HomeMy WebLinkAboutContract 56702-A1CSC No. 56702-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 56702
WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 56702, (the
CONTRACT) which was administratively authorized on the 11th day of
November, 2021 in the amount of $ 82,600.00; and
WHEREAS, the CONTRACT involves professional services for the
following project:
Professional Services - Areas 1 & 2, CPN 101917; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $16,900.00. (See Attached Funding
Breakdown Sheet, Page -3-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $99,500.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
of the date subscribed by the City's
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 1 of 3
Professional Services - Areas 1 & 2
CPN 101917
APPROVED:
City of Fort Worth
William Johnson (5(b 12, 202311:45 CDT)
William Johnson
Assistant City
Manager
DATE:
Halff Associates, Inc.
. '-�%
Jacob Hays, P.E.
Public Works Team Leader
DATE: August 22, 2023
APPROVAL RECOMMENDED:
�-Z.-
Lauren Grier (Se° 11. 202307 24 CDTI
Lauren Prieur, P.E.
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Y-/ 7.�4—
Clint Hoover, P.E.
Engineering Manager
APPROVED AS TO FORM AND LEGALITY:
wowrl
Mack (Sep 11, 2023 12:07 CDT)
Douglas W. Black
Sr. Assistant City Attorney
F4 �d4b
FOq T �C
ATTEST: ' 9�
P �jo o=0
l.g
o
QnURna o'o
Jannette Goodall
City Secretary
M&C: N/A
Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas P ofessional Services - Areas 1 & 2
Prof Services Agreement Amendment Template CPN 101917
Revision Date: November 23, 2021
Page 2 of 3
FUNDING BREAKDOWN SHEET
City Secretary No. 56702
Amendment No. 1
Department Fund -Account -Center Amount
0200431 34018-0200431-5330500-101917-E03230-9999- $16,900.00
18010205
Total: $16,900.00
City of Fort Worth, Texas Professional Services - Areas 1 & 2
Prof Services Agreement Amendment Template CPN 101917
Revision Date: November 23, 2021
Page 3 of 3
ATTACHMENT "A"
Scope for Enaineerina Desian Related Services for LED Conversion Areas 1 & 2 and
Miscellaneous Assistance Part 2 City Proiect No. 101917
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of this project is to: Assist the City in overseeing construction of the LED
Conversion Areas 1 and 2. Assistance will also include updates to CITY standard street
lighting details and miscellaneous design of street light improvements.
WORK TO BE PERFORMED
Task 1. Additional Construction Phase Services
TASK 1. Additional Construction Phase Services
ENGINEER will provide the following additional construction phase services.
1.1. Project Management
• The ENGINEER shall attend monthly meetings facilitated by the City to discuss
program progress and coordinate activities for the upcoming period.
• Prepare invoices, in accordance with Attachment B to this Standard Agreement
and submit monthly in the format requested by the CITY.
ASSUMPTION
A. The remaining project duration is assumed to be three (3) months.
DELIVERABLES
A. Monthly invoices
1.2. Field Inspection and Verification
• The ENGINEER shall conduct field inspections and verifications for the
remaining program assets utilizing acceptable processes established to date
• The ENGINEER shall coordinate with the CONTRACTOR and update the map
books for the remaining assets utilizing acceptable processes established to
date.
The ENGINEER shall review contractor monthly pay applications for general
conformance with the design concepts and general compliance with the
requirements of the contract for construction. Such review shall not relieve the
Contractor from its responsibility for performance in accordance with the contract
for construction, nor is such review a guarantee that the work covered by the pay
application is free of errors, inconsistencies or omissions. The ENGINEER shall
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 3
log and track all LED light conversions and update the City's GIS spreadsheet to
reflect upgrades.
• The ENGINEER shall attend the "Final" project walk through and assist with
preparation of final punch list. ENGINEER will field verify all items on the punch
list have been addressed.
• As requested by the CITY, the ENGINEER shall provide necessary
interpretations and clarifications of contract documents, review change orders,
and make recommendations as to the acceptability of the work.
• The ENGINEER shall conduct a final quality control of all GIS deliverables once
work is completed and fully accepted. Upon final acceptance the ENGINEER
shall deliver the final GIS assets for the City's use and records.
ASSUMPTION
A. The remaining project duration is assumed to be three (3) months.
B. The remaining assets for Area 1 is 61 and Area 2 is 53.
DELIVERABLES
A. Response to Contractor's Request for Information
B. Review of Contractor's pay applications
C. Updated map books
D. Final Punch List items
E. Final GIS assets
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition.
• Services related to development of the CITY's project financing and/or budget.
• Performance of materials testing or specialty testing services.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and
re -bidding of the contract for construction.
• Services necessary due to the default of the Contractor.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 2 of 3
Performance of miscellaneous and supplemental services related to the project
as requested by the CITY.
Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
Performance of miscellaneous and supplemental services related to the project
as requested by the CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 3 of 3
ATTACHMENT B
COMPENSATION
Engineering Design Phase Services for
Professional Services — Areas 1 & 2 — Amendment #1
City Project No. 101917
Time and Materials with Rate Schedule Project
I. Compensation
a. The ENGINEER shall be compensated for personnel time, non -labor expenses, and
subcontract expenses in performing services for this Amendment #1 for an amount not
to exceed $16,900.00, unless amended. Amendment #1 shall be Time and Materials.
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Catef;ory Rate for the ENGINEER's team member performing the work and
includes all direct salaries, overhead, and profit.
Labor Category Rate as presented in the rate schedule table below is the rate
for each labor category performing the work and includes all direct salaries,
overhead, and profit. Each labor category rate may include a number of
specialties. Labor category specialties are provided below.
Labor Cateeory (Specialtv):
Engineer (Civil, Structural, Mechanical, Electrical, Oil & Gas)
Scientist (Environmental and Geological)
Surveyor
Field Tech (Survey, SUE, Environmental & Construction)
Office Tech (CADD, Designer & Surveyor)
Administrative (Accounting, Assistant, Marketing & Human Resources)
Specialist (GIS, ROW, Visualization & IT)
Intern
Labor Mi -em
00 115.00
Engineer
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 6
115.00 146.00
IV 194.00 243.00
V 246.00 350.00
ATTACHMENT B
COMPENSATION
I
69.00
94.00
I I
99.00
129.00
Scientist
III
131.00
170.00
IV
183.00
196.00
V
230.00
103.00
350.00
104.00
II
120.00
121.00
Surveyor
III
126.00
145.00
IV
149.00
188.00
V
196.00
48.00
277.00
69.00
I I
70.00
88.00
Field Tech
III
91.00
109.00
IV
119.00
141.00
V
174.00
43.00
175.00
69.00
I I
70.00
87.00
Office Tech
111
87.00
114.00
IV
114.00
136.00
V
150.00
31.00
286.00
69.00
Administrative
II
III
70.00
88.00
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 2 of 6
LIM
ATTACHMENT B
COMPENSATION
87.00 114.00
IV 116.00 146.00
V 151.00 330.00
1 66.00 95.00
97.00 129.00
Specialist III 132.00 175.00
IV 184.00 223.00
V 226.00 345.00
Intern 62.00 69.00
*The above rates are valid for a twelve month period commencing on City
execution of the contract. All rates are subject to annual adjustment which will
be submitted to City for review no later than thirty (30) days prior to such
escalation becomes effective.
II. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or
internal office cost.
Direct Expenses (Non -labor) include, but are not limited to, mileage, travel and lodging,
expenses, mail, supplies, printing and reproduction services, other direct expenses
associated with delivery of the work; plus applicable sales, use, value added, business
transfer, gross receipts, or other similar taxes.
III. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost
to ENGINEER plus a markup of ten percent (10%).
IV. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and
will keep the City informed of progress toward that end so that the budget or work effort
can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted,
nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services that the PROJECT
cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 3 of 6
LIM
ATTACHMENT B
COMPENSATION
of the project, increased costs or other conditions, the ENGINEER shall immediately report
such fact to the City and, if so instructed by the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER'S excess costs expended prior to such
increase will be allowable to the same extent as is such costs had been incurred after the
approved increase.
The Engineer shall be paid monthly payments as described in Section II — Method of
Payment.
V. Method of Payment
a. The ENGINEER shall be paid by the City based upon an invoice created on the basis of
statements prepared from the books and records of account of the ENGINEER, based on
the actual hours and costs expended by the ENGINEER in performing the work.
b. Each invoice shall be verified as to its accuracy and compliance with the terms of this
Agreement by an officer of the ENGINEER.
c. ENGINEER shall prepare and submit invoices in the format and including content as
presented in Exhibit B-1.
d. Payment of invoices will be subject to certification by the City that such work has been
performed.
VI. Progress Reports. The ENGINEER shall prepare and submit to the designated representative of
the Transportation and Public Works Department monthly progress reports and schedules in
the format required by the City.
VII. A Summary of fees are listed in the following table.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 4 of 6
ATTACHMENT B
COMPENSATION
I. Summary of Fees — Amendment #1
Firm Primary Responsibility Fee Amount %
Prime Consultant
Halff Associates, Inc. LED Conversion Areas 1 & 2 $16,900.00 100%
and Misc. Assistance
Proposed SBE Sub -Consultants
Non-SBE Consultants
Project Number & Name
CPN 101917- LED Conversion
Areas 1 & 2 and Misc. Assistance —
Amendment #1
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 5 of 6
TOTAL
Total Fee
$16,900.00
$16,900.00 100%
SBE Fee SBE %
$0.00 0%
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 6 of 6
LIM
Professional Services Invoice Project Manager: IClint Hoover, MBA, P.E., S.E. Summary
Project: LED Conversion Areas 1 & 2 and Misc. Assistance
City Project #: �101917
City Sec Number: Supplier Instructions:
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
Company Name: IHalff Associates, Inc. When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
I Consultant folder within Project's folder.
Supplier's PM: David M. Smith
email: dsmith@halff.com
Supplier Invoice #:
Office Address: 4000 Fossil Creek Blvd. Fort Worth, TX 76137
Payment Request #:
Telephone: 817-847-1422
Service Date:From
Fax: 817-232-9784
Service Date:To
Invoice Date:
Remit Address: P.O. Box 678316 Dallas, TX 75267-8316
Sheet FID and Work Type Description
Work Type 1
Work Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Agreement LTD
Agreement Amendment Amount to Completed Percent ($) Invoiced Current
Amount Amount Date Amount Spent Previously Invoice
$82,600.00 $82,600.00
Remaining
Balance
$82,600.00
Totals This Invoice $82,600.00 $82,600.00 $82,600.00
Overall Percentage Spent:
Halff Associates, Inc.
817-847-1422
817-232-9784
4000 Fossil Creek Blvd.
P.O. Box 678316
Fort Worth, TX 76137
Dallas, TX 75267-8316
CFW Project Manager
Clint Hoover, MBA, P.E., S.E.
Supplier's Project Manager:
IDavid M. Smith I
Supplier's PM email:
IdsmithPhalff.com
Name of Project:
LED Conversion Areas 1 & 2 and Misc.
Assistance
Labor Cateaory Name
Project Manager (example)
Senior Engineer (example)
Engineer (example)
Junior Engineer (example)
CAD Technician (example)
Adminstralive Support (example)
etc
Total Labor
Subcontract Service
Subcontract Service - <1 example>
I Subcontract Service - <2 example>
I etc
I
Subcontractor Subtotal
10 Percent Markup on Subcontract Services
Nonlabor Expenses
Invoice
Supplier Project No
Proj. Invoice No
Invoice date
I Period Service Date:From
Service Date:To
City Secretary Contract #:
P.O. Number:
Hours Rate ($/hr) Amount
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.0
I I
I I
I I
I I
$0.00
$0.00
Nonlabor Expense Subtotal
Total Expenses (Subcontract Services+Markup+Nonlabor Expenses)
I I
I I
I I
I I
I I
$0.00
46349.001
$0.00
$0.00
TOTAL DUE THIS INVOICE $0.00
Professional Services Invoice Project Manager: Clint Hoover, MBA, P.E., S.E
Project: LED Conversion Areas 1 & 2 and Misc. Assistan(
City Project #: 101917
Work Type Desc: supplier Instructions:
FID:
City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Company Name: HalffAssociates, Inc.
Supplier's PM: David M. Smith
email: dsmith@halff.com
Supplier Invoice #: David M. Smith
Office Address: 4000 Fossil Creek Blvd. Fort Worth, Tx 76137
Payment Request #:
Telephone: 817-847-1422
Service Date:From
Fax: 817-232-9784
Service Date:To
Invoice Date:
Remit Address: P.O. Box 678316 Dallas, Tx 75267-8316
Pay Items Agreement LTD
Agreement Amendment Amendment Amount to Completed
Description Amount Number Amount Date Amount
30 - Design $82,600.00 $82,600.00
Totals This Unit: $82,600.00 $82,600.00
Overall Percentage Spent:
Percent ($) Invoiced
Spent Previously
Current Remaining
Invoice Balance
$82,600.00
$82,600.00
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
DOCUMENT TITLE: 101917 — Vueworks Street Light Design
Contract (Various Locations) (Amendment#1)
M&C:
Date:
To:
Name
1.
Clint Hoover
2.
Anna Benavides
3.
Rajnish Gupta
4.
Martin Phillips
5.
Lauren Prieur
6.
Doug Black
7.
William Johnson
8.
Ronald Gonzales
9.
Jannette Goodall
10.
Allison Tidwell
11.
Tabitha Giddings
CPN: 101917 CSO:
Department Initials
TPW - Signature
TPW — Initial 7%
TPW -Signature •7
TPW — Initial
TPW - Signature F
Legal — Signature dWdwb
CMO - Signature
CSO - Signature K K�
CSO - Signature
CSO - Initial
TPW
DOC#:
Date Out
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: OYES ®No
RUSH: ❑YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES []No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a),FortWorthTexas.izov at ext. 7233 for pick up when completed.
Thank you!