HomeMy WebLinkAboutContract 57192-CO3CSC No. 57192-CO3
FoRT�W�ORTH .,
City of Fort Worth
Change Order Request
Project Name W Long Ave and Angle Ave Intersection Improvements
Client Project #(s)1 101583
City Sec # ) 57192
Project Description Improve intersection safety by creating a more compact intersection, decreasing the vehicle travel distance across the intersection and shortening pedestrian
pathways across the roadway.
Contractor Reyes Group Ltd. I Change Order #I 3 I Datel 7/5/2023
City Project Mgr.1 Brendan McInnes, P.E. I City Inspectorl James Ruiz
Dept.
TPW -Unit 1
TPW -Unit 2
Totals
Contract Time
(CD)
Original Contract Amount
$1,110,652.00
$614,967.00
$1,725,619.00
310
Extras to Date
$1,356,967.70
$691,776.30
$2,048,744.00
180
Credits to Date
$1,110,652.00
$614,967.00
$1,725,619.00
Pending Change Orders (in MC Process)
$0.00
$0.00
Contract Cost to Date
$1,356,967.70
$691,776.30
$2,048,744.00
490
Amount of Proposed Change Order
-$4,459.55
$4,112.50
-$347.05
0
Revised Contract Amount
$1,352,508.15
$695,888.80
$2,048,396.95
490
Original Funds Available for Change Orders
$111,065.20
$61,496.70
$172,561.90
Remaining Funds Available for this CO
$0.00
$0.00
Additional Funding (if necessary)
$4,112.50
$4,112.50
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 18.71 %
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $2,157,023.75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Concrete pavement was added to repair existing failing pavement that was discovered after the roadway was milled. Additional asphalt was used to correct a low point in the
existing pavement at the curb line in order to maintain positive drainage as well as placed in an alley way to prevent base from washing into the street. Additional copper bare
wire was added that was needed as a tracer wire that was missed in the original plans and added per RFI 09. Additional sod being added to backfill area behind the retaining wall
at the comer of Angle and Long where slope was graded to tie into the new developments parking lot. Items are also being removed that were not used in the project to offset
cost of the overrun items. These line items were part of the original contract and will not result in additional cost due to new pricing.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name IContractor (Name) Contract Signature Date T
Reyes Group, Ltd. Marcos G Reyes ° ° Sep 2, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
9—V—
Aug 30, 2023
8reh ah "'k'; Nel
Aug 30, 2023
rogram Manager
Date
Senior Capital Project Officer
Date
Sep 11, 2023
.11b11.6
Sep 11, 2023
pt)
Date
ent (Dept)
Date
Taf icia L Wadrack
Sep 13, 2023
Sep 13, 2023
As City Attorney
3 I
Date
Sep 14, 2023
Assista
Date
Sep 15, 2023
Council Action (if required) ir
ny
MC Number I I MC Date Approved
ATTEST:
goer °a
F
=a—
Jannette Goodall, City Secretary
°a,0 *'
aQa
nEXPBad
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
Change Order Additions
Project Name W Long Ave and Angle Ave Intersection Improvements City Sec # 57192
Client Project # 101583 1
Contractorl Reyes Group Ltd. PMI Brendan McInnes, P.E. I Inspectorl James Ruiz
Change Order Submittal # = Date 1 7/5/2023 1
ADDITIONS
HEM
UESCHIP I ION
DEP I
Oty
Unit
Unit Cost
I otal
23
3212.0302 2" Asphalt Pavement Type D (pavement overlay)
TPW - Unit 1
130.00000000
SY
$19.5U
$2,535.00 1
24
3213.0102 T' Cone Pvmt
TPW - Unit 1
48.54700000
SY
$90.00
$4,369.231
25
3213.0104 9" Cone Pvmt
TPW - Unit 1
31.54100000
SY
$120.00
$3,784.92 1
26
3213.0202 T' Cone Pvmt HES
TPW - Unit 1
7.75600000
SY
$100.00
$775.601
30
3213.0321 Cone Sidewalk, Adjacent to Rat Wall
TPW - Unit 1
24.60000000
SF
$14.00
$344.40 1
38
3232.0202 TxDOT Std Ret Wall - RW 1 (L) B
TPW - Unit 1
19.33000000
SF
$185.00
$3,576.05 1
39
3291.0100 Topsoil
TPW - Unit 1
8.00000000
CY
$72.00
$576.00 1
40
3292.0100 Block Sod Placement
TPW - Unit 1
69.00000000
SY
$8.25
$569.25 1
31 3441.1409 NO 8 Insulated Elec Condr TPW - Unit 2 1,175.00000000 LF $3.50 $4,112.501
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Change Order Additions Page 2 of 6
i
i
i
i
i
i
i
i
i
TPW -Unit 1 $16,530.451
TPW - Unit 2 $4,112.50 1
1
1
Sub Total Additions $20,642.95 1
Change Order Additions Page 3 of 6
FORT W� City of Fort Worth
Change Order Deletions
Project Name W Long Ave and Angle Ave Intersection Improvements City Sec # 57192
Client Project # 101583 1
Contractorl Reyes Group Ltd. PMI Brendan McInnes, P.E. Inspectorl James Ruiz
Change Order Submittal # Date 1 4/26/2023 1
HEM UESCHIP I ION
27 3213.0204 9" Gone Pvmt HES
50 3471.0001 Traffic Control
DELETIONS
UEPI
TPW - Unit 1
TPW - Unit 1
Oty Unit Unit Cost
95.000OOOOU EA $142.OU
2.00000000 MO $3,750.00
I otal 1
$13,490.00 1
$7,500.00 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Change Order )eletions Page 4 of 6
TPW -Unit 1
i
i
i
i
i
i
$20,990.001
TPW - Unit 2
$0.00 1
1
Sub Total Deletions
1
$20,990.00 1
Change Order Deletions Page 5 of 6
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE AMOUNT
1 1/5/2023 $323,125.00
5/18/2023 $38,159.44
Total 1 $361,284.44 I
FORT WORTH:-;
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Construction Change Order No. 3 — West Angle and Long Ave
M&C: 21-0979 CPN: 101583
Date:
To:
Name
1.
Bus. Support Partner — Anitra
2.
Marcos G. Reyes — Contractor
3.
James Ruiz - Inspector
4.
Brendan McInnes —Project Manager
5.
Chad Allen — Program Manager
6.
Lissette Acevedo — Senior CPO
7.
Patricia Wadsack — Asst. Director
8.
Lauren Prieur — Director
9.
Doug Black — City Attorney
10.
William Johnson - ACM
H.
Jannette Goodall - CSO
12.
TPW Contracts
CSO: 57192 DOC#: 1
Department
Initials
Date Out
TPW-initial
AR AR
Aug 30, 2023
Contractor
MGRMGR
Sep 2, 2023
TPW - sign
Aug 30, 2023
TPW-initial
Aug 30, 2023
TPW - sign
Sep 11, 2023
TPW - sign
Sep 11, 2023
TPW - sign
Sep 13, 2023
TPW - sign
Sep 13, 2023
Legal - sign
d dwb
Sep 14, 2023
CMO - sign
/
Sep 15, 2023
CSO - sign
—R49—
Sep 15, 2023
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: [—]YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: []YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsCa7fortworthtexas._oov, for pick up when completed; list "Please call Brendan Cad
ext # 2817 for questions. Thank you. "