Loading...
HomeMy WebLinkAboutContract 57011-AR10CSC No. 57011-AR10 FoR,�RTH ., City of Fort Worth Construction Allowance Request Project Named Trinity Boulevard Phase 1 - IH 820 to Salado Trail Client Project #(s) l 102101 I City Sec # 157011 Project Trinity Boulevard Phase 1 - Roadway, Drainage, Illumination, Landscape and Traffic Improvements Description ContractorlSJ Louis Construction of Texas LTD. I CA #I 10 I Datel 9/13/2023 City Project Mgr.I Mitch Aiton I City Inspectorl Steve Johnson UNIT or DEPT Original Contract Amount Extras to Date Credits to Date Current Contract Amount JAmount of Proposed Allocation Original Allowance Available to Allocation Allowance Funds Previously Allocated Revised Allowance Balance Unit I, IV & V $16,716,606.80 Unit II $5,063,103.22 Unit III $230,906.00 I Totals $22,010,616.02 $16,716 606.80 $5 063,103.22 $230 906.00 $22 010 616.02 $7 400.00 $0.00 $0.00 $0.00 $7 400.00 $500,000.00 $225,933.27 $100,000.00 $81,092.90 $20,000.00 $13,307.34 $620,000.00 $320,333.51 $266,666.73 $18,907.10 $6,692.66 $0.00 1 $292 266.49 JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request (with attachments): This construction allowance is to add item 27A Gas Well Gate Relocation for 1 LS at $7,400. We need to keep access to a gas well but with the 5 8 feet change in grade there is not a safe place to keep access to the trucks near the existing driveway. In coordination with the gas company, there is a gate on the opposite side of the pad that could be relocated and gas well trucks could access the pad from previously constructed concrete pavement. The work is done by a subcontractor that included grading and culvert work in addition to the gate relocation. Price is considered fair and justified, recent bid with similar items can be provided for reference upon request. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. SJ Louis Construction of Texas LTD. I Adam Lunsford I',, Sep 13, dlnspection Supervisor ��E,7 Date Sep 13, 2023 Project and Contract Compliance Manager Mn'oL Anon Date Sep 13, 2023 Program Manager Date Se ' Project Officer Date Sep 14, 2023 eo of se < o� 3 z CDT)Sep 14, 2023 Assistant Director (Dept) Oat✓icier 6 wadsacK Date Sep 20, 2023 Direc Llment (Dept) Date Sep 20, 2023 nt City Attorney Date lAssistant Cit M Date 9 Sep 21, 2023„ ow..„ Sep 21, 2023 O� FOR?°�J'aa ATTEST: pFo° o9�do Jannette Goodall, City Secretary °d�*�° ,_. a°au rezp54ab �dd664� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Construction Allowance SUMMARY Page 1 of 4 FORT WORTH, City of Fort Worth Construction Allowance Additions Project Name I Trinity Boulevard Phase 1 - IH 820 to Salado Trail Fity Sec # I 57U11 Client Project # 1 102101 1 ContractorISJ Louis Construction of Texas LTD. PM1 Mitch Aiton I Inspector) Steve Johnson Construction Allowance Submittal # ate I 9/13/2U23 I ADDITIONS ITEM DESCRIPTION DEPT 27A Gas Well Gate Relocation Unit I. IV & V Qty Unit Unit Cost Total 1.0000 LS $7,400.00 $7,400.00 Unit I, IV & V $7,400.00 Unit II $0.00 Unit III $0.00 $0.00 Total Additions $7,400.00 Construction Allowance Additions Page 2 of 4 FORT WORTH,, City of Fort Worth Construction Allowance Value Project Name I Trinitv Boulevard Phase 1 - IH 820 to Salado Trail I City Sec # I 57U11 Client Project # 1 102101 1 Contractor SJ Louis Construction of Texas LTD. I PM1 Mitch Aiton I Inspector) Steve Johnson Construction Allowance Submittal # ® Date 1 9/13/2023 1 CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total Unit 1 Item 84 9999.0025 Construction Allowance 0.014800 LS $500,000.00 $7,400.00 Construction Allowance Value 3of4 M/SBE for this Construction Allowance Request M/SBE Sub I Type of Service I Amount for this CAR Total $0.00 Previous Construction Allowance Requests CAR # DATE AMOUNT Total 1 $0.00 I Construction Allowance MSBE Data Page 4 of 4 REQUEST FOR INFORMATION REPORT (RFI) 1 1 CONTRACT TITLE CONTRACT NO. PRIME CONTRACTOR Trinity Boulevard Phase I to Salado Trail 57011• • • of - • 0 CONTRACTOR'S REQUEST FOR INFORMATION EQUESTING PARTY NAME REQUESTING PARTY TITLE REQUESTING PARTY ORG. PHONE DATE OF REQUE! Ronald Etter Project• ••- • I I. RFI SUBJECT SECTION(S) REFERENCED Gas '•• Gate POTENTIAL COST IMPACT POTENTIAL SCHEDULE IMPACT NO CHANGE NO CHANGE INCREASE IN COST $ 7,400.00 ■INCREASE IN TIME # of •• DECREASE IN COST DECREASE IN TIME # of D• INFORMATION REQUESTED Project can't keep access to the gas pad with the 8 foot raise in grade at this location and 5+ raise in grade at all other potential driveways or intersections. There is a gate on the west side of the gas pad that can be altered to work on a temporary basis. Mitch Aiton Sr Professional Engineer 682-715-9424 06/01 /23 08/14/23 Gas company has a preferred contractor that will do it for $7,400. Price incudes relocating gate, adding culvert for drainage and necessary dirt work for adjusting the grade. They can do the gate and we'll add some flexbase between the gas pad and the roundabout for access while the grade is raised. The proposed price for the gas companie's subcontractor to relocate the gate, add drainage culvert and grading is $7,036.25. On a recent bid for 100146 Keller Hicks, a gate was bid for $2,300, $75/CY for excavation, $50/CY for borrow. Bid tab can be provided upon request. TxDOT average bid prices show a 12" CMP at $55/1-F. The proposed price is fair and justified. No Schedule Impact REVISIONS xo p oFscRlPnox onto 1 p : p s p p GRAPHIC SCALE IN FEET 0 25 50 100 tioq �� IF PLAN SHEET IS 11X1J, SCALE IS. 1�=100' LEGEND CONCRETE PAVEMENT YATH O INTEGRAL CURB INTEGRAL COLORED TRUCK APRON _ INTEGRAL COLORED AND TEXTURED CONCRETE ISLAND INTEGRAL COLORED AND TEXTURED CONCRETE FLEXIBLE BASE, TYPE A. GR-1 TEMP ACCESS PAVING POINTS ND. NORTHING EASTING DESC T/P ELEV 1 69JJ5]3 3611 2365803 5129 BEGIN 498 06 2 fi9J.... .51 2365J81 4719 BEGIN 498 06 3 6977715 7673 2365869 7193 PT 49J 2B 4 6977745.J414 2365870 9641 PT 497 OB 5 69J]]10.5483 11111111117 PC a9J 08 6 69]]]40.522a 2365996 6346 PC 497,09 J 69]JJ40.6808 2356077 8744 PT 497,05 8 69]]J618099 2366056 5090 PT 49706 9 6978129 5736 2366502 0747 PC 49608 10 6978144 3160 2366488 5594 PC 49607 11 69]8151.6691 2366531 8199 PT a96.08 12 6978168.8665 2366521.6097 PT 496.08 13 6978215.4833 2366639 3036 END 49505 14 59]8232.6805 2356629 0934 END 495.06 �1111j, a: :T Kimley>>> Horn BIN P—. (-1 33s 6s 1 1F.. (817)1335- 70 T9RE TX 76102 N. F_928 C PRQIECT p0210I MAPSCO NO- O661, O66C & 0680 CITY OF FORT WORTH, TEXAS TRANSPORTATION AND PUBLIC WORKS CAPITAL DELIVERY DIVISION TRINITY BOULEVARD ROADWAY IMPROVEMENTS I.H. 820 TO SALADO TRAIL TEP BARNETT TEMPORARY ACCESS EXHIBIT DESIGNED TDT I SCALE' DATE' SHEET: DRAWN: LA 1' 50 August 2023 CHECKED JNR Request for Proposal Project Name C.M.R. -Proposal No. Date Trinity Blvd., Phase I (I.H. 820 to Salado Trail) 20 September 12, 2023 City of Fort Worth, Texas Response Required By Transmitted By Mr. Mitch Aiton, P.E., PMP Ronald Etter 200 Texas Street Project Manager Fort Worth, Texas 76102 Signature Via Email R&"oA& Effor cc: Mr. Josh Kercho- Kimley Horn, Via Email Description of Work This CMR is refrence to the request to oay DOKIR Construction for the misc. items needed to make gas well access gate usable which inlcudes, berm removal, culvert, and flex base work. Breakdown of Proposal Trinity Blvd., Phase I (I.H. 820 to Salado Trail) DOKIR Construction Gas Well Gate Relocation Item Description New DOKIR Construction Gas Well Gate Relocation Quantity Unit Price Extension I LS $7,400.00 $7,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 Net Change: $7,400.00 Additional Calendar Days: 0 If acceptable, please provide an authorization signature below and return one (1) copy to our office. S.J. Louis Construction Action xc: S. J. Louis Project No. 22111 S.J. Louis Construction of Texas Ltd. 520 S. 6th Avenue Mansfield, Texas 76063 (817) 477-0320 Office (817) 477-0552 Fax Dokir Construction Co., Inc. 657 S FM 2331 Godley, TX 76044 Bill To TEP Barnett USA, LLC Field -Barnett Attn: Field Services 5657 E 1st Street Fort Worth, TX 76103 Quantity Description Job: Poly Trt A Pad P.O. No 08/15/2023 to 08/16/2023 Regrade northwest comer of pad, bring in materials to add access, move berm and weir gate to accommodate gates, add culvert near gates for drainage Labor, Equipment and Materials Materials - 3 loads base Vendor50000034 Attn: Julie Miller Sales Tax Thank you for your business. Invoice Date Invoice # 9/18/2023 1 2808 Terms Project Net 30 Rate Amount 6,500.00 6,500.00T 8.25% 536.25 Total $7,036.25 FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Trinity Boulevard CA #10 M&C: N/A CPN: 102101 CSO: 57011 DOC#: N/A Date: 9/13/2023 To: Name Department Initials Date Out 1. Mitch Aiton TPW - Signature N MA Sep 13, 2023 2. Jessica Rodriquez TPW - Review zw,— Sep 13, 2023 3. Adam Lunsford SJ Louis - Signature P Sep 13, 2023 4. Steve Johnson TPW - Signature�Z Sep 13, 2023 5. Raul Lopez TPW - Signature AA AA Sep 14, 2023 6. Lissette Acevedo TPW — Signature G�v Sep 14, 2023 7. Patricia Wadsack TPW — Signature PLWPLw Sep 20, 2023 8. Lauren Prieur TPW — Signature Sep 20, 2023 9. Doug Black Legal — Signature dwbwb Sep 21, 2023 10. William Johnson CMO — Signature WX Sep 21, 2023 11. Jannette Goodall CSO - Signature RF Sep 21, 2023 12. TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ® For Your Information ® Signature/Routing and or Recording ® Comment ❑ File Return To: Please notify TPWContractsnu,fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!