HomeMy WebLinkAboutContract 27966-A5 AMENDMENT NO. 5 STATE OF TEXAS b CITY SECRETARY CONTRACT NO.�_ (0lD-/�S (M&C not required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, (Engineer) made and entered into City Secretary Contract No. 27966, (the Contract) which was authorized by the City Council by M&C C-19206 on the 27th day of August 2002 and subsequently revised by four previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LII (52) . WHEREAS, it has become necessary to execute Amendment No. 5 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include additional engineering services specified in a proposal letter dated June 9, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $13,000.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $441,289.00. OFFICIAL RECORD CITY SECRET`P I• 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 67 U day of 5 Tarrant County, Texas. 2011, in Fort Worth, ATTEST: = 4 CiySecretarx Y ty �? APPROVAL RECOMMENDED: APPROVED: Frank S. Crumb, P.E. 7E7 � Director, Fernando Costa Water Department Assistant City Manager Teague Nall and Perkins ENGINEER By: , Name: Ty Hilton, P.E. Principal 1100 Macon Street Fort Worth Texas 76102 OFFICIAL. RECORD PRO AS TO FORM AND LEGALITY: CITY SECRETARY FT. WORTH, TX Assistant City Attorney -2- 0 TEAGUE NALL AND PERK/NS Civil Engineering Surveying Landscape Architecture Planning June 9, 2011 Mr. Rakesh Chaubey, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth, Texas 76102 Re: Sanitary Sewer Rehabilitation Contract 52 Amendment No. 5 City of Fort Worth No. 01219 TNP No. FTW 09249 Dear Mr. Chaubey: Teague Nall and Perkins, Inc. is submitting this fee amendment for Contract 52 Part 3 based on additional effort required by the City but not included in the original scope of work. The following is a brief description and cost for the additional services that we are providing on this project: Additional Design Services The City of Fort Worth Water Dept. entered into an agreement with TNP in August of 2009 for the design of sanitary sewer line M-39 near the intersection of US 287 and Lancaster Avenue. This agreement was based on sanitary sewer alignment option 'B' (see attached Option 'B' exhibit). TNP proceeded with conceptual and preliminary design using this alignment. In June 2010, it became necessary for the City to modify the proposed alignment (see attached revised alignment). This change required changes to the engineering design and required coordination with a consultant engaged in an adjacent project. The following is a fee breakdown for the additional services: DesignRevisions.............................................................................................$ 8,000 Additional Coordination .................................................................. $ 1,500 Additional easements—3 permanent & 4 temporary (Original scope anticipated 1 permanent& 2 temporary) ............................ $ 3,500 Total Contract Amendment No. 5: $ 13,000 MWBE Participation in this amendment is 26.9% 1100 Macon Street •Fort Worth, Texas 76102.817.336.5773 phone•817.336.2813 fax Mr.Rakesh Chaubey,PE,June 3,2011,Page 2 of 2 Summary of Contract Fee: Original ContractAmount: $ 290,300 Amendment No. 1: (Contract 52, Part 1 — Prepare ROE & Easement Docs and Hydraulic Study of Marine Creek) $ 21,750 Amendment No. 2: (Contract 52, Part 1 — Redesign Lateral L-1981) $ 4,100 Amendment No. 3 (Inception of Contract 52, Part 3 Project): $ 108,539 Amendment No. 4: (Contract 52, Part 2—SRF Funding Exhibits & Coord.)$ 3,600 Amendment No. 5: (1st Amendment for Contract 52 Part 3) $ 13,000 Revised Contract Amount $ 441,289 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. jotm (Lip Tom Dayton, P.E. Copy: Mr. Ty Hilton, PE -TNP