HomeMy WebLinkAboutContract 57449-FP1 (2)City Secretary -FP1 Contract No. 57449 FORT WORTHa Date Received 09/21/2023 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: The Blue Lagoon Dream Addition City Project No.: 103231 Improvement Type(s): 0 Paving Original Contract Price: ❑ Drainage ❑ Street Lights ❑ Traffic Signals Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: Cl��is youn Chris Youne(Seo 21. 202 3:29 CDT) Contractor C00 Title McMahon Contracting, LP Company Name Sereio Garcia Pedroza (Sep 21, 202313:33 CDT) Project Inspector lChaG , aa�aL'P U. Khal Jaafari P.E. (Sep 11, 202314:52 CDT) PPr�(oj1{ect Manager Rebecca Die Owen (Seo 21. 202315:20 CDT) CFA Manager TPW Director 1.�J.hn-nJ-.,--% willia22.202300:14 GMT+2) Asst. City Manager $746,280.68 -$136, 799.82 $609,480.86 $609,480.86 Sep 21, 2023 Date Sep 21, 2023 Date Sep 21, 2023 Date Sep 21, 2023 Date Sep 21, 2023 Date Sep 22, 2023 Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: The Blue Lagoon Dream Addition City Project No.: 103231 City's Attachments Final Pay Estimate ❑x Change Order(s): & Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety. Statement of Contract Time Contract Time 120 WD Work Start Date: 6/21/2022 Completed number of Soil Lab Test: 304 Completed number of Water Test: 8 Days Charged: 256 Work Complete Date: 8/7/2023 Page 2of2 FORT WORT 11 CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name THE BLUE LAGOON DREAM ADDITION Contract Limits Project Type PAVING IMPROVEMENT City Project Numbers 103231 DOE Number 3231 Estimate Number 1 Payment Number 1 For Period Ending 8/7/2023 WD City Secretary Contract Number Contract Time 12WD Contract Date 5/3/2022 Days Charged to Date 256 Project Manager NA Contract is 100.00 Complete Contractor McMAHON CONTRACTING, LP P.O. BOX 153086 IRVING, TX 75015 Inspectors O.AGUILLON / S. GARCIA Thursday, September 14, 2023 Page 1 of 4 City Project Numbers 103231 DOE Number 3231 Contract Name THE BLUE LAGOON DREAM ADDITION Estimate Number I Contract Limits Payment Number 1 Project Type PAVING IMPROVEMENT For Period Ending 8/7/2023 Project Funding UNIT IV: PAVING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 CEMENT (32 LB/SY) 126 TN $270.00 $34,020.00 126 $34,020.00 2 6" CEMENT TREATMENT (STREET) 7847 SY $6.24 $48,965.28 7847 $48,965.28 3 7" CONC PVMT (STREET) 7372 SY $55.09 $406,123.48 7372 $406,123.48 4 7" CONC PVMT (ALLEY) 1420 SY $60.31 $85,640.20 1420 $85,640.20 5 4" CONC SIDEWALK (CO #4) 0 SF $7.13 $0.00 0 $0.00 6 4" FLEXIBLE BASE, TYPE A GR-1 (ALLEY) 1665 SY $20.86 $34,731.90 1665 $34,731.90 7 BARRIER FREE RAMP TYPE P-1 (CO #4) 0 EA $2,504.74 $0.00 0 $0.00 8 TOPSOIL (CO #4) 0 CY $60.00 $0.00 0 $0.00 9 BLOCK SOD PLACEMENT (CO #4) 0 SY $9.60 $0.00 0 $0.00 10 FURNISH/INSTALL ALUM SIGN GROUND 0 EA $678.00 $0.00 0 $0.00 MOUNT CITY STD (CO #4) Sub -Total of Previous Unit $609,480.86 $609,480.86 Thursday, September 14, 2023 Page 2 of 4 City Project Numbers 103231 Contract Name THE BLUE LAGOON DREAM ADDITION Contract Limits Project Type PAVING IMPROVEMENT Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 4 Total Contract Price DOE Number 3231 Estimate Number I Payment Number 1 For Period Ending 8n12023 $746,280.68 ($136,799.82) $609,480.86 Total Cost of Work Completed $609,480.86 Less % Retained $0.00 Net Earned $609,480.86 Earned This Period $609,480.86 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $609,480.86 Thursday, September 14, 2023 Page 3 of 4 City Project Numbers 103231 DOE Number 3231 Contract Name THE BLUE LAGOON DREAM ADDITION Estimate Number I Contract Limits Payment Number 1 Project Type PAVING IMPROVEMENT For Period Ending 8/7/2023 Project Funding Project Manager NA City Secretary Contract Number Inspectors O.AGUILLON / S. GARCIA Contract Date 5/3/2022 Contractor McMAHON CONTRACTING, LP Contract Time 120 WD P.O. BOX 153086 Days Charged to Date 256 WD IRVING, TX 75015 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $609,480.86 Less % Retained $0.00 Net Earned $609,480.86 Earned This Period $609,480.86 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $609,480.86 Thursday, September 14, 2023 Page 4 of 4 (PROJECT NAME: CONTRACT: I CFA # CITY PROJECT # FID # FILE # INSPECTOR: PROJECT MANAGER: (ORIGINAL CONTRACT EXTRAS TO DATE CREDITSTODATE CONTRACT TO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT DEVELOPER -AWARDED -PROJECT CHANGE ORDER (flue Lagoon Dream Addition I)NIT IV PAVING IMPROVEMENTS CtFA#71-n147 I CITY PARTICIPATION] NO (;PN #103231 30114-0200431-E07685 W-2767 ! X-26870 CHANGE ORDER No: 4 Oscar Aguillon Phone No: 817 992 2600 RECEIVED Khal Jaafari, PE Phone No: 817 392 7872 By Khal Jaafari at 6:14 pm, Sep 12, 2023 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREET LIGHTS Developer O 'Wevetoper Developer Developer eveloper Cost City Cost Cost -C Cx osf' Cost _City Cost Coat City Cost Cost City Cost $233,681.00 $0.00 $190,248.00 $0.00 $746,280.68 $0.00 L000 $160,424.00 $0.00$9,000.00 $2,403.75 ($210.00)$242,581.00 $0.00 $192,661.76 $0,00 $746,280.68$160,214.00 $0.00 $0.00 $0.00 $0.00 $0.00 ($136,799.82) $0.00 $000 $242,581.00 S0.00 $192,661.75 $0.0$609,480.86$160,214.00 $0,00 $0.00 NW0,00, 242.fiA1.00 $192,661,75 $609,,480.86 $160,214.00 I $0.00 Dev. Cost: $1,204,927.61 $1,204,927.61 CONTRACT DAYS 120 120 120 Revised: 10-12-2011 Page 1 RECEIVED By Khal Jaafari at 6:14 pm, Sep 12, 2023 You are directed to make tlry. fnll{rwina chanaas in the contract documents• ' CITY BID ITEM PAY fftlA# # QUANTITY Uf(IT ITEM DES('�IPJION UNIT PRICE TOTAL Unit tV - Item 3,?.1 -0301 -4234 R, F. 4' Concr je 5id walk 7.13-$30.188.42 Unit 1V - Itgm 7 32 �3-0506 -10 EA Barrier Free �arrlp. voe P 1 $2 04.74 $25�47.40 Unit IV - Item 8 3291.9100 -530 C.Y. Toosod 40.00 -$31 �00.00 / Unit IV - lt@m . a?V-9,ign -4760 Y, ock �od Placement $9.60 - 45,&6 130 1 Unit IV -Item i� 9441-4003 -6 Furnishflnstallum Sign Ground Mount City Std $678.00 �4,063.DD TOTAI, 5136.799.82 REASONS FOR CHANGE ORDER The Contractor requested additional compensation from the Developer to install the sidewalks and backfili behind the curbs, The contracor also requested 8 weeks to be added to the contract time. To expedite the construction, the Developer obtained a different sub -contractor Io install the items at the contract price and within the original contract time. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: Thomas o er Engineeri ,LLC 707 AVENUE, LLC By: By: Name: Thomas Hoover Name: Jamal Aloffe Title: Manager Title: Owner APPROVED: McMahon Contracting, LP By: f-•--f-- � �— Name:''��A,^(�%1�1 Title: Revised: 10-12-2011 Pang 2 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS July 26, 2023 McMahon Contracting, LP 3019 Roy Orr Blvd Grand Priarie, TX 75050 RE: Acceptance Letter Project Name: The Blue Lagoon Dream Addition Project Type: T/PW — Paving Imporvements City Project No.: 103231 To Whom It May Concern: On August 10, 2023 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on August 22, 2023. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on August 22, 2023, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7872. Sincerely, k& ,7aa�al-i T E. Khal Jaafari P.E. (Sep 11, 2023 14:52 CDT) Khal Jaafari, P.E., Project Manager Cc: Sergio Garcia, Inspector Donald Watson, Inspection Supervisor Oscar Aguillon, Senior Inspector Victor Tornero, P.E., Program Manager Thomas Hoover Engineering, LLC, Consultant McMahon Contracting, LP, Contractor 707 Avenue, LLC, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 STATE OF TEXAS) CONTRACTOR'S ALL BILLS PAID AFFIDAVIT COUNTY OF DALLASI BEFORE ME, the undersigned authority, on this day personally appeared Chris Young, Chief Operations Offices, (Affiant) known to me to be the person whose name is subscribed to this affidavit: and being by me first duly sworn, upon oath stated as follows: "My name is Shelley McMahon. I am of sound mind and capable of making this affidavit." 2. "I am a Member of McMahon Contracting L P. (Contractor). I have full authority to legally bind McMahon Contracting L.P. (Contractor). McMahon Contracting L.P. entered into a CONTRACT for The Blue Lagoon Dream Addition CPN #103231 (hereinafter "CONTRACT")." 3. "All bills for labor, material, utilities, insurance and all other accounts in connection with or arising from the above CONTRACT have been paid and satisfied. Upon the request of the City of Mesquite, I will allow a complete examination of the financial records relative to this project, including canceled checks, invoices and statements." 4. "CONTRACTOR HAS FULLY SATISFIED AND PAID ANY AND ALL CLAIMS in accordance with applicable statues, ordinances, charters and other provisions." 5 _ "CONTRACTOR will accept FULL AND FINAL PAYMENT under the aforementioned CONTRACT and waives and releases any right the CONTRACTOR may have to pursue claims of any nature against the City of Mesquite arising out of or in any manner in connection with the above stated CONTRACT, including but not limited to claims for damages suffered by third parties or the CONTRACTOR due to any cause or recovery of liquidated damages suffered by third parties or the CONTRACTOR due to any cause or recovery of liquidated damages which may have been withheld by the City of Mesquite. This Affidavit shall not be deemed to after or modify the terms and provisions of the above -stated CONTRACT." Affian _4� SUBSCRIBED AND SWORN TO BEFORE ME, this 1 6t day of 2023_ A.D. to certify which witness my hand and seal of office. lowili tlipit. ,Z� A N Pi1gCI` c •;•O Notary Pubic Signature - C/) -1c gym: N 2 cr 1 `•Zorn Notary's Printed Signature <�< OM • ....... '/i�� My Commission Expires: t 1, ��� CONSENT O SURETY COMPANY TO FINAL PAYMENT <J h4 DOCUMENT G 70 7 OWNER X ARCHITECT ❑ CONTRACTOR ❑ SURETY OT14ER ❑ Bond # 219208J PROJECT: Blue Lagoon Drearn Addition, John T White Road and Williams Road, Euless (natlle, address) TO (Owner) 707 Avenue, LLC 4148 Slick Rock Cltsse Isuless, TX 76040 ARCHITECT'S PROJECT NO: CONTRACTFOR: CONTRACT DATE: FIND Dual Obligee, the City of Fort Worth CONTRACTOR: rvlcMahon Contracting, LP In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address al -Surety Company) Westfield insurance Company P O Box 5001 Westfield Center, 44251-5001 on bond of (here insert name and address of Contractor) McMahon Contracting, LP 3019 Roy Orr 131vd Grand Prairie, TX 75050 ,SURETY COMPANY, ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety company of any of its obligations to tl€ere insert name and address of0%vuer) 707 Avenue, LLC 41,18 Slielc [cock Cllasc, Lulcss,'1'X 76040 ,OWNER, as set forth in the said Surety Company's bond IN WITNESS WHEROF, 'Elie surOy Company has hereunto set its hand this 19th day of September, 2023. Westfield Insurance Coin parry Sur ty Company Signature of Authorized Representative Attest (seal): Mistie Beck, Attorney -in -);act Title NOTE: This farm is to he used as n companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVITOF PAYh4F:NT OF DrBT AND CLAINIS, Current Edition AIA DOCUMENT G707' CONSENT OF SURETY COMPANY TO FINAL PAYMENT *APRIL 1970 EDITION •AIA t970 THE AMER€CAN INSTITUTE OF ARCHITECTS, 17.13 NEW YORK AVE. NW WASHINGTON, D.C. 200E VIARNING: Unlicensed photocopying violates U.S, copyright lays and is subject to legal prosecution. THIS POWER Or ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER # AND ISSUED PRIOR TO 05125122, FOR ANY PERSON OR PERSONS NAMED BELOW. POWER NO. 4220012 14 General Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. CERTIFIED COPY Ohio Farmers Insurance Co. Westfield Centel,, Ohio Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL. INSURANCE COMPANY and 01410 FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company' and collectively as 'Companies," duly organized and existing under the laws of the State of Ohlo, and having Its principal office In Westfield Center, Medina County, Ohio, do by these presents make, constitute and appoint TONY FIERRO, JOHNNY MOSS, JAY JORDAN, MISTIE BECK, JEREMY BARNETT, JADE PORTER, ROBERT G. KANUTH, JARRETT WILLSON, JACK NOTTINGHAM, BRADY WILSON. 13RENNAN WILLIAMSON, JOINTLY OR SEVERALLY of ROCKWALL and State of TX its true and tawfO Attorney(s)-in-Fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other Instruments or contracts of suretyship In any penal limit. - - - - - - - - - • - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE, OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate seal of the applicable Company and duly attested by Its Secretary, hereby ratifying and confirming all that the said Attorney(s)•€n-Fact may do In the premises. Said appointment Is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY: 'Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorneyls)-i n- Fact to represent and act for and on behalf of the Company subject to the following provisions: The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be as binding upon the Company as it signed by the President and sealed and attested by the Corporate Secretary.' 'Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile seat shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting held on February B, 2000). In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals to be hereto affixed this 2501 day of MAY A.D., 2022 , Corporate ,40 �A , "��t7Nlli r r 11�SU WESTFIELD INSURANCE COMPANY seals$ti .�',. �a� • ts�; /'.� WESTFIELD NATIONAL INSURANCE COMPANY Affixed =�+:°" OHIO FARMERS INSURANCE COMPANY b �T n �CtiI�TE��p3 �t "4qurWHR�'•ie 41 rnu M•+f¢'"•'n;,ll l.µ,..,``� State of chin By, Ga W, tutu er, Nation Suret Leader and County of Medina ss.: Gary Senior Executive On this 25111 clay of MAY A.D., 2022 , before me personally came Gary W, Stumper to me known, Who, being by me duly sworn, did depose and say, that ha resides in Medina, OH; that tie is National Surety Leader and Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFICLO NATIONAL.. INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above instrument; that he knows the seals of said Companies; that the seats affixed to said Instrument are such Corporate seals; that they were so affixed by order of the Boards of Directors of said Companies; and that he stoned his name thereto by like order. Notarial µ„elrlwunl. Seal a"` a l A t °'"•. Affixed State. of Chao ,j+ do David A. Kotnik, Attorney at Law, Notary public County of Medina is.: �; y ��,• My Commission Does Not Expire (Sec, 147,03 Ohio Revised Codej o F v I, Frank A. Carrhio, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and 01110 FARMERS NSURANCE COMPANY, do hereby certify that the above and foregoing Is a true and correct copy of a Power of Attorney, executed by said Companies, which is stilt in Aril force and effect; and furthermore, the resolutions of the Boards of Directors, set out In the Power of Attorney are in full force and effect, tt(10" 1In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this day of ir�•"�q,t1f�R� "'.,, ,,,.,'�soN�it;,ti�,,, ,. 1�5U `fiv r".�.,'•�� ; ` Eli' ,,SG :, ..... '• ;,"�'�' W. _,-SEAL Secretary Frank A. Carrino, Secretary y��rH,llallgl"' � r r *i , r''!''�'ll,/,l, f, l,il•''', BPOAC2 (combined) (03.22)