Change Order Request
Project Namel Vickery Blvd Retaining Wall
I City Sec # 1 58014
Client Project #(s)1 102446
Project Construction of New Concrete Retaining wall at Vickery Blvd and Micki Lynn Ave to address slope failure
Description
Contractorl Fort Wortn Civil Constructors, LLC l
Change Order #1 1
Datel 9/5/2023
City Project Mgr.l Tariqul Islam
l
City Inspectorl Jason Bradley
Dept.
TPW
Contract Time
Totals (CD)
Original Contract Amount
$1,459,328.30
$1,459,328.30 155
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$1,459,328.30
$1,459,328.30 155
Amount of Proposed Change Order
$55,072.50
$55,072.50 124
Revised Contract Amount
$1,514,400.80
$1,514,400.80 279
Original Funds Available for Change Orders
$70,000.00
$70,000.00
Remaining Funds Available for this CO
$70,000.00
$70,000.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 3.77%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $1,824,160.38
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order is to add a bid item to install hydro -mulch to control erosion on the sloped area behind the retaining wall. The Staffverified the price as reasonable by
comparing it to recent bids. The CO will also increase the existing embankment quantity by 1140 CY due to revising the temporary special shoring plans for safety
requirements. This change order will add 124 calendar days to contract days due to these delays: (1) Delays due to scheduling conflict (36 days): The project was initially
scheduled to begin on 10/31/2022 but was delayed until 01/09/2023 for the City's alternate traffic control/ramp closure approval to avoid the holiday season. The delayed
start of the project created a scheduling conflict with the drilling subcontractor since they already had another commitment until 2/20/2023. The 36 days were deemed
reasonable for the critical path of the work. (2) Rain/Weather Delays (10 days): Experienced more than average yearly rain days at the start of the project and couldn't do
any work on the following days: 1/23/2023, 1/24/2023, 1/27/2023, 1/30/2023 — 2/3/2023, 2/8/2023, 2/14/2023, 2/22/2023, 2/23/2023, 3/1/2023 — 3/3/2023, 3/10/2023,
3/16/2023, 3/17/2023, 3/20/2023, 3/24/2023, 4/26/2023 and 5/10/2023. (3) Revising the temporary shoring plans (28 days): During construction, it was identified that the
temporary shoring design needed to be revised for safety concerns. This delay included the preparation and the approval of the revised. Work was stopped from
2/28/2023 until 3/16/2023. (4) Additional scope (8 days): Increasing the embankment quantity of the project by 1140 CY. (5) Delays due to access constraints (15 days):
Due to access constraints behind the retaining wall for the embankment to be placed, the retaining wall had to be built in two phases. The two -phased construction of the
retaining wall resulted in the projects loss of efficiency and production by 15 calendar days. (6) Delays due to the need for time for grass and tree establishment (27 days):
Due to the summer's excessively hot weather, the hydro -mulch establishment and tree planting work is proposed to be complete by late September. As a result, after the
completion of all remaining bid items on 9/2/2023, the contractor will have to stop working until 9/28/2023.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time
and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person
responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Nam IF Contract Signature to
Fort Worth Civil Constructors, LLC Brad Caldwell I o S e., Sep 7, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Sep 10, 2023
Sep 6, 2023
Program Manager
Date
Senior Capital Project Officer
Date
-�
Sep 11, 2023
Sep 11, 2023
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
P�. W'd."k
Sep 12, 2023
�
Sep 12, 2023
sistant City Attorney
Date
Assistant City Manager
Date
oal
Sep 14, 2023
w „ Mr
Sep 15, 2023
M&C Number
ATTEST:
uY G
pOt °°°d
$9�$—
Jannette Goodall, City Secretary
d
°cba?�x
asga
M&C Date Approved I
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH
.*..
Project Name I Vickery Blvd Retaining Wall
Client Project # 1 102446
Contractorl Fort Worth Civil Constructors, LLC
11 EM UESGKIP I MN
New -26 Hydromulch
13 Embankment by Plan
City of Fort Worth
Change Order Additions
City Sec # 58014 ###
l PMl Tanqul Islam Inspectorl Jason Bradley
Date 1 9/5/2023
ADDITIONS
UEPI U Unit unit GOst total
IPW 1,1U .000000UU by $8./5 $9,62b.0Uj
TPW 1,140.00000000 Gy $55.25 $62,985.001
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Tk $72,610.001
1
1
Sub Total Additions $72,610.001
Change Order Additions Page 2 of 4
FORTWORTH City of Fort Worth
IV--- Change Order Deletions
Project Name I Vickery Blvd Retaining Wall
Client Project # 1 102446
Contractorl Fort Worth Civil Constructors, LLC PMI Tadqul Islam
DELETIONS
I I LM ULJUKIV I IUN ULFI
ib tlIOCK Wo I NVV
24 Uonstructlon Allowance I `vv
City Sec # 1 58014 1 ###
I
Inspectorl Jason Bradley
0 Date 1 9/5/2023 1
Uty unit Unit Cost Iotal 1
zvu.000UUUUU JY �8.10 �L,53L5U1
U.18Ybuuuu Lb y8U,000.UU $15,000.UUI
Tk $17,537.501
1
1
1
Sub Total Deletions $17,537.501
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
Total I $0.00 I
t yy p
FORT WORTH CIVIL CONSTRUCTORS, LLC
i
V
f
S I.11Jt;t
August 16, 2023
Mr. Tariqul Islam
The City of Ft. Worth
Graduate Engineer
TPW / Street Services
5001 James Avenue
Fort Worth, TX 76115
Re: Vickery Retaining Wall
CPN # 102446
Change Order Request #1- Hydromulch
Mr. Islam,
Per your e-mail dated August 16, 2023, The City of Ft. Worth has agreed to replace the sod on the above
referenced project with hydromulch. Please see below our change order proposal.
Description Quantity UOM Unit Price Total Price
Hydromulch 1,100 SY $8.75 $9,625.00
If you have any questions or would like to discuss in detail, please feel free to contact me at 817.343.2246 or
bradc(@fwcivcon.com.
Sincerely,
Brad Caldwell
Operations Manager
Cc: Jason Bradley
File 228010
(0) 817. 562. 2292 1 (F) 817. 562. 2293 I www.FWCivCon.com
Office: 4860 Mark IV Parkway, Fort Worth, TX 76106 1 Mail: P.O. Box 164513, Fort Worth, TX 76161
FORT WORTH.,
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: Vickery Blvd Retaininq Wall, CO 1
M&C CPN 102446 CSO #
DATE: 9/6/2023 INITIALS
To: Alexiz Ramirez
1.
FWCC — Brad Caldwell
8C
2.
ac
3.Jason Bradley (Inspector)
4.Tariqul Islam (PM)
r.i
r.i.
5 Omar Elbagalati (PGM)
�
6 Mary Hanna (SCPO)
7e/,/
7. Patricia Wadsack (AD) PAW
a�w
s Lauren Prieur (Director) L
9 Doug Black (ACA)
dwb
10. William Johnson (ACM)
W;
11, Jannette Goodall (CS)
58014 DOC#
DATE OUT
Sep 11, 2023
Sep 7, 2023
Sep 10, 2023
Sep 6, 2023
Sep 11, 2023
Sep 11, 2023
Sep 12, 2023
Sep 12, 2023
Sep 14, 2023
Sep 15, 2023
Sep 15, 2023
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: U Yes❑✓ No
RUSH: ❑Yes ❑✓ No SAME DAY: [:]Yes❑✓ No NEXT DAY: []Yes ❑✓ No
ROUTING TO CSO: ❑✓ Yes ❑No
Action Required:
❑ As Requested ❑ Attach Signature, Initial and Notary Ta
■ Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call
at ext. for pick up when completed. Thank you.