Loading...
HomeMy WebLinkAboutContract 27966-A4 AMENDMENT NO. 4 STATE OF TEXAS S CITY SECRETARY CONTRACT (M&C not required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, Inc. (Engineer) made and entered into City Secretary Contract No. 27966, (the Contract) which was authorized by the City Council by M&C C-19206 on the 27t' day of August 2002 and subsequently revised by three previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LII (52) . WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include additional engineering services specified in a proposal letter dated March 30, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $3,600.40. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $428,289.00. OFNI- I�Ou ':K ;ORD 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the �t�` day of ��p�,A U 20111 in Fort Worth, Tarrant County, Texas. ATTEST: Af 00000000 a O�� 0 0 Y-"�L 6U& 0 o d S Marty Hendrix o 8 City Secretary )o° °ao°0-}��d °°°000°o 7 APPROVAL RECOHII4ENDED: APPROVED: Frank S. Crumb, P.E. Fernando Costa Director, Water Department Assistant City Manager TEAGUE MALL AND PERKINS, INC. _ ENGINEER NO &(, "7,3QUIRE By: Name: Ty Hilton, P.E. , Principal 1100 Macon Street Fort Worth, Texas 76102 APPR AS FORM AND LEGALITY: Assi t City Attorney IRW -2- rx 4 l N!b TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning March 30, 2011 Mr. Rakesh Chaubey, P.E. City of Fort Mrth Department of Engineering 1000 Throckmorton Fort Worth, Texas 76102 Re: Sanitary Sewer Rehabilitation Contract 52- Part 2 Amendment No.4 TNP No. FTW 00238 Dear Mr. Chaubey: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services required by the City The following is a brief description and cost for the additional services that we are providing on this project: Additional Design Services The City of Fort Worth Water Dept. informed TNP at the June 1, 2010 consultants'quarterly project status meeting that the SS Rehab projects remaining for bid were being considered for State Revolving Fund (SRF) Tier II loan funding. As a result of this consideration, the Water Dept. requested TNP to submit the following exhibits: 1) USGSquad map indicating the locations of the proposed sanitary sewer improvements2)description table identifying the SS laterals and whether they were relocation or replacement lines. Per direction from the Water Dept., he replacement lines in existing alignment will be funded by SRF and the relocated lines will be funded by the operating budget. To clarify this funding scenario, the Water Dept. requested TNP to modify the construction plan set and spec book to identify and label the replaced lines in existing alignment as Unit 1 and the relocated lines as Unit 2. This work involves labeling SS lines as Unit 1 or Unit 2 in the layout sheets and plan & profile sheets. The work also consists of adding specific TWDB (SRF Tier II Funding) language to the contract spec book, as well as, breaNng out the proposal bid items Into Units 1 and 2 in the contract spec book The following is a breakdown of additional costs incurred for the expansion in scope. Label SS lines in plans, modify spec book and proposal....................$ 2,880 (Incktdes modified spec book and proposal-2 days each for cad tech and Ell) Prepare TWDB quad map and table description.................................$ 720 (0.6 day each for cad tech and Eln Total Contract Amendment No.4: $ 3,600 1100 Macon Street•Fort worth,Texas 76102.817.336.5773 phone•817.336.2813 fax www.tnp-ontirie.com Mr.Rakesh Chaubey,PE,March 30,2011,Page 2 of 2 Summary of Contract Fee: Original ContractAmount: $ 290,300 Amendment No. 1: $ 21,750 Amendment No. 2: $ 4,100 Amendment No. 3: $ 108,539 Amendment No. 4: $ 3,600 Revised Contract Amount $ 428,289 Thank you for consideration of this contract amendment request. If you have any questions,please do not hesitate to call me. Sincerely, TEAGUE NALLAND PERKINS, INC. ji-vll Tom Dayton, Copy: Mr. Ty Hilton, PE-TNP