SECTION 00 52 43
AGREEMENT FOR EMERGENCY PROCUREMENT OF
30-INCH WATER MAIN BREAK AT THE LANCASTER AVENUE / COLLIER STREET
INTERSECTION
THIS AGREEMENT is made by and between the City of Forth Worth, a Texas home rule municipality,
acting by and through its duly authorized City Manager, ("City"), and William J. Schultz, Inc. d/b/a
Circle "C" Construction Comoanv, authorized to do business in Texas, acting by and through its duly
authorized representative, ("Contractor"). City and Contractor, in consideration of the mutual covenants
hereinafter set forth, agree as follows:
Article 1. WORK
Contractor shall complete all Work as specified or indicated in the "Contract Documents" attached hereto
or specifically referenced herein, for the Project described below.
Article 2. PROJECT
The "Project" is generally as follows: Perform emergency repairs for the 30-inch water main repair at the
Lancaster Avenue / Collier Street intersection and replace the 30-inch water main on Collier Street.
The Work is detailed in attached work plan and in city specifications sections 33 05 10, 33 04 40, 33 11
05, 33 11 13, 33 12 25, 33 05 20, 33 05 22.
Article 3. CONTRACT TIME
Time is of the essence.
Contractor recognizes that time is of the essence and the Contractor will be required to remain at each
jobsite until the pavement repair is complete. The City expects the Contractor to have a sense of urgency
to complete repairs as soon as possible.
Article 4. CONTRACT PRICE
City agrees to pay Contractor for performance of the Work, based on Contractor's invoices, an amount up
to Eiaht Hundred Thousand Dollars ($800,000.00). This figure may be adiusted uD or down as final
invoices are received.
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A. The Contract Documents which comprise the entire agreement between City and Contractor
concerning the Work consist of the following:
1. This Agreement.
2. Exhibits to this Agreement:
a. Evidence of Current Insurance
b. Current Prevailing Wage Rate Table
c. Memorandum of Emergency Authority
3. General Conditions incorporated by reference OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH 30-INCH WATER MAIN BREAK AT LANCASTER AVE. / COLLIER ST. INTERSECTION
00 52 43E
Emergency Agreement
Page 2 of 5
Article 6. INDEMNIFICATION
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense,
the city, its officers, servants and employees, from and against any and all claims arising out
of, or alleged to arise out of, the work and services to be performed by the contractor, its
officers, agents, employees, subcontractors, licenses or invitees under this contract. This
indemnification provision is specifically intended to operate and be effective even if it is
alleged or proven that all or some of the damages being sought were caused, in whole or in
Part, by anv act, omission or negligence of the citv. This indemnity provision is intended to
include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in
defending against such claims and causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city,
its officers, servants and employees, from and against any and all loss, damage or destruction
of property of the city, arising out of, or alleged to arise out of, the work and services to be
performed by the contractor, its officers, agents, employees, subcontractors, licensees or
invitees under this contract. This indemnification provision is specifically intended to operate
and be effective even if it is alleged or proven that all or some of the damages being sought
were caused, in whole or in Part, by anv act, omission or negligence of the citv.
Article 7. MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Conditions will have
the meanings indicated in the General Conditions.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the Contractor
without the advanced express written consent of the City.
7.3 Successors and Assigns.
City and Contractor each binds itself, its partners, successors, assigns and legal representatives to
the other party hereto, in respect to all covenants, agreements and obligations contained in the
Contract Documents.
7.4 Severability/No Waiver.
Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable
by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall
continue to be valid and binding upon CITY and CONTRACTOR.
Failure by City or Contractor to enforce any provision of this Agreement shall not render that
provision un-enforceable should there be a future breach.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of Texas.
Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District
of Texas, Fort Worth Division.
CITY OF FORT WORTH 30-INCH WATER MAIN BREAK AT LANCASTER AVE. / COLLIER ST. INTERSECTION
00 52 43E
Emergency Agreement
Page 3 of 5
7.6 Other Provisions.
7.6.1 City Wage Rate. The Contractor agrees to pay at least minimum wage per hour for all
labor as the same is classified, promulgated and set out by the City.
7.6.2 Non -appropriation of Funds. In the event no funds or insufficient funds are
appropriated by City in any fiscal period for any payments due hereunder, City will notify
Contractor of such occurrence and this Agreement shall terminate on the last day of the fiscal
period for which appropriations were received without penalty or expense to City of any kind
whatsoever, except as to the portions of the payments herein agreed upon for which funds have
been appropriated.
7.6.3 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a
sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government
Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or
more, the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Contractor certifies that
Contractor's signature provides written verification to the City that if Chapter 2271,
Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not
boycott Israel during the term of the contract.
7.6.4 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in
accordance with Chapter 2274 of the Texas Government Code -(as added by Acts 2021, 87th
Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract for goods or
services that has a value of $100,000 or more, which will be paid wholly or partly from public
funds of the City, with a company (with 10 or more full-time employees) unless the contract
contains a written verification from the company that it: (1) does not boycott energy
companies; and (2) will not boycott energy companies during the term of the contract. The
terms "boycott energy company" and "company" have the meaning ascribed to those terms by
Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13,
§ 2). To the extent that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, Contractor certifies that Contractor's signature
provides written verification to the City that Contractor: (1) does not boycott energy
companies; and (2) will not boycott energy companies during the term of this Agreement.
CITY OF FORT WORTH 30-INCH WATER MAIN BREAK AT LANCASTER AVE. / COLLIER ST. INTERSECTION
00_52_43E
Emergency Agreement
Page 4 of 5
7.6.5 Prohibition on Discrimination Against Firearm and Ammunition Industries.
Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited
from entering into a contract for goods or services that has a value of $100,000 or more which
will be paid wholly or partly from public funds of the City, with a company (with 10 or more
full-time employees) unless the contract contains a written verification from the company that
it: (1) does not have a practice, policy, guidance, or directive that discriminates against a
firearm entity or firearm trade association; and (2) will not discriminate during the term of the
contract against a firearm entity or firearm trade association. The terms "discriminate,"
"firearm entity" and "firearm trade association" have the meaning ascribed to those terms by
Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19,
§ 1). To the extent that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, Contractor certifies that Contractor's signature
provides written verification to the City that Contractor: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
7.6.6 Immigration Nationality Act. Contractor shall verify the identity and employment
eligibility of its employees who perform work under this Agreement, including completing the
Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall
provide City with copies of all 1-9 forms and supporting eligibility documentation for each
employee who performs work under this Agreement. Contractor shall adhere to all Federal and
State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Contractor employee who is not legally eligible to perform such services.
CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM
ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS
PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES,
SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to
Contractor, shall have the right to immediately terminate this Agreement for violations of this
provision by Contractor.
7.7 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized
signatory of the Contractor.
SIGNATURE PAGE AND ANY ATTACHMENTS/EXHIBITS TO FOLLOW
CITY OF FORT WORTH 30-INCH WATER MAIN BREAK AT LANCASTER AVE. / COLLIER ST. INTERSECTION
00_52_43E
Emergency Agreement
Page 5 of 5
IN WITNESS WHEREOF, City and Contractor have executed this Agreement which is effective as of the
date signed by the City's Assistant City Manager ("Effective Date").
CONTRACTOR: CITY OF FORT WORTH
WILLIAM J. SCHULTZ, INC. DBA CIRCLE "C"
CONSTRUCTION COMPANY
banes Bc��l Gcd�FF
By: for By: Dana Burghdoff (Aug fi, 202A6:51 CDT)
Name: Teri Skelly Dana Burghdoff
Title: President Assistant City Manager
Date: August 25th, 2023
Address:
500 W. Trammell PO Box 40328
Fort Worth, TX 76140
APPROVAL RECOMMENDED:
2023
Christopher H der (Augug 28, 202315:46 CDT)
Christopher Harder, P.E.
Director, Water Department
Date: Aug 31, 2023
4 0o nnL
O
Attest:
(J QdIl���4p54
Jannette S. Goodall, City Secretary
(Seal)
M&C N/A (Attached 08/24/23 Emereencv Memo)
Date: N/A (Attached 08/24/23 Emereencv Memo)
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
r!vements.
Tony Sliolola, P.E.
Assistant Director
Approved as to Form and Legality:
P
Mack (Aug 29, 2023 18:19 CDT)
Douglas W. Black
Sr. Assistant City Attorney
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH 30-INCH WATER MAIN BREAK AT LANCASTER AVE. / COLLIER ST. INTERSECTION
INTEROFFICE MEMO
Date: August 24, 2023
To: Dana Burghdoff, Assistant City Manager
From: Chris Harder, P.E., Water Director
Subject: EMERGENCY REPAIR — 30-INCH WATER MAIN BREAK AT THE LANCASTER
AVENUE / COLLIER STREET INTERSECTION
On Thursday, August 17, 2023, a water main break erupted at the Lancaster Avenue/Collier Street
intersection. The break is exacerbated by its proximity to the Holly Water Treatment Plant with water being
pushed at over 100 PSI leading to flooding in the Lancaster/Henderson intersection and also onto private
property near the intersection. The water main is a shallow 1930s-era 30-inch cast-iron pipe which has
deteriorated. The break was repaired the same day by William J. Schultz, Inc. dba Circle C Construction
Company ("Circle C"). On Monday, August 22, 2023, the same water main broke apart again very near the
vicinity of the earlier break. Water Field Operations immediately mobilized to isolate the break and the
City utilized the services of Circle C again to conduct the repairs.
This transmission main is critical to meeting customer summer water demands, and the resulting impact on
private property and the water system itself during a rupture, necessitates the Utility to quickly replace the
line on Collier in order to prevent further breaks and protect the health and safety of the public who are
reliant on a functioning water system.
Water Department staff have analyzed the situation with respect to the water system and has determined
that the best long-term solution to preserve the city's asset and to avoid future service interruptions is to
replace the cast iron pipe with new pipe in Collier Street. Sufficient redundancy exists in the water
distribution network so residents and business should not notice a loss of water pressure.
Given that the original pipe has now broken twice, this memo is submitted to inform the City Manager's
Office and the City Council that, pursuant to the emergency authority found in City Code Chapter 2, Article
I, Section 2-9 of the City's Code of Ordinances, the Water Department will initiate emergency procurement
of the following contractors and consultant for the services and costs as indicated below to perform
emergency replacement of an approximately 460-foot segment of the water main and an additional
approximately 220-feet of appurtenant 6-inch pipe as shown on the attachment.
• William J. Schultz, Inc. dba Circle C Construction Company (Emergency water main
repair/replacement: $800,000.00)
• Texas Materials Group, Inc. dba Texas Bit (Pavement Repair: $200,000.00)
• Freese and Nichols, Inc. (Engineering Design $60,000.00)
The contracts and work will be billed on a task order basis. The total of the contracts is estimated to be
$1,060,000.00.
A traffic control plan will be developed as part of the design work This memo informs the City Manager's
Office that emergency closure of Collier Street or a portion of Lancaster Avenue for greater than 10-days
to perform the repairs and for the safety of the public is permitted under Chapter 11 of the Transportation
Engineering Manual but the Water Department will take measures to keep streets open to traffic, or local
traffic only, as the situation may warrant.
Waiting to bid and award a contract to perform this work is not the best interest of the health and safety of
the City of Fort Worth. In addition to the citations, above, Section 252.022 of the Local Government Code
exempts from normal bidding requirements expenditures that are necessary to preserve or protect public
health or safety of the municipality's residents and procurements necessary because of unforeseen damage
to public machinery, equipment, or property.
M&C(s) will be circulated to ratify the above contracts after the work has been performed.
APPROVED FOR EMERGENCY PROCUREMENT:
Recommended: Christopher H rder(Aug24,202309:42CDT)
Chris Harder, P.E., Director, Water Department
&Gg�
Approved as to form and Legality: DBlack(Au¢24.202310:17CDT)
Douglas W. Black, Sr. Assistant City Attorney
Approve: Jo GunrKAuaT5.2D2308:11CDT)
Jo Ann Gunn, Chief Procurement Officer, Purchasing
t,)AH,a� 8"rIt
Approve: Dana Burehdoff (Au 51:52 CDT)
Dana Burghdoff, Assistant City Manager
EMERGENCY 30-INCH MAIN REPL. Cp_g�:
COLLIER ST & LANCASTER AVE
X
;tar x �"ri ��•;♦ ;•..}��..�� 1- "?
' 1 w i r
i:.
m _ f
435 LF 30" Water d Line - �- •- ' - `
To Be Abandone
Proposed 425 LF 30" Water Line - 1i1\�h
•l
- �•. ..... �- -,6:1- - I � I�11� -_ -y- -- T, -• -'•�._ _ { �_� �� •,� � V•- ___� -.' - - wrn �qf _rV!'3 ts?
Proposed 220 LF Repl. (Exist 6') ' Y, p '1 + WLANCASTERrAVE! ' W LANGASTERAVE'-
YJLdNCASTERAVE ` \ t
_ ch
35 LF Service Water Line '
7.7
I.
• ' 7 I'J I I - _� I I I I ' 7 !�I�` I ' n � _ ,`t,t .�Lj'�41 'i lil) t���iI1711I� {I {'x .II I','I'}�� Ivy 4.
/ IIII 1l I a ill.
m I Y7, -` ddd -� 6 .'yl.�ll•111�' IIII �7 JIn I� II414� I'I� I IN III1�I II{'IYIl
z.,R `1 •i^. •. I o `$ l� •� I.L�I:L•o-:• LI nl�w 6 1_�'••—•u%'i'•I:��'hiv{ lull �l.•
_7 I I •a �' R•, u` c ` •�• 'N�1:.. tPt t„�,.... 3-r' �Proposed Emergency Repl.
1 i' �1Y
�a. Proposed Water Line Repl.
Proposed Water to be Abandoned = 435 LF - I I - r % "I . 0 150
Proposed Water to be Replaced = 680 LF J p �i;-_ : ��" x- I Feet