Change Order Request
Project Name:l Lake Arlington Lift Station Sanitary Sewer Gravity Mains I City Sec No.: 1 58322 l
Project No.(s):1 56021107004301001400 NTP I N/A .1 City Proj. No.: l 101311 .. l
Project Description: Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and downstream of
Lake Arlington Force Main (North Line)
Contractor. S.J. Louis Construction of Texas, Ltd Change Order # l 2 Date: 8121/2023
City Project Mgr.l Pratima Poudyal City Inspector: l Shane Behn
Phone Number: 817-392-6149 Phone Number:l 817-392-2190
Dept. Base Bid Alternate•B Totals Contract Time
(Cal ender days)
Original Contract Amount $15.059,130.11 $1,494,410.00 $16.553,540.11 450
Extras to Date $757,214.94-$807,600.00-$50,385.06
Credits to Dale
Pending Change Orders (in M&C Process)
Contract Cost to Date $15,816,345.05 $686,810.00 $16,503,155.05 450
Amount of Proposed Change Order $31,744.00 0.00 $31,744.00
Revised Contract Amount $15,848,089.05 $686,810.00 $16,534,899.05 450 _
Original Funds Available for Change Orders $248,303.00 0.00 $248,303.00
Remaining Funds Available for this CO
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT -0.11%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $20,691,925.14
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 2 provides for the following:
• Epoxy manhole lining for all the exposed concrete on Type A polymer manhole as requested by Sewer Field Operations.
• The hauling and disposal of previously unknown large volume of trash, debris and concrete blocks that were encountered during the trench
excavation.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name Contractor Name ntraclor 1 ature Datg
S.J. Louis Construction of Texas, Ltd ' Adam Lunsford I I js1it z3
Inspegto T Date Projec Manager V • Date
���� was
Director (Wat pt) Date Con uctio S ;so
(Water Dept) Me '
C!2��LfEoGel- hLyiei _. � ...... _, . d ' S . Sep 11, 2023
Assistant City Attorney Date Assistant City Manager Date
MAW, I Sep 14, 2023 Dana e4 ✓ aFF Sep 15, 2023
Council Action (If Required)
M&C Number N/A M&C Date Approved ( NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name I Lake Arlington Lift Station Sanitary Sewer Gravity Mains City Sec No.: 1 58322
Project No.(s): 1 5602110700430/001480 1 DOE No.] N/A City Proj. No.: 1 101311
Project I Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and downstream of
�
Description Lake Arlington Force Main (North Line)
Contractor S.J. Louis Construction of Texas, Ltd Change Order: Date:1 8/21/2023
City Project Mgr, I Pratim? Poudyal City Inspector I Shane Behn
ADDITIONS
I I tM
UrSGKIN I IUN
DEPT
Qty
Unit
Unit Cost
Total
66
Epoxy Manhole Lining (Warren) for All Exposed Concrete on Type A Polymer
Base Bid
17.00
FA
$2,300.00
$39,100.00
Manhole
67
Hauling TrashlDebris to Landfill
Base Bid
30.00
LD
$290.00
$8,700.00
68
Trash/Debris Disposal to Landfill
Base Bid
600.00
TN
$65.99
$39,594.00
69
Hauling and Disposal of Concrete
Base Bid
15.00
LD
$290.00
$4,350.00
Base Bid 1$91,744.00
Alternate•B
Additions Sub Total I$91,744.00
Page 1 of 3
FO R T WO R-r H City of Fort Worth
—" ,. *' Change Order Deletions
Project Name Lake Arlington Lift Station Sanitary Sewer Gravity Mains City Sec No.:
Project No.(s): 56021/0700430/001480 1 DOE No. N/A City Proj. No.:
Project Description I Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and
downstream of Lake Arlington Force Main (North Line)
Contractor S.J. Louis Construction of Texas, Ltd I Change Order: L 2 J Date 8/21/2023
City Project Mgr. Pralima Poudyal City Inspector: I Shane Behn
ITEM DESCRIPTION
53 Construction Allowance
58322
101311
DELETIONS
DEPT Qty Unit Unit Cost Total
Base Bid 0.40 LS $150,000.00 $60.000.00
Base Bid $60,000.00
Alternate-B
Page 2 of 3 ,Deletions Sub Total $60,000.00
F]
12
MWWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co # DATE AMOUNT
Total $0.00
Page 3 of 3
8/25/2023
Lake Arlington Lift Station Sanitary Sewer Gravity Mains
CSC: 58322
CPN:101311
Change Order 2 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
l
Signature
Pratima Poudyal, P.E.
Name of Employee
Project Manager
Title
ATTEST:
Jannette Goodall
City Secretary