HomeMy WebLinkAboutContract 56638-CO5FORT WORTH City of Fort Worth Change Order Request Project Name:I 2018 Bond Yr 2 - Conlracl8 Project No.(s):1 560021070043015740010 I M8C: 1 Project Desuiplion:I Water, Sanitary Sewer followed by Paving Improvement on several streets in CD 3 CSC No. 56638-005 l City Sec No.: 56638 City Prof. No.: 1 101452-2 1 Conlraclorl Texas Materials Group dba Texas Bit Change Order II 1 5 1 City Project Mgr.l Brenda Oropeza I City Inspector: 1 Steve Cisneros Phone Number:l 817-392.8271 I Phone Number:l 817-392-7925 I Date: l 9/712023 1 i Dept. Water Sewer TPW Tolals Original Contract Amount $2,079,497.19 $3,115,607.22 $1,997,562.10 $7,192,666.61 Extras to Date $251,571.95 $968,328.21 $175,843.41 $1,395,743.67 Credits to Dale $0.00 $211.09 $0.00 $211.09 Contract Cost to Dale $2,331,069.14 $4,083.724.34 $2,173,405.51 $8,688,198.99 lAmounl of Proposed Change Order $0.00 $0.00 $0.00 $0.00 Revised Contract Amount $2,331,069.14 $4,083,724.34 $2,173,405.51 $8,588,1g8,9g Original Funds Available for Change Orders $00,000.00 $100'000.00 $100,000.00 $280,000.00 Remaining Funds Available for Uhis CO $80,000.00 $100,000.00 $100,000.00 $280,000.00 Additional Funding (if necessary) $0.00 $0.00 $0.00 $0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % ORIGINAL CONTRACT 19% MAXALLOWABLECONTRACTAMOUNT (ORIGINAL CONTRACTCOST+25%) $8,990,833.14 Contract Time (Calender days) 460 120 570 570 JUSTIFICATION (REASONS) FOR CHANGE ORDER This project Included the replacement of a 10-Inch sanitary sewer main with a 24-Inch sewer main across the banks of a creek within Z Boz South Park. Subsequent to installation of the new sewer main, it was determined that additional shor-flex slope protection was necessary to further protect the disturbed banks of the creek from erosion. Change order No. 5 provides for the Installation of additional Shor-flex slope protection material. )t is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full (both Ume and money) for all costs arising out of, or Incidental to, the above Change Order, I Contractors Company Name Contractor Name P l Texas Materials Group dba Texas Bit Jamie Greenway fh Cori ractor Signature �' , ���� t���n �/ Date 9-7-2023 l 1 Inspe ter _ — Date Pr Jectpana e, Dale l I �y �r (7"^ `l '-7 Director (Water Dept) �i aF2 wa (, S . l Senior Assistant Attorney t Dale Sep 11, 2023 Date Sep 14, 2023 Construction Supervisor (TPW Qepl) �C�r-1 1. 1 s � LLd� Assistant CIIManager big_; Dale '>z _ ' Z17 Date Sep 15, 2023 l i M8C Number 1 NIA 1 Council Action (If Required) M8C Dale Approved I NIA l OFFICIAL RECORD Page 1 CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth --- � Change Order Additions Project Name I 2010 Bond Yr 2- Contract 6 City Sec No.: I 66630 Project No.(s): I 5600210700430157d0010 I M8C No.l 22.0294 City Prof. No: I 101452.2 Project Doscription I Water, Sanitary Sower followed by Paving improvement on several sheets In CD 3 Contractor I Texas Materials Group dba Texas Bit I Change Order: I 5 Date: I 97712023 City Project Mgr. Brenda0ropeza I Cltylnspaclor Steve Cisneros ADDITIONS ITEM DESCRIPTION DEPT Qty 'Unl( UnItCost Total 11.87 SNOR-FLEX Slope Protection Sewer 39.00 1.1' $500.90 $19,535.10 1100 12' Concrelo Curb Sewer 24,06 LF $74.6WI,790A0 11.09 Cloanout Oebds at Sower & Creak Crossing Saver 1.00 LS $3,730.28 $3,730.28 Wale[ $0.00 Sewer $25,055.70 Paving $0.00 Additions Sub Total $25,055.70 Page 2 FORT WO RTI-I City of Fort Worth Change Order Additions Project Name 201OBond Yr2- Contract 6 Project No.(s): 560021070043015740010 I M&C No.1 22-0294 Project Description Water, Sanitary Sewer followed by Paving Improvement on several streets In CD 3 Contractor Texas Materials Group dba Texas Bit Change Order: 5 City Project Mgr. Brenda0iopeza Cllyinspector I SleveCisneros ITEIV DESCRIPTION 69 9999.00O7Sevier Construction Allowance DELETIONS DEPT Qly Sevier 0.25055780 City Sec No.: ( 56630 City Pro). No: 101452.2. Dale: 1 9012023 Unit, Unilcost Total' US $100,000,00 $25,055.70 Water $0.00 Sevier $25,055.78 Paving $0.00 Deletions Sub Total $25,055.78 Page 3 MISBE for this Change Order MISBE Sub Type of Service Amount for this CO Total' _._ Previous Change Orders DATE COit, AMOUNT . Total Page 4 9/7/2023 2018 Bond Year 2 - Contract 6 CSC: 56638 CPN: 101452-2 Change Order 5 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 54.H.� Signature Brenda Oropeza Name of Employee Graduate Engineer Title ATTEST: ?,.,, Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX