HomeMy WebLinkAboutContract 57011-AR10CSC No. 57011-AR10
FoR,�RTH .,
City of Fort Worth
Construction Allowance Request
Project Named Trinity Boulevard Phase 1 - IH 820 to Salado Trail
Client Project #(s) l 102101
I City Sec # 157011
Project Trinity Boulevard Phase 1 - Roadway, Drainage, Illumination, Landscape and Traffic Improvements
Description
ContractorlSJ Louis Construction of Texas LTD. I CA #I 10 I Datel 9/13/2023
City Project Mgr.I Mitch Aiton I City Inspectorl Steve Johnson
UNIT or DEPT
Original Contract Amount
Extras to Date
Credits to Date
Current Contract Amount
JAmount of Proposed Allocation
Original Allowance Available to Allocation
Allowance Funds Previously Allocated
Revised Allowance Balance
Unit I, IV & V
$16,716,606.80
Unit II
$5,063,103.22
Unit III
$230,906.00
I Totals
$22,010,616.02
$16,716 606.80
$5 063,103.22
$230 906.00
$22 010 616.02
$7 400.00
$0.00
$0.00
$0.00
$7 400.00
$500,000.00
$225,933.27
$100,000.00
$81,092.90
$20,000.00
$13,307.34
$620,000.00
$320,333.51
$266,666.73
$18,907.10
$6,692.66
$0.00
1 $292 266.49
JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor and material as per
attached proposed Construction Allowance Request (with attachments):
This construction allowance is to add item 27A Gas Well Gate Relocation for 1 LS at $7,400. We need to keep access to a gas well but with the 5
8 feet change in grade there is not a safe place to keep access to the trucks near the existing driveway. In coordination with the gas company,
there is a gate on the opposite side of the pad that could be relocated and gas well trucks could access the pad from previously constructed
concrete pavement. The work is done by a subcontractor that included grading and culvert work in addition to the gate relocation. Price is
considered fair and justified, recent bid with similar items can be provided for reference upon request.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
SJ Louis Construction of Texas LTD. I Adam Lunsford I',,
Sep 13,
dlnspection Supervisor
��E,7
Date
Sep 13, 2023
Project and Contract Compliance Manager
Mn'oL Anon
Date
Sep 13, 2023
Program Manager
Date
Se ' Project Officer
Date
Sep 14, 2023
eo of se < o� 3 z CDT)Sep
14, 2023
Assistant Director (Dept)
Oat✓icier 6 wadsacK
Date
Sep 20, 2023
Direc Llment (Dept)
Date
Sep 20, 2023
nt City Attorney
Date
lAssistant Cit M
Date
9
Sep 21, 2023„
ow..„
Sep 21, 2023
O� FOR?°�J'aa
ATTEST: pFo° o9�do
Jannette Goodall, City Secretary °d�*�° ,_.
a°au rezp54ab
�dd664�
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Construction Allowance SUMMARY
Page 1 of 4
FORT WORTH, City of Fort Worth
Construction Allowance Additions
Project Name I Trinity Boulevard Phase 1 - IH 820 to Salado Trail Fity Sec # I 57U11
Client Project # 1 102101 1
ContractorISJ Louis Construction of Texas LTD. PM1 Mitch Aiton I Inspector) Steve Johnson
Construction Allowance Submittal # ate I 9/13/2U23 I
ADDITIONS
ITEM DESCRIPTION DEPT
27A Gas Well Gate Relocation Unit I. IV & V
Qty Unit Unit Cost Total
1.0000 LS $7,400.00 $7,400.00
Unit I, IV & V $7,400.00
Unit II $0.00
Unit III $0.00
$0.00
Total Additions $7,400.00
Construction Allowance Additions
Page 2 of 4
FORT WORTH,, City of Fort Worth
Construction Allowance Value
Project Name I Trinitv Boulevard Phase 1 - IH 820 to Salado Trail I City Sec # I 57U11
Client Project # 1 102101 1
Contractor SJ Louis Construction of Texas LTD. I PM1 Mitch Aiton I Inspector) Steve Johnson
Construction Allowance Submittal # ® Date 1 9/13/2023 1
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
Unit 1
Item 84 9999.0025 Construction Allowance 0.014800 LS $500,000.00 $7,400.00
Construction Allowance Value
3of4
M/SBE for this Construction Allowance Request
M/SBE Sub I Type of Service I Amount for this CAR
Total $0.00
Previous Construction Allowance Requests
CAR # DATE AMOUNT
Total 1 $0.00 I
Construction Allowance MSBE Data
Page 4 of 4
REQUEST FOR INFORMATION REPORT (RFI)
1 1
CONTRACT TITLE CONTRACT NO. PRIME CONTRACTOR
Trinity Boulevard Phase I to Salado Trail 57011• • • of - • 0
CONTRACTOR'S REQUEST FOR INFORMATION
EQUESTING PARTY NAME REQUESTING PARTY TITLE REQUESTING PARTY ORG. PHONE DATE OF REQUE!
Ronald Etter Project• ••- • I I.
RFI SUBJECT SECTION(S) REFERENCED
Gas '•• Gate
POTENTIAL COST IMPACT POTENTIAL SCHEDULE IMPACT
NO CHANGE NO CHANGE
INCREASE IN COST $ 7,400.00 ■INCREASE IN TIME # of ••
DECREASE IN COST DECREASE IN TIME # of D•
INFORMATION REQUESTED
Project can't keep access to the gas pad with the 8 foot raise in grade at this location and 5+ raise in grade at all other potential
driveways or intersections.
There is a gate on the west side of the gas pad that can be altered to work on a temporary basis.
Mitch Aiton Sr Professional Engineer 682-715-9424 06/01 /23 08/14/23
Gas company has a preferred contractor that will do it for $7,400. Price incudes relocating gate, adding culvert for drainage and
necessary dirt work for adjusting the grade. They can do the gate and we'll add some flexbase between the gas pad and the
roundabout for access while the grade is raised.
The proposed price for the gas companie's subcontractor to
relocate the gate, add drainage culvert and grading is $7,036.25.
On a recent bid for 100146 Keller Hicks, a gate was bid for $2,300,
$75/CY for excavation, $50/CY for borrow. Bid tab can be
provided upon request. TxDOT average bid prices show a 12"
CMP at $55/1-F. The proposed price is fair and justified.
No Schedule Impact
REVISIONS
xo p oFscRlPnox onto
1 p
: p
s p
p
GRAPHIC SCALE IN FEET
0 25 50 100
tioq ��
IF PLAN SHEET IS 11X1J,
SCALE IS. 1�=100'
LEGEND
CONCRETE PAVEMENT
YATH O
INTEGRAL CURB
INTEGRAL COLORED TRUCK APRON _
INTEGRAL COLORED AND TEXTURED
CONCRETE ISLAND
INTEGRAL COLORED AND TEXTURED
CONCRETE
FLEXIBLE BASE, TYPE A. GR-1
TEMP ACCESS PAVING POINTS
ND. NORTHING EASTING DESC T/P ELEV
1 69JJ5]3 3611 2365803 5129 BEGIN 498 06
2 fi9J.... .51 2365J81 4719 BEGIN 498 06
3 6977715 7673 2365869 7193 PT 49J 2B
4 6977745.J414 2365870 9641 PT 497 OB
5 69J]]10.5483 11111111117 PC a9J 08
6 69]]]40.522a 2365996 6346 PC 497,09
J 69]JJ40.6808 2356077 8744 PT 497,05
8 69]]J618099 2366056 5090 PT 49706
9 6978129 5736 2366502 0747 PC 49608
10 6978144 3160 2366488 5594 PC 49607
11 69]8151.6691 2366531 8199 PT a96.08
12 6978168.8665 2366521.6097 PT 496.08
13 6978215.4833 2366639 3036 END 49505
14 59]8232.6805 2356629 0934 END 495.06
�1111j,
a: :T
Kimley>>> Horn
BIN
P—. (-1 33s 6s 1 1F.. (817)1335- 70 T9RE TX 76102
N. F_928
C PRQIECT p0210I MAPSCO NO- O661, O66C & 0680
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS
CAPITAL DELIVERY DIVISION
TRINITY BOULEVARD
ROADWAY IMPROVEMENTS
I.H. 820 TO SALADO TRAIL
TEP BARNETT
TEMPORARY ACCESS EXHIBIT
DESIGNED TDT I SCALE' DATE' SHEET:
DRAWN: LA 1' 50 August 2023
CHECKED JNR
Request for Proposal
Project Name
C.M.R. -Proposal No. Date
Trinity Blvd., Phase I (I.H. 820 to Salado Trail)
20 September 12, 2023
City of Fort Worth, Texas
Response Required By
Transmitted By
Mr. Mitch Aiton, P.E., PMP
Ronald Etter
200 Texas Street
Project Manager
Fort Worth, Texas 76102
Signature
Via Email
R&"oA& Effor
cc: Mr. Josh Kercho- Kimley Horn, Via Email
Description of Work
This CMR is refrence to the request to oay DOKIR Construction for the misc. items needed to make gas well access gate usable which
inlcudes, berm removal, culvert, and flex base work.
Breakdown of Proposal
Trinity Blvd., Phase I (I.H. 820 to Salado Trail)
DOKIR Construction Gas Well Gate Relocation
Item Description
New DOKIR Construction Gas Well Gate Relocation
Quantity Unit Price Extension
I LS $7,400.00 $7,400.00
$0.00
$0.00
$0.00
$0.00
$0.00
Net Change: $7,400.00
Additional Calendar Days: 0
If acceptable, please provide an authorization signature below and return one (1) copy to our office.
S.J. Louis Construction Action
xc: S. J. Louis Project No. 22111
S.J. Louis Construction of Texas Ltd.
520 S. 6th Avenue
Mansfield, Texas 76063
(817) 477-0320 Office (817) 477-0552 Fax
Dokir Construction Co., Inc.
657 S FM 2331
Godley, TX 76044
Bill To
TEP Barnett USA, LLC
Field -Barnett
Attn: Field Services
5657 E 1st Street
Fort Worth, TX 76103
Quantity
Description
Job: Poly Trt A Pad
P.O. No
08/15/2023 to 08/16/2023
Regrade northwest comer of pad, bring in materials to add access,
move berm and weir gate to accommodate gates, add culvert near
gates for drainage
Labor, Equipment and Materials
Materials - 3 loads base
Vendor50000034
Attn: Julie Miller
Sales Tax
Thank you for your business.
Invoice
Date Invoice #
9/18/2023 1 2808
Terms Project
Net 30
Rate Amount
6,500.00 6,500.00T
8.25% 536.25
Total $7,036.25
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Trinity Boulevard CA #10
M&C: N/A CPN:
102101
CSO:
57011
DOC#: N/A
Date:
9/13/2023
To:
Name
Department
Initials
Date Out
1.
Mitch Aiton
TPW
- Signature
N MA
Sep 13, 2023
2.
Jessica Rodriquez
TPW - Review
zw,—
Sep 13, 2023
3.
Adam Lunsford
SJ Louis - Signature P
Sep 13, 2023
4.
Steve Johnson
TPW
- Signature�Z
Sep 13, 2023
5.
Raul Lopez
TPW
- Signature
AA AA
Sep 14, 2023
6.
Lissette Acevedo
TPW
— Signature
G�v
Sep 14, 2023
7.
Patricia Wadsack
TPW
— Signature
PLWPLw
Sep 20, 2023
8.
Lauren Prieur
TPW
— Signature
Sep 20, 2023
9.
Doug Black
Legal
— Signature
dwbwb
Sep 21, 2023
10.
William Johnson
CMO
— Signature
WX
Sep 21, 2023
11.
Jannette Goodall
CSO
- Signature
RF
Sep 21, 2023
12. TPW Contracts
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
® For Your Information
® Signature/Routing and or Recording
® Comment
❑ File
Return To: Please notify TPWContractsnu,fortworthtexas.gov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!