Loading...
HomeMy WebLinkAboutContract 56463-CO2CSC No. 56463-0O2 Fc3R-r WORTH City of Fort Worth Change Order Request Project Name: I Southside IV Booster Pump Station and Hydropneumatic Tank City Sec No.: 1 56463 Project No.(s):1 56003 0600430 5740010103116 001680 1 DOE No, I N/A City Proj. No.: J 103116 Project Description:) New booster pump station and hydropneumatic tank at the Sun Country Elevated Storage Tank site. Contractor. Gracon Construction, Inc. Change Order # 2 1 Date: 1 8/16/2023 City Project Mgr.1 Suzanne Abbe City Inspector: Nathan Gray Phone Number: 817-392-8209 Phone Number: 817-392-4961 Dept. Water Totals Contract Time (Calendar days) Original Contract Amount $5,588,670.00 $5,588,670.00 365 Extras to Date $0.00 0.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $5,588,670,00 $5,588,870.00 365 Amount of Proposed Change Order $0.00 10.00 360 Revised Contract Amount $5,588,670,00 55,588, 70.00 S25 Original Funds Available for Change Orders $167,660.00 $167,660:00 Remaining Funds Available for this CO $167,660.00 $167,660.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) 1$6,985,837.50 JUSTIFICATION ,(REASONS):FOR'CHANGE-ORDE Change Order No. 2 provides for the addition of door stops to the pump station building, reprogramming pressure set points for the pumps, reimbursement for power cost during operational readyness tests, and a credit for a reduced duration of functional demonstration testing. Staff concurs with the contractors request for an additional calendar 360 days on the project for the change order for the following: o Pumps were delivered 2/1412023, 305 days after the target date in the baseline schedule. o Operational testing was paused from April 13, 2023 to August 7, 2023 to develop a plan to complete testing during low demand. Contractor's Company Name - Gontractot me; Contracts Signaiu erg T T Gracon Construction, Inc, Greg I e e,_ f IflWeattit Date r Date 8/21 /2023 J 8/23/2023 Director,(Waterl //. Date Construction Supervisor (Water Dent) Date Sep 11, 2023 SefitorAsslstantC.(ty, _- ..Date._._ . Assistant City Manager Date t� -t L Sep 15, 2023 Council Action (If RegUlredi' M&C Number N/A M&C Date Approved 7--I�lA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FO RT' WO RT H City of Fort Worth Change Order Additions Project Name I Southside IV Booster Pump Station and Hydropneumatic Tank City Sec No.: 1 56463 Project No.(s): 1 56003 0600430 5740010103116 001680 DOE No.1 N/A 1 City Proj, No.: 1 103116 Project Description New booster pump station and hydropneumatic tank at the Sun Country Elevated Storage Tank site. Contractor 1 Gracon Construction, Inc. Change Order: Date: 1 8/16/2023 I City Project Mgr. 1 Suzanne Abbe j City Inspector 1 Nathan Gray ADDITIONS I I hm uh5GKIF 11UN DEPT Qty Unit Unit Cost I Total 46 CP-04 Door Stops Water 1.00 ILS $441.60 $441.60 47 CP-05 Reprogramming pump pressure setpoints Water 1.00 LS $9,378.64 $9,378.64 48 CP-05 Power cost for operational readyness test (Water 1.00 LS $1,148.53 $1,148.53 49 CP-05 Credit for reduced functional demonstration testing (Water 1.00 LS 1 I I l I 1 � III I i I -$400.00 I I -$400.00 Paige 1 of 1 I I I I I I I I I I I I I I I Water $10,568.77 Additions Sub Total $10,568.77 lip" R-F WO RT H City of Fort Worth s — Change Order Deletions Project Name Southside IV Booster Pump Station and Hydropneumatic Tank 1 City Sec No.: 56463 Project No.(s): 56003 0600430 5740010103116 001580 1 DOE No. I N/A City Proj. No.: 103116 Project Description I New booster pump station and hydropneumatic tank at the Sun Country Elevated Storage Tank site. i Contractor ' Gracon Construction, Inc. Change Order: F7 Date 8/16/2023 I City Project Mgr. Suzanne Abbe City Inspector: I Nathan Gray I DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 45 Allowance I Water 0.1056877 LS $100,000.00 $10,568.77 Water $10,568.77 Deletions Sub Total $10,568.77 Page 1 of 1 MWBE Sub CO # MWWBE Breakdown for this Change Order I Type of Service I Amount for this CO Total $0.00 Previous Change Orders DATE I AMOUNT Total $0.00 Page 1 of 1 8/9/2023 Southside IV Booster Pump Station and Hydropneumatic Tank CPN:103116 CSC No.: 56463 Change Order 2 Notes Staff has reviewed the requested days and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title ATTEST: C"' Jannette Goodall City Secretary 44p44pn�� �poF FO 0% v �° ° ° o�� d Pvoo o=d ppp'f °°° °° d� p �� dEXA5o4p OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX