Change Order Request
Project Name: I
Southside IV Booster Pump Station and Hydropneumatic Tank
City Sec No.: 1 56463
Project No.(s):1
56003 0600430 5740010103116 001680 1 DOE No, I N/A
City Proj. No.: J 103116
Project Description:)
New booster pump station and hydropneumatic tank at the Sun Country Elevated Storage Tank site.
Contractor.
Gracon Construction, Inc. Change Order #
2 1 Date: 1 8/16/2023
City Project Mgr.1
Suzanne Abbe City Inspector:
Nathan Gray
Phone Number:
817-392-8209 Phone Number:
817-392-4961
Dept. Water Totals Contract Time
(Calendar days)
Original Contract Amount $5,588,670.00 $5,588,670.00 365
Extras to Date $0.00 0.00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $5,588,670,00 $5,588,870.00 365
Amount of Proposed Change Order $0.00 10.00 360
Revised Contract Amount $5,588,670,00 55,588, 70.00 S25
Original Funds Available for Change Orders $167,660.00 $167,660:00
Remaining Funds Available for this CO $167,660.00 $167,660.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) 1$6,985,837.50
JUSTIFICATION ,(REASONS):FOR'CHANGE-ORDE
Change Order No. 2 provides for the addition of door stops to the pump station building, reprogramming pressure set points for the pumps,
reimbursement for power cost during operational readyness tests, and a credit for a reduced duration of functional demonstration testing.
Staff concurs with the contractors request for an additional calendar 360 days on the project for the change order for the following:
o Pumps were delivered 2/1412023, 305 days after the target date in the baseline schedule.
o Operational testing was paused from April 13, 2023 to August 7, 2023 to develop a plan to complete testing during low demand.
Contractor's Company Name - Gontractot me; Contracts Signaiu erg T T
Gracon Construction, Inc, Greg I e e,_ f
IflWeattit Date r Date
8/21 /2023 J 8/23/2023
Director,(Waterl //. Date Construction Supervisor (Water Dent) Date
Sep 11, 2023
SefitorAsslstantC.(ty, _- ..Date._._ . Assistant City Manager Date
t� -t L Sep 15, 2023
Council Action (If RegUlredi'
M&C Number N/A M&C Date Approved 7--I�lA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FO RT' WO RT H City of Fort Worth
Change Order Additions
Project Name I Southside IV Booster Pump Station and Hydropneumatic Tank
City Sec No.: 1
56463
Project No.(s): 1 56003 0600430 5740010103116 001680 DOE No.1 N/A 1
City Proj, No.: 1
103116
Project
Description
New booster pump station and hydropneumatic tank at the Sun Country Elevated Storage Tank site.
Contractor 1 Gracon Construction, Inc. Change Order:
Date: 1 8/16/2023 I
City Project Mgr. 1 Suzanne Abbe j City Inspector 1 Nathan Gray
ADDITIONS
I I hm uh5GKIF 11UN
DEPT Qty
Unit
Unit Cost
I Total
46 CP-04 Door Stops
Water 1.00
ILS
$441.60
$441.60
47 CP-05 Reprogramming pump pressure setpoints
Water 1.00 LS
$9,378.64
$9,378.64
48 CP-05 Power cost for operational readyness test (Water 1.00 LS
$1,148.53
$1,148.53
49 CP-05 Credit for reduced functional demonstration testing (Water 1.00 LS
1
I
I
l
I
1 � III
I i I
-$400.00
I
I
-$400.00
Paige 1 of 1
I I
I I I
I I I
I I I
I
I I I
Water $10,568.77
Additions Sub Total $10,568.77
lip" R-F WO RT H City of Fort Worth
s — Change Order Deletions
Project Name Southside IV Booster Pump Station and Hydropneumatic Tank 1 City Sec No.: 56463
Project No.(s): 56003 0600430 5740010103116 001580 1 DOE No. I N/A City Proj. No.: 103116
Project Description I New booster pump station and hydropneumatic tank at the Sun Country Elevated Storage Tank site. i
Contractor ' Gracon Construction, Inc. Change Order: F7 Date 8/16/2023 I
City Project Mgr. Suzanne Abbe City Inspector: I Nathan Gray I
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
45 Allowance I Water 0.1056877 LS $100,000.00 $10,568.77
Water $10,568.77
Deletions Sub Total $10,568.77
Page 1 of 1
MWBE Sub
CO #
MWWBE Breakdown for this Change Order
I Type of Service I Amount for this CO
Total $0.00
Previous Change Orders
DATE I AMOUNT
Total $0.00
Page 1 of 1
8/9/2023
Southside IV Booster Pump Station and Hydropneumatic Tank
CPN:103116
CSC No.: 56463
Change Order 2 Notes
Staff has reviewed the requested days and considers them to be fair and reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery
Title
ATTEST:
C"'
Jannette Goodall
City Secretary
44p44pn��
�poF FO 0%
v �°
° ° o�� d
Pvoo o=d
ppp'f °°° °°
d� p
�� dEXA5o4p
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX