINE
LS
1.00
$ 9,385.18
$9,385.18
78
RELOCATE DRINKING FOUNTAIN WATERLINE
LS
1.00
$ 8,498.00
$8,498.00
79
ENTRY SIGN
LS
1.00
$ 40,028.50
$40,028.50
80
CONCRETE BLEACHER EXTENSION
LS
1.00
$ 17,466.00
$17,466.00
81
COSERV TRANSFORMER
LS
1.00
$ 28,265.15
$28,265.15
82
COSERV SWITCHGEAR
LS
1.00
$ 34,612.36
$34,612.36
83
SOCCER SHADE STRUCTURES
LS
1.00
$ 93,550.00
$93,550.00
84
GRAVITY RETAINING WALL
LS
1.00
$ 72,453.00
$72,453.00
85
ADDITIONAL GATES AT THE SOUTH FIELDS
LS
1.00
$ 7,797.02
$7,797.02
86
WATER METERS
LS
1.00
$ 165,759.95
$165,759.95
87
INTERPRETIVE SIGN STANDS
LS
1.00
$ 1,155.00
$1,155.00
88
COURT STRIPING
LS
1.00
$ 4,481.55
$4,481.55
89
RIGHT OF WAY SIDEWALKS AT LITSEY RD
LS
1.00
$ 142,438.00
$142,438.00
90
BUFFALO SOD
LS
1.00
$ 10,473.00
$10,473.00
91
TREE STAKING
LS
1.00
$ 7,267.00
$7,267.00
92
BUFFALO SOD AT ROW
LS
1.00
$ 46,603.95
$46,603.95
93
TIF SOD AT S SIDE OF N FIELDS
LS
1.00
$ 9,576.00
$9,576.00
94
RETAINING WALL 45 DEG BENDS
LS
1.00
$ 6,250.00
$6,250.00
95
SIDEWALK (BASKETBALL COURTS)
LS
1.00
$ 9,576.00
$9,576.00
96
CMAR FEE (7% OF CONSTRUCTION COSTS)
LS
1.00
$327,298.13
$327,298.13
PHASE II - TOTAL
$3,688,008.49
AMEDMENT No.1 ATTACHMENT
Alliance Phase I & II GMP PROPOSAL
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Item No.
Description
Spec. Section
No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
AMENDMENT No. 1
89 (ADDITIONAL ROW & BASKETBALL SIDEWALK I I LS I 1.00 I $ 28,000.00 I $28,000.00
AMENDMENT No. 1 - TOTAL
$28,000.00
SUMMARY
ALLIANCE PARK PRE -CONSTRUCTION - TOTAL
$25,000.00
ALLIANCE PARK PHASE I - TOTAL
$1,286,991.51
ALLIANCE PARK PHASE II - TOTAL
$3,688,008.49
ALLIANCE PARK AMENDMENT No. 1 - TOTAL
$28,000.00
END OF SECTION
Signature:
Email: Ronald.Gonzales@fortworthtexas.gov
TOTAL PROPOSAL
$5,028,000.00
Signature:
Email: allison.tidwell@fortworthtexas.gov