HomeMy WebLinkAboutContract 59822-PM1CSC No. 59822-PMI
FORT WORTH
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
WATER, SANITARY SEWER, PAVING, STREET LIGHTS
AND DRAINAGE IMPROVEMENTS
FOR
RANCH AT DUCK CREEK
WJ BOAZ RD
City Project No. 104753
IPRC23-0021
FID# 30114-0200431-104753-EO7685
K-3091
Mattie Parker
Mayor
David Cooke
City Manager
Christopher P. Harder, P.E.
Director, Water Department
Lauren L. Prieur, P.E.
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
August, 2023
GMcivil
Engineering & Surveying
2559 SW Grapevine Pkwy.
Grapevine, Texas 76051
817.329.4373
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
08/28/2023
MATTWW J . BAACKE
..........................
�� . 99368 : •�
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 6
SECTION 00 00 10
TABLE OF CONTENTS
DEVELOPER AWARDED PROJECTS
Division 00 - General Conditions
Last Revised
1001113
irrtiltion tamers
03/20/2020
1002113
lastpaetiefis t bidders
03/20/2020
00 41 00
Bid FE)Fm
04/02/2014
00 42 43
Proposal Form Unit Price
05/22/2019
00 4313
Bend
04/02/2014
nn�T
Bidde s Pr-egttali f;,.., ien's
04/02/2014
0045 12
Prequalification Statement
09/01/2015
nn�3
made,. Pr-eq, alifie do A ppli ..,tie
03/09/2020
00 45 26
Contractor Compliance with Workers' Compensation Law
04/02/2014
0045 40
Minority Business Enterprise Goa
08/21/2018
00 52 43
Agreement
06/16/2016
00 61 25
Certificate of Insurance
07/01/2011
00 62 13
Performance Bond
01/31/2012
00 62 14
Payment Bond
01/31/2012
00 62 19
Maintenance Bond
01/31/2012
007200
Genera Conditions
11/15/2017
007300
c,,ppleme tar-Y Conditions
07/01/2011
0073 10
Standard City Conditions of the Construction Contract for Developer
01/10/2013
Awarded Projects
Division 01 - General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
01 2500
Substitution Procedures
08/30/2013
01 31 19
Preconstruction Meeting
08/30/2013
nio�o
Wejeet Meetings
07/01/2011
01 3233
Preconstruction Video
08/30/2013
01 3300
Submittals
08/30/2013
01 35 13
Special Project Procedures
08/30/2013
01 45 23
Testing and Inspection Services
03/20/2020
01 50 00
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
07/01/2011
0157 13
Storm Water Pollution Prevention Plan
07/01/2011
01 60 00
Product Requirements
03/20/2020
01 66 00
Product Storage and Handling Requirements
04/07/2014
01 70 00
Mobilization and Remobilization
04/07/2014
01 7123
Construction Staking
04/07/2014
01 74 23
Cleaning
04/07/2014
01 77 19
Closeout Requirements
04/07/2014
01 78 23
Operation and Maintenance Data
04/07/2014
01 78 39
Project Record Documents
04/07/2014
CITY OF FORT WORTH
W J Boaz Rd.
STANDARD CONSTRUCTION
SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS
CPN#104753
Revised March 20,
2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 6
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
NONE
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 6
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
httn:Hfortworthtexas.uov/tvw/contractors/
or
httos:Hani)s.fortworthtexas.i!ov/Proi ectResources/
Division 02 - Existing Conditions
Last Revised
0241 13
Selective Site Demolition
12/20/2012
02 41 14
Utility Removal/Abandonment
12/20/2012
0241 15
Paving Removal
02/02/2016
Division 03 - Concrete
03 30 00
Cast -In -Place Concrete
12/20/2012
03 34 13
Controlled Low Strength Material (CLSM)
12/20/2012
03 34 16
Concrete Base Material for Trench Repair
12/20/2012
03 80 00
Modifications to Existing Concrete Structures
12/20/2012
Division 26 - Electrical
26 05 00
Common Work Results for Electrical
11/22/2013
'1�0
Demolition f , > eetKv-1 &_J0t£ms
12/20/2012
26 05 33
Raceways and Boxes for Electrical Systems
12/20/2012
26 05 43
Underground Ducts and Raceways for Electrical Systems
07/01/2011
26 05 50
Communications Multi -Duct Conduit
02/26/2016
Division 31- Earthwork
31 1000
Site Clearing
12/20/2012
3123 16
Unclassified Excavation
01/28/2013
31 23 ?;_�
Berro
01/28/2013
11 24 00
amkmaants
01/28/2013
31 25 00
Erosion and Sediment Control
12/20/2012
31 36 00
Cabiens
12/20/2012
31 37 00
Riprap
12/20/2012
Division 32 - Exterior Improvements
Z7�T
Pet:maneat Aaph�k llcuing Repai
12/20/2012
32- Ai ig
Temporary Asphalt Paving D opai
12/20/2012
320129
Concrete Paving Repair
12/20/2012
32 1 1 23
> leXible Base GE)U .^o^
12/20/2012
32 1129
Lime Treated Base Courses
12/20/2012
32 11331
Gernert Treated Base r,,,,,.^o^
12/20/2012
?2 1137
Liquid Tro^*�' coil £t�ahli�
08/21/2015
37�v
Acp11 alt N,,ing
12/20/2012
1�3
Asphalt P ,ing r .^ v coal^„+^
12/20/2012
32 13 13
Concrete Paving
12/20/2012
32 1320
Concrete Sidewalks, Driveways and Barrier Free Ramps
06/05/2018
32 1373
Concrete Paving Joint Sealants
12/20/2012
32 14 16
Mdi T.TnitPa.4xg
12/20/2012
CITY OF FORT WORTH
W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS
CPN#104753
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 6
32 16 13
Coneroto r„rh and Gt ears .-ad Valley Gttt4ers
10/05/2016
32 1723
Pavement Markings
11/22/2013
3')�5
Curb nddfess Painting
11/04/2013
3231 132
Chain Fenees and Gates
12/20/2012
323126
Wife Fenees „,a Gates
12/20/2012
37�9
WeedFenees „aa Gates
12/20/2012
3232 13
Gast i Plate r, ,,rote Retaining W.,
06/05/2018
3291 19
Topsoil Placement and Finishing of Parkways
12/20/2012
3292 13
Hydro -Mulching, Seeding, and Sodding
12/20/2012
3293 43
wand Shru•c
12/20/2012
Division 33 - Utilities
333 0 30
Sewer and Nla h lv T��,.�
12/20/2012
33-01 31-
Closed Circuit Tele.y sie (CCTv) inspee fie .
03/03/2016
33�v
Byva0 IL1rM rX ftg ..f Existing Sewer- syste
12/20/2012
33�0
Toro. Beading ,,,..,1 Eleetfieal is l.,tie
12/20/2012
33�=
CeFF sie Cents e Test St ti rs
12/20/2012
33�=
Magnesium Anode C...1,, die Protecti.,,-. Syste
12/20/2012
33�0
Temporary Watef Sef-,4e
07/01/2011
33 04 40
0oaning ;ems n cceptanee Testing fWater- Mains
02/06/2013
33�0
Cleaning of Sewer- Mains
12/20/2012
3305 10
Utility Trench Excavation, Embedment, and Backfill
12/12/2016
33�z
Wmer- Line e Lower -in
12/20/2012
3305 43
Fr-aa> Covernd Grade Rings—Gast
01/22/2016
3305 13.10
Vie; Cove~ and Gr-a e Rings Compete
01/22/2016
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to
3305 14
12/20/2012
Grade
33�o
Coner-ete WWeer Vaults
12/20/2012
33�T
Concrete Cellar-s
12/20/2012
33 05 20
,g
12/20/2012
33�=
Tunnel Liner- Pl. e
12/20/2012
33�z
Steel Cecxsg Pipe
12/20/2012
330523
12/20/2012
33�4
installation ^-Carri�jr or Tuyxd Li", r Plate
06/19/2013
33�o
Utility 1, adiers/T ,,,.eAer-s
12/20/2012
33 05 30
Location of Existing Utilities
12/20/2012
33 1105
Bolts, Nuts, .-ad Gaskets
12/20/2012
33�0
Ductile ir-E) Pipe
12/20/2012
33�T
Doetile ir-e Fittings
12/20/2012
3 1 1 � � �12
Poly..;,-...1 Chloride (PNIC) Press ro Pipe
11/16/2018
1 1 1 _3
(onerote Prc=.v PIp�Baf Tr,..a Steel !.tinder- Type
12/20/2012
1 1 1
Buried Stool Piro and Fitting
12/20/2012
33�0
Water Seryic-ea 1 irwh t h
02/14/2017
33�T
Large W4er- Meters
12/20/2012
33�0
Resilient Seated G e Valve
12/20/2012
3- 12 3,
n WW n Rubber- Seated Butterfly V ly
12/20/2012
?3 12 'l`,
Connection to E-xisting W4er- Mains
02/06/2013
33�0
Air- Valve Assemblies f r Petable W ee- Systenis
12/20/2012
01 /03/2014
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 5 of 6
33 1250
Water EcmrX 3 gl-atiens
12/20/2012
33 12 60
Sta d^~d Blow FFValye Assembly bly
06/19/2013
3,13 21 12
Cured in nlaee Pipe (CIPP)
12/20/2012
3,13 21 1,31
Fiber -glass Reinf reed Pipe for- Gfa-v pY &anit j 3•s
12/20/2012
33 31 5
High Density Pelyethyle„e (HDPE) Pir,r €o;
12/20/2012
333120 20
PelyN4f Chloride (nvr) Gravity Sanit Sewer- Pipe
06/19/2013
y fy
�
33 3121
Polyvinyl C le-ide (PNIC) ClosedProfile r,-.,.,i EZ'�a�a.2�'�y2'V�EF
12/20/2012
Pipe
22
Sanitary fJrr :j&rrg
12/20/2012
33 31 23
c^„;t^M, Sewcc Pire Enlargament
12/20/2012
Z2�o
Sanit ..., Sewer- Sef.y; o Sefviee T : ee
04/26/2013
ZZ�o
Combination Air valve far &arxaz ; Sewc~ F ~^�^
12/20/2012
3339 10
✓azJ is Plaez Coner-ete Manholes
12/20/2012
33 39 20
Precast Concrete Manholes
12/20/2012
333930
Tilwrgk-\.-,0 moles
12/20/2012
�`x„'AC)
12/20/2012
2Z�o
EPEW.. T ; e ^ .�� Eanit&r,, Sewer c# , 4w-e-^
12/20/2012
3341 10
Reinforced Concrete Storm Sewer Pipe/Culverts
07/01/2011
P- 11 11
High Density Polyethylene (I-IDPE) Pik tor. -A Drain
12/20/2012
✓3 11 12
Reinforced Pe1y floe - (fl_'.PE) Piro
11/13/2015
33-46 00
✓al!dyz�mge
12/20/2012
33 4601
worm Dmin.--
07/01/2011
33 46-02
Tfe-}Ak Dmixc
07/01/2011
33 49 10
Cast -in -Place Manholes and Junction Boxes
12/20/2012
33 49 20
Curb and Drop Inlets
12/20/2012
33 49 40
Storm Drainage Headwalls and Wingwalls
07/01/2011
Division 34 -
Transportation
3n�0
Traffic Signals
10/12/2015
34 ^� 41 10.01
Att-aehmeatA—rCepAfeller- Gabinet
12/18/2015
zn n� 41 10.02
Attaehfnefit B Coatrellef: Speei e-atiea
02/2012
3n n�03
Aaaehment C Software Specification
01/2012
3/1 11 11
Temporary "'' ✓finals
11/22/2013
34 41 13
Removing T~^ffie Signals
12/20/2012
Z^4z1 5
R2�ular R.W.d MaGhing Beaeon
11/22/2013
34 411116
node^,~;^„ u5,br- d Signal.
11/22/2013
34 41 20
Roadway Illumination Assemblies
12/20/2012
34 41 20.01
Arterial LED Roadway Luminaires
06/15/2015
3n n�02
Freeway LED Re dway
06/15/2015
34 4120.03
Resid NVA) LED Raadw , Tamar.;&i:es
06/15/2015
34 41 30
Aluminum Signs
11/12/2013
zn�0
Single Mode Fiber- Optie Cable
02/26/2016
3471 13
Traffic Control
11/22/2013
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Appendix
Page 6 of 6
G -4.J1 vailab liter
GC-4.02 Subsurface and Physical Conditions
GC 4.06 I. zcf E)us Env-,.r,..ent l C l:.rron at Frte
GE-F}$A.D Al nerit , and Women Owned Compliance
GE-Fr.07 '1449e4�
GC 6.0-9 Pa.- its and Utilities
GC-6.2/1 T,andisefiminatien
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised March 20, 2020
DIVISION 00
GENERAL CONDITIONS
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Ranch at Duck Creek, WJ Boaz Road, City Project #104753
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Specification I Unit of I Bid
Item Description Section No. Measure Quantity Unit Price Bid Value
Storm Drain Facilities
1
0241.3013 Remove 18" Storm Line
0241 14
LF
16
$30.00
$480.00
2
0241.3014 Remove 21" Storm Line
0241 14
LF
41
$35.00
$1,435.00
3
0241.4201 Remove 4' Drop Inlet
0241 14
EA
2
$1,500.00
$3,000.00
4
0241.4401 Remove Headwall (2-8' x 4')
0241 14
EA
1
$6,500.00
$6,500.00
5
0241.4401 Remove Headwall (8' x 3')
0241 14
EA
1
$4,500.00
$4,500.00
6
3137.0102 Large Stone Riprap, dry
31 3700
SY
421
$125.00
$52,625.00
7
3305.0109 Trench Safety
33 05 10
LF
1,083
$4.00
$4,332.00
8
3341.0201 21" RCP, Class III
3341 10
LF
130
$85.00
$11,050.00
9
3341.0205 24" RCP, Class III
3341 10
LF
70
$95.00
$6,650.00
10
3341.1500 8' x 3' RCB
3341 10
EA
69
$555.00
$38,295.00
11
3341.1501 8' x 4' RCB
3341 10
LF
424
$625.00
$265,000.00
12
3341.1502 8' x 5' RCB
3341 10
LF
390
$645.00
$251,550.00
13
3341.1602 9' x 5' RCB
3341 10
LF
65
$755.00
$49,075.00
14
3349.5001 10' Curb Inlet (Type II)
33 49 20
EA
4
$6,200.00
$24,800.00
15
9999.0001 TxDOT Headwall w/ Parallel Wingwalls (10 RCBs - Sizes vary)
00 00 00
EA
1
$112,500.00
$112,500.00
16
9999.0002 TxDOT Headwall w/ Parallel Wingwalls (7 RCBs - Sizes vary)
00 00 00
EA
1
$85,800.00
$85,800.00
17
9999.0003 CSS Backfill over Ex. Utility Lines
00 00 00
LF
260
$40.00
$10,400.00
18
9999.0004 21" RCP End & Plug
00 00 00
EA
4
$500.00
$2,000.00
19
9999.0005 Remove Storm Line (8' x 3' RCB)
00 00 00
LF
34
$60.00
$2,040.00
20
9999.0006 Cut & Plug Existing 21" RCP
00 00 00
EA
1
$500.00
$500.00
21
9999.0007 Pedestrian Rail
00 00 00
LF
269
$240.00
$64,560.00
�torm Drain Subtotal
$997,092.00
Paving Facilities
22
0211.0500 Remove & Replace Ex. Fence
0241 13
LF
171
$50.00
$8,550.00
23
0241.0401 Remove & Replace Existing Concrete Drive
0241 13
SY
209
$150.00
$31,350.00
24
0241.0402 Remove & Replace Existing Asphalt Drive
0241 13
SY
124
$120.00
$14,880.00
25
0241.1000 Remove Existing Concrete Pavement
0241 13
SY
738
$20.00
$14,760.00
26
0241.1100 Remove Existing Asphalt Pavement (WJ Boaz Road)
0241 13
SY
4,933
$15.00
$73,995.00
27
3110.0101 Right -Of -Way Clearing
311000
LS
1
$15,000.00
$15,000.00
28
3123.0101 Unclassified Excavation
31 23 16
CY
3,124
$14.50
$45,298.00
29
3211.0400 Hydrated Lime @ 36 lbs./S.Y. (Arterial)
3211 29
TON
104.8
$245.00
$25,676.00
30
3211.0502 8" Lime Treated Subgrade (Arterial)
3211 29
SY
6,324
$5.00
$31,620.00
31
3213.0105 10" Concrete Pavement (Arterial)
32 13 13
SY
5,818
$98.00
$570,164.00
32
3213.0301 10' Conc Sidewalk
31 1320
LF
1,454
$52.00
$75,608.00
33
3213.0301 5' Conc Sidewalk
31 1320
LF
141
$26.50
$3,736.50
34
3213.0506 P-1 Ramp
32 13 20
EA
6
$3,200.00
$19,200.00
35
3291.0100 Topsoil
3291 19
CY
0.1
$30.00
$3.00
36
3292.0100 Seeding, Hydromulch
32 92 13
SY
3,491
$8.00
$27,928.00
37
3305.0107 Manhole Adjustment, Minor
33 05 14
EA
4
$2,500.00
$10,000.00
38
3741.0001 Traffic Control
3471 13
LS
1
$9,500.00
$9,500.00
39
9999.0008 Material Import
00 00 00
CY
10,926
$26.50
$289,539.00
40
9999.0009 Pavement Striping
00 00 00
LS
1
$10,500.00
$10,500.00
41
9999.0010 Connect to Existing Pavement
00 00 00
EA
2
$2,500.00
$5,000.00
42
9999.0011 Remove & Replace Existing Gravel Drive
00 00 00
SY
158
$40.00
$6,320.00
Raving Subtotal
$1,288,627.50
Street Lighting Facilities
43
2605.3011 2" CONDT PVC SCH 40 (T)
26 05 33
LF
1,934
$18.00
$34,812.00
44
3441.1405 NO 2Insulated Elec Condr
3441 14
LF
5,802
$2.00
$11,604.00
45
3441.1502 Ground Box Type B, w/Apron
3441 15
EA
9
$1,250.00
$11,250.00
46
3441.1632 Install Type 33A Arm
34 41 20
EA
8
$1,050.00
$8,400.00
47
3441.1772 240480 Volt Single Phase Transocket Metered Pedestal
3441 17
EA
1
$9,500.00
$9,500.00
48
3441.3201 LED Lighting Fixture (R-2)
3441 20
EA
8
$950.00
$7,600.00
49
3441.3302 Rdwy Ilium Foundation TY 3,5,6, and 8
34 41 20
EA
8
$1,750.00
$14,000.00
50
3441.3342 Rdwy Ilium TY 18 Pole
34 41 20
EA
8
$3,500.00
$28,000.00
btreet Lighting Subtotal
$125,166.00
Bid Summa
torm Drain Facilities Subtotal
$997,092.00
Paving Facilities Subtotal
$1,288,627.50
Street Lighting Facilities Subtotal
$125,166.00
Total Bid
$2,410,885.50
`Note - Estimate does not include any franchise utility relocations.
This bid is submitted by the entity listed below:
Company: Conatser Construction TX, L.P.
�q 1 S
Street Address: 5327 Wichita Street
By:
J
City, State, Zip Code: Ft. Worth, TX 76119
Phone: 817-534-1743
.„.: Pis
r
a" 08/08/2023
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
140
working days after
the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF
FORT WORTH
Rauch at Dack Creek, WJ Boaz Raad
STANDARD CONSTRUCTION BID PROPOSAGDEVEJ OPER AWARDED PROJECTS
C,ty Protect #104753
Form IUVised
Jaaaary 29, 2020
W 42 43_Brd Proposal
0045 12 - 1
PREQUALIFICATION STATEMENT
Page 1 of 1
SECTION 00 45 12
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by
identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the
major work type(s) listed.
Major Work Type
Water and Wastewater New
Development,
Rehabilitation, and
Redevelopment Open Cut
(all sizes)
Concrete
Construction/Reconstruction
Unlimited
Roadway and Pedestrian
Lighting
Contractor/Subcontractor Prequalification
Company Name Expiration Date
Conatser Construction TX, L.P. 10/31/2023
Conatser Construction TX, L.P. 12/31/2024
Conatser Construction TX, L.P. 01/26/2024
The undersigned hereby certifies that the contractors and/or subcontractors described in
the table above are currently prequalified for the work types listed.
BIDDER:
Conatser Construction TX. L.P. By: - lam C),-- H k-9c) ► 0-S
Company (Please Prmt)
5327 Wichita Street Signature:
Address
Fort Worth. TX 76119 Title:
City/State/Zip (Please Print)
Date: 08/08/2023
END OF SECTION
CITY OF FORT WORTH WJ Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 104753
Revised September 30, 2021
00 45 26 - 1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on City
Protect No. 104753. Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worker's compensation coverage.
CONTRACTOR:
Conatser Construction TX. L.P.
Company
5327 Wichita Street
Address
Fort Worth. TX 76119
City/State/Zip
THE STATE OF TEXAS
COUNTY OF TARRANT
By: r r oA--' r uqa ins
(Please Print)
Signature: ,
Title: 1pies i d icr) r
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
Rro C.�,- H :jai nS known to me to be the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as
the act and deed of Pre-sZrnr for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this 9,g day of
fVUg u S1 2023.
.•xii' Y W.. KATHERINE RASE . Il.i.) d''C•>
NOTARY PUBLIC
*d*: IF)# 133467933 Notary Public in and for the State of Texas
';� •. �: State of TTexas
"•oF Comm. Exp.11.30.2025
END OF SECTION
CITY OF FORT WORTH WJBoaz Rd
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 4104753
Revised July 1, 2011
005243-1
Developer Awarded Project Agreement
Page 1 of 4
SECTION 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on 08/28/2023 is made by and between the
Developer, Starliaht Homes Texas. LLC authorized to do business in Texas
("Developer"), and Conatser Construction TX. L.P. . authorized to do business in
Texas, acting by and through its duly authorized representative, ("Contractor").
Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
follows:
Article 1. WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
W J Boaz Rd.
CPN #104753
Article 3. CONTRACT TIME
3.1 Time is of the essence.
All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
Documents are of the essence to this Contract.
3.2 Final Acceptance.
The Work will be complete for Final Acceptance within 140 calendar days after the
date when the Contract Time commences to run as provided in Paragraph 12.04 of the
Standard City Conditions of the Construction Contract for Developer Awarded Projects.
3.3 Liquidated damages
Contractor recognizes that time is of the essence of this Agreement and that Developer
will suffer financial loss if the Work is not completed within the times specified in
Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
the Standard City Conditions of the Construction Contract for Developer Awarded
Projects. The Contractor also recognizes the delays, expense and difficulties involved in
proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
completed on time. Accordingly, instead of requiring any such proof, Contractor agrees
that as liquidated damages for delay (but not as a penalty), Contractor shall pay
Developer Two Hundred Fifty Dollars ($250.00) for each day that expires after the time
specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of
Acceptance.
CITY OF FORT WORTH WJBoaz Rd
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised June 16, 2016
005243-2
Developer Awarded Project Agreement
Page 2 of 4
Article 4. CONTRACT PRICE
Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
Documents an amount in current funds of Two Million Four Hundred Ten Thousand
Eli ht Hundred Eighty Five & 50/100 Dollars ($2,410.885.50)
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A. The Contract Documents which comprise the entire agreement between Developer and
Contractor concerning the Work consist of the following:
1. This Agreement.
Attachments to this Agreement:
a. Bid Form (As provided by Developer)
1) Proposal Form (DAP Version)
2) Prequalification Statement
3) State and Federal documents (project specific)
b. Insurance ACORD Form(s)
c. Payment Bond (DAP Version)
d. Performance Bond (DAP Version)
e. Maintenance Bond (DAP Version)
f. Power of Attorney for the Bonds
g. Worker's Compensation Affidavit
h. MBE and/or SBE Commitment Form (If required)
3. Standard City General Conditions of the Construction Contract for Developer
Awarded Projects.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment
or, if not attached, as incorporated by reference and described in the Table of
Contents of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
9. The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
CITY OF FORT WORTH WJBoaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised June 16, 2016
005243-3
Developer Awarded Project Agreement
Page 3 of 4
Article 6. INDEMNIFICATION
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification vrrovision is snecifically intended to overate
and be effective even if it is alleged or proven that all or some of the damages being
sought were caused. in whole or in vart, by anv act, omission or negligence of the citv.
This indemnity provision is intended to include, without limitation, indemnity for
costs, expenses and legal fees incurred by the city in defending against such claims and
causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
the city, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification
provision is snecifically intended to overate and be effective even if it is alle ed or
proven that all or some of the damages being sought were caused. in whole or in hart,,
by anv act, omission or negligence of the citv.
Article 7. MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
the Construction Contract for Developer Awarded Projects.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written consent of the Developer.
7.3 Successors and Assigns.
Developer and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, in respect to all covenants, agreements and
obligations contained in the Contract Documents.
7.4 Severability.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon DEVELOPER and
CONTRACTOR.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH WJBoaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised June 16, 2016
005243-4
Developer Awarded Project Agreement
Page 4 of 4
7.6 Autho7.6 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement, if other than duly
authorized signatory of the Contractor.
IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
counterparts.
This Agreement is effective as of the last date signed by the Parties ("Effective Date").
Contractor:
Conatser Construction TX, L.P.
( mature)
(fit 4r�(� t-tugo 1 ins
(Printed Name)
Title: PV-eSkdCJ-)}
Company Name:
Conatser Construction TX, L.P.
Address: 5327 Wichita Street
Fort Worth, TX 76119
Date: 08/28/2023
Developer:
Starlight Homes Texas, LLC
l � 1 �II�II►�
��-iAllFf �P�CSK`�
(Printed Nake)
Title: 4-r- t,� n
Company Name:
Starlight Homes Texas, LLC
Address: 1800 Valley View Lane, Suite 100
Farmers Branch, TX 75234
Date: 2!jg 2o23
CITY OF FORT WORTH WJBoazRd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised June 16, 2016
a
Bond No. 0254473
0
SECTION 00 6213
PERFORMANCE BOND
THE STATE OF TEXAS §
COUNTY OF TARRANT §
pllh'_13-1
I'l-A ORMANCE BOND
Page I of a
KNOW ALL BY THESE PRESENTS:
That we. Conatser Construction TX. L.P. , known as "Principal" herein
and — Berkley Insurance Company a corporate stlrety(sureties, if more
than one) duly authorized to do business in the State of Texas, known as -.Surety- herein (whether
one or more). are held and firmly bound unto the Developer. Starli lit Homes Texas, LLC.
authorized to do business in Texas ("Developer") and the City° of Fort Worth, a Texas municipal
corporation ("CIt, "). in the penal sum oi; Two Million Four Hundred Ten Thousand.
EUi ht Hundred Eighty Five & 501100 Dollars 62,410,885.501 laNk-ful money of the
United States, to be paid in Fort Worth. Tarrant County, Texas for the payment of which sum
well and truly to be made jointly unto the Developer and the City as dual obligees, vve bind
ourselves. our heirs. executors. administrators. successors and assigns, jointly and severally.
firmly by these presents.
WHEREAS, Developer and City have entered into an Agreement for the construction of
community facilities in the City of Fort Worth by and through a Community Facilities
Agreement. CFA Number 23-0081 and
WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
the t$_h _ day of Auqust . 2023, which Contract is hereby referred to and made a part
hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and
other accessories defined by law, in the prosecution of the Work, including any Change Orders,
as provided for in said Contract designated as W JBoaz Rd
NOW, THEREFORE, the condition of this obligation is such that if the said Principal
shall faithfully perform it obligations under the Contract and shall in all respects duly and
faithfully perform the Work, including Change Orders. under the Contract. according to the plans,
specifications, and contract documents therein referred to, and as well during any period of
extension of the Contract that may be granted on the part of the Developer and/or City. then this
obligation shall be and become null and void. otherwise to remain in full force and effect.
CITY OF FORT %VORTI I
S I �titif).+RD C"l'l Y Ct)\UiTlt)NS — Ut Vi Lt)1'I_it ,AV AItDIF1) i'Rt)JkC'I ti
me»rd Amutim 3 1. -1013
If J Roaz Rd
CM -104,7133
006313-2
PERFORMANCE BOND
Page 2 or 3
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall fie in
Tarrant COWAN. Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division.
This bond is made and executed in compliance A ith the provisions of Chapter 2253 of the
Texas Government Code. as amended. and all liabilities on this bond shall be determined in
accordance with the provisions of said statue.
IN WITNESS WHEREOF, the Principal and the Surety have SiGNED and SEALED
this instrument by duty authorized agents and officers on this the 8th day of
Auaust 2D23.
PRINCIPAL:
Conatser Construction TX, L.P.
BY: � � iMi� �.
Signature
ATTEST:
`
Brock Huggins, President
(Principal) fe�creName
and Title
Address: 5327 Wichita St.
Fort W_o_rthjTX 76119
Witness as to Principal
SURETY.
BerklQy Insurance Company
Signature
Robbi Morales®,Attorney-in-fact
Name and Title
Address: 5005 LBt Freeway, Suite 1500
Dallas, TX 75244
y�
_''
W ness as to 5uret}
Telephone Number: 214/989-0000
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
CITY cif, f-oR'r kvotN rl1 JYJ Boo: Rd.
KIANDARD CITY COND1'i IONS— D1. VL:LOPER AWARDED PROJECTS F PV vin47S3
Re%lsed Jam* 31. 20 12
00b213-3
PLRVOR-MANCE I O\D
Page 3 W'3
The date of the bond shall not be prior to the date the Contract is awarded.
C'1'I Y 01= I.ORT" M OR I II 11V Boa Rd.
STANDARD CI'I Y CONDII IONS — DI:VROPLR AWARDED PROJI-C" I'S C'R.\-104753
Re i.wd Januan 31 2012
Bond No. 0254473
uu 62 14 - 1
PAY,MENT RONNI)
Pace 1 00
SECTION 00 62 14
PAYMENT BOND
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, Conatser Construction TX. L.P. known as "Principal -
herein. and Berkley Insurance Company , a corporate
surety (or sureties if more than one). duly authorized to do business in the State of Texas.
known as -Surety- herein (whether one or more), are held and firmly bound unto the Developer,
Starlight Homes Texas. LLC, authorized to do business in Texas "(Developer"). and the City of
Fort Worth, a Texas municipal corporation ("City"), in the penal sum Two Million Four
Hundred Ten Thousand Eight Hundred Eighty Five & 501100 Dollars IS2,410,885.50)
fau till money of the United States, to be paid in Fort Worth. Tarrant County. Texas, for the
payment of which sum well and truly be made jointly unto the Developer and the City as dual
obligees, we bind ourselves. our heirs. executors, administrators, successors and assigns, _jointly
and severally, firmly by these presents:
WHEREAS, Developer and City have entered into an Agreement for the construction of
community facilities in the Cite of Fort Worth, by and through a Community Facilities
Agreement. CFA dumber 23-0081 . and
WHEREAS, Principal has entered into a certain written Contract with Developer,
awarded the 8th day of August _. 2023. which Contract is hereby
referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
materials. equipment. labor and other accessories as defined by lave. in the prosecution of the
Work as provided for in said Contract and designated as W 3 Boaz Rd.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
the Contract, then this obligation shall be and become null and void. otherwise to remain in bill
force and effect.
0TY OF FORT woRrfl
STANDARD C IT) CONDH IONS —DEVELOPER _Akk ARD}_D PROJECTS
kn ised hneuarn +1 2012
J1 "J 80a: Rd.
CP\•404`53
006214-2
PAYMENT BOND
Page 2 of 3
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code. as amended. and all liabilities on this bond shall be determined in
accordance with the provisions of said statute.
IN WITLESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
this instrument by duly, authorized agents and officers on this the 8th day of
August 2023.
A'I FEST:
(Pnncipal) Sec ry
Witness as to Principal
ATTEST:
(Surety) Secretary
/tness as to Suret,,
PRINCIPAL:
Conatser Construction TX, L.P.
BY:
- Stgnaidre
Brock Huggins, President
Name and Title
Address. 5327 Wichita St.
Fort Worth, TX 76119
SURETY:
Berkley Insurance Company
BY:
Signature
Robbi Morales, Attorney -in -fact
Name and Title
Address: 5005 LBJ Freeway, Suite 1500
Dallas, TX 75244
'I elephone Number: 214!989-0000
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
bylaws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address. both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
c i r)Y OF YORTNkowrtt II J Bwc Rd.
!i'I A NDA'RD CITY CONDITION' — DF V I9LON-R ANVARDED PROX ' rg
ReN iced Januury 31- 2012
M621.1-3
PAY ENTBOND
PNgc 3 of 3
CI I YOP UOKf WOR1'II I II'J Bocc Rd.
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS '104`53
ReNixdJanuan 31.20I_
Bond No. 0254473
SECTION 00 62 19
MAINTENANCE BOND
THE STATE OF TEXAS §
COUNTY OF TARRANT §
006219-1
NIAINNTENANCI: BOIND
Page I of 3
KNOW ALL BY THESE PRESENTS:
That we Conatser Construction TX. L.P. . known as "Principal"
herein and — Berkley Insurance Company a corporate surety (sureties, if
more than one) duly authorized to do business in the State of Texas. knoavn as "Surety" herein
(w°hether one or more), are held and firmly bound unto the Developer. Starlight Homes Texas.
LLC authorized to do business in Texas ("Develope(") and the City of Fort Worth, a Texas
municipal corporation ("City"), in the sum of Two Million Four Hundred Ten
Thousand Eight Hundred Eight, IFive &. 501100 Dollars (S2,410,885.50) lawful money
of the United States. to be paid in Fort Worth. Tarrant Coanty, Texas, for payment of which sum
well and truly be made jointly unto the Developer and the City as dual obligees and their
successors. we bind ourselves, our heirs, executors.. administrators. successors and assigns, jointly
and severally, firmly by these presents.
WHEREAS, Developer and City have entered into an Agreement for the construction of
community facilities in the City of Fort Worth br- and through a Community Facilities
Agreement. CFA Number 23-0081 and
WHEREAS, the Principal has entered into a certain written contract with the Developer
awarded the 8th day of Auaust i02;, which Contract is hereby
referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
materials, equipment labor and other accessories as defined by law-, in the prosecution of the
Work. including any Work resulting from a duly authorized Change Order (collectively herein,
the "Work-) as provided for in said Contract and designated as WJBoa.-Rd and
WHEREAS. Principal binds itself to use such materials and to so construct the Work in
accordance with the plans. specifications and Contract Documents that the Work is and will
remain free from defects in materials or workmanship for and during the period of two (2) years
alter the date of Final Acceptance of the Work by the City ("Maintenance Period"). and
CITY U- FOR r 4L"UMI I 1I'J Btmc Rd.
S [ANDARD C11 Y CONDITIONS — DIN1.1011A AWARDED PROJCCTS CY.:'- 04753
Reused lanuan 31.2012
006219-2
MAINTENANCI i OND
Page 2 cif 3
WHEREAS. Principal binds itself to repair or reconstruct the Work in whole or in part
upon receiving notice from the Developer and/or City of the need thereof at any time within the
Maintenance Period.
NOW THEREFORE, the condition of this obligation is such that if Principal shall
remedy any defective Work, for which timely notice ,%,as provided by Developer or City, to a
completion satisfactory to the City. then this obligation shall become null and void. othenvise to
remain in Full force and effect.
PROVIDED, HOWEVER, if Principal shall fall so to repair or reconstruct any timely
noticed defective Work. it is agreed that the Developer or City may cause any and all such
defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
by the Principal and the Suret4 under this Maintenance Bond, and
PROVIDED FURTHER. that if any legal action be tiled on this Bond. venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas. Fort
Worth Division, and
PROVIDED FURTHER, that this obligation shall be continuous in nature and
successive recoveries may be had hereon for successive breaches.
f [TY OF FOR'r WORTH W J Borc Rai_
STANDARD CH Y CONDiTION'S — DEVELOPL11 AM ARDLD PROJLC t S CPA F104-53
Roised Januan 31.2012
C13jb'— 19-3
MAIti' ENANCGBOND
Page 3 car 3
IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the 8th day of
At iggt .2023.
ATTEST:
�r
(Prinei� pal) Sec
KLx,k-- s2r _.>
\Vitness as to Principal
ATTEST:
(Surety) ecretary
1 ' ness as to Suret`°
PRINCIPAL:
Conatser Construction TX, L.P.
BY: : u1 • _
Signature
Brock Huggins, President
Name and Title
Address: 5327 Wichita St.
_,.Fort Worth, TX 76119
SURETY:
Berkle_Slnsurance Comp_
ai
Signature
Robbi Morales, Attorney -in -fact
Name and Title
Address: 5005 LBj Freeway, Suite 1500
Wallas, TX 75244
Telephone Number: 214(989 i0000�
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY 01 FORT WOR Ili IIV How Rd..
S`CANDARD CIVI C ONI)rrioNs—m.m.LO1't,R Alb ARDI D PROJECTS CPA' 1114'33
Re%isedlanuarY 31,2012
No. BI-7280k
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made; constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; .Sophinie Hunter;
Robbi Morales; Kelly A. Westbrook, Thta McEivau; Joshua Saunders, Tonie Petranek; or Milraela Peppers of Aon Risk
Services Southwest, Inc. of Dallas, TX its true and lawful Attomey-in-Fact, to sign its name as surety only as delineated below
and to execute, seal, acknowledge and deliver any and .all bonds and undertakings, with the exception of Financial Guaranty
Insurance, providing that no single obligation shall exceed Fifty Million and 00/1.00 U.S. Dollars (U.S.$50,000,000.00), to the.
same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers .of the Company at its
principal office in their own proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25, 2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney -in -fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attorney limits the acts of .those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company; and such signature and seal when so used. shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person .or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
IN WPIWESS WI-MRE01r, the Company has caused these presents to -be signed and attested by its appropriate officers and its
corporate seal hereunto affixed this JiNay of Mr:
Attest_ Berk] Insurance Company
(Seat) I3y r By
Tra'S_ edenvan Ie fter-
Executive Vice President & Secretary .Se i Ice esident
WARNING. THIS POWER: LNVALID iT NOT PRINTED ON BLUE "BERKLEY" SECURITY PAPER.
STATE OF CONNECTICUT )
) ss:
COUNTY OF FAT RFIE,LD )
Sworn to before me, a Notary Public in the State of Connecticut, this I day of aOa;�L by Ira S. Ludenuan
and Jeffrey M. Rafter who are swom to me to be the Executive Vice President Secretary, and Senior Vice .President,
respcctivel}; of Berkley Insurance:Gompany. ►iaNOTARY P°� Ia " �
CONNEi 7TIGUf
MYCOMMISS'ON EXPIRED
AreML30,20e4 140tary, Public, State o£Connecticut
CRRTTFiCATE.
I, the undersigned; Assistant Secretary:of BERKL) Y INSURANCE COMPANY DO.HEREBY CERTIFY that the foregoing is a
true, correct and complete copy of the ii .gmal.Power of Attorney; that said Power of Attorney has not beea revoked or rescinded
and that the -authority of the Attorney in-tact.set forth therein, who. executed the bond or twdert akin; to which. this Power of
Attorney is attached,-i5=in fall force_and effect as of ibis dzte.
C ive-a under my° and and seal of the Company, this Ath clay of 2023
Vincent P. Torte
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call Berkley Surety Group, LLC and its affiliates by
telephone for information or to make a complaint:
BERKLEY SURETY GROUP, LLC
Please send all notices of claim on this bond to:
Berkley Surety Group, LLC
(866) 768-3634
412 Mount Kemble Avenue, Suite 31ON
Morristown, NJ 07960
Attn: Surety Claims Department
You may contact the Texas Department of Insurance to obtain
information on companies, coverages, rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: httR:llwww.tdi.state.tx.us
E-mail: ConsumerProtection(&.tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or about a claim
you should contact your agent or Berkley Surety Group, LLC first. if
the dispute is not resolved, you may contact the Texas Department of
Insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and does not become a part or
condition of the attached document and is given to comply with Texas
legal and regulatory requirements.
STANDARD CITY CONDITIONS
OF THE CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Page
Article1 — Definitions and Terminology.......................................................................................................... I
1.01 Defined Terms............................................................................................................................... 1
1.02 Terminology..................................................................................................................................5
Article2 —
Preliminary Matters......................................................................................................................... 6
2.01
Before Starting Construction........................................................................................................6
2.02
Preconstruction Conference.......................................................................................................... 6
2.03
Public Meeting.............................................................................................................................. 6
Article 3 —
Contract Documents and Amending............................................................................................... 6
3.01
Reference Standards..................................................................................................................... 6
3.02
Amending and Supplementing Contract Documents.................................................................. 6
Article 4 — Bonds and Insurance....................................................................................................................... 7
4.01 Licensed Sureties and Insurers..................................................................................................... 7
4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7
4.03 Certificates of Insurance............................................................................................................... 7
4.04 Contractor's Insurance.................................................................................................................. 9
4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12
Article 5 —
Contractor's Responsibilities........................................................................................................12
5.01
Supervision and Superintendent.................................................................................................12
5.02
Labor; Working Hours................................................................................................................13
5.03
Services, Materials, and Equipment...........................................................................................13
5.04
Project Schedule..........................................................................................................................14
5.05
Substitutes and "Or-Equals".......................................................................................................14
5.06
Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16
5.07
Concerning Subcontractors, Suppliers, and Others...................................................................16
5.08
Wage Rates..................................................................................................................................18
5.09
Patent Fees and Royalties...........................................................................................................19
5.10
Laws and Regulations.................................................................................................................19
5.11
Use of Site and Other Areas.......................................................................................................19
5.12
Record Documents......................................................................................................................20
5.13
Safety and Protection..................................................................................................................
21
5.14
Safety Representative.................................................................................................................21
5.15
Hazard Communication Programs.............................................................................................22
5.16
Submittals....................................................................................................................................22
5.17
Contractor's General Warranty and Guarantee..........................................................................23
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
5.18 Indemnification........................................................................................................................... 24
5.19 Delegation of Professional Design Services.............................................................................. 24
5.20 Right to Audit: ............................................................................................................................ 25
5.21 Nondiscrimination.......................................................................................................................25
Article 6 - Other Work at the Site............
6.01 Related Work at Site ............
Article 7 - City's Responsibilities ...........................................
7.01 Inspections, Tests, and Approvals ......................
7.02 Limitations on City's Responsibilities ...............
7.03 Compliance with Safety Program .......................
Article 8 - City's Observation Status During Construction .................
8.01 City's Project Representative ...........................................
8.02 Authorized Variations in Work ........................................
8.03 Rejecting Defective Work ................................................
8.04 Determinations for Work Performed ................................
Article 9 - Changes in the Work .......................................
9.01 Authorized Changes in the Work .................
9.02 Notification to Surety ....................................
Article 10 - Change of Contract Price; Change of Contract Time
10.01 Change of Contract Price ...........................................
10.02 Change of Contract Time ...........................................
10.03 Delays.........................................................................
26
26
26
26
26
27
a
a
Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work......................29
11.01 Notice of Defects........................................................................................................................29
11.02 Access to Work........................................................................................................................... 29
11.03 Tests and Inspections.................................................................................................................. 29
11.04 Uncovering Work.......................................................................................................................30
11.05 City May Stop the Work.............................................................................................................30
11.06 Correction or Removal of Defective Work................................................................................30
11.07 Correction Period........................................................................................................................ 30
11.08 City May Correct Defective Work............................................................................................. 31
Article12 - Completion.................................................................................................................................. 32
12.01 Contractor's Warranty of Title................................................................................................... 32
12.02 Partial Utilization........................................................................................................................ 32
12.03 Final Inspection...........................................................................................................................32
12.04 Final Acceptance.........................................................................................................................33
Article 13 - Suspension of Work....................................................................................................................33
13.01 City May Suspend Work............................................................................................................ 33
Article14 - Miscellaneous.............................................................................................................................. 34
14.01 Giving Notice.............................................................................................................................. 34
CITY OF FORT WORTH
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
14.02 Computation of Times ........................
14.03 Cumulative Remedies .........................
14.04 Survival of Obligations .......................
14.05 Headings ..............................................
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
34
34
35
35
0073 10- 1
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 1 of 35
ARTICLE I — DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed -defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos —Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsaw — City's on-line, electronic document management and collaboration system.
5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
8. Contract —The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
9. Contract Documents —Those items that make up the contract and which must include the
Agreement, and it's attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10-2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non -Resident Bidder
iii. Prequalification Statement
C. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
i. Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
1. Supplementary Conditions
In. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project's Contract Documents
o. Drawings
P. Documentation submitted by contractor prior to Notice of Award.
q. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are not Contract Documents.
10. Contractor —The individual or entity with whom Developer has entered into the Agreement.
11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer — An individual or entity that desires to make certain improvements within the
City of Fort Worth
13. Drawings —That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
14. Engineer —The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 3
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 3 of 35
16. Final Inspection — Inspection carried out by the City to verb that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
17. General Requirements —A part of the Contract Documents between the Developer and a
Contractor.
18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
20. Milestone —A principal event specified in the Contract Documents relating to an
intermediate Contract Time prior to Final Acceptance of the Work.
21. Non -Participating Change Order —A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
22. Participating Change Order —A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
23. Plans — See definition of Drawings.
24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
25. Project —The Work to be performed under the Contract Documents.
26. Project Representative —The authorized representative of the City who will be assigned to
the Site.
27. Public Meeting — An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of the Project.
28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding legal holidays).
29. Samples Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights -of -way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications —That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
Specifications may be specifically made a part of the Contract Documents by attachment or,
if not attached, may be incorporated by reference as indicated in the Table of Contents
(Division 00 00 00) of each Project.
33. Standard City Conditions — That part of the Contract Documents setting forth requirements
of the City.
34. Subcontractor —An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of a part of the Work at the Site.
35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent — The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions —That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having
a direct contract with Contractor or with any Subcontractor to furnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including but not limited to, those that convey
electricity, gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or
other control systems.
40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of 35
41. Work —The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non -Participating Change Order, or Field
Order, and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or
legal holidays authorized by the City for contract purposes, in which weather or other
conditions not under the control of the Contractor will permit the performance of the
principal unit of work underway for a continuous period of not less than 7 hours between 7
a.m. and 6 p. m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective:
1. The word "defective," when modifying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
C. Furnish, Install, Perform, Provide:
1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
ARTICLE 2 — PRELIMINARY MATTERS
2.01 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non -
Participating Change Orders occur.
2.02 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.03 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING
3.01 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers,
directors, members, partners, employees, agents, consultants, or subcontractors, any duty or
authority to supervise or direct the performance of the Work or any duty or authority to
undertake responsibility inconsistent with the provisions of the Contract Documents.
3.02 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Participating Change Order or a
Non -Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City's written interpretation or clarification.
ARTICLE 4 — BONDS AND INSURANCE
4.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided Section 4.04.
4.02 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor's obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount
equal to the Contract Price as security to protect the City against any defects in any portion of the
Work described in the Contract Documents. Maintenance bonds shall remain in effect for two
(2) years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney -in -fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 4.01 and 4.02.C.
4.03 Certificates of Insurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of
insurance requested by City or any other additional insured) which Contractor is required to
purchase and maintain.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
1. The certificate of insurance shall document the City, an as "Additional Insured" on all
liability policies.
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full
compliance with the insurance requirements or failure of the City to identify a deficiency
from evidence that is provided shall not be construed as a waiver of Contractor's obligation
to maintain such lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10-9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first -dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting parry to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either parry or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
4.04 Contractor's Insurance
A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor's
performance of the Work and Contractor's other obligations under the Contract Documents,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
3. The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10-10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 10 of 35
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance
Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the City. The Commercial General
Liability policy, shall have no exclusions by endorsements that would alter of nullify
premises/operations, products/completed operations, contractual, personal injury, or advertising
injury, which are normally contained with the policy, unless the City approves such exclusions
in writing.
1. For construction projects that present a substantial completed operation exposure, the City
may require the contractor to maintain completed operations coverage for a minimum of no
less than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits o£
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance)
making the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U"
coverage's. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non -owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in
an amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired and non -owned.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 11
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 11 of 35
1) ,$1, 000, 000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the following requirements:
1. The Contractor's construction activities will require its employees, agents, subcontractors,
equipment, and material deliveries to cross railroad properties and tracks owned and
operated by: None
Write the name of the railroad company. (If none, then write none)
2. The Contractor shall conduct its operations on railroad properties in such a manner as not to
interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use
or operation of its/their trains or other property. Such operations on railroad properties may
require that Contractor to execute a "Right of Entry Agreement" with the particular railroad
company or companies involved, and to this end the Contractor should satisfy itself as to the
requirements of each railroad company and be prepared to execute the right -of -entry (if any)
required by a railroad company. The requirements specified herein likewise relate to the
Contractor's use of private and/or construction access roads crossing said railroad company's
properties.
3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions
shall provide coverage for not less than the following amounts, issued by companies
satisfactory to the City and to the Railroad Company for a term that continues for so long as
the Contractor's operations and work cross, occupy, or touch railroad property:
a. General Aggregate: None
Enter limits provided by Railroad Company (If none, write none)
b. Each Occurrence:: None
Enter limits provided by Railroad Company (If none, write none)
4. With respect to the above outlined insurance requirements, the following shall govern:
a. Where a single railroad company is involved, the Contractor shall provide one insurance
policy in the name of the railroad company. However, if more than one grade separation
or at -grade crossing is affected by the Project at entirely separate locations on the line or
lines of the same railroad company, separate coverage may be required, each in the
amount stated above.
b. Where more than one railroad company is operating on the same right-of-way or where
several railroad companies are involved and operated on their own separate rights -of -
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of 35
way, the Contractor may be required to provide separate insurance policies in the name
of each railroad company.
c. If, in addition to a grade separation or an at -grade crossing, other work or activity is
proposed on a railroad company's right-of-way at a location entirely separate from the
grade separation or at -grade crossing, insurance coverage for this work must be included
in the policy covering the grade separation.
d. If no grade separation is involved but other work is proposed on a railroad company's
right-of-way, all such other work may be covered in a single policy for that railroad, even
though the work may be at two or more separate locations.
5. No work or activities on a railroad company's property to be performed by the Contractor
shall be commenced until the Contractor has furnished the City with an original policy or
policies of the insurance for each railroad company named, as required above. All such
insurance must be approved by the City and each affected Railroad Company prior to the
Contractor's beginning work.
6. The insurance specified above must be carried until all Work to be performed on the railroad
right-of-way has been completed and the grade crossing, if any, is no longer used by the
Contractor. In addition, insurance must be carried during all maintenance and/or repair work
performed in the railroad right-of-way. Such insurance must name the railroad company as
the insured, together with any tenant or lessee of the railroad company operating over tracks
involved in the Project.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
4.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or
maintain all of the bonds and insurance required by the Contract Documents, the Developer or City
shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure
to maintain prior to any change in the required coverage.
ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES
5.01 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of 35
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
5.02 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.03 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14 of 35
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time
for projects with City participation shall be made by participating change orders.
5.05 Substitutes and "Or -Equals "
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or "or -equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or -equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of 35
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 0125 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of 35
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 5.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or -equal" at Contractor's expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types
requiring pre -qualification
5.07 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enterprise Compliance:
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 17
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of 35
❑ Required for this Contract.
(Check this box if there is any City Participation)
❑x Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City's MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of 35
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.08 Wage Rates
❑ Required for this Contract.
® Not Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31 st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the
City's determination that there is good cause to believe the Contractor or Subcontractor has
violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or
claimants as the difference between wages paid and wages due under the prevailing wage rates,
such amounts being subtracted ftom successive progress payments pending a final determination
of the violation.
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the I Ith day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of 35
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
5.09 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.01.
5.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of 35
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the
written notice (by letter or electronic communication), and shall be entitled to recover its cost in
doing so. The City may withhold Final Acceptance until clean-up is complete and cost are
recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor
and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated
to show changes made during construction. These record documents together with all approved
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 21 of 35
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or
among employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal
will be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 5.16.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For -Information -Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and
acceptance of a separate item as such will not indicate approval of the assembly in which the
item functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
5.17 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to
perform the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or final payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
4.02.13. The City will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers,
agents, employees, subcontractors, licenses or invitees under this Contract. THIS
INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE
AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME
OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY
ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by
the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be
performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees
under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY
INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR
PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE
CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF
THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor's responsibilities for construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified
by such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance
and design criteria given and the design concept expressed in the Contract Documents. City's
review and acceptance of Submittals (except design calculations and design drawings) will be
only for the purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing City funds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit -
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 26
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 26 of 35
ARTICLE 6 — OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a parry to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any work of
others by cutting, excavating, or otherwise altering such work; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work will be affected.
C. If the proper execution or results of any part of Contractor's Work depends upon work
performed by others under this Article 7, Contractor shall inspect such other work and promptly
report to City in writing any delays, defects, or deficiencies in such other work that render it
unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's
failure to so report will constitute an acceptance of such other work as fit and proper for
integration with Contractor's Work except for latent defects in the work provided by others.
ARTICLE 7 — CITY'S RESPONSIBILITIES
7.01 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.02 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
7.03 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 5.13.
ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION
8.01 City's Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents.
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Work. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in general, if the Work is proceeding in accordance with the Contract Documents.
City's Project Representative will not be required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work. City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Work
will conform generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents.
8.02 Authorized Variations in Work
City's Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.03 Rejecting Defective Work
City will have authority to reject Work which City's Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or
completed.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 28
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 28 of 35
8.04 Determinations for Work Performed
Contractor will determine the actual quantities and classifications of Work performed. City's Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
ARTICLE 9 — CHANGES IN THE WORK
9.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, City may, at any time or
from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall
promptly proceed with the Work involved which will be performed under the applicable
conditions of the Contract Documents (except as otherwise specifically provided). Extra Work
shall be memorialized by a Participating Change Order which may or may not precede an order
of Extra work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a
project with City participation, a Field Order may be issued by the City.
9.02 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
10.01 Change of Contract Price
A. The Contract Price may only be changed by a Participating Change Order for projects with City
participation.
10.02 Change of Contract Time
A. The Contract Time may only be changed by a Participating Change Order for projects with City
participation.
10.03 Delays
A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 29
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 29 of 35
ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
11.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
11.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
11.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by
City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Work, as determined solely by
City.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other
similar negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all invoices for retests to
Developer/Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance
until the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contractor's
expense.
11.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
of any of them.
11.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee, if any, on said Work.
11.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 31 of 35
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end
of the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor's obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.08 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of 35
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 11.09.
ARTICLE 12 — COMPLETION
12.01 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.02 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Work that can be
used by City for its intended purpose without significant interference with Contractor's
performance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.03 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.04 Final Acceptance
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 — SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 — MISCELLANEOUS
14.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given i£
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving parry.
14.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 35
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 35 of 35
14.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
14.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
DIVISION 01
GENERAL REQUIREMENTS
011100-1
DAP SUMMARY OF WORK
SECTION 01 11 00
SUMMARY OF WORK
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 3
1. Summary of Work to be performed in accordance with the Contract Documents
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract
2. Division 1 - General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Work Covered by Contract Documents
1. Work is to include furnishing all labor, materials, and equipment, and performing
all Work necessary for this construction project as detailed in the Drawings and
Specifications.
B. Subsidiary Work
Any and all Work specifically governed by documentary requirements for the
project, such as conditions imposed by the Drawings or Contract Documents in
which no specific item for bid has been provided for in the Proposal and the item is
not a typical unit bid item included on the standard bid item list, then the item shall
be considered as a subsidiary item of Work, the cost of which shall be included in
the price bid in the Proposal for various bid items.
C. Use of Premises
1. Coordinate uses of premises under direction of the City.
2. Assume full responsibility for protection and safekeeping of materials and
equipment stored on the Site.
Use and occupy only portions of the public streets and alleys, or other public places
or other rights -of -way as provided for in the ordinances of the City, as shown in the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equipment for construction
purposes may be stored in such space, but no more than is necessary to avoid
delay in the construction operations.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #104753
Revised December 20, 2012
011100-2
DAP SUMMARY OF WORK
Page 2 of 3
b. Excavated and waste materials shall be stored in such a way as not to interfere
with the use of spaces that may be designated to be left free and unobstructed
and so as not to inconvenience occupants of adjacent property.
c. If the street is occupied by railroad tracks, the Work shall be carried on in such
manner as not to interfere with the operation of the railroad.
1) All Work shall be in accordance with railroad requirements set forth in
Division 0 as well as the railroad permit.
D. Work within Easements
1. Do not enter upon private property for any purpose without having previously
obtained permission from the owner of such property.
2. Do not store equipment or material on private property unless and until the
specified approval of the property owner has been secured in writing by the
Contractor and a copy furnished to the City.
3. Unless specifically provided otherwise, clear all rights -of -way or easements of
obstructions which must be removed to make possible proper prosecution of the
Work as a part of the project construction operations.
4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,
lawns, fences, culverts, curbing, and all other types of structures or improvements,
to all water, sewer, and gas lines, to all conduits, overhead pole lines, or
appurtenances thereof, including the construction of temporary fences and to all
other public or private property adjacent to the Work.
5. Notify the proper representatives of the owners or occupants of the public or private
lands of interest in lands which might be affected by the Work.
a. Such notice shall be made at least 48 hours in advance of the beginning of the
Work.
b. Notices shall be applicable to both public and private utility companies and any
corporation, company, individual, or other, either as owners or occupants,
whose land or interest in land might be affected by the Work.
c. Be responsible for all damage or injury to property of any character resulting
from any act, omission, neglect, or misconduct in the manner or method or
execution of the Work, or at any time due to defective work, material, or
equipment.
6. Fence
a. Restore all fences encountered and removed during construction of the Project
to the original or a better than original condition.
b. Erect temporary fencing in place of the fencing removed whenever the Work is
not in progress and when the site is vacated overnight, and/or at all times to
provide site security.
c. The cost for all fence work within easements, including removal, temporary
closures and replacement, shall be subsidiary to the various items bid in the
project proposal, unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #104753
Revised December 20, 2012
011100-3
DAP SUMMARY OF WORK
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
I DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #104753
Revised December 20, 2012
01 25 00 - 1
DAP SUBSTITUTION PROCEDURES
SECTION 0125 00
SUBSTITUTION PROCEDURES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 4
1. The procedure for requesting the approval of substitution of a product that is not
equivalent to a product which is specified by descriptive or performance criteria or
defined by reference to 1 or more of the following:
a. Name of manufacturer
b. Name of vendor
c. Trade name
d. Catalog number
2. Substitutions are not "or -equals".
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid. No
separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Request for Substitution - General
1. Within 30 days after award of Contract (unless noted otherwise), the City will
consider formal requests from Contractor for substitution of products in place of
those specified.
2. Certain types of equipment and kinds of material are described in Specifications by
means of references to names of manufacturers and vendors, trade names, or catalog
numbers.
a. When this method of specifying is used, it is not intended to exclude from
consideration other products bearing other manufacturer's or vendor's names,
trade names, or catalog numbers, provided said products are "or -equals," as
determined by City.
3. Other types of equipment and kinds of material may be acceptable substitutions
under the following conditions:
a. Or -equals are unavailable due to strike, discontinued production of products
meeting specified requirements, or other factors beyond control of Contractor;
or,
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
012500-2
DAP SUBSTITUTION PROCEDURES
Page 2 of 4
b. Contractor proposes a cost and/or time reduction incentive to the City.
1.5 SUBMITTALS
A. See Request for Substitution Form (attached)
B. Procedure for Requesting Substitution
1. Substitution shall be considered only:
a. After award of Contract
b. Under the conditions stated herein
2. Submit 3 copies of each written request for substitution, including:
a. Documentation
1) Complete data substantiating compliance of proposed substitution with
Contract Documents
2) Data relating to changes in construction schedule, when a reduction is
proposed
3) Data relating to changes in cost
b. For products
1) Product identification
a) Manufacturer's name
b) Telephone number and representative contact name
c) Specification Section or Drawing reference of originally specified
product, including discrete name or tag number assigned to original
product in the Contract Documents
2) Manufacturer's literature clearly marked to show compliance of proposed
product with Contract Documents
3) Itemized comparison of original and proposed product addressing product
characteristics including, but not necessarily limited to:
a) Size
b) Composition or materials of construction
c) Weight
d) Electrical or mechanical requirements
4) Product experience
a) Location of past projects utilizing product
b) Name and telephone number of persons associated with referenced
projects knowledgeable concerning proposed product
c) Available field data and reports associated with proposed product
5) Samples
a) Provide at request of City.
b) Samples become the property of the City.
c. For construction methods:
1) Detailed description of proposed method
2) Illustration drawings
C. Approval or Rejection
1. Written approval or rejection of substitution given by the City
2. City reserves the right to require proposed product to comply with color and pattern
of specified product if necessary to secure design intent.
3. In the event the substitution is approved, if a reduction in cost or time results, it will
be documented by Change Order.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
012500-3
DAP SUBSTITUTION PROCEDURES
Page 3 of 4
4. Substitution will be rejected i£
a. Submittal is not through the Contractor with his stamp of approval
b. Request is not made in accordance with this Specification Section
c. In the Developer's opinion, acceptance will require substantial revision of the
original design
d. In the City's or Developer's opinion, substitution will not perform adequately
the function consistent with the design intent
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. In making request for substitution or in using an approved product, the Contractor
represents that the Contractor:
1. Has investigated proposed product, and has determined that it is adequate or
superior in all respects to that specified, and that it will perform function for which it
is intended
2. Will provide same guarantee for substitute item as for product specified
3. Will coordinate installation of accepted substitution into Work, to include building
modifications if necessary, making such changes as may be required for Work to be
complete in all respects
4. Waives all claims for additional costs related to substitution which subsequently
arise
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
01 25 00 - 4
DAP SUBSTITUTION PROCEDURES
Page 4 of 4
EXHIBIT A
REQUEST FOR SUBSTITUTION FORM:
TO:
PROJECT: DATE:
We hereby submit for your consideration the following product instead of the specified item for
the above project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Substitution:
Reason for Substitution:
Include complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Fill in Blanks Below:
A. Will the undersigned contractor pay for changes to the building design, including engineering
and detailing costs caused by the requested substitution?
B. What effect does substitution have on other trades?
C. Differences between proposed substitution and specified item?
D. Differences in product cost or product delivery time?
E. Manufacturer's guarantees of the proposed and specified items are:
Equal Better (explain on attachment)
The undersigned states that the function, appearance and quality are equivalent or superior to the
specified item.
Submitted By: For Use by City
Signature
as noted
Firm
Address
Date
Telephone
For Use by City:
Approved
City
Recommended Recommended
Not recommended _Received late
By
Date
Remarks
Date
Rejected
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
SECTION 013119
PRECONSTRUCTION MEETING
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
013119-1
DAP PRECONSTRUCTION MEETING
Page 1 of 3
1. Provisions for the preconstruction meeting to be held prior to the start of Work to
clarify construction contract administration procedures
B. Deviations from this City of Fort Worth Standard Specification
1. No construction schedule required unless requested by the City.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Attend preconstruction meeting.
2. Representatives of Contractor, subcontractors and suppliers attending meetings
shall be qualified and authorized to act on behalf of the entity each represents.
3. Meeting administered by City may be tape recorded.
a. If recorded, tapes will be used to prepare minutes and retained by City for
future reference.
B. Preconstruction Meeting
1. A preconstruction meeting will be held within 14 days after the delivery of the
distribution package to the City.
a. The meeting will be scheduled and administered by the City.
2. The Project Representative will preside at the meeting, prepare the notes of the
meeting and distribute copies of same to all participants who so request by fully
completing the attendance form to be circulated at the beginning of the meeting.
3. Attendance shall include:
a. Developer and Consultant
b. Contractor's project manager
c. Contractor's superintendent
d. Any subcontractor or supplier representatives whom the Contractor may desire
to invite or the City may request
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
01 31 19 - 2
DAP PRECONSTRUCTION MEETING
Page 2 of 3
e. Other City representatives
f. Others as appropriate
4. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easements or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
f. Notice to Proceed
g. Construction Staking
h. Progress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
1. Insurance Renewals
m. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation of Pre -Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff. Temporary construction facilities
gg. MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
J. Questions or Comments
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
0131 19 - 3
DAP PRECONSTRUCTION MEETING
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
I DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
013233-1
DAP PRECONSTRUCTION VIDEO
Page 1 of 2
SECTION 0132 33
PRECONSTRUCTION VIDEO
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative and procedural requirements for:
a. Preconstruction Videos
B. Deviations from this City of Fort Worth Standard Specification
1. Though not mandatory, it is highly recommended on infill developer projects.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Preconstruction Video
1. Produce a preconstruction video of the site/alignment, including all areas in the
vicinity of and to be affected by construction.
a. Provide digital copy of video upon request by the City.
2. Retain a copy of the preconstruction video until the end of the maintenance surety
period.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
013233-2
DAP PRECONSTRUCTION VIDEO
Page 2 of 2
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
SECTION 0133 00
DAP SUBMITTALS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
013300-1
DAP SUBMITTALS
Page 1 of 8
1. General methods and requirements of submissions applicable to the following
Work -related submittals:
a. Shop Drawings
b. Product Data (including Standard Product List submittals)
c. Samples
d. Mock Ups
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Notify the City in writing, at the time of submittal, of any deviations in the
submittals from the requirements of the Contract Documents.
2. Coordination of Submittal Times
a. Prepare, prioritize and transmit each submittal sufficiently in advance of
performing the related Work or other applicable activities, or within the time
specified in the individual Work Sections, of the Specifications.
b. Contractor is responsible such that the installation will not be delayed by
processing times including, but not limited to:
a) Disapproval and resubmittal (if required)
b) Coordination with other submittals
c) Testing
d) Purchasing
e) Fabrication
f) Delivery
g) Similar sequenced activities
c. No extension of time will be authorized because of the Contractor's failure to
transmit submittals sufficiently in advance of the Work.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
013300-2
DAP SUBMITTALS
Page 2 of 8
d. Make submittals promptly in accordance with approved schedule, and in such
sequence as to cause no delay in the Work or in the work of any other
contractor.
B. Submittal Numbering
When submitting shop drawings or samples, utilize a 9-character submittal cross-
reference identification numbering system in the following manner:
a. Use the first 6 digits of the applicable Specification Section Number.
b. For the next 2 digits number use numbers 01-99 to sequentially number each
initial separate item or drawing submitted under each specific Section number.
c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e.
A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical
submittal number would be as follows:
03 30 00-08-B
1) 03 30 00 is the Specification Section for Concrete
2) 08 is the eighth initial submittal under this Specification Section
3) B is the third submission (second resubmission) of that particular shop
drawing
C. Contractor Certification
1. Review shop drawings, product data and samples, including those by
subcontractors, prior to submission to determine and verify the following:
a. Field measurements
b. Field construction criteria
c. Catalog numbers and similar data
d. Conformance with the Contract Documents
Provide each shop drawing, sample and product data submitted by the Contractor
with a Certification Statement affixed including:
a. The Contractor's Company name
b. Signature of submittal reviewer
c. Certification Statement
1) `By this submittal, I hereby represent that I have determined and verified
field measurements, field construction criteria, materials, dimensions,
catalog numbers and similar data and I have checked and coordinated each
item with other applicable approved shop drawings."
D. Submittal Format
1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches.
2. Bind shop drawings and product data sheets together.
3. Order
a. Cover Sheet
1) Description of Packet
2) Contractor Certification
b. List of items / Table of Contents
c. Product Data /Shop Drawings/Samples /Calculations
E. Submittal Content
1. The date of submission and the dates of any previous submissions
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
013300-3
DAP SUBMITTALS
Page 3 of 8
2. The Project title and number
3. Contractor identification
4. The names o£
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section number, page and
paragraph(s)
6. Field dimensions, clearly identified as such
7. Relation to adjacent or critical features of the Work or materials
8. Applicable standards, such as ASTM or Federal Specification numbers
9. Identification by highlighting of deviations from Contract Documents
10. Identification by highlighting of revisions on resubmittals
11. An 8-inch x 3-inch blank space for Contractor and City stamps
F. Shop Drawings
1. As specified in individual Work Sections includes, but is not necessarily limited to:
a. Custom -prepared data such as fabrication and erection/installation (working)
drawings
b. Scheduled information
c. Setting diagrams
d. Actual shopwork manufacturing instructions
e. Custom templates
f. Special wiring diagrams
g. Coordination drawings
h. Individual system or equipment inspection and test reports including:
1) Performance curves and certifications
i. As applicable to the Work
2. Details
a. Relation of the various parts to the main members and lines of the structure
b. Where correct fabrication of the Work depends upon field measurements
1) Provide such measurements and note on the drawings prior to submitting
for approval.
G. Product Data
1. For submittals of product data for products included on the City's Standard Product
List, clearly identify each item selected for use on the Project.
2. For submittals of product data for products not included on the City's Standard
Product List, submittal data may include, but is not necessarily limited to:
a. Standard prepared data for manufactured products (sometimes referred to as
catalog data)
1) Such as the manufacturer's product specification and installation
instructions
2) Availability of colors and patterns
3) Manufacturer's printed statements of compliances and applicability
4) Roughing -in diagrams and templates
5) Catalog cuts
6) Product photographs
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
01 33 00 - 4
DAP SUBMITTALS
Page 4 of 8
7) Standard wiring diagrams
8) Printed performance curves and operational -range diagrams
9) Production or quality control inspection and test reports and certifications
10) Mill reports
11) Product operating and maintenance instructions and recommended
spare -parts listing and printed product warranties
12) As applicable to the Work
H. Samples
As specified in individual Sections, include, but are not necessarily limited to:
a. Physical examples of the Work such as:
1) Sections of manufactured or fabricated Work
2) Small cuts or containers of materials
3) Complete units of repetitively used products color/texture/pattern swatches
and range sets
4) Specimens for coordination of visual effect
5) Graphic symbols and units of Work to be used by the City for independent
inspection and testing, as applicable to the Work
I. Do not start Work requiring a shop drawing, sample or product data nor any material to
be fabricated or installed prior to the approval or qualified approval of such item.
1. Fabrication performed, materials purchased or on -site construction accomplished
which does not conform to approved shop drawings and data is at the Contractor's
risk.
2. The City will not be liable for any expense or delay due to corrections or remedies
required to accomplish conformity.
3. Complete project Work, materials, fabrication, and installations in conformance
with approved shop drawings, applicable samples, and product data.
J. Submittal Distribution
1. Electronic Distribution
a. Confirm development of Project directory for electronic submittals to be
uploaded to City's Buzzsaw site, or another external FTP site approved by the
City.
b. Shop Drawings
1) Upload submittal to designated project directory and notify appropriate
City representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
b) If Contractor requires more than 1 hard copy of Shop Drawings
returned, Contractor shall submit more than the number of copies listed
above.
c. Product Data
1) Upload submittal to designated project directory and notify appropriate
City representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distribution (if required in lieu of electronic distribution)
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
013300-5
DAP SUBMITTALS
Page 5 of 8
a. Shop Drawings
1) Distributed to the City
2) Copies
a) 8 copies for mechanical submittals
b) 7 copies for all other submittals
c) If Contractor requires more than 3 copies of Shop Drawings returned,
Contractor shall submit more than the number of copies listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
c. Samples
1) Distributed to the Project Representative
2) Copies
a) Submit the number stated in the respective Specification Sections.
3. Distribute reproductions of approved shop drawings and copies of approved
product data and samples, where required, to the job site file and elsewhere as
directed by the City.
a. Provide number of copies as directed by the City but not exceeding the number
previously specified.
K. Submittal Review
The review of shop drawings, data and samples will be for general conformance
with the design concept and Contract Documents. This is not to be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, except as otherwise
provided herein
The review and approval of shop drawings, samples or product data by the City
does not relieve the Contractor from his/her responsibility with regard to the
fulfillment of the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City will
have no responsibility therefore.
3. The Contractor remains responsible for details and accuracy, for coordinating the
Work with all other associated work and trades, for selecting fabrication processes,
for techniques of assembly and for performing Work in a safe manner.
4. If the shop drawings, data or samples as submitted describe variations and show a
departure from the Contract requirements which City finds to be in the interest of
the City and to be so minor as not to involve a change in Contract Price or time for
performance, the City may return the reviewed drawings without noting an
exception.
5. Submittals will be returned to the Contractor under 1 of the following codes:
a. Code 1
1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or
comments on the submittal.
a) When returned under this code the Contractor may release the
equipment and/or material for manufacture.
b. Code 2
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
013300-6
DAP SUBMITTALS
Page 6 of 8
1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of
the notations and comments IS NOT required by the Contractor.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the
final product.
c. Code 3
1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is
assigned when notations and comments are extensive enough to require a
resubmittal of the package.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the
final product.
b) This resubmittal is to address all comments, omissions and
non -conforming items that were noted.
c) Resubmittal is to be received by the City within 15 Calendar Days of
the date of the City's transmittal requiring the resubmittal.
d. Code 4
1) "NOT APPROVED" is assigned when the submittal does not meet the
intent of the Contract Documents.
a) The Contractor must resubmit the entire package revised to bring the
submittal into conformance.
b) It may be necessary to resubmit using a different manufacturer/vendor
to meet the Contract Documents.
6. Resubmittals
a. Handled in the same manner as first submittals
1) Corrections other than requested by the City
2) Marked with revision triangle or other similar method
a) At Contractor's risk if not marked
b. Submittals for each item will be reviewed no more than twice at the City's
expense.
1) All subsequent reviews will be performed at times convenient to the City
and at the Contractor's expense, based on the City's or City
Representative's then prevailing rates.
2) Provide Contractor reimbursement to the City within 30 Calendar Days for
all such fees invoiced by the City.
c. The need for more than 1 resubmission or any other delay in obtaining City's
review of submittals, will not entitle the Contractor to an extension of Contract
Time.
7. Partial Submittals
a. City reserves the right to not review submittals deemed partial, at the City's
discretion.
b. Submittals deemed by the City to be not complete will be returned to the
Contractor, and will be considered "Not Approved" until resubmitted.
c. The City may at its option provide a list or mark the submittal directing the
Contractor to the areas that are incomplete.
8. If the Contractor considers any correction indicated on the shop drawings to
constitute a change to the Contract Documents, then written notice must be
provided thereof to the Developer at least 7 Calendar Days prior to release for
manufacture.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
013300-7
DAP SUBMITTALS
Page 7 of 8
9. When the shop drawings have been completed to the satisfaction of the City, the
Contractor may carry out the construction in accordance therewith and no further
changes therein except upon written instructions from the City.
10. Each submittal, appropriately coded, will be returned within 30 Calendar Days
following receipt of submittal by the City.
L. Mock ups
1. Mock Up units as specified in individual Sections, include, but are not necessarily
limited to, complete units of the standard of acceptance for that type of Work to be
used on the Project. Remove at the completion of the Work or when directed.
M. Qualifications
1. If specifically required in other Sections of these Specifications, submit a P.E.
Certification for each item required.
N. Request for Information (RFI)
Contractor Request for additional information
a. Clarification or interpretation of the contract documents
b. When the Contractor believes there is a conflict between Contract Documents
c. When the Contractor believes there is a conflict between the Drawings and
Specifications
1) Identify the conflict and request clarification
2. Sufficient information shall be attached to permit a written response without further
information.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
013300-8
DAP SUBMITTALS
Page 8 of 8
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August 30, 2013
0135 13- 1
DAP SPECIAL PROJECT PROCEDURES
SECTION 0135 13
SPECIAL PROJECT PROCEDURES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 7
The procedures for special project circumstances that includes, but is not limited to:
a. Coordination with the Texas Department of Transportation
b. Work near High Voltage Lines
c. Confined Space Entry Program
d. Air Pollution Watch Days
e. Use of Explosives, Drop Weight, Etc.
f. Water Department Notification
g. Public Notification Prior to Beginning Construction
h. Coordination with United States Army Corps of Engineers
i. Coordination within Railroad permits areas
j. Dust Control
k. Employee Parking
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 33 12 25 — Connection to Existing Water Mains
1.2 REFERENCES
A. Reference Standards
1. Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specification, unless a date is specifically cited.
2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752.
High Voltage Overhead Lines.
3. North Central Texas Council of Governments (NCTCOG) — Clean Construction
Specification
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordination with the Texas Department of Transportation
1. When work in the right-of-way which is under the jurisdiction of the Texas
Department of Transportation (TxDOT):
a. Notify the Texas Department of Transportation prior to commencing any work
therein in accordance with the provisions of the permit
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August, 30, 2013
013513-2
DAP SPECIAL PROJECT PROCEDURES
Page 2 of 7
b. All work performed in the TxDOT right-of-way shall be performed in
compliance with and subject to approval from the Texas Department of
Transportation
B. Work near High Voltage Lines
1. Regulatory Requirements
a. All Work near High Voltage Lines (more than 600 volts measured between
conductors or between a conductor and the ground) shall be in accordance with
Health and Safety Code, Title 9, Subtitle A, Chapter 752.
2. Warning sign
a. Provide sign of sufficient size meeting all OSHA requirements.
3. Equipment operating within 10 feet of high voltage lines will require the following
safety features
a. Insulating cage -type of guard about the boom or arm
b. Insulator links on the lift hook connections for back hoes or dippers
c. Equipment must meet the safety requirements as set forth by OSHA and the
safety requirements of the owner of the high voltage lines
4. Work within 6 feet of high voltage electric lines
a. Notification shall be given to:
1) The power company (example: ONCOR)
a) Maintain an accurate log of all such calls to power company and record
action taken in each case.
b. Coordination with power company
1) After notification coordinate with the power company to:
a) Erect temporary mechanical barriers, de -energize the lines, or raise or
lower the lines
c. No personnel may work within 6 feet of a high voltage line before the above
requirements have been met.
C. Confined Space Entry Program
1. Provide and follow approved Confined Space Entry Program in accordance with
OSHA requirements.
2. Confined Spaces include:
a. Manholes
b. All other confined spaces in accordance with OSHA's Permit Required for
Confined Spaces
D. Use of Explosives, Drop Weight, Etc.
When Contract Documents permit on the project the following will apply:
a. Public Notification
1) Submit notice to City and proof of adequate insurance coverage, 24 hours
prior to commencing.
2) Minimum 24 hour public notification in accordance with Section 01 31 13
E. Water Department Coordination
During the construction of this project, it will be necessary to deactivate, for a
period of time, existing lines. The Contractor shall be required to coordinate with
the Water Department to determine the best times for deactivating and activating
those lines.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August, 30, 2013
013513-3
DAP SPECIAL PROJECT PROCEDURES
Page 3 of 7
2. Coordinate any event that will require connecting to or the operation of an existing
City water line system with the City's representative.
a. Coordination shall be in accordance with Section 33 12 25.
b. If needed, obtain a hydrant water meter from the Water Department for use
during the life of named project.
c. In the event that a water valve on an existing live system be turned off and on
to accommodate the construction of the project is required, coordinate this
activity through the appropriate City representative.
1) Do not operate water line valves of existing water system.
a) Failure to comply will render the Contractor in violation of Texas Penal
Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor
will be prosecuted to the full extent of the law.
b) In addition, the Contractor will assume all liabilities and
responsibilities as a result of these actions.
F. Public Notification Prior to Beginning Construction
Prior to beginning construction on any block in the project, on a block by block
basis, prepare and deliver a notice or flyer of the pending construction to the front
door of each residence or business that will be impacted by construction. The notice
shall be prepared as follows:
a. Post notice or flyer 7 days prior to beginning any construction activity on each
block in the project area.
1) Prepare flyer on the Contractor's letterhead and include the following
information:
a) Name of Project
b) City Project No (CPN)
c) Scope of Project (i.e. type of construction activity)
d) Actual construction duration within the block
e) Name of the contractor's foreman and phone number
f) Name of the City's inspector and phone number
g) City's after-hours phone number
2) A sample of the `pre -construction notification' flyer is attached as Exhibit
A.
3) Submit schedule showing the construction start and finish time for each
block of the project to the inspector.
4) Deliver flyer to the City Inspector for review prior to distribution.
b. No construction will be allowed to begin on any block until the flyer is
delivered to all residents of the block.
G. Public Notification of Temporary Water Service Interruption during Construction
1. In the event it becomes necessary to temporarily shut down water service to
residents or businesses during construction, prepare and deliver a notice or flyer of
the pending interruption to the front door of each affected resident.
2. Prepared notice as follows:
a. The notification or flyer shall be posted 24 hours prior to the temporary
interruption.
b. Prepare flyer on the contractor's letterhead and include the following
information:
1) Name of the project
2) City Project Number
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August, 30, 2013
013513-4
DAP SPECIAL PROJECT PROCEDURES
Page 4 of 7
3) Date of the interruption of service
4) Period the interruption will take place
5) Name of the contractor's foreman and phone number
6) Name of the City's inspector and phone number
c. A sample of the temporary water service interruption notification is attached as
Exhibit B.
d. Deliver a copy of the temporary interruption notification to the City inspector
for review prior to being distributed.
e. No interruption of water service can occur until the flyer has been delivered to
all affected residents and businesses.
f. Electronic versions of the sample flyers can be obtained from the Project
Construction Inspector.
H. Coordination with United States Army Corps of Engineers (USACE)
At locations in the Project where construction activities occur in areas where
USACE permits are required, meet all requirements set forth in each designated
permit.
I. Coordination within Railroad Permit Areas
At locations in the project where construction activities occur in areas where
railroad permits are required, meet all requirements set forth in each designated
railroad permit. This includes, but is not limited to, provisions for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of-way and property of the
Railroad Company from damage arising out of and/or from the construction of
the project. Proper utility clearance procedures shall be used in accordance
with the permit guidelines.
Obtain any supplemental information needed to comply with the railroad's
requirements.
J. Dust Control
1. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
K. Employee Parking
1. Provide parking for employees at locations approved by the City.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August, 30, 2013
013513-5
DAP SPECIAL PROJECT PROCEDURES
Page 5 of 7
1.4 SUBMITTALS [NOT USED]
1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.6 CLOSEOUT SUBMITTALS [NOT USED]
1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.8 QUALITY ASSURANCE [NOT USED]
1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.10 FIELD [SITE] CONDITIONS [NOT USED]
1.11 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
1.3.B — Added requirement of compliance with Health and Safety Code, Title 9.
8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August, 30, 2013
013513-6
DAP SPECIAL PROJECT PROCEDURES
EXHIBIT A
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construction:
Page 6 of 7
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE
OF THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August, 30, 2013
Date:
EXHIBIT B
FORT WORTH
DOE NO. xxxx
Project Dame:
013513-7
DAP SPECIAL PROJECT PROCEDURES
Page 7 of 7
NOTICE OF TEMPORARY WATER SERVICE
INTERRUPTION
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR
WATER SERVICE WILL BE INTERRUPTED ON
BETWEEN THE HOURS OF AND
IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL:
MR. AT
(CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER)
OR
MR. 'AT
(CITY INSPECTOR) (TELEPHONE NUMBER)
THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.
THANK YOU,
,CONTRACTOR
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised August, 30, 2013
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 1 of 2
SECTION 0145 23
TESTING AND INSPECTION SERVICES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Testing and inspection services procedures and coordination
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
a. Contractor is responsible for performing, coordinating, and payment of all
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the first Quality Assurance test performed by the City fails, the
Contractor is responsible for payment of subsequent Quality Assurance
testing until a passing test occurs.
a) Final acceptance will not be issued by City until all required payments
for testing by Contractor have been paid in full.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Testing
1. Complete testing in accordance with the Contract Documents.
2. Coordination
a. When testing is required to be performed by the City, notify City, sufficiently
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, notify City,
sufficiently in advance, that testing will be performed.
3. Distribution of Testing Reports
a. Electronic Distribution
1) Confirm development of Project directory for electronic submittals to be
uploaded to the City's document management system, or another form of
distribution approved by the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS W J Boaz Rd.
Revised March 20, 2020 CPN#104753
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 2 of 2
2) Upload test reports to designated project directory and notify appropriate
City representatives via email of submittal posting.
3) Hard Copies
a) 1 copy for all submittals submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Project Representative with trip tickets for each delivered load of
Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Inspection
1. Inspection or lack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Documents.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded
through the City's document management system.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised March 20, 2020
01 50 00 - 1
DAP TEMPORARY FACILITIES AND CONTROLS
Page 1 of 4
SECTION 0150 00
TEMPORARY FACILITIES AND CONTROLS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Provide temporary facilities and controls needed for the Work including, but not
necessarily limited to:
a. Temporary utilities
b. Sanitary facilities
c. Storage Sheds and Buildings
d. Dust control
e. Temporary fencing of the construction site
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Temporary Utilities
1. Obtaining Temporary Service
a. Make arrangements with utility service companies for temporary services.
b. Abide by rules and regulations of utility service companies or authorities
having jurisdiction.
c. Be responsible for utility service costs until Work is approved for Final
Acceptance.
1) Included are fuel, power, light, heat and other utility services necessary for
execution, completion, testing and initial operation of Work.
2. Water
a. Contractor to provide water required for and in connection with Work to be
performed and for specified tests of piping, equipment, devices or other use as
required for the completion of the Work.
b. Provide and maintain adequate supply of potable water for domestic
consumption by Contractor personnel and City's Project Representatives.
c. Coordination
1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised JULY 1, 2011
015000-2
DAP TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
d. Contractor Payment for Construction Water
1) Obtain construction water meter from City for payment as billed by City's
established rates.
3. Electricity and Lighting
a. Provide and pay for electric powered service as required for Work, including
testing of Work.
1) Provide power for lighting, operation of equipment, or other use.
b. Electric power service includes temporary power service or generator to
maintain operations during scheduled shutdown.
4. Telephone
a. Provide emergency telephone service at Site for use by Contractor personnel
and others performing work or furnishing services at Site.
5. Temporary Heat and Ventilation
a. Provide temporary heat as necessary for protection or completion of Work.
b. Provide temporary heat and ventilation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persons on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclose and anchor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and waste so as not to cause nuisance or health
problem.
d. Haul sewage and waste off -site at no less than weekly intervals and properly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at completion of Project
C. Storage Sheds and Buildings
1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor
above ground level for materials and equipment susceptible to weather damage.
2. Storage of materials not susceptible to weather damage may be on blocks off
ground.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to permit easy access for identification,
inspection and inventory.
4. Equip building with lockable doors and lighting, and provide electrical service for
equipment space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
5. Fill and grade site for temporary structures to provide drainage away from
temporary and existing buildings.
6. Remove building from site prior to Final Acceptance.
D. Temporary Fencing
1. Provide and maintain for the duration or construction when required in contract
documents
E. Dust Control
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised JULY 1, 2011
015000-3
DAP TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
1. Contractor is responsible for maintaining dust control through the duration of the
project.
a. Contractor remains on -call at all times
b. Must respond in a timely manner
F. Temporary Protection of Construction
1. Contractor or subcontractors are responsible for protecting Work from damage due
to weather.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A. Temporary Facilities
1. Maintain all temporary facilities for duration of construction activities as needed.
3.5 [REPAIR] / [RESTORATION]
3.6 RE -INSTALLATION
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES
A. Temporary Facilities
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised JULY 1, 2011
01 50 00 - 4
DAP TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
1. Remove all temporary facilities and restore area after completion of the Work, to a
condition equal to or better than prior to start of Work.
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised JULY 1, 2011
01 55 26 - 1
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 1 of 3
SECTION 0155 26
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative procedures for:
a. Street Use Permit
b. Modification of approved traffic control
c. Removal of Street Signs
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 34 71 13 — Traffic Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES
A. Reference Standards
1. Reference standards cited in this specification refer to the current reference standard
published at the time of the latest revision date logged at the end of this
specification, unless a date is specifically cited.
2. Texas Manual on Uniform Traffic Control Devices (TMUTCD).
1.4 ADMINISTRATIVE REQUIREMENTS
A. Traffic Control
1. General
a. When traffic control plans are included in the Drawings, provide Traffic
Control in accordance with Drawings and Section 34 71 13.
b. When traffic control plans are not included in the Drawings, prepare traffic
control plans in accordance with Section 34 71 13 and submit to City for
review.
1) Allow minimum 10 working days for review of proposed Traffic Control.
B. Street Use Permit
1. Prior to installation of Traffic Control, a City Street Use Permit is required.
a. To obtain Street Use Permit, submit Traffic Control Plans to City
Transportation and Public Works Department.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised July 1, 2011
015526-2
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
1) Allow a minimum of 5 working days for permit review.
2) Contractor's responsibility to coordinate review of Traffic Control plans for
Street Use Permit, such that construction is not delayed.
C. Modification to Approved Traffic Control
1. Prior to installation traffic control:
a. Submit revised traffic control plans to City Department Transportation and
Public Works Department.
1) Revise Traffic Control plans in accordance with Section 34 71 13.
2) Allow minimum 5 working days for review of revised Traffic Control.
3) It is the Contractor's responsibility to coordinate review of Traffic Control
plans for Street Use Permit, such that construction is not delayed.
D. Removal of Street Sign
1. If it is determined that a street sign must be removed for construction, then contact
City Transportation and Public Works Department, Signs and Markings Division to
remove the sign.
E. Temporary Signage
1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
requirements of the latest edition of the Texas Manual on Uniform Traffic Control
Devices (MUTCD).
2. Install temporary sign before the removal of permanent sign.
3. When construction is complete, to the extent that the permanent sign can be
reinstalled, contact the City Transportation and Public Works Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Traffic Control Standards
1. Traffic Control Standards can be found on the City's Buzzsaw website.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised July 1, 2011
015526-3
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised July 1, 2011
0157 13- 1
DAP STORM WATER POLLUTION PREVENTION
Page 1 of 3
SECTION 01 5713
STORM WATER POLLUTION PREVENTION
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Procedures for Storm Water Pollution Prevention Plans
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the
Contract
2. Division 1 — General Requirements
3. Section 3125 00 — Erosion and Sediment Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Construction Activities resulting in less than 1 acre of disturbance
a. Work associated with this Item is considered subsidiary to the various Items
bid. No separate payment will be allowed for this Item.
2. Construction Activities resulting in greater than 1 acre of disturbance
a. Measurement and Payment shall be in accordance with Section 3125 00.
1.3 REFERENCES
A. Abbreviations and Acronyms
1. Notice of Intent: NOI
2. Notice of Termination: NOT
3. Storm Water Pollution Prevention Plan: SWPPP
4. Texas Commission on Environmental Quality: TCEQ
5. Notice of Change: NOC
A. Reference Standards
1. Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specification, unless a date is specifically cited.
2. Integrated Storm Management (iSWM) Technical Manual for Construction
Controls
1.4 ADMINISTRATIVE REQUIREMENTS
A. General
1. Contractor is responsible for resolution and payment of any fines issued associated
with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN # 104753
Revised July 1, 2011
015713-2
DAP STORM WATER POLLUTION PREVENTION
Page 2 of 3
B. Construction Activities resulting in:
1. Less than 1 acre of disturbance
a. Provide erosion and sediment control in accordance with Section 3125 00 and
Drawings.
2. 1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Small Construction Site Notice Required under general permit
TXR150000
a) Sign and post at job site
b) Prior to Preconstruction Meeting, send 1 copy to City Department of
Transportation and Public Works, Environmental Division, (817) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
5 acres or more of Disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
a) Sign and post at job site
b) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
2) TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
4) Once the project has been completed and all the closeout requirements of
TCEQ have been met a TCEQ Notice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
1.5 SUBMITTALS
A. SWPPP
Submit in accordance with Section 01 33 00, except as stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as follows:
1) 1 copy to the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Works, Environmental Division for review
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN # 104753
Revised July 1, 2011
015713-3
DAP STORM WATER POLLUTION PREVENTION
Page 3 of 3
B. Modified SWPPP
1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
in accordance with Section 0133 00.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
I DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN # 104753
Revised July 1, 2011
SECTION 0160 00
PRODUCT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
01 60 00
DAP PRODUCT REQUIREMENTS
Page 1 of 2
1. References for Product Requirements and City Standard Products List
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A list of City approved products for use is available through the City's website at:
httvs:Hapes.fortworthtexas.2ov/ProiectResources/ and following the directory
path: 02 - Construction Documents\Standard Products List
A. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved products will only be allowed for use upon specific
approval by the City.
B. Any specific product requirements in the Contract Documents supersede similar
products included on the City's Standard Product List.
1. The City reserves the right to not allow products to be used for certain projects even
though the product is listed on the City's Standard Product List.
C. Although a specific product is included on City's Standard Product List, not all
products from that manufacturer are approved for use, including but not limited to, that
manufacturer's standard product.
D. See Section 0133 00 for submittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised March 20, 2020
01 60 00
DAP PRODUCT REQUIREMENTS
Page 2 of 2
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
10/12/12 D. Johnson Modified Location of City's Standard Product List
4/7/2014 M.Domenech Revised for DAP application
03/20/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is
accessible through the City's website.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised March 20, 2020
01 66 00 - 1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 1 of 4
SECTION 0166 00
PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Scheduling of product delivery
2. Packaging of products for delivery
3. Protection of products against damage from:
a. Handling
b. Exposure to elements or harsh environments
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY AND HANDLING
A. Delivery Requirements
1. Schedule delivery of products or equipment as required to allow timely installation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3. Delivery trucks will not be permitted to wait extended periods of time on the Site
for personnel or equipment to receive the delivery.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
016600-2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
4. Deliver products or equipment in manufacturer's original unbroken cartons or other
containers designed and constructed to protect the contents from physical or
environmental damage.
5. Clearly and fully mark and identify as to manufacturer, item and installation
location.
6. Provide manufacturer's instructions for storage and handling.
B. Handling Requirements
1. Handle products or equipment in accordance with these Contract Documents and
manufacturer's recommendations and instructions.
C. Storage Requirements
1. Store materials in accordance with manufacturer's recommendations and
requirements of these Specifications.
2. Make necessary provisions for safe storage of materials and equipment.
a. Place loose soil materials and materials to be incorporated into Work to prevent
damage to any part of Work or existing facilities and to maintain free access at
all times to all parts of Work and to utility service company installations in
vicinity of Work.
3. Keep materials and equipment neatly and compactly stored in locations that will
cause minimum inconvenience to other contractors, public travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide easy access for inspection.
4. Restrict storage to areas available on construction site for storage of material and
equipment as shown on Drawings, or approved by City's Project Representative.
5. Provide off -site storage and protection when on -site storage is not adequate.
a. Provide addresses of and access to off -site storage locations for inspection by
City's Project Representative.
6. Do not use lawns, grass plots or other private property for storage purposes without
written permission of owner or other person in possession or control of premises.
7. Store in manufacturers' unopened containers.
8. Neatly, safely and compactly stack materials delivered and stored along line of
Work to avoid inconvenience and damage to property owners and general public
and maintain at least 3 feet from fire hydrant.
9. Keep public and private driveways and street crossings open.
10. Repair or replace damaged lawns, sidewalks, streets or other improvements to
satisfaction of City's Project Representative.
a. Total length which materials may be distributed along route of construction at
one time is 1,000 linear feet, unless otherwise approved in writing by City's
Project Representative.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
016600-3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 ERECTION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL
A. Tests and Inspections
1. Inspect all products or equipment delivered to the site prior to unloading.
B. Non -Conforming Work
1. Reject all products or equipment that are damaged, used or in any other way
unsatisfactory for use on the project.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Protect equipment from exposure to elements and keep thoroughly dry if required by
the manufacturer.
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
01 66 00 - 4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
01 70 00 - 1
DAP MOBILIZATION AND REMOBILIZATION
Page 1 of 4
SECTION 0170 00
MOBILIZATION AND REMOBILIZATION
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Mobilization and Demobilization
a. Mobilization
1) Transportation of Contractor's personnel, equipment, and operating supplies
to the Site
2) Establishment of necessary general facilities for the Contractor's operation
at the Site
3) Premiums paid for performance and payment bonds
4) Transportation of Contractor's personnel, equipment, and operating supplies
to another location within the designated Site
5) Relocation of necessary general facilities for the Contractor's operation
from 1 location to another location on the Site.
b. Demobilization
1) Transportation of Contractor's personnel, equipment, and operating supplies
away from the Site including disassembly
2) Site Clean-up
3) Removal of all buildings and/or other facilities assembled at the Site for this
Contract
c. Mobilization and Demobilization do not include activities for specific items of
work that are for which payment is provided elsewhere in the contract.
Remobilization
a. Remobilization for Suspension of Work specifically required in the Contract
Documents or as required by City includes:
1) Demobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly or temporarily securing
equipment, supplies, and other facilities as designated by the Contract
Documents necessary to suspend the Work.
b) Site Clean-up as designated in the Contract Documents
2) Remobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site necessary to resume the Work.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site necessary to resume the Work.
3) No Payments will be made for:
a) Mobilization and Demobilization from one location to another on the
Site in the normal progress of performing the Work.
b) Stand-by or idle time
c) Lost profits
3. Mobilizations and Demobilization for Miscellaneous Projects
a. Mobilization and Demobilization
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017000-2
DAP MOBILIZATION AND REMOBILIZATION
Page 2 of 4
1) Mobilization shall consist of the activities and cost on a Work Order basis
necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site for the issued Work Order.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site for the issued Work Order
2) Demobilization shall consist of the activities and cost necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly for each issued Work
Order
b) Site Clean-up for each issued Work Order
c) Removal of all buildings or other facilities assembled at the Site for
each Work Oder
b. Mobilization and Demobilization do not include activities for specific items of
work for which payment is provided elsewhere in the contract.
4. Emergency Mobilizations and Demobilization for Miscellaneous Projects
a. A Mobilization for Miscellaneous Projects when directed by the City and the
mobilization occurs within 24 hours of the issuance of the Work Order.
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Mobilization and Demobilization
a. Measure
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and materials furnished in accordance with this Item
are subsidiary to the various Items bid and no other compensation will be
allowed.
Remobilization for suspension of Work as specifically required in the Contract
Documents
a. Measurement
1) Measurement for this Item shall be per each remobilization performed.
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Specified Remobilization" in accordance with Contract
Documents.
c. The price shall include:
1) Demobilization as described in Section 1.1.A.2.a.1)
2) Remobilization as described in Section 1.1.A.2.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017000-3
DAP MOBILIZATION AND REMOBILIZATION
Page 3 of 4
Remobilization for suspension of Work as required by City
a. Measurement and Payment
1) This shall be submitted as a Contract Claim in accordance with Article 10
of Section 00 72 00.
2) No payments will be made for standby, idle time, or lost profits associated
with this Item.
4. Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Mobilization" in accordance with Contract
Documents. Demobilization shall be considered subsidiary to mobilization
and shall not be paid for separately.
c. The price shall include:
1) Mobilization as described in Section 1.1.A.3.a.1)
2) Demobilization as described in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Emergency Mobilization" in accordance with
Contract Documents. Demobilization shall be considered subsidiary to
mobilization and shall not be paid for separately.
c. The price shall include
1) Mobilization as described in Section 1.1.A.4.a)
2) Demobilization as described in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017000-4
DAP MOBILIZATION AND REMOBILIZATION
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
DATE
4/7/2014
NAME
M.Domenech
END OF SECTION
Revision Log
SUMMARY OF CHANGE
Revised for DAP application
Page 4 of 4
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017123-1
DAP CONSTRUCTION STAKING AND SURVEY
Page 1 of 4
SECTION 01 71 23
CONSTRUCTION STAKING AND SURVEY
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Requirements for construction staking and construction survey
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Construction Staking
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will
be allowed.
2. Construction Survey
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will
be allowed.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Submittals, if required, shall be in accordance with Section 01 33 00.
B. All submittals shall be approved by the City prior to delivery.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS
A. Certificates
1. Provide certificate certifying that elevations and locations of improvements are in
conformance or non-conformance with requirements of the Contract Documents.
a. Certificate must be sealed by a registered professional land surveyor in the
State of Texas.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised April 7, 2014
017123-2
DAP CONSTRUCTION STAKING AND SURVEY
Page 2 of 4
B. Field Quality Control Submittals
1. Documentation verifying accuracy of field engineering work.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Construction Staking
1. Construction staking will be performed by the City.
2. Coordination
a. Contact City's Project Representative at least 2 weeks in advance for
scheduling of Construction Staking.
b. It is the Contractor's responsibility to coordinate staking such that construction
activities are not delayed or negatively impacted.
3. General
a. Contractor is responsible for preserving and maintaining stakes furnished by
City.
b. If in the opinion of the City, a sufficient number of stakes or markings have
been lost, destroyed or disturbed, by Contractor's neglect, such that the
contracted Work cannot take place, then the Contractor will be required to pay
the City for new staking with a 25 percent markup. The cost for staking will be
deducted from the payment due to the Contractor for the Project.
B. Construction Survey
1. Construction Survey will be performed by the City.
2. Coordination
a. Contractor to verify that control data established in the design survey remains
intact.
b. Coordinate with the City prior to field investigation to determine which
horizontal and vertical control data will be required for construction survey.
c. It is the Contractor's responsibility to coordinate Construction Survey such that
construction activities are not delayed or negatively impacted.
d. Notify City if any control data needs to be restored or replaced due to damage
caused during construction operations.
1) City shall perform replacements and/or restorations.
General
a. Construction survey will be performed in order to maintain complete and
accurate logs of control and survey work as it progresses for Project Records.
b. The Contractor will need to ensure coordination is maintained with the City to
perform construction survey to obtain construction features, including but not
limited to the following:
1) All Utility Lines
a) Rim and flowline elevations and coordinates for each manhole or
junction structure
2) Water Lines
a) Top of pipe elevations and coordinates for waterlines at the following
locations:
(1) Every 250 linear feet
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN#104753
Revised April 7, 2014
017123-3
DAP CONSTRUCTION STAKING AND SURVEY
Page 3 of 4
(2) Horizontal and vertical points of inflection, curvature, etc. (All
Fittings)
(3) Cathodic protection test stations
(4) Sampling stations
(5) Meter boxes/vaults (All sizes)
(6) Fire lines
(7) Fire hydrants
(8) Gate valves
(9) Plugs, stubouts, dead-end lines
(10) Air Release valves (Manhole rim and vent pipe)
(11) Blow off valves (Manhole rim and valve lid)
(12) Pressure plane valves
(13) Cleaning wyes
(14) Casing pipe (each end)
b) Storm Sewer
(1) Top of pipe elevations and coordinates at the following locations:
(a) Every 250 linear feet
(b) Horizontal and vertical points of inflection, curvature, etc.
c) Sanitary Sewer
(1) Top of pipe elevations and coordinates for sanitary sewer lines at
the following locations:
(a) Every 250 linear feet
(b) Horizontal and vertical points of inflection, curvature, etc.
(c) Cleanouts
c. Construction survey will be performed in order to maintain complete and
accurate logs of control and survey work associated with meeting or exceeding
the line and grade required by these Specifications.
d. The Contractor will need to ensure coordination is maintained with the City to
perform construction survey and to verify control data, including but not
limited to the following:
1) Established benchmarks and control points provided for the Contractor's
use are accurate
2) Benchmarks were used to furnish and maintain all reference lines and
grades for tunneling
3) Lines and grades were used to establish the location of the pipe
4) Submit to the City copies of field notes used to establish all lines and
grades and allow the City to check guidance system setup prior to
beginning each tunneling drive.
5) Provide access for the City to verify the guidance system and the line and
grade of the carrier pipe on a daily basis.
6) The Contractor remains fully responsible for the accuracy of the work and
the correction of it, as required.
7) Monitor line and grade continuously during construction.
8) Record deviation with respect to design line and grade once at each pipe
joint and submit daily records to City.
9) If the installation does not meet the specified tolerances, immediately notify
the City and correct the installation in accordance with the Contract
Documents.
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN# 104753
Revised April 7, 2014
017123-4
DAP CONSTRUCTION STAKING AND SURVEY
Page 4 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL
A. It is the Contractor's responsibility to maintain all stakes and control data placed by the
City in accordance with this Specification.
B. Do not change or relocate stakes or control data without approval from the City.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
I DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
W J Boaz Rd.
CPN#104753
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS
Revised April 7, 2014
SECTION 0174 23
CLEANING
PART1- GENERAL
1.1 SUMMARY
017423-1
DAP CLEANING
Page 1 of 4
A. Section Includes:
1. Intermediate and final cleaning for Work not including special cleaning of closed
systems specified elsewhere
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Scheduling
1. Schedule cleaning operations so that dust and other contaminants disturbed by
cleaning process will not fall on newly painted surfaces.
2. Schedule final cleaning upon completion of Work and immediately prior to final
inspection.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. Storage and Handling Requirements
1. Store cleaning products and cleaning wastes in containers specifically designed for
those materials.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017423-2
DAP CLEANING
Page 2 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
2.2 MATERIALS
A. Cleaning Agents
1. Compatible with surface being cleaned
2. New and uncontaminated
3. For manufactured surfaces
a. Material recommended by manufacturer
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL SNOT USED
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING
A. General
1. Prevent accumulation of wastes that create hazardous conditions.
2. Conduct cleaning and disposal operations to comply with laws and safety orders of
governing authorities.
3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
storm or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017423-3
DAP CLEANING
Page 3 of 4
6. Handle materials in a controlled manner with as few handlings as possible.
7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with
this project.
8. Remove all signs of temporary construction and activities incidental to construction
of required permanent Work.
9. If project is not cleaned to the satisfaction of the City, the City reserves the right to
have the cleaning completed at the expense of the Contractor.
10. Do not burn on -site.
B. Intermediate Cleaning during Construction
1. Keep Work areas clean so as not to hinder health, safety or convenience of
personnel in existing facility operations.
2. At maximum weekly intervals, dispose of waste materials, debris and rubbish.
3. Confine construction debris daily in strategically located container(s):
a. Cover to prevent blowing by wind
b. Store debris away from construction or operational activities
c. Haul from site at a minimum of once per week
4. Vacuum clean interior areas when ready to receive finish painting.
a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance.
5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which
may become airborne or transported by flowing water during the storm.
C. Exterior (Site or Right of Way) Final Cleaning
1. Remove trash and debris containers from site.
a. Re -seed areas disturbed by location of trash and debris containers in accordance
with Section 32 92 13.
2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
that may hinder or disrupt the flow of traffic along the roadway.
3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
junction boxes and inlets.
4. If no longer required for maintenance of erosion facilities, and upon approval by
City, remove erosion control from site.
5. Clean signs, lights, signals, etc.
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
01 74 23 - 4
DAP CLEANING
Page 4 of 4
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
SECTION 01 7719
CLOSEOUT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
017719-1
DAP CLOSEOUT REQUIREMENTS
Page 1 of 3
A. Section Includes:
1. The procedure for closing out a contract
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Guarantees, Bonds and Affidavits
1. No application for final payment will be accepted until all guarantees, bonds,
certificates, licenses and affidavits required for Work or equipment as specified are
satisfactorily filed with the City.
B. Release of Liens or Claims
1. No application for final payment will be accepted until satisfactory evidence of
release of liens has been submitted to the City.
1.5 SUBMITTALS
A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017719-2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 CLOSEOUT PROCEDURE
A. Prior to requesting Final Inspection, submit:
1. Project Record Documents in accordance with Section 0178 39
2. Operation and Maintenance Data, if required, in accordance with Section 0178 23
B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section
01 74 23.
C. Final Inspection
1. After final cleaning, provide notice to the City Project Representative that the Work
is completed.
a. The City will make an initial Final Inspection with the Contractor present.
b. Upon completion of this inspection, the City will notify the Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Work is defective or incomplete.
2. Upon receiving written notice from the City, immediately undertake the Work
required to remedy deficiencies and complete the Work to the satisfaction of the
City.
3. Upon completion of Work associated with the items listed in the City's written
notice, inform the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, will make a subsequent
Final Inspection of the project.
4. Provide all special accessories required to place each item of equipment in full
operation. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oil and grease as required for the first lubrication of the equipment
c. Initial fill up of all chemical tanks and fuel tanks
d. Light bulbs
e. Fuses
f. Vault keys
g. Handwheels
h. Other expendable items as required for initial start-up and operation of all
equipment
D. Notice of Project Completion
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017719-3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (if required)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017823-1
DAP OPERATION AND MAINTENANCE DATA
Page 1 of 5
SECTION 0178 23
OPERATION AND MAINTENANCE DATA
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Product data and related information appropriate for City's maintenance and
operation of products furnished under Contract
2. Such products may include, but are not limited to:
a. Traffic Controllers
b. Irrigation Controllers (to be operated by the City)
c. Butterfly Valves
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Schedule
1. Submit manuals in final form to the City within 30 calendar days of product
shipment to the project site.
1.5 SUBMITTALS
A. Submittals shall be in accordance with Section 0133 00. All submittals shall be
approved by the City prior to delivery.
1.6 INFORMATIONAL SUBMITTALS
A. Submittal Form
1. Prepare data in form of an instructional manual for use by City personnel.
2. Format
a. Size: 8 1/2 inches x 11 inches
b. Paper
1) 40 pound minimum, white, for typed pages
2) Holes reinforced with plastic, cloth or metal
c. Text: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
01 78 23 - 2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
d. Drawings
1) Provide reinforced punched binder tab, bind in with text
2) Reduce larger drawings and fold to size of text pages.
e. Provide fly -leaf for each separate product, or each piece of operating
equipment.
1) Provide typed description of product, and major component parts of
equipment.
2) Provide indexed tabs.
f. Cover
1) Identify each volume with typed or printed title "OPERATING AND
MAINTENANCE INSTRUCTIONS".
2) List:
a) Title of Project
b) Identity of separate structure as applicable
c) Identity of general subject matter covered in the manual
Binders
a. Commercial quality 3-ring binders with durable and cleanable plastic covers
b. When multiple binders are used, correlate the data into related consistent
groupings.
4. If available, provide an electronic form of the O&M Manual.
B. Manual Content
Neatly typewritten table of contents for each volume, arranged in systematic order
a. Contractor, name of responsible principal, address and telephone number
b. A list of each product required to be included, indexed to content of the volume
c. List, with each product:
1) The name, address and telephone number of the subcontractor or installer
2) A list of each product required to be included, indexed to content of the
volume
3) Identify area of responsibility of each
4) Local source of supply for parts and replacement
d. Identify each product by product name and other identifying symbols as set
forth in Contract Documents.
Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identify data applicable to installation
3) Delete references to inapplicable information
3. Drawings
a. Supplement product data with drawings as necessary to clearly illustrate:
1) Relations of component parts of equipment and systems
2) Control and flow diagrams
b. Coordinate drawings with information in Project Record Documents to assure
correct illustration of completed installation.
c. Do not use Project Record Drawings as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent format under separate headings for different procedures.
b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
01 78 23 - 3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
5. Copy of each warranty, bond and service contract issued
a. Provide information sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties or bonds
C. Manual for Materials and Finishes
1. Submit 5 copies of complete manual in final form.
2. Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) Information required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full information on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in final form.
Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut -down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
01 78 23 - 4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
i. Charts of valve tag numbers, with location and function of each valve
j. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
k. Other data as required under pertinent Sections of Specifications
3. Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1) Function, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Controls
3) Communications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
f. Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
4. Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Provide operation and maintenance data by personnel with the following criteria:
1. Trained and experienced in maintenance and operation of described products
2. Skilled as technical writer to the extent required to communicate essential data
3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
01 78 23 - 5
DAP OPERATION AND MAINTENANCE DATA
Page 5 of 5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
DATE NAME
8/31/2012 D. Johnson
4/7/2014 M.Domenech
END OF SECTION
Revision Log
SUMMARY OF CHANGE
1.5.A.1 — title of section removed
Revised for DAP Application
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017839-1
DAP PROJECT RECORD DOCUMENTS
Page 1 of 4
SECTION 0178 39
PROJECT RECORD DOCUMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Work associated with the documenting the project and recording changes to project
documents, including:
a. Record Drawings
b. Water Meter Service Reports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
City's Project Representative.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Accuracy of Records
1. Thoroughly coordinate changes within the Record Documents, making adequate
and proper entries on each page of Specifications and each sheet of Drawings and
other Documents where such entry is required to show the change properly.
2. Accuracy of records shall be such that future search for items shown in the Contract
Documents may rely reasonably on information obtained from the approved Project
Record Documents.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017839-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
3. To facilitate accuracy of records, make entries within 24 hours after receipt of
information that the change has occurred.
4. Provide factual information regarding all aspects of the Work, both concealed and
visible, to enable future modification of the Work to proceed without lengthy and
expensive site measurement, investigation and examination.
1.10 STORAGE AND HANDLING
A. Storage and Handling Requirements
1. Maintain the job set of Record Documents completely protected from deterioration
and from loss and damage until completion of the Work and transfer of all recorded
data to the final Project Record Documents.
2. In the event of loss of recorded data, use means necessary to again secure the data
to the City's approval.
a. In such case, provide replacements to the standards originally required by the
Contract Documents.
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED]
2.2 RECORD DOCUMENTS
A. Job set
1. Promptly following receipt of the Notice to Proceed, secure from the City, at no
charge to the Contractor, 1 complete set of all Documents comprising the Contract.
B. Final Record Documents
1. At a time nearing the completion of the Work and prior to Final Inspection, provide
the City 1 complete set of all Final Record Drawings in the Contract.
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 MAINTENANCE DOCUMENTS
A. Maintenance of Job Set
1. Immediately upon receipt of the job set, identify each of the Documents with the
title, "RECORD DOCUMENTS - JOB SET".
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017839-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 4
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable method for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for review
by the City, until start of transfer of data to final Project Record Documents.
c. Maintain the job set at the site of work.
3. Coordination with Construction Survey
a. At a minimum clearly mark any deviations from Contract Documents
associated with installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a "cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
Conversion of schematic layouts
a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
ducts, and similar items, are shown schematically and are not intended to
portray precise physical layout.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) However, design of future modifications of the facility may require
accurate information as to the final physical layout of items which are
shown only schematically on the Drawings.
b. Show on the job set of Record Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
ceiling plenum", "exposed", and the like).
3) Make all identification sufficiently descriptive that it may be related
reliably to the Specifications.
c. The City may waive the requirements for conversion of schematic layouts
where, in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Record Documents
Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Drawings to the
corresponding final documents, coordinating the changes as required.
b. Clearly indicate at each affected detail and other Drawing a full description of
changes made during construction, and the actual location of items.
c. Call attention to each entry by drawing a "cloud" around the area or areas
affected.
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
017839-4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 4
d. Make changes neatly, consistently and with the proper media to assure
longevity and clear reproduction.
2. Transfer of data to other Documents
a. If the Documents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as final
Record Documents.
b. If any such Document is not so approved by the City, secure a new copy of that
Document from the City at the City's usual charge for reproduction and
handling, and carefully transfer the change data to the new copy to the approval
of the City.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP Application
CITY OF FORT WORTH W J Boaz Rd.
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #104753
Revised April 7, 2014
GEOTECHNICAL REPORT
A L P H A /� T E S T I N G Geotechnical
Construction Materials
Environmental
WHERE IT ALL BEGINS TBPE Firm No. 813
September 28, 2021
Starlight Homes Texas, LLC
1800 Valley View Lane, Suite 100
Farmers Branch, Texas 75234
Attention: Mr. Scot Albert
Re: Pavement Recommendations
Ranch at Duck Creek — Phase 2
Off Wj Boaz Road
Fort Worth, Texas
ALPHA Report No. W212004-A
5058 Brush Creek Road Tel: 817-496-5600
Fort Worth, Texas 76119 Fax: 817-496-5608
www.alphatesting.com
Submitted herein are the recommended pavement sections for the proposed subdivision (Ranch
at Duck Creek — Phase 2). The proposed subdivision is generally located on the north side of Wj
Boaz Road, about 1,900 ft west of North Old Decatur Road in Fort Worth, Texas. This study
was authorized by Mr. Scot Albert using the Starlight Homes Work Agreement on July 01, 2021
and performed in accordance with ALPHA Proposal No. 85000-revl dated July 01, 2021. This
report is an extension of ALPHA Report No. W212004 dated September 1, 2021 containing
geotechnical recommendations for residential foundations.
The purpose of this study is to develop pavement sections for the planned streets in the subject
subdivision in accordance with the City of Fort Worth Pavement Design Manual (January 2015).
We understand the proposed streets within the subdivision could be classified as "Residential -
Urban", "Collector" or "Arterial", as described in the referenced manual.
PURPOSE AND SCOPE
The purpose of this geotechnical exploration is for ALPHA TESTING, INC. ("ALPHA") to
evaluate for Starlight Homes Texas, LLC (Client) some of the physical and engineering
properties of subsurface materials at selected locations on the subject site with respect to
formulation of appropriate geotechnical design parameters for the proposed pavement. The field
exploration was accomplished by securing subsurface samples from widely spaced test borings
performed across the expanse of the site. Engineering analyses were performed from results of
the field exploration and results of laboratory tests performed on representative samples.
Also included are general comments pertaining to reasonably anticipated construction problems
and recommendations concerning earthwork and quality control testing during construction.
This information can be used to evaluate subsurface conditions and to aid in ascertaining
construction meets project specifications.
Recommendations provided in this report were developed from information obtained in test
borings depicting subsurface conditions only at the specific boring locations and at the particular
time designated on the logs. Subsurface conditions at other locations may differ from those
observed at the boring locations, and subsurface conditions at boring locations may vary at
different times of the year. The scope of work may not fully define the variability of subsurface
materials and conditions that are present on the site.
ALHA Report No. W212004-A
The nature and extent of variations between borings may not become evident until construction.
If significant variations then appear evident, our office should be contacted to re-evaluate our
recommendations after performing on -site observations and possibly other tests.
SUMMARY OF RECOMMENDATIONS
Table A contains a summary of pavement section requirements for proposed streets at the subject
project.
TABLE A
Summary of Pavement Section Requirements
Street Classification Residential -Urban Collector Arterial
PCC Pavement Thickness(in) placed 6 7'/2 10
on lime stabilized subgrade soil
28-day Concrete Compressive 3,600 3,600 3,600
Strength (psi)
Subgrade Treatment 6 inches Lime 8 inches Lime 8 inches Lime
Application Rate (lbs per sq yd) 30 36 36
Reinforcing Bar No. 3 3 4
Reinforcing Bar Spacing (in) 18 18 18
Further recommendations and analyses used to develop the summary in Table A are provided
further in this report.
FIELD EXPLORATION
Subsurface conditions on the site were explored by drilling a total of 31 test borings to a depth of
about 20 ft. The test borings were performed in general accordance with ASTM D 420 using
standard rotary drilling equipment. The approximate location of each boring is shown on the
attached Boring Location Plan, Figure I.
Subsurface types encountered during the field exploration are presented on the attached Log of
Boring sheets (boring logs). These boring logs contain our Field Technician's and Engineer's
interpretation of conditions believed to exist between actual samples retrieved. Therefore, the
boring logs contain both factual and interpretive information. Lines delineating subsurface strata
on the boring logs are approximate and the actual transition between strata may be gradual.
LABORATORY TESTS
Selected samples of the subsurface materials were tested in the laboratory to evaluate their
engineering properties as a basis in providing recommendations for pavement sections design
and earthwork construction. The following laboratory tests were performed to facilitate
pavement section recommendations:
PJ
ALHA Report No. W212004-A #X
• Moisture Content (ASTM D 2216)
• Atterberg-Limits (ASTM D 4318)
• Unconfined Compressive Strength (ASTM D 2166)
• Sulfate Content (TX-145-E Part II)
• Lime Series (Plasticity Index vs. Lime Content)
GENERAL SUBSURFACE CONDITIONS
Based on geological maps available from the Bureau of Economic Geology, published by The
University of Texas at Austin, the project site lies within the undivided Fort Worth Limestone
and Duck Creek formation. This undivided formation generally consists of alternating layers of
limestone and marl (limey shale). Residual overburden soils associated with these undivided
formations generally consist of clay soils characterized by moderate to high shrink -swell
potential.
Subsurface conditions encountered in most of the borings generally consisted of clay and shaly
clay to depths of about 5 ft to 19 ft below the ground surface underlain by limestone extending to
the 20 ft termination depth of the borings. Subsurface conditions encountered in Borings 1, 2, 3,
4, 5, 7, 10 and 13 generally consisted of clay, shaly clay and/or shale extending to the 20 ft
termination depth. Layers of limestone about 1 ft to 13 ft thick were encountered between the
clay and shaly clay layers in Borings 1, 2, 4, 5, 7, 10 and 13 at depths of about 3 ft to 8 ft below
the ground surface.
Most of the materials encountered in the borings are considered relatively impermeable and are
anticipated to have a relatively slow response to water movement. Therefore, several days of
observation would be required to evaluate actual groundwater levels within the depths explored.
Also, the groundwater level at the subject site is anticipated to fluctuate seasonally depending on
the amount of rainfall, prevailing weather conditions, and subsurface drainage characteristics.
During our field exploration, free groundwater was not encountered in borings. However, it is
common to encounter seasonal groundwater in fill material, from fractures within the clayey
matrix, at the soil/rock (limestone or shale) interface and from fractures within the rock
(limestone or shale), particularly during or after periods of precipitation. If more detailed
groundwater information is required, monitoring wells or piezometers can be installed.
Further details concerning subsurface materials and conditions encountered can be obtained from
the attached boring logs.
ENGINEERING ANALYSIS AND RECOMENDATIONS
Calculations used to determine the required pavement thickness are based only on the physical
and engineering properties of the materials and conventional thickness determination procedures.
Related civil design factors such as subgrade drainage, shoulder support, cross -sectional
configurations, surface elevations, joint design and environmental factors will significantly affect
the service life and must be included in preparation of the construction drawings and
specifications but were not included in the scope of this study. Normal periodic maintenance
will be required for all pavement to achieve the design life of the pavement system.
3
ALHA Report No. W212004-A
Pavement Suburade Preparation
Based on review of the grading plans prepared by Goodwin and Marshall, Inc. (Job No. 10874,
Sheets 31, 32 and 33 dated March 2021) and conditions encountered in the borings, we expect
the pavement subgrade could consist of clay soils or similar onsite materials used for grading the
site. In addition, the pavement subgrade could also consist of limestone in some areas depending
on the given location along the alignment and grading requirements. Since the subgrade
conditions and required treatments could vary along the proposed road alignment, ALPHA
should be retained to observe construction to verify conditions are as expected. Also, we should
be provided with the final grading plan for review prior to construction to verify or modify in
writing the recommendations contained in this report.
The exposed clayey surface soils should be scarified to a depth of 6 inches and 8 inches for
Residential Urban and Collector/Arterial streets, respectively, and mixed with a minimum 30 and
36 lbs per sq yard of hydrated lime (by dry soil weight) in conformance with TxDOT Standard
Specifications Item 260. The application rate for Residential Urban Streets is the minimum rate
required by the City of Fort Worth. The application rate for Collector/Arterial streets equates to
about 6 percent lime based on a dry soil unit weight of 100 pcf. The results of lime series tests
performed on representative clay samples are attached (Figure 2).
We recommend lime stabilization procedures extend at least 1 ft beyond the edge of the
pavement to reduce effects of seasonal shrinking and swelling upon the extreme edges of
pavement. The soil -lime mixture should be compacted to at least 95 percent of standard Proctor
maximum dry density (ASTM D 698) and within the range of 0 to 4 percentage points above the
mixture's optimum moisture content. In all areas where hydrated lime is used to stabilize
subgrade soil, routine Atterberg-limit tests should be performed to verify the resulting plasticity
index of the soil -lime mixture is at/or below 15.
Mechanical lime stabilization of the pavement subgrade soil will not prevent normal seasonal
movement of the underlying untreated materials. Pavement and other flatwork constructed at
final grades could experience soil -related potential seasonal movements of about 61/z inches
depending on the depth of limestone from final grade. Potential seasonal movements are
discussed in more detail in ALPHA Report No. W212004 performed for the residential
foundations to be constructed at the site.
Lime stabilization of the pavement subgrade is not required where the pavement subgrade
consists of limestone. In pavement areas where limestone is exposed after final subgrade
elevation is achieved, on -site lime stabilized clay cuttings, on -site processed limestone cuttings,
or flexible base material could be used as a leveling course (as needed) to provide a smooth
surface for placement of the pavement.
California Bearing Ratio (CBR) tests were not performed for this specific project. However,
based on our experience in the area and similar conditions, the CBR value for the natural clay
soil is estimated to be about 2 to 3. Following improvement with lime, the CBR value for the
lime stabilized clayey soils is expected to be at least 10.
4
ALHA Report No. W212004-A
Portland Cement Concrete Pavement Section
Using the 1993 AASHTO pavement design procedures (WinPAS computer program distributed
by American Concrete Pavement Association), the following design parameters were used in
analyses of the PCC pavement section.
• Compressive strength of concrete 3,600 psi at 28 days
• Modulus of Elasticity
4,000,000 psi
• Modulus of Rupture
620 psi
• Modulus of Subgrade Reaction*
280 pci
• Load Transfer Co -efficient
3.0
• Drainage Coefficient
1.0
• Initial PSI
4.5
• Terminal PSI for
2.0 (Residential Urban)
2.25 (Collector)
2.5 (Arterial)
• Standard Deviation
0.39
• Reliability
85 percent
* Subgrade prepared with lime stabilization, or graded limestone as discussed in the previous
section.
Using the Street Classification of "Residential -Urban" as described in the referenced Fort Worth
Pavement Design Manual, it is estimated annual traffic volume will be about 35,000 Equivalent
Single Axle Loads (ESALs) in one direction over a 25-year design life with 0.5 percent annual
traffic growth. Based on this, we estimate the cumulative ESALs over the design life of the
Residential Urban street pavement to be about 930,000.
Using the Street Classification of "Collector" as described in the referenced Fort Worth
Pavement Design Manual, the annual traffic volume will be about 100,000 Equivalent Single
Axle Loads (ESALs) in one direction over a 25-year design life with 1.5 percent annual traffic
growth. Based on this, we estimate the cumulative ESALs over the design life of the pavement
to be about 3,000,000.
Using the Street Classification of "Arterial" as described in the referenced Fort Worth Pavement
Design Manual, the annual traffic volume will be about 300,000 Equivalent Single Axle Loads
(ESALs) in one direction over a 30-year design life with 2.5 percent annual traffic growth.
Based on this, we estimate the cumulative ESALs over the design life of the pavement to be
about 13,000,000.
If the actual expected traffic volume is different than used for our analysis herein, our office
should be provided with the actual expected traffic volume so that we can re-evaluate our
recommendations.
5
ALHA Report No. W212004-A
#X
Based on the subgrade preparations recommended herein, the projected traffic volume and stated
design parameters, a minimum 6-inch section of Portland cement concrete is required for
Residential Urban classified streets, a minimum 7%2-inch section of Portland cement concrete is
required for Collector classified streets and a minimum 10-inch section of Portland cement
concrete is required for Arterial classified streets at this project.
PCC should have a minimum 3,600 psi compressive strength at 28 days. The concrete section
should be placed over a properly prepared subgrade as discussed herein. Concrete should be
designed with 4.5 ± 1.5 percent entrained air. Reinforcing steel for concrete pavement should be
in accordance with Table 4.1 of the referenced Pavement Design Manual. Joints and saw -cutting
in concrete should be in accordance with Section Four of the referenced Pavement Design
Manual.
Drainage and Maintenance
Routine maintenance, including sealing of cracks and joints should be performed over the life of
the pavement. Adequate drainage should be provided to reduce seasonal variations in the
moisture content of subgrade soils. Maintaining positive surface drainage throughout the life
of the pavement is essential.
Soluble Sulfates
A total of five (5) samples obtained from the borings were tested for soluble sulfate
concentrations. Results of the laboratory testing (TxDOT Test Method TEX-145-E Part II) are
summarized in Table B.
TABLE B
Soluble Sulfates
Sample
Boring
Depth,
Material Type
Soluble Sulfate,
No.
No.
ft
m /K m
g g Epp )
1
2
0-2
Dark Brown CLAY
38
2
10
0-2
Brown CLAY
41
3
18
2-4
Dark Brown CLAY
43
4
24
2-4
Brown CLAY
65
5
31
0-2
Dark Brown CLAY
62
Based on the results of laboratory testing, the soluble sulfate content measured in the samples
tested is considered relatively low (<3,000 ppm). It should be noted that concentrations of
soluble sulfates in soil are typically very localized and concentrations in other areas of the site
could vary significantly. Therefore, it is recommended sulfate sampling/testing be performed
along the pavement subgrade during construction. During construction, experienced
geotechnical personnel should make close observations for possible sulfate reactions.
M
ALHA Report No. W212004-A #X
GENERAL CONSTRUCTION PROCEDURES AND RECOMMENDATIONS
Variations in subsurface conditions could be encountered during construction. To permit
correlation between test boring data and actual subsurface conditions encountered during
construction, it is recommended a registered Professional Engineering firm be retained to
observe construction procedures and materials.
Some construction problems, particularly degree or magnitude, cannot be reasonably anticipated
until the course of construction. The recommendations offered in the following paragraphs are
intended not to limit or preclude other conceivable solutions, but rather to provide our
observations based on our experience and understanding of the project characteristics and
subsurface conditions encountered in the borings.
Site Preparation and Grading
Existing fill may be present at this site, as discussed in Section 6.1 of the referenced report.
Although not encountered in the borings, the possible fill material can contain organics,
boulders, rubble, and other debris which could be encountered during site grading and general
excavations. The earthwork and excavation contract should contain provisions for removal of
unsuitable material in the fill material. Test pit excavation performed prior to construct can be
used to evaluate potential fill soils for depth, extent and composition at this site. ALPHA would
be pleased to provide this service if desired.
Limestone was encountered within 4 ft of the ground surface in several borings and could be
encountered during general excavation and grading at this site. From our experience, this
limestone can be hard and difficult to excavate. Rock excavation methods (including, but not
limited to rock teeth, rippers, jack hammers, or sawcutting) may be required to remove the
limestone. Crushing equipment may be required to process this limestone if it is desired to use
this material as compacted fill on the site. The contractor selected should have experience with
excavation in hard limestone.
All areas supporting pavement or areas to receive new fill should be properly prepared.
• After completion of the necessary stripping, clearing, and excavating and prior to placing
any required fill, the exposed subgrade should be carefully evaluated by probing and
testing. Any undesirable material (organic material, wet, soft, or loose soil) still in place
should be removed.
• The exposed subgrade should be further evaluated by proof -rolling with a heavy
pneumatic tired roller, loaded dump truck or similar equipment weighing approximately
25 tons to check for pockets of soft or loose material hidden beneath a thin crust of
possibly better soil. Proof -rolling procedures should be observed routinely by a
Professional Engineer or his designated representative. Any undesirable material
(organic material, wet, soft, or loose soil) exposed from the proof -roll should be removed
and replaced with well -compacted material as outlined in the Fill Compaction section.
• Prior to placement of any fill, the exposed subgrade should then be scarified to a
minimum depth of 6 inches and recompacted as outlined in the Fill Compaction section.
7
ALHA Report No. W212004-A
#X
If fill is to be placed on existing slopes (natural or constructed) steeper than six horizontal to one
vertical (6:1), the fill materials should be benched into the existing slopes in such a manner as to
provide a minimum bench width of five (5) ft. This should provide a good contact between the
existing soils and new fill materials, reduce potential sliding planes, and allow relatively
horizontal lift placements.
Even if fill is properly compacted as recommended in the Fill Compaction section, fills in excess
of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total
fill thickness. This should be considered when planning or placing deep fills.
Slope stability analysis of embankments (natural or constructed) and global stability analysis for
retaining walls was not within the scope of this study.
The contractor is responsible for designing any excavation slopes, temporary sheeting or shoring.
Design of these structures should include any imposed surface surcharges. Construction site
safety is the sole responsibility of the contractor, who shall also be solely responsible for the
means, methods and sequencing of construction operations. The contractor should also be aware
that slope height, slope inclination or excavation depths (including utility trench excavations)
should in no case exceed those specified in local, state and/or federal safety regulations, such as
OSHA Health and Safety Standard for Excavations, 29 CFR Part 1926, or successor regulations.
Stockpiles should be place well away from the edge of the excavation and their heights should be
controlled so they do not surcharge the sides of the excavation. Surface drainage should be
carefully controlled to prevent flow of water over the slopes and/or into the excavations.
Construction slopes should be closely observed for signs of mass movement, including tension
cracks near the crest or bulging at the toe. If potential stability problems are observed, a
geotechnical engineer should be contacted immediately. Shoring, bracing or underpinning
required for the project (if any) should be designed by a professional engineer registered in the
State of Texas.
Due to the nature of the clay soils found near the surface at most of the borings, traffic of heavy
equipment (including heavy compaction equipment) may create pumping and general
deterioration of shallow soils. Therefore, some construction difficulties should be anticipated
during periods when these soils are saturated.
Fill Compaction
The following compaction recommendations pertain to general filling and site grading. The
pavement subgrade should be prepared as discussed in the Pavement Subgrade Preparation
section.
Clay soils with a plasticity index equal to or greater than 25 should be compacted to a dry density
between 95 and 100 percent of standard Proctor maximum dry density (ASTM D 698). The
compacted moisture content of the clays during placement should be within the range of 2 to 5
percentage points above optimum.
Clay soils with a plasticity index less than 25 should be compacted to a dry density of at least 95
percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1
percentage point below to 3 percentage points above the material's optimum moisture content.
8
ALHA Report No. W212004-A
#X
Clayey materials used as fill should be processed and the largest particle or clod should be less
than 6 inches prior to compaction.
Processed limestone or other rock -like materials used as fill should be compacted to at least 95
percent of standard Proctor maximum dry density. The compacted moisture content of limestone
or other rock -like materials used as fill is not considered crucial to proper performance.
However, if the material's moisture content during placement is within 3 percentage points of
optimum, the compactive effort required to achieve the minimum compaction criteria may be
minimized. In general, processed limestone used as fill should have a maximum particle size of
6 inches. However, any processed limestone used as fill within 3 ft of the final pavement
subgrade elevation should have a maximum particle size of 3 inches. A gradation of at least 40
percent passing a standard No. 4 sieve is recommended.
Where mass fills are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at
least 100 percent of standard Proctor maximum dry density (ASTM D-698) and within 2
percentage points of the material's optimum moisture content. The portion of the fill/backfill
shallower than 10 ft should be compacted as outlined herein.
Compaction should be accomplished by placing fill in about 8-inch thick loose lifts and
compacting each lift to at least the specified minimum dry density. Field density and moisture
content tests should be performed on each lift.
In general site grading areas where final fill slopes will be four horizontal to one vertical (4:1) or
steeper and greater than 5 ft in height, field density and moisture content tests should be
performed on each lift.
Utilities
Where utility lines are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at
least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within —2 to +2
percentage points of the material's optimum moisture content. The portion of the fill/backfill
shallower than 10 ft should be compacted as previously outlined. Density tests should be
performed on each lift (maximum 12-inch thick) and should be performed as the trench is being
backfilled.
Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over
time of up to about I to 2 percent of the total fill thickness. This should be considered when
designing pavement over utility lines and/or other areas with deep fill.
If utility trenches or other excavations extend to or beyond a depth of 5 ft below construction
grade, the contractor or others shall be required to develop an excavation safety plan to protect
personnel entering the excavation or excavation vicinity. The collection of specific geotechnical
data and the development of such a plan, which could include designs for sloping and benching
or various types of temporary shoring, is beyond the scope of this study. Any such designs and
safety plans shall be developed in accordance with current OSHA guidelines and other
applicable industry standards.
9
ALHA Report No. W212004-A
Groundwater
Groundwater was not encountered in the borings. However, from our experience, shallower
groundwater seepage could be encountered from the subsurface stratigraphy in excavations for
pavement, utilities and other general excavations at this site. The risk of seepage increases with
depth of excavation and during or after periods of precipitation. Standard sump pits and
pumping may be adequate to control seepage on a local basis.
In any areas where cuts are made, attention should be given to possible seasonal water seepage
that could occur through natural cracks and fissures in the newly exposed stratigraphy. The risk
of seepage is increased where limestone is exposed in excavations and slopes or is near final
grade. In these areas subsurface drains may be required to intercept seasonal groundwater
seepage. The need for these or other dewatering devices should be carefully addressed during
construction. Our office could be contacted to visually observe final grades to evaluate the need
for such drains.
LIMITATIONS
Professional services provided in this geotechnical exploration were performed, findings
obtained, and recommendations prepared in accordance with generally accepted geotechnical
engineering principles and practices. The scope of services provided herein does not include an
environmental assessment of the site or investigation for the presence or absence of hazardous
materials in the soil, surface water or groundwater. ALPHA, upon written request, can be
retained to provide same.
ALPHA TESTING, INC. is not responsible for conclusions, opinions or recommendations
made by others based on this data. Information contained in this report is intended for the
exclusive use of the Client (and their designated design representatives), and is related solely to
design of the specific structures outlined on the cover page of this report. No party other than the
Client (and their designated design representatives) shall use or rely upon this report in any
manner whatsoever unless such party shall have obtained ALPHA's written acceptance of such
intended use. Any such third party using this report after obtaining ALPHA's written acceptance
shall be bound by the limitations and limitations of liability contained herein, including
ALPHA's liability being limited to the fee paid to it for this report. Recommendations presented
in this report should not be used for design of any other structures except those specifically
described in this report. In all areas of this report in which ALPHA may provide additional
services if requested to do so in writing, it is presumed that such requests have not been made if
not evidenced by a written document accepted by ALPHA. Further, subsurface conditions can
change with passage of time. Recommendations contained herein are not considered applicable
for an extended period of time after the completion date of this report. It is recommended our
office be contacted for a review of the contents of this report for construction commencing more
than one (1) year after completion of this report. Non-compliance with any of these
requirements by the Client or anyone else shall release ALPHA from any liability resulting from
the use of, or reliance upon, this report.
10
ALHA Report No. W212004-A
Recommendations provided in this report are based on our understanding of information
provided by the Client about characteristics of the project. If the Client notes any deviation from
the facts about project characteristics, our office should be contacted immediately since this may
materially alter the recommendations. Further, ALPHA TESTING, INC. is not responsible for
damages resulting from workmanship of designers or contractors and it is recommended the
Owner retain qualified personnel, such as a Geotechnical Engineering firm, to verify
construction is performed in accordance with plans and specifications.
CLOSURE
All recommendations in the referenced geotechnical report remain unchanged unless specifically
modified herein. We appreciate the opportunity to be of service. Please contact us with any
questions or comments.
Sincerely,
ALPHA TESTING, INC.
.....BRIAN J. HOYT .................. v748 r' ,
Ilk
Septeemeer 8, 2021
Kimberly Fyffe
Geotechnical Project Manager
KLFBJH /nl
Copies: (1-PDF) Client
Brian J. Hoyt, P.E.
Geotechnical Department Manager
Attachments: Boring Location Plan — Figure 1
Mechanical Lime Series — Figure 2
WinPAS Analysis Results
Log of Borings (Borings 1 through 31)
Key to Soil Symbols and Classifications
11
B-38 B-44�
- I - �'_��t ,I _ _-_ �nl _ a.4 I '[ I •i€ ®€ E� &€ r Sry
—J — — -- — —
B 28
�t •€ "1€— .-!a—mot Br ___ - �4..«E . �.. _ e
------ ------ ----- _-_—
B-6 —12 B-18 B-33IRr. B-26 u,€l .31
B-1
B•€
\
E a r
1 ^/ t : ^J
—12
°€ -- 7 a +F1 4 SL B—I / {—I B-2 / '€ ,,,"'�._ .. .:€ ` 1 •€ ` €
r 1 ��i } B 50
B-3} • '�P�i B-9 ¢. B-15�%;ll' k B—_21 —25 1� B 43 _ F
E
'�� I` r; B: ... ir��
1 I` F 1
t �� I
€ a € a� I �% _ '•�` f , .� l� ate li 1
I r.k k -€ k� =t B-24,. ,} B-28� B-30
B-2 _I ° 9 B-5p B-8 B-11 20
B-14 . B-17 i �€ x �•
r
-j€ "It €
...^ i€ �3✓8 ��€ i�€ � _ -_
_
I y
F B 4 B-7 �~� — B-10 -. B-13
B 16 B-19 B-23- B-27= �, B-29--
` I S t t E t €
-
t i 1
GEOTECHNICAL EXPLORATION
RANCH AT DUCK CREEK — PHASE 2
OFF WJ BOAZ ROAD
FORT WORTH, TEXAS
ALPHA PROJECT NO. W212004—A
ALPNA fiTESTING
WHERE IT ALL BF BINS
FIGURE I
BORING LOCATION PLAN
APPROXIMATE ADJACENT BORING
LOCATION (W193011)
APPROXIMATE BORING LOCATION
ALPHA �t\TESTING
WHERE IT ALL BEGINS
Geotechnical • Construction Materials • Environmental • TBPE Firm No. 813
REPORT OF MECHANICAL LIME SERIES RESULTS
Project No: W212004
Date: 08/18/21
% Lime 0% 2% 4% 6% 8%
PI 50 22 18 13 9
70
65 FF++++ ++ +++
60 +++++++++
55
50
45
40 -++++++++++++++
d 35
30
25 +++++++++++++
20
15
10
0
0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15%
Percent Dry Weight of Lime
FIGURE 2
Win PAS
Pavement Thickness Design According to
1993 AASHTO Guide for Design of Pavements Structures
American Concrete Pavement Association
Rigid Design Inputs
Agency:
City of Fort Worth
Company:
Alpha Testing Inc.
Contractor:
Project Description:
Residential Pavement Analysis
Location:
Fort Worth, TX
Rigid Pavement Design/Evaluation
PCC Thickness
5.91
inches
Load Transfer, J
Design ESALs
930,000
Mod. Subgrade Reaction, k
Reliability
85.00
percent
Drainage Coefficient, Cd
Overall Deviation
0.39
Initial Serviceability
Modulus of Rupture
620
psi
Terminal Serviceability
Modulus of Elasticity
4,000,000
psi
Modulus of Subqrade Reaction (k-value) Determination
Resilient Modulus of the Subgrade 0.0 psi
Resilient Modulus of the Subbase 0.0 psi
Subbase Thickness 0.00 inches
Depth to Rigid Foundation 0.00 feet
Loss of Support Value (0,1,2,3) 0.0
Modulus of Subgrade Reaction 280.00 psi/in
3.00
280 psi/in
1.00
4.50
2.00
Thursday, April 23, 2015 1:12:04PM Engineer:
Win PAS
Pavement Thickness Design According to
1993 AASHTO Guide for Design of Pavements Structures
American Concrete Pavement Association
Rigid Design Inputs
Agency: City of Fort Worth
Company: Alpha Testing Inc.
Contractor:
Project Description: Collector Pavement Analysis
Location: Fort Worth, TX
Rigid Pavement Design/Evaluation
PCC Thickness
7.52 inches
Load Transfer, J
Design ESALs
3,000,000
Mod. Subgrade Reaction, k
Reliability
85.00 percent
Drainage Coefficient, Cd
Overall Deviation
0.39
Initial Serviceability
Modulus of Rupture
620 psi
Terminal Serviceability
Modulus of Elasticity
4,000,000 psi
Modulus of Subqrade Reaction (k-value) Determination
Resilient Modulus of the Subgrade 0.0 psi
Resilient Modulus of the Subbase 0.0 psi
Subbase Thickness 0.00 inches
Depth to Rigid Foundation 0.00 feet
Loss of Support Value (0,1,2,3) 0.0
Modulus of Subgrade Reaction 280.00 psi/in
3.00
280 psi/in
1.00
4.50
2.25
Thursday, April 23, 2015 1:11:04PM Engineer:
WinPAS
Pavement Thickness Design According to
1993 AASHTO Guide for Design of Pavements Structures
American Concrete Pavement Association
Rigid Design Inputs
Agency:
City of Fort Worth
Company:
Alpha Testing Inc.
Contractor:
Project Description:
Arterial Pavement Analysis
Location:
Fort Worth, TX
Rigid Pavement Design/Evaluation
PCC Thickness
9.87 inches
Load Transfer, J
Design ESALs
13,000,000
Mod. Subgrade Reaction, k
Reliability
85.00 percent
Drainage Coefficient, Cd
Overall Deviation
0.39
Initial Serviceability
Modulus of Rupture
620 psi
Terminal Serviceability
Modulus of Elasticity
4,000,000 psi
Modulus of Subqrade Reaction (k-value) Determination
Resilient Modulus of the Subgrade 0.0 psi
Resilient Modulus of the Subbase 0.0 psi
Subbase Thickness 0.00 inches
Depth to Rigid Foundation 0.00 feet
Loss of Support Value (0,1,2,3) 0.0
Modulus of Subgrade Reaction 280.00 psi/in
3.00
280 psi/in
1.00
4.50
2.50
Thursday, April 23, 2015 1:09:59PM Engineer:
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058Brush Creek Rd. BORING NO.: 1
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
W. Boaz Road Project Surface Elevation:
12/12/2019 End Date: 12/12/2019 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): 18
oZAfter Drilling (ft): 18
O 7After Hours (ft):
MATERIAL DESCRIPTION
jDark Brown CLAY
Light Brown CLAY
5
- � Tan CLAY
j
j_10
j
j
_15�
j
j
Tan LIMESTONE with clay seam and layers
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
(�
t
_
E
x
>
00
`o
>j
U�
-0-0
OM
o
E
o
a
>C�
0of
O
oZ
0 E
U
00
a>
.S c
N�
a�
U
0
-0
.V
N
0
p��
(n
x 0
�a
��
0
Z
0
J
a
0
a
a-
1
2.25
30
2.0
6.0
18.0
20.0 IL
100/
1.25"
2.75 23 65 22 43 0.4
2.75 22
3.75 19
3.5 17
3.5 15
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058Brush Creek Rd. BORING NO.: 7
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
W. Boaz Road Project Surface Elevation:
12/12/2019 End Date: 12/12/2019 West:
CONTINUOUS FLIGHT AUGER North:
GROUND WATER OBSERVATIONS
0)
Rods (ft): NONE
-VOn
Drilling (ft): DRY
oZAfter
7After Hours (ft):
O
MATERIAL DESCRIPTION
-
j
Dark Brown CLAY
Tan CLAY
5
10
15
Tan LIMESTONE with clay seam and layers
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
(�
t
_
E
x
00
>j
-0-0
N
o
E
o
a
>C�
0of
O
oZ
0 E
U
0a�
a>
N�
U
0
-0
.V
N
a0
0
p��
(n
x 0
�a
��
0
Z
0
3
J
a
0
a
a-
1
2.25
32
4.0
19.0
100/
20.0 1.25"
2.75 29
4.5+ 11
4.5+ 13
3.25 20 57 22 35 0.0
4.5+ 12
5058BrushCreekRd. BORING NO.: 12
ALPHA #\TESTING Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Pox: 817-496-5608 PROJECT NO.: W193011
WHERE IT ALL BEGINS www.alphatesting.com
Client:
Project:
Start Date:
Drilling Method:
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
W. Boaz Road Project Surface Elevation:
12/12/2019 End Date: 12/12/2019 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): 17
oZAfter Drilling (ft): 7
O 7After Hours (ft):
MATERIAL DESCRIPTION
jDark Brown CLAY
Tan CLAY
5 j
�s
j
_10
j
j
15 /
Tan LIMESTONE with clay seam and layers
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
(�
t
_
E
x
>
00
`o
>j
U�
-0-0
OM
o
E
o
a
>C�
0of
O
oZ
0 E
U
00
a>
.S c
N�
a�
U
0
-0
.V
N
0
p��
(n
x 0
�a
��
0
Z
0
J
a
0
a
a-
1
2.5
34
4.0
15.0 =
17.0
100/
20.0 L 0.75"
2.25 28 71 24 47
4.0 2.1 113 16
3.5 16
4.5 18
4.0 23
5058Brush CreekRd. BORING NO.: 17
ALPHA #\TESTING Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Pox: 817-496-5608 PROJECT NO.: W193011
WHERE IT ALL BEGINS www.alphatesting.com
Client:
Project:
Start Date:
Drilling Method:
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
W. Boaz Road Project Surface Elevation:
12/11/2019 End Date: 12/11/2019 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
oZAfter Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
jDark Brown CLAY
Brown CLAY
Tan CLAY with calcareous deposits
5 j
j
j
10
j
j
jTan SHALY CLAY
j
15
Tan LIMESTONE with clay seam and layers
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
(�
t
_
E
x
>
00
`o
>j
U�
-0-0
OM
o
E
o
a
>C�
0of
O
oZ
0 E
U
00
a>
.S c
N�
a�
U
0
-0
.V
N
0
p��
(n
x 0
�a
��
0
Z
0
J
a
0
a
a-
1
2.0
35
2.0
4.0
13.0 1
15.0
18.0
20.0 6
100/
0.75"
2.5 1.3 98 26
4.5+ 13
4.5+ 17
4.5+ 15 45 20 25 0.5
4.0 17 42 18 24
ALPHA
#\TESTING
5058Brush CreekRd.
Fort Worth, Texas 76119
Phone: 817-496-5600
BORING NO.:
22
sheet 1 of 1
Pox: 817-496-5608
PROJECT NO.:
W193011
WHERE
IT ALL BEGINS
www.alphatesting.corn
Client:
Starliqht Homes Texas, LLC
Location: Fort Worth, Texas
Project:
W. Boaz Road Project
Surface Elevation:
Start Date:
12/11/2019 End Date:
12/11/2019
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
Drilling (ft): DRY
oZAfter
7After Hours (ft):
O
MATERIAL DESCRIPTION
0
Dark Brown CLAY
5
Tan LIMESTONE with clay seam and layers
10
_15_
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
t
_
x
>
`o
U�
(�
o
E
E
o
N�
00
oo
0E
o0)
Coo�
w
o
C
J
o
J
.T�
a
a
oof
oZ
ao o
.S c
a�
p��
(n
x
OUP
o O
Z
J
a
�a
a-
a
1
1.5
31
1"
4
100/
0.25"
16.0
20.0 L 1.2 100/
1.5
36
4.0
24
88
28
60
1.3
14
14
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058Brush Creek Rd. BORING NO.: 27
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
W. Boaz Road Project Surface Elevation:
12/11/2019 End Date: 12/11/2019 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
Drilling (ft): DRY
oZAfter
7After Hours (ft):
O
MATERIAL DESCRIPTION
-
j
Dark Brown CLAY
Brown CLAY with limestone fragments
_5
Tan LIMESTONE with clay seam and layers
_15
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
(�
t
_
E
x
>
`o
U�
N�)
o
C
E
JoN
J
o
T
a
oof
o
ooZa
a
a
OUP
O
pw�
(n
x
�a
o
Z
3
J
a
a
a-
1
2.0
34
2.75 26
4.0
5.0 4.5+ 20 54 20 34 0.3
100/
3.5"
100/
0.5"
16.0
100/
20.0 L 0.75"
ALPHA
5058BrushCreekRd.
Fort Worth, Texas 76119
BORING NO.:
28
sheet 1 of 1
#\TESTING
Phone: 817-496-5600
Pox: 817-496-5608
PROJECT NO.:
W193011
WHERE IT ALL BEGINS
www.alphatesting.corn
Client: Starliqht Homes Texas, LLC
Location:
Fort Worth, Texas
Project: W. Boaz Road Project
Surface Elevation:
Start Date: 12/11/2019 End Date:
12/11/2019
West:
Drilling Method: CONTINUOUS FLIGHT AUGER
North:
Hammer Drop
(Ibs / in):
140 / 30
GROUND WATER OBSERVATIONS
-6•E
.4
E71
_ x
w
0 g
Z70n Rods (ft):
>
��
N
ii� �'°'
_
E
o
ZAfter Drilling (ft): 11
a:�
o�
3
Y
0 o
��
a> a
v
g
After_ Hours (ft):
a
@
o�
v -
- ao o
�,
T
3
cn
o
C�
U
Ha
o o Z C
m
_�
D
?U)
MATERIAL DESCRIPTION
jDark
Brown CLAY
-
2.0
34
-
1.5
33
78 28 50
0.0
- 5
-
2.5
30
_1
6.0
Tan LIMESTONE with clay seam and layers
100/
- 10
,
1.5"
1
_
13.0
Gray LIMESTONE with shale seams
100/
- 15
,
1.25"
100/
_20
20.0
,
0.25"
TEST BORING TERMINATED AT 20 FT
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058Brush Creek Rd. BORING NO.: 33
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
W. Boaz Road Project Surface Elevation:
12/11/2019 End Date: 12/11/2019 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
-VOn Rods (ft): 12
Drilling (ft): DRY
oZAfter
7After Hours (ft):
O
MATERIAL DESCRIPTION
-
j
Dark Brown CLAY
Brown CLAY
with limestone fragments
5
Tan LIMESTONE with clay seam and layers
_10
17
Gray LIMESTONE with shale seams
_15
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
(�
t
_
E
x
00
>j
-0-0
N
o
E
o
a
>C�
0of
O
oZ
0 E
U
0a�
a>
N�
U
0
-0
.V
N
a0
0
p��
(n
x 0
�a
��
0
Z
0
3
J
a
0
a
a-
1
2.0
29
2.0
6.0
100/
1.25"
13.0
12"
100/
20.0 0.75"
4.5 22 77 27 50 0.1
4.5+ 17
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058Brush Creek Rd. BORING NO.: 38
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
W. Boaz Road Project Surface Elevation:
12/11/2019 End Date: 12/11/2019 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
Drilling (ft): DRY
oZAfter
7After Hours (ft):
O
MATERIAL DESCRIPTION
-
j
Dark Brown CLAY
with limestone fragments
5
Tan LIMESTONE with clay seam and layers
_10
Gray LIMESTONE with shale seams
_15_
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
t
_
x
>
`o
U�
(�
o
E
E
o
00
>C�
>j
O
U
0 E
-0-0
a>
Coo�
U
0
-0
.V
N
a
0of
oZ
a0 0a�
p��
(n
x 0
0�
0 0
Z
0
J
a
0
�a
a-
3
a
1
1.75
31
73
26
47
100/
2.75"
14.0
100/
1.75"
100/
20.0 L 0.25"
2.25 31
4.5+ 20
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client: Starliqht Homes Texas, LLC
Project: W. Boaz Road Project
Start Date: 12/9/2019 End Date:
Drilling Method: CONTINUOUS FLIGHT AU
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
oZAfter Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
i
Brown CLAY
5
Tan CLAY with limestone fragments
Tan LIMESTONE with clay seam and layers
_10_
_15
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
5058Brush Creek Rd. BORING NO.: 43
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Location:
Fort Worth, Texas
Surface Elevation:
12/9/2019
West:
GER
North:
Hammer Drop
(Ibs /
in):
140 /
30
-o .S
w
a
E o
t
_
x
>
`o
U� r�
o
E
E
o
N�
>C�
O
U E
OM
a> N�
w
U
0
-0
.V
N
a
0of
oZ
a0 0a�
p��
(n
x 0
�� 0 0
Z
0
J
a_
0
Ha
a-
3
2.5
31
3.5
28
4.0
100/
4.5+
15
38
17
21
5.0
2
100/
0.25"
100/
1.25"
17.0
1.1
20.0 L 100/
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client:
Starliqht Homes Texas, LLC
Project:
W. Boaz Road Project
Start Date: 12/11/2019 End Date:
Drilling Method: CONTINUOUS FLIGHT AU
GROUND WATER OBSERVATIONS
0)
-VOn Rods (ft): NONE
Drilling (ft): DRY
oZAfter
7After Hours (ft):
O
MATERIAL DESCRIPTION
- j
Dark Brown CLAY
with limestone fragments from 2 ft to 6 ft
5
Tan LIMESTONE with clay seam and layers
10
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
5058Brush Creek Rd. BORING NO.: 44
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Location:
Fort Worth, Texas
Surface Elevation:
12/11 /2019
West:
GER
North:
Hammer Drop
(Ibs /
in):
140 /
30
-o .S
w
a
E o
t
_
x
>
`o
U� r�
o
E
E
o
N�
>�
O
U E
OM
a> N�
w
U
0
-0
.V
N
a
0�
oZ
a0 0a�
p��
(n
x 0
0� 0 0
Z
0
J
a_
0
Ha
a-
3
2.5
32
2.5
31
4.5+
24
84
25
59
1.6
6.0
12"
14.0
100/ 17
1.75"
100/
20.0 L 0.5"
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client: Starliqht Homes Texas, LLC
Project: W. Boaz Road Project
Start Date: 12/9/2019 End Date:
Drilling Method: CONTINUOUS FLIGHT AU
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
oZAfter Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
i
Brown CLAY
5
Tan CLAY with limestone fragments
Tan LIMESTONE with clay seam and layers
_10_
_15
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
5058Brush Creek Rd. BORING NO.: 46
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Location:
Fort Worth, Texas
Surface Elevation:
12/9/2019
West:
GER
North:
Hammer Drop
(Ibs /
in):
140 /
30
-o .S
w
a
E o
t
_
x
>
`o
U� r�
o
E
E
o
N�
>C�
O
U E
OM
a> N�
w
U
0
-0
.V
N
a
0of
oZ
a0 0a�
p��
(n
x 0
�� 0 0
Z
0
J
a_
0
Ha
a-
3
2.5
32
3.0
26
67
22
45
0.5
4.0
4.5+
13
5.0
100/
0.25"
100/
1.25"
16"
17.0
20.0 L 100/ 100/
ALPHA
#\TESTING
5058Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
BORING NO.:
550
Sheet 1 of 1
Pox: 817-496-5608
PROJECT NO.:
W193011
WHERE
IT ALL BEGINS
www.alphatesting.corn
Client:
Starliqht Homes Texas, LLC
Location: Fort Worth, Texas
Project:
W. Boaz Road Project
Surface Elevation:
Start Date:
12/9/2019 End Date:
12/9/2019
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
oZAfter Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
jBrown CLAY with limestone fragments
Tan CLAY with limestone fragments
5
Tan LIMESTONE with clay seam and layers
_10
_15_
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
o
(�
t
_
E
x
N�
`o
U�
o
w
C
E
J
J
o
a
>0
oof
wo
oZ
UE
o
ma)
•E c
C000
a�
0
0
0
.T�
a
ao
o
p��
(n
X c
Ha
c
oW
o
Z
c
J
D
a-�
4.0
6.0
17.0
20.0 L
2.25
31
3.25 1.7 96 27
4.5 17 54 18 36 4.9
7
100/ 7
1.5"
100/ 10
5"
100/ 7
1"
ALPHA #\TESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058Brush Creek Rd. BORING NO.: 51
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fox: 817-496-5608 PROJECT NO.: W193011
www. alphatesting. com
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
W. Boaz Road Project Surface Elevation:
12/9/2019 End Date: 12/9/2019 West:
CONTINUOUS FLIGHT AUGER North:
GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
ZAfter Drilling (ft): DRY
7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
- with limestone fragments from 2 ft to 5 ft
Tan LIMESTONE with clay seam and layers
Gray LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
140 / 30
-o .S
w
a
E
t
_
x
(�
FD
E
E
o
>
00N��a
OC
-J0O�
oof
o
ooZa
(n
x 0
O
��
0 0
Z
J
a
O
�a
a-
3
a
2.25
29
72
26
46
2.75
28
4.5+
21
5.0
100/
0.5"
6
125
8
2.25"
14.0
3.5" 17
.5
100/ 10
20.0 k 1.5"
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
_ �/
Dark Brown CLAY with limestone fragments
Brown and Tan CLAY with limestone fragments
_
and calcareous deposits
_5
_
Tan LIMESTONE with clay seams and layers
10
_ J//
Tan CLAY
_15�
_
Gray SHALE
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 1
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2 E a
N t _ X
o U� c'� E E c o
ND-OL N w C J J .T� "
> �' o ° E �' a� m o ° -o
cn X ca ° .E m a
H a a- Z 3 a
2.0 1.5 28 74 23 51 0.7
4.5+ 11 41 19 22
5.0 4.25 17
100/
1.0"
100/
0.50"
13.0
4.5+ 21
16.0
20.0 4.5+ 18
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
Tan LIMESTONE with clay seams and layers
5
10
Tan and Gray CLAY
15
Gray SHALE
_20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 2
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
N
(
t
_
E
x
>
`o
L
w
E
J
c�
>
��dE
°�o
�N
°
-oN�
T
3
�
_
a
�
(n
')
a
� a
�
Z
CU
Jax
a-
3
2.0
2.0
32
33
13
1025�7.,
31
12.0
7 2.75 23 63 19 44 0.4
18.0
20.0 4.5+ 13
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
BORING NO.: 3
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
N
t
_
x
>
`o
U�
o
E
E
o
-OL
J
JT
>
�N
O
-oN�
��
o
dE
c
a
�
a
�
o
J
aCU
(n
� a
Z
a
a-
3
MATERIAL DESCRIPTION
CLAY k Brt f t with limestone
own wmesone fragments
2.0
30
2.0
/
Brown CLAY with limestone fragments and calcareous
4.5+
18
deposits
- 5
4.5+
16
_
6.0
CLAY with limestone fragments and calcareous
4.5+
13 34 16 18 0.3
_Tan
�
deposits
-
4.5
15
-10
_ 13.0
Tan and Gray CLAY
_15�
_20 20.0
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
4.0 29
4.5+ 22 69 25 44
5058 Brush Creek Rd. BORING NO.: 4
ALPHA TESTING Port Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Pox: 817-496-5608 PROJECT NO.: W212004
WHERE IT ALL BEGINS www.alphatesting.com
Client:
Project:
Start Date:
Drilling Method:
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
Ranch at Duck Creek - Phase 2 Surface Elevation:
8/4/2021 End Date: 8/4/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
Drilling (ft): DRY
o1After
7After Hours (ft):
O
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
_
Brown CLAY with limestone fragments
5
Tan CLAY with calcareous deposits
_
Tan LIMESTONE with clay seams and layers
10
15
_
Tan and Gray CLAY
_20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
Hammer Drop (Ibs / in):
170 / 24
�.S
w
a
E
0
t
_
x
>
co
`o
0't6
U�
(�
o
E
E
o
00
>�
3
O
0
0 E
-OL
aT
N
N�
w
0
C
0
J
-0
J
.V
.T
N
E
��
o-
0
c
a�
�_
3
(n
cu
x 0
��_
0 0
Z
0
CU
_a
J
_�
a
0
�a
a-
-
3
3.5
4.4
96
28
2.0
4.5+
6
52
19
33
4.0
5.0
4.5+
15
2 0/
68
100/ 16
5.25"
18.0
20.00 4.5+ 20
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
BORING NO.: 5
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
N
t
_
x
>
`o
U�
o
E
E
o
-OL
J
JT
>
�N
O
-oN�
��
o
dE
c
a
�
a
�
o
J
aCU
(n
� a
Z
a
a-
3
MATERIAL DESCRIPTION
Dark Brown CLAY 4.5 32 83 26 57 4.3
_
.0
Tan LIMESTONE
3 .0
_
_
Brown CLAY with limestone fragments and calcareous
5
deposits
4.0
Tan CLAY with limestone fragments and calcareous
_
deposits
6.0
Tan LIMESTONE with clay seams and layers
10
12.0
_
Tan and Gray CLAY with limestone fragments
15
_
19.0
20
Grav SHALE
20.0
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
43
4.5+ 12
4.5+ 15
100/
2.0"
a
4.5+ 18
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
_ %/
Dark Brown CLAY
_ 5
Brown CLAY with limestone fragments
_
Light Brown CLAY with calcareous deposits and
_
limestone fraqments
_
Tan CLAY with calcareous deposits
10
_
Tan and Gray CLAY with limestone fragments
15
_
Tan LIMESTONE with clay seams and layers
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 6
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2 E a
N t _ X
o U� c'� E E c o
ND-OL N w C J J .T� "
> �' o ° E �' a� m o ° -o
cn X ca ° .E m a
H a a- Z 3 a
2.5 30
4.0 4.5 26
6.0 3.0 23
8.0 3.0 23 61 20 41 0.4
2.5 14
13.0
2.5 27
17.0
20.0 �� 100/
0.
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/3/2021 End Date: 8/3/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY
_
/
Reddish Brown CLAY with limestone fragments
and calcareous deposits
_ 5
Tan CLAY
_
with limestone layer at 5' to 6'
_
Tan LIMESTONE with clay seams and layers
10
_ �%/
Tan and Gray CLAY
_15
_
- with calcareous deposits and limestone fragments
at 18' to 20 '
_20 ,
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 7
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2 E a
N t _ X
o U� c'� E E c o
ND-OL N w C J J .T� "
> �' o ° E �' a� m o ° -o
cn X ca ° .E m a
H a a- Z 3 a
2.0 4.5 25
4.0 4.5+ 10 54 21 33 2.0
100/
6.50"
8.0 b
15
5 0"
13.0
4.5+ 21
20.0 4.5+ 19
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
BORING NO.: 8
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
GROUND WATER OBSERVATIONS
-6•E
.4
E-�
N
t
_
x
,N
-i
Z7On Rods (ft): NONE
�'
T
N
U�
-0�c
��
.55W
j
_
E
-C
c
ZAfter Drilling (ft): DRY
�o
3
Y Z
0 o
a
v
g
After_ Hours (ft):
a
@
0of
o�
v`
.9 C:
ao
rj
T
3
o
o-
o o"
m
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments and calcareous
2.0
28
71
23
48
0.7
deposits 2.0
_
Light Brown CLAY with rocks, limestone fragments
4.5+
13
and calcareous deposits
_5
4.5+
13
_
6.0
Tan LIMESTONE with clay seams and layers
100/
_
0.75"
10
Fb
57
_ 13.0
=J// Tan and Gray CLAY with limestone fragments .
15
_ / 18.0
_ Tan LIMESTONE with clay seams and layers
_20 20.0 \� 10Q(
TEST BORING TERMINATED AT 20 FT 0u
25
30
35
40
45
50
4.0
25
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
% Dark Brown and Brown CLAY with rocks and
/ limestone fraqments
- 5 Tan CLAY with limestone fragments and calcareous
deposits
Tan and Gray CLAY
_10�
15
Tan LIMESTONE with clay seams and layers
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
2.0
4.0
8.0
16.0
BORING NO.: 9
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
N
t
_
x
>
`o
U�
o
E
E
r
o
ND
>�
3
O
Y
U E
-OL
a>
N
N�
w
U
C
O
J
-O
J
.V
:
2:'
-
N
E
��
o-
0
c
a�
�_
3
_a
-T
� a
a-
Z
CU
3
3.0
30
4.5+
21
71
23
48
4.5+
12
36
16
20
0.1
4.5+
15
4.5+
18
20.0 �� 100/
0
4.5+ 16
8
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/3/2021 End Date: 8/3/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Light Brown CLAY with limestone fragments and
/ calcareous deposits
_ 5 Tan CLAY with calcareous deposits
Tan LIMESTONE with clay seams and layers
10
�%/ Tan and Gray CLAY with limestone fragments
15
_20 ,
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 10
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
��dE
°�
a
7
3
-T
� a a-
Z
CU
3
3.5
28
2.0
4.5+
13
51
20
31
4.0
5.0
4.5+
18
50/
3.0"
100/
4.50"
13.0
4.5+ 23
20.0
4.5+ 16 50 17 33
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
BORING NO.: 11
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
GROUND WATER OBSERVATIONS
-6•E
.4
E-�
N
t
_
x
,N
-i
Z7On Rods (ft): NONE
�'
T
N
U�
-0�c
��
.55W
j
_
J
E
-C c
ZAfter Drilling (ft): DRY
�o
3
Y Z
0 o
>
a
c
v
g
After_ Hours (ft):
a
@
0of
o�
v`
.9 C:
ao
rj
T
3
o
o-
o o"
m
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments and calcareous
3.0
25
deposits 2.0
_
Light Brown CLAY with limestone fragments and
4.5+
12
calcareous deposits 4.0
5
Tan CLAY with calcareous deposits 5.0
4.5+
15
Tan LIMESTONE with clay seams and layers
100/
_
4.75"
8.0
_ 10�
�%/ Tan CLAY with limestone fragments 3.0 22 65 20 45 0.7
_
_ 15 15.0 4.5+ 23
Tan LIMESTONE with clay seams and layers
_20 20.0 �� 10Q/ 15
TEST BORING TERMINATED AT 20 FT 0u
25
30
35
40
45
50
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/4/2021 End Date: 8/4/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
_5
_ 6.0
/ Brown CLAY with limestone fragments and calcareous
deposits 8.0
_ Tan CLAY with calcareous deposits and limestone
_10 fragments
_15 Tan LIMESTONE with clay seams and layers
_ Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
14.0
BORING NO.: 12
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
N
t
_
x
>
`o
U�
o
E
E
r
o
�'
ND
>
3
�' o
Y
f
-OL
�' a�
N
m
w
o
C
O
J
-o
J
:
2:'
-
E
�
o-
0
c
a�
3
7
-T
� a
a-
Z
CU
3
2.5
30
4.5+
24
4.25
20
80
24
56
0.4
4.0
17
48
15
33
0.3
3.0
16
4.5+ 22
100/
0.25"
18.0
20.0 \� 100/
0
5058 Brush Creek Rd. BORING NO.: 13
ALPHA TESTING Port Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Pox: 817-496-5608 PROJECT NO.: W212004
WHERE IT ALL BEGINS www.alphatesting.com
Client:
Project:
Start Date:
Drilling Method:
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
Ranch at Duck Creek - Phase 2 Surface Elevation:
8/3/2021 End Date: 8/3/2021 West:
CONTINUOUS FLIGHT AUGER North:
GROUND WATER OBSERVATIONS
0)
-VOn Rods (ft): NONE
Drilling (ft): DRY
o1After
7After Hours (ft):
O
MATERIAL DESCRIPTION
Dark Brown CLAY
_
Brown CLAY with calcareous deposits and limestone
fragments
5
Tan CLAY with limestone fraqments
_
Tan LIMESTONE with clay seams and layers
10
15
_ Tan and Gray SHALY CLAY
_20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
Hammer Drop (Ibs / in):
170 / 24
�.S
w
a
E
N
t
_
x
>
co
`o
0't6
U�
(�
o
E
E
o
N�
>�
3
O
Y E
U
-OL
aT
N
N�
w
U
C
°
J
-°
J
.V
.T
N
E
��
°�
d
c
a�
7
3
Z
CU
-T
�a
a-
3
3.0
31
2.0
4.5+
19
4.0
5.0
4.5+
12
100/
100/
1"
2100/
18.0
20.0 4.5+ 22 58 22 36
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/3/2021 End Date: 8/3/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
Brown CLAY with limestone fragments
— 5 Tan CLAY with calcareous deposits
_10
_ Tan LIMESTONE with clay seams and layers
15
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 14
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
"
�
dE °�
a
7
3
-T
� a a-
Z
CU
3
2.5
30
2.0
4.5+
17
4.0
4.5+
12
2.0
19
27
13
14
0.0
19
13.0
85
20.0 �_ 100/
T-n
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/3/2021 End Date: 8/3/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
�%/ Dark Brown CLAY with limestone fragments
5 Brown CLAY with calcareous deposits and limestone
fragments
Tan CLAY with calcareous deposits
_10
Tan LIMESTONE with clay seams and layers
15
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 15
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
"
�
°�
dE
a
3
7
-T
� a
a-
Z
CU
3
3.0
29
82
26
56
0.9
4.5+
21
4.0
3.5
17
6.0
4.5+
14
38
15
23
0.7
4.5+
18
12.0
10/
16.0 ` 0 50"
20.0 �_ 100/
0
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/30/2021 End Date: 7/30/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments and calcareous
deposits
- 5 Tan CLAY with calcareous deposits
_10
_15 j
_ Tan LIMESTONE with clay seams and layers
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 16
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
�
dE °�
a
7
3
-T
� a a-
Z
CU
3
4.5+
20
4.5+
20
4.0
4.5+
14
3.0
16
4.5+
20
18.0
20.0 \� 100/
aipli
4.5+ 16 49 17 32
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/30/2021 End Date: 7/30/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
BORING NO.: 17
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
GROUND WATER OBSERVATIONS
-6•E
.4
E-�
N
t
_
x
,N
-i
Z7On Rods (ft): NONE
�'
T
N
U�
-0�c
��
.55W
j
_
J
E
-C c
ZAfter Drilling (ft): DRY
�o
'oc�
3
Y Z
0 o
>
a
c
v
g
After_ Hours (ft):
a
@
o�
v`
.9 C:
ao
rj
T
3
o
o-
o o"
m
MATERIAL DESCRIPTION
Dark Brown CLAY
4.5+
23
2.0
Brown CLAY with limestone fragments and calcareous
4.5+
19
73
25
48
deposits 4.0
5
Tan CLAY with calcareous deposits
4.5+
14
-
4.0
16
3.0
21
10
13.0
Tan and Gray SHALY CLAY
15
_ 16.0
Tan LIMESTONE with clay seams and layers
_20 20.0 �� 100/
TEST BORING TERMINATED AT 20 FT 0u
25
30
35
40
45
50
4.5+
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/3/2021 End Date: 8/3/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
_ �/
Dark Brown CLAY with limestone fragments
_ 5
Brown CLAY with calcareous deposits
_
Tan CLAY
_
with calcareous deposits at 6' to 8'
10
_
Tan LIMESTONE with clay seams and layers
15
_
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 18
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
"
�
dE °�
a
7
3
-T
� a a-
-
Z
CU
3
2.0
2.2
86
34
77
27
50
0.1
4.5+
21
73
24
49
4.0
4.5+
14
6.0
4.5+
15
4.5+
13
10.0
100/
16.0 ` p 5"
20.0 100/
0
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/29/2021 End Date: 7/29/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
Brown CLAY with limestone fragments
- 5 Tan CLAY with limestone fragments
_ with calcareous deposits at 6' to 8'
_10
Tan and Gray CLAY
15
20 Tan LIMESTONE with clav seams and lavers
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 19
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
"
��dE
°�
a
3
7
-T
� a
a-
Z
CU
3
4.0
23
69
22
47
2.0
4.5+
16
4.0
4.5+
12
40
15
25
0.4
3.25
20
4.5+
14
13.0
4.5+ 10
19.0 4.5+ 21
20.0 100/
1 0"
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/30/2021 End Date: 7/30/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
BORING NO.: 20
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
GROUND WATER OBSERVATIONS
-6•E
.4
E-�
N
t
_
x
,N
-i
Z7On Rods (ft): NONE
�'
T
N
U�
-0�c
��
.55W
j
_
J
E
-C c
ZAfter Drilling (ft): DRY
�o
3
Y Z
0 o
>
a
c
v
g
After_ Hours (ft):
a
@
0of
o�
v`
.9 C:
ao
rj
T
3
o
o-
o o"
m
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments and calcareous
4.5+
21
deposits 2.0
_
Light Brown CLAY with limestone fragments and
4.5+
18
calcareous deposits 4.0
5
Tan CLAY with calcareous deposits
4.5
14
-
4.5
14
3.5
16
10
_ 13.0
_ Tan and Grav CLAY 14.0
_15 Tan LIMESTONE with clay seams and layers
20 Grav LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
4.0
100/
0.50"
19.0
20.0 ,_ 10Q/
0.
23 70 23 47
5058 Brush Creek Rd. BORING NO.: 21
ALPHA TESTING Port Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Pox: 817-496-5608 PROJECT NO.: W212004
WHERE IT ALL BEGINS www.alphatesting.com
Client:
Project:
Start Date:
Drilling Method:
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
Ranch at Duck Creek - Phase 2 Surface Elevation:
8/3/2021 End Date: 8/3/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
Drilling (ft): DRY
o1After
7After Hours (ft):
O
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Light Brown CLAY with limestone fragments and
_
calacareous deposits
-5
Tan CLAY with calcareous deposits
_
Tan LIMESTONE with clay seams and layers
10
15
_
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
Hammer Drop (Ibs / in):
170 / 24
�.S
w
a
E
N
t
_
x
>
co
`o
0't6
U�
(�
o
E
E
c
ND
>
3
�' o
Y E
f
-OL
�' a�
N
m
w
o
C
O
J
-o
J
.T�
"
E
0�
o-
a
c
a�
�_
3
(n
�
x�
o�
c a
_a
J
_�
a
�CU
a
��
Z�
a
3.5
29
2.0
4.5+
21
4.5+
15
43
17
26
1.1
6.0
7.0
4.5+
14
100/
6.75"
100/
22
0.50"
100/
16.0
0.75"
20.0 �_ 100/
ubb
5058 Brush Creek Rd. BORING NO.: 22
ALPHA TESTING Port Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Pox: 817-496-5608 PROJECT NO.: W212004
WHERE IT ALL BEGINS www.alphatesting.com
Client:
Project:
Start Date:
Drilling Method:
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
Ranch at Duck Creek - Phase 2 Surface Elevation:
8/3/2021 End Date: 8/3/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
Drilling (ft): DRY
o1After
7After Hours (ft):
O
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
5
_
Tan LIMESTONE with clay seams and layers
10
_
Gray LIMESTONE with shale seams
15
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
Hammer Drop (Ibs / in): 170 / 24
w a
�.S E 0 t _ x
o U� c'� E E c o
00 3 0 E -OL N w C J J .T� "
>� O 0 a> N� 0 0 -0 .V N
c n X ca o .E m � a
Ha Z Z a
2.5 29 75 24 51 0.0
4.5 23
6.0
2.0 32 82 25 57
50/
4.5"
100/
0.50"
12.0
100/
0 5/'
20.0 100/
0
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/29/2021 End Date: 7/29/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
Brown CLAY with limestone fragments
- 5 with calcareous deposits at 4' to 6'
Tan CLAY with limestone fragments
Tan and Gray SHALY CLAY
_10
with calcareous deposits at 8' to 10'
_15
Tan LIMESTONE with clay seams and layers
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 23
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
"
��dE
°�
a
7
3
-T
� a a-
Z
CU
3
4.5+
19
2.0
4.5+
13
31
15
16
0.0
4.5+
13
6.0
4.5+
17
8.0
3.75
23
15.0
4.5+ 17 45 18 27
20.0 10Q(
0
Lob
9
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/30/2021 End Date: 7/30/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
Brown CLAY with limestone fragments
- 5 Tan CLAY with limestone fragments and calcareous
deposits
_10
_ Tan LIMESTONE with clay seams and layers
15
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 24
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
��dE
°�
a
3
7
-T
� a
a-
Z
CU
3
4.5+
23
2.0
4.5+
20
4.0
4.5+
14
3.0
19
33
16
17
4.5+
14
20.0 10Q(
0
Lob
5058 Brush Creek Rd. BORING NO.: 25
ALPHA TESTING Port Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Pox: 817-496-5608 PROJECT NO.: W212004
WHERE IT ALL BEGINS www.alphatesting.com
Client:
Project:
Start Date:
Drilling Method:
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
Ranch at Duck Creek - Phase 2 Surface Elevation:
8/3/2021 End Date: 8/30/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
�/ Dark Brown CLAY
_ 5 Tan CLAY with limestone fragments and calcareous
deposits
_ Tan LIMESTONE with clay seams and layers
10
15
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
Hammer Drop (Ibs / in):
170 / 24
�.S
w
a
E
0
t
_
x
>
co
`o
0't6
U�
(�
o
E
E
c
00
>�
3
O
0 E
0
-OL
aT
N
N�
w
0
C
0
J
-0
J
.V
.T
"
N
E
��
o-
0
c
a�
�_
3
(n
x 0
��_
0 0
0
_a
J
_�
a
0
�a
a-
Z
3 CU
3.0
33
79
26
53
0.7
4.5+
23
4.0
4.5+
13
4.5+
11
8.0
100/
1.50"
100/
0.25"
100/
16.0
0.50"
20.0 10Q(
0
Lob
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 8/3/2021 End Date: 8/30/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
BORING NO.: 26
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
GROUND WATER OBSERVATIONS
-6•E
.4
E-�
N
t
_
x
,N
-i
Z7On Rods (ft): NONE
�'
T
N
U�
-0�c
��
.55W
j
_
E
-C
c
ZAfter Drilling (ft): DRY
�o
3
Y Z
0 o
a
v
g
After_ Hours (ft):
a
@
0of
o�
v`
.9 C:
ao
rj
T
3
o
o-
o o"
m
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
3.5
29
_
2.0
_
Brown CLAY with limestone fragments and calcareous
1
4.5+
21
deposits
4.0
_ 5
Light Brown CLAY with calcareous deposits and
2.5
20
46
17
29
0.5
_
limestone fragments
5.0/ N6.
100/
Tan LIMESTONE with clay seams and layers
0.50"
10
_15
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
llllhk� 075�0.,
15.0 ` 10Q/
1
20.0 �� 100/
ubb
5058 Brush Creek Rd. BORING NO.: 27
ALPHA TESTING Port Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Pox: 817-496-5608 PROJECT NO.: W212004
WHERE IT ALL BEGINS www.alphatesting.com
Client:
Project:
Start Date:
Drilling Method:
Starliqht Homes Texas, LLC Location: Fort Worth, Texas
Ranch at Duck Creek - Phase 2 Surface Elevation:
7/29/2021 End Date: 7/29/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
Brown CLAY
- 5 Tan CLAY with calcareous deposits
_10
_15 Tan LIMESTONE with clay seams and layers
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
2.0
4.0
14.0
20.0
Hammer Drop (Ibs / in):
170 / 24
�.S
w
a
E
N
t
_
x
>
co
`o
0't6
U�
(�
o
E
E
c
ND
>
3
�' o
Y E
f
-OL
�' a�
N
m
w
o
C
O
J
-o
J
.T�
"
E
0�
o-
a
c
a�
�_
3
(n
�
x�
o�
c a
Z�
_a
J
_�
a
�CU
a
��
a
4.5+
21
4.5+
17
62
20
42
2.4
3.5
13
4.0
13
3.5
20
32
17
15
100/ 15
0.75"
100/ 7
0.
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/30/2021 End Date: 7/30/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with calcareous deposits and limestone
fragments
5
Light Brown CLAY with calcareous deposits
_
Tan CLAY with calcareous deposits
j
_10
_
Tan LIMESTONE with clay seams and layers
15
_
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
4.0
6.0
10.0
17.0
BORING NO.: 28
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2
E a
0
t
_
x
>
`o
U�
o
E
E
r
o
ND
>�
3 Y D
O 0 E
-OL
a>
N
N�
w
0
C
0
J
-0
J
.V
:
2:'
-
N
E
��
o- 0
c
a�
�_
3
(n
x 0
��_
0 0
0
_a
J
_�
a
0
� a a-
Z
3 CU
4.5+
19
4.5+
17
4.5+
14
4.5+
12
33
15
18
0.1
15
1075�0.,
20.0 �� 100/
0
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/28/2021 End Date: 7/28/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
_ Brown and Tan CLAY with rocks and limestone
fragments
5 Tan CLAY with limestone fragments and calcareous
deposits
Brown CLAY with limestone fragments
_10
Tan and Gray SHALY CLAY
- -I
_15 /
Tan LIMESTONE with clay seams and layers
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
BORING NO.: 29
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
w
-6 .S 2
E a
N
t
_
x
>
`o
(
E
E
c�
>
L
�N
w
°
J
-oN�
T
"
��dE
°�
a
7
3
-T
� a a-
Z
CU
3
4.5+
22
68
23
45
6.5
2.0
4.5+
5
4.0
4.5+
11
6.0
7
38
17
21
8
10.0
15.0 E 2.5 25
20.0 �� 100/
ubb
6
5058 Brush Creek Rd.
BORING NO.:
30
ALPHA TESTING
Port Worth, Texas 76119
Sheet 1 1
Phone: 817-496-5600
of
Pox: 817-496-5608
PROJECT NO.:
W212004
WHERE IT ALL BEGINS
www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Location:
Fort Worth, Texas
Project: Ranch at Duck Creek - Phase
2
Surface Elevation:
Start Date: 7/30/2021 End Date:
7/30/2021
West:
Drilling Method: CONTINUOUS FLIGHT AUGER
North:
Hammer Drop
(Ibs / in):
170 / 24
GROUND WATER OBSERVATIONS
�•E
.4
E-� N t
_ x
,N
Z7On Rods (ft): NONE
�' T
N
0S (.q j
-ff
_
E E -C c
J
ZAfter Drilling (ft): DRY
'oc�
0 o
>
a, a
c
v
g
After_ Hours (ft):
a o�
@ v`
ao o
3
T
o
Ha
o- o o"
Z C
�
a m
?U)
MATERIAL DESCRIPTION
�/ Brown CLAY with limestone fragments and calcareous
4.5+
21
_
deposits
-
4.5+
21
76 25 51
_
4.0
- 5
Tan CLAY with calcareous deposits
4.5+
21
-
4.5+
15
4.5+
15
10
�
10.0
_
Tan LIMESTONE with clay seams and layers
15
` 100/
_
16.0 p 5"
_
Gray LIMESTONE with shale seams
20.0 100/
_20
TEST BORING TERMINATED AT 20 FT
0u
25
30
35
40
45
50
ALPHA #\TESTING 5058 Brush Creek Rd.
Fort Worth, Texas 76119
Phone: 817-496-5600
Fax: 817-496-5608
WHERE IT ALL BEGINS www.alphatesting.com
Client: Starliqht Homes Texas, LLC
Project: Ranch at Duck Creek - Phase 2
Start Date: 7/30/2021 End Date: 7/30/2021
Drilling Method: CONTINUOUS FLIGHT AUGER
0) GROUND WATER OBSERVATIONS
-VOn Rods (ft): NONE
o1After Drilling (ft): DRY
O 7After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
_ 5
Brown CLAY with limestone fraqments
_
Tan LIMESTONE with clay seams and layers
10
15
_
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
25
30
35
40
45
50
4.0
5.0
BORING NO.: 31
Sheet 1 of 1
PROJECT NO.: W212004
Location: Fort Worth, Texas
Surface Elevation:
West:
North:
Hammer Drop (Ibs / in): 170 / 24
-6 .S
w
2
E a
0
t
_
x
>
`o
U�
o
E
E
r
o
ND
>�
3
O
Y D
0 E
-OL
a>
N
N�
w
0
C
0
J
-0
J
.V
:
2:'
-
N
E
��
o-
0
c
a�
�_
3
x 0
��_
0 0
0
_a
J
_�
a
0
(n
� a
a-
Z
3 CU
4.5+
23
4.5+
23
77
24
53
4.4
4.5+
17
1 50"
100/
0.50"
4.5+
16.0
20.0 �� 100/
0
21
A LPN A #NTESTING KEY TO SOIL SYMBOLS
WHERE IT ALL BEGINS
AND CLASSIFICATIONS
SOIL & ROCK SYMBOLS
RELATIVE DENSITY OF COHESIONLESS SOILS (blows/ft)
®
(CH), High Plasticity CLAY
VERY LOOSE 0 TO 4
®
(CL), Low Plasticity CLAY
LOOSE 5 TO 10
MEDIUM 11 TO 30
(SC), CLAYEY SAND
DENSE 31 TO 50
VERY DENSE OVER 50
(SP), Poorly Graded SAND
(SW), Well Graded SAND
SHEAR STRENGTH OF COHESIVE SOILS (tsf)
Ell
(SM), SILTY SAND
VERY SOFT LESS THAN 0.25
SOFT 0.25 TO 0.50
IN
(ML), SILT
FIRM 0.50 TO 1.00
STIFF 1.00 TO 2.00
®
(MH), Elastic SILT
VERY STIFF 2.00 TO 4.00
HARD OVER 4.00
LIMESTONE
RELATIVE DEGREE OF PLASTICITY (PI)
®
SHALE / MARL
LOW 4 TO 15
SANDSTONE
MEDIUM 16 TO 25
HIGH 26 TO 35
o
(GP), Poorly Graded GRAVEL
VERY HIGH OVER 35
r.'
(GW), Well Graded GRAVEL
®
(GC), CLAYEY GRAVEL
RELATIVE PROPORTIONS (%)
(GM), SILTY GRAVEL
(OL), ORGANIC SILT
TRACE 1 TO 10
LITTLE 11 TO 20
SOME 21 TO 35
(OH), ORGANIC CLAY
AND 36 TO 50
11�����
��1♦
S
SAMPLING SYMBOLS
PARTICLE SIZE IDENTIFICATION (DIAMETER)
■SHELBY
TUBE (3" OD except where
BOULDERS
8.0" OR LARGER
noted otherwise)
COBBLES
3.0" TO 8.0"
SPLIT SPOON (2" OD except where
COARSE GRAVEL
0.75' TO 3.0"
noted otherwise)
FINE GRAVEL
5.0 mm TO 3.0"
®
AUGER SAMPLE
COURSE SAND
2.0 mm TO 5.0 mm
❑
TEXAS CONE PENETRATION
MEDIUM SAND
FINE SAND
0.4 mm TO 5.0 mm
0.07 mm TO 0.4 mm
❑SILT
ROCK CORE (2" ID except where
CLAY
0.002 mm TO 0.07 mm
LESS THAN 0.002 mm
noted otherwise)
CITY OF FORT WORTH
FORT WORTH, WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 03/07/2023
Note: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes.
Approval Spec I. Classsification Manufacturer Model1National
Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/161
07/23/97 33 05 13 Urethane Hydrophilic Watcrstop Asahi Kogyo K.K. Adcka Ultra -Seal P-201
ASTM D2240/D412/D792
04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001
04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket
ASTM C-443/C-361 SS MH
1/26/99 33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring
Traffic and Non -traffic area
5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidScal Manhole Encapsulation System
Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13)
I /26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowtitc
ASTM 3713 Non -traffic area
08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing
Non -traffic area
Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16)
*
33 05 13 Manhole Frame and Covers I Wetern Iron Works, Bass & Hays Foundry 1 1001
24"x40" WD
I *
33 05 13
Manhu ole Frames and CoCovs
Western Iron Works, Bass & Hays Foundry
30024
24" Dia.
*
33 OS 13
Manhole Frames and Covers
McKinley iron Works Inc.
A 24 AM
24" Dia.
08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
R-1272
ASTM A48 & AASHTO M306
24" Dia.
08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
R- 165-LM (Hinged)
ASTM A48 & AASHTO M306
24" Dia.
08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
NF 1274
ASTM A48 & AASHTO M306
30" Dia.
08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
R-1743-Let (Hinged)
ASTM A48 & AASHTO M306
30" dia.
33 05 13
Manhole Frames and Covers
Sigma Corporation
MH-144N
33 05 13
Manhole Frames and Covers
Sigma Corporation
MH-143N
33 05 13
Manhole Frames and Covers
Pont-A-Mousson
GTS-STD
24" dia.
33 05 13
Manhole Frames and Covers
Neenah Casting
24" dia.
10/31/06
33 05 13
Manhole Frames and Covers (Hinged)
Powerseal
Hinged Ductile Iron Manhole
ASTM A536
24" Dia.
7/25/03
33 05 13
Manhole Frames and Covers
Saint-Gobain Pipelines (Pamrex/rexus)
RE32-R8FS
30" Dia.
01/31/06
33 05 13
30" Dia. MH Ring and Cover
East Jordan Iron Works
V 1432-2 and V 1483 Designs
AASEITO M306-04
30" Dia.
11/02/10
33 05 13
30" Dia. MH Ring and Cover
Sigma Corporation
MH1651 FWN & MH16502
30" Dia
07/19/11
33 05 13
30" Dia. MH Ring and Cover
Star Pipe Products
MR32FTWSS-DC
30" Dia
08/10/11
33 05 13
30" Dia. MH Ring and Cover
Accucast
220700 Heavy Duty with Gasket Ring
30" Dia
30" ERGO XL Assembly
l0/14/13
33 05 13
30" Dia. MH Ring and Cover (Hinged & Lockable)
East Jordan Iron Works
with Cam Lock/MPIC/T-Gasket
ASSFITO MI 05 & ASTM A536
30" Dia
06/01/17
3405 13
30" Dia. MH Ring and Cover (Hinged & Lockable) CI
SIP Industries
2280 (32")
ASTM A 48
30" Dia,
CAP-ONE-30-FTW, Composite, w/ Leek
.111111
33 0 13
30" Dia. MH Ring and Cover
Composite Access Products, L.P.
w/o Hmg
30" Dia.
10/07/21
3405 13
30" Dia. MH Ring and Cover
Trumbull Manufacturing
32"(30') Frame and Cover
30" Dia.
Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/161
*
33 05 13
Manhole Frames and Covers
Pant-A-Mousson
Pamnght
24" Dia.
*
3305 13
Manhole Frames and Covers
Neenah Casting
24" Dia.
*
3305 13
Manhole Frames and Covers
Western Iron Works,Bass & Haw Foundry
300-24P
24" Dia.
*
3305 13
Manhole Frames and Covers
McKinley Iron Works Inc.
WPA24AM
24" Dia.
03/08/00
33 05 13
Manhole Frames and Covers
Aceneast
RC-2100
ASTM A 48
24" Dia.
04/20/01
33 05 13
Manhole Frames and Covers
(SIP)Serampore Industries Private Ltd.
300-24-23.75 Ring and Cover
ASTM A 48
24" Dra.
Water & Sewer - Manholes & Bases/Precast Concrete (Zev 1/8/13)
*
33 39 10
Manhole, Precast Concrete
Hydro Conduit Corp
SPL Item 949
ASTM C 478
48"
*
33 39 10
Manhole, Precast Concrete
Wall Concrete Pipe Co. Inc.
ASTM C-443
48"
09/23/96
33 39 10
Manhole, Precast Concrete
Concrete Product Inc.
48" I.D. Manhole w/ 32" Cone
ASTM C 478
48" w/32" cone
05/08/18
33 39 10
Manhole, Precast Concrete
The Turner Company
48", 60" I.D. Manhole w/ 32" Cone
ASTM C 478
48", 60"
10/27/06
33 39 10
Manhole, Precast Concrete
Oldcastle Precast Inc.
48" I.D. Manhole w/ 24" Cone
ASTM C 478
48" Dram w 24" Rrng
06/09/10
33 39 10
Manhole, Precast (Reinforced Polvmer)Concrete
US Composite Pipe
Reinforced Polymer Concrete
ASTM C-76
48" to 72"
09/06/19
33 3920
Manhole, Precast Concrete
Forterra Pipe and Precast
60" & 72" I.D. Manhole w/32" Cone
ASTM C-76
60" & 72"
10/07/21
32 39 20
Manhole, Precast Concrete
Forterra Pipe and Precast
48" I.D. Manhole w/32" Cone
ASTM C-77
48"
10/07/21
33 3920
Manhole, Precast (Reinforced Polymer) Concrete
Armorock
48" & 60" I.D. Manhole w/32" Cone
48" & 60"
10/07/21
33 3920
Manhole, Precast (Hybrid) Polymer & PVC
Predl Swtcros
48" & 60" I.D. Manhole w/32" Cone
48" & 60" Not Traffic Areas
ASTM C-478; ASTM C-923;
03/07/23 33 3920 Manhole. Precast Concrete AmeriTcx Pipe and Products- LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-443
04/28/07 Manholq Precast (Reinforced Pulymcr) Concrete Amitech USA Mcycr Polyercee Pipe
*
EI-14
Manhole Rehab Systems
04/23/01
EI-14
Manhole Rehab Systems
E1-14
Manhole Rehab Systems
4120101
EI-14
Manhole Rehab System
5/12/03
EI-14
Manhole Rehab System (Liner)
08/30/06
General Concrete Repair
Quadcx
Standard Cement Materials, Inc.
AP/M Permaform
Strong Company
Triplex Lining System
FlexKrete Technologies
Rcliner MSP
Strong Seal MS2A Rehab System
MH repair product to stop infiltration ASTM D5813
Vinyl Polyester Repair Product
Misc. Use
* From Original Standard Products List
FORT WORTH,
Note: All water or sewer
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
than 15 inch diameter shall be approved for use by the Water Department on a
basis. Special beddin¢ may be required for some
Updated: 03/07/2023
I 01111111
E I-14 Manhole Rehab Systems
SpraWoq,
Spray Wall Polyurethane Coating
ASTM D639/D790
I 12/14/01
Coating for Corrosion protection(Exterior)
ERTECH
Series 20230 and 2100 (Asphatic Emulsion)
Structures Only
I 01/31/06
Coatings for Corrosion Protection
Chesterton
Are 791, S1BB, SI, S2
Acid Resistance Test
Sewer Applications
I8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
Sewer Applications
�., ,a, �., .,
....o<. „a,,,pp, aa.�„K iccap, ay
ram. rr „a.,aa,,,K.1lo„r, co,
03/19/18
33 39 20 Coating for Corrosion protection(Exterior)
Sherwin William s
Grade (Aaphatic Emulsion)
Structures Only
Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16)
*
33 05 13 Manhole Insert
Knutson Enterprises
Made to Order - Plastic
ASTM D 1248
For 24" dia.
I *
3305 13 Manhole Insert
South Western Packaging
Made to Order - Plastic
ASTM D 1248
For 24" dia. I
I *
3305 13 Manhole Insert
Noflow-Inflow
Made to Order - Plastic
ASTM D 1248
For 24" dia. I
I 09/23/96
33 05 13 Manhole Insert
Southwestern Packing & Seals, Inc.
LifeSaver - Stainless Steel
For 24" dia I
I 09/23/96
33 05 13 Manhole Insert
Southwestern Packing & Seals, Inc.
TetherLok - Stainless Steel
For 24" dia I
Water & Sewer - Pipe Casing Spacers 33-05-24 (07/01/13)
11/04/02
Steel Band Casing Spacers
Advanced Products and Systems, Inc.
Carbon Steel Spacers, Model SI
02/02/93
Stainless Steel Casing Spacer
Advanced Products and Systems, Inc.
Stainless Steel Spacer, Model SSI
04/22/87
Casing Spacers
Cascade Waterworks Manufacturing
Casing Spacers
09/14/10
Stainless Steel Casing Spacer
Pipeline Seal and Insulator
Stainless Steel Casing Spacer
Up to 48"
09/14/10
Coated Steel Casin Spacers
Pipeline Seal and Insulator
Coated Steel Caam Spacers
Up to 48"
05/10/11
Stainless Steel Casing Spacer
Powerseal
4810 Powerchock
Up to 48"
03/19/18
Casing Spacers
BWM
SS-12 Casing Spacer(Stainless Steel)
03/19/18
Casing Spacers
BWM
FB-12 Casing Spacer (Coated Carbon Steel)
for Non_pressure Pipe and Grouted Casing
03/29/22
33 05 13 Casing Spacers
CCI Pipeline Systems
CSC12, CSS12
Water & Sewer - Pipes/Ductile Iron 33-11-10(1/8/13)
I *
33 11 10 Ductile Iron Pipe
Griffin Pope Products, Co.
Super Bell-Tite Ductile Iron Pressure Pipe,
AW WA C150, C151
3" thin 24" I
08/24/18
33 11 10 Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Fastite Pipe (Bell Spigot)
AW WA C150, C151
4" thin 30"
08/24/18
33 11 10 Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Flex Ring (Restrained Joint)
AW WA C150, C151
4" thin 30"
*
33 11 10 Ductile Iron Pipe
U.S. Pipe and Foundry Co.
AW WA C150, C151
°
33 11 10 Ductile Iron Pipe
McWane Cast Iron Pipe Co.
AWWA CI50, C151
Water & Sewer - Utility Line Marker (08/24/2018)
Sewer - Coatings/Epoxy 33-39-60 (011E 13)
02/25/02
Epoxy Lining System
Sauereisen, Inc
SewerGard 210RS
LA County #210-1.33
I 12/14/01
Epoxy Lining System
Ertech Technical Coatings
Ertech 2030 and 2100 Series
I
I 04/14/05
Interim Ductile Iron Pipe Coating
Induron
Protecto 401
ASTM B-117
Ductile Iron Pipe Only I
I01/31/06
Coatings for Corrosion Protection
Chesterton
Are 791, SIHB, SI, S2
Acid Resistance Test
Sewer Applications I
I8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
Sewer Applications I
Sewer - Coatings/Polyurethane
11/21/11 1 33-31-11 IAir Release Valve I A.R.I. USA, Inc. I D025LTP02(Camposite Bady)
E 1-04 [Conc.
onc. Pipe, Reinforced Wall Concrete Pipe Co. Inc ASTM C 76
E t-04 onc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76
E I-04 onc. Pipe, Reinforced Hanson Concrete Products ASTM C 76
EI-04 Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76
System PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved Previously I
onnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously I
Systems Trenchless Replacement System Polyethylene Calgarv, Canada Approved Previously I
I 1111117
I 03/22/10
04/09/21
33 31 13
3331 13
33 31 13
I. Cast Fiberglass (FRP)
Fiberglass Pipe (FRP)
Glass -Fiber Reinf ced Polymer Pipe (FRP)
Hobas Pipe USA, Inc.
Ameron
Thompson Pipe Group
Hobas Pipe (Non -Pressure)
Boadstrand RPMP Pipe
Thompson Pipe Flomite)
ASTM D3262/D3754
ASTM D3262/D3754
ASTM D3262/D3754
03/07/23
33 31 13
Fiberglass Pipe (FRP)
Future Pipe Industries
Fiberstrong FRP
ASTM D3262, ASTM D3681, ASTM D4161, AW WA M45
Sewer - Pipe/Polymer Pipe
4/14/05
I 06/09/10
Polvmer Modified Concrete Pipe
El-9 Reinforced Polymer Concrete Pipe
Sewer - Pipes/HDPE 33-31-23(1/8/13)
Amnech USA
US Composite Pipe
Meyer Polvcrete Pipe
ReinPolvmer Concrete Pine
ASTM C33, -11, F417 8" to 111", Class V
ASTM C-76
* From Original Standard Products List
FORT WORTH,
Note: All water or sewer
I
12/02/11
10/22/14
I
IMPAICJrii
01/18/18
11/11/98
I 09/11/12
05/06/05
I 04/27/06
I 1/19/2011
I 3/19/2018
I 3/29/2019
I 10/21/2020
I 10/22/2020
I 10/21/2020
INV
I 05/03/99
I 05/29/96
I
1 11/03/98
I 11JI4101
I 06/09/03
I
09/26/91
1 09/26/91
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 03/07/2023
than 15 inch diameter shall be approved for use by the Water Department on a proiect specific basis. Special bedding may be required for some
High -density polyethylene pipe
Phillips l)""n". Ina
Opticore Ductile Polyethylene Pipe
ASTM D 1248
8"
High -density polyethylene pipe
Plexco Inc.
AST. D 1248
8"
High -density polyethylene pipe
Polly Pipe, Inc.
ASTMD1248
8" I
High -density polyethylene pipe
CSR Hydro ConduiUPipehne Systems
McConnell Pipe Enlargement
ASTM D 1248
I
I
Sewer - P1Des/PVC (Pressure Sewer) 33-11-12 (4/1/131
33-II-I�
DR -Id PVC Pressure Pipe
Pipelife Jetstream
PVC Pressure Pipe
AWWAC900
4"thou 12"
33-11-12
DR-14 PVC Pressure Pipe
Royal Budding Products
Royal Seal PVC Pressure Pipe
AW WA C900
4" thou 12"
(Sewer - Pioes/PVC* 33-31-20 (7/l/13)
I
33-31-20
PVC Sewer Pipe
1-M Manufacturing Co., Inc. (JM Eagle)
SDR-26
ASTM D 3034
4" - 15"
33-31-20
PVC Sewer Pipe
Diamond Plastics Corporation
SDR-26
ASTM D 3034
4" thou 15"
33-31-20
PVC Sewer Pipe
Lamson Vylon Pipe
ASTM F 789
4" thru 15"
33-31-20
PVC Sewer Pipe
Vinyltech PVC Pipe
Gravity Sewer
ASTM D3034
4" thru 15"
33-31-20
PVC Sewer Rpe
Diamond Plastics Corporation
"S" Gravity Sewer Pipe
ASTM F 679
18" to 27"
33-31-20
PVC Sewer Pipe
J-M Manufacturing Co, Inc. (JM Eagle)
SDR 26/35 PS 115/46
ASTM F 679
18" - 28"
33-31-20
PVC Sewer Pipe
Pipelife Jet Stream
SDR-26 and SDR-35
ASTM F-679
18"
33-31-20
PVC Solid Wall Pipe
Diamond Plastics Corporation
SDR 26/35 PS 115/46
ASTM F-679
18" to 48"
33-31-20
PVC Sewer Fittings
Harco
SDR-26 and SDR-35 Gasket Fittings
ASTM D-3034, D-1784, etc
4" - 15"
33-31-20
PVC Sewer Fittings
Plastic Trends, Inc.(Westlak)
Gasketed PVC Sewer Main Finings
ASTM D 3034
33 3120
PVC Sewer Pipe
Pipelife Jet Stream
SDR 35
ASTM F679
18"- 24"
33 3120
PVC Sewer Pipe
Pipelife Jet Stream
SDR 26
ASTM D3034
4"- IS"
33 31 20
Gasketed Fittings (PVC)
GPK Products, Inc.
SDR 26
ASTM D3034/F-679
4"- 15"
33 31 20
PVC Sewer Pipe
NAPCO(Westlak)
SDR 26
ASTM D3034
4" - 11"
33 3120
PVC Sewer Pipe
Sanderson Pipe Corp.
SDR 26
ASTM D3034
4"- IS"
333120
PVC Sewer Pipe
NAPCO(Westlak)
SDR 26/35 PS 115/46
ASTM F-679
18"-36"
Sewer - P1De3 a t7R ia—Fl FF 33-31-12 (01/18/131
Cared in Place Pipe
Cured in Place Pipe
Cured in Place Pipe
Sewer - Pioes/Rehab/Fold & Form
Fold and Form Pipe
Fold and Form Pipe
Fold and Form Pipe
Fold and Form Pipe
Fold and Form Pipe
Insimform Texark, Inc
ASTM F 1216
National Envirotech Group
National Liner, (SPL) Item #27
ASTM F-1216/D-5813
Reynolds Inc/Inliner Technolgy (Inhneir USA)
[miner Technology
ASTM F 1216 I
I
Cullum Pipe Systems, Inc.
Insimform Technologies, Inc.
Insimform "NuMpe"
ASTM F-1504 I
American Pipe & Plastics, Inc.
Demo. Purpose Only
Ultralmer
Ultraliner PVC Alloy Pipeliner
ASTM F-1504, 1871, 1867 I
Miller Pipeline Corp.
EX Method
ASTM F-1504, F-1947 Up to 18" diameter I
I
Sewer - Pioes/Ouen Profile Large Diameter
E100-2 PVC Sewer Pipe, Ribbed
Lamson Vylon Pipe
Carlon Vylon H.C. Closed Profile Pipe,
ASTM F 679
18" to 48" I
E100-2 PVC Sewer Pipe, Ribbed
Extrusion Technologies, Inc.
Ultra -Rib Open Profile Sewer Pipe
ASTM F 679
18" to 48"
E100-2 PVC Sewer Pipe, Ribbed
Uponor ETI Company
(E100-2) Polypropylene (PP) Sewer Pipe, Double Wall
Advanced Drainage Systems (ADS)
SaniTite HP Double Wall (Corrugated)
ASTM F 2736
24"-30"
(E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall
Advanced Drainage Systems (ADS)
SmuTite HP Triple Wall Pipe
ASTM F 2764
30" to 60"
Steel Reinforced Polyethylene Pipe
CoaTech Construction Products
Durmaxx
ASTM F 2562
24" to 72"
* From Original Standard Products List
FORT WORTH,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 03/07/2023
Note: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes.
Approval
Spec I.
Classsification
Manufacturer
ModelI.
National Spec
Water - ADuurtenances
33-12-10 W7/Ol/13)
01/18/18
33-12-10
Double Strap Saddle
Roma,
202NS Nylon Coated
AWWA C800
1"-2"SVC, up to 2411Pipe
08/28/02
Double Strap Saddle
Smith Blair
#317 Nylon Coated Double Strap Saddle
07/23/12
33-12-10
Double Strap Service Saddle
Mueller Company
DR2S Double (SS Stra DI Saddle
AWWA C800
1 "-2" SVC, up to 24" PiRe
03/07/23
33-12-10
Double Strap Service Saddle
Powerseal
3450AS, Incl. Ca. St , Dbl Stra ,Stainless
NSF ANSI 372
1"-2" SVC, up to 24" Pipe
10/27/87
Curb Stops -Ball Meter Valves
McDonald
6100M,6100MT & 610MT
3/4" and I"
10/27/87
Curb Stops -Ball Meter Valves
McDonald
4603B, 4604B, 6100M, 610OTM and 6101M
I %" and 2"
FB600-7NL, FB1600-7-NL, FV23-777-W-NL,
1/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
-2-7-L
AWWA C800
2"
-6-NL, FB1600-6-NL, FV23-666-W-
1111018
33-12-10
Stops
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
NL, L22-66NL
AWWA C800
I -1 /2"
FB6004-NL, FB1600-4-NL, B11-444-WR-
1111018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
NIL, B22444-WR-NL, L28-44NL
AWWA C800
I"
13-25000N, B-24277N-3, B-20200N-3, H.
AWWA C800, ANSF 61,
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15000N, , H-1552N, H142276N
ANSI/NSF 372
2"
B-25000N, B-20200N-3, B-24277N-3,H-
AWWA C800, ANSF 61,
1/21/2.1.
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15000N, H-14276N, H-15525N
ANSI/NSF 372
1-1/2"
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15530N
ANSI/NSF 372
1"
01/26/00
Coated Tapping Saddle with Double SS Straps
JCM Industries, Inc.
#406 Double Band SS Saddle
1"-2" Taps on up to 12"
0/5/21/12
33-12-25
Tapping Sleeve (Coated Steel)
JCM Industries, Inc.
412 Tapping Sleeve ESS
AWWA C-223
Up to 30" w/12" Out
03/29/22
33-12-25
Tapping Sleeve (Coated or Stainless Steel)
JCM Industries, Inc.
415 Tapping Sleeve
AWWA C-223
Concrete Pipe Only
05/10/11
Tapping Sleeve (Stainless Steel)
Powerseal
3490AS (Flange) & 3490MJ
4"-8" and 16"
02/29/12
33-12-25
Tapping Sleeve (Coated Steel)
Romac
FTS 420
AWWA C-223
U p to 42" w/24" Out
02/29/12
33-12-25
Tapping Sleeve (Stamless Steel)
Romac
SST Stainless Steel
AWWA C-223
Up to 24" w/12" Out
02/29/12
33-12-25
Tapping Sleeve (Stainless Steel)
Romac
SST III Stainless Steel
AWWA C-223
Up to 30" w/12" Out
05/10/11
Joint Repair Clamp
Powerseal
3232 Bell Joint Repair Clamp
4" to 30"
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW37C-12-lEPAF FTW
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW39C-12-1EPAF FTW
08/30/06
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW65C-14-lEPAF FTW
Class "A"
Concrete Meter Box
Bass & Hays
CMB37-B12 1118 LID-9
Concrete Meter Box
Bass & Hays
CMB-18-Dual 1416 LID-9
Concrete Meter Box
Bass & Hays
CMB65-B65 1527 LID-9
Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/111
*
El-I1
Combination Air Release Valve
Combination At Release Valve
Multiplex Manufacturing Cc
Valve and Primer Corp.
Crispin Air and Vacuum Valves, Model No.
APCO #143C, #145C and #147C
1/2", 1" & 2"
1", 2" & 3"
Water - Dry Barrel Fire Hydrants 33-1240 (01/15/14)
10/01/87
E-1-12
Div Barrel Fire Hydrant
American -Darling Valve
Drawing Nos. 90-18608, 94-18560
AWWA C-502
03/31/88
E-1-12
Dry Buret Fire Hydrant
American Darling Valve
Shop Drawing No. 94-18791
AWWA C-502
09/30/87
E-1-12
Dry Barrel Fire Hydrant
Clow Corporation
Shop Drawing No. D-19895
AWWA C-502
01/12/93
E-1-12
Dry Barrel Fire Hydrant
American AVK Company
Model 2700
AWWA C-502
08/24/88
E-1-12
Dry Barrel Fire Hydrant
Clow Corporation
Drawings D20435, D20436, B20506
AWWA C-502
E-1-12
Dry Barrel Fire Hydrant
ITT Kennedy Valve
Shop Drawmg No. D-80783FW
AWWA C-502
0.187
E-1-12
Dry Barrel Fire Hydrant
M&H Valve Company
Shop Drawing No. 13476
AWWA C-502
Shop Drawings No. 6461
10/14/87
E-1-12
Div Barrel Fire Hydrant
Mueller Company
A-423 Centurion
AWWA C-502
01/15/88
E1-12
Dry Barrel Fire Hydrant
Mueller Company
A-423 Super Centurion 200
AWWA C-502
10/09/87
E-1-12
Dry Barrel Fire Hydrant
U.S. Pipe & Foundry
Shop Drawing No. 110251
AIWA C-102
09/16/87
E-1-12
Dry Barrel Fire Hydrant
American Flow Control AFC
Waterous Pacer WB67
AWWA C-502
08/12/16
33-12-40
Dry Barrel Fire Hydrant
EJ (East Jordan Iron Works)
WaterMaster 5CD250
02/05/93 1 EI01-5 I Detector Check Meter
08/05/04 Magnetic Drive Vertical Turbine
Ames Company Model 1010 Dctcctor Check Valve AWWA C551 4" - 10"
Hcrscy Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6"
* From Original Standard Products List
FORT WORTH,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 03/07/2023
Note: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes.
Approval I. Classsification Manufacturer ModelINational
( Water - Pines/PVC (Pressure Water) 33-31-70 (01/08/13) -
1
01/18/18
33-11-12
PVC Pressure Pipe
Vinyltech PVC Pipe
DR14
ASTM D1784
4"-12"
3/19/2018
33 11 12
PVC Pressure Pipe
Pipelife Jet Stream
DR14
AWWA C900
4"-12"
3/19/2018
33 11 12
PVC Pressure Pipe
Pipelife Jet Stream
DR18
AWWA C900
I6"-24"
5/25/2018
33 11 12
PVC Pressure Pipe
Diamond Plastics Comoration
DR 14
AWWA C900
4"-12"
5/25/2018
33 11 12
PVC Pressure Pipe
Diamond Plastics Corporation
DR 18
AWWA C900
16"-24"
AWWA C900-16
UL 1285
12/6/2018
33 11 12
PVC Pressure Pipe
J-M Manufacturing Co., Inc d/b/a JM Eagle
DR 14
ANSI/NSF 61
4"-28"
FM 1612
12/6/2018
33 11 12
PVC Pressure Pipe
J-M Manufacturing Co., Inc d/b/a IM Eagle
DR 18
°
16"-24"
9/6/2019
33 11 12
PVC Pressure Pipe
Underground Solutions Inc.
DR14 Fusible PVC
AWWA C900
4" - 8"
9/6/2019
33 11 12
PVC Pressure Pipe
NAPCO(Westlake)
DR18
AWWA C900
16"-24"
9/6/2019
33 11 12
PVC Pressure Pipe
NAPCO(Westlake)
DR14
AWWA C900
4"- 12"
9/6/2019
33 11 12
PVC Pressure Pipe
Sanderson Pipe Corp.
DR14
AWWA C900
4"- 12"
l Water - Piues/Valves & Fittings/Ductile Iron Fittines 33-11-11 (01/08/13)
07/23/92
EI-07
Ductile Iron Fittings
Star Pipe Products, Inc
Mechanical Joint Fittings
AWWA C153 & C110
*
EI-07
Ductile Iron Fittings
Gnffin Pipe Products, Co.
Mechanical Joint Finings
AWWA C 110
*
E1-07
Ductile Iron Fittings
McWane/Tyler Pipe/ Union Utilities Division
Mechanical Joint Fittings, SSB Class 350
AWWA C 153, C 110, C III
08/11/98
EI-07
Ductile Iron Fittings
Sigma, Co.
Mechanical Joint Finings, SSB Class 351
AWWA C 153, C 110, C 112
02/26/14
E1-07
MI Fittings
Accucast
Class 350 C-153 MJ Fittings
AW WA C153
4"-12"
05/14/98
EI-07
Ductile Iron Joint Restraints
Ford Meter Box Co./Uni-Flange
Uni-Flange Series 1400
AW WA C111/C153
4" to 36"
05/14/98
EI-24
PVC Joint Restraints
Ford Meter Box Co /Uni-Flange
Uni-Flange Series 1500 Circle -Lock
AW WA C111/C153
4" to 24"
11/09/04
EI-07
Ductile Iron Joint Restraints
One Bolt, Inc.
One Bolt Restrained Joint Fitting
AWWA C111/C1161CI53
4" to 12"
02/29/12
33-11-11
Ductile Iron Pipe Mechanical Joint Restraint
EBAA Iron, Inc.
Megalug Series 1100 (for DI Pipe)
AWWA C111/C1161CI53
4" to I"
02/29/12
33-11-11
PVC Pipe Mechanical Joint Restraint
EBAA Iron, Inc.
Megalug Series 2000 (for PVC Pipe)
AWWA C111/C1161CI53
4" to 24"
08/05/04
EI-07
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
Sigma One-Lok SLC4 - SLC10
AW WA C111/C153
4" to 10"
03/06/19
33-I1-I1
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
Sigma One-Lok SLCS4 - SLCS12
AW WA C111/C153
4" to 12"
08/05/04
EI-07
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
Sigma One-Lok SLCE
AW WA C111/C153
12" to 24"
08/10/98
EI-07
MJ Fittings(DIP)
Sigma, Co.
Sigma One-Lok SLDE
AW WA C153
4" - 24"
10/12/10
E1-24
Interim Restrained Joint System
S & B Techncial Products
Bulldog System ( Diamond Lok 21 & 1M
ASTM F-1624
4" to 12"
08/16/06
E1-07
Mechanical Joint Fittings
SIP Industries(Smampore)
Mechanical Joint Finings
AWWA C153
4" to 24"
11/07/16
33-11-I1
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
PVC Stargrip Series 4000
ASTM A536 AW WA CI I I
11/07/16
33-11-I1
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
DIP Stargrp Series 3000
ASTM A536 AW WA CI I I
EZ Grip Joint Restraint (EZD) Black For DIP
03/19/18
334141
Mechanical Joint Retaner Glands
SIP Industries(Serampore)
ASTM A536 AW WA CI I I
3"-48"
EZ Grip Joint Restraint (EZD) Red for C900
03/19/18
33-11-I1
Mechanical Joint Retainer Glands
SIP Indu aries(Serampore)
DR14 PVC Pipe
ASTM A536 AW WA CI I I
4"-12"
03/19/18
33-11-I1
Mechanical Joint Retainer Glands
SIP Induaries(Serampore)
tic vuP "on rnn, oa ,"n._J neLL 1Vf "oo
ASTM A536 AW WA Cl 11
16"-24"
Water - Piues/Valves & Fittines/Resilient Seated Gate Valve* 33-12-20 (05/13/15)
Resilient Wedged Gate Valve w/no Gears
American Flow Control
Smes 2500 Drawing # 94-20247
16"
12/13/02
Resilient Wedge Gate Valve
American Flow Control
Series 2530 and Series 2536
AWWA C515
30" and 36"
08/31/99
Resilient Wedge Gate Valve
American Flow Control
Series 2520 & 2524 (SD 94-20255)
AWWA C515
20" and 24"
05/18/99
Resilient Wedge Gate Valve
American Flow Control
Series 2516 (SD 94-20247)
AW WA C515
16
10/24/00
E1-26
Resilient Wedge Gate Valve
American Flow Control
Series 2500 (Ductile Iron)
AWWA C515
4" to 12"
08/05/04
Resilient Wedge Gate Valve
American Flow Control
42" and 48" AFC 2500
AWWA C515
42" and 48"
05/23/91
E1-26
Resilient Wedge Gate Valve
American AVK Company
American AVK Resilient Sesded GV
AWWA C509
4" to 12"
01/24/02
E1-26
Resilient Wedge Gate Valve
American AVK Company
20" and smaller
*
E1-26
Resilient Seated Gate Valve
Kennedy
4" - 12"
*
E1-26
Resilient Seated Gate Valve
M&H
4" - 12"
*
E1-26
Resilient Seated Gate Valve
Mueller Co.
4" - 12"
11/08/99
Resilient Wedge Gate Valve
Mueller Co.
Series A2361 (SD 6647)
AWWA C515
16"
01/23/03
Resilient Wedge Gate Valve
Mueller Co.
Sm. A2360 for 18"-24" (SD 6709)
AWWA C515
24" and smaller
05/13/05
Resilient Wedge Gate Valve
Mueller Co.
Mueller 30" & 36", C-515
AWWA C515
30" and 36"
01/31/06
Resilient Wedge Gate Valve
Mueller Co.
Mueller 42" & 48", C-515
AWWA C515
42" and 48"
01/28/88
EI-26
Resilient Wedge Gate Valve
Clow Valve Co.
AWWA C509
4" - 12"
10/04/94
Resilient Wedge Gate Valve
Clow Valve Co.
16" RS GV (SD D-20995)
AWWA C515
16"
11/08/99
EI-26
Resilient Wedge Gate Valve
Clow Valve Co.
Clow RW Valve (SD D-21652)
AW WA C515
24" and smaller
11/29/04
Resilient Wedge Gate Valve
Clow Valve Co.
Clow 30" & 36" C-515
AWWA C515
30" and 36" (Note 3)
11/30/12
Resilient Wedge Gate Valve
Clow Valve Co.
Clow Valve Model 2638
AWWA C515
24" to 48" (Note 3)
05/08/91
EI-26
Resilient Seated Gate Valve
Stockham Valves & Fittings
AWWA C 509, ANSI 420 - stem,
4" - 12"
*
E1-26
Resilient Seated Gate Valve
U.S. Pipe and Foundry Co.
Metroseal 250, requirements SPL #74
3" to 16"
10/26/16
33-12-20
Resilient Seated Gate Valve
EI (East Jordan Iron Works)
EJ I'l—Master Gate Valve & Boxes
08/24/18
Mateo Gate Valve
Matco-Norca
225 MR
AWWA/ANSI C115/An21.15
4" to 16"
* From Original Standard Products List
FORT WORTH,
Note: All water or sewer
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
than 15 inch diameter shall be approved for use by the Water Department on a
basis. Special bedding may be required for some
Updated: 03/07/2023
*
EI-30
Rubber Seated Butterfly Valve
Henry Pratt Co.
AWWAC-504
24"
*
EI-30
Rubber Seated Butterfly Valve
Mueller Co.
AW WA C-504
24"and smaller
1/11/99
EI-30
Rubber Seated Butterfly Valve
De=ik Valves Co.
AW WA C-504
24" and larger
06/12/03
EI-30
Valmatic Arnencan Butterfly Valve
Valmatic Valve and Manufactunng Corp.
Valmatm American Butterfly Valve.
AW WA C-504
Up to 84" diameter
04/06/07
E1-30
Rubber Seated Butterfly Valve
M&H Valve
M&H Style 4500 & 1450
AW WA C-504
24" to 48"
03/19/18
33 1221
Rubber Seated Butterfly Valve
G. A. Industries (Golden Anderson)
AW WA C504 Butterfly Valve
AW WA C-504
30"-54"
Water - Polvetl vlene Encasement 33-11-10 (Ol/2LjL
ALI
05/12/05
H.I-13
Polyethylene Encasment
Flexsol Packaging
Fulton Enterprises
AWWA C105
8 and LLD
05/12/05
E1-13
Polyethylene Encasment
Mountain States Plashes (MSP) and AEP Ind.
Standard Hardware
AW WA C105
8 and LLD
05/12/05
E1-13
Polyethylene Encasment
AEP Industries
Bullstrong by Cowmwn Bolt & Gasket
AW WA C105
8 and LLD
09/06/19
33-11-11
Polyethylene Encasment
Northtown Products Inc.
PE Encasement for DIP
AW WA C105
8 and LLD
Water - Sampling .Station
03/07/23
1 33 12 50 lWater Sampling Station
Eclipse
Number 88 , 12-inch Depth m B
As shown in spec. 33 12 50
Water - Automatic Flusher
10/21/20 Automated Flushing System Mueller Hydroguard HG2-A-iN-2-PVC-0I B-LPLG(Pumancnt)
04/09/21 Automated Flushing System
04/09/21 Automated Flushing System
Kupf le Foundry Company Eclipse 49800wc
Kupferle Foundry Company Eclipse 49700 (Portable)
* From Original Standard Products List
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 06/27/2023
Approval
I
Spec No.
Concrete
Classification
Manufacturer
Model No. National Spec
19/9/2022
03 30 00
Mix Design
American Concrete Company
30CAF029 3000 psi Concrete for Sidewalks & ADA Ramps
19/9/2022
03 30 00
Mix Design
American Concrete Company
OIJAF382 1000 psi Concrete Base Material for Trench Repair
19/9/2022
03 30 00
Mix Design
American Concrete Company
40CNF065 4000 psi Concrete for Manholes & Utility Structures
19/9/2022
03 30 00
Mix Design
American Concrete Company
45CAF076 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Argos
D10000001737 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Argos
DI 00000017914500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Argos
D10000001793 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Argos
DI0000001103 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Argos
DIOOO0002107 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Argos
DI0000001273 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Argos
DIOOO0001617 3600 psi Concrete for Machine Placed Paving
19/9/2022
03 30 00
Mix Design
Argos
DI 00000083814500 psi Concrete for HES Paving
19/9/2022
03 30 00
Mix Design
Argos
DIOOO0009857 50 psi Flowable Fill - CLSM
19/9/2022
03 30 00
Mix Design
Argos
D 1000000 1055 3000 psi Concrete for Inlets, Junction Boxes, Manholes, Channel Liners, Sidewalks, Driveways, Curb & Gutter
19/9/2022
03 3000
Mix Design
Argos
DIOOOOO1043S 3000 psi Concrete for Sidewalks, Curbs
19/9/2022
03 30 00
Mix Design
Argos
DIOOOOO1565S 3000 psi Concrete for Curbs, Curb & Gutters, Sidewalks, Driveways, ADA Ramps
19/9/2022
03 30 00
Mix Design
Argos
DIOOOOO1615 3600 psi Concrete for Inlets, Boxes, Encasement, Blocking
19/9/2022
03 30 00
Mix Design
Argos
DIOOO0001061 3600 psi Concrete for Inlets, Boxes, Encasement, Blocking
19/9/2022
03 30 00
Mix Design
Argos
DIOOO0001083S 4000 psi Concrete for Valve Pads, Inlets, Structures, Headwalls, Thrust Blocking
19/9/2022
03 30 00
Mix Design
Argos
DIOOO0001083 4000 psi Concrete for Valve Pads, Inlets, Structures, Headwalls, Thrust Blocking
19/9/2022
03 30 00
Mix Design
Argos
DIOOO0001685 4000 psi Concrete for Valve Pads
19/9/2022
03 30 00
Mix Design
Argos
DI0000005751 750 Psi Concrete Base for Trench Repair
19/9/2022
03 30 00
Mix Design
Argos
DIOOO0001681 4000 psi Concrete for Headwalls, Retaining Walls, Box Culverts, Valley Gutters
19/9/2022
03 30 00
Mix Design
Big D Concrete
7SKGRT 3000 psi Concrete for Grouting
19/9/2022
03 3000
Mix Design
Big D Concrete
14500AE 4500 psi Concrete for High Early Strength Paving
1 5/2/2023
32 13 13
Mix Design
Big D Concrete
CM14520AE 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Big Town Concrete
452065-1 4500 psi hand placed paving
19/9/2022
03 30 00
Mix Design
Big Town Concrete
450065-1 4500 psi hand placed paving
19/9/2022
03 3000
Mix Design
Bumco Texas
45U500BG 4500 psi Concrete Mix for Hand Placed Paving, Storm Structures
19/9/2022
03 3000
Mix Design
Bumco Texas
40U553BG 4000 psi Concrete Mix for Machine Placed Paving
19/9/2022
03 30 00
Mix Design
Borneo Texas
55U120AG 4000 psi Concrete Mix for High Early Strength Paving
19/9/2022
03 30 00
Mix Design
Bumco Texas
30U100AG 3000 psi Concrete Mix for Pipe Collars, Inlets, Thrust Blocks, Sidewalks, ADA Ramps
19/9/2022
03 30 00
Mix Design
Bumco Texas
30U1O1AG 3000 psi Concrete Mix for Flatwork
19/9/2022
03 30 00
Mix Design
Bumco Texas
30U500BG 3000 psi Concrete Mix for Blocking, Driveways, Curb & Gutters, Sidewalks, ADA Ramps
19/9/2022
03 30 00
Mix Design
Bumco Texas
40U500BG 4000 psi Concrete Mix for Storm Drain Structures, Driveways, Screen Walls
19/9/2022
03 30 00
Mix Design
Bumco Texas
36U500BG 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations
19/9/2022
03 30 00
Mix Design
Bumco Texas
08Y450BA 800 psi Concrete Mix for Base for Trench Repair
19/9/2022
03 30 00
Mix Design
Bumco Texas
OIY690BF 100 psi Concrete Mix for Flowable Fill
14/1/2023
03 34 16
Mix Design
Bumco Texas
IOYH50BF 1000 psi Concrete Base Material for Trench Repair
19/9/2022
03 3000
Mix Design
Carder Concrete
FWCC602021 4500 psi concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Carder Concrete
FWCC552091 3600 psi for Machine Placed Paving
19/9/2022
03 30 00
Mix Design
Carder Concrete
FWCC602091 3600 psi for Machine Placed Paving
19/9/2022
03 3000
Mix Design
Carder Concrete
FWCC359101 Flowable Fill - CLSM
19/9/2022
03 3000
Mix Design
Carder Concrete
FWFF237501 Flowable Fill - CLSM
19/9/2022
03 30 00
Mix Design
Carder Concrete
FWCC602001 4000 psi Concrete for Storm Drain Structures, Manholes, Headwalls, Retaining Walls, Valley Gutters, Drive Approaches
19/9/2022
03 30 00
Mix Design
Carder Concrete
FWCC502021 3500 psi concrete for Sidewalks, Driveways, Ramps, Curb & Gutter
19/9/2022
03 30 00
Mix Design
Carder Concrete
FWCC502001 3000 psi for Sidewalks, Driveways, Ramps, Curb & Gutter, Flatwork
19/9/2022
03 30 00
Mix Design
Charley's Concrete
4142 3600 psi Concrete for Curb Inlets, Junction Boxes
19/9/2022
03 30 00
Mix Design
Charley's Concrete
4518 4000 psi Concrete for Headwalls, Wingwalls
19/9/2022
03 3000
Mix Design
Charley's Concrete
5167 3600 psi Concrete Mix for Machine Placed Paving
19/9/2022
03 3000
Mix Design
Charley's Concrete
4609 4500 psi Concrete Mix for Hand Placed Paving, Manholes
19/9/2022
03 3000
Mix Design
Charley's Concrete
6103 4500 psi Concrete Mix for Hand Placed Paving, Manholes
19/9/2022
03 3000
Mix Design
Charley's Concrete
4502 3000 psi Concrete Mix for Sidewalks
19/9/2022
03 3000
Mix Design
Charley's Concrete
3759 3000 psi Concrete Mix for Sidewalks
19/9/2022
03 3000
Mix Design
Charley's Concrete
1502 150 psi Concrete for Flowable Fill-CLSM
19/9/2022
03 3000
Mix Design
Charley's Concrete
1518 150 Psi Concrete for Flowable Fill-CLSM
19/9/2022
03 3000
Mix Design
Charley's Concrete
5642 4000 psi Concrete for Storm Drain Structures
19/9/2022
03 3000
Mix Design
Charley's Concrete
6595 5000 psi Concrete Mix for High Early Strength Paving
19/9/2022
03 3000
Mix Design
Charley's Concrete
6589 4500 psi Concrete Mix for High Early Strength Paving
19/9/2022
03 30 00
Mix Design
Chisholm Trail Redi Mix
C13020AE 3000 psi Concrete for Driveways, Curb & Gutter
19/9/2022
03 30 00
Mix Design
City Concrete Company
11-350-FF 50-150 psi Concrete for Flowable Fill-CLSM
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
Approval
Spec No.
STANDARD PRODUCTS LIST AS OF 06/27/2023
Classification Manufacturer
Model No. National Spec
Concrete (Continued)
19/9/2022
03 30 00
Mix Design
City Concrete Company
30HA25II 3000 psi Concrete for Rip -Rap
19/9/2022
03 30 00
Mix Design
City Concrete Company
30HA20II 3000 psi Concrete Mix for Blocking, Sidewalks, Flatwork, Pads
19/9/2022
03 30 00
Mix Design
City Concrete Company
45NG25II 3600 psi Concrete Mix for Drilled Shafts/Lighting and Traffic Signal Foundations
19/9/2022
03 30 00
Mix Design
City Concrete Company
50QG25I13600 psi Slurry Displaced Drilled Shaft
19/9/2022
03 30 00
Mix Design
City Concrete Company
45NA201I 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
City Concrete Company
36LA2011 3600 psi Concrete Mix for Machine Placed Paving
19/9/2022
03 30 00
Mix Design
City Concrete Company
36JAOOIJ 3600 psi Concrete Mix for Machine Placed Paving
19/9/2022
03 30 00
Mix Design
City Concrete Company
40LA2011 4000 psi Concrete Mix for Storm Drain Structures
111/16/2022
03 30 00
Mix Design
City Concrete Company
CLNG251I 3600 psi Concrete for Drilled Shaft/Lighting and Traffic Signal Foundations
1 5/5/2023
03 30 00
Mix Design
City Concrete Company
CCNA25OAG 3600 psi Concrete for Drilled ShaftsLighting and Traffic Signal Foundations
1 5/5/2023
03 3000
Mix Design
City Concrete Company
CSSQA25OAG 3,600 psi Concrete for Slurry Displacement Shafts, Underwater Shafts
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
250 3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
350 3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps
19/9/2022
03 34 13
Mix Design
Cow Town Redi Mix
9 70 psi Flowable Fill - CLSM
19/9/2022
03 34 13
Mix Design
Cow Town Redi Mix
9-5-2 70 psi Flowable Fill - CLSM
19/9/2022
03 34 13
Mix Design
Cow Town Redi Mix
220-8 50 psi Concrete Mix for Flowable Fill - CLSM
19/9/2022
03 34 13
Mix Design
Cow Town Redi Mix
320-8 50 psi Concrete Mix for Flowable Fill - CLSM
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
230-8 750 psi Concrete Base Material for Trench Repair
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
330-58 750 psi Concrete Base Material for Trench Repair
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
353 3000 psi Concrete Mix for Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments, Non-TxDOT Retaining Walls
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
253-W 3000 psi Concrete Mix Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments, Non-TxDOT Retaining Walls
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
260 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
260-1 3600 psi Concrete Mix for Headwalls
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
260-2 3600 psi Concrete Mix for Box Culverts, Headwalls
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
360 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
360-1 3600 psi Concrete Mix for Box Culverts, Headwalls, Wingwalls
19/9/2022
03 3000
Mix Design
Cow Town Redi Mix
264-N 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Cow Town Redi Mix
366 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Cow Town Redi Mix
265 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Cow Town Redi Mix
365 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
370-NC 4500 psi Concrete for HES Paving
19/9/2022
03 3000
Mix Design
Cow Town Redi Mix
370-INC 5000 psi Concrete for HES Paving
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
375-NC 5000 psi Concrete for HES Paving
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
267 4200 psi Concrete Mix for Manholes and Drainage Structures
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
270 5000 psi Concrete Mix for Cast -in -Place Box Culverts
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
370 5000 psi Concrete Mix for Cast -in -Place Box Culverts
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
255-2 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Encasement
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
257 3600 psi Concrete mix for Valley Gutters
1 11/14/2022
32 13 13
Mix Design
Cow Town Redi Mix
357-M 3600 psi Concrete Mix for Machine Placed Paving
19/9/2022
33 13 13
Mix Design
Cow Town Redi Mix
257-M 3600 psi Concrete Mix for Machine Placed Paving
19/9/2022
34 13 13
Mix Design
Cow Town Redi Mix
260-M 4000 psi Concrete Mix for Machine Placed Paving
19/9/2022
35 13 13
Mix Design
Cow Town Redi Mix
360-M 4000 psi Concrete Mix for Machine Placed Paving
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
255-LP 3000 psi Concrete Mix for Curb & Gutter
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
355-LP 3000 psi Concrete Mix for Curb & Gutter
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
255 3500 psi Concrete Mix for Flatwork, Inlets, Thrust Blocking Concrete Encasement
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
355 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Encasement
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
365-STX 4000 psi Concrete for Bridge slabs, top slabs of direct traffic culverts, approach slabs
19/9/2022
03 30 00
Mix Design
Cow Town Redi Mix
357 3600 psi Concrete Mix for Valley Gutters
16/21/2023
03 30 00
Mix Design
Cow Town Redi Mix
360-DS 3600 psi Concrete for Drilled Shaft/Lighting and Traffic Signal Foundation
1 1/18/2023
03 30 00
Mix Design
Cow Town Redi Mix
380-NC 4500 psi Concrete for HES Paving
19/9/2022
03 30 00
Mix Design
GCH Concrete Services
GCH4000 4000 psi Concrete for for Sidewalks, Ramps, Headwalls, Inlets, and Storm Drain Structures
19/9/2022
03 30 00
Mix Design
GCH Concrete Services
GCHVS 4000 psi Concrete for Machine Placed Paving
19/9/2022
03 3000
Mix Design
GCH Concrete Services
GCH4500 4500 psi Concrete Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
C47PV5E5 3000 psi Concrete for Sidewalks, ADA Ramps
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
2MWR-70J23504 3000 psi Concrete for Sidewalks, ADA Ramps
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
2MWR-147QW5D5 3000 psi Concrete Mix for Sidewalks, ADA Ramps
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
2MWR-056PS5D5 4000 psi Concrete Machine Placed Paving
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
2MWR-161UV5DM 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
2MWR-IOMQS50N 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
161PS5EM 4500 psi Concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
C47PV5E5 3000 psi Concrete Mix for Sidewalks, ADA Ramps
14/7/2023
03 30 00
mix Design
Ingram Concrete & Aggregates
1OLQS50N 3,600 psi Concrete for Drilled Shafts/Lighting and Traffic Signal Foundations
19/9/2022
03 30 00
Mix Design
Ingram Concrete & Aggregates
161PS5EM 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
1551 3000 psi Concrete Mix for Blocking
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 06/27/2023
Approval Spec No. Classification Manufacturer Model No. National Spec
Conerete(Continued)
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
5177 3000 psi Concrete Mix for Sidewalks
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
1261 3000 psi Concrete Mix for Sidewalks
19/9/2022
4 30 00
Mix Design
Holcim - SOR, Inc.
2125 4500 psi Concrete for HES Paving
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
1701 4000 psi Concrete Mix for Storm Drain Structures, Sanitary Sewer Manholes, Junction Box
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
5409 4000 psi Concrete Mix for Sidewalks, Inlets
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
5507 4500 psi Concrete Mix for Hand Placed Paving
1 12/15/2022
3 3000
Mix Design
Holcim - SOR, Inc.
3741 100 psi concrete for flowable fill/CSLM
19/9/2022
04 30 00
Mix Design
Holcim - SOR, Inc.
5017 200 psi Concrete for Base Material for Trench Repair
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
9600 3600 psi Concrete for Drill Shafts/Lighting and Traffic Si al Foundations
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
1851 4500 psi Concrete for Storm Drain Structures, Hand PlaceSaying
1 12/5/2022
4 30 00
Mix Design
Holcim - SOR, Inc.
1822 3600 psi Concrete for Drilled Shafts/Lghting and Traffic Sal Foundations
19/9/2022
03 30 00
Mix Design
Holcim - SOR, Inc.
1859 4000 psi Concrete for Drilled Shafts/Lighting and Traffic Signal Foundations
14/7/2023
03 30 00
Mix Design
Liquid Stone
C301D 3,000 psi Concrete for Sidewalks, Approaches, and Driveways.
14/27/2023
03 30 00
Mix Design
Liquid Stone
C361DNFA 3,600 psi Concrete for Retaining wall, driveway, junction box apron, approach
14/7/2023
03 30 00
Mix Design
Liquid Stone
C361DHR 3,600 psi Concrete for Drilled Shaft/Lighting and Traffic Signal Foundations
1 1/24/2023
03 30 00
Mix Design
Liquid Stone
C451DHR-A 4500psi Concrete for HES Paving
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2132214 3,000 psi Concrete for Sidewalks & Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
D9490SC 3,000 psi Concrete for Sidewalks & Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2131214 3,000 psi Concrete for Sidewalks & Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2131314 3,000 psi Concrete for Sidewalks & Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2136014 3,000 psi Concrete for Sidewalks & Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2136214 3,000 psi Concrete for Sidewalks & Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2141224 4,000 psi Concrete for Sidewalks & Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2141024 4,000 psi Concrete for Sidewalks & Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2136224 3,600 psi Concrete for Curb Inlets
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2141233 3,600 psi Concrete for Storm Structures, Inlets, Blocking & Encasement
19/9/2022
03 30 00
Mix Design
Martin Marietta
FLOW25A 50 psi Concrete for Flowable Fill/CLSM
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2142233 3,600 psi Concrete for Manholes, Inlets & Headwalls
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2146333 3,600 psi Concrete for Manholes, Inlets & Headwalls, Concrete Encasement
19/9/2022
03 30 00
Mix Design
Martin Marietta
R21412304,000 psi Concrete for Manholes, Inlets & Headwalls, Valve Pads
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2146035 4,000 psi Concrete for Manholes, Inlets & Headwalls, Valve Pads
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2146335 4,500 psi Concrete for Hand Placed Paving, Inlets, Storm Drain Structures
111/2/2022
32 13 13
Mix Design
Martin Marietta
Q214IN27 4,000 psi Concrete for Machine Placed paving
111/2/2022
32 13 13
Mix Design
Martin Marietta
Q214IK30 4,000 psi Concrete for Machine Placed Paving
111/2/2022
32 13 13
Mix Design
Martin Marietta
R2146N36 4,500 psi Concrete for Hand Placed Paving
1 11/15/2022
33 13 13
Mix Design
Martin Marietta
R2146K36 4,500 psi Concrete for Hand Placed Paving
1 11/15/2022
3413 13
Mix Design
Martin Marietta
R2146P36 4,500 psi Concrete for Hand Placed Paving
111/2/2022
32 13 13
Mix Design
Martin Marietta
R2146K36 4,500 psi Concrete for Hand Placed Paving
111/2/2022
32 13 13
Mix Design
Martin Marietta
R2146N35 / 6.11 sacks / 4,500 psi concrete for Hand Place Paving, Inlets, Manholes, Headwalls
111/2/2022
32 13 13
Mix Design
Martin Marietta
R2146K34 4,000 psi Concrete for Inlets, Manholes, Headwalls
111/2/2022
32 13 13
Mix Design
Martin Marietta
R2141N24 4,000 psi Concrete for Sidewalks and Ramps
111/2/2022
32 13 13
Mix Design
Martin Marietta
R2141K24 4,000 psi Concrete for Sidewalks and Ramps
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2146038 4,500 psi Concrete for Inlets, Storm Drain Structures
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2146036 4,500 psi Concrete for Hand Placed Paving, Inlets
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2146042 4,500 psi Concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2146242 4,500 psi Concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2146236 4,500 psi Concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Martin Marietta
D9493SC 4,500 psi Concrete for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Martin Marietta
R2147241 4,500 psi Concrete for Hand Placed Paving
14/1/2023
32 1320
Mix Design
Martin Marietta
R2136N14 / 5.00 sacks / 3,000 psi concrete for Sidewalks
14/1/2023
03 30 00
Mix Design
Martin Marietta
R2146P33 / 6.01 sacks / 4,000 psi concrete for Bridge Deck
14/1/2023
03 30 00
Mix Design
Martin Marietta
R2146033 4,000 psi Concrete for Riprap
14/7/2023
32 1320
Mix Design
Martin Marietta
R2136K14 3,000 psi concrete for sidewalks and ramps
14/7/2023
32 13 13
Mix Design
Martin Marietta
R2161 K70 6,000 psi (3,000 psi (a,) 24 hrs.) for HES Paving
14/l/2023
03 30 00
Mix Design
Martin Marietta
310LBP 3,600 psi Concrete for Retaining Walls
1 5/22/2023
32 13 13
Mix Design
Martin Marietta
R2146K37/6.22 sack / 4,500 psi Concrete for Hand Placed Paving
14/1/2023
03 30 00
Mix Design
Martin Marietta
R2141030 4,000 psi Concrete for Riprap
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
Approval
Spec No.
STANDARD PRODUCTS LIST AS OF 06/27/2023
Classification Manufacturer
Model No. National Spec
Concrete(Continued)
1 5/3/2023
03 3000
Mix Design
Martin Marietta
M7842344 4,000 psi Concrete for Bridge Deck
16/1/2023
32 1320
Mix Design
Martin Marietta
R2136R20 3,000 psi Concrete for Sidewalks and Ramps
16/1/2023
32 1320
Mix Design
Martin Marietta
R2136N20 3,000 psi Concrete for Sidewalks and Ramps
16/27/2023
03 30 00
Mix Design
Martin Marietta
U2146N41 / 6.44sacks / 3,600 psi Concrete for Drilled Shafts / Lighting and Traffic Signal Foundations
16/27/2023
03 30 00
Mix Desaign
Martin Marietta
U2146K45 / 6.65 sacks / 3,600 psi Concrete for Drilled Shafts / Lighting and Trafic Signal Foundations
19/9/2022
32 1320
Mix Design
NCS Redi Mix
NCS5020A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks
19/9/2022
03 30 00
Mix Design
NBR Ready Mix
TX C-YY 3000 psi Concrete Mix for Curb Inlets
19/9/2022
03 30 00
Mix Design
NBR Ready Mix
TX C-NY 3000 psi Concrete Mix for Curb Inlets
1 1/24/2023
03 30 00
Mix Design
Rapid Redi Mix
RRM6320AHP 4500 psi Concrete for Hand Placed Paving
1 1/24/2023
03 30 00
Mix Design
Rapid Redi Mix
RRM5525A 3600 psi Concrete for Valley Gutters, Sidewalks, Approaches, ADA Ramps
1 1/18/2023
03 30 00
Mix Design
Rapid Redi Mix
RRM6020ASS 4000 psi Concrete for Strom Drain Structures
1 1/18/2023
03 30 00
Mix Design
Rapid Redi Mix
RRM5320A 3000 psi Concrete for Blocking
1 1/18/2023
03 3000
Mix Design
Rapid Redi Mix
RRM5020A 3000 psi Concrete for Curb, Gutter, Driveways, Sidewalk, Ramps
19/9/2022
03 30 00
Mix Design
Redi-Mix
DCA2E554 3000 psi Concrete Mix for Rip Rap
19/9/2022
03 30 00
Mix Design
Redi-Mix
VOJ11524 3000 psi Concrete Mix for Curb & Gutter
19/9/2022
03 34 13
Mix Design
Redi-Mix
FOCI0021 215 psi Flowable Fill - CLSM
19/9/2022
03 30 00
Mix Design
Redi-Mix
10JI1524 3000 psi Concrete Mix for Driveways, Sidewalks, ADA Ramps
19/9/2022
03 30 00
Mix Design
Redi-Mix
IOJI 1504 3000 psi Concrete Mix for Sidewalks
19/9/2022
03 30 00
Mix Design
Redi-Mix
1 OLI 1504 3,600 psi Concrete Mix for Sidewalks, Curb & Gutter
19/9/2022
03 30 00
Mix Design
Redi-Mix
1OLI 1524 3600 psi Concrete Mix Manholes, Inlets, Junction Boxes, Headwalls
19/9/2022
03 30 00
Mix Design
Redi-Mix
1RJ11524 3500 psi Concrete Mix for Thrust Blocks, Valve Pads
19/29/2022
03 3000
Mix Design
Redi-Mix
1OL21524 4000 psi Concrete Mix for Manholes
19/9/2022
03 30 00
Mix Design
Redi-Mix
15611524 4000 psi Concrete Mix for Cast -in -Place Storm Drain Structures
19/9/2022
03 3000
Mix Design
Redi-Mix
1OLI 15E4 3600 psi Concrete Mix for Bridge substructures
19/9/2022
03 30 00
Mix Design
Redi-Mix
156115134 4000 psi Bridge Slabs
19/9/2022
03 34 13
Mix Design
Redi-Mix
F35238VN 100 psi Flowable Fill - CLSM
19/9/2022
03 34 13
Mix Design
Redi-Mix
FOD138VM 100 psi Flowable Fill - CLSM
19/9/2022
03 34 13
Mix Design
Redi-Mix
1OJ11554 3000 psi Concrete Mix for Rip -Rap
19/9/2022
03 30 00
Mix Design
Redi-Mix
POG138K9 1000 psi Concrete Mix for Trench Repair Base Material
19/9/2022
03 30 00
Mix Design
Redi-Mix
1 OKI 1524 3600 psi Concrete Mix for Encasement
19/9/2022
03 30 00
Mix Design
Redi-Mix
1 ONI 1507 4500 psi (2600 psi (& 24 firs.) Concrete Mix for HES Paving
19/9/2022
03 30 00
Mix Design
Redi-Mix
10NI1504 5000 psi (3600 psi @ 2 days) Concrete Mix for HES Paving
19/9/2022
03 3000
Mix Design
Redi-Mix
50KI1524 3600 psi Concrete Mix for Machine Placed Paving
19/9/2022
03 30 00
Mix Design
Redi-Mix
1 OMI 15D4 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures
19/9/2022
03 30 00
Mix Design
Redi-Mix
10MI1524 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Redi-Mix
10MI1504 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Redi-Mix
145CD5P4 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures
1 11/2/2022
03 3000
Mix Design
Redi-Mix
145P25P4 4500 psi Concrete for Storm Drain Structures
112/5/2022
03 30 00
Mix Design
Redi-Mix
10KI15C4 3500 psi Concrete for Thrust Blocks, Valve Pads
112/5/2022
03 30 00
Mix Design
Redi-Mix
156115C4 4000 psi Concrete for CIP Storm Drain Structures
112/5/2022
03 30 00
Mix Design
Redi-Mix
10LI15C4 3600 psi Concrete for Manhole, Inlet, Junction Box, Headwall
15/15/2023
03 30 00
Mix Design
Redi-Mix
80LI15D5 3600 psi Concrete for Drilled Shafts/Lighting and Traffic Signal Foundations
15/15/2023
03 30 00
Mix Design
Redi-Mix
1ON115136 Slurry Displacement Shafts, Underwater Drilled shafts
19/9/2022
03 34 13
Mix Design
SRM Concrete
30000 3,000 psi Concrete for Sidewalks and Ramps, Curb & Gutter
19/9/2022
03 34 13
Mix Design
SRM Concrete
40050 4,000 psi Concrete for Headwalls, Retaining Wall
19/9/2022
03 30 00
Mix Design
SRM Concrete
35023 3,600 psi Concrete for Machine Placed Paving
19/9/2022
03 3000
Mix Design
SRM Concrete
40068 3,600 psi Concrete for Machine Placed Paving
19/9/2022
03 3000
Mix Design
SRM Concrete
45000 4,500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
SRM Concrete
45300 4,500 psi Concrete for Hand Placed Paving
19/9/2022
03 3000
Mix Design
SRM Concrete
40326 4,500 (3,00 @ 3-days) psi Concrete for HES Paving
1 10/10/2022
03 30 00
Mix Design
SRM Concrete
35000 3600 psi Concrete for Sewer Manholes
1 10/10/2022
03 30 00
Mix Design
SRM Concrete
35300 3600 psi Concrete for Swere Manholes
19/9/2022
03 3000
Mix Design
SRM Concrete
35022 3,600 psi Concrete for Junction Box, Retaining Walls
19/9/2022
03 30 00
Mix Design
SRM Concrete
30050 3,000 psi Concrete for Sidewalks, Ramps, Inlets, Junction Boxes, Thrust Blocks, Curb and Gutter, Driveways, Barrier Ramp
12/10/2023
03 3000
Mix Design
SRM Concrete
50310 5,000 psi Concrete for HES Paving
1 1/13/2023
32 13 13
Mix Design
SRM Concrete
45023 4,500 psi Concrete for Hand Placed Paving
15/5/2023
03 30 00
Mix Design
SRM Concrete
DIOOOO8553CB 4,000 psi Concrete for Bdridge Approach Slab, Deck Slab
19/9/2022
03 30 00
Mix Design
Tarrant Concrete
FW6020AHP 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Tarrant Concrete
FW60AHP 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 30 00
Mix Design
Tarrant Concrete
TCFW6020AHP 4500 psi Concrete Mix for Hand Placed Paving
19/9/2022
03 3000
Mix Design
Tarrant Concrete
FW7520AMR 4500 (3000 psi (& 3-days) psi Concrete HES Paving
19/9/2022
03 3000
Mix Design
Tarrant Concrete
FW6520AMR 4500 (3000 psi (& 3-days) psi HES Paving
19/9/2022
03 30 00
Mix Design
Tarrant Concrete
FW5520AMP 3600 psi Concrete for Machine Placed Paving
19/9/2022
03 30 00
Mix Design
Tarrant Concrete
FW5320A 3000 psi Concrete Mix for Blocking
19/9/2022
03 34 13
Mix Design
Tarrant Concrete
FWFF150CLSM 50-150 psi Flowable Fill - CLSM
19/9/2022
03 34 13
Mix Design
Tarrant Concrete
FWFF275 50-150 psi Flowable Fill - CLSM
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
Approval
Spec No.
STANDARD PRODUCTS LIST AS OF 06/27/2023
Classification Manufacturer
Model No.
National Spec
I
Concrete(Continued)
I9/9/2022
03 3000
Mix Design
Tarrant Concrete
FW6020A2 4000 psi Concrete Mix for Storm Drain Structures
110/10/2022
03 3000
Mix Design
Tarrant Concrete
TCFW6025A2 4000 psi Concrete for Manholes
110/10/2022
03 3000
Mix Design
Tarrant Concrete
TCFW5020A 3000 psi Concrete for Sidewalks
I9/9/2022
03 30 00
Mix Design
Tarrant Concrete
FW5025A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps
I9/9/2022
03 30 00
Mix Design
Titan Ready Mix
3020AE 3000 psi Concrete for Sidewalks
I9/9/2022
03 30 00
Mix Design
Tarrant Concrete
CP5020A 3000 psi Concrete Mix for Curb and Gutter
I9/9/2022
03 3000
Mix Design
Tarrant Concrete
FW5525A2 3600 psi Concrete Mix for Sidewalks, Drive Approaches, ADA Ramp
I9/9/2022
03 30 00
Mix Design
Titan Ready Mix
TRC4520 4500 psi Concrete for Hand Placed Paving
I9/9/2022
03 30 00
Mix Design
True Grit Redi Mix
0250.230 3000 psi Concrete Mix for Flatwork, Curb & Gutter, Driveways, Sidewalks, ADA Ramps
I9/9/2022
03 3000
Mix Design
True Grit Redi Mix
270.230 5000 psi Concrete for Hand Placed Paving
I9/9/2022
03 30 00
Mix Design
True Grit Redi Mix
0250.2301 3000 psi Concret Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps
I9/9/2022
03 30 00
Mix Design
True Grit Redi Mix
0260.2302 4000 psi Concrete Mix for Machine Placed Paving
I9/9/2022
03 3000
Mix Design
True Grit Redi Mix
0255.2301 3600 psi Concrete Mix for Machine Placed Paving
I9/9/2022
03 3000
Mix Design
True Grit Redi Mix
0260.2301 4500 psi Concrete Mix for Hand Placed Paving
I9/9/2022
03 3000
Mix Design
True Grit Redi Mix
0265.2301 4500 psi Concrete Mix for Valley Gutters, Hand Placed Paving
I9/9/2022
03 3000
Mix Design
Wise Redi Mix
3678 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations
Asphalt Pavi4nr
I9/9/2022
32 1216
Mix Design
Austin Asphalt
FT5D137965 PG64-22 Type D Fine Surface
I9/9/2022
32 1216
Mix Design
Austin Asphalt
DA5D135965 PG64-22 Type D Fine Surface
I9/9/2022
32 12 16
Mix Design
Austin Asphalt
FT5B117965 PG64-22 Type B Fine Base
I9/9/2022
32 1216
Mix Design
Austin Asphalt
FT1B139965 PG64-22 Type B Fine Base
I9/9/2022
32 12 16
Mix Design
Austin Asphalt
FT1B117.2 PG64-22 Type B Fine Base
I9/9/2022
32 1216
Mix Design
Reynolds Asphalt
1901D PG64-22 Type D Fine Surface
I9/9/2022
32 12 16
Mix Design
Reynolds Asphalt
1112B PG64-22 Type B Fine Base
I9/9/2022
32 1216
Mix Design
Reynolds Asphalt
1612B PG64-22 Type B Fine Base
I9/9/2022
32 12 16
Mix Design
Sunmount Paving
341DV6422 PG64-22 Type D Fine Surface
I11/26/2022
32 1216
Mix Design
Surmount Paving
340DV6422 PG64-22 Type D Fine Surface
I12/5/2022
33 1216
Mix Design
Surmount Paving
3076BV6422 PG62-22 Type B Fine Base
I9/9/2022
32 1216
Mix Design
Surmount Paving
341-BRAP6422ERG PG64-22 Type B Fine Base
I9/9/2022
32 1216
Mix Design
TXBIT
37-211305-20 PG64-22 Type B Fine Base
I9/9/2022
32 1216
Mix Design
TXBIT
44-211305-17 PG64-22 Type B Fine Base
I9/9/2022
32 1216
Mix Design
TXBIT
211305 (1757) PG64-22 Type B Fine Base
I9/9/2022
32 1216
Mix Design
TXBIT
222475 (1857) PG64-22 Type D Fine Surface
I9/9/2022
32 1216
Mix Design
TXBIT
29-222475-19 PG64-22 Type D Fine Surface
I9/9/2022
32 1216
Mix Design
TXBIT
1-222475-20 PG64-22 Type D Fine Surface
I9/9/2022
32 1216
Mix Design
TXBIT
64-224125-18 PG70-22 Type D Fine Surface
I9/9/2022
32 1216
Mix Design
TXBIT
12-222475-19 PG64-22 Type D Fine Surface
I
Detectable Warm Surface
I9/9/2022
32 1320
DW1- Pavers
Pine Hall Brick (Winston Salem, NC)
Tactile Pavers
I9/9/2022
32 1320
DWS - Pavers
Western Brick Co. (Houston, TX)
Detectable Warning Pavers
19/9/2022
32 1320
DWS - Composite
Engineered Plastics, Inc. (Wrlliamsvtlle, Armor Tile
I9/9/2022
32 1320
DWS - Composite
ADA Solutions (Wilmington, MA)
Heritage Brick CIP Composite Paver
I4/7/2023
32 1320
DWS - Pavers
ADA Solutions (Wilmington, MA)
Detectable Warning Pavers
I
Silicone Joint Sealant
I9/9/2022
32 13 73
Joint Sealant
Dow
890SL - Cold Applied, Single Component, Silicone Joint Sealant
TM D5893
I9/9/2022
13 73
Joint Sealant
Tremco
900SL - Cold Applied, Single Component, Silicone Joint Sealant
TM D5893
I9/9/2022
�32
32 1373
Joint Sealant
Pecom
300SL - Cold Applied, Single Component, Silicone Joint Sealant
TM D5893
NTMD5893
I9/9/2022
32 13 73
Joint Sealant
Crafco
RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant
U *H Trench E�pet(�en �pII
I9/9/2022
33 OS 10
Embedment and
Silver Creek Materials
Utility Embedment Sand
ASTM C33
I9/9/2022
33 05 10
Embedment Sand
Crouch Materials
Utility Embedment Sand
ASTM C33
I9/9/2022
33 05 10
Embedment Sand
F and L Dirt Movers
Utility Embedment Sand
ASTM C33
I9/9/2022
33 05 10
Embedment Sand
F and L Dirt Movers
Utility Embedment Sand
ASTM C33
I9/9/2022
33 05 10
Embedment Sand
Tin Top Martin Marietta
Utility Embedment Sand
ASTM C33
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
Approval
Spec No.
STANDARD PRODUCTS LIST AS OF 06/27/2023
Classification Manufacturer
Model No.
National Spec
Framsi`` Cover and Grade Rings -Cast Iron** for Stormwater Structures
19/9/2022
33 05 13
Manhole Frames and Covers
Neena Foundry
32" Diameter Liftmate Water Manhole Gasketed Frame and Cover w/Longhom Logo, Model No. NF-1743LT66
19/9/2022
33 05 13
Manhole Frames and Covers
Neena Foundry
32" Diameter Liftmate Sanitary Sewer Manhole Frame and Cover w/Longhom Logo, Model No. NF-1743LT69
19/9/2022
33 05 13
Manhole Frames and Covers
SIP Industries
32" Diameter Fort Worth Sanitary Sewer Manhole Frame and Cover, Item No. NF-2280
19/9/2022
33 05 13
Manhole Frames and Covers
EJCO
Ergo XL Assembly 32" Diameter Sanitary Sewer Manhole Frame and Cover, Model No. 00148021LO10
19/9/2022
33 05 13
Manhole Frames and Covers
Neena Foundry
32" Diameter Liftmate Storm Sewer Junction Box and Manhole Frame and Cover w/Longhorn Logo, Model No. NF-1743LTXX
19/9/2022
3305 13
Manhole Frames and Covers
Neena Foundry
24" Diameter Liftmate Storm Sewer Inlet Manhole Frame and Cover w/Longhorn Logo, Model No. NF-1650LT61
I9/9/2022
3305 13
Manhole Frames and Covers
AccuCast (Govind Steel Company,
Ltd. 24" Diameter MHRC #220605 **
ASTM A48 AASHTO M306
19/9/2022
33 05 13
Manhole Cover
Neena Foundry
32" Diameter NF-1274-T91
ASTM A48 AASHTO M306
19/9/2022
3305 13
Manhole Frames and Covers
Neena Foundry
32" DiameterNF-1743-LM (Hinged)
ASTM A48 AASHTO M306
19/9/2022
33 05 13
Manhole Frame
Neena Foundry
32.25" Diameter NF-1930-30
ASTM A48 AASHTO M306
19/9/2022
33 05 13
Manhole Frames and Covers
Neena Foundry
32" DiameterNF-1743-HV
ASTM A48 AASHTO M306
I9/9/2022
33 05 13
Manhole Frames and Covers
SIP Industries
24" Diameter 2279ST>•<>•<
ASTM A48 AASHTO M306
19/9/2022
33 05 13
Manhole Frames and Covers
SIP Industries
32" Diameter 2280ST
ASTM A48 AASHTO M306
19/9/2022
33 05 13
Manhole Frames and Covers
EJCO
32.25" Diameter EJ1033 X2/A
ASTM A48 AASHTO M306
**Note: All
new development
and new installation manhole lids shall meet the minimum 30"opening requirement as specified in City Specification 33 0513. Any smaller opening sizes will only be allowed for existing manholes that require replacement frames and
covers.
Reinforced Concrete Storm Drain Pipe/Culverts
19/9/2022
3341 10
Precast Box Culverts
Forterm
Precast Box Culverts
19/9/2022
3341 10
Concrete Pipe Wyes and Bends Forterra
RCP Wye and Bends
19/9/2022
3349 10
Precast Box Culverts
Rinker Materials
Rinker Materials Reinforced Concrete Box Culvert ASTM C789, C850
ASTM C789, C850
19/9/2022
3349 10
Concrete Pipe
Rinker Materials
Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pipe ASTM C76, C655
ASTM C76, C655
19/9/2022
3341 10
Concrete Pipe
Forterra
Reinforced Concrete Pipe - Tongue and Groove +D48
Polypfopylene Storm Drain Pipe
19/9/2022
133 d� 13
1 Polypropylene Pipe
Advanced Drainage Systems, Inc.
HP Polypropylene Storm Drain Pipe
1+
Storm Drain
ianholes and Junction Boxes
19/9/2022
33 49 10
Stacked Manhole
Oldcastle
Precast 4' x 4' Stacked Manhole
ASTM C478
19/9/2022
3349 10
Junction Box
Oldcastle
Precast 5' x 8' Storm Junction Box
ASTM C478
19/9/2022
33 49 10
Junction Box
Oldcastle
Precast 4' x 4' Storm Junction Box
ASTM C478
19/9/2022
33 49 10
Junction Box
Oldcastle
Precast 5' x 5' Storm Junction Box
ASTM C478
19/9/2022
33 49 10
Junction Box
Oldcastle
Precast 6' x 6' Storm Junction Box
ASTM C478
19/9/2022
33 49 10
Junction Box
Oldcastle
Precast 8' x 8' Storm Junction Box Base
ASTM C478
19/9/2022
33 49 10
Junction Box
Oldcastle
Precast 5' x 8' Storm Junction Box Base
ASTM C478
19/9/2022
33 49 10
Junction Box
Cowtown Redi Mix
No. 260-2 6 Sack 3600 psi Concrete for Concrete Collars
ACI 318-14
19/9/2022
33 49 10
Manhole
Rinker Materials
Rinker Materials Reinforced 48" Diameter Spread Footing Manhole
ASTM C433
19/9/2022
33 49 10
Manhole Connector
Trelleborg Engineered Systems
Kor-N-Seal 106/406 Series Pipe to Manhole Connector
ASTM C923
19/9/2022
33 49 10
Junction Box
Forterm
4' x 4' FRT-4x4-409-PRECAST-BASE
ASTM C913
19/9/2022
33 49 10
Junction Box
Forterra
5' x 5' FRT-5x5-409-PRECAST-TOP
ASTM C913
19/9/2022
33 49 10
Junction Box
Forterm
5' x 5' FRT-5x5-409-PRECAST-BASE
ASTM C913
19/9/2022
33 49 10
Junction Box
Forterra
6' x 6' FRT-6x6-409-PRECAST-TOP
ASTM C913
19/9/2022
33 49 10
Junction Box
Forterm
6' x 6' FRT-6x6-409-PRECAST-BASE
ASTM C913
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
4'x 4' TPG-4x4-409-PRECAST TOP
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
4'x 4' TPG-4x4-409-PRECAST BASE
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
4'x 4' TPG-4x4-412-PRECAST 4-FT RISER
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
5 'x 5' TPG-5x5-410-PRECAST TOP
ASTM C615
19/9/2022
3349 10
Junction Box
Thompson Pipe Group
5 'x 5' TPG-5x5-410-PRECAST BASE
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
5'x 5' TPG-5x5-412-PRECAST 5-FT RISER
ASTM C615
19/9/2022
3349 10
Junction Box
Thompson Pipe Group
6'x 6' TPG-6x6-411-PRECAST TOP
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
6'x 6' TPG-6x6-411-PRECAST BASE
ASTM C615
19/9/2022
3349 10
Junction Box
Thompson Pipe Group
6 'x 6' TPG-6x6-412-PRECAST 6-FT RISER
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
7 'x 7' TPG-7x7-411-PRECAST TOP
ASTM C615
19/9/2022
3349 10
Junction Box
Thompson Pipe Group
7 'x 7' TPG-7x7-411-PRECAST BASE
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
7 'x 7' TPG-7x7-412-PRECAST 4-FT RISER
ASTM C615
19/9/2022
3349 10
Junction Box
Thompson Pipe Group
8 'x 8' TPG-8x8-411-PRECAST TOP
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
8 'x 8' TPG-8x8-411-PRECAST BASE
ASTM C615
19/9/2022
33 49 10
Junction Box
Thompson Pipe Group
8 'x 8' TPG-8x8-412-PRECAST 5-FT RISER
ASTM C615
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
Approval
Spec No.
STANDARD PRODUCTS LIST AS OF 06/27/2023
Classification Manufacturer
Model No.
National Spec
Storm Drain
Curb and Drop Inlets
19/9/2022
33 49 20
Curb Inlets
Forterra
1 O' x 3' FRT-1 00-405-PRECAST
ASTM C913
19/9/2022
33 49 20
Curb Inlets
Forterra
10' x 3' FRT-1 00-406-PRECAST
ASTM C913
19/9/2022
33 49 20
Curb Inlets
Forterra
10' x 4.5' FRT-lOx4-407-PRECAST
ASTM C913
19/9/2022
33 49 20
Curb Inlets
Forterra
10' x 4.5' FRT-lOx4-420-PRECAST
ASTM C913
19/9/2022
33 49 20
Junction Box
Forterra
4' x 4' FRT-4x4-409-PRECAST-TOP
ASTM C913
19/9/2022
33 49 20
Curb Inlet
Thompson Pipe Group
10' x 3' TPG-lOx3-405-PRECAST INLET
ASTM C615
19/9/2022
33 49 20
Curb Inlet
Thompson Pipe Group
15' x 3' TPG-15x3-405-PRECAST INLET
ASTM C615
19/9/2022
33 49 20
Curb Inlet
Thompson Pipe Group
20' x 3' TPG-20X3-405-PRECAST INLET
ASTM C615
19/9/2022
33 49 20
Drop Inlet
Thompson Pipe Group
4' x 4' TPG-4X4-408-PRECAST INLET
ASTM C615
19/9/2022
33 49 20
Drop Inlet
Thompson Pipe Group
5' x 5' TPG-5X5-408-PRECAST INLET
ASTM C615
19/9/2022
33 49 20
Drop Inlet
Thompson Pipe Group
6' x 6' TPG-6X6408-PRECAST INLET
ASTM C615