HomeMy WebLinkAboutContract 59010-A1CSC No. 59010-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 59010
WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 59010, (the
CONTRACT) which was authorized by M&C 22-1042 on the 13th day of
December, 2022 in the amount of $ 171,822.00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Intersection Improvements at North Beach Street and Western
Center Blvd (HSIP) , CPN 104038; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $36,096.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $207,918.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
Prof Services Agreement Amendment Template CPN104038
Revision Date: November 23, 2021
Page 1 of 4
APPROVED:
City of Fort Worth
William Johnson (S 12, 2023 11:45 CDT)
William Johnson
Assistant City Manager
DATE: Sep 12, 2023
APPROVAL RECOMMENDED:
A.I a .+
Lauren Prieur (Sep 8, 2023 10:39 CDT)
Lauren Prieur
Director, Transportation
ENGINEER
Halff Associates, Inc.
bavi�(A. Ewkett
David A. Burkett (Aug 25, 2023 17:12 CDT)
David A. Burkett
Director of Transportation
DATE: Aug 25, 2023
& Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Iskal Shrestha (Aug 28, 2023 14:14 CDT)
Iskal Shrestha, P.E. PMP, CCM
Senior Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
Prof Services Agreement Amendment Template CPN104038
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
I
DBlack (Sep 11, 202312:01 CDT)
Douglas W. Black
Sr. Assistant
City Attorney
ATTEST:
a°moo o9�°c
Pvo o=A
�� /' C
Qdan nEoa5�4d
Jannette Goodall
City Secretary
M&C: N/A
Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
Prof Services Agreement Amendment Template CPN104038
Revision Date: November 23, 2021
Page 3 of 4
Department
020
FUNDING BREAKDOWN SHEET
City Secretary No. 59010
Amendment No. 1
Fund -Account -Center
34027-5330500-104038-003930
Total:
Amount
$36,096.00
$36,096.00
City of Fort Worth, Texas Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
Prof Services Agreement Amendment Template CPN104038
Revision Date: November 23, 2021
Page 4 of 4
ATTACHMENT "A"
Scope for Enqineerinq Design Related Services for Intersection Improvements at N. Beach
Street and Western Center Blvd (HSIP)
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of the N. Beach St. and Western Center Blvd. Highway Safety Improvements
(HSIP) Project is project is to improve efficiency and increase visibility, safety and traffic
flow.
WORK TO BE PERFORMED
Task 1. Design Management
Task2. GORaoptl `eI E)8-84�
Task 3. Preliminary De&k n
Task � . Fi n d «esign
Tasks Genstr in4ion oh o Se��
Tack 6ROW/Easement SePliGes
Task 7 Survey onst Subsurfase Utility Engineering SerV!Ges-
Task R . Pew+tt+r�g
Task 9. Public Meeting
TASK 1. DESIGN MANAGEMENT.
ENGINEER will manage the compilation of submittals to include plans, specifications, and
estimates provided by the City of Fort Worth (CITY), through its consultants, for one
additional intersection project (ADDITIONAL PROJECT) to be included with ENGINEER's
project in order to create a single PS&E package for TxDOT letting.
1.1. Coordination with ADDITIONAL PROJECT:
• Regular coordination meetings
• Coordinate project schedule and deadlines for submittals.
• Coordinate with the other consultant to establish the standard details and bid
items proposed in both projects.
• Review submittals for completeness and compliance with established standard
details and bid items, not to include QAQC of engineering and design.
1.2. Preparation of Submittal Packages:
• Incorporate plans sheets, bid items, and standard details into the submittal
packages for each milestone and in the final PS&E package submitted for letting.
This includes:
• Producing combined summary sheets split by CSJ
City of Fort Worth, Texas Intersection Improvements at N. Beach Street and Western Center Blvd.
Attachment (HSIP) CPN104038
PMO Release Date: 07.23.2012
Page 1 of 3
• Prepare summary of all project quantities (including ADDITONAL
PROJECT).
• Prepare and maintain a sheet index to include ADDITIONAL PROJECT.
• Posting both projects to TxDOT Connect
• Prepare PS&E portfolio package.
• Update TxDOT Connect
• Incorporating ADDITIONAL PROJECT information into required TxDOT forms for
each submittal package
• Incorporate ADDITONAL PROJECT into Contract Time Determination for
TxDOT.
ASSUMPTIONS
• Eight (8) meetings with the other consultant
• ENGINEER will only be responsible for QAQC of ENGINEER's project. The other
consultant will perform QAQC of their work.
• ENGINEER will be responsible for compiling and incorporating sheets and
information provided from the other consultant.
• ENGINEER will not be responsible for attending separate design review
meetings for ADDITIONAL PROJECT.
• ENGINEER is not responsible for coordination or deliverables for environmental
clearance of ADDITIONAL PROJECT.
• ENGINEER will not be held responsible for adverse impacts to the project
schedule or deliverables caused by the ADDITIONAL PROJECT.
DELIVERABLES
A. Compilation of design plans from ADDITIONAL PROJECT to create a single
PS&E package for TxDOT letting.
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
TASK 4. FINAL DESIGN (90 PERCENT) AND FINIAL CONSTRUCTION' DOCUMENTS
(1 nn PERCENT).
TASK 5. CONSTRUCTION PHASE SERVICES.
TASK 6 WEASSEMENT SERVICES
-r��v�r� �r.r�r.-rv� .-rvc�
City of Fort Worth, Texas Intersection Improvements at N. Beach Street and Western Center Blvd.
Attachment (HSIP) CPN104038
PMO Release Date: 07.23.2012
Page 2 of 3
TASK 7. SURVEY AND S BS i S-ACE LITILITY ENGINEERING SERVICES.
TASK Q. PERMITTING.
Task 9. PUBLIC MEETING.
After the preliminary plans have been reviewed and approved by the CITY, the ENGINEER
shall prepare project exhibits, and attend up to (2) public meeting to help explain the
proposed project to residents. The CITY shall select a suitable location, time and date. The
Engineer needs to coordinate with the City's project manager to format the mailing list of all
affected property owners accordingly.
ASSUMPTIONS
• UP to two (2) Public Meeting is assumed.
DELIVERABLES
A. Public Meeting exhibits
City of Fort Worth, Texas Intersection Improvements at N. Beach Street and Western Center Blvd.
Attachment (HSIP) CPN104038
PMO Release Date: 07.23.2012
Page 3 of 3
ATTACHMENT B
COMPENSATION
Design Services for
Intersection Improvements at N. Beach Street and Western Center Blvd Highway Safety
Improvements Project (HSIP)
City Project No.104038
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
2023 Rate
2024 Rate
($/hour)
($/hour)
QA Manager
265.00
278.25
Project Manager
250.00
262.50
Project Engineer
205.00
215.25
EIT
130.00
136.50
CADD
143.00
150.15
Environmental Project/QC Manager
200.00
210.00
Senior Environmental Scientist
141.00
148.05
Mid -Level Environmental Scientist
123.00
129.15
Junior Environmental Scientist
95.00
99.75
RPLS
165.00
173.25
Survey Tech
125.00
131.25
Survey Crew 2-Person
175.00
183.75
Administrative
105.00
110.25
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
CPN104038
AN
ATTACHMENT B
COMPENSATION
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
CPN104038
AM
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Halff Associates, Inc Project Management and
Design
Proposed MWBE Sub -Consultants
Non-MWBE Consultants
Project Number & Name
CPN104038 — Intersection
Improvements at N. Beach Street
and Western Center Blvd (HSIP)
City MWBE Goal = 8 %
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
TOTAL
Fee Amount %
$36,096.00 1 100
$ 36,096.00 100%
Total Fee MWBE Fee MWBE %
$ 36,096.00 $ 0.00 0%
Consultant Committed Goal = 8 %
Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
CPN104038
AN
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
CPN104038
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Intersection Improvements at N. Beach Street and Western Center Blvd Highway Safety Improvements Project (HSIP)
City Project No. 104038
Labor
(hours
Exoense
(iA
Task Description
Task No. Manager
Project
Manager
Project
En gineer
EIT
CADD
Env.
Project/
DC
Manager
Sr Env.
Scientist
Mid Env.
Scientist
Jr. Env
Scientist
RPLS
Survey
Teph
Survey
Crew 2-
Person
Administat
rve
Total Labor
Cost
SubeonsuNant
MWBE Non-MWBE
Travel
Data
Collection
Reprotluction/
Postage
Total Expense
Cost
Task Sub Total
Rate $285
$250
$205
$130
$143
$200
$141
$123
$95
$185
$125
$175
$105
26
52
24
56
0
0
0
0
0
0
0
0
328288
0
$0
$0
$0
$0
$0
$28,288
1.0 Project Management- Additional Project 0
1.1 Coordination with ADDITIONAL PROJECT
1.� Coordination Meeting 4 4
$1820
$0
$1820
Coordination on standards, bid items,
schedule 8 8
1 Review submittals for corry�lateness 2 4 4
$3,640
$3,640
$1 840
$0
$1 840
1.2 i reparation of Submittal Packages
1. Inwmorate ADDT'L PROJECT sheets Q 8 32
$0
$6,436
$0
$6,436
Prepare TxDOT Summary Sheets split by
1 ; CSJ and combined 4 8 8 16
$5 968
$0
$5 968
Prepare and maintain sheet index to include
1 : ADDT'L PROJECT 4 8
$1,964
$0
$1,964
Incorporate ADDT'L PROJECT info into
1: TxDOT forms 6 12 4
$4480
$0
$4480
Incorporate ADDT'L PROJECT into TxDOT
1 : Contract Time Determination 2 8
$2,140
$0
$2,140
9.0
Public Meeting�
0
8 12
12
18
0
0
0
0
0
0
0
0
$7 808
$0
SO
$0
$0
$0
$0
$7 808
9.1
Pren(�@ a Exhibils
2/ 8
8
16
$5468
$0
$5468
9.2
Al�Qll� Public Meeting
q 4
4
$2,340
$0
$2,340
Totalsl
01
321 641
361
721
01
01
01
01
01
01
01
0
$36,096
$0
$0
$01
SO
$0
$0
$36,096
I Pro Pet Summary
Tout Hours 204
Total Labor $36.096
�t �/ FF To"�r' Ex s�e $0
Non-F�l�RIF St_ ��nt $0
1 10% Sub Markup $0
MBE/SBE Partic�P� in 0.0%
I Total Projeff Co:1 $36,096
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date. 8.09.2012 Intersection Improvements at N. Beach Street and Western Center Blvd (HSIP)
CPN104038
l of
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: AMENDMENT #1, N. BEACH & WESTERN CENTER
BLVD- HSIP
M&C: N/A CPN: 104038 CSO: 59010 DOC#: 1
Date:
To:
Name
Department
Initials
Date Out
1.
Alex Ripley
TPW - initial
&
Aug 28, 2023
2.
David Burkett Consultant
- Signature
B D$
Aug 25, 2023
3.
Iskal Shrestha
TPW - Signature
Aug 28, 2023
5
4.
Chad Allen
TPW -initial
Sep 6, 2023
5.
Lissette Acevedo
TPW -initial
Sep 6, 2023
6.
TPW AD, Patricia Wadsack
TPW - initial
RBLW
Sep 8, 2023
7.
Lauren Prieur
TPW - signatures
Sep 8, 2023
8.
Doug Black
Legal - signature
dWdwb
Sep 11, 2023
9.
William Johnson
CMO -signature
w
Sep 12, 2023
10.
Jannette Goodall
CSO - signature
RpR
Sep 12, 2023
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE:
All documents received from any
and all City Departments requesting City Manager's signature
for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed
the routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a,FortWorthTexas.2ov at ext. 7233 or 8363, for pick up when
completed. Thank you!
Updated 06.21.2023 mdhm