HomeMy WebLinkAboutContract 57029-A1CSC No. 57029-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 57029 WHEREAS, the City of Fort Worth (CITY) and Neel -Schaffer, Inc., (ENGINEER) made and entered into City Secretary Contract No. 57029, (the CONTRACT) which was authorized by M&C 22-0049 on the 11th day of January, 2022 in the amount of $543,512.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2020, WSM-J; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $53,760.00 (Water: $37,632; Sewer: $16,128. 00) . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $597,272.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [WSSS Repl. Contract 2020 WSM-J] Prof Services Agreement 7wendment Template [1034201 Revision Cate: November 23, 2021 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth pana Burandoff (Sep 2, 202 .. 8 CDT) Dana Burghdoff Assistant City Manager DATE: Sep 22, 2023 APPROVAL RECOMMENDED: Chri,+r,,,hPr HACI(Ir (Sen W -)m'� 14 i3 CDT1 Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Neel -Schaffer, Inc. J�Ies P. Amick, P.E. .Engineering Manager DATE: 9 r,� z� r2 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. L am Conlon Project Manager APPROVED AS TO FORM AND LEGALITY wj�� 1 nplarl* ISan 71 7n7-� 14-05 CDT) Douglas W. Black Sr. Assistant City Attorney d4�oponu aAF FORt add ATTEST: pC90 0 4 °6o b� Jannette Goodall City Secretary City of Fort Worth, Texas Prof services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 M&C'. N/A Date: N/A Form 1295: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX (P7c98 Repl. Contract 2020 i13H-J) (1034201 RL NEEL-SCH,AEEER Solutions you can build upon September 7, 2023 Mr. Liam Conlon City of Fort Worth - Water Department 311 West 10th Street Fort Worth, Texas 76102 Reference: Design Services for Water and Sanitary Sewer Replacement Contract 2020, WSM-J, City Project Number 103420; Amendment 1 for Additional Services to Extend the Project by adding Malvern Trail waterline to the project, and other adjustments to water and sewer alignments within the existing project scope. Revision 6. Dear Liam: Neel -Schaffer, Inc. offers additional Professional Engineering and Surveying Services for this project. These additional services were requested by the City of Fort Worth, since there has not been a water rehabilitation project on Malvern Trails from Canberra Court to Mitchell Boulevard. The sanitary sewer in Malvern Trail was replaced in two projects in 1998 (X-17829) and 1999 (X-17891) respectively and will not be addressed in this amendment. This amendment will also cover the City's request to re-route the sewer lateral L-2513 off of the Catholic Diocese of Fort Worth property on Burchill Road to relocate this lateral in Burchill Road to tie to existing sewer lateral L-2660 at McKenzie Street then proceed northerly along McKenzie Street approximately 155 feet to the original ending manhole east of the Catholic Diocese of Fort Worth property. The survey limits of the work are approximately 900 feet of Malvern Trail from Canberra Court to Mitchell Boulevard for the Malvern Trail portion of the addition and approximately 155 feet of survey will be required on McKenzie Street to complete the mapping. An additional 600 feet of Burchill Road from the west side of Binkley Street to its junction with Vaughn Boulevard is included. The water and sanitary sewer work and associated paving replacement are described below: TASK DESCRIPTION Task 1.0 Project Management & Prepare Monthly MBE/SBE Reports. ($2,645.00) Task 2.1 Additional 150' of 12" waterline (design) in Mitchell Blvd. ($3,460.00) Task 2.2 Additional 50' of 24" waterline (design) in Mitchell Blvd. at Moresby Street. ($2,235,00) Task 2.3 Additional 80' of 8" waterline (design) across Mitchell Blvd. at Malvern Trail. ($535.00). Task 2.4 Realignment of 900' of 12" waterline (design) in Berry Street to middle of road to shorten long services ($5,010.00). Task 2.5 Second revision to tle-in for 24" waterline (design) in Mitchell Blvd. at E. Berry Street due to timing of project with other projects consultant. ($2,235.00) ARLINGTON • DALLAS • FORT WORTH • HOUSTON • SAN ANTONIO engineers • planners • surveyors • environmental scientists • landscape architects 515 Houston St., Ste, 651 • Fort Worth, TX 76102 • ph: 817-870-2422 • fax: 817-870-2489 • www,neeI-schaffer.com Mr. Liam Conlon September 7, 2023 Page 2 Task 2.6 Second revision to tie-in for 12" waterline (design) in Mitchell Blvd. at E. Berry Street due to timing of projects with other projects consultant. ($2,235.00) Task 2.7 Additional 335' of 8" sanitary sewer in Burchill Road (survey & design) to eliminate line through Catholic Diocese Property. ($3,215.00) Task 2.8 Additional 154' of 12" sanitary sewer (survey & design) in McKenzie to tie-in to original location. ($2,205.00) Task 2.9 Revision of waterline in Shropshire Street from an 8" waterline to a 12" waterline from Canberra Court to the 12" waterline and junction with Sandgate Street with the 12" profile added. ($3,730.00) Task 2.10 The addition, then removal of the 8" waterline on Burchill's south end (survey & design) from junction with Binkley Street to junction with Vaugh Boulevard being approximately 600 feet of additional survey and two plan sheets for the 8" waterline, plus the additional paving area modifications. ($5,965.00) Task 3.1 Malvern Trail addition of 870' of 6" waterline replacement (survey & design) with 8" waterline from Mitchell Blvd. to Canberra Court. ($6,307,00) Task 3.2 Addition of 860 feet of POL for Malvern Trail from Mitchell Blvd. to Canberra Court. ($855.00) Task 3.3 Adjustments to Layout and Paving Sheets ($320.00) Task 8.0 Additional Design Surveys. ($12,810) This work will require approximately two new double plan sheets for the Malvern Trail 8" water line replacement. One new plan/profile sheet may be needed for the re-route of the 8" lateral, L-2660, in Burchill Road. No additional SUE or Geotechnical work is included, Neel -Schaffer, Inc. proposes to increase the contract amount by $53,760.00 for these additional services. See attached Level of Effort for backup. All additional services will be performed in accordance with the original contract dated January 22, 2022. Summary of Contract Fee Original Contract Amount Proposed Amendment No. 1 Revised Contract Amount $543,512.00 $ 53, 760.00 $597,272.00 O:Mobs\16921 -2020 WSM-AAdm4AContmc1\Am 1\2020 WSM ] Amendment 01_ReO.doox Mr. Liam Conlon September 7, 2023 Page 3 If you have any questions or we may be of further service, please call me at 817/870-2422. Sincerely, NE L-SCHAFFER, INC. Richar E. "Rick" Sh pson, RPLS, PS Senior Project Manager TBPElS PE Firm Reg. No. F-2697 TOPEtS LS Firm Reg. No.10027200 HL O:Vobs\16921 - 2020 WSM-AAdmin\Contract\Am 1\2020 WSM-J Amendment IIl_RoO.dom 1 �A EXHIBIT B-2 Level of Effort Spreadsheet Rev. 2 TASK/HOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract 2020, WSM-J Amendment 1 City Project No. 103420 Labor (hours) E(pense Task No. Task Description Principal Project Project EIT I CADD Administrative Total Labor Subconsultant I Total Expense Task Sub Total Percent ManaR@@r, Engineer Cost Travel Reproduction Cost Complete Rate $270 $215 $185 $1401 $160 $95 MWBE Non-MWBE 1.0 Project Management 0 71 01 01 0 12 $2,64$ $0 $0 $0 $0 $0 $2,645 1.1 Managing the Team I I I Sty $0 SO 1.2 aq d Reporting 2I S430 $0 $430 .Com�icto PrU12.1 esian Zoordination Meeting 1 $215 $0 $215 1.2.2 Design Submittal Review Meetings 21 1 1 $430 $0 $430 1.2.3 Prepare Baseline Schedule 1 11 I I $215 $0 $215 Prepare Monthly Progress Reports with 1.2.4 Schedule I 11 I I I 6 $785 SO $785 1.2.5 Prepare Monthly MBE/SSE Reports I I I 6 $570 1 $0 $570 2.0 Design 01 221 481 01 1521 0 $37,930 $01 $01 $0 $375 $375 $38,305 2" waerline in M itchell I J 1 2.1 Blvd. at MoresbylStr ett(sheet 14) 4 8 $2,235 $0 $2,235 Additional 50' of 24" waterline in Mitchell I 2.2 Blvd. at Moresby Street (sheet 8) 1 4 8 $2,235 $0 $2,235 Additional 0' of 8" waterline across 2.3 Michell BlvBd. at Malvern Trail (sheet 11) I 1 21 $535 I I I $0 $535 Add 'of 12" waterline across OE. I I I 2.4 By d,atBerry Street (sheet 12Mitchell 11 2 4 $1,225 $01 $1,2251 Realign 900' of 12" waterline in Berry to middle of road to shorten long services 2.5 (three sheets) (sheets 19,20, & 21) 2 4 24 $5.010 SO $5,010 Second revision to tie-in for24" waterline in Mitchell Blvd at E. Berry Street due to J time of projects with other projects J 2.6 consultant 8 $2,235 $0 $2,235 Second revision to tie-in for 12" waterline in Streetdueto atth timethererry time of projects with other projects 2.7 arrojectBlv 1 4 8 $2,235 $0 $2,235 Additional 335' of 8" sewer in Burchill Road to eliminate line through Catholic 1 1 2.8 Diocese Property (sheet 32) 2 4 12 $3,090 $125 $125 $3,215 Addit154' of 12" in I 1 1 I 2.9 tobe� nnal to original locatine(new sh et)1e 2 21 8 S2,080 $1251 $1251 $2,2051 Malvern - 870' of 8" waterline (two I 2.10 new sheets) I 4 11 I 241 $6,180 I I $1251 $1251 $6,3051 Revision of waterline in Shropshire Street from an 8" waterline to a 12" waterline from Canberra Court to the 12" waterline and junction with Sandgate Street with the ;. 2.1�we�eVLv�inchprolle added. 2 4 16 $3,730 $0 $3.730 Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Remaining Budget The addition, then removal, of the 8" waterline on Burchill's south end from junction with Binkley Street to junction with Vaughn Boulevard, being approximately 600 feet of additional survey and two plan sheets for the 8" 2.12 waterline 3 8 2.13 Malvern Trail - 860' Paving 1 I 1 2.14 Adjustment to Layout & Paving Sheets I I I I 8.0 Survey I I 01 21 I 0l I 0 8.1 Design Survey 1 21 1 10.0 Additional Services of 01 01 01 Additional Uesign Services (as uirected oy 10.1 City) Totals 0 311 481 01 1 Water Line Footage 1,1501 70% I Sewer Line Footage 4891 30% 1,639 100% (A) Total Fee $53.760 (B) Survey Fee $10,500 (C) Total Fee ((- survey Fee $43,260 1 Water Fee (�0% of C) Sewer Fee (30% of C) I $30.282.00 I $12,978.00 1 Description WP Water Sewer I Conceptual Design (30%) 30 $9,085.00 $3,893.00 I Preliminary Design (60%) 30 $18,169.00 $7,787.00 1 Final Design (10%) 30 $3,028.00 $1,298.00 I Survey 30 $7,350.00 $3,150.00 I I Subtotal I $37.632.00 1 $16,128.00 I Total I $53,760.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 24 $5,965 41 $855 21 $320 41 2 $1,260 $10,5001 $0 $0 41 2 $1,260 $10,5001 1 01 0 $0 1 1 1 $01 Sol $ol 1561 14 $41,835 $10,5001 $01 $01 $0 $5,965 $0 $855 so 5320 $0 $10,500 $11,760 $10,500 511,760 $0 $0 $0 $0 $0 $375 $10,875 $52,710 Project Summary Total Hours 249 Total Labor $41,835 Total Expense $375 MBE/SBE Subconsultant $10.500 Non-MBE/SBE Subconsultant $0 10% Sub Markup $1,050 MBE/SBE Participation 19.5% Total Project Cost $53,760.00