HomeMy WebLinkAboutContract 51468-A4CSC No. 51468-A4
AMENDMENT No . 4
TO CITY SECRETARY CONTRACT No. 51468
WHEREAS, the City of Fort Worth (CITY) and VRX Inc., (ENGINEER) made
and entered into City Secretary Contract No. 51468, (the CONTRACT) which
was authorized by M&C C-28834 on the llth day of September, 2018 in the
amount of $ 165,562.26; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $114,012.00 which was authorized by M&C 21-0211 on
March 23, 2021; Amendment Number 2 in the amount of $27,405.92 which was
administratively authorized on June 8, 2021; and Amendment Number 3 in
the amount of $111,174.66 which was authorized by M&C 22-0430 on June 14,
2022;
WHEREAS, the CONTRACT involves engineering services for the
following project:
Trentman Street Bridge Replacement over the Tributary of Lake
Arlington, CPN 100604; and
WHEREAS, it has become necessary to execute Amendment No. 4 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $10,668.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $428,822.84.
OFFICIAL RECORD
CITY SECRETARY
3. FT. WORTH, TX
All other provisions of the Contract, which are not expressly
City of Fort Worth, Texas Trentman Street Bridge Replacement Project
Prof Services Agreement Amendment Template CPN 100604
Revision Date: November 23, 2021
Page 1 of 4
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
William Johnson (S 21, 2023 21:11 GMT+2)
William Johnson
Assistant City Manager
DATE: Sep 21, 2023
of the date subscribed by the City's
ENGINEER
VRX, Inc.
Rl,� lbralu4v, PE
Noelle Ibrahim, PE (Sep 18, 2023 15:18 CDT)
Nawal (Noelle) Ibrahim, PE
VRX President
DATE: Sep 18, 2023
APPROVAL RECOMMENDED:
^4714--*
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
sandin uvre
Sandip Uprety (Sep 14, 2023 1:17 CDT)
Sandip Uprety
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas entman Street Bridge Replacement Project
Prof Services Agreement Amendment Template CPN 100604
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
ndw I
DBlack (Sep 21, 202313:47 CDT)
Douglas W. Black
Sr. Assistant City Attorney
nnq�
�o � Rr��9d0
ATTEST:
?dannn�4A544
Jannette Goodall
City Secretary
M&C No: N/A
M&C Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 3 of 4
entman Street Bridge Replacement Project
CPN 100604
FUNDING BREAKDOWN SHEET
City Secretary No. 51468
Amendment No. 4
Department Fund -Account -Center Amount
34014 0200431 5330500 100604 002630 9999
TPw 14010202 $10,668.00
Total: $10,668.00
City of Fort Worth, Texas entman Street Bridge Replacement Project
Prof Services Agreement Amendment Template CPN 100604
Revision Date: November 23, 2021
Page 4 of 4
VRX, INC.
4500 Mercantile Plaza Drive, Suite 300
Fort Worth, TX 76137
Firm #9690
OFFICE: 281.686.4909
August 21, 2023
Mr. Sandip Uprety; Professional Engineer
City of Fort Worth,
Transportation and Public Works
200 Texas Street
Fort Worth, Texas 761021
Re: Amendment No. 4 Request City Project No. 100604
Trentman Street Bridge Replacement and Pavement Rehabilitation
CONTRACT No. 51468
Dear Mr. Uprety,
This letter is in reference to contract No. 51468 between VRX, Inc. and the City of Fort
Worth (the City) dated October 26, 2018, herein referred to as the "Contract."
This letter requests an amendment (Amendment No. 4) revising the previously approved subject
project design plans and contract documents. Specifically, this amendment includes the provision
of additional work associated with the following items.
1. Revise Channel Stabilization plans to eliminate eastern easement at 3901 Brookline Ave.
Note: Channel stabilization plans to be updated with revision clouds
2. Revise Storm Drainage plans to eliminate western easement at 3901 Brookline Ave.
3. Revise remaining plans, specifications, and estimate to reflect changes noted in Items 1
and 2.
4. Revise Water plans to reflect changes noted in Items 1 and 2.
5. Revise Sanitary Sewer plans to eliminate conflicts created by ATMOS relocations
completed in October, 2021.
Additional Paving, Drainage &
Channel Stabilization Design Work: $ 6,222.00
Additional Water & Sanitary Sewer Design Work: $ 45446.00
VRX, INC.
4500 Mercantile Plaza Drive, Suite 300
Fort Worth, TX 76137
Firm #9690
OFFICE: 281.686.4909
Paving Water/Sanitary Total
Original Contract
$ 165,562
$0
$ 165,562
Amendment No. 1
$ 78,306
$ 35,706
$ 114,012
Amendment No. 2
$ 27,405
$0
$ 27,405
AmendmentNo.3
$ 111,175
$0
$ 111,175
Amendment No.4
$ 6,222
$ 4,446
$ 10,668
Total
$ 397,370
$ 43,339
$ 428,822
Description
Original
Revised
Contact Amount
$ 165,562
$ 428,822
Total Contract M/WBE
$ 28,740
$ 85,409
Total Contract M/WBE (%)
17.4%
19.9%
City's M/WBE Goal (%)
15%
15%
I sincerely appreciate your consideration of this request. Please call or email me if you have any
questions or would like to discuss the details included in this letter.
Respectfully,
40-�Clv� or,
Kelly Moncrief, P.E.
Senior Project Manager
VRX
Enclosure:
Supplemental LOE
vac
Supplemental Fee Proposal - Amendment No. 4
City of Fort Worth
Bridge Deck Replacements for CPN - 100604
Trentman Street at Prairie Dog Creek
DESCRIPTION
Project
Manager
Quality
Manager
Senior
Engineer
Project
Engineer
Engineer In
Training
Senior
CADD
Operator
Admin/
Clerical
TOTAL
HOURS
LABOR COST
VRX
Project Coorination
Project Management/Coordination 6.0 3.0
9.0
$ 2,025.00
PS&E (Public Works)
Revise drainage to eliminate easement
0.5
2.0
6.0 2.0
10.5
$
1,382.00
Revise Water to accommodate drainage
0.5
1.0
2.0 4.0
7.5
$
965.00
Update Plan Sheets (ROW, Roadway, etc),
Quantities & Specs
1.0
2.0 4.0 8.0
15.0
$
1,850.00
VRX HOURS
6.0
2.0
6.0
2.0
12.0
14.0
0.0
42.0
CONTRACT HOURLY RATE
$ 242.00
$ 192.00
$ 191.00
$
151.00
$ 113.00
$ 113.00
$ 82.00
VRX SUBTOTAL (Public Works) 11
$
6,222.00 1
PS&E (Water)
Addition of water replacement at Fairfax (110') 0.5 0.5 1.5 6.0 8.5 $ 1,096.00
VIRX HOURS
6.0
CONTRACT HOURLY RATE I $ 0242.00 $ 0192.00 I $ 0191.00 I $ 151.00 I $ 113.00 I $ 1113.00 I $ 082.00 8 5
VRX SUBTOTAL (Water)
$ 1,096.00
DESCRIPTION
Project
Engineer
Engineer In
Training
TOTAL
HOURS
LABOR COST
SHIELD ENGINEERING GROUP, PLLC
PS&E (Sanitary Sewer)
Plan updates & profile revisions to eliminate
conflict with ATMOS gas (relocated in 2021)
1.0
12.0
13.0
$ 1,975.00
Verify Sewer capacity calculations
1.0
1.0
$ 175.00
Coordinate & update base files
8.0
8.0
$ 1,200.00
SEG HOURS 0.0 0.0
0.0 2.0
20.0
22.0
CONTRACT HOURLY RATE
$ 175.00
$ 150.00
SEG SUBTOTAL 11 1 $ 3,350.00 1
PROJECT TOTAL $ 10,668.00 11
8/21/2023
1of1
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Engineering Agreement for Trentman St. Bridge, Amendment #4
M&C: N/A CPN
Date:
08/09/2023
To:
Name
1.
Filogonio Munoz
2.
Nawal (Noelle) Ibrahim
3.
Sandip Uprety
4.
Gregory Robbins
5.
Mary Hanna
6.
Patricia L. Wadsack
7.
Lauren Prieur
8.
Douglas W. Black
9.
William Johnson
10.
Jannette Goodall
11.
TPW Contracts
100604 CSO: 51468 DOC#:
Department
Initials
Date Out
TPW
F R
Sep 14, 2023
VRX, Inc. Vendor N.J. -
Sep 18, 2023
TPW-
a
Sep 14, 2023
TPW
Sep 18, 2023
TPW
Sep 19, 2023
TPW
pL PLW
Sep 19, 2023
TPW
Sep 19, 2023
Legal
d
Sep 21, 2023
CMO
W
Sep 21, 2023
CSO
R
Sep 21, 2023
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ❑No
RUSH: DYES ®No SAME DAY: DYES ®No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsn,FortWorthTexas.sov at ext. 7233 for pick up when completed.
Thank you!