Loading...
HomeMy WebLinkAboutContract 59217-A1AMENDMENT NO.1 TO AGREEMENT CSC NO. 59217-A1 Fort Worth Convention Center — Phase 1 STATE OF TEXAS CITY SECRETARY CONTRACT NO. 59217 COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Hunt -Byrne -Smith, a Joint Venture of the City of Dallas, County of Dallas, State of Texas (Contractor) made and entered into City Secretary Contract No. 59217 (The Contract) which was authorized by the City Council by M&C 22-0971, the 12th day of September 2023, for City of Fort Worth's Convention Center Phase 1; and WHEREAS, further amendment is necessary to support contractors' ability to deliver against the additional scope of work for the Fort Worth Convention Center Phase 1 and related costs; and NOW THEREFORE, City and Contractor, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: Paragraph 7 of the contract is amended as follows: "The agreed upon estimated construction budget amounts shall be a total of not -to - exceed $73,000,000.00. These amounts include the City's "Owner's Contingency" (7.5%) for use by the OWNER only and any Savings, Contingency, Buy Out Savings and Allowances remaining at the end of construction will be retained by the OWNER. Notwithstanding anything herein to the contrary, the estimated budget amounts are not guaranteed by Contractor. Only the Guaranteed Maximum Price, once established via mutual agreement of the parties, will be guaranteed by the Contractor. Refer to Attachment A: Attachment A-1: CMAR General Liability Insurance Attachment A-2: CMAR Evidence of Commercial Property Insurance Attachment A-3: CMAR Payment & Performance Bonds Attachment A-4: City of Fort Worth Prevailing Wage Attachment A-5: Schedule OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY Standard Agreement for Professional Services AMENDMENT Revision Date: 3/20/2020 FT. WORTH, TX Page 1 of 2 Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth Dana Kah(O# ByDana Burghdoff2023 22:2'0 CDT) Name: Dana Burghdoff, AICP Title: Assistant City Manager Date: Sep 28, 2023 Approval Recommended: By: l ,)Z,( 4A - - Name: Ricardo Salazar II (Interim) Title: Director, Property Management Dept. ann Attest: 4� EORTaa o �o o9-�d0 o Clg o=d aaan>eza5 4a bnnuoa� By: Name: Jannette Goodall Title: City Secretary Contractor: Hunt -Byrne -Smith, A Joint Venture By: ---- Name: Robert F. Hart Title: President, Hunt Construction Group, Inc. Date: 9/20/23 City of Fort Worth, Texas Standard Agreement for Professional Services AMENDMENT Revision Date: 3/20/2020 Page 2 of 2 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: .. 4• 61" Name: Brian Glass Title: City Architect Approved as to Form and Legality: By: Name: John B. Strong Title: Assistant City Attorney Contract Authorization: M &C : 23-0768 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX (c) Prior to the expiration of the period of time that the written contract or written agreement requires such insurance be provided to the additional insured. (2) Only to the extent permitted by law; and (3) Will not be broader than that which you are required by the written contract or written agreement to provide for such additional insured. With respect to the insurance afforded to the person(s) or organization(s) that are additional insureds under this endorsement, the following additional exclusion applies: This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders, designs or specifications; or (2) Supervisory, inspection, architectural or engineering activities. The limits of insurance that apply to the additional insured shown in the Schedule are described in the Limits Of Insurance section. How this insurance applies when other insurance is available to the additional insured is described in the Other Insurance Condition in Section IV — Commercial General Liability Conditions, except as otherwise amended below. B. With respect to insurance provided to the person(s) or organization(s) that are additional insureds under this endorsement, the When You Add Others As An Additional Insured To This Insurance subparagraph, under the Other Insurance Condition of Section IV — Commercial General Liability Conditions is replaced with the following: When You Add Others As An Additional Insured To This Insurance (a) Primary Insurance When Required By Contract This insurance is primary if you have agreed in a written contract or written agreement that this insurance be primary. If other insurance is also primary, we will share with all that other insurance by the method described in Paragraph (c) below. This insurance does not apply to other insurance to which the additional insured in the Schedule has been added as an additional insured. (b) Primary And Non -Contributory To Other Insurance When Required By Contract This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured in the Schedule is a Named Insured under such other insurance; and (ii) You have agreed in a written contract or written agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured in the Schedule. (c) IMethod Of Sharing If all of the other insurance permits contribution by equal shares, we will follow this method also. Under this approach, each insurer contributes equal amounts until it has paid its applicable limit of insurance or none of the loss remains, whichever comes first. If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under this method, each insurer's share is based on the ratio of its applicable limit of insurance to the total applicable limits of insurance of all insurers. All other terms and conditions in the policy remain unchanged. Page 2 of 2 Form HS 24 80 07 13 POLICY NUMBER: 57CSEQU3251 COMMERCIAL GENERAL LIABILITY CG 20 37 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART Name Of Additional Insured Person(s) Or Organization(s) BLANKET WHERE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT SCHEDULE Location And Description Of Completed Operations Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 37 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 1 POLICY NUMBER: 57CSEQU3251 COMMERCIAL GENERAL LIABILITY CG 20 26 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - DESIGNATED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s): BLANKET WHERE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your acts or omissions or the acts or omissions of those acting on your behalf: 1. In the performance of your ongoing operations; or 2. In connection with your premises owned by or rented to you. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 26 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 1 POLICY NUMBER: 57CSEQU3251 COMMERCIAL GENERAL LIABILITY CG 20 28 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - LESSOR OF LEASED EQUIPMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s): BLANKET WHERE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, this insurance does not apply to any 'occurrence" which takes place after the equipment lease expires. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 28 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 1 Policy Number: 57CSEQU3251 The insurance afforded herein for any subsidiary not named in this Coverage Part as a named insured does not apply to injury or damage with respect to which such insured is also a named insured under another policy or would be a named insured under such policy but for its termination or the exhaustion of its limits of insurance. 3. Newly Acquired Or Formed Organization Any organization you newly acquire or form, other than a partnership, joint venture or limited liability company, and over which you maintain financial interest of more than 50% of the voting stock, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: a. Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, whichever is earlier; b. Coverage A does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization; and c. Coverage B does not apply to "personal and advertising injury" arising out of an offense committed before you acquired or formed the organization. 4. Nonowned Watercraft With respect to watercraft you do not own that is less than 51 feet long and is not being used to carry persons for a charge, any person is an insured while operating such watercraft with your permission. Any other person or organization responsible for the conduct of such person is also an insured, but only with respect to liability arising out of the operation of the watercraft, and only if no other insurance of any kind is available to that person or organization for this liability. However, no person or organization is an insured with respect to: a. "Bodily injury" to a co -"employee" of the person operating the watercraft; or b. "Property damage" to property owned by, rented to, in the charge of or occupied by you or the employer of any person who is an insured under this provision. 5. Additional Insureds When Required By Written Contract, Written Agreement Or Perm it The following person(s) or organization(s) are an additional insured when you have agreed, in a written contract, written agreement or because of a permit issued by a state or political subdivision, that such person or organization be added as an additional insured on your policy, provided the injury or damage occurs subsequent to the execution of the contract or agreement. A person or organization is an additional insured under this provision only for that period of time required by the contractor agreement. However, no such person or organization is an insured under this provision if such person or organization is included as an insured by an endorsement issued by us and made a part of this Coverage Part. a. Vendors Any person(s) or organization(s) (referred to below as vendor), but only with respect to "bodily injury" or "property damage" arising out of "your products" which are distributed or sold in the regular course of the vendor's business and only if this Coverage Part provides coverage for "bodily injury" or "property damage" included within the "products -completed operations hazard". (1) The insurance afforded the vendor is subject to the following additional exclusions: This insurance does not apply to: (a) "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the absence of the contract or agreement; (b) Any express warranty unauthorized by you; (c) Any physical or chemical change in the product made intentionally by the vendor; (d) Repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container; (e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products; (f) Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; (g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or Page 12 of 21 HG 00 01 09 16 Policy Number: 57CSEQU3251 (h) "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: (i) The exceptions contained in Sub- paragraphs (d) or (f); or (ii) Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. (2) This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing such products. b. Lessors Of Equipment (1) Any person(s) or organization(s) from whom you lease equipment; but only with respect to their liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). (2) With respect to the insurance afforded to these additional insureds this insurance does not apply to any "occurrence" which takes place after the equipment lease expires. c. Lessors Of Land Or Premises Any person or organization from whom you lease land or premises, but only with respect to liability arising out of the ownership, maintenance or use of that part of the land or premises leased to you. With respect to the insurance afforded these additional insureds the following additional exclusions apply: This insurance does not apply to: 1. Any "occurrence" which takes place after you cease to lease that land; or 2. Structural alterations, new construction or demolition operations performed by or on behalf of such person or organization. d. Architects, Engineers Or Surveyors Any architect, engineer, or surveyor, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your acts or omissions or the acts or omissions of those acting on your behalf: (1) In connection with your premises; or (2) In the performance of your ongoing operations performed by you or on your behalf. With respect to the insurance afforded these additional insureds, the following additional exclusion applies: This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of or the failure to render any professional services by or for you, including: 1. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or 2. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional services by or for you. e. Permits Issued By State Or Political Subdivisions Any state or political subdivision, but only with respect to operations performed by you or on your behalf for which the state or political subdivision has issued a permit. With respect to the insurance afforded these additional insureds, this insurance does not apply to: (1) "Bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the state or municipality; or (2) "Bodily injury" or "property damage" included within the "products -completed operations hazard". f. Any Other Party Any other person or organization who is not an additional insured under Paragraphs a. through e. above, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your acts or omissions or the acts or omissions of those acting on your behalf: (1) In the performance of your ongoing operations; HG 00 01 09 16 Page 13 of 21 Policy Number: 57CSEQU3251 (2) In connection with your premises owned by or rented to you; or (3) In connection with "your work" and included within the "products -completed operations hazard", but only if (a) The written contract or agreement requires you to provide such coverage to such additional insured; and (b) This Coverage Part provides coverage for "bodily injury" or "property damage" included within the "products - completed operations hazard". However: (1) The insurance afforded to such additional insured only applies to the extent permitted by law; and (2) If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. With respect to the insurance afforded to these additional insureds, this insurance does not apply to: "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the 'occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional services by or for you. The limits of insurance that apply to additional insureds is described in Section III - Limits Of Insurance. How this insurance applies when other insurance is available to the additional insured is described in the Other Insurance Condition in Section IV - Commercial General Liability Conditions. No person or organization is an insured with respect to the conduct of any current or past partnership, joint venture or limited liability company that is not shown as a Named Insured in the Declarations. SECTION III - LIMITS OF INSURANCE 1. The Most We Will Pay The Limits of Insurance shown in the Declarations and the rules below fix the most we will pay regardless of the number of: a. Insureds; b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits". 2. General Aggregate Limit The General Aggregate Limit is the most we will pay for the sum of: a. Medical expenses under Coverage C; b. Damages under Coverage A, except damages because of "bodily injury" or "property damage" included in the "products - completed operations hazard"; and c. Damages under Coverage B. 3. Products -Completed Operations Aggregate Limit The Products -Completed Operations Aggregate Limit is the most we will pay under Coverage A for damages because of "bodily injury" and "property damage" included in the "products - completed operations hazard". 4. Personal And Advertising Injury Limit Subject to 2. above, the Personal and Advertising Injury Limit is the most we will pay under Coverage B for the sum of all damages because of all "personal and advertising injury" sustained by any one person or organization. 5. Each Occurrence Limit Subject to 2. or 3. above, whichever applies, the Each Occurrence Limit is the most we will pay for the sum of: a. Damages under Coverage A; and b. Medical expenses under Coverage C because of all "bodily injury" and "property damage" arising out of any one 'occurrence". 6. Damage To Premises Rented To You Limit Subject to 5. above, the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, while rented to you, or in the case of damage by fire, lightning or explosion, while rented to you or temporarily occupied by you with permission of the owner. Page 14 of 21 HG 00 01 09 16 Policy Number: 57CSEQU3251 (3) Any manager, if you or the additional insured is a limited liability company; (4) Any "executive officer" or insurance manager, if you or the additional insured is a corporation; (5) Any trustee, if you or the additional insured is a trust; or (6) Any elected or appointed official, if you or the additional insured is a political subdivision or public entity. This duty applies separately to you and any additional insured. 3. Legal Action Against Us No person or organization has a right under this Coverage Part: a. To join us as a party or otherwise bring us into a "suit" asking for damages from an insured; or b. To sue us on this Coverage Part unless all of its terms have been fully complied with. A person or organization may sue us to recover on an agreed settlement or on a final judgment against an insured; but we will not be liable for damages that are not payable under the terms of this Coverage Part or that are in excess of the applicable limit of insurance. An agreed settlement means a settlement and release of liability signed by us, the insured and the claimant or the claimant's legal representative. 4. Other Insurance If other valid and collectible insurance is available to the insured for a loss we cover under Coverages A or B of this Coverage Part, our obligations are limited as follows: a. Primary Insurance This insurance is primary except when b. below applies. If other insurance is also primary, we will share with all that other insurance by the method described in c. below. b. Excess Insurance This insurance is excess over any of the other insurance, whether primary, excess, contingent or on any other basis: (1) Your Work That is Fire, Extended Coverage, Builder's Risk, Installation Risk or similar coverage for "your work"; (2) Premises Rented To You That is fire, lightning or explosion insurance for premises rented to you or temporarily occupied by you with permission of the owner; (3) Tenant Liability That is insurance purchased by you to cover your liability as a tenant for "property damage" to premises rented to you or temporarily occupied by you with permission of the owner; (4) Aircraft, Auto Or Watercraft If the loss arises out of the maintenance or use of aircraft, "autos" or watercraft to the extent not subject to Exclusion g. of Section I - Coverage A - Bodily Injury And Property Damage Liability; (5) Property Damage To Borrowed Equipment Or Use Of Elevators If the loss arises out of "property damage" to borrowed equipment or the use of elevators to the extent not subject to Exclusion j. of Section I - Coverage A - Bodily Injury And Property Damage Liability; (6) When You Are Added As An Additional Insured To Other Insurance Any other insurance available to you covering liability for damages arising out of the premises or operations, or products and completed operations, for which you have been added as an additional insured by that insurance; or (7) When You Add Others As An Additional Insured To This Insurance Any other insurance available to an additional insured. However, the following provisions apply to other insurance available to any person or organization who is an additional insured underthis coverage part. (a) Primary Insurance When Required By Contract This insurance is primary if you have agreed in a written contract or written agreement that this insurance be primary. If other insurance is also primary, we will share with all that other insurance by the method described in c. below. (b) Primary And Non -Contributory To Other Insurance When Required By Contract If you have agreed in a written contract, written agreement, or permit that this insurance is primary and non- contributory with the additional insured's own insurance, this insurance is primary and we will not seek contribution from that other insurance. Page 16 of 21 HG 00 01 09 16 Policy Number: 57CSEQU3251 Paragraphs (a) and (b) do not apply to other insurance to which the additional insured has been added as an additional insured. When this insurance is excess, we will have no duty under Coverages A or B to defend the insured against any "suit" if any other insurer has a duty to defend the insured against that "suit". If no other insurer defends, we will undertake to do so, but we will be entitled to the insured's rights against all those other insurers. When this insurance is excess over other insurance, we will pay only our share of the amount of the loss, if any, that exceeds the sum of: (1) The total amount that all such other insurance would pay for the loss in the absence of this insurance; and (2) The total of all deductible and self -insured amounts under all that other insurance. We will share the remaining loss, if any, with any other insurance that is not described in this Excess Insurance provision and was not bought specifically to apply in excess of the Limits of Insurance shown in the Declarations of this Coverage Part. c. Method Of Sharing If all of the other insurance permits contribution by equal shares, we will follow this method also. Under this approach each insurer contributes equal amounts until it has paid its applicable limit of insurance or none of the loss remains, whichever comes first. If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under this method, each insurer's share is based on the ratio of its applicable limit of insurance to the total applicable limits of insurance of all insurers. 5. Premium Audit a. We will compute all premiums for this Coverage Part in accordance with our rules and rates. b. Premium shown in this Coverage Part as advance premium is a deposit premium only. At the close of each audit period we will compute the earned premium for that period and send notice to the first Named Insured. The due date for audit and retrospective premiums is the date shown as the due date on the bill. If the sum of the advance and audit premiums paid for the policy period is greater than the earned premium, we will return the excess to the first Named Insured. c. The first Named Insured must keep records of the information we need for premium computation, and send us copies at such times as we may request. 6. Representations a. When You Accept This Policy By accepting this policy, you agree: (1) The statements in the Declarations are accurate and complete; (2) Those statements are based upon representations you made to us; and (3) We have issued this policy in reliance upon your representations. b. Unintentional Failure To Disclose Hazards If unintentionally you should fail to disclose all hazards relating to the conduct of your business that exist at the inception date of this Coverage Part, we shall not deny coverage under this Coverage Part because of such failure. 7. Separation Of Insureds Except with respect to the Limits of Insurance, and any rights or duties specifically assigned in this Coverage Part to the first Named Insured, this insurance applies: a. As if each Named Insured were the only Named Insured; and b. Separately to each insured against whom claim is made or "suit" is brought. 8. Transfer Of Rights Of Recovery Against Others To Us a. Transfer Of Rights Of Recovery If the insured has rights to recover all or part of any payment, including Supplementary Payments, we have made under this Coverage Part, those rights are transferred to us. The insured must do nothing after loss to impair them. At our request, the insured will bring "suit" or transfer those rights to us and help us enforce them. b. Waiver Of Rights Of Recovery (Waiver Of Subrogation) If the insured has waived any rights of recovery against any person or organization for all or part of any payment, including Supplementary Payments, we have made under this Coverage Part, we also waive that right, provided the insured waived their rights of recovery against such person or organization in a contract, agreement or permit that was executed prior to the injury or damage. 9. When We Do Not Renew If we decide not to renew this Coverage Part, we will mail or deliver to the first Named Insured shown in the Declarations written notice of the HG 00 01 09 16 Page 17 of 21 POLICY NUMBER: 57UENQU3252 COMMERCIAL AUTO CA20481013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: THE HUNT CORPORATION Endorsement Effective Date: 9/1/2023 SCHEDULE Name Of Person(s) Or Organization(s): IF ANY Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.I. of Section II — Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I — Covered Autos Coverages of the Auto Dealers Coverage Form. CA 20 48 10 13 © Insurance Services Office, Inc., 2011 Page 1 of 1 Policy Number: 57UENQU3252 F THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED AND RIGHTS OF RECOVERY AGAINST OTHERS This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM A. Any person or organization whom you are required by contract to name as additional insured is an "insured" for LIABILITY COVERAGE but only to the extent that person or organization qualifies as an "insured" under the WHO IS AN INSURED provision of Section II - LIABILITY COVERAGE. B. For any person or organization for whom you are required by contract to provide a waiver of subrogation, the Loss Condition - TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US is applicable. Form HA 99 13 01 87 Printed in U.S.A. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT Policy Number: 57WEQU3250 Endorsement Number: 23 Effective Date: 9/1/2023 Effective hour is the same as stated on the Information Page of the policy. Named Insured and Address: THE HUNT CORPORATION 7720 N 16TH ST, SUITE 100 PHOENIX, AZ 85020 We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. SCHEDULE ANY PERSON OR ORGANIZATION FROM WHOM YOU ARE REQUIRED BY CONTRACT OR AGREEMENT TO OBTAIN THIS WAIVER FROM US. ENDORSEMENT IS NOT APPLICABLE IN KY, NH, NJ OR ANY MO CONSTRUCTION RISK. Countersigned by --?� Authorized Representative Form WC 00 03 13 Printed in U.S.A. Process Date: Policy Expiration Date: THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT - CALIFORNIA Policy Number: 57WEQU3250 Endorsement Number: 24 Effective Date: 9/1 /2023 Effective hour is the same as stated on the Declarations of the policy. Named Insured and Address: THE HUNT CORPORATION 7720 N 16TH ST, SUITE 100 PHOENIX, AZ 85020 We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule. The additional premium for this endorsement shall be 2.0 % of the California workers' compensation premium otherwise due on such remuneration. SCHEDULE Person or Organization Job Description ANY PERSON OR ORGANIZATION FROM WHOM YOU ARE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT TO OBTAIN THIS WAIVER OF RIGHTS FROM US. Countersigned by Authorized Representative Form WC 04 03 06 Printed in U.S.A. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT Policy Number: 57WEQU3250 Endorsement Number: 25 Effective Date: 9/1/2023 Effective hour is the same as stated on the Information Page of the policy. Named Insured and Address: THE HUNT CORPORATION 7720 N 16TH ST, SUITE 100 PHOENIX, AZ 85020 This endorsement applies only to the insurance of the operations described in the Schedule where provided by the policy because Texas is shown in you are required by a written contract to obtain this Item 3.A. of the Information Page. waiver from us. We have the right to recover our payments from This endorsement shall not operate directly or anyone liable for an injury covered by this policy. We indirectly to benefit anyone not named in the will not enforce our right against the person or Schedule. organization named in the Schedule, but this waiver The premium for this endorsement is shown in the applies only with respect to bodily injury arising out Schedule. Schedule 1. ( ) Special Waiver Name of person or organization (x) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: ALL TEXAS OPERATIONS 3. Premium: INCLUDED The premium charge for this endorsement shall be 2.0 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: INCLUDED Form WC 42 03 04 B Printed in U.S.A. Process Date: Policy Expiration Date: THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. UTAH WAIVER OF SUBROGATION ENDORSEMENT Policy Number: 57WEQU3250 Endorsement Number: 26 Effective Date: 9/1/2023 Effective hour is the same as stated on the Information Page of the policy. Named Insured and Address: THE HUNT CORPORATION 7720 N 16TH ST, SUITE 100 PHOENIX, AZ 85020 This endorsement applies only to the insurance provided by the policy because Utah is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) Schedule This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Our waiver of rights does not release your employees' rights against third parties and does not release our authority as trustee of claims against third parties. ANY PERSON OR ORGANIZATION FROM WHOM YOU ARE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT TO OBTAIN THIS WAIVER OF RIGHTS FROM US. Countersigned by Authorized Representative Form WC 43 03 05 Printed in U.S.A. AMENDMENT 1 ATTACHMENT A-2 DATE(MM/DD/YYYY) Ac"J? o EVIDENCE OF COMMERCIAL PROPERTY INSURANCE 09/15/2023 THIS EVIDENCE OF COMMERCIAL PROPERTY INSURANCE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE ADDITIONAL INTEREST NAMED BELOW. THIS EVIDENCE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS EVIDENCE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE ADDITIONAL INTEREST. rrtuuuu.rt..AME, I PHONE I COMPANY NAME AND ADDRESS NAIC NO: CONTACT PERSON AND ADDRESS (A/C. No. Ext): Insurance Partners Inc. Indian Harbor Insurance Company 25043 Network Place 2450 S Tibbs Ave Indianapolis FAX (A/C, No): CODE: AGENCY 00002778 CUSTOMER ID #: NAMED INSURED AND ADDRESS Hunt Construction Group, Inc. (Fort Worth Convention Center) Indianapolis ADDITIONAL NAMED INSURED(S) PROPERTY INFORMATION LOCATION / DESCRIPTION E-MAIL casey.nix@aecom.com ADDRESS: I SUB CODE: IN 46241 Chicago IL 60673 IF MULTIPLE COMPANIES, COMPLETE SEPARATE FORM FOR EACH POLICY TYPE Installation/Builder Risk LOAN NUMBER POLICY NUMBER US00070282CA23A 2450 S. Tibbs Avenue EFFECTIVE DATE EXPIRATION DATE CONTINUED UNTIL IN 46241 08/01/2023 12/31/2024 n TERM I NATED IF CHECKED THIS REPLACES PRIOR EVIDENCE DATED: (ACORD 101 may be attached if more space is required) ❑ BUILDING OR ❑ BUSINESS PERSONAL PROPERTY 1201 Houston Street Fort Worth TX 76102 THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS EVIDENCE OF PROPERTY INSURANCE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. COVERAGE INFORMATION PERILS INSURED I I BASIC I I BROAD I XI SPECIAL I COMMERCIAL PROPERTY COVERAGE AMOUNT OF INSURANCE: $ 30,000,000 DED: 25,000 YES NO N/A ❑ BUSINESS INCOME ❑ RENTAL VALUE If YES, LIMIT. I I Actual Loss Sustained; # of months: BLANKET COVERAGE If YES, indicate value(s) reported on property identified above: $ TERRORISM COVERAGE X Attach Disclosure Notice / DEC IS THERE ATERRORISM-SPECIFIC EXCLUSION? X IS DOMESTIC TERRORISM EXCLUDED? X LIMITED FUNGUS COVERAGE If YES, LIMIT: DED: FUNGUS EXCLUSION (If "YES", specify organization's form used) REPLACEMENT COST X AGREED VALUE X COINSURANCE X If YES, EQUIPMENT BREAKDOWN (If Applicable) X If YES, LIMIT: DED: ORDINANCE OR LAW - Coverage for loss to undamaged portion of bldg If YES, LIMIT: DED: Demolition Costs X If YES, LIMIT: 25,000,000 DED: Incr. Cost of Construction X If YES, LIMIT: 25,000,000 DED: EARTH MOVEMENT (If Applicable) X If YES, LIMIT. 30,000,000 DED: 50,000 FLOOD (If Applicable) X If YES, LIMIT: 30,000,000 DED: 25,000 WIND / HAIL INCL ❑ YES ❑ NO Subject to Different Provisions: If YES, LIMIT: DED: NAMED STORM INCL ❑ YES ❑ NO Subject to Different Provisions: X If YES, LIMIT: 30,000,000 DED: 50,000 PERMISSION TO WAIVE SUBROGATION IN FAVOR OF MORTGAGE HOLDER PRIOR TO LOSS CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ADDITIONAL INTEREST CONTRACT OF SALE LENDER'S LOSS PAYABLE LOSS PAYEE LENDER SERVICING AGENT NAME AND ADDRESS MORTGAGEE u NAME AND ADDRESS City of Fort Worth 1000 Throckmorton Street AUTHORIZED REPRESENTATIVE Fort Worth TX 76102 (Ytl� @ 2003-2015 ACORD CORPORATION. All rights reserved. ACORD 28 (2016/03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: 00002778 LOC #: `"� ADDITIONAL REMARKS SCHEDULE AGENCY NAMED INSURED Insurance Partners Inc. Hunt/Byrne/Smith, a Joint Venture POLICY NUMBER CARRIER NAIC CODE EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 28 FORM TITLE: Evidence of Commercial Property Insurance: Notes Water Damage other than Flood - Included Property in Transit/Temporary Storage - $2,500,000 Page of ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD AMENDMENT 1 ATTACHMENT A-3 Document A312TM - 2010 Conforms with The American Institute of Architects AIA Document 312 Performance Bond CONTRACTOR: (Name, legal status and address) Hunt/Byrne/Smith, a Joint Venture 13355 Noel Road, Suite 400 Dallas, TX 75240 OWNER: (Name, legal status and address) City of Fort Worth Texas 200 Texas Street Fort Worth, TX 76102 CONSTRUCTION CONTRACT Date: March 23, 2023 Amount:. $30,000,000.00 Description: (Name and location) BOND Date: September 6, 2023 (Not earlier than Construction Contract Date) Amount: $30,000,000.00 Bond Number: 024268013, 022231253 SURETY: (Name, legal status and principal place of business) Liberty Mutual Insurance Company 175 Berkeley Street Boston, MA 02116 State of Inc: Massachusetts Fort Worth Convention Center - Phase 1 1201 Houston Street Fort Worth, TX 76102 Modifications to this Bond: F✓ None 0 See Section 16 CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Cor or to Seal) Hunt/Byrne/S ' h, a Joint Ventu a LibertZMuu Insur n Company ?Z&Signature Signature: Name ry � EI S, Assistant SMet&me a, Attorney -in -Fact And T tiol siConstruction Group, Inc. (Any And Title: ad itnagnatures appear on the last page of this Performance Bond) (FOR INFORMATION ONLY— lypete address and telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE: Marsh (Architect, Engineer or other party:) Marsh Risk & Insurance Services 17901 Von Karman Ave., Suite 1100 Irvine, CA 92614-5246 This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. § 1 The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. § 2 If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except when applicable to participate in a conference as provided in Section 3. § 3 If there is no Owner Default under the Construction Contract, the Surety's obligation under this Bond shall arise after .1 the Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring a Contractor Default. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor and Surety to discuss the Contractor's performance. If the Owner does not request a conference, the Surety may, within five (5) business days after receipt of the Owner's notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend. Unless the Owner agrees otherwise, any conference requested under this Section 3.1 shall be held within ten (10) business days of the Surety's receipt of the Owner's notice. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default; .2 the Owner declares a Contractor Default, terminates the Construction Contract and notifies the Surety; and .3 the Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Construction Contract. § 4 Failure on the part of the Owner to comply with the notice requirement in Section 3.1 shall not constitute a failure to comply with a condition precedent to the Surety's obligations, or release the Surety from its obligations, except to the extent the Surety demonstrates actual prejudice. § 5 When the Owner has satisfied the conditions of Section 3, the Surety shall promptly and at the Surety's expense take one of the following actions: § 5.1 Arrange for the Contractor, with the consent of the Owner, to perform and complete the Construction Contract; § 5.2 Undertake to perform and complete the Construction Contract itself, through its agents or independent contractors; § 5.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and a contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Section 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the Contractor Default; or § 5.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner; or .2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial. § 6 If the Surety does not proceed as provided in Section 5 with reasonable promptness, the Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Section 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. § 7 If the Surety elects to act under Section 5.1, 5.2 or 5.3, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication, for .1 the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; .2 additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Section 5; and .3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. § 8 If the Surety elects to act under Section 5.1, 5.3 or 5.4, the Surety's liability is limited to the amount of this Bond. § 9 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors and assigns. § 10 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. § 11 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after a declaration of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. § 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. § 13 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. § 14 Definitions § 14.1 Balance of the Contract Price. The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made. including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract. § 14.2 Construction Contract. The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and changes made to the agreement and the Contract Documents. § 14.3 Contractor Default. Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material term of the Construction Contract. § 14.4 Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. § 14.5 Contract Documents. All the documents that comprise the agreement between the Owner and Contractor. § 15 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. § 16 Modifications to this bond are as follows: (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) Signature: Signature: Name and Title: Name and Title: Address Address CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of Oranqe ) On SEP 0 6 2023 before me, Kathv R. Mair, Notary Public , DATE [Name of Notary Public and Title "Notary Public'] personally appeared MvHua---------------------------------------------- (Name s) of Signer(s)' who proved to me on the basis of satisfactory evidence to be the person(-&) whose name(s) is/a-re subscribed to the within instrument and acknowledged to me that he/she/they executed the same in h+s/her/the# authorized capacity(ie-&), and that by his/her/ signatureW on the instrument the person(-&), or the entity upon behalf of which the person(-&) acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. KATHY R. MAIR Notary Public - California Orange County_ Commission : 2355508 Expires May 22, 2025 l Place Notary Seal Above ---------------------------------------------- OPTIONAL MNA 1 Signature of Nota Public Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: My Hua ❑ Corporate Officer - Title(s): ❑ Partner - ❑ Limited ❑ General ❑ Individual ® Attorney -in -Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Number of Pages: Signer's Name: ❑ Corporate Officer - Title(s): ❑ Partner - ❑ Limited ❑ General ❑ Individual ❑ Attorney -in -Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer is Representing: This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Liberty Mutual Insurance Company Mutual The Ohio Casualty Insurance Company Certificate No: 8208696-024017 SURETY West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Tenzer V. Cunningham; Sokha Evans; Martha Gonzales; My Hua; Mechelle Larkin; Kathy R. Mair; Jeffrey Strassner; Brenda Wong all of the city of Los Angeles state of CA each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 7th day of September 2022 Liberty Mutual Insurance Company P� 1NS(J P�.14 INS& d %NSupq The Ohio Casualty Insurance Company r°oaPo"La,oyr°oaPOR�y� P� oRPOR'%0 West American Insurance Company 1912 0 0 1919 0 lu 1991 0 vi >s qo o viE Ydd �BACNUS�.aa yONANPB�`,dL 'rye �NorAxr aa3 r •D V �h * *� �'yl * l �M * ►�a By. m David M. Carey, Assistant Secretary 01c .~ M State of PENNSYLVANIA � ss County of MONTGOMERY o � On this 7th day of September 2022 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance C000 f Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes c a) > therein contained by signing on behalf of the corporations by himself as a duly authorized officer. > IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. Q 5 c� co 9P PAS,. d O O ` Q�G KONwE F( Commonwealth of Pennsylvania . Notary Seal �2 to °q<a y Teresa Paslella, Notary Publ'c y '� w ~ u Montgomery County �� ®� � E O OF My commission expires March 28, 2025 B % 44't C M �P Commission number 1126W y' s_ CD.. 'L �P��G Member Pennsylvan a Association of Notaries Teresa Paslella, Notary Public Q o � or v It 04 This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual 3 o .6 Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: d C14 i ARTICLE IV —OFFICERS: Section 12. Power of Attorney. `o 0 L_ Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President v may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and allCa > undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full -0 Co power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall o a> o Z be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this - m article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. t� o. ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in - fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this day of S E P 0 6 2023 - Pv 1Nsu P�11 INS& %NSURNX •9 tiJ o°aPo�r y0 �iJ c,°�oRyr'4gy `4P 4oµP0ryaT 'p0 1912 n c 1919 1991 0 ! t d� �9ACHU8aa y°Z"ANP'a�o �s '"D1pN° as By Renee C. Llewellyn, Assistant Secretary r 1 LMS-12873 LMIC OCIC WAIC Mulb Co 02/21 Liberty. Mutual. SURETY Important Notice TO OBTAIN INFORMATION OR TO MAKE A COMPLAINT: You may write to Liberty Mutual Surety at: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httD://www.tdi.state.tx.us E-mail: ConsumerProtection &tdi.state.tx.us Premium or Claim Disputes Should you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. Attach This Notice To Your Policy: This notice is for information only and does not become a part or condition of the attached document. LMIC-3500 Rev. 7.1.07 Document A312TM - 2010 Conforms with The American Institute of Architects AIA Document 312 Payment Bond Bond Number: 024268013, 022231253 CONTRACTOR: (Name, legal status and address) Hunt/Byrne/Smith, a Joint Venture 13355 Noel Road, Suite 400 Dallas, TX 75240 OWNER: (Name, legal status and address) City of Fort Worth Texas 200 Texas Street Fort Worth, TX 76102 CONSTRUCTION CONTRACT Date: March 23, 2023 Amount: $30,000,000.00 Description: (Name and location) Fort Worth Convention Center - Phase 1 1201 Houston Street Fort Worth, TX 76102 BOND Date: September 6, 2023 (Not earlier than Construction Contract Date) Amount: Modifications to this Bond: $30,000,000.00 SURETY: (Name, legal status and principal place of business) Liberty Mutual Insurance Company 175 Berkeley Street Boston, MA 02116 State of Inc: Massachusetts None = See Section 18 CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: Hunt/Byrne/Smith, a Joint Venture Signatu Signature: Nam hem ins, Assistant SecretiaTayne And Ti r - nt Construction Group, Inc. And Title: (Any additional signatures appear on the last page of this Payment Bond) This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. My Hua, Attornay-in-Faci (F0,0JNFr'ORMATION OZYLY.—_NgLner address and telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE: Marsh Risk & Insurance Services 17901 Von Karman Ave., Suite 1100 (Architect, Engineer or other party:) Irvine, CA 92614-5246 § 1 The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein by reference, subject to the following terms. § 2 If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Construction Contract, then the Surety and the Contractor shall have no obligation under this Bond. § 3 If there is no Owner Default under the Construction Contract, the Surety's obligation to the Owner under this Bond shall arise after the Owner has promptly notified the Contractor and the Surety (at the address described in Section 13) of claims, demands, liens or suits against the Owner or the Owner's property by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Construction Contract and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety. § 4 When the Owner has satisfied the conditions in Section 3, the Surety shall promptly and at the Surety's expense defend, indemnify and hold harmless the Owner against a duly tendered claim, demand, lien or suit. § 5 The Surety's obligations to a Claimant under this Bond shall arise after the following: § 5.1 Claimants, who do not have a direct contract with the Contractor, .1 have furnished a written notice of non-payment to the Contractor, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were, or equipment was, furnished or supplied or for whom the labor was done or performed, within ninety (90) days after having last performed labor or last furnished materials or equipment included in the Claim; and .2 have sent a Claim to the Surety (at the address described in Section 13). § 5.2 Claimants, who are employed by or have a direct contract with the Contractor, have sent a Claim to the Surety (at the address described in Section 13). § 6 If a notice of non-payment required by Section 5.1.1 is given by the Owner to the Contractor, that is sufficient to satisfy a Claimant's obligation to furnish a written notice of non-payment under Section 5.1.1. § 7 When a Claimant has satisfied the conditions of Sections 5.1 or 5.2, whichever is applicable, the Surety shall promptly and at the Surety's expense take the following actions: § 7.1 Send an answer to the Claimant, with a copy to the Owner, within sixty (60) days after receipt of the Claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed; and § 7.2 Pay or arrange for payment of any undisputed amounts. § 7.3 The Surety's failure to discharge its obligations under Section 7.1 or Section 7.2 shall not be deemed to constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, except as to undisputed amounts for which the Surety and Claimant have reached agreement. If, however, the Surety fails to discharge its obligations under Section 7.1 or Section 7.2, the Surety shall indemnify the Claimant for the reasonable attorney's fees the Claimant incurs thereafter to recover any sums found to be due and owing to the Claimant. § 8 The Surety's total obligation shall not exceed the amount of this Bond, plus the amount of reasonable attorney's fees provided under Section 7.3, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. § 9 Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any construction performance bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and Surety under this bond, subject to the Owner's priority to use the funds for the completion of the work. § 10 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for the payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligation to make payments to, or give notice on behalf of, Claimants or otherwise have any obligations to Claimants under this Bond. § 11 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. § 12 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the state in which the project that is the subject of the Construction Contract is located or after the expiration of one year from the date (1) on which the Claimant sent a Claim to the Surety pursuant to Section 5.1.2 or 5.2, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. § 13 Notice and Claims to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. Actual receipt of notice or Claims, however accomplished, shall be sufficient compliance as of the date received. § 14 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. § 15 Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor and Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made. § 16 Definitions § 16.1 Claim. A written statement by the Claimant including at a minimum: .1 the name of the Claimant; .2 the name of the person for whom the labor was done, or materials or equipment furnished; .3 a copy of the agreement or purchase order pursuant to which labor, materials or equipment was furnished for use in the performance of the Construction Contract; .4 a brief description of the labor, materials or equipment furnished; .5 the date on which the Claimant last performed labor or last furnished materials or equipment for use in the performance of the Construction Contract; .6 the total amount earned by the Claimant for labor, materials or equipment furnished as of the date of the Claim; .7 the total amount of previous payments received by the Claimant; and .8 the total amount due and unpaid to the Claimant for labor, materials or equipment furnished as of the date of the Claim. § 16.2 Claimant. An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to Furnish labor, materials or equipment for use in the performance of the Construction Contract. The term Claimant also includes any individual or entity that has rightfully asserted a claim under an applicable mechanic's lien or similar statute against the real property upon which the Project is located. The intent of the Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished. § 16.3 Construction Contract. The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and all changes made to the agreement and the Contract Documents. § 16.4 Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. § 16.5 Contract Documents. All the documents that comprise the agreement between the Owner and Contractor. § 17 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. § 18 Modifications to this bond are as follows: (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) Signature: Signature: Name and Title: Name and Title: Address Address CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of Orange ) On SEP 0 6 2023 before me, Kathv R. Mair, Notary Public DATE [Name of Notary Public and Title "Notary Public"' personally appeared MvHua---------------------------------------------, [Name(s) of Signer(s)) who proved to me on the basis of satisfactory evidence to be the person(-&) whose name(-s) is/a-Fe subscribed to the within instrument and acknowledged to me that he/she/they executed the same in J4&/her/th4_* authorized capacity(ires), and that by 4is/hedthe# signature(&) on the instrument the person(&), or the entity upon behalf of which the person(-&) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. KATHY R. MAIR "k �� Notary Public - California 140 +t - Orange County \\\\. - ., Commission M 2355508 2 [ �y Comm. Exaires May 22. 2025 v Signature of No ry Public Place Notary Seal Above ---------------------------------------------- OPTIONAL -------------------------------------- Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: My Hua ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ® Attorney -in -Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Number of Pages: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney -in -Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer is Representing: This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Liberty Mutual Insurance Company Mutual The Ohio Casualty Insurance Company Certificate No: 8208696-024017 SURETY West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Tenzer V. Cunningham; Sokha Evans; Martha Gonzales; My Hua; Mechelle Larkin; Kathy R. Mair; Jeffrey Strassner; Brenda Wong all of the city of Los Angeles state of CA each individually if there be more than one named, its true and lawful attomey-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations. in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 7th day of September 2022 Liberty Mutual Insurance Company [Nsuq �tY INS& d tNSUq The Ohio Casualty Insurance Company West American Insurance Company J3 got° Q3 Foc+ �3 bt° 2 1912 - c 1919 0 2 1991 Y ;Z8 g 3 y O Q O fn E dp1 sACHUs�a� yNAN°8� ifs IA14 ,aa r G 'G) U ei7 * >,� �yl * tt� �,p « *� By. io ruu David M. Carey, Assistant Secretary C Y M State of PENNSYLVANIA ss N p1 County of MONTGOMERY o 4- =3 On this 7th day of September 2022 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance M m m Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes (D N therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. ca 9P PAST Oa O O ` Q� H WF F� Commonwealth of Pennsylvania - Notary Seal °�' '9c„ Teresa Pastelia. Notary Publx: N '— OF OF = y Montgomery County r.. My commission expires March 26. 2025 B O a)C P Commission number 1126M Y• yn5yt_VP�G Member PennsylvanaAssoaauonotHotanes Teresa Pastella, Notary Public Q O � CO CD This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual 3 000 O •-S Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: t0 M ARTICLE IV- OFFICERS: Section 12. Power of Attorney. `0 00 0 Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President v Co L) may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all C: — N undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full - •- power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall o m Zc0i be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this a M article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ti CL ARTICLE All - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, — bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in - fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Companys Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this day of SE P 0 6 2023 P� INsu P�tY INS& %"auk4 °fir yo yJ cQ�yl°aP*O��*�qayn 11919 ca yoyacic+° BY CHU° "Ar°Renee C. Llewellyn, c�Assistant Secretary Secreta ryh LMS-12873 LMIC OCIC WAIC Multi Co 02/21 lt�Liberty mutual. SURETY Important Notice TO OBTAIN INFORMATION OR TO MAKE A COMPLAINT: You may write to Liberty Mutual Surety at: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection &,tdi.state.tx.us Premium or Claim Disputes Should you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. Attach This Notice To Your Policy: This notice is for information only and does not become a part or condition of the attached document. LMIC-3500 Rev. 7.1.07 AMENDMENT 1 ATTACHMENT A-4 2013 PREVAILING WAGE RATES Commercial Construction Projects $ AC Mechanic Helper 13.67 Acoustical Ceiling Installer 16.83 Acoustical Ceiling Installer Helper 12$70 $ Bricklayer/Stone Mason 19.45 Bricklayer/Stone Mason Trainee 13$31 $ Bricklayer/Stone Mason Helper 10.91 $ Carpenter 17.75 $ Carpenter Helper 14.32 Concrete Cutter/Sawer 17.00 $ Concrete Cutter/Sawer Helper 11.00 $ Concrete Finisher 15.77 Concrete Finisher Helper 11.00 $ Concrete Form Builder 15.27 Concrete Form Builder Helper 11.00 $ Drywall Mechanic 15.36 $ Drywall Helper 12.54 $ Drywall Taper 15.00 $ Drywall Taper Helper 11.50 $ Electrician (Journeyman) 19.63 $ Electrician Apprentice (Helper) 15.64 $ Electronic Technician 20.00 $ Floor Layer 18.00 $ Floor Layer Helper 10.00 $ Glazier 21.03 Instruction to Offerors Page 18 of 33 Project Name (month & year) $ Glazier Helper 12.81 $ Insulator 16.59 $ Insulator Helper 11.21 $ Laborer Common 10.89 $ Laborer Skilled 14.15 $ Lather 12.99 $ Metal Building Assembler 16.00 Metal Building Assembler Helper 12.00 Metal Installer (Miscellaneous) 13.00 $ Metal Installer Helper (Miscellaneous) 11.00 $ Metal Stud Framer 16.12 $ Metal Stud Framer Helper 12.54 $ Painter 16.44 $ Painter Helper 9.98 $ Pipefitter 21.22 $ Pipefitter Helper 15.39 $ Plasterer 16.17 $ Plasterer Helper 12.85 $ Plumber 21.98 $ Plumber Helper 15.85 $ Reinforcing Steel Setter 12.87 Reinforcing Steel Setter Helper 11.08 $ Roofer 16.90 $ Roofer Helper 11.15 $ Sheet Metal Worker 16.35 $ Sheet Metal Worker Helper 13.11 $ Sprinkler System Installer 19.17 $ Sprinkler System Installer Helper 14.15 Instruction to Offerors Page 19 of 33 Project Name (month & year) Steel Worker Structural $ 17.00 Steel Worker Structural Helper 13$74 Waterproofer $ 15.00 Equipment Operators $ Concrete Pump 18.50 $ Crane, Clamshell, Backhoe, Derrick, D'Line Shovel 19.31 $ Forklift 16.45 Foundation Drill Operator 22$50 $ Front End Loader 16.97 $ Truck Driver 16.77 $ Welder 19.96 $ Welder Helper 13.00 The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted and published by the North Texas Construction Industry (Fall 2012) Independently compiled by the Lane Gorman Trubitt, PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's (The Construction Association) website. www.texoassociation.org/Chapter/wagerates.asp Instruction to Offerors Page 20 of 33 Project Name (month & year) AMENDMENT 1 ATTACHMENT A-5 FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Activity ID Activity Name Ong Dur Remaining %I Start Duration Complete FW CC - Overall Schedule Layout I 119-fSep-23 133:244 �! 2yll Knish u')A15 OI J JJSI-5 J-`L L1 1 2'33 4I 6I7I8 9I 11I1111 I1Ad11I1OI161111J8l FI M A1`LI [I `L 1261 [I ZI2�313i 313413i1% . . FrW1-1025 Phase Substantial Completion Od Od 0% 06-Mar-26 FTN1-1030 Project Closeout 30d 30d 0% 09-Mar-26 17-Apr-26 Final Completion Od Od 0% 17-Apr-26 319dr Phase IA- Kitchen/Vault 275d 289d 0% 1 17-Aug-23A 13-Dec24 Phase l A Mobilization 15d 4d 0% 17-Aug-23A 07Sep-23 Phase l A Demolition 69d 69d 0% 18-Oct-23 15-Feb-24 FrW1-1035 M ERRS®' FTN1-1010 FrW1-1065 FrW1-1075 FrW1-1095 Phase l A Foundations/ Ll Concrete 90d 90d 0% 09-Nov-23 12-Apr-24 F1W1-1085 Phase 1AVault Tunnel 51d 51d 0% 20-Nov-23 22-Feb-24 FrIN1-1105 Phase 1AStmcture 28d 28d 0% 27-Feb-24 10-Apr-24 FrWl-1115 Phase lA Enclosure 46d 46d 0% 26-Mar-24 04Jun-24 F1Wl-1125 Phase lA Roughin/Finishes 136d 136d 0% 29-Apr-24 06-Deo-24 FrWl-1135 Phase l A Commissioning 22d 22d 0% 01-Nov-24 13-Deo-24 FTN1-1220 Phase l A Substantial Completion Mezzanine Od Od 0% 07-Nov-24` FrIN1-1165 Omer Occupy Mezzanine 10d 10d 0% 08-Nov-24 04-Dec24 FrWl-1300 Phase l A Substantial Completion Kitchen Od Od 01 13-Deo-24' F1Wl-1400 Client/User Kitchen Bum -in period 30d 30d 0% 16-Dec24 28Jan-25 F7W1-1015 Phase IB - BOH / Loading Dodos 373d 373d r% 110mrZ,r. 0%01 Jul-24 06-Feb-26 FrW1-1045 Phase 1 B - Electrical Upgrades/ BOH Renovations 225d 225d 0%01Jul-24 19Jun-25 FTW1-1055 Phase 1 B Annex Demolition/Loading Docks 31 Bd 318d 0%04-Oct-24 06-Feb-26 FrW13000 Phase 1 B - BE Comer Complete Od Od 0% 03Jan-25' F1W1-1200 Phase I B BOH Restroom Renovations Complete Od Od 0% 05Jun-25 Ff W1-1210 Phase 1 B South Loading Docks Complete Od Od 0% 02Sep-25 F rWI-1240 Phase 1 B North Loading Docks Complete Od Od 0 % 06-Feb-26 F1Wl-1145 Phase 1 B Substantial Completetion Loading Docks / BOH Od Od 0 % 064v1ar-26 Phase 1C FrW1-1020 Phase IC- Commerce Street Demo 63d 63d 63d 63d r•..r 0% 20-Nov-25 r 20-Feb-26 F1W1-1022 Phase 1C Substantial Completion Road & Site Improvements I Od Od 0% 20-Feb-26 r Phase Phase I Su ■� Project Final C r PhAsd IA- Kitchen / Vduk: ■ 3hasel 1AMobilixatiun fir ; Ph ase l A D- rmolitign !Phase 1 A Foundations% L1 Cgngeti Phase 1AVault Tuhnel' t— :Phase IAStructure: Phase I Enclosure Phase;lA Rough -in / Finishes PhasE 1/,Cgmmissiori phase,1A:Su )stgntipl Cony plgtion Mgz;ani to : m Omier Oc upy- Mezzanihe! ' Phasd 1 F, Substantial Corn fetich Fitch and ;♦ ClieuVUser, Kitchen Bum-in;pedod P6asg 1B- plegtrical UJpdrar✓sy BOH Phase:1 B Ann phase 1 B- BE Confer Complete: ♦ Phase 11 B BCH Res room Renovations C ' I I I I I I I I♦ I I Phase 1 B Tooth LoE ding Pocks Ph=ell B:Nort Phase B S ,� PI iase IG - C Phase 1C Su r- Remaining Level of Effort ♦ ♦ Milestone TASK filter: (Untitled Filter)_1. r- Actual Level of Effort ♦S Actual Work FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31-Aug-23 A=COM HUNT O Remaining Work Phase 1 Construction SummaryNS RU To sER €5 EJ SMITH Page 1 of t CONSTRUCTION FS Critical Remaining Work FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 I FW CC - Overall Schedule Layout Activity ID Activity Name Ong Dur Remaining %I Start Finish ZC22 Duration Complete J J I A I, r.�l/hti�uac�+llfuiGaGuuanautaurtt imrna4�ntld4l,+!t��®�®I - 6 �� r Weather ork Days FWCC No cluded in • • FWT1 -5000 opstand07/21/23-08/06/23 7d Od 100% 27Jul-23A 04-Aug-23A FWT1-5010 Mary Kay 01/08/2024-01/25/24 14d 14d 0% 08Jan-24' 25Jan-24 FWT1-5020 TX Technology Student Association 04/02/2024 - 04/06/2024 4d 4d 0% 02-Apr-24- 05-Apr-24 FWT73030 Copeland 07/24/2024 - 08/08/2024 12d 12d 0% 24Jul-24' 08-Aug-24 FWT1-5040 Nat'l Agri Aviation R TX EMS 11 /16/2024 - 11/27/2024 Sol 8d 0% 18-Nov-24' 27-Nov-24 FWT13050 TX Technology Student Assoc 04/0212025 - 04/0512025 3d 3d 0% 02-Apr-25" 04-Apr-25 FWT73060 Copeland 07/23/2025 - 08/03/2025 8d 8d 0% 23Jul-25" 01-Aug-25 FWT1-5070 TX EMS 11/21/25-11/26/2025 4d 4d 0% 21-Nov-25' 26-Nov-25 2 2' - 2L'{4 2 2 O N)D JJFJM Aj IA S OINIU JIFJM AIMJJ JJAIS OINIU JIFIM JM1 15 �l1 J Isle=/I�13 41'd11-1 1 2'3 a s 6 �l8 s 1JI1 r[I1 11511/1 1 M 12IY2a'IY2-I Iz � I ■i Man Kay 01/68/�02¢- n/�5124 TX Tee indlogy S tud breAs:ociatidn -NO2/2,0204/0u!024 I ■ Co tel$nd107, 2412024 08/08/2L24 1: N at'I'Agti A riatlon & 7K EMS 1 /1d/2d24 I TX Tec mology S.udert As- 1: Tr r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 O Remaining Work Phase 1 Contractual No -Work Days Critical Remaining Work TASK filter: (Untitled Filter)_1. Data Date: 31-Aug-23 A=COM HUNT Page 1 of t �19-�Sep-2�3 133:28�I 3 1313L /31341 3 A6, 11/27/2b24: ro 04/,022 2025 ; 04'0 3/�o�5 - 3&3/�oz EMS 11 121. 25 -1 1/ AS C NS RUC NS RU T� EJ SMITH CONSTRUCTION FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Activity ID Activity Name FTWI-1000 Preconstmction FfW1-1005 RFP Preconstruction Services Timeline BP1A-1000 City Council CMAR Recommendation Approval ■■�� FW CC - Overall Schedule Layout Ong Cur Remaining %I Start Finish - 2[22 Duration Complete ./ J A 317d j 45d 94.95% (27Jun-22A I03-Nov-23 213d Od 100% 27Jun-22A 29Jun-23A Od Od 100% 29-Nov-22A BP113-1000 Advisory Committee Review 2 d Ocl 100% 1 10-Oct-22A 14-Nov-22A BPI B-1005 Advisory Committee recommendation to City Council Od Od 100 % 06-Dec-22 A BP18-1010 M & C Contract Increase Approval Od Od 0 % 12Sep-23' CMAR Notice of Award Od Od 100% 08Jul-22A Contract r. FlW1-2005 CMAR Pre -Construction FTW1-2000 CMAR Pre -con Services Start Od Od Prepare CMAR Pre -Con Contract 15d Od 100% 1 27Jun-22A FTW1-2010 100% 25Jul-22A 27-Aug-22A FTW1-2015 CMAR Pre -Con Contract issued for Signatures Od Od 100% 29-Aug-22A FTW1-2020 CMAR Pre -con Contract Executed Od Od 100% 06Sep-22A CMAR Construction FfW1-2025 Prepare CMAR Contract($30M) 50d Oct I % 26Sep-22A 23-Mar-23A FTW1-2030 CMAR Contract Issued for Signatures 5d Od 100% 27-Mar-23A 03-Apr-23A FTW1-2035 CMAR Contract Executed Od Od 100% 13-Apr-23A FTW1-2040 CMAR Contract Amendment #01 ($73M) 5d 5d 0%12Sep-23 �� r• Notice to Proceed MEP Design -Assist - (NTP1) Od Od 100% 18-May-23 A IBSep-23 Notice to Proceed N I F1A•1000 NTP1A-1005 Notice to Proceed Early Release Electrical (NPT2) Od Od 100% 02-Aug-23 A NTP1A-1020 Early Release AHUs(NTP3) Od Od 100% 08-Aug-23A NTP1A-1010 Notice to Proceed Phase l A (NTP4/ IGMP-1) Od Od 100% 22-Aug-23 A NTP1A-1015 Notice to Proceed Phase 1A(NTP5) Od Od 0% 19Sep-23 r• � 22-Aug-23A GMPIA-1000 Execute Phase IA-NTP4/IGMP d 10 % 21-Aug-23A BP1 B-1015 City Council Phase l Final GMP Approval Od Od 0% 14-Nov-23 Execute Contract Amendment #02 (GMP) 5d �5�}dr� 0% 15-Nov-23 21-Nov-23 1 GMP1 B-1000 Design PRG1-1000 Master Planning/Programming 40d Od 100% 27- Jun -22A 22-Aug-22A Preliminary Phase I Program Dwgs Issued Od Od 100% 09-Aug-22A PRG1-1005 — Remaining Level of Effort ♦ ♦ Milestone — Actual Level of Effort Actual Work Remaining Work Critical Remaining Work Iyl-if=f/1�1-5-41 �i1-`LLf C I1I2'33 4I5 6I7I8 9I 11I 1111 I1Ad11 10I1611f 1J811I 121I `L1 Z 41 `L12fi ZI2124 Prei unktnJcti n 'M 'R rsin i ! i i 4 City CoP c it O, A eco a dal op AI PrQval i I I I I I I I I , ldvisory cSmmRtee redon ne,datioh tc City Cou icll, . M G, Cc ntr$ct:lnc 9W App vvsl nice of Av*rdl ,Pon SnviCeS St" it $R Pre Cdn Con real issued for-zn atulres' IAR'! Pn ran Con trad Exe"ed I M I I I I I I I I I ICMAFR Cbniaot Ececdtec I ♦I I I I I I I I I 1 CMAR Cnnttact endmenl#Q1($73 N): N(lice tPPn ceed ME Dzsipn- ksgist : IN 1P7) ♦I loti x to Procned Early Release Bectricsl (JPj2): ar y Oelgas( AHUS ( ) N)tice to PnceediPh ise 1A(N FP4/IGMP-1} ♦ Nbtico tc Proceed hose;l A (NTP5) ♦ICit/Cbuttcil haseil final GMP Approval 1, E.e*e:Cc lVactAnninctrnent I'02:(GMP ihary' P rase I IPragrem Dams Igsr►rd TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNT Phase 1 Schedule Update Page 1 of 48 Ns Ru To 'ER 19-Sep-23 13:20 :)l71 3134I�� ■ •in EJ SMITH CONSTRUCTION Activity ID Activity Name Orig Dur Remainingl %I Start Durationj Completel Finish zwz ;XZ4ZJZb Al S1 01_Tl JJA A M J Fr A JJ 1 1 N 1 -�l M - I MI T 17 I �l 71 1 )1 1 1 r Bid Package 1 A - Kitchen Vault 217 6j JN I' 1, 1- , 4 5 1 JA) 1 JJ)j 1 1 2J41 1 34 I SD1A-1000 100% Schematic Design 40d Od 100% 23-Aug-22 A 11 -Nov-22 A DD1A-1000 1 Oir/. Design Development 60d Od 100% 144Nov-22 A 31 -Jan-23 A CD1A-1000 100% Construction Documents 76d Od 100% 01-Feb-23A 30-May-23 A CD1A-1005 Issue Phase 1AAddendum #1 1 d Od 100% 28-Jun-23A 28-Jun-23A CDIA-1010 Issue Phase 1AAcklenclum #2 1 d Old 100% 18-Jul-23A 18-Jul-23A SD113-1000 1000% Schematic Design Od Od 100% 17-Nov-22 A 31 Jan-23 A DD113-1000 100% Design Development 75d Od 100% 01-Feb-23A 30-May-23 A CD113-1000 100% Construction Documents 34d Od 0% 31 -May-23 A 18,Jul-23A ril CDIB-1005 Issue Addendum #3 1 d Old 100% 21 -Aug-23 A 21 -Aug-23 A Estimates Conceptual ROM Estimate 550d 28d 21 Od c, ROMI -2000 Conceptual ROM Estimate 8d OdI 100% 28,Jul-22 A 08 Aug-22 A ROMl-2005 Conceptual ROM Estimate Revisions 5d Od 100% 11-Aug-22A 115-Aug-22A SID Estimate Bid Package IA-Kithen / Vault D1A-2000 Prepare 100%SD Estimate 25d Odj 100% 14-Nov-22A 21 -Dec-22 A SD1A-2005 Review & Reconcile 100% SO Estimate 5d Odl 100% 1 22-Dec-22 A 23-Dec-22 A SDIA-2010 Approve 100% SD Estimate Od Odj 100%1 23-1)eo-22 EA! ♦ Albprbve 100%51 E6tirr its BdP k 1 B - Lo SD1B- 000 ding Dock / Street Prepare 100%SD Estimate 48d 3!��d )d 0% 100% 01-Feb-23 17-Mar-23 A SD113-2005 Review & Reconcile 100% SO Estimate Idl Ocil 100% 20-Mar-23A SD1113-2010 I Approve 100% SD Estimate Od Od' 100% 6-/- ve 1003D Estimate ♦ApP DID Estimate 13.0dj 0% 01-FCb23A Bid Package IA-Kiichen /Vault 3 0d Od 0% UDlA-ZUUU Prepare 100. Estimate a 17-Mar-23 A DD11A-2005 Review & Reconcile 100% DO Estimate 5d Od 100% 20-Mar-23 A 21 -Mar-23 A DD1A-2010 Approve 100% DID Estimate Od Odl 101% 22-Mar-23 A ♦ Approve 1 00-/—DC Estimate Bid Package 1 B - Loading L)L)lL3-2uuu Dock / Street Prepare 100% DD Estimate 92d 40d Od 11 7------Ud 1 1 0(J% 31 -May-23 A I!J;l 31 IZ;J A DDlB -2005 Review & Reconcile 100% DO Estimate 5d Odl 0% 1 31 -Jul-23 A 22-Aug-23 A DD1113-2010 Approve 100% DID Estimate Od Od 0% 22-Aug-23 A Apprg41100%bl) Edrqat4, CID Estimate Bid Package IA-Kiichm Vault 177!! 1. CDIA-2000 Prepare 00% Estimate (NTP4) 40d d 0."' �1 Way-23 Od 31 -May-23 A 00 0 to 31-Jul-23A CD1A-2005 Review & Reconcile 100% CD Estimate (NTP4) 5d Od 0% 31 -23 Od 31 -Jul-23 A 22-Aug-23 A CD1A-2010 Approve 100% CD Estimate IGMP- NTP4 Od Od 0% 22-Aug-23 A I, AIIPr6va100%'04 EdmataIGAP',/N'TP4 0 - Remaining Level of Effort Milestone TASK filter: All Activities — Actual Level of Effort Actual Work FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 �LECOM HUNT O Remaining Work Phase 1 Schedule Update Ns Ru To 'ER ES EJ SMITH 2 Page of 48 CONSTRUCTION Critical Remaining Work A Rudy ID CD713-2000 Activity Name Prepare 100% CD Estimate Orig Dur 40d Remaining Duration 40d %I Complete 0%31-Aug-23A Start Finish 27-W-23 CD113-2005 Review & Reconcile 100% CD Estimate 5d 5d 0%30-Oct-23 03-Nov-23 CDIB-2010 Approve 100% CD Estimate Od 04d Od Od 0% 03-Nov-23 • Design 100% OSJan-23A r 26Jan-23A DA1-2000 Request for Oual'rfications 15d Od DA1-2005 Request for Proposals 16d Od 100% 02-Feb-23A 23-Feb-23A DA7-2010 RFP Interviews 2d Od 100% 08-Mar-23A 09-Mar-23A DA1-2015 Subcontractor Selection/Owner Approval 2d Od 100% 20-Mar-23A 22-Mar-23A DA7-2030 Design Assist Support 53d Od 0% 26-May-23A 01 Sep-23 DA7-2020 Letter of Intent to DA Subcontractors Od •d Gear r. Prepare Electrical Procurement Package 45d Od 100% 26-May-23A Early Release Packages Electrical anels & ERP1A-2610 21 r. r . Od 42.22% 29-May-23A 01-Aug-23A ERP1A-2615 Procure Electrical Panels & Gear 260d 210d 7.31 % 03-Aug-23 A I 28Jun-24 Mechanical AHLIs ERP1A-2310 •. Prepare Mechanical Procurement Package 20d 21 •d • . . 26Jul-Jul Od 0%97E ERP1A-2215 Procure MechanicalAHUs 230d 210d 0%28Jun-24 r De PRMTIA-1000 Phase lAParm d Od d 10 % 01 Jun-23A 21 Ju1-23A Phase 1B Permit 100d 15d 9% 19Jul-23A 22Sep-23 PRMTIA-1005 PRMTIA-1010 Phase 1 A Permit Approved Od Od 100% 21Jul-23A PRMTI B-1000 Phase 1 B/C Permit Approved Od Od 0% 22Sep-23 PRMT1 B-1005 Annex Demolition Permit 10d 10d 0% 19-Nov-24 04-Dec-24 BUY1-0205 Demolition Subcontract 15d 2d 0% 25-Aug-23A 15d 15d 0% 01 Sep-Sep 05Sep-23 BUY1-0305 Concrete Subcontract 22Sep-Sep BUY13305 Site Utilities Subcontract 15d 15d 0% 01 Sep-23 22Sep-23 20d 20d • O6Sep-23 r • 03-Oct-23 BUY7-0505 Structural / Mlsc Steel Subcontract 20d 20d 0 % BUY1-0810 Alum Curtain / Storefront / Glazing Subcontract 20d 20d 0% 06Sep-23 03-Oct-23 BUY7-1110 Food Service Equipment Subcontract 20d 20d 0% 06Sep-23 03-Oct-23 BUY7-1405 Hydraulic Elevators Subcontract 20d 20d Earthwork Subcontract 20d 20d 0% 06Sep-23 03-Oct-23 BUYl3105 0% 06Sep-23 03-Oct-23 BUY1-0405 7 • •. Masonry Subcontract 20d 20d DIP /WP/ Joint Sealants Subcontract 20d 20d ••. of . • 0% 19Sep-23 16-Oct-23 BUY1-0705 0% 19Sep-23 16-Oct-23 - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort ffi Actual Work fib Remaining Work Critical Remaining Work Gl'G:1 O N D JJFIM Af MJJ JIA vSJOIN U JI FJN I��= 133 I`I-`LJ-1 1 '1lJ 4I5 6 8 Prep are:1 ObOl Review & Re ApFrovB 100 I ! !I I I I I f I I I f leslgn'As ist Suop( L ttdro In19ntto:DASubcdntl I I♦ I I OMEN Pgasa 13 Parm@ P as; lA Pear it Approv I I ♦ P6as4 1 3/O, P4m FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update I I )emolltior Subconl ■ Cpnoretc Sybcpn. ■ SgeYtilil!as Subo Ill Structual/:Mfsc C Alum CGrtdin Y S C Food S:rvibe Eq C hlydreu is Rlevatl C Whw irk $ugrx M4so try 0*( 7 !DIP /1VP? Joir LlG4 f y� Q f J Ll'Lb 9I 1nI11 1I1Ad11 1I16I 1f 1J8I 1I�21I LIJ 41 LI26 LIZI2 DID EStirr3tg mei1e:1 Ol l%CD, Esimate: CGDF,stilnate ctdrs P; Cvre Elect p: l -an: so & 3e4r opopin ProcUra Msichdnical AH7s d I I I I I Apprpvei fit 4nnbx De nolftioh P )m-k let', 3C� ,tract: feel Sub ontradt irefrodt / 3Win0 Si ibcbnttad ipmerlt S )bdontlYac s 5ubicor treat tract Itrect Soakonts Suboontractl TASK filter: All Activities Data Date: 31-Aug-23 A COM HUNT NS NU 11O ER ES Page Page 3 of 48 in EJ SMITH CONSTRUCTION Acti fty ID BUY1-0710 Activity Name Roofing / Flashing /Accessories Subcontract Orig Dur 20d Remaining Duration 20d %I Complete 0% Start 19Sep-23 Finish 16-W-23 BUY1-0725 Applied Fire Protection Subcontract 20d 20d 0% 19Sep-23 16-Oct-23 BUY1-0905 Drywall / Framing /Acoustical & Metal Ceilings Subcontract 20d 20d 0% 19Sep-23 16-Oct-23 BUY1-2105 Fire Suppression Subcontract 20d 20d 0% 19Sep-23 16-Oct-23 BUY1-2205 Plumbing / Mechanical Subcontract 20d 20d 0% 19Sep-23 16-0ct-23 BUY1-2605 Electrical/ Fire Alarm Subcontract 20d 20d 0% 19Sep-23 16-Oct-23 BUY1-0510 Decorative Railings Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0605 Finish Carpentry/ Millwork Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0715 EIFS Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0720 Thermal Insulation Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0730 Firestopping Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0735 Expansion Joint Covers Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0605 Doors/Frames/ Hardware Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0615 Louvers Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0910 Ceramic/ Stone Tiling Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0915 Carpet Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0920 Paint/ Wal l Coverings Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-1005 Sgns& Graphics Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY7-1010 Toilet Compartments/ Accessories Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-1015 Wal& Door Protection Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-1020 Fire Protection Cabinets Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY7-1105 Loading Dock Bumpers/ Equipment Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUYl-1205 Roller Window Shades Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-1210 Entrance Floor Mats/ Grilles Subcontract 20d 20d 0% 22-Nov-23 21-Dec-23 BUY1-2705 Low Voltage Subcontract 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0620 Overhead Doors 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0310 Precast Concrete 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0925 Plaster 20d Resinous Flooring 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0930 20d 0% 22-Jov-23 21-Deo-23 BUY1-1025 Metal Lockers 20d 20d 0% 22-Nov-23 21-Deo-23 BUY1-0315 Concrete Paving 20d 20d 0% 09-Aug-24 06Sep-24 Submittals/ Procurement _ ,.n Selective Demo 32d 32d 0% 01-Sep-23 17-Oct-23 02 4100 - Demolition A 32d 32d 0% 01 Sep-23 17-Oct-23 P-1 ASS.O-1010I Submittal - RO - 02 41 00 - Demolition 10d 10d 0% 1 01 Sep-23 15Sep-23 r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work Gl'G:1 NJD Jl F I M Af 71 J1A PIP If J1 FJM A -cfl-9 = I-6 3 I` I-`L -1 1 1 33 4I 5 6 �I Ei 9 Rrfofil ig /I Flashi ig V ; Applicf 5re:P ec'ti DWy II / rmjni / Fire S ippresisio i S', ; Plumil / Me ahi Electral7 Rm la DecoYaf FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update It] Finish C rpe j 0 EIrS:Su oo, I1 Thenhal ns' FitesYopin� O Expahsi n J Doors/ ra', LCU4rs Uo j Q Ceramic St C�rpit 1�b1 O Paint/Is1 b Sgns:&wrap Tglet:Ccim Q Wel & or, Flie Procti O I -jading Dot ILD Rpllef ndp EPtrgn Flo Q Low Volt e Nerhe D Precast on L3 Plaster j 0 Resigou FI' Q Metal Lcke Submitta -RO;02 1 TASK filter: All Activities Ll G4 ff yy�� QQ ff J Lt'Lb J f Z)L�b 11111 111Ad11 111611f 1J8I 11Z21LI Z 241L126 L1212 - 1M& 31 41Y ACcea- jes'Su >�ltract on St boontract ¢tcdusl ica( & Mel al belling; S4bcpnt acS ubdonl and Cal Si bobntract rtn Sub )ontradt R ailing : Sbbcbnt act ntry / v�iIM* S )boontlac I I I I I ntrdct ulafion Subcontict Subcontfac[I, oint C vets Sub mritrarwt rpe3 / �rdwate�uboorltra 3 contrEp one Ti ing, Suba ntrect bontm I� CotedgS S rbo ntract: hies ,IJb?ontra(t part�edts 1, Acpeasoges oul icojrtrict Prfte1Ltliioh Subc)rrtract bn Ca in4ts But oohtracl kBu pens PECI jiptnent Lubiontmlt wSh dea Subontract or Me s/:GrillesSubco!ntnrct Su ntrect', crate Po9n9 rs :of�adta 'avin� 00:- D mblitibn Data Date: 31-Aug-23 A COM HUNT Page 4 of 48 NS NUNS RU T� in EJ SMITH CONSTRUCTION Acth ity ID Activity Name (HBS) - RO - 02 4100 - Demolition Crig Dur 2d Remaining Duration 2d %I Complete 0 % Start 18Sep-23 Finish 19Sep-23 Approval (A/E) - RO - 02 4100 - Demolition 10d 10d 0% 20Sep-23 03-Cct-23 LARReview Submittal-R1 -0241 00-Demolition 5d 5d 0% 04-W-23 1045 t-23 Approval (A/E)-R1-024100-Demolition 5d 5d 0% 11-Oct-23 17-Oct-23 Division r 0% r 01 Sep-23 106-Nov-23 03 10 00 - Concrete Forming and Aocessarles 46d 46d 0% P-1 ASS.O-1020 Submittal - RO -03 10 00 -Concrete Forming and Accessories 20d 20d 0% 01 Sep-23 29Sep-23 P-1 AS-R.0-1020 Review (HBS) - RO - 03 10 00 -Concrete Forming and Accessories 5d 5d 0% 02-Oct-23 06-Oct-23 P-1 AS-A.0-1020 Approval (A/E) - RO - 03 10 00 - Concrete Forming and Acce 10d 10d 0% 09-W-23 20-W-23 P-1ASS.1-1020 Submittal - R1 - 03 10 00 - Concrete Forming and Accessories 5d 5d 0% 23-0ct-23 27-0ct-23 P-IAS-A.1-1020 Approval (A/E) - R1 - 03 10 00 - Concrete Forming and AT- 5d 5d 0% 304M-23 03-Nov-23 P-1A-S-F0-1020 Fabricate & Deliver/Store - 03 10 00 - Concrete Forming and Accessories 03 20 00 - Concrete Reinforcement P-1 ASS.O-1030 Submittal - RO - 03 20 00 - Concrete Reinforcement 1d 1d 0% 06-Nov-23 06-Nov-23 36d 1 Od 36d 10d 0 % 0% 01 Sep-23 01 Sep-23 15Sep-23 P-1 AS-R.0-1030 Review (HBS) - RO - 03 20 00 -Concrete Reinforcement 5d 5d 0% 18Sep-23 22Sep-23 P-1AS-A.0-1030 Approval (A/E) - RO - 03 20 00 - Concrete Reinforcement 10d 10d 0% 25Sep-23 064W-23 P-IASS.1-1030 Submittal - R1 - 03 20 00 - Concrete Reinforcement 5d 5d 0% 094M-23 13-W-23 P-1AS-A.1-1030 Approval WE) - R1 - 03 20 00 - Concrete Reinforcement 5d 5d 0% 16-W-23 20-Cct-23 P-1AS-F0-1030 Fabricate & Deliver/Store - 03 20 00 - Concrete Reinforcement 1 Of lid 0% 23-Oct-23 23-Oct-23 03 30 00 - Cast -In -Place Concrete Jill 27d 27d 0% 25Sep-23 31-Oct-23 P-1 ASS.O-1040 Submittal - RO - 03 30 00 - Cast -In -Place Concrete 5d 5d 0% 25Sep-23 29Sep-23 P-1 AS-R.0-1040 Review (HBS) - RO - 03 30 00 - Cast -In -Place Concrete 2d 2d 0% 02-Oct-23 03-Oct-23 P-1 AS-A.0-1040 Approval (A/E) - RO - 03 30 00 - Cast -In -Place Concrete 10d 10d 0% 044M-23 17-W-23 P-1ASS.1-1040 Submittal - R1 - 03 30 00 - Cast -In -Place Concrete 5d 5d 0% 18-W-23 24-Cct-23 P-1AS-A.1-1040 Approval (A/E) - R1 - 03 3000-Cast-In-Place Concrete 5d 5d 0%254)ct-23 31-Oct-23 61d 61d 0% 22-Dec23 19-Mar-24 P-1ASS.0-1050 Submittal - RO - 03 35 43 - Polished Concrete Finishing 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1050 Review (HBS) - RO - 03 35 43 - Polished Concrete Finishing 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1050 Approval WE) - RO - 03 35 43 - Polished Concrete Finishing 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1050 Submittal - RI - 03 35 43 - Polished Concrete Finishing 10d 10d 0% 20-Feb-24 04-Mar-24 P-1AS-A.1-1050 Approval (A/E) - R1 - 03 35 43 - Polished Concrete Finishing 10d 10d 0% 05-Mar-24 18-Mar-24 P-1AS-F0-1050 Fabricate & Deliver/Store - 03 35 43 - Polished Concrete Finishing 1d ld 0% 19-Mar-24 19-Mar-24 034500-Pre-CastArcFitecUrel Compete P-1A-S-S.0-1060 Submittal - RO -03 45 00 - Pre-CastAmhltec turel Concrete 61d 61d 0% 22-Dec23 20d 20d 0% 22-Dec-23 22Jan-24 P-1 AS-R.0-1060 Review (HBS) - RO -03 45 00 - Precast Architectural Concrete 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1060 Approval (A/E) - RO - 03 45 00 - Precast Anctkectural Concrete 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1 -1060 Submittal - R1 - 03 45 00 - Pre-CastAmhkec tural Concrete 10d 10d 0% 20-Feb-24 04-Mar-24 r— Remaining Level of Effort ♦ ♦ Milestone — Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJI AIB OI `JI-6171SI3I,il-L1J. I1 1 34I516I7I F�9I 11I11tG1 I1Ad11I1I16I 111J8I 1IZ21I LI Z124 [I26I ZI 712*3I 313�'3I34I T I Ravirlw (HBS) - RO - 02 41 0) - befnolitioa Approval (A/E) - F r) 02 41 00:- Demolition: I I I I I 1 6uhmittal L Ft1 - )2 4100 Demolition 1 Approval.k4) - Rf - 02 49 00 - Demofdiom I $ubjnittal-:Rd,,-0310 00-7okrote Fonninb and Acgest,ngs Review (HBS) - F;0) 0� 10 00:- Concrete Forming:and A-zcessdries ■ I ApprovaC(A!E) RO - 03 ' 0 00-',Concrf;te:Formidg And Accessories 1: Submittal-:R1-031000-Concrete Forming acidAcr=ssiodds 111 Approval (A/E i - R1 03 10 00- ConCretis Forming and Accessodes j I fabricate 0 eliver/$toi a -b3 ,10 00 Cpncretg Fgrn ng ,ano Aocegsooes i SL�r ittal-00-'0320,00:-C)nGretp Reinforcement, j 1 Review (HBf;)1 RC - (13 20 C0 -Concrete lReintorcemeht [ I Approval (NB) - 110 : 03 2( 00 -Concrete ReinfordzrAen! 1 :Submittal'-R1-D32000 Concrete ReinfbrcemenC 0: Approval:(kE) R1 - 03 20 00-IConcrete:ReinfercBme t I; Fobricat4 &:De ivej/Store - 00 20 00 - Oogcrete keipfo Cement 1$ubrnittal-:R0,-033000-:agt-lq-Place,Cgncrete:, Review (HBS - F7) - 03:30 D0' Cast-In-Placee Concrete ■ Adproval:(A/E) - RO - 03 D D 00 - Cast-Id-Plsce Cdncietf 1: Submittal-R1-033©OU-Cast-In-PIaceboncratei /#pprov3l (A/E; - fit ;03 30100 Casttln-Place Coricre le M : SUbn rittal - RO 03 35 43 - Polished Cpneret - Finishing 0 kec ievf (H$S - $0 -,03 35:43:- Polished Concrete Finishing, :0: Ajprgval (A F) RQ - 0315 43 - Polished 'ohcrgte Rnishing D 1;ubmiltal R1 -03 3543 -;Polished Concrete Finishirg ;0 Approval (A/E) -I R1 - 03 35 43 - Pofish� A Concrete Finishing Fabricate & beljver/Store`03 3$ 45 - I roli5hzd Compete Finishing 07 I Subn rittal - RO 03 45 00 - Pre -Gast Afchheraral Concrete stet levy (FIBS - AO 03 45: 00:- Pre -oast Ar-hi(ectpml Cgncfete 0 AF prgval (A E) RO - 03 45 00 - Pre -Cast 4rchitectuml Concrete j D �ubmittal Ri-034500-;Pre-CAst And rRectufal Codcxette TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To SER " EJ SMITH 1' Page 5 of 48 CONSTRUCTION activity ID Activity Name P-1 AS-A.1-1060 Approval (A/E) - R1 -03 45 00 - Pre -Cast Architectural Concrete P-1A-S-F0-1060 Fabricate & Deliver/Store - 03 45 00 - Pre -Cast Amhitectual r. n rPrP 03 49 00 - Glass4�oer-Reinlorced Concrete P-1 ASS.O-1070 Submittal - RO -03 49 00 - Glass -Fiber -Reinforced Concrete P-1 AS-R.0-1070 Review (HBS) - RO - 03 49 00 -Glass-Fiber-Reinforced Concrete P-1 AS-A.0-1070 Approval (A/E) - RO - 03 49 00 - Glass -Fiber -Reinforced Concrete P-1 A-S-S.1-1070 Submittal - R1 - 03 49 00 - Glass -Fiber -Reinforced Concrete P-lAS-A.1-1070 Approval (A/E) - R1 - 03 49 00 - Glass -Fiber -Reinforced Concrete P-lAS-FO-1070 Fabdcate & Deliver/Store- 03 49 00 - Glass-Fiber-Reinfomd r r,Crere 04 01 10 - Masonr, , Cleaning P-1 AS-S.0-1080 Submittal - RO - 04 01 10 - Masonry Cleaning P-lAS-R.0-1080 Review (HBS) - RO - 04 01 10 -Masonry Cleaning P-lA-S-A.0-1080 Approval (A/E) - RO - 04 01 10 - Masonry Cleaning P-1ASS.1-1080 Submittal - R1 - 04 01 10 - Masonry Cleaning P-lAS-A.1-1080 Approval (A/E) - R1 - 04 01 10 - Masonry Cleaning 04 0120 63 - Brick Masonry Repair P-1 ASS.O-1090 Submittal - RO - 04 01 20 63 - Brick Masonry Repair P-1 AS-R.0-1090 Review (HBS) - RO -04 0120 63 - Brick Masonry Repair P-1 AS-A.0-1090 Approval (A/E) - RO - 04 0120 63 - Brick Masonry Repair P-1ASS.1-1090 Submittal - RI - 04 01 20 63 - Brick Masonry Repair P-1 AS-A.1-1090 Approval (A/E) - R1 - 04 0120 63 - Brick Masonry Repair 04 0120 64 - Brick Masonry Repointing P-1ASS.0-1100 Submittal - RO - 04 01 20 64 - Brick Masonry Repointing P-1 AS-R.0-1100 Review (HBS) - RO - 04 0120 64 - Brick Masonry Repointing P-1 A-S-A.0-1100 Approval (A/E) - RO - 04 01 20 64 - Brick Masonry Repointing P-1ASS.1-1100 Submittal - R1 - 04 01 20 64 - Brick Masonry Repointing P-1 AS-A.1-1100 Approval (A/E) - R1 - 04 0120 64 - Brick Masonry Repointing 04 20 00 - Unit Masonry P-1 ASS.0-1110 Submittal - RO - 04 20 00 - Unit Masonry 71 AS-R.0-1110 Review (HBS) - RO - 04 20 00 - Unit Masonry P-1 AS-A.0-1110 Approval (A/E) - RO - 04 20 00 - Unit Masonry P-1ASS.1-1110 Submittal - R1 - 04 20 00 - Unit Masonry P-1 AS-A.1-1110 Approval (A/E) - R1 - 04 20 00 - Unit Masonry P-lA-S-F0-1110 Fabricate & Deliver/Store - 04 20 00 - Unit Masonry 05 12 00 - Structural Steel Framing P-1 A-SS.0-1120 I Submittal - RO - O5 12 00 - Structural Steel Framing - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work Ong Dur Remaining % Start Finish Duration Complete 10d 10d 0% 05-Mar-24 18-Mar-24 1d 1d 0% 19-Mar-24 19-Mar-24 61d 61d 0% 17-Cct-23 15Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 10d 10d 0% 14-Nov-23 29-Nov-23 10d 10d 0% 30-Nov-23 13-Dec23 10d 10d 0% 14-Dec23 28-Dec-23 10d 10d 0% 29-Dec23 12Jan-24 ld Id 0% 15Jan-24 15Jan-24 60,1 601 0% 17-Cct-23 12Jan-24 20d 20d 0% 17-W-23 13-Nov-23 1� 10d 0% 14-Nov-23 29-Nov-23 10d 1Od 0% 30-Nov-23 - 13-Dec-23 10d 10d 0% 14-Dec23 28-Dec23 10d 10d 0% 29-Dec23 12Jan-24 60d 60d 0% 17-W-23 12Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 1Od 10d 0% 14-Nov-23 29-Nov-23 10d 10d 0% 30-Nov-23 13-Dec23 10d 10d 0% 14-Dec23 28-Dec23 10d 10d 0% 29-Dec23 12Jan-24 60d 60d 0% 17-Cct-23 12Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 10d 10d 0% 14-Nov-23 29-Nov-23 10d 10d 0% 30-Nov-23 13-Dec23 10d 10d 0% 14-Dec23 28-Dec23 10d 10d 0% 29-Dec23 12Jan-24 61d 61d 0% 174M-23 15Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 10d 10d 0% 14-Nov-23 29-Nov-23 10d 10d 0% 304Nov-23 13-Dec23 1Od 10d 0% 14-Dec23 28-Dec23 IOd 1Od 0% 29-Dec23 12Jan-24 1d 1d 0% 15Jan-24 15Jan-24 20d 20dj 0% 1 13-Sep-23 110-Oct-23 L91= LI�jt S/8 91M 3M JIAIS OI ll�:�II Al MI IA1I L2d111 1Fb3�11 431E I❑ Approval (A/E) RI - 03 45 00 - Pra-CI ist Architectural Concrete FabriCah & beliver/Stbrei- 03 45 06 - PrejCaSt Architectural Cpncret r 0 Submittal - rJ-103I49 00,, Glassfiber-Reinforceq Onorete b Review:(HRS)` RO - )3,49 00 - Gless�Rber-keipfo eecl Concrete d Approval Air) -IRO - 03 40 00 - Glao-Fiber-Rein oroed';Conpete'; ❑ Sbbdnift it-IRT-O 14900-Glass-Fiber-Rdinforr✓d Concrete; ❑ iApp..I (A/E) - Rl:- 03 49 00 - Glass-Fibdr-R ainforded Cohcr4te I Fabricate: & Deli mrrlStpre - 05 49t 00 - Glass-Rber-ROinforosd Concrete 0 I Submittal - F7-104I01 10 F Mssonr) CI4aning l b Review:(HYS)r RO - )4 61 10 - Masonry Cleaning p APpmyal ;Alk) -:RO - 0,4 01 10 - Masonry OleaniN ❑ Subinifttl-';R1:-010110-M*nry Cleiinirx,J ❑ Appro,ral(A/F)-Rl:-0?40110- Masonry CIeE ning 0 Submlttal-F7-';04I01 20 83 , Brick Masonry Repair ❑ Revew,(HYS)!- R0 - )4 0120 63 'Brick Masonry ►repair b Approval ;A/E) -IRO - Op 01 20 66 - brick Masons, Repair ❑ Spbinilt rl-';R1j-OIOn 20 63 - 00 Masonry Rl rpalr ❑ !Appra ral'(A/E)-Rl:-04 of 20 62 - Brick Mast mry; Repair Q Submittal - fZ-';04101 2064 � Brick Masonry RegoirTing ❑ ReviLw,(H►S)'- PO - )4 0120 64: Brick Masonry ►repointing ❑ ApQrr:I6 A/E) -IRO - 04 01 20 64 - Brick Masons, Repointing ❑ Submil it -;R7;- 0101 20 64 - I$rick Masonry Repointing ❑ Approval '(A/k) - R1I- 04 01 20 64 - Brick Mas inry; Repointing Subm0a(-rJ-';04I2000' Unit Masonry Q Re*w:(HW,%- RP - )4 20 00 - Uq it Masonry 0 Appro4d A/E) -,RO - 04 20 00 - Unit Masohp! ❑ Shbfnittrl-IRi1-042000-UndMasonry'! ❑ Appro rat (A/b) - RI:- 04 20 00 - Unit Masonry I I I I I IFabdcmte, & Deli md,Stgre - 04 20, 00 - QnitlM.0ry Cr Submittal: RO - )5 12 bO Structural Steel:Framing FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update TASK filter: All Activities Data Date: 31-Aug-23 A=COAA HUNT IIIISWKM CONSTRUCTION SERVICES EJ SMITH Page 6 of 48 CONSTRUCTION Acts ity ID P-1AS-R.0-1120 Activity Name I Review (HBS)-RO-051200- Structural Steel Framing Orig Dur 10d Remaining Duration 10d %I Complete 0% Start 1140ct-23 Finish 24-Oct-23 P-1 AS-A.0-1120 Approval (A/E) - RO -05 12 00 -Structural Steel Framing 10d 10d 0% 25-Oct-23 07-Nov-23 P-IASS.1-1120 Submittal - R1 - 05 12 00 - Structural Steel Framing 10d 10d 0% 08-Nov-23 21-Nov-23 P-1 AS-A.1-1120 Approval (A/E) - R1 - 05 12 00 - Structural Steel Framing 10d 10d 0% 22-Nov-23 07-Dec23 P-1AS-F0-1120 Fabricate & Deliver/Store - 05 12 00 - Structural Steel Framing 40d 40d 0% 08-Dec-23 05-Feb-24 053100-Steel Decking 61d 61d 0% 04-W-23 02Jan-24 P-1 A-S-S.0-1130 Submittal - RO - 05 31 00 - Steel Decking 20d 20d 0% 04-Oct-23 31-Oct-23 P-1 AS-R.0-1130 Review (HBS) - R0 - 05 3100 - Steel Decking 10d 10d 0% 01-Nov-23 14-Nov-23 P-1 AS-A.0-1130 Approval (A/E) - RO - 05 3100 - Steel Decking 10d 10d 0% 15-Nov-23 30-Nov-23 P-1ASS.1-1130 Submittal-R1-053100-Steel Decking 10d 10d 0% 01-Dec23 14-Dec23 P-1AS-A.1-1130 Approval WE)-R1-053100-Steel Decking 10d 10d 0% 15-Dec23 29-Deo-23 P-1AS-FA-1130 Fabricate &Deliver/Store -053100-Steel Decking 1d 1d 0% 02Jan-24 02Jan-24 054000-Cold-Formed Metal Framing 61d 61d 0% 04-Oct-23 02Jan-24 P-1 A-S-S.0-1140 Submittal - RO - 05 40 00 - Cold -Formed Metal Framing 20d 20d 0% 04-0W-23 31-Oct-23 P-1AS-R.0-1140 Review (HBS) - RO - 05 40 00 - Colo -Formed Metal Framing 10d 10d 0% 01-Nov-23 14-Nov-23 P-1 AS-A.0-1140 Approval (A/E) - RO - 05 40 00 - Cold -Formed Metal Framing 10d 10d 0% 15-Nov-23 30-Nov-23 P-1AS.S.1-1140 Submittal - R1 - 05 40 00 - Cold -Formed Metal Framing 10d 10d 0% 01-Dec23 14-Dec23 P-1AS-A.1-1140 Approval (A/E) - R1 - 05 40 00 - Cold-Fonmed Metal Framing 10d 10d 0% 15-Dec23 29-Dec23 P-1 AS-FO-1140 Fabricate & Deliver/Store - 05 40 00 - Cold -Formed Metal Framing 1 of lid 0% 02Jan-24 02Jan-24 05 50 00 - Metal Fabrications P-1 ASS.0-1150 Submittal - RO - 05 50 00 - Metal Fabrications 61d 61d 0% 04-W-23 0 4 20d 20d 0% 04-Oct-23 31-0W-23 P-1 AS-R.0-1150 Review (HBS) - RO - 05 50 00 - Metal Fabrications 10d 10d 0% 01-Nov-23 14-Nov-23 P-1 AS-A.0-1150 Approval WE) - RO - 05 50 00 - Metal Fabrications 10d 10d 0% 15-Nov-23 30-Nov-23 P-1ASS.1-1150 Submittal - R1 - 05 50 00 - Metal Fabrications 10d 10d 0% 01-Dec23 14-Deo-23 P-1 AS-A.1-1150 Approval (A/E) - R1 - 05 50 00 - Metal Fabrications 10d 10d 0% 15-Dec-23 29-Dec23 P-1AS-F0-1150 Fabricate & Deliver/Store - 05 50 00 - Metal Fabrications 1d 1d 0% 02Jan-24 02Jan-24 055113-Metal Pan Stairs 1k 61d 61d 02Jan-24 P-1 A-S-S.0-1160 Submittal - RO - 05 51 13 - Metal Pan Stairs 20d 20d 0% 04-Oct-23 31-Oct-23 P-1 AS-R.0-1160 Review (HBS) - RO - 05 51 13 - Metal Pan Stairs 10d 10d 0% 01-Nov-23 14-Nov-23 P-1 AS-A.0-1160 Approval (A/E) - RO - 05 51 13 - Metal Pan Stairs 10d 10d 0% 15-Nov-23 30-Nov-23 P-IASS.1-1160 Submittal-R1-055113-Metal Pan Stairs 10d 10d 0% 01-Dec23 14-Dec23 P-1 AS-A.1-1160 Approval WE) - R1 - 05 51 13 - Metal Pan Stairs 10d 10d 0% 15-Dec23 29-Dec23 P-1 AS-FO-1160 Fabricate & Deliver/Store - 05 51 13 - Metal Pan Stairs 1 of 1 d 0% 02Jan-24 02Jan-24 05 52 13 - Pipe and Tube Railings 61d 61d 0% 04-Cct-23 02Jan-24 P-1A-S-S.0-1170 Submittal - RO -05 52 13 -Pipe and Tube Railings 20d 20d 0% 04-W-23 31-W-23 P-1 AS-R.0-1170 j Review (HBS) - RO - 05 52 13 - Pipe and Tube Railings 10d 10d 0% 01-Nov-23 14-Nov-23 P-1 AS-A.0-1170 1 Approval (A/E) - RO - 05 52 13 - Pipe and Tube Railings 10d 10d 0% 15-Nov-23 30-Nov-23 - Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I ,il-`L 1I1 �4I516 171 F�9I 11I11t G1 I1Ad11I1I16I111J8111L2II LI Z124 [I26I ZI ZI2*3I31 '3I34I ■; Review JHBS) RO - 05' 2 00-:StructuraC Steel Fmmirg Approval rq/P4 - RO 0! 12 OQ -Structural Steel Fran ing, ■ Subrittal - I31 10$ 1: 00 - Structural $teel Framing 10 APP,roval (4/E) - R7 05 12 00 - Stmctural Steel F arcing', O Fat Cate & Ll Jar/Store -n5 12 00 ; SOuc Ural Steel Frdming Submittal . RC - 05 31 0 ) -Steel Deakin$ 0 Review (HBn - RO;- 0! i 31 00 - Steel Decking'! d Approval (✓ JE) - RO - 05:3100 - Steel: Decking j p Submittal - RI -:05 31 b01 Steel: Decking j ■ ApprovA (NEB - F-1 :05 31 00' Steel Dedah I Fabhca e & Die iv er/Store - 05 31 00 - SW 1: a ikirig ::j Submittel:RC-054b0)-Cold-Fomted!Metal Framiw ❑ Review (HBq -SRO;- 0! i 40 00 - Coll -Formed Metal -coming d App6val(F✓E)-R0-05;40 ,00-Cpld': coned Metal Framing (7 Submlttal - 91 -:05 40,bO Cold,Fo6ned Metal F aM!ng, G AppiovA (A/E) - FI '05 40 00' Cold -Formed k letal Framing: I Fabhca e & Deliver/Store - OS 40 00 - Cold -Formed Metal Framing Submittal,RO-05500)-Metal Fab'ri lions O Review (WBF) - RO;- 0! i 50 00 - Metal Fabrications NJ APprovdl ()! ✓E) - RO - 05:50 00 - Metal Fabricatgne b Submittal - RI -:05 50 b0 , Metal Fabricatignsj ❑ ApprovA (A/E� - F-1 :05 50 00' Metal Fab*ti)ns! I Fabhcae & Deliv ar/Storb - 05 50 00 - Metal' Fa )ricetidns ::j Submittal : R0 - 05 51 13 - Metal Pad Stairs ❑ Revieu (HBI) - R01- 0! i 51 13 - Metal Pan Stairs' d Approval (F ✓E) - RO - 05:51 113 - Ivtetal Pan Stairs (7 Submittal - 91 -:05 51:13 Metal Pan Stairs j ❑ ApproW(A/Ej,- H'055113' Metal Pan Stais I Fabhcae & Deliv ar/Store - 05 51 13 - Metal: Pan Stairs Submittal ; R0 - 05 52 13 - Pipe and Tube Railings 0 Review (HBn - RO:- 0! i 52 13 - Pipo arld Tube R2ilik gs d Approval (F ✓E) - RO - 05:52113 - Pipe and Tube:RAings TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU no SER " EJ SMITH Page 7 of 48 CONSTRUCTION Acts ity ID P-1 ASS.1-1170 Activity Name Submittal - R1 - 05 52 13 - Pipe and Tube Railings Crig Cur 10d Remaining Duration 10d %I Complete 0% Start 01-Deo-23 Finish 14-Dec23 P-1AS-A.1-1170 Approval (A/E) - R1 - 05 52 13 - Pipe and Tube Railings 10d 10d 0% 15-Dec23 29-Deo-23 P-1AS-F0-1170 Fabricate & Deliver/Store -05 52 13 -Pipe and Tube Railings ld 1d 0% 02Jan-24 02Jan-24 05 73 00 - Decorai Metal Railings 61d 61d 0% 042ct-23 02Jan-24 P-IASS.0-1180 Submittal - RO - 05 73 00 - Decorative Metal Railings 20d 20d 0% 04-Oct-23 31-Oct-23 P-lAS-R.0-1180 Review (HISS) - RO - 05 73 00 - Decorative Metal Railings 10d 10d 0% 01-Nov-23 14-Nov-23 P-lAS-A.0-1180 Approval (A/E) - RO - 05 73 00 - Decorative Metal Railings 10d 10d 0% 15-Nov-23 30-Nov-23 P-1ASS.1-1180 Submittal - R1 - 05 73 00 - Decorative Metal Railings 10d 10d 0% 01-Dec23 14-Dec23 P-lAS-A.1-1180 Approval (A/E) - R1 - 05 73 00 - Decorative Metal Railings 10d 10d 0% 15-Deo-23 29-Deo-23 P-lAS-F.0-1180 Fabricate & Deliver/Store - 05 73 00 - Decorative Metal Railings 1d 1d 0% 02Jan-24 02Jan-24 0610 00 - Rough P-1ASS.0-1190 Carpentry Submittal - RO - 06 10 00 - Rough Carpentry 61 d 20d 61d 20d 0% 0% 17-W-23 17-0ct-23 15Jan-24 13-Nov-23 P-1 AS-R.0-1190 Review (HISS) - RO - 06 10 00 - Rough Carpentry 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1190 Approval (A/E) - RO - 06 10 00 - Rough Carpentry 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-1190 Submittal - R1 - 06 10 00 - Rough Carpentry 10d 10d 0% 14-Dec23 28-Dec23 P-IAS-A.1-1190 Approval (A/E) - R1 - 06 10 00 - Rough Carpentry 10d 10d 0% 29-Dec-23 12Jan-24 P-lAS-FO-1190 Fabricate & Deliver/Store - 06 10 00 - Rough Carpentry 1d 1d 0% 15Jan-24 15Jan-24 061600-Sherri 61d 61d 0% 17-Oct-23 15Jan-24 P-1 A-S-S.0-1200 Submittal - RO - 06 16 00 - Sheathing 20d 20d 0% 17-Oct-23 13-Nov-23 P-1AS-13.0-1200 Review (HISS)-RO-061600-Sheathing 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1200 Approval (A/E) - RO -06 16 00 -Sheathing 10d 10d 0% 30-Nov-23 13-Dec-23 P-IASS.1-1200 Submittal-R1-061600-Sheathing 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1200 Approval (A/E)-R1-061600-Sheathing 10d 10d 0% 29-Deo-23 12Jan-24 P-lAS-F0-1200 Fabricate &Deliver/Store -061600-Sheathing 1d 1d 0% 15Jan-24 15Jan-24 06 20 23 - Interior Finish Carpentry 61d 61d 0% 22-Dec23 19-Mar-24 P-1ASS.0-1210 Submittal - RO - 06 20 23 - Interior Rnish Carpentry 20d 20d 0% 22-Deo-23 22Jan-24 P-lAS-R.0-1210 Review (HISS) - RO - 06 20 23 - Interior Finish Carpentry 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1210 Approval (A/E) - RO - 06 20 23 - Interior Finish Carpentry 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1210 Submittal - RI - 06 20 23 - Interior Finish Carpentry 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1210 Approval (A/E) - R1 - 06 20 23 - Interior Finish Carpentry 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F.0-1210 I Fabricate & Deliver/Store - 06 20 23 - Interior Finish Carpentry ld 1d 0% 19-Mar-24 19-Mar-24 06 40 23 - Interior Archheclural Woodwork P-1ASS.0-1220 Submittal - RO -06 40 23 - InteriorAmhitectural Woodwork 61d 61d 0% 22-Dec23 20d 20d 0% 22-Dec-23 22Jan-24 P-lAS-R.0-1220 Review(HBS)-RO-064023-InteriorArchitectural Woodwork 10d 10d 0%23Jan-24 05-Feb-24 P-1AS-A..0-1220 Approval (A/E) - RO -06 40 23 - InteriorArchdectural Woodwork 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1220 Submittal-R1 - 06 40 23 - IntedorAmhitec tural Woodwork 10d 10d 0% 20-Feb-24 04-Mar-24 r- Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work Zb JGJI"IS OI-`JI-6171�I3I,il-`L L1I1 �34ISI6 17I F�9I 11I11tG1 I1Ad11I1I16I 111J8111L21I `LI Z124 [I26I LI ZI2�3I313�'3I34I �❑ Submittal - R1 -;05 52:13 , Pipe end Tube Railinois ❑ Apptoi WE) - F'1 ;0552 13 Pipe and Tube Railings I Oabjica e $ Dpliv x/$torg - 05 p2 j 3 - Pipe $nd Tube pailingS $ubmittpl -RO - 05 7;3 0) - peporai Mbtal Railirgs , El Review(FIB;")-,10'i 7$00- Decorative Mi Rio ilings O App"I (F JE) - RO - 05:73 00 - D'ecdrative Metal I lailing5 ❑ Submittal - R1 -;05 73 AO , Decorai Metal Rail ngs ■ AppfovA (A/Ej - FI ;05 73 OO I- Decorative Me al Railings I 4,abjica e $ Df iv ar/$torg - 05 �3 QO - Dgwjai Metal Railings, , Ill Submittal - rZ) -b6:10 DO, Rough Carpentry b Revi w:(HUS)'r F(O - )6,10 00 - Rough Carpenjry , P Approval A/r) -:RD - Op 10 00 - Rough Cairpgntr, ❑ SUbMitt; tl-IRT- O i 10 00 - Rodgh;CarpehtrX ❑ Appro,,al(A/E)-R1;-061000-RoughICarp"ty Fabdcate, & Deli ✓eroStore - 09 1 Q 00 - Rough 7arpentry E Submittal-ID-106!16 D0; Sheathing b Re*w;(HRS), qO - )6 j 6 p0 - S6eajhing Q APProval ;A/E)-:RD-061600-Shdathing, ❑ S6bd ittil-IRl:-031600-Shdath.ing ❑'Appro rat (A/E) - R1;- O6 16 00 - Sheathing I !Fabricate, & Deli ✓erlStore - 09 1 Q 00 -Sheathing Subn iittal - RO OB 2Q 23 - 10terior Rnish Gal gentry, 0 ties levy (H$S - AO -,06 20i23i- Interior Pini, n Carpentry: , :0: Ajlprgval (AZ:) RQ - 06 20 23 - Ini R iish Carpentryy 6 1 submittal R1 - 06 20 23 -;Interior Rhist CAp entry :0 Approval (A/E) -I R1 - 06 20 23 - Interio, Finish Carpentry FabdpffiE & beliver/Store F 06 20 2� - I nteliorv,Fnish (Carpentry, C7 Sobn iittal - RO OB 40 23 - 10tegorAmhitecb al Woodwork ket levy (FIBS - AD -�,06 40i23i- Interior ", eptuial Wogdwprk , 0 AI �prgval (,�) ; RO - 06 40 23 - InteriorArh@sectuml Woodwork P �ubmittal R1-064023- IlnteriorArchNclural Woodwork TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To 'ER " EJ SMITH 1' Page 8 of 48 CONSTRUCTION Acts ity ID P-1AS-A.1-1220 Activity Name Approval (A/E) - R1 - 06 40 23 - InteriorArchitectural Woodwork Crig Dur 10d Remaining Duration 10d %I Complete 0% Start 05-Mar-24 Finish 18-Mar-24 P-lAS-F0-1220 Fabricate &Deliver/Store -064023- InterlorArchitectural I ld 0% 19-Mar-24 19-Mar-24 064116-Plastic Laminallefaced Architectural Calirets 61d 61d 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1230 Submittal - RO - 06 41 16 - Plastic Laminate -Faced Architectural 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1230 Review (HBS) - RO - 06 41 16 - Plastic Laminate -Faced 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1230 Approval (IF) - RO - O6 41 16 -Plastic Laminate -Faced 10d 10d 0 % 06-Feb-24 19-Feb-24 P-1ASS.1-1230 Submittal-R1-064116- Plastic Laminate -Faced Architectural 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1230 Approval (A/E) - R1 - 06 41 16 - Plastic Laminate -Faced 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1230 Fabricate &Deliver/Store-064116- Plastic Laminate -Faced Amhftectu'I Cabinets 064216- Rush Wood Paneling ld ld 0% 19-Mar-24 19-Mar-24 61d 61d 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1240 Submittal - RO - 06 42 16 -Flush Wood Paneling 20d 20d 0% 22-Dec-23 22Jan-24 P-1 AS-R.0-1240 Review (HBS) - RO - 06 42 16 -Flush Wood Paneling 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1240 Approval (A/E) - RO - 06 42 16 -Flush Wood Paneling 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1240 Submittal - R1 - 06 42 16 -Flush Wood Paneling 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1240 Approval (A/E)-R1-O64216-Rush Wood Paneling 10d 10d 0% 05-Mar-24 1B-Mar-24 P-lAS-F.0-1240 Fabricate &Deliver/Store -064216-Rush Wood Paneling ld ld 0% 19-Mar-24 16-Mar-24 066400-Plastic Paneling 61d OL 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1250 Submittal - RO - 06 64 00 - Plastic Paneling 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1250 Review (HBS) - RO - 06 64 00 - Plastic Paneling 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1250 Approval (A/E) - RO - 06 64 00 - Plastic Paneling 10d 10d 0% 06-Feb-24 19-Feb-24 P-1 ASS.1-1250 Submittal - R1 - 06 64 00 - Plastic Paneling 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1250 Approval (A/E) - R1 - 06 64 00 - Plastic Paneling 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F.0-1250 Fabricate & Deliver/Store - 06 64 00 - Plastic Paneling 1d 1d 61d 0% WILD. 0% 0% 19-Mar-24 16-Mar-24 Division r 07 1113 - Bitumnous P-1A.S.S.0-1260 Dampproofing Submittal - RO - 07 11 13 - Bituminous Dampproofing r7 61d a 17-Oct-23 17-Oct-23 15Jan-24 13-Nov-23 20d 20d P-1AS-R.0-1260 Review (HBS) - RO - 07 11 13 - Bitumnous Dampproofing 10d 10d 0% 14-Nov-23 29-Nov-23 P-lAS-A.0-1260 Approval (A/E) - RO - 07 11 13 - Bitumnous Dampproofing 10d 10d 0% 30-Nov-23 13-Deo-23 P-IASS.1-1260 Submittal-R1-071113- Bituminous Dampproofing 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1260 Approval (A/E) - R1 - 07 11 13 - Bitumnous Dampproofing 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-1260 07 13 26 - Self -Adhering P-lA-S-S.0-1270 Fabricate & Deliver/Store - 07 11 13 - Bitumnous Dampproofing 1 d ld 0% 15Jan-24 15Jan-24 Sheet Membrane Waterproofing Submittal - RO -07 13 26 - SeH-Adhering Sheet Membrane 61d 61d 0% 17-W-23 15Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 P-lAS-R.0-1270 Review (HBS) - RO - 07 13 26 - Sell -Adhering Sheet Membrane 10d 10d 0% 14-Nov-23 29-Nov-23 P-lAS-A.0-1270 Approval (A/E) - RO - 07 13 26 - Self -Adhering Sheet Membrane 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1270 Submittal - R1 - 07 13 26 - SeH-Adhering Sheet Membrane MiRinnofirin 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1270 Approval (A/E) - R1 - 07 13 26 - Self -Adhering Sheet Membrane 10d 10d 0% 29-Deo-23 12Jan-24 r- Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort fps Actual Work O Remaining Wont Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I,il-`L L1I1 �34I516I/I F�9I 1^I11tG1 I1Ad11I1I16I 111J8111L21I `LI LI24 LI26I LI ZI2d 3131t31341 I❑ Approval(A/E)-IR1-064D 23- Int4do'ArbhitbcturatWoodwork Fabricate &peljver/Store 06 46 23 - nten0 rchitectu,ml Wopduwrf O Sbbn Offal - RO 06 41, 16 - Plastic Laminate- -aoed Archftectural Cabinets 1) pet ievf (HOS - AO 06 41:16:- Plastic pan inate-paced Ardjitecturpl Oab nets :0: Appreval (A E) RO - 06 41 1:6 - Plestq Lrninate-FacE4 Architectural C✓kinets ❑ t iub'miffal R1 - 06 41 1:6 -,Plastic La'miiiiate-Fdced Arbhitectuml Cebin ets! :0 Approval(A/E) 'R1-064,116-Plastic Laminate -Faced Architectural Cabinets Fabrcatt & peljver/Store 06 41 16 - Plastic Laminatel,Faced grehRcztu,ml Cal tinets O Solon iittal - RO 06 42 16 - Plush Wood Rani fling 0 pet levy (FIBS - AO 06 42:16:- Flush Ww I Paneling :11: Approval (A F) RO - 06 42 1:6 - Flush We ad ,Paneling j ❑ Sub mittaI R1-06421:6-Flush Wobd°arlelieg I I :0 Approval(A/E) R1-064216- P1ulsh'Nobd Paneling Fabricate & beljver/StoreI- 06 42 16 - I lush Wood Paneling I I O Subn iiffal - RO 06 64 00 - Plastic Par relio9 pet ievf (FOS - A0 06 64: 00:- Plastic Pan Ming ❑ ' Ap preval (A E) Ro - 06 0 00 - Plastid Pt neling�' ❑ Submittal R1-066400-IPlastio Pbne.ing'� ;❑ Approval (A/E) R1 - 06 64 00 - Plastic Paneling Fabricate & peljver/StoreI- 06 64 o6 - Mastic Paneling 11!11 (Submittal - M -D7111 13 F Bitumnous Dampprodfini I NJ Reviowj(HI IS)!- R,0 - )711 13 - Bituminous I)arppp�ofing M APPmYal ;AlE)-:RO -0y 11 13-$Hutnnous Dempprgofipg S Subgnitttl -M:- 0 r 11 13 - BHumnous Demopn ofiri ♦! Y1pproraI (A/�) - R1: 07 11 13 - Bitumnbu§ Dampproofing I IFabriate'! & Deli ✓enStore - 07 11:13 - Bllurtmriius IDampprobfirlg CISubmhtal-M-107:1326�S41f-AdtYeringShebtMenbranelWaterproofing d ReviEw!(HI IS)', FD - )7 93 26 - SBH-Adhering She rt Membrane) Waterproofing El APPr6raI,A/P)-;Ro-0y1$26-$elft-Adherind Slksel Membra6e%%leippothg ■ Submift il-'Rl:-Or1826-Self,-Adhering',Sheei Membrane Waterproofing: ■ Approval(A/F)-Rl:-071326-£eH-Adhefing Sheet Membrane Watbiploo ing!, TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns Ru To SER " EJ SMITH L' Page 9 of 48 CONSTRUCTION Aofn ity ID Activity Name P-1AS-FO-1270 Fabricate&Deliver/Store -071326-Self-Adhering Sheet embmna Waternroofi Orig Dur 1d 61d Remaining Duration 1d 61d %I Complete 0% Start 15Jan-Jan Finish 15Jan-Jan 07 13 53 - Elastomeric Sheet WaErproofirg — 0% 174)et-23 15Jan-24 P-lA.S-S.0-1280 Submittal - RO - 07 13 53 - Elastomeric Sheet Waterproofing 20d 20d 0% 17-W-23 13-Nov-23 P-lAS-R.0-1280 Review (HISS) - RO - 07 13 53 - Elastomeric Sheet Waterproong 10d 10d 0% 14-Nov-23 29-Nov-23 P-lAS-A.0-1280 Approval (A/E) - RO - 07 13 53 - Elastomeric Sheet Waterproofing 10d 10d 0% 30-Nov-23 13-Dec-23 P-1A.S.S.1-1280 Submittal - R1 - 07 13 53 - Elastomeric Sheet Waterproofing 10d 10d 0% 14-Deo-23 28-Dec23 P-lAS-A.1-1280 Approval (A/E) - R1 - 07 13 53 - Elastomeric Sheet Waterproofing 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-1280 Fabricate & Deliver/Store - 07 13 53 - Elastomeric Sheet 1 d Id 0% 15Jan-24 I "an-24 07 14 13 - Hot Fluid A,Ii.d Waterproofing 61d 51d 0% 17-0W-23 15Jan-24 P-1ASS.0-1290 Submittal - RO - 07 14 13 - Hot Fluid Applied Waterproofing 20d 20d 0% 17-Oct-23 13-Nov-23 P-lAS-R.0-1290 Review (HBS)-RO-071413- Hot Fluid Applied Waterproofing 10d 10d 0% 144Jov-23 29-Nov-23 P-lAS-A.0-1290 Approval WE) - RO - 07 14 13 - Hot Fluid Applied Waterproofing 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1290 Submittal-R1-071413- Hot Fluid Applied Waterproofing 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1290 Approval (A/E) - R1 - 07 1413- Hot Fluid Applied Waterproofing 10d 10d 0% 29-Deo-23 12Jan-24 P-1AS-FO-1290 Fabricate &Deliver/Store -071413-Hot Fluid Applied Wale 1d 1d 0% 15Jan-24 15Jan-24 07 16 16 - Crystalline Waterprodirg P-lA-S-S.0-1300 Submittal - RO - 07 16 16 - Crystalline Waterproofing 61d 61d 01/. 17-Oct-23 15Jan-24 20d 20d 0% 17-01 13-Nov-23 P-lAS-R.0-1300 Review (HBS)-RO-071616- Crystalline Waterproofi rig 10d 10d 0% 14-Nov-23 29-Nov-23 P-lAS-A.0-1300 Approval (A/E) - RO - 07 16 16 - Crystalline Wate 1p oding 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-1300 Submittal-R1-071616- Crystalline Waterproofing 10d 10d 0% 14-Deo-23 28-Deo-23 P-lAS-A.1-1300 Approval (ArE)-R1-071616- Crystalline Watelploding 10d 10d 0% 29-Deo-23 12Jan-24 P-lAS-F0-1300 Fabricate &Deliver/Store -071616- Crystalline Waterproofing ld 1d 0% 15Jan-24 15Jan-24 61d 61d 0% 22-Deo-23 19 Mar-24 P-1ASS.0-1310 Submittal - RO - 07 21 00 - Thermal Insulation 20d 20d 0% 22-Deo-23 22Jan-24 P-lAS-R.0-1310 Review (HISS)-RO-072100- Thermal Insulation 10d 10d 0% 23Jan-24 05-Feb-24 P-IAS-A.0-1310 Approval (A/E) - RO - 07 2100 -Thermal Insulation 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1310 Submittal - Rl - 07 21 00 - Thermal Insulation 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1310 Approval (A/E) - R1 - 07 2100- Thermal Insulation 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1310 Fabricate &Deliver/Store -072100- Thermal Insulation 1d 1d 0% 19-Mar-24 19-Mar-24 19-Mar-24 22Jan-24 072419-Water-Drel rege Exterior tried afi on a nd Finis h Sy stem(EIPS) P-1A-S-S.0-1320 Submittal - RO - 07 24 19 - Wabr-Drainage 5tteriorinsubtion and 61d 61d 09/ Iff-Deo-23 20d 20d 0% 22-Deo-23 P-lAS-R.0-1320 Review (HISS) - RO - 07 24 19 - Water-Drahage E#erbrisubtion 10d 10d 0% 23Jan-24 05-Feb-24 P-lAS-A.0-1320 Approval (A/E)-RO-072419-Water-Drainage Exterior Insulation 10d 10d 0% 06-Feb-24 19-Feb-24 P-IASS.1-1320 Submittal-R1-072419- Water-D rainage Extenorl rsubtim and 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1320 Approval(A/E)-R1-072419-Water-Drainage Exterior Insulation Fin nh System tF:IFS1 10d 10d 0% 05-Mar-24 18-Mu24 PAAS-17.0-1320 Fabricate&Deliver/Store-072419-Water-Drainage Fedor 1d 1ci 0% 19-Mar-24 19-Mar-24 072715- NonblWminous Self-Adheared Sheet Air Banter 61d 61d 0% 17-Cc1-23 15Jan-24 r— Remaining Level of Effort ♦ ♦ Milestone r— Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJI AIS OI JJJ�I�I .IL1I1 ?I AIM 17I E�9I 1nI11tG1 I1Ad11I1I16I 111J8111L21I`LI LI24 `LI26I 11 LI2�3I318�ZUi ,Zb 3I34I31E -cfl' dl':il IFabricate&©eli✓er%Store-071826-SeH;Adlieribg Sheet fvlembmnB WatEpbofhg 0 Submittal-171-b7;1353F EI8stombrio;SheetlWatei proof! rig b Reviawi(HI IS)'r RO - )713 $3 - Elastomeric Sheet Waterproofing Approval ;A/E) -;RO - 0y 1$ 53 - �Iastomeric $heat Walprprooing ❑ Spbroitt tl-',1371- 0 r 13 50 - Elagtoroedc Sheet Waterproofing; ❑ ,Approral (A/E) - R1;- 07 13 53 - Elastomeric'heiet Weterp"fing I ;Fa66cate'&©eli✓er%Store-071353-Blaston do She et WatefproolN D I Submittai - FJr-!07114 13 F Hbt Fluid Applied Waterproofing d ReviEwl(HXfS)', RO - )7 94 13 -Hot Fluid Appli2d Vate,rpfoofing! El Approval ;A/�)-;RO-Oy1413-Hot:Fluid Apoiec Wateiproofii ❑ Submitt al - Rl:- 0 ✓ 14 18 -Hot: Fluid Applied, W rterproofing j ❑ Approral (A/F) - Rl:- 07 14 13 - Hot Fluid AprAed, Woterproofidg I Fabrirate',& ©ell mr%Store - 07 1413 -Hot Fluid Applied WalerProoflnY O I Submfttai - M-107;16 16',Crystallihe Walerpbofing q Review;(HI IS)'r RO - )716 16 -Crystalline Waterp—lInq C1 Approval,A/O)-:RO-Oy1$16-ory$talline',W$taipiodijg ,0 Spbynitttl-'Rl:-Orlolo-CryotallineWeterproofidg ■ Approval,(A/E)-Rl:-071616-CrystallindWiteiplodhg I FabriDeli ✓er/Store-071616- C"alli ne Waltzipr rq Ill Subn iittel - RO 07 21', 00 - Thermal In9ulatio n Rey iew (H,BS - RO -107 21:00:-Thermat im elation ❑ ; Al,prgvai (A• F) % R0 - 07 �1 00 - Thamial l nsylatlpn Q Submittal R1-07210.0-jlherhel lhsL lation ;❑ Adprdval(A/E) R1-072100- Th4rm al Insulation FsbdcatE &Deliver/Store l-072106--he"Al lnsul6o'n M I Shbmival - RO .07 24 19 - WetOr-Draihage ►xtedoe l rsubrion and PiriSh FWstbm,(EI FS) 0 Re%!eW(I4�3S-RO -�0724;19I- Weler,glair age, FaterbrlrsUbtlonl . R dsh Sysl[ mj(ElES) ❑ ; Al'proval (,4' F) I R0 - 07 �4 1:9 - Water,Dr i nsige, B da dpr n sulatiq n and Fh;ish ,8y tern ($ FS) ❑ d;ubmittal Rl-07241:9-Waterbrein�,ge',Ex)'edorlriuptionord:Firsh Sygten(EIF$) ;❑ Apprdval(A/E)-!Rl-072s119-Writer Dreiiriage ExpddrinsdhtonaTId Fhih3y9teria (FJI Fabricate & Deliver/Stbr I47 2419 -water-Drainage Exhriori h&1 Lbn aid l nith Syste FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update TASK filter: All Activities Data Date: 31-Aug-23 ALCOM HUNT NS NU fl0 s€n €5 EJ SMITH Page 10 of 48 CONSTRUCTION Acts ity ID P-1ASS.0-1330 Activity Name Submittal - RO - 07 27 15 - Nonbituminous SeR-Adheared Sheet Air earn Crig Dur 20d Remaining Duration 20d %I Complete 0 % Start 17-Cct-23 Finish 13-Nov-23 P-lAS-R.0-1330 Review (HBS) - RO - 07 27 15 - Nonbituminous Self-Adheared 10d 10d 0% 14-Nov-23 29-Nov-23 P-IAS-A.0-1330 Approval (A/E) - RO - 07 27 15 - Nonbituminous Self-Adheared Sba 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1330 Submittal - R7 - 07 27 15 - Nonbituminous Self-Adheared Sheet 10d 10d 0% 14-Dec23 28-Deo-23 P-lAS-A.1-1330 Approval (A/E) - R1 - 07 2715- Nonbituminous Self-Adheared heel 10d 10d 0% 29-Deo-23 12Jan-24 P-1AS-FO-1330 Fabricate &Deliver/Store -072715-Nonbtuminous Self-Arlheamd Sheet Air Barrier 07 27 26 - Rrid-Applied Membrane At r Ba riers ld ld 0% 15Jan-24 15Jan-24 61d 61d 0% 17-Oct-23 15Jan P-1 ASS.O-1340 Submittal - RO - 07 27 26 - Fluid -Applied Membrane Air Barriers 20d 20d 0% 174)ct-23 13-Nov-23 P-lAS-R.0-1340 Review(HBS)-RO-072726-Fluid-Applied Membrane Air Sa— 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1340 Approval (A/E) - RO - 07 27 26 - Fluid -Applied Membrane Air Ba— 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-1340 Submittal - R1 - 07 27 26 - Fluid -Applied Membrane Air Barriers 10d 10d 0% 14-Deo-23 28-Dec23 P-lAS-A.1-1340 Approval(A/E)-R1-072726-Fluid-Applied Membrane Air Bani 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-1340 Fabricate&Deliver/Store -072726-Fluid-Applied Membrane Air Barrism 1d 1d 0% 15Jan-24 15Jan-24 075419-PVC Roofing 61d 61d 0% 17-W-23 15Jan-24 P-1 ASS.O-1350 Submittal - RO - 07 54 19 - PVC Roofing 20d 20d 0% 17-0W-23 13-Nov-23 P-1 AS-R.0-1350 Review (HBS) - RO - 07 54 19 - PVC Roofing 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1350 Approval WE) - RO - 07 54 19 - PVC Roofing 10d 10d 0% 304Nov-23 13-Deo-23 P-1ASS.1-1350 Submittal-R1-075419-PVC Roofing 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-1350 Approval (A/E) - R1 - 07 54 19 - PVC Roofing 10d 10d 0% 29-Deo-23 12Jan-24 P-1 A-S-FO-1350 Fabricate & Deliver/Store - 07 54 19 - PVC Roofing 1 d ld 0% 15Jan-24 15Jan-24 07 62 00 - Sheet Metal Flashing & Trim I —W 61d 61 d 0% 174)d-23 15Jar1-24 P-1 ASS.O-1360 Submittal - RO - 07 62 00 - Sheet Metal Flashing & Tdm 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-1360 Review (HBS) - RO - 07 62 00 - Sheet Metal Flashing & Trim 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1360 Approval (A/E) - RO - 07 62 00 - Sheet Metal Flashing & Trim 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1360 Submittal - R1 - 07 62 00 - Sheet Metal Flashing & Trim 10d 10d 0% 14-Deo-23 28-Dec23 P-1 AS-A.1-1360 Approval WE) - R1 - 07 62 00 - Sheet Metal Flashing & Trim 10d 10d 0% 29-Deo-23 12Jan-24 P-lAS-F0-1360 Fabricate & Deliver/Store - 07 62 00 - Sheet Metal Flashing & Tdm 1 d 1d 0% 15Jan-24 15Jan-24 077100-Man ufacWred Roof Specialties 61d 61d 0% 17-0ct-23 15Jan-24 P-1ASS.0-1370 Submittal - RO - 07 71 00 - Manufactured Roof Specialties 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-1370 Review (HBS) - RO - 07 7100 - Manufactured Roof Specialties 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1370 Approval (A/E) - RO - 07 7100 - Manufactured Roof Specialties 10d 10d 0% 304Nov-23 13-Deo-23 P-1AS.S.1-1370 Submittal - R1 - 07 71 00 - Manufactured Roof Specialties 10d 10d 0% 14-Deo-23 28-Dec23 P-lAS-A.1-1370 Approval (A/E) - R1 - 07 7100 - Manufactured Roof Specialties 10d 10d 0% 29-Dec23 12Jan-24 PAAS-FO-1370 07 71 29 - Manufactured Fabricate & Deliver/Store - 07 71 00 - Manufactured Roof Suer-ialties Roof Expansion Joint 1 d ld 0% 15Jan-24 15Jan-24 61d 61d 0% 174W-23 15Jan-24 P-1 ASS.0-1380 Submittal - RO - 07 71 29 - Manufactured Roof Expansion Joint 20d 20d 09/. 174)ct-23 13-Nov-23 P-1 AS-R.0-1380 j Review (HBS) - RO - 07 71 29 - Manufactured Roof Expansion 10d 10d 0% 14-Nov-23 29-Nov-23 r— Remaining Level of Effort ♦ ♦ Milestone r— Actual Level of Effort ffi Actual Work O Remaining Work Critical Remaining Work Zb J GJI AIS OI-91-F517IEI3I :il-`L L1I1 �34ISI6I/I F�9I 11I11tG1 I1Ad11I1I16I 111J8111�211 `LI LI24 `LI26I 11 LI2*3I31 zui '3I34I Submittal -1Z0 -:0727 15 � NontrRurninous Self-AdIrrand Sheet Air Barrier: d Reviowl(HI IS)h RO - )7 27 15 - Nonbituminous: SF/-Adheared Sheet Air Barrier 0 APprovaf A/E)-:RO - O% 2� 15 - Norlblfumihotts SeO-Adhearec Stjeet Aiq Bame, ❑ Submift rl -'Rl 0 7 27 15 - Noribltuminous Self Adheared Sheet Air Barrie: ■ Y1ppro'ral(A/F)-R1;-072715- Nonbituminous Self:Adhedred Sheet Air Barrier I IFabricate'A Deli mr%Stdre - 07 2715 - NonbRt mirlou5 SeR,Adheared Sheet 4ir Bailfer O Submittal - p -:07:27 26, Roid-Applied Membrane Air ,Barriers : d Reviewl(HI S)'r F60 - )7 27 26 - FIGid-Applied Mem bmne Air Barbers C1 Approval ;A/E) -:RO - Oy 2� 26 - NuM-APPlied .Memb'rans Air Barriers ❑ SubtnRt r: -'Rl 0 r 2y 20 - Ruio-Applied Memb ang Air Bamors ❑ ;Approval(A/f)-R1:-072726-Fluid-Applied Membrane Air Barriers) I ;Fabricate'& Deli ✓erlStdre - 07 27 26 - Fluid-Alplidd Membrane Air Bartels I 0 I Submital - IJ-',07:54 19',PVC Robfirig d Reviewl(HKS)', RO - )7 S4 19 - PVC Roofing El Approval A/() -;RO - O% 54 19 - pV� Roofing: I I I I ❑ Submittul -'Rl:- O r 54 19 - PVC Rbofing', ❑ ;Appm gal (A/F) - Rl:- 07 54 19-PVC Roofing I IFabncatel& Deli ✓erlStdre - 07 5419 - PVC Ruofing O Submittal - M-:07:62 DO' Sheet Metal Flashing:& dim ❑ Review:(HIRS)'r RO - )7 d2 00 - Sheet Meta:, Flashi ng A Trim El Approval A/0) -:RO - Oy 6Q 00 - $hGet Metal Playing A Trim j ❑ SubGnitti tl -'R1 0 ✓ 62 00 - Sheet Metal Mashin d &'!Tdm ❑ Appno gal (A/E) - Rl:- 07 62 00 -Sheet Metal I lashing & Tden I IFabricata & Deli ✓erlStdre - 07 62 00 - Sheet Metal Flashing & Tdm 0 Submittal - F D -b7:71 DO: Manufactured Roof Spa, fatties d Review;(HYS); RO - )7 91 p0 - Manufactured Roc1 Specialties : El APProval A/E) -;RO - 0y 7100 - Manufactyrea R )of ,$ppcialtieg ❑ SubmiO; d -87'- 0 ✓ 7100 - Manufactured, Roof Specialties ❑ ;Appro,,al(A/E)-R1:-077100-Manufacturer RoofSpeciaRies I IFabric%16 & Deli ✓erlStore - 07 71: 00 - Maroif-Vuted )Roof Spe'cialtie5 O Submittal - R)-107:71 29 M2nufacturod Roof Eup: nsibn Joint : d Review:(HIS)' RO - )7 7129 - Manufactured Rocl Expansion Joint TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To SER " EJ SMITH Page I I of 48 CONSTRUCTION Acts ity ID P-1 AS-A.0-1380 Activity Name Approval (A/E) - RO - 07 7129 - Manufactured Roof Expansion Crig Dur 10d Remaining Duration 10d %I Complete 0% Start 30-Nov-23 Finish 13-Dec-23 P-1ASS.1-1380 Submittal - R1 - 07 71 29 - Manufactured Roof Expansion Joint 10d 10d 0% 14-Dec23 28-De723 P-IAS-A.1-1380 Approval (A/E) - R1 - 07 7129 - Manufactured Roof Expansion jaiot 10d 10d 0% 29-Dec-23 12Jan-24 P-lAS-F0-1380 Fabricate & Deliver/Store - 07 71 29 - Manufactured Roof ld ld 0% 15Jan-24 15Jan-24 077200-Roof Accessories 61d 61d 0% 17dct-23 15Jan-24 P-1 A-S-S.0-1390 Submittal - RO - 07 72 00 - Roof Accessories 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-1390 Review (HBS) - RO - 07 72 00 - Root Accessories 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1390 Approval (A/E) - RO - 07 72 00 - Roof Accessories 10d 10d 0% 30-Nov-23 13-Dec-23 P-1 ASS.1-1390 Submittal - R1 - 07 72 00 - Roof Accessories 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-1390 Approval (A/E) - R1 - 07 72 00 - Roof Accessories 10d 10d 0% 29-Dec-2312Jan-24 P-1 AS-FO-1390 Fabricate & Deliver/Store - 07 72 00 - Roof Accessories 1 d 1 d 0% 15Jan-24 15Jan-24 07 8100 - Applied Fire Prollectlon 0 61d 61d 0% 17-W-23 15Jan-24 P-IASS.0-1400 Submittal - RO - 07 81 00 -Applied Fire Protection 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-1400 Review (HISS) - RO - 07 8100 -Applied Fire Protection 10d 10d 0% 14-Nov-23 29-Nov-23 P-lAS-A.0-1400 Approval (A/E) - RO - 07 8100 -Applied Fire Protection 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-1400 Submittal-R1-078100-Applied Fire Protection 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1400 Approval (A/E) - R1 - 07 8100 -Applied Fire Protection 10d 10d 0% 29-Dec-23 12Jan-24 P-lAS-F0-1400 Fabricate &Deliver/Store -078100-Applied Fire Protection ld ld 0% 15Jan-24 15Jan-24 078123-Inhmecerd Fireproofing 61d 61d 0% 22-Deo-23 19-Mar-24 P-IASS.0-1410 Submittal - RO - 07 81 23 - Intumecent Fireproofing 20d 20d 0% 22-Dec-23 22Jan-24 P-lAS-R.0-1410 Review (HBS) - RO - 07 81 23 - Intumecent Fireproofing 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1410 Approval (A/E) - RO - 07 81 23 - Intumecent Fireproofing 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1410 Submittal - R1 - 07 81 23 - Intumecent Fireproofing 10d 10d 0% 20-Feb-24 04 Mar-24 P-lAS-A.1-1410 Approval (A/E) - R1 - 07 8123 - Intumecent Fireproofing 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1410 Fabricate & Deliver/Store - 07 81 23 - Intumecent Fireproofing 1 of ld 0% 19-Mar-24 19-Mar-24 07 84 13 - Penetration Firestopping 61d 61d 0% 22-Dec23 19-Mar-24 P-1ASS.0-1420 Submittal - RO - 07 84 13 - Penetration Firestopping 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1420 Review (HISS) - RO - 07 84 13 - Penetration Firestopping 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1420 Approval (A/E) - RO - 07 84 13 - Penetration Firestopping 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1420 Submittal - R1 - 07 84 13 - Penetration Firestopping 10d 10d 0% 20-Feb-24 04-Mar-24 P-IAS-A.1-1420 Approval (A/E) - R1 - 07 84 13 - Penetration Firestopping 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1420 Fabricate & Deliver/Store - 07 84 13 - Penetration Frestopping ld ld 0% 19-Mar-24 19-Mar-24 078443-Joint Fieestapping 61d 61d 0% 22-Dee23 19-Mar-24 P-1 ASS.O-1430 Submittal - RO - 07 84 43 - Joint Firestopping 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1430 Review (HISS) - RO - 07 84 43 - Joint Firestopping 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1430 Approval (A/E) - RO - 07 84 43 - Joint Firestopping 10d 10d 0% 06-Feb-24 19-Feb-24 P-IASS.1-1430 Submittal-R1-078443- Joint Firestopping 10d 10d 0% 20-Feb-24 04-Mar-24 - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work J GJ`JI-6171�3I `LIJJ 1Gd11J�' Zb I IOI I�4I1III 11L1 917IIA I24 L2I LZ20333334I ■ Approval A/E) -:RO - 07 7129 - Manufactured R rof IExpansiori Joint ■ Subrnitt l -IR1;- 0 7 74 29 -Manufactured Roof Expansion Joint ■ Apbro'ral(A/�)-R1I-O�712g-Manufictgrs( Rgof ;Expansion Joint: I (Fabricate!& Deli ✓erlStore-0771:29-Mariufa^.tured:RoofExpansion:joint 0 Submittal - M-'07172 DO' Roof Acae*ries ❑ Review,(HI iS)I, RD - )7 72 00 - Rbof Aoces9,oas ❑ AppmVal ;A/E) -:RO - OP 72 00 - Roof Aocessdrie: I, ❑ SPbmitttl - IR1I- 0 r 72 00 - Roo'f Apcessoile8 ❑ Approral '(A/D)-R1I-O�72 Op-$oof ApceIlas I :Fabricate! & Deli ✓erlStore- 07 70 00 - Hoot Atceasoq'ies Q Submittal -rJ( 47:81 00' Applied FirelProtedtion 0 Revibwl(Ht IS)I, T - )7 81 00-Aripliod Fire Prdtec lion 11 Approval ;A/E) -IRO - 09 8100 -Applied Fire Prof actibn ❑ Subrnitt tl-IR11-0✓8100-Applied Fire Protectim ❑ Aop ro'ral (A/�) - R1I- O� 81 04 -Applied Fre fbipetipn I IFabriate!& Deli ✓erlStore - 07 81:00 -Applied Fire Protection O ' Subn dial - �O 07 8123 - Intumecent F2pi oof;ing! ❑ Re\ Iew (FPS - RO �107 81123:- IntuMedenl Fit Hoofing l :0: Approval (A E) ; RO - 07 81 23 - Intomace,t FreproofinY 8ubmit[al Rl-Q781 Q3-;Intumecent iirepro0fing ;0 Apprgval (A/r=) RI - 07 01 23 - jntgmucept Fireprogfing Fabriou & Deliver/Store 07 81, 2y -I ntu;meoent Riep;roofin4 Subn iitial -RO 07 84 13 - P,enbtration Fies2,pping q fie\iew(TS -RO -!0784:13I-Penbtratior Fireslbppingl ;❑ Approval (A F) ? RO - 07 84 1'3 - Penetration Fireatoppirlg 11u4mittal R1 -Q7 841:3-0enetratipn Frestopping !❑ Apprgval (A/P) ; R1 - 07 L 4 13 - pepeti atign Frestopping Fabricate & Deliver/Stbre.'07 84 13 - penetration Firestopping Sobn iittal - HO O7 84 43 - Joint Rrestoppin£ ❑ Re%iew(HIBS -RO �107841431- JointVirbstupping' i0 Approval (ALE) : RO - 07 84 43 - Joint Fire, aoppirlg 1) 8ugmiltal R1-Q78443-(Joint F,ireitopping TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU Tio 'ER " EJ SMITH 1' Page 12 of 48 CONSTRUCTION Acts ity ID P-1AS-A.1-1430 Activity Name Approval (A/E) - R1 - 07 8443- Joint Firestopping Orig Dur 10d Remaining Duration 10d %I Complete 0% Start 05-Mar-24 Finish 18-Mar-24 P-1AS-F0-1430 Fabricate & Deliver/Store -078443- Joint Firestopping I 1d 0% 19-Mar-24 19-Mar-24 079200-Joint Sealants 61d 61d 0% 17-W-23 15Jan-2 P-1 ASS.O-1440 Submittal - RO - 07 92 00 - Joint Sealants 20d 20d 0% 17-0W-23 13-Nov-23 P-1 AS-R.0-1440 Review (HBS) - RO - 07 92 00 - Joint Sealants 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1440 Approval WE) - RO - 07 92 00 - Joint Sealants 10d 10d 0% 304Nov-23 13-Dec23 P-1 ASS.1-1440 Submittal - R1 - 07 92 00 - Joint Sealants 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-1440 Approval (A/E) - R1 - 07 92 00 -Joint Sealants 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-1440 Fabricate & Deliver/Store - 07 92 00 - Joint Sealants 079219- Acoustical Joint Sealarts ld ld 0% 15Jan-24 15Jan-24 61d 61d 0% 17-Oct-23 P-1 ASS.O-1450 Submittal - RO - 07 92 19 -Acoustical Joint Sealants 20d 20d 0% 17dW-23 13-Nov-23 P-1 AS-R.0-1450 Review (HBS) - RO - 07 92 19 -Acoustical Joint Sealants 10d 10d 0% 144Nov-23 29-Nov-23 P-1 AS-A.0-1450 Approval (A/E) - RO - 07 92 19-Acoustical Joint Sealants 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-1450 Submittal-R1-079219-Acoustical Joint Sealants 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-1450 Approval (A/E) - R1 - 07 92 19 -Acoustical Joint Sealants 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-1450 Fabricate & Deliver/Store - 07 92 19 -Acoustical Joint Sealants ld ld 0% 15Jan-24 15Jan-24 07951313- Interior Expansion Joint Covers 61d EL 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1460 Submittal - RO - 07 95 13 13 - Interior Expansion Joint Covers 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1460 Review (HBS) - RO - 07 95 13 13 - Interior Expansion Joint Covers 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1460 Approval (A/E) - RO - 07 95 13 13 - Interior Expansion Joint Covers 10d 10d 0% 06-Feb-24 19-Feb-24 P-1 ASS.1-1460 Submittal - R1 - 07 95 13 13 - Interior Expansion Joint Covers 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1460 Approval (A/E) - R1 - 07 95 13 13 - Interior Expansion Joint Covers 10d 10d 0% 05-Mar-24 18-Mar-24 P-lA-S-F0-1460 07 951316 - Exterior Fabricate & Deliver/Store - 07 95 13 13 - Interior Expansion Joint Covers Expansion Joint Covers ld ld 0% 19-Mar-24 16-Mar-24 61d 61d 0% 22-Dec23 19�vlar-24 P-1 ASS.O-1470 Submittal - RO - 07 95 13 16 - Exterior Expansion Joint Covers 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1470 Review (HBS) - RO - 07 95 13 16 - Exterior Expansion Joint 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1470 Approval (A/E) - RO - 07 95 13 16 - Exterior Expansion Joint 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1470 Submittal - R1 - 07 95 13 16 - Exterior Expansion Joint Covers 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1470 Approval (A/E) - R1 - 07 95 13 16 - Exterior Expansion Joint 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-FO-1470 Fabricate & Deliver/Store - 07 95 13 16 - Exterior Expansion Joint ld ld 0% 19-Mar-24 19-Mar-24 0811 13 - Hollow Metal Doors and Frames P-1 A-S-S.0-1480 Submittal - RO - 08 11 13 - Hollow Metal Doors and Frames 61d 61d 0% 22-Dec23 19�vlar-24 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1480 Review (HBS) - RO - 08 11 13 - Hollow Metal Doors and Frames 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1480 Approval WE) - RO - 08 11 13 - Hollow Metal Doors and Frames 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1480 Submittal - R1 - 08 11 13 - Hollow Metal Doors and Frames 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1480 Approval (A/E) - R1 - 08 11 13 - Hollow Metal Doors and Frames 10d 10d 0% 1 05-Mar-24 18-Mar-24 — Remaining Level of Effort ♦ ♦ Milestone — Actual Level of Effort flflflflflfl■ Actual Work O Remaining Work flflflflflfl■ Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I,il-`L L1I1 �34I516I /I tt 9I 11I11tG1 I1Ad11I1I16I 111J8111L21I `LI LI24 [I26I LI ZI2*3I 313�'3I34I l❑ Approval (A/E) -I R1 - 07 114 43 - Joint F ireatopping Fabricate & bellver/Store '� 07 84 43 point Firestopping 0 Submittal - FJ-107:92 00 Joint Sealants b Review:(HH% Ro - )7 02 00 - Joint Sealarts d Approval Air) -,RO - 07 92 00 - Ooirit Sealent¢ ❑ Sbbdnitrtl-IR1:-079200-Joint Sbalant5 ❑ 'Appm,,al(A/E)-R1;-079200-Joint Saalant: I IFabricge, & Deli ✓erlStgre - 07 92 00 - Joint S"a'nls, n Submittal-hl-10719219;- Acoustical Joint Sealants b Re4w:(Hrs)'r Ro - )7 02 19-Agoustical Jpint:Salapts P Approval ;A/r) -:RO - 07 92 19-Aoobstical Joiht £;ealants ❑ SbbMitt rl-IRl:-Or 9219-Acoustical Joint Sea ants ❑ Approval (A/E) - R1l- 07 92 19-Aooustical.Joi tt Sealants I !Fabnvate,& Deli ✓erlStgre-07, 9219-Acoustical Joint Sealants O Sobn trial - RO 07 95 13 13 - Interior Expan;ion Joint Covers pee ievf (FOS - FiO 07 95:13:13 - Interior I:xpgnslon Joint Goversl j ❑ : AF proval (A F) Rq - 07 95 13 13-Interic r Expansion Joint Covers ❑ Submittal R1 -07 95 1:3 13 - lmdriot E; pahsibn Joint Cbvers ;❑ Apprcval (A/E) R1 -07 95 13 13 Inturiot Expansion Joint Covers Fabricate & bellver/Store,- 07 95 13 1:1- irile' r Expansion Joint:co /ers III : Sobn iittal - RO .0 95 13 15 - Exterior,Ecpaksion Joint Givers 0 tIec ieW (I-(BS -0007 95l13:16 - EMepor Expansion Joint Coverj :❑ : AF proval (A E) R0 - 07 95 1:3 16 -!Exterior Expansion Joint Covers: ❑ Submittal R1 - 07 95 1:3 1. - Exterior Expansion Joirit Covers I❑ Approval (A/E) R1 - 67 95 13 16 -IExr eror Expansion Joint Cbvers Fabricate & Deliver/Store, 07 95 13 11 i -Exterior Eamsion Joint C.vets EM : Solon dial - RO .08 11! 13 - Hollow Metal Does and'! Frames n Rex iew (HBS - RO �108 11:131- Hollow Met if Doors and Frames I11:Al'pmvai(-E)iR5-08 j11Q-Hollovj Metal,Dgorsan{ Frames: 4 !iubmitfal Ri-081113-Hollow , Metal Doors! and Frames ;❑ A0proval(A/E) -IR1-081113-HoloHMotallDoors:anb Frames: TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns Rn To SER " EJ SMITH 1' Page 13 of 48 CONSTRUCTION Acts ity ID Activity Name P-1AS-F0-1480 Fabricate & Deliver/Store - 08 11 13 - Hollow Metal Doors and Orig Dur 1d Remaining Duration 1d %I Complete 0% Start 19-Mar-24 Finish 19-Mar-24 081216-At lunirum Frames 61d 61d 0% 04-Oct-23 02Jan-24 jo P-lA.S-S.0-1490 Submittal - RO - 08 12 16 - Alluminum Frames 20d 20d 0% 04-W-23 31-Oct-23 P-lAS-R.0-1490 Review (HBS) - RO - 08 12 16 -Alluminum Frames 10d 10d 0% 01-Nov-23 14-Nov-23 P-lAS-A.0-1490 Approval (A/E) - RO - 08 12 16 -Alluminum Frames 10d 10d 0% 15-Nov-23 30-Nov-23 P-1ASS.1-1490 Submittal-R1-081216- Alluminum Frames 10d 10d 0% 01-Dec23 14-Dec-23 P-lAS-A.1-1490 Approval (A/E)-R1-081216-Alluminum Frames 10d 10d 0% 15-Deo-23 29-Dec23 P-lAS-F0-1490 Fabricate &Deliver/Store -081216-Alluminum Frames I 1d 0% 02Jan-24 02Jan-24 08 13 16 - A uni rum Terrace Doors 61d 61d 0% 04-0ct-23 02Jan-24 P-1ASS.0-1500 Submittal - RO - 08 13 16 -Aluminum Terrace Doors 20d 20d 0% 04-Oct-23 31-Oct-23 P-lAS-R.0-1500 Review (HBS) - RO - 08 13 16 -Aluminum Terrace Doors 10d 10d 0% 014Jov-23 14-Nov-23 P-lAS-A.0-1500 Approval WE) - RO - 08 13 16 -Aluminum Terrace Doors 10d 10d 0% 15- Nov-23 30-Nov-23 P-1ASS.1-1500 Submittal-R1-081316-Aluminum Terrace Doors 10d 10d 0% 01-Dec23 14-Deo-23 P-lAS-A.1-1500 Approval (A/E) - R1 - 08 13 16 -Aluminum Terrace Doors 10d 10d 0% 15-Dec23 29-Dec-23 P-lAS-FA-1500 Fabricate &Deliver/Store -081316-Aluminum Terrace Doors ld ld 0% 02Jan-24 02Jan-24 081416-Rush Wood Doors ir P-lA-S-S.0-1510 Submittal - RO - 08 14 16 -Flush Wood Doors 61d 61d 0% 22-Dec23 19-Mar-24 20d 20d 0% 22-Dec-23 22Jan-24 P-lAS-R.0-1510 Review (HBS) - RO - 08 14 16 - Flush Wood Doors 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1510 Approval (A/E) - RO - 08 14 16 -Flush Wood Doors 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1510 Submittal-R1-081416-Flush Wood Doors 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1510 Approval (A/E) - R1 - 08 14 16 -Flush Wood Doors 10d 10d 0% 05-Mar-24 1 B-Mar-24 P-lAS-F0-1510 Fabricate & Deliver/Store - 08 14 16 -Flush Wood Doors ld ld 0% 19-Mar-24 19-Mar-24 08 33 23 - Overhead Calling Doors 61d 61d 0% 22-Dec23 19-Mar-24 P-lA-S-S.0-1520 Submittal - RO - 08 33 23 - Overhead Coiling Doors 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1520 Review (HIBS) - RO - 08 33 23 - Overhead Coiling Doors 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1520 Approval (A/E) - RO - 08 33 23 - Overhead Coiling Doors 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1520 Submittal-R1-083323- Overhead Coiling Doors 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1520 Approval (A/E) - R1 - 08 33 23 - Overhead Coiling Doors 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1520 Fabricate &Deliver/Store -083323- Overhead Coiling Doors 1d 1d 0% 19-Mar-24 19-Mar-24 084413- Curtain Wal l Sysia in P-IASS.0-1530 Submittal - RO - 08 44 13 - Curtain Wall Sysem 150d 150d 0% 13-Sep-23 15-Apr-24� 07-Nov-23 40d 40d 0% 13-Sep-23 P-lAS-R.0-1530 Review(HBS)-RO-084413-Curtain Wal System 10d 10d 0% 08-Nov-23 21-Nov-23 P-1 AS-A.0-1530 Approval (A/E) - RO -08 44 13 -Curtain Wall System 10d 10d 0% 22-Nov-23 07-Dec23 P-IASS.1-1530 Submittal-R1-084413-Curtain Well System 10d 10d 0% 08-Dec-23 21-Deo-23 P-lAS-A.1-1530 Approval (A/E) - R1 - 08 4413- Curtain Wall System 10d 10d 0% 22-Dec23 08Jan-24 P-lAS-F0-1530 Fabricate &Deliver/Store -084413- Curtain Wall System 70d 70d 0% 09Jan-24 15-Apr-24 08 7100 - Door Hardware I 61d 61 d 0% 22-Dec-23 19-Mar-24 r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work G-cfllJSl L�ItG1�LI�' Zb JI II IAl-IAdIIIJLSId-L 11 96I7III24 L2I 1L20333334I I Fabricate & Denver/Store i- 08 11'! 13 - hollow Metal Dorfrs and Frames ::::j Submittal;RC-08121i-Allulninurrl Frames p Review (h1B - ROI-Olt 1 E 16 Alluminum Frames b APprov01(F✓E)-00-08:12';16-AJIurninum Rmrjie: ❑ Submittal-R7-:0812h6�Allurrnuin Frames ❑ App(ovA(A/Ey-FI 081216:AIIuminum Fmnes, 1 Pabhca e & D61iv ar/StorO - 08 12 16-Allum�m n Flames Submittal ; RC - 08 13 1 3-Alufninum:Teaace Doots t3 RevieVv (4-) - RO:- OO 13 16 -Aluminum Terrace D )ors j b Approv$I(FJE)-00-081,13;16-Alpm(num Ygrrace Dop,, Q Submittal-Fll-:0813:16-Aluminurh Terrace:Do)rs! ❑ ApplovA (A/Ey - F-t 0813 16:Atl/minum Tem ce'Dobrs I Rabkcae & D21iv x/Stora - O8 13 16-AWmifturn TBrrabe Doors =' Shbn iittsl - RO 08 14 16- Plush Wood Dooi s 0 Re,o law (NIBS - RO �108 14:16:- Flush Woa I Doors ❑ : A jprpvaj (A F) ; Ro - 08 141:6 - Rush We od poprs Q Submitlal RI -0814 1:6-'Flush Wood logrs i❑ Apprdval(A/E) R1-081416-Flukh'Nobd Doors: Fabricate & Deliver/Store, 08 14 16 - I lush Wood Doors W Subn dial - RO 08 33 23 - Overhead Coiling Doom 0 Re,o ieW (NIBS - RO -108 33:23:- Overhead ►oiling (Doors: I❑ I AI'prpval (A• F) I Ro - 0813 �3 - O vgrhpa( Calling Doors Q Submittal R1 - 08 33 23 -Overhead Coiling Doors ;❑ A0prdval (A/E) R1 - 08 33 23 - OvierN md, Cdiling Dpors Fabricate & Deliver/Store'- 08 33 23 - I )vbrha'ad Colling Doors C= SubmittalFR�)-08443;Curtain WaRSyslem ❑, Review FHB3)1, R0-(84410-Cu4ain Wal c)Btem 0 ApproYal (4/E) - (10 0$ 44 13 - (rurtpin Well $yst 3m', ❑ SIjW'rttel- Fit =0£4413,- Curtain Wall Sysiorn ❑ ApProal(A/E)-31',084413- CurtainIWall ZWbml Fabricate:&©eliverlStdre-08441£-Curtain Well System' f f TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 ALCOM HUNTin Phase 1 Schedule Update Ns Ru To SER " EJ SMITH r' Page 14 of 48 CONSTRUCTION Acts ity ID P-1 ASS.O-1540 Activity Name Submittal - RO - 08 71 00 - Door Hardware Cidg Dur 20d Remaining Duration 20d %I Complete 0% Start 1 22-Dec23 Finish 22-Jan-24 P-1 AS-R.0-1540 Review (HBS) - RO - 08 71 00 - Door Hardware 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1540 Approval (A/E) - RO - 08 71 00 - Door Hardware 10d 10d 0% 06-Feb-24 19-Feb-24 P-1 ASS.1-1540 Submittal - R1 - 08 71 00 - Door Hardware 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1540 Approval (A/E) - R1 - 08 7100 - Door Hardware 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-FA-1540 Fabricate & Deliver/Store - 08 71 00 - Door Hardware 1d 1d 0% 19-Mar-24 19-Mar-24 08 80 00 - Exterior Glazing 61d 61d P-1 ASS.O-1550 Submittal - RO - 08 80 00 - Exterior Glazing 20d 20d 0% 044)ct-23 31-Oct-23 P-1 AS-R.0-1550 Review (HBS) - RO - 08 80 00 - Exterior Glazing 10d 10d 0% 01-Nov-23 14-Nov-23 P-1 AS-A.0-1550 Approval (A/E) - RO - 08 80 00 - Exterior Glazing 10d 10d 0% 15-Nov-23 30-Nov-23 P-1ASS.1-1550 Submittal-R1-088000-Exterior Glazing 10d 10d 0% 01-Dec23 14-Dec23 P-1 AS-A.1-1550 Approval (A/E) - R1 - 08 80 00 - Exterior Glazing 10d 10d 0% 15-Dec23 29-Dec23 P-1 AS-FO-1550 Fabricate & Deliver/Store - 08 80 00 - Exterior Glazing ld ld 0% 02Jan-24 02Jan-24 089119-Rxed Louvers 61d 61d 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1560 Submittal - RO - 08 91 19 - Fond Louvers 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1560 Review (HBS) - RO - 08 91 19 - Fond Louvers 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1560 Approval (A/E) - RO - 08 91 19 - Fixed Louvers 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1560 Submittal-R1-089119-Fixed Louvers 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1560 Approval (A/E) - R1 - 08 91 19 - Fixed Louvers 10d 10d 0% 05-Mar-24 18-Mar-24 P-1 A-S-FO-1560 Fabricate & Deliver/Store - 08 91 19 - Fixed Louvers 1 d ld 0% 19-Mar-24 19-Mar-24 Division ar 24 092116- Gypmsum P-1ASS.0-1570 Board Shaft Assemblies I Submittal - RO - 09 21 16 - Gypmsum Board Shaft Assemblies 61d 61d 20d 0% 0% 17-Oct-23 17-Oct-23 15Jan-24 13-Nov-23 20d P-lAS-R.0-1570 Review (HBS) - RO - 09 21 16 - Gypmsum Board Shaft Assemblies 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1570 Approval (A/E) - RO - 09 21 16 - Gypmsum Board Shaft Assernhl 10d 10d 0% 30-Nov-23 13-Deo-23 P-IASS.1-1570 Submittal-R1-092116- Gypmsum Board Shaft Assemblies 10d 10d 0% 14-Dec-23 28-Deo-23 P-1 AS-A.1-1570 Approval (A/E) - R1 - 09 21 16 - Gypmsum Board Shaft ASSe 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-1570 Fabricate&Deliver/Store -092116- Gypmsum Board Shaft Assemblies 09 22 16 - Nonstructural Metal Framing P-1ASS.0-1580 Submittal - RO - 09 22 16 - Non -Structural Metal Framing ld ld 0% 15Jan-24 15Jan-24 61d 61d 0% 17-W-23 j 15Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-1580 Review (HBS) - RO - 09 22 16 - Non -Structural Metal Framing 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1580 Approval (A/E) - RO - 09 22 16 - Non -Structural Metal Framing 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1580 Submittal - R1 - 09 22 16 - Non -Structural Metal Framing 10d 10d 0% 14-Dec23 28-Dec23 P-IAS-A.1-1580 Approval (A/E) - R1 - 09 22 16 - Non -Structural Metal Framing 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-1580 Fabricate &Deliver/Store -092216- Non -Structural Metal ld ld 0% 15Jan-24 15Jan-24 09 24 00 - Cement Plastering 61d 61d P-1 ASS.0-1590 Submittal - RO - 09 24 00 - Cement Plastering 20d 20d 0% 22-Deo-23 19-Mar-24 22-Deo-23 22-Jan-24 0% r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJZb I"IS OI-`JI-6171�I3I ,il-`L L1I1 �34ISI6I/I F�9I 11I11tG1 I1Ad11I1I16I 111J8111L2II LI Z124 [I26I LI ZI2S 3I31 '3I34I �I O Solon iittal - RO .08 7100 - Door Hardcrarb I I I I 0 Re%iew(HBS-RO-�,0871;00:-Door Herd%rare I I ,❑ A{�prgval(AE),RO-08�100- Door Hariwere Q t iubmittal R1 - 08 71 00 -Door Hardw re ;Ip AOproval(A/E) R1-087100-,Door Madedre Fabricate & Deliver/StoreI- 08 7100 - Door Hardware Submittal ; RO - 08 80 0) - Exterior Glazing p Review (W13:9 - RO:- 01 180 00 - Exterior, Glazing j b Approv$l (/ JE) - 00 - 08:80 00 - Ezterlor Glazing l7 Submittal - F41 -:08 80 b0 Exterior Glazing ❑ ApplovA (A/Ey - F7 -:08 80 00 EA[erior Gla�ini I Babtica e & DBliv ar/Store - 08 80 00 - E tedbr:lazing O Subn iittal - RO 08 9119 - Fixed Louvers: In Re% iew (HBS - RO -108 91:19;- Fixed Leuv xs :0: Afurroval (A�E) RQ - 08 Of 1:9 - Fixed �or/vers ❑ ! iub'mittal R1 - 08 91 19 -:Fixed Louvei s !❑ Approval(A/E) �IR1-089119-,Fixed-oyver5 Fabricate & Deliver/Store� 08 91 19 -19xed Louvers 0 (Submittal -M-W:2116',G�pmsulnBoard ShaltRse;mb;lies O Revew:(HI iS)!- RO - )9 21 16 - Gypnisum Boats alaft Assemblies! b Approval ;A/E)-IRO-092116-Uypmsum,Bdarc ShaftAssemblies ❑ Spbrnittrl-';R1j-0d2n 10-Gypmsum Boiprc{SkaftjAsgembliys ❑ ;Approeal (A/E) - Rl:- 09 21 16 - Gypmsu6 Board, Shaft Assemblies I ;Fabricate!& Deli ✓erlStdre-0921;16-GypinsiiinBoard ShAftAssembliet O ' Submittal - FZ0-!09,22 16',Nbn-Stmddrel Metal Fmi nin✓3 ❑ Revibwl(HI IS)!- Rd - )9 22 16 - NanStmetural Meal Framing l7 APproyal ;A/F) -IRO - 09 2P 16 - NorlStmctural lk�sta'I Framing; ❑ Spbroift it -';R1 j- 0) 2� 1$ - NogStjuctural Meta l Framing ❑ !Appro ral '(A/E) - Rl:- 09 22 16 - NonSt;rudurA Metal Framing', I ;Fabdcitel& Deli er/Stdre - 09 2216 - NonSti uctbral, MetallFraming O Sitbn iittbl - RO 09 24 00 - Cement Plbstiadn g TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns Ru To 'ER " EJ SMITH 1' Page 15 of 48 CONSTRUCTION Acts ity ID P-1 AS-R.0-1590 Activity Name 1 Review (HBS) - RO - 09 24 00 - Cement Plastering Cidg Dur 10d Remaining Duration 10d %I Complete 0% Start 23-Jan-24 Finish 05-Feb-24 P-1 AS-A.0-1590 Approval (A/E) - RO -09 2400 -Cement Plastering 10d 10d 0% 06-Feb-24 19-Feb-24 P-IASS.1-1590 Submittal - R7 -09 24 00 -Cement Plastering 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1590 Approval (A/E)-R1-092400-Cement Plastering 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1590 Fabricate & Deliver/Store -0924 00 -Cement Plastering ld ld 0% 19-Mar-24 19-Mar-24 09 29 00 - Gypsum Board r 61d 61 d 0% 17-W-23 15Jan-24 P-1 A-S-S.0-1600 Submittal - RO - 09 29 00 - Gypsum Board 20d 20d 0% 174)ct-23 13-Nov-23 P-1 AS-R.0-1600 Review (HBS) - RO - 09 29 00 -Gypsum Board 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1600 Approval (A/E) - RO - 09 29 00 - Gypsum Board 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-1600 Submittal-R1-092900-Gypsum Board 10d 10d 0% 14-Dec23 28-Deo-23 P-1 AS-A.1-1600 Approval WE) - R1 - 09 29 00 - Gypsum Board 10d 10d 0% 29-Dec-23 12Jan-24 P-1 AS-FA-1600 Fabricate & Deliver/Store - 09 29 00 - Gypsum Board ld ld 0% 15Jan-24 15Jan-24 09 30 13 - Ceramic Tiling 61d 61d 0% 22-Dec23 19-Mar-24 P-lA-S-S.0-1610 Submittal - RO - 09 30 13 - Ceramic Tiling 20d 20d 0% 22-Dec-23 22Jan-24 P-1 AS-R.0-1610 Review (HBS) - RO - 09 30 13 - Ceramic Tling 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1610 Approval (A/E) - RO - 09 30 13 - Ceramic Tiling 10d 10d 0% 06-Feb-24 19-Feb-24 P-1AS.S.1-1610 Submittal - R1 - 09 30 13 - Ceramic Tiling 10d 10d 0% 20-Feb-24 g4 Mar-24 P-lAS-A.1-1610 Approval (A/E) - R1 - 09 3013-Ceramic Tiling 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1610 Fabricate &Deliver/Store -093013-Ceramic Tiling 1d 1d 0% 19-Mar-24 19-Mar-24 09 5123 - Acotalcalille Collings 61d 61d 0% 17-W-23 P-1ASS.0-1620 Submittal - RO - 09 51 23 -Acoustical Tile Ceilings 20d 26d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-1620 Review (HBS) - RO - 09 5123 -Acoustical Tile Ceilings 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1620 Approval WE) - RO - 09 5123 -Acoustical Tile Ceilings 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1620 Submittal-R1-095123-Acoustical Tile Ceilings 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1620 Approval (A/E) - R1 - 09 5123 -Acoustical Tile Ceilings 10d 10d 0% 29-Dec-23 12Jan-24 PAAS-17.0-1620 Fabricate & Deliver/Store - 09 51 23 -Acoustical Tile Ceilings ld ld 0% 15Jan-24 15Jan-24 09 65 13 - Resilient Base & Accessories P-1A-S-S.0-1630 Submittal - RO - 09 65 13 - Resilient Base &Accessories 61d 61d 0% 22-Dec23 19-Mar-24 22Jan-24 20d 20d 0% 22-Dec23 P-1 AS-R.0-1630 Review (HBS) - RO - 09 65 13 - Resilient Base & Accessories 10d 10d 0% 23-Jan-24 05-Feb-24 P-1 AS-A.0-1630 Approval (A/E) - RO - 09 65 13 - Resilient Base & Accessories 10d 10d 0% 06-Feb-24 19-Feb-24 P-IASS.1-1630 Submittal - R1 - 09 65 13 - Resilient Base &Accessories 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1630 Approval WE) - R1 - 09 65 13 - Resilient Base &Accessories 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1630 Fabricate & Deliver/Store - 09 65 13 - Resilient Base &Accessories ld ld 0% 19-Mar-24 19-Mar-24 09 65 19 - Resilient Tile Flooring 61d 61d 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1640 Submittal - RO -09 65 19 - Resilient Tile Flooring 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1640 Review (HBS) - RO - 09 65 19 - Resilient Tile Flooring 10d 1 od 0% 1 23Jan-24 I 05-Feb-24 P-1 AS-A.0-1640 Approval (A/E) - RO - 09 65 19 -Resilient Tile Flooring 10d 10d 0% 1 06-Feb-24 1 19-Feb-24 — Remaining Level of Effort ♦ ♦ Milestone r— Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work J GJI AIB OI `JI-6171�I3I ,il-`L 1I1 � 3 4I516I/I F�9I 11I11tG1 I1Ad11I1I16I 111J8111L21I `LI LI24 [I26I LI 712*3I 313�'3I34I O Rec ieW (HBS - RO -109 24: 00:- Cement Ph staring I❑ : Alproval (A—F) t RO - 09 24 QO - Cement Plastering j Submittal R1-092400-CemeptMa_eripg ❑ Approval (A/E) -!;R7-09400-Ceinett plastering] Fabricate & Deliver/Stbre 09 24 00 - Cement Plastering O Submittal -R-:09I2900: Gypsum:Boisrd ❑ Reviewl(HI IS):- RO - )9 29 00 - Ggpswm Board; b ApproWal ;A/E) -IRO - 08 29 00 -Gypsum B,oatd ❑ Spb�,nitt tl-';Rl:- 0 i 20 00 - Gypsurj Board 0 !Approral '(A/E) - Rl:- 00 29 00 - CPypsum goai d I (Fabricate: & Deli rerlStdre - 09 29 00 - Gypsun I Board [::I: SObn Offal - RO 09 30 13 - Ceramic Tiling: ❑ Ret ieW (NIBS - RO �109 30I13:- Ceramic Tit ng I❑ Alipnoval (A E)RO - 09 30 1:3 - Care ic' filing j E) Submittal R1-Q9301:3-Cerarpbtlinl :❑ Approval (A/E) -'; RI - 09 3;D 13 - Ceian is Tling Fabritaate & Deli ver/Stbre. 09 30 13 - Ceramic Tlin¢ O 'Submittai-FD-:09:51 23:Aooust cal Tile Ceilingk ❑ Revi2w:(1­1I IS)b RO - )9 51 23 -Acoustical Tile Ceil ngs I I I b Approtral ;A/E) -IRO - 09 5123 -Acoustical;1116 G )ilings I ❑ Spbrnittil-';R1I- 0 3 M 2$ -Acoustical Tile, C�ilin gs ; ❑ ;ApPm'ral 'IA/E)-Rl:-005122-Acoustical:TilE Ceilings I :Fabricates & Deli terlStdre - 09 51:23-Abotlsth al Tile'�Ceilin0s : Shbn iiffal - RO 09 65 13 - Resilient Basa &. \ocessories : ❑ Rec ieW (HBS - RO �109 65' 13'- Resilient B; rse A Access6dels :El: Aliproval (A E) I RO - 09 65 1:3 - Resilient 3ase & Accessopes 0 audmittal R - Q9 65 1:3 -:Resilient Oar A Aucessorjes •❑ Approval (A/lE) ; Ri - 09 65 13 - Resilk nt Base & ACpessones , : I Fabri6ate & Deliver/Stbre: 09 65 13 - I iesilieat Basd & Aocessori4s 0 Sbbn iittal - RO 09 65 19 - Resilient Tile Floc rind ❑ Ret ieW (HBS - RO -109 65I19:- Resilient Til a Fboring I❑ i Alproval (A F) i RO - 09 65 1:9 - Resilient rile Ropring TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To 'ER " EJ SMITH 1' Page 16 of 48 CONSTRUCTION Acts ity ID P-1 ASS.1-1640 Activity Name Submittal - R1 - 09 65 19 - Resilient Tile Flooring Orig Dur 10d Remaining Duration 10d %I Complete 0% Start 20-Feb-24 Finish 04-Mar-24 P-1AS-A.1-1640 Approval (A/E) - R1 - 09 65 19 - Resilient Tile Flooring 10d 10d 0% 05-Mar-24 18-Mar-24 P-1AS-F0-1640 Fabricate & Deliver/Store - 09 65 19 - Resilient Tile Flooring 1d 1d 0% 19-Mar-24 19-Mar-24 09 67 23 - Resinous Flooring 61d 61d 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1650 Submittal - RO - 09 67 23 - Resinous Flooring 20d 20d 0% 22-Dec-23 22Jan-24 P-1 AS-R.0-1650 Review (HBS) - RO - 09 67 23 - Resinous Flooring 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1650 Approval (A/E) - RO - 09 67 23 - Resinous Flooring 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1650 Submittal - R1 - 09 67 23 - Resinous Flooring 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1650 Approval (A/E) - R1 - 09 67 23 - Resinous Flooring 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1650 Fabricate & Deliver/Store - 09 67 23 - Resinous Flooring 1d 1d 0% 19-Mar-24 19-Mar-24 09 6813 - Carpet Ills 61d 61 d 0% 22-Dec23 19-Mar-24 P-1 AS-S.0-1660 Submittal - RO - 09 68 13 - Carpet Tile 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1660 Review (HBS) - RO - 09 68 13 - Carpet Tile 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1660 Approval (A/E) - RO - 09 68 13 - Carpet Tile 10d 10d 0% 06-Feb-24 19-Feb-24 P-1 ASS.1-1660 Submittal - R1 - 09 68 13 - Carpet Tile 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1660 Approval (A/E) - R1 - 09 68 13 - Carpet Tile 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1660 Fabricate &Deliver/Store -096813-Carpet Tile ld 1d 0% 19-Mar-24 19-Mar-24 09 68 20 - Woven Carpet 61d 61 d 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1670 Submittal - RO - 09 68 20 - Woven Carpet 20d 20d 0% 22-Deo-23 22Jan-24 P-1 AS-R.0-1670 Review (HBS) - RO - 09 68 20 - Woven Carpet 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1670 Approval (A/E) - RO - 09 68 20 - Woven Carpet 10d 10d 0% 06-Feb-24 19-Feb-24 P-1 ASS.1-1670 Submittal - R1 - 09 68 20 - Woven Carpet 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1670 Approval (A/E) - R1 - 09 68 20 -Woven Carpet 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1670 Fabricate & Deliver/Store - 09 68 20 - Woven Carpet ld ld 0% 19-Mar-24 19-Mar-24 097200-Wad lc rings 61d 61d 0% 22-Dec-23 19-Mar-24 P-1ASS.0-1680 Submittal-RO-097200-Walcavedrgs 20d 20d 0% 22-Dec-23 22Jan-24 P-1 AS-R.0-1680 Review (HBS) - RO - 09 72 00 - Walboverings 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1680 Approval (A/E) - RO - 09 72 00 - Walcovering s 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1680 Submittal-R1-097200-Walco✓edngs 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1680 Approval (A/E) - R1 - 09 7200-Walcoverirgs 10d 10d 0% 05-Mar-24 1B-Mar-24 P-1 AS-FO-1680 Fabricate & Deliver/Store - 09 72 00 - Walcoveri g a 1 d 1 d 0% 19-Mar-24 19-Mar-24 09 77 13 - Stretch Fabric We 119ystem3 61d 61d 0% 17-W-23 an-24 P-1 ASS.O-1690 Submittal - RO - 09 77 13 - Stretch Fabric Wall Syste ms 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-1690 Review (HBS) - RO - 09 77 13 - Stretch Fabric Wal Systems 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1690 Approval (A/E) - RO - 09 77 13 - Stretch Fabric Wal I Systems 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-1690 Submittal - R1 - 09 77 13 - Stretch Fabric Wall Systems 10d 10d 0% 14-Deo-23 28-Deo-23 P-1 AS-A.1-1690 Approval (A/E) - R1 - 09 77 13 - Stretch Fabric Wa1I Systems 10d 10d 0% 29-Dec23 12Jan-24 r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I ,il-`L L1I1 �34I516I/I F�9I 1nI11tG1 I1Ad11I1I16I 111J8111L21I `LI LI24 [I26I LI ZI2*3I31 '3I34I ❑ 1iuh'mittal R1-09651:9-;ResilientTleFlobrirYg :0 Apprgval (A/E) -I R1 - 09 65 19 - Resilient Tle IFloofing Fabricate & peljver/Store' 09 6$ 11 tepilient Tile Flooring , O , Spbn iittal - p0 0$ 0 23 - Resinous Ftioorinl l ❑ ReN iew (FfBS - RO 09 6723:- Resinous roofing'' :C : AW rdval (A F) : RO - 09 67 23 - Rekinbus Flood hg aubmiltal R1-096723-:Resinous: Rocrnfg ;❑ Apprgval(A/E) -IR1-Q96723-ResinuusIRaoring I Fabricatf & peljver/S$re- 09 67 2$ - I iepinops Fbgring =1 Spbn iiftal - �O 0$ 6$ 13 - oarpet Tile, 4 Rey iew (H$S - RO -' 09 68:13:- Carpet ,Tile :❑ Alprdval (A F) : RO - 09 68 1:3 - Carpet I a ❑ t;udmiHal R1-09681'3-:Carpet Tills ;❑ Approval (A/E) R1 - Q9 08 13-Catpe, Tile Fabricate & pel'ryer/S$ra L 09 6$ 1$ - Garpet;Tile , 1111111 : Spbn Offal - p0 .09 6$ 20 - Woven Carpej M aeN iew (HBS - RO 09 68:20:- Woven Car pets, :❑ AIprove! (AE): RO - 09 68 20 - Wdveh Capri ❑ aubmiltal R1-096820-Moved Carpet !❑ Approval (A/R) �', R1 - d9 6b 20 - Woven Carpet I Fabricate &peljver/S$re-096$20-r Voyen!, Carpet 0; Spbmiffal-�O 0$7�00-0,0alFcwedrjgsj , Q Ret iew (HBS - RO -'09 72:00:- Walbovtirin gs ❑ : Alprdval (A F) C RO - 09 72 00 - Wdlcdvei ing k ❑ Submittal R1-097200-1NalooVedng> I I I I ;E Approval (A/E) -I R1 - d9 72 00 - WalcuerIngIS j I Fabricate & peljver/Stgre'-09 7Q OQ - r Vow eHngsj , E�l ' Subm0al - rZ)-'0977 13;- Strretch Fabne Wal(Sy�L-ms', j Q Review:(HI IS)',- RP - )9,77 13 - Stretch Fabric Wal Systems 0 Appro4d ;A/E) -:RO - 09 77 13 - Strdtch Fabr d W it Systems ❑ Shbfnittr1-IR11-037713-Str9tch;Fabric'!W9II"thms ❑ 'Ap m ral (A/E) - Rl:- 09 77 13 - Stretch', Fabrk W41 Systerrts TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns Ru no SER " EJ SMITH r' Page 17 of 48 CONSTRUCTION Aan ity ID Activity Name P-lAS-F0-1690 Fabricate &Deliver/Store -097713-Stretch Fabric Wall Systems Orig Dur 1d Remaining Duration 1d %I Complete 0% Start 15Jan-24 Finish 15Jan-24 09 84 33 - Sand Absorbing Ce if rg Units 61d 61d 0% 174)ct-23 15Jan-24 P-lA-S-S.0-1700 Submittal - RO - 09 84 33 - Sound Absorbing Ceiling Units 20d 20d 0% 17-W-23 13-Nov-23 P-lAS-R.0-1700 Review (HISS) - RO - 09 84 33 - Sound Absorbing Ceiling Units 10d 10d 0% 14-Nov-23 29-Nov-23 P-lAS-A.0-1700 Approval (A/E) - RO - 09 84 33 - Sound Absorbing Ceiling Units 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-1700 Submittal - R1 - 09 84 33 - Sound Absorbing Ceiling Units 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1700 Approval (A/E)-R1-098433- Sound Absorbing Ceiling Units 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-1700 Fabricate &Deliver/Store -098433- Sound Absorbing Ceiling I 1d 0% 15Jan-24 I"an-24 09 91 13 - Exterior Painting P-1ASS.0-1710 Submittal - RO - 09 91 13 - Exterior Painting 61d 61d 0% 22-Dec23 19-Mar-24 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1710 Review (HBS) - RO - 09 91 13 - Exterior Painting 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1710 Approval WE) - RO - 09 91 13 - Exterior Painting 10d 10d 0% 06-Feb-24 19-Feb-24 P-1 ASS.1-1710 Submittal - R1 - 09 91 13 - Exterior Painting 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1710 Approval (A/E) - R1 - 09 91 13 - Exterior Painting 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-FO-1710 Fabricate & Deliver/Store - 09 91 13 - Exterior Painting ld 1d 0% 19-Mar-24 19-Mar-24 099123-Interior Painting 61d 61d 0% 22-Dec23 19-Mar-24 P-1 ASS.O-1720 Submittal - RO - 09 91 23 - Interior Painting 20d 20d 0% 22-Dec-23 22Jan-24 P-1 AS-R.0-1720 Review (HBS) - RO - 09 9123 - Interior Painting 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1720 Approval (A/E) - RO - 09 9123 - Interior Painting 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1720 Submittal - R1 - 09 91 23 - Interior Painting 10d 10d 0% 20-Feb-24 04-Mar-24 P-1 AS-A.1-1720 Approval (A/E) - R1 - 09 9123 - Interior Painting 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1720 Fabricate & Deliver/Store - 09 91 23 - Interior Painting 1d 1d 0% 19-Mar-24 19-Mar-24 09 96 00 - High Performance Coatings P-1A-S-S.0-1730 Submittal - RO - 09 96 00 - High Performance Coatings 61d 61d 0% 22-Dec23 19-Mar-24 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1730 Review (HBS) - RO - 09 96 00 - High Performance Coatings 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1730 Approval (A/E) - RO - 09 96 00 - High Performance Coatings 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1730 Submittal - R1 - 09 96 00 - High Performance Coatings 10d 10d 0% 20-Feb-24 OZ ar-24 P-lAS-A.1-1730 Approval (A/E) - R1 - 09 96 00 - High Performance Coatings 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-FO-1730 Fabricate & Deliver/Store - 09 96 00 - High Performance Coatings ld ld 0% 19-Mar-24 19-Mar-24 0% 61d 61d 0% 22-Dec-23 19-Mar-24 Division 10 10 21 13 - Phenolic -Core Toilet Compartments P-1 AS-S.6-1740 Submittal - RO -10 21 13 - Phenolic -Core Toilet Compartments 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1740 Review (HBS) - RO -10 21 13 - Phenolic -Core Toilet 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1740 Approval (A/E) - RO -10 21 13 - Phenolic -Core Toilet romnstmAnts 10d 10d 0% 06-Feb-24 19-Feb-24 P-1A.S.S.1-1740 Submittal - R1 -10 21 13 - Phenolic -Core Toilet Compartments 10d 10d 0% 20-Feb-24 04-Mar-24 P-lAS-A.1-1740 Approval (A/E) - R1 -10 21 13 - Phenolic -Core Toilet 10d 10d 0% 05-Mar-24 18-Mar-24 P-lAS-F0-1740 Fabricate & Deliver/Store - 10 21 13 - Phenolic -Core Toilet 1 d 1d Con, 102800-Toilet Bath& Laundry Accessories 61d 61d 0% 19-Mar-24 19-Mar-24 0% 22-Dec23 19-Mar-24 r- Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort fi Actual Work O Remaining Work Critical Remaining Work JGJZb I"IS OI-`JI-6171SI3I,il-`L L1I1 �34I516 171 F�9I 1nI11tG1 I1Ad11I1I16I 111J8111�211 `LI Z124 [I26I LI ZI243I313�'3I34I I ;Fabricate' & Deli ✓edStore - 09 77 13 - Stretch Fabric Wall Sys14 ms 0 Submittal-FJ-I09B433,SOund Absdbing Ceiling Units b Reviawi(HI IS)!- RO - )9 94 93 - Sound Absorbing�eil'IngIUnits APProyaI ;A/P) -:R0 - 00 84 33 - $oynd AbSor$in< CgiliQg Units ❑ Subrnin rl-F7:- 0 d 84 30 - Sortnd Absoroing Coiling Units ❑ ,Approral(A/E)-R1:-098433- Sound Abtodiino Ceiling Units I ;Fa6ricate'&Deli✓er%Stdre-098433- Sound Absorbing Ceiling Units; O I Snbn Ottal - RO -09 91'! 13 - Exterior Painting I I I I n Rec ieW (HBS - RO �109 91113;- Exterior:Pai ntiri9 I❑ Al pmval (A' F) Ro - 09 $1 1j3 - Exteror Fainting Q aubmittal RI - 09 91 1:3 -:Exterior Sain ing', '❑ Approval (A/E) R1 - 09 91 13 - Extedc r Painting FabdcatE & Dellver/Starei- 0991 13 - I Extedot Painting O Subn Offal - RO 09 9123 - Interior Painting I I I I ❑ Ret ieW (NIBS - RO �109 91;231- Interior Painting j❑ l Ali (A- E) - Rd - 09 $1 23 - Intodoj Piinting l Q Submittal Ri-099143-:Interior Pint ng' :❑ Apprdval (A/E) R1 - 09 91 23 - Int&do Painting Fabricate & Deliver/Store,, 09 91 23 -1 nteriorPaintirig W Subn iiffal - RO 09 96 00 - Hgl1 Performanc Coatings 0 Rec ieW (NIBS - RO -109 96:00;- Higtr Perfoi manse Coatings !El: AF prgvai (A• F) I Ro -09 06 00 -High I era rmanpe Coatings Q Sub;mittal R1 - 09 96 00 -:High Perfbi nuance Coatings ,f7 Apprdval (A/E) R1 - 09 96 00 -,High F'erfbmiance Coatings Fabdcate & Deliver/Store:'- 09 96 00 - I iigh Performance Coatings M: SQbn Offal - RO 10 211 13 - Rheholio-Cbre To let Cam partrbenls ❑ Rec ieW (FIBS - RO -110 21:13;- Phedolid-Core Toilet CodpartrnenC I❑ Atproval (A E) i RO - 10 21 1:3 - Phenolic -Done Toilet Compartments: j Ij tiubmOal Rj-1,0211:3-:Phenolic-ooia TpileRcomparmerts: :❑ Approval (4) RI -1:0 91 13-Ph6nc lic-Core Toilef Compartinenls : I Fabkate & Dellver/Stbre:10 21, 13 - Phenollo-Coro Toilet CoinpartmeHIS : TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 q=WM HUNT in Phase 1 Schedule Update N5 "°RU T� EJ SMITH 1' Page 18 of 48 CONSTRUCTION Activity ID I Activity Name I Orig Dur P-1 ASS.O-1750 Submittal - RO -10 28 00 -Toilet, Bath & Laundry Accessories 20d P-lAS-R.0-1750 Review (HBS) - RO -10 28 00 -Toilet, Bath & LaurdryAccessories 10d P-lAS-A.0-1750 Approval (A/E) - RO -10 28 00 -Toilet, Bath & Laundry Accessories 10d P-1ASS.1-1750 Submittal - R1 -10 28 00 -Toilet, Bath & Laundry Accessories 10d P-lAS-A.1-1750 Approval (A/E) - R1 -10 28 00 -Toilet, Bath & Laundry Accessories 10d P-lAS-FO-1750 Fabricate & Deliver/Store - 10 28 00 - Toiet, Bath & Laundry A- now ld 10 51 13 -Metal Lockers 61d 205 P-1 ASS.O-1780 Submittal - RO -10 51 13 - Metal Lockers P-1 AS-R.0-1780 Review (HBS) - RO -10 51 13 - Metal Lockers 10d P-1 AS-A.0-1780 Approval (A/E) - RO -10 51 13 - Metal Lockers 10d P-1A.S.S.1-1780 Submittal - R1 -10 51 13 - Metal Lockers 10d P-1 AS-A.1-1780 Approval (A/E) - R1 -10 51 13 - Metal Lockers 10d P-1 A-S-FO-1780 Fabricate & Deliver/Store - 10 51 13 - Metal Lockers ld 10 44 13 - Fire Protection Cabinets 61d 20d P-1 ASS.O-1760 Submittal - RO -10 44 13 - Fire Protection Cabinets P-lAS-R.0-1760 Review (HBS) - RO -10 44 13 - Fire Protection Cabinets 10d P-1 AS-A.0-1760 Approval (A/E) - RO -10 44 13 - Fire Protection Cabinets 10d P-1ASS.1-1760 Submittal - R1 -10 44 13 - Fire Protection Cabinets 10d P-IAS-A.1-1760 Approval (A/E) - R1 -10 44 13 - Fire Protection Cabinets 10d P-1 A-S-FO-1760 Fabricate & Deliver/Store - 10 44 13 - Fire Protection Cabinets 1 d 10 4416 - Fire Extinguishers 61d P-IASS.0-1770 Submittal - RO -10 44 16 - Fire Extinguishers 20d P-lA.S-R.0-1770 Review (HBS) - RO - 10 44 16 - Fire Extinguishers 10d P-1 AS-A.0-1770 Approval (A/E) - RO -10 44 16 - Fire Extinguishers 10d P-1ASS.1-1770 Submittal - R1 -10 44 16 - Fire Extinguishers 10d P-lAS-A.1-1770 Approval (A/E) - R1 -10 44 16 - Fire Extinguishers 10d P-lAS-F0-1770 Fabricate & Deliver/Store - 10 44 16 - Fire Extinguishers 1 of 1130 00 - Loading Dock Equipment 61d P-1ASS.0-1790 Submittal - RO -11 30 00 - Loading Dock Equipment 20d P-1 AS-R.0-1790 Review (HBS) - RO -11 30 00 - Loading Dock Equipment 10d P-lAS-A.0-1790 Approval (A/E) - RO -11 30 00 - Loading Dock Equipment 10d P-1ASS.1-1790 Submittal - RI -11 30 00 - Loading Dock Equipment 10d P-lAS-A.1-1790 Approval (A/E) - R1 -11 30 00 - Loading Dock Equipment 10d P-lAS-F0-1790 Fabricate & Deliver/Store - 11 30 00 - Loading Dock Equipment ld 1140 00 - Food Service Equipment 220d Kitchen 130d PRC1A-1110 I Submittal -RO- Kitchen Hood 35d r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Remaining Duration 20d 10d 10d 10d 10d ld 20d 10d 10d 10d 10d ld 20d 10d 10d 10d 10d 1d 20d 10d 10d 10d 10d id Start Complete 0% 22-Dec23 0% 23Jan-24 0% 06-Feb-24 0% 20-Feb-24 0% 05-Mar-24 0% 19-Mar-24 00/. 22-Dec23 0% 22-Dec23 0% 23Jan-24 0% 06-Feb-24 0% 20-Feb-24 0% 05-Mar-24 0% 19-Mar-24 0% 22-Dec23 0% 23Jan-24 0% 06-Feb-24 0% 20-Feb-24 0% 05-Mar-24 0% 19-Mar-24 0% 22-Dec23 0% 22-Dec23 0% 23Jan-24 0% 06-Feb-24 0% 20-Feb-24 0% 05-Mar-24 0% 19-Mar-24 Finish 22Jan-24 05-Feb-24 19-Feb-24 04-Mar-24 18-Mar-24 19-Mar-24 19-Mar-24 22Jan-24 05-Feb-24 19-Feb-24 04-Mar-24 18-Mar-24 19-Mar-24 22Jan-24 05-Feb-24 19-Feb-24 04-Mar-24 18-Mar-24 19-Mar-24 19-Mar-24 22Jan-24 05-Feb-24 19-Feb-24 04-Mar-24 18-Mar-24 19-Mar-24 61 d' 0% 22-Dec23 19-Mar-24 20d 0% 22-Dec23 22Jan-24 10d 0% 23Jan-24 05-Feb-24 10d 0% 06-Feb-24 19-Feb-24 10d 0% 20-Feb-24 04-Mar-24 10d 0% 05-Mar-24 18-Mar-24 1d 0% 1 19-Mar-24 19-Mar-24 220d 0% 04-Oct-23 14-Aug-24 130d _' 0% 04-Oct-23' 08-Apr-24 35d 0% 04-Oct-23 21-Nov-23 �r�lAISOI FS�-�Ib�31�11I1I�I4ISI�I 89I1^(T7/I1Ad�7I1I16�1I18�1IL21I�I`L�26�(L�L243I3I�3I34I� M Submittal - RO 10 28 00 - lbilel, Bath & Lai ndly A'ccessdries 0 Rek ieW (RIBS - RO -', 10 28:00:-Toilet, Bath & IaundryACcessonesi ❑ : Ai �PrQvaj (A• F)' Ro - 10 �8 L10 - Tolj t, Oa(dli Liundryj cgessoriq a Q tiubmittal R1-1'02800-Toilet,BafhE Laundry Accessories ' ❑ Approval(A/E) -IR1-1102800-Toilet, 3at'h&Laundry Accessorids Fabricate &Deliver/Store'-10280©--Met, Bath& Laundry Accesskdet O : Subn iittal - RO 10 5113 - Metal Lodkers: I I I I III Rek ieW (HBS - AO 10 51;13;- Metal Lock ors :19; N'PrQval (A' F) I Ro - 10 $1 1:3 - Metal toi leers Q t iubmitlal R1 -1'!0 51 1:3 -Metal Lookei s ;❑ Apprdval (A/E) R1 -1:0 51 13 - ,Metal-odkerk Fabricate & Deliver/Store: 10 51 13 -1 Aetal Lockers O : Subn iittal - RO 18 44 13 - Fire Rrotectiori C; ibirieta In Rek ieW (HBS - RO �110 44:13;- Fire Protecon ICa'binets; ❑ : Ajiprpvai (A F) } Ro - 10 44 13 - Fire PtotErtign 0abinels ❑ 1 iub'mittal R1 -1'!0 44 1:3 -:Fire Protectin Cabinets ;❑ Apprdval (A/E) -'R1 -1:0 44 13 - Fire Pi oteotidn Cabinets Fabricate & Deliver/Stores-10 44 13-19relProtec[fon Cabinets O : Subn iittal - RO 10 44 16 - Fire Extinguisher El Rek levy (43S - RO �', 10 44:16:- Fire ExtingiiiiishBrsl I❑ Alprpva((A'F),Ro-10g41:6-Frp Ejtin)ui*hers j Q tiubmillal R1-1'!0441:6-:Fre Extinguh hers :❑ Approval(A/E) �'�R1-1:04416- RrA E; tinfouishers Fabricate & Deliver/Store, 10 44 16 - I irelExtinguishers M : Subn iittal - RO 11 30, 00 - Loading Dbck:Eq jiprheot ❑ Rek ieW (NIBS - RO -111 30:00 Loading: Dc c k Eqdipmerl :❑ : Approval (A F)' Ro - 11 30 40 - Loadir) ►ocK Equiprr j 00 tiugmilial R1-1;1303,0- Loading doN Equipment: : 0 Approval (A/E) R1 -1:1 30 00 - Loading Dock Equipment : I Fabricate & Deliver/Stbre.,11 30 00 -1 ceding Dock Ecluipmeht : OW'I Subnitttel - RO 1 Kilchun Hood TASK filter: All Activities Actual Work FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 O Remaining Work Phase 1 Schedule Update Critical Remaining Work Data Date: 31-Aug-23 ALCOM HUNT oNs RuW EJ SMITH Page 19 of 48 CONSTRUCTION Activity ID PRC1A-1115 Activity Name Review (HBS) RO - Kitchen Hood Orig Dur 10d Remaining Duration 10d %I Complete 0% Start 1 22-Nov-23 Finish 07-Dec23 PRC1A-1120 Approval (A/E)RO-Kitchen Hood 10d 10d 0% 08-Dec23 21-Deo-23 PRCIA-1125 Submittal R1 -Kitchen Hood 10d 10d 0% 22-Dec23 08Jan-24 PRCIA-1130 Approval (A/E) R1 -Kitchen Hood 5d 5d 0% 09Jan-24 15Jan-24 PRCIA-1135 Manufacture/ Delivery Kitchen Hood 60d 60d 0% 16Jan-24 08-Apr-24 PRC1A-1140 Submittal -RO - Cold Storage 35d 35d -0ct-23 0% 04-Oct-23 21-Nov-23 PRC1A-1145 Review(HBS)RO - Cold Storage 10d 10d 0% 22-Nov-23 07-Deo-23 PRC1A-1150 Approval (A/E)RO-Cold Storage 10d 10d 0% 08-Dec23 21-Deo-23 PRC1A-1155 Submittal R1 -Cold Storage 10d 10d 0% 22-Dec23 08Jan-24 PRC1A-1160 Approval WE) R1 -Cold Storage 5d 5d 0% 09Jan-24 15Jan-24 PRCIA-1165 Manufacture / Delivery Cold Storage 150d 150d 0% 16Jan-24 14-Aug-24 PRCIA-1170 Submittal -RO- Kitchen Equipment 35d 35d 0% 044)ot-23 4-Aug-24 10 21-Nov-23 PRCIA-1175 Review (HBS) RO - Kitchen Equipment 10d 10d 0% 22-Nov-23 07-Dec23 PRC1A-1180 Approval (A/E)RO- Kitchen Equipment 10d 10d 0% 08-Dec23 21-Deo-23 PRC1A-1185 Submittal R1 - Kitchen Equipment 10d 10d 0% 22-Dec23 08Jan-24 PRC1A-1190 Approval (A/E) R1 -Kitchen Equipment 5d 5d 0% 09Jan-24 15Jan-24 PRCIA-1195 Manufacture / Delivery Kitchen Equipment 150d 150d 0% 16Jan-24 14-Aug-24 �• �- 19-Mar-24 123661- Solid Surfacing Countertops 61d 61d 0% 22-Dec23 P-1ASS.0-1810 I FSubmfttal - RO -12 36 61 - Solid Surfacing Countertops 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1810 Review (HBS) - RO -12 36 61 - Solid Surfacing Countertops 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1810 Approval (A/E) - RO -12 36 61 - Solid Surfacing Countertops 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1810 Submittal - R1 -12 36 61 - Solid Surfacing Countertops 10d 10d 0% 20-Feb-24 04-Mar-24 P-IAS-A.1-1810 Approval (A/E) - R1 -12 36 61 - Solid Surfacing Countertops 10d 10d 0% 05-Mar-24 18-Mar-24 P-1AS-F0-1810 Fabricate & Deliver/Store - 12 36 61 - Solid Surfacing Countertops 1d 1d 0% 19-Mar-24 19-Mar-24 12 53 85 - Quartz PgglornDmIle Corrr>arto 61d 61d 0% 22-Dec23 19-Mar-24 P-1ASS.0-1820 Submittal - RO -12 53 85 - Quartz Agglomerate Countertops 20d 20d 0% 22-Dec23 22Jan-24 P-1 AS-R.0-1820 Review (HBS) - RO -12 53 85 - Quartz Agglomerate Countertops 10d 10d 0% 23Jan-24 05-Feb-24 P-1 AS-A.0-1820 Approval (A/E) - RO -12 53 85 - Quartz Agglomerate Countertops 10d 10d 0% 06-Feb-24 19-Feb-24 P-1ASS.1-1820 Submittal-R1-125385- Quartz Agglomerate Countertops 10d 10d 0% 20-Feb-24 04-Mar-24 P-1AS-A.1-1820 Approval (A/E) - R1 -12 53 85 - Quartz Agglomerate Countertops 10d 10d 0% 05-Mar-24 18-Mar-24 P-1AS-F0-1820 Fabricate &Deliver/Store -125385- Quartz Agglomerate 1 1d 1d 0%1 19-Mar-24 19-Mar-24 14 20 50 01 - General Elevator Requirements - No.7, 8, 9 , 10 1 61c1l 61 d 0% 04-Oct-23 P-1 ASS.0-1840 Submittal - R0 -14 20 50 01 - General Elevator Requirements - 20d 20d 00/, 04-Oct-23 Nn.7_R_9. 1n P-1AS-R.0-1840 Review (HBS) - RO -14 20 50 01 - General Elevator Requirements 1 1 Od I too 0% 01-Nw-2< r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort F>• Actual Work F>IIIIIIIIIIIIU Remaining Work F>• Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I,il-`L 1I1 �34ISI6 17I F�9I 11I11tG1 I1Ad11I1I16I 111J8I 1I�21I LI Z124 [I26I ZI ZI2*3I 313�13I34I 318 ❑ ReVieW (H BS; RO-10tcherl Hood ■ Apprpva (A/E)i RC - kitchen Hood I ■ $u$mltal;R1:-Ktchen Hood: 1Approial';(A/E) F 11 j Kitchen Hood Mahuf tcWre % Delivery Kitchen Hbo1I =;3! SubMittAl - 130: Cbld 3t"gb ❑ Review (H BS RO - i;old Storage; I❑ Apprpva (A/E): RC - Cold Storage) ❑ $u$ml tal';R7:-Cold: Storage g jAppro ral' (!VE) R1 Cold Storage, A� IManufacture / D,elivery Cold Stoaag4 Subrrflttal-1 30 KitchrIn Equipment 0 Review (HBS? RO - I (itcherl Equipmernt ❑ ApprOva (A/E): R0 -kitchen Equipment ❑ $u$mt ta1;R1:- K tdlen Equiprpegt 0 Appro/al'(A/E) H1 ' Kitchen Equipment'! 'Manufacthre/ D',elNery Kitchen Equipment G Subn Offal - q0 12 36 61 -Solid Surfacing Countertops ❑ Re\iew(HBS -RO -�1236I611-SolidlSdrfa�ing Cbuntertbpb :0: AF pr6val (AL F) ; RO - 12 36 61 -Solid Suradhg Countertops 8uomittal . R1 -12 36 91 -Solid $urfgoii Ig Countertops '❑ APprQval (0) ; R1 -1:2 36 61 -,Solid f;urfpdng Countertops I I Fabridate & Deliver/Stbre:12 36 61 ioli(i Surfacing Countertops 1111111 Sobn iiffal - Flo 12 58 85 - Quartz Agglornec its Countertops'; 111� Rey iew (HBS, - RO 12 53185:- QualTz Agg ornerate Codntertops I❑ Allproval (ALE) ; RO - 12 83 85 -Quartz AWlb'merete CbuntertopS 1J titlomit[al R1-1,253$5- Quartz Agglc meate Couterps I j :0 Apprgval (A/)E) ; RI -1:2 5,Ci 85 - Quprt7 Agglo'fnemte Cquntertpp9 Fabricate & beliver/Stop; 12 5$ 8$ - I )uartz Aggomerote Countertops'; $ubmittpl -RC - 14 20 5) 01 - General Elevator, RGqu rements - Na,.7,6, 9, 10 P'; Revile* (MBl)-,R0j-1,1205001-(�er;eral Elevator Requirements -,No.7, $, g, 1) TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date:31-Aug-23 q_(ZQM HUNTin Phase 1 Schedule Update Ns RU To SER " EJ SMITH 1' Page 20 of 48 CONSTRUCTION Activity ID I Activity Name P-1 AS-A.0-1840 Approval (A/E) - RO -14 20 50 01 - General Elevator R—, Arement_e - Nn 7 R Q 1 n P-1ASS.1-1840 Submittal - R1 -14 20 50 01 - General Elevator Requirements - Nn7 R 9 1n LPlA-S-A.1-11,140 Approval (A/E) - R1 -14 20 50 01 -Geneml Elevator Rannimmpnrc-Nn7 R 9 1nO-40 Fabricate & Deliver/Store - 14 20 50 01 - General Elevator /rim pntR-Nn 7_R_9. 1n 2105 00 - Common Work Results for Fire Supression P-1ASS.0-1850 Submittal - RO -21 05 00 - Common Work Results for Fire P-1 AS-R.0-1850 Review (HBS) - RO - 21 05 00 - Common Work Results for Fire SntXas5tnn P-1 AS-A.0-1850 Approval (A/E) - RO - 2105 00 - Common Work Results for Fire cnujEaEatnn P-1ASS.1-1850 Submittal - R7 -21 05 00 - Common Work Results for Fire SnnreSSrnn P-1AS-A.1-1850 Approval (A/E) - R1 - 2105 00 - Common Work Results for Fire Si lDmmnn P-1A-S-F0-1850 Fabricate & Deliver/Store - 21 05 00 - Common Work Results for Rm Sim _ 21 13 13 - Wet -Pipe Sprinkler System _ P-1ASS.0-1860 Submittal - RO - 21 13 13 - Wet -Pipe Sprinkler System P-1AS-R.0-1860 Review (HISS) - RO - 21 13 13 - Wet -Pipe Sprinkler System P-1AS-A.0-1860 Approval (A/E) - RO - 21 13 13 - Wet -Pipe Sprinkler System P-IASS.1-1860 Submittal-R1-211313-Wet-Pipe Sprinkler System P-1AS-A.1-1860 Approval (A/E) - R1 - 21 13 13 - Wet -Pipe Sprinkler System P-1AS-F0-1860 Fabricate & Deliver/Store - 21 13 13 - Wet -Pipe Sprinkler System 22 05 00 - Common Work Results for Plumbing P-IASS.0-1870 Submittal - RO - 22 05 00 - Common Work Results for Plumbing P-1 AS-R.0-1870 Review (HISS) - RO - 22 05 00 - Common Work Results for Plnmhinn P-1 AS-A.0-1870 Approval (A/E) - RO - 22 05 00 - Common Work Results for Ph—hinn P-1ASS.1-1870 Submittal - Ril - 22 05 00 - Common Work Results for Plumbing P-1 A-S-A.1-1870 Approval (A/E) - R1 - 22 05 00 - Common Work Results for Plnmhinn P-1AS-FO-1870 Fabricate & Deliver/Store - 22 05 00 - Common Work Results for Plnmhinn 22 05 17. Sleeves & Sleeve Seals for Plumbing Piping F P-1ASS.0-1880 Submittal - RO - 22 05 17 - Sleeves & Sleeve Seals for Plumbing Pini �P-1 AS-R.0-1880 Review (HBS) - RO - 22 05 17 - Sleeves & Sleeve Seals for �proval Pijnn P-1 AS-A.0-1880 Approval (A/E) - RO - 22 05 17 -Sleeves &Sleeve Seals for PI. —hi— Pi jnn P-1ASS.1 -1880 Submittal - R1 -22 05 17 - Sleeves & Sleeve Seals for Plumbing Pininn P-1 AS-A.1-1880 Approval (A/E) - R1 - 22 05 17 - Sleeves & Sleeve Seals for Plnmhinn Pijnn _ P-1 AS-FO-1880 Fabricate & Deliver/Store - 22 05 17 - Sleeves & Sleeve Seals for Pithinn Pininn 22 05 18 - Escutcheons for Plumbing Piping P-1A-S-S.0-1890 Submittal - RO - 22 05 18 -Escutcheons for Plumbing Piping P-1AS-R.0-1890 Review (HBS) - RO - 22 05 18 - Escutcheons for Plumbing Piping P-1AS-A.0-1890 Approval (A/E) - RO - 22 05 18 - Escutcheons for Plumbing Piping r— Remaining Level of Effort ♦ ♦ Milestone r— Actual Level of Effort Orig Dur Remaining % Start Duration Complete 10d 10d 0% 15-Nov-23 10d 10d 0% 01-Deo-23 10d 10d 0% 15-Dec23 1d 1d 0% 027an-24 61d 61d 0% 17-W-23 20d 20d 0% 174Oct-23 10d 10d 0% 14-Nov-23 10d 10d 0% 30-NOV-23 10d1 10d 0% 14-Dec23 1Od 1Od 0% 29-Dec-23 1d 1d 0% 15Jan-Jan 61d1 1dl 0% 17-Oct-23 10d I 10d I 0% 14-NOV-23 10d 1Od 0% 30-NOV-23 10d 10d 0% 14-Dec-23 10d 10d 0% 29-Dec23 1d 1d 0% 15Jan-24 r—�eer_wrG� 61d 61d 0% 17-Oct-23 20d 20d 0% 17-Oct-23 10d 10d 0% 14-Nov-23 1 Od I 10d I 0% 30-NOV-23 1 Od1 10d1 0% 29-Dec-23 1d 1d 0% 15Jan-24 61 d 0 % 174M-23 20d 20d 0% 17-Oct-23 10d 10d 0% 14-Nov-23 10d 10d 0% 30-Nov-23 1Od 10d 0% 14-Dec23 1Od 10d 0% 29-Dec23 I 1d 09/. 15Jan-24 61d ■ 61d 0% 17-Oct-23 20d 20d 0% 17-Oct-23 10d 10d 0 %�30Nov-23 ov-23 10d 10d 0% Finish 30-Nov-23 14-Deo-23 29-Deo-23 02Jan-24 15Jan-24 13-Nov-23 29-Nov-23 13-Dec23 28-Dec23 12Jan-24 15Jan-24 15Jan-24 29-Nov-23 13-Dec23 28-Dec-23 12Jan-24 15Jan-24 15Jan-24 13-Nov-23 29-Nov-23 13-Dec23 28-Dec23 12Jan-24 15Jan-24 15Jan-24 13-Nov-23 29-Nov-23 13-Dec23 28-Dec23 12Jan-24 15Jan-24 15Jan-24 13-Nov-23 29-Nov-23 13-Dec23 L.I GJI AIS OI-91-F51=1/ibl3l�l:il-C LIIII �I4ISI,I/IS 9I 17G1 I1Ad111111), �18111 L2117, 11 IC1261 ZI Zi2�:i1313�'3 i341� ❑ Approval (✓ ✓E) - RO-1420'50 01' General Elevat x Requirements - No.7, 8 9, 10 Submittal - R1 -:14 20 50 0! 1 - General Elevator F requirements;- No.7, 8,:9 j 10 ❑ AppjovA (A/Ei - F'1 14 ¢0 50 Q7 L General:Eluatpr F,iequirgmgnts - No.�,, 8, 9„1Q I F abhce e & Deliv ar/Store - 14 20 50 01 Gene al Elevator F?;equiremehts I- No.7! 8,19 , 10: E�l Submittal - FZ) -!21:05 00' Cpmmop Work Rgsu(ts f )r Fire Supressign j q Reviewl(HHS)'!- RP - ?1 05 00 - Common Work Results for Fire Supressioh j 0 Appro4ai ;AIE) -,RO - 21 05 00 - Common Wok Resultsfor Firb Supressbnl I❑ Sibrnittrl-IR11-210500-Common Work Res✓fts!foe Fire Stpression: ❑ Apprcrrat (A/E) - R1:- 21 05 OS - Qommgn Work Results for, Rre Sup !on I jFabriate,& bell /edStgre - 21: Off,, 00 - Qonimc n Wor{ Resgtts for Fire Sgpmasign j 1�1 ,Subm0al-M-'21j1313'-Wet-Pipq Spdnkler,Systen Q Re*w:(HI IS),- Rb - ?1 ,1 3 13 - Wet -pipe Sprinkler System ❑ Approval ;A/E) -,RO -21 13 13 -Wet-Pipe Sprints ?r System ❑ SUbMitt it-IR7;-211313-Wet-Pipe Sprihkler trstem'! ❑ Appro eal (A/E) - R1:- 21 13 1 S - Wet -Pipe Spr nkler System: I ;Fabricate, & Oat ✓er/Stgre - 21: 13,13 - Wet,,Pip? Sprinkler System j Submittal - FZ) -122:05 00 Common Work Results f x Plumbing j b Revipwj(HI IS); F(O - ?2 05 p0 - Cgmrpon Wprlq Results fqr Plu6bigg P Approval ;A/E) -:RO - 22 06 00 - Common Work 1Jesults; for Plumbing '■ Submittal-IRT-2?0500- Comnbn Woik Res jlts�fod Plumbing, O Approval (A/E) - R1:- 22 05 00 - Common We rk Results foe. Plumbing I ;Fabricate!& Deli ✓er!Stgre - 22 OS 00 - Qorrim(n Work Results for Plumbing En Submittal - FJ-',22:05 17 Sleeves A Sleeve Seals or Plumbing Piping j b Revipwj(HI IS)', RO - 22 05 17 - Sleeves & Sleeve Teals for Plurbing Pipipg j j P Approval ;A/E) -:RO - 20 06 17 - $leaves &!,Sl4ev; Seats for Plumbing Piping ❑ Subiinifftl-'R71-2? O5 17 - Sle&veS & Sleev4 S� )ald for Plumping Pipino ❑ Approrat (A/E) - R1;- 22 05 17 - Sleeves &j SIIIeve, Seals for Plumbing Piping I I IFabricate'!& beli ✓er(Stgre - 22 0517 -Sleeve,, & Sleeve Seialslfor Plumbing Piping Ill Submittal-FZ0-122:0518' Escutcheons for Piumbin g P,ipin9 j b Revipwj(H)', RO - ?2 05 18 - EycutFheong for PI umbing Pipinb ❑ Approval A/E) -:RO - 2p OS 18 - Esgltchedns;for Plumbing Piping', TASK filter: All Activities fs Actual Work FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 O Remaining Work Phase 1 Schedule Update FS Critical Remaining Work Data Date: 31-Aug-23 A COM HUNT BYM in CONSTRUCTION SERVICES EJ SMITH Page 2l of 48 CONSTRUCTION Acts ity ID P-1 ASS.1-1890 Activity Name Submittal - R1 -22 05 18 - Escutcheons for Plumbing Piping Orig Dur 10d Remaining Duration 10d %I Complete 0% Start 14-Dec23 Finish I 28-Dec23 P-1AS-A.1-1890 Approval (A/E) - R1 - 22 05 18 - Escutcheons for Plumbing Piping 10d 10d 0% 29-Dec-23 12Jan-24 P-1AS-F0-1890 Fabricate & Deliver/Store - 22 05 18 -Escutcheons for Plumbing Pinin ld 1d 0% 15Jan-24 15Jan-24 220519- Motors & Gages for Plumbing Piping 61d 61d 0% 17-Oct-23 --A 15Jan-24 P-1 ASS.O-1900 Submittal - RO - 22 05 19 - Meters & Gages for Plumbing Piping 20d 20d 0% 17-0W-23 13-Nov-23 P-1 AS-R.0-1900 Review (HISS) - RO - 22 05 19 - Meters & Gages for Plumbing 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1900 Approval (A/E) - RO - 22 05 19 - Meters & Gages for Plumbing 10d 10d 0% 30-Nov-23 13-1)eo-23 P-1ASS.1-1900 Submittal - R1 -22 05 19 - Meters & Gages for Plumbing Piping 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1900 Approval (A/E) - R1 - 22 05 19 - Meters & Gages for Plumbing 10d 10d 0% 29-Dec-23 12Jan-24 P-1 AS-FO-1900 Fabricate & Deliver/Store - 22 05 19 - Meters & Gages for Plumb, no P C6n, 1 d Id 0% 15Jan-24 15Jan-24 22 05 23 - General Duly Valves for Plumbing Piping 61d 61d 0% 17-W-23 15Jan-24 P-1ASS.0-1910 Submittal - RO -22 05 23 - General Duty Valves for Plumbing PFnmnn 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-1910 Review (HISS) - RO - 22 05 23 - General Duty Valves for Plumbing 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1910 Approval (A/E) - RO - 22 05 23 - General Duty Valves for Plumbing 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-1910 Submittal - R1 -22 05 23 - General Duty Valves for Plumbing 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1910 Approval (A/E) - R1 - 22 05 23 - General Duty Valves for Plumbing 10d 10d 0% 29-Dec-23 12Jan-24 P-1AS-17.0-1910 Fabrigte & Deliver/Store - 22 05 23 - General Duty Valves for 1d 1d 0% 15Jan-Jan 15Jan-24 22 05 29 - Hangers & Supports for Plumbing Piping 61d 61d 0% 17-0W-23 15Jan-24 P-1ASS.0-1920 Submittal - RO -22 05 29 - Hangers & Supports for Plumbing 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-1920 Review (HBS) - RO - 22 05 29 - Hangers & Supports for Plumbing 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1920 Approval (A/E) - RO - 22 05 29 - Hangers & Supports for Plumbing 10d 10d 0% 30-Nov-23 13-1)eo-23 P-1ASS.1-1920 Submittal - R1 -22 05 29 - Hangers & Supports for Plumbing Pinino 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-1920 Approval (A/E) - R1 - 22 05 29 - Hangers & Supports for Plumbing Pinin 10d 10d 0% 29-Dec-23 12Jan-24 P-1 AS-FA-1920 Fabricate & Deliver/Store - 22 05 29 - Hangers & Supports for Plumbing Pining Adjusting, & Balancing for Plumbing Submittal - RO - 22 05 93 - Testing, Adjusting, & Balancing for 1 d Id 0% 15Jan-24 15Jan-24 22 05 93 - Testing, 61d 61d 0% 17-Oct-23 15Jan-24 P-1 ASS.O-1930 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-1930 Review (HISS) - RO - 22 05 93 - Testing, Adjusting, & Balancing for 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1930 Approval (A/E) - RO - 22 05 93 - Testing, Adjusting, & Balancing for Plumb, no 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1930 Submittal - R1 -22 05 93 - Testing, Adjusting, & Balancing for 10d 10d 0% 14-Dec23 28-1)eo-23 P-lAS-A.1-1930 Approval (A/E) - R1 - 22 05 93 -Testing, Adjusting, & Balancing for Plumbino 10d 10d 0% 29-Dec-23 12Jan-24 P-1 AS-FO-1930 Fabricate & Dellver/Store - 22 05 93 - Testing, Adjusting, & for 1 d 1 d 0 % 15Jan-24 15Jan-24 22 07 19 - Plumbing Pipe Insulation 61d 61d 0% 17-W-23 15Jan-24 P-1ASS.0-1940 Submittal - RO -22 07 19 - Plumbing Pipe Insulation 20d 20d 0% 174)ct-23 13-Nov-23 P-IAS-R.0-1940 Review(HBS)-RO-220719-Plumbing Pipe Insulation 10d 10d 0% 14-Nov-23 29-Nov-23 P-lAS-A.0-1940 Approval (A/E) - RO - 22 07 19 - Plumbing Pipe Insulation 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1940 Submittal - R1 -22 07 19 - Plumbing Pipe Insulation 10d 10d 0% 14-Deo-23 28-Deo-23 P-IAS-A.1-1940 Approval (A/E) - R1 - 22 07 19 - Plumbing Pipe Insulation 10d 10d 0% 29-Dec-23 12Jan-24 - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Wont Critical Remaining Work J GJI"IS 0I-`JI-6171SI3I ,il-`L L1I1 � 3 4ISI6I/I f5 9I1^I11tG1 I1Ad11I1I16I 111J8111L21I `LI LI24 [I26I LI 71293I 313�'3I34I �I ❑ Subrnittrl-IR7;-2 2 05 18 - Escutcheons for Plu nbing (Piping; ❑ Approval(A/E) - R11- 22 OS 18 - Escutcheons for Plurnbing �Pipvng I iFabricate,& Oeli rer%Stgre - 2� Or,,18 - Psc jtcti,ons fpr Plumbing Pip!6g So Submittal - M-'22i05 19'- Meters Gages for P)urbing Piping j Q Reviewl(HHS)'- Ro - t2 05 19 - Meters & Gages fr Plumbing Piping 0 Approval ;A/E) -;RO - 22 05 19 - Meyers & Gages forPlumbing;Piding I❑ S6bfnittrl-IRL'-2>0519-Meters;&Gages for Plumbing Piping) ❑ APPro'ral (A/E)-R1I-220519-Meters)&6ayeslorIPlumbfngIPiping; I !Fabricate, & Oeli ✓erl,Stgre - 22 05,19 - Meters & gages for Plurpbing Piping Subm0a(- IZ)-,22i05 23' General buiy Valves for Plurpbipg Pipipg j Q Review:(HI IS)',- R0 - 22 1)5 23 - Generaal Duty Vavus for plumbing Piping ❑ ApproLd ;A/E) -,RO - 22 05 23 - General DUtyVa ves for Plumbing Piping I❑ Submitt rl-IRV-220523- General DutyIValve: for Plumbing Piping ❑ Appro ral (A/E) - R1;- 22 OS 23 - General Duty Valves for Plumbing Piping, I ;Fabricate,&Deli rer%Stgre-2�Ow, 23-Genpm Duty t✓alves?or;PlumbjrI Submittal - FJr-';22:05 29 L HorI & $upports for Plumbing Pipipg Q Reviewl(HI IS),- Fib - 2 b5 29 - Hangers & supports for plumbing piping ❑ Approtraf ;A/E) -;RO - 22 05 29 - Hangers & Suppart5 for Plumbing Pipino ❑ SUbrnitt tl-IRl:-2 2 05 29 - Hangers & SUppbrte for Plumbing Piping ❑ Approval (A/E) - R1:- 22 05 29 - Hangers 9 Supports for Plumbing Piping, I ;Fabricate,& 4eli ✓erl,Stgre - 24 0�,, 29 - Hangen2 &;Supports,7or';Plumbing:Pipng', E�] , Submittal- Fl-22j05 93' Testing, Adjusting,;& $al[ ncipg for Plufnbing j Q Reviewl(HI IS)',- RO - 22 1)5 93 - Testing, Adjusting, & Balancing for Plumbing j ❑ Approval ;A/E) -:RO - 22 05 93-7esting, Adjugin(I, &, Bdlancir for Plumbing I❑ SUbrhiftrl-IR7',-2>0593- Testing; Adjusting,& Ba'lanl:ing for Pumbing ❑ Appro cal (A/E) - R1;- 22 05 99-Testng, Adjuring, & Balancng for Plpmbinf I I :Fabricate,& peli ✓erlStgre- 2g O� 93--rp*g, Adjusting, & Oalencing:for, Plt mt ing Submittal- IZ) -'22:07 19', Plumbing Pipe lnspla(ion j Q Reviewi(HI IS)',- RP - 2 07 19 - Plornoing Pipe Ins ilation'! ❑ Approtraf ;A/E) -IRO - 22 07 19 - Plurhbing Pipb I"uldtidn I ❑ Subrnitt rl-IRE-220719-Plurnbing Pipe In ulitia'n ❑ 'ApPmtral(A/E)-R1;-220719-Plumbing Pip; Insulation TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU n. 'ER " EJ SMITH r' Page 22 of 48 CONSTRUCTION Acth lty ID Activity Name P-1AS-F0-1940 Fabricate & Deliver/Store - 22 07 19 - Plumbing Pipe Insulation Crig Dur 1d Remaining Duration 1d %I Complete 0% Start 15Jan-Jan Finish 15Jan-Jan 22 1116 - Domestic Water Piping ^ 61d 61d 0% 17-Oct-23 15Jan-24 P-1A-S-S.0-1950 Submittal - RO -22 11 16 - Domestic Water Piping 20d 20d 0% 17-W-23 13-Nov-23 P-1AS-R.0-1950 Review (HISS) - RO - 22 11 16 - Domestic Water Piping 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1950 Approval (A/E) - RO - 22 11 16 - Domestic Water Piping 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-1950 Submittal - R1 -22 11 16 - Domestic Water Piping 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-1950 Approval (A/E) - R1 - 22 11 16 - Domestic Water Piping 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-1950 Fabricate & Deliver/Store - 22 11 16 - Domestic Water Piping 1 d 1d 0% 15Jan-24 I "an-24 22 11 19 - Domestic_ Water Piping Specialties I 61d 61d 0% 17-0W-23 15Jan-24 P-1ASS.0-1960 Submittal - RO -22 11 19 - Domestic Water Piping Specialties 20d 20d 0% 17-Oct-23 13-Nov-23 P-1AS-R.0-1960 Review (HISS) - RO - 22 11 19 - Domestic Water Piping Specialties 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1960 Approval WE) - RO - 22 11 19 - Domestic Water Piping Specialties 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1960 Submittal - R1 -22 11 19 - Domestic Water Piping Specialties 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-1960 Approval (A/E) - R1 - 22 11 19 - Domestic Water Piping Specialties 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-FO-1960 Fabricate & Deliver/Store - 22 11 19 - Domestic Water Piping 1d 1d 0% 15Jan-24 15Jan-24 221123-Plumbing Pumps 61d 61d 0% 17-Oct-23 15Jan-24 P-1A-S-S.0-1970 Submittal - RO -22 11 23 - Plumbing Pumps 20d 20d 0% 17-01 13-Nov-23 P-1AS-R.0-1970 Review (HISS) - RO - 22 1123 - Plumbing Pumps 10d 10d 0% 14-Nov-23 29-Nov-23 P-1AS-A.0-1970 Approval (A/E) - RO - 22 1123 - Plumbing Pumps 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-1970 Submittal-R1-221123-Plumbing Pumps 10d 10d 0% 14-Deo-23 28-Dec23 P-1AS-A.1-1970 Approval (A/E) - R1 - 22 1123-Plumbing Pumps 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-1970 Fabricate &Deliver/Store -221123-Plumbing Pumps 1d 1d 0% 15Jan-24 15Jan-24 22 13 16 - Sanitary Waste &Vent Pipi I61d 61d 0% 17-W-23 15Jan-24 P-1A-S-S.0-1980 Submittal - RO -22 13 16 - Sanitary Waste & Vent Piping 20d 20d 0% 17-01 13-Nov-23 P-1 AS-R.0-1980 Review (HISS) - RO - 22 13 16 - Sanitary Waste & Vent Piping 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-1980 Approval (A/E) - RO - 22 13 16 - Sanitary Waste & Vent Piping 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-1980 Submittal - R1 -22 13 16 - Sanitary Waste & Vent Piping 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-1980 Approval (A/E) - R1 - 22 13 16 - Sanitary Waste & Vent Piping 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-1980 Fabricate &Deliver/Store -221316-Sanitary Waste &Vent PFi 1d 1d 0% 15Jan-24 15Jan-24 22 13 19 - Sanitary Waste A 0 rig Specialties P-1A-S-S.0-1990 Submittal - RO - 22 13 19 - Sanitary Waste Piping Specialties 61d 61d 0% 174W-23 15Jan-24� 13-Nov-23 20d 20d 0% 17-Oct-23 P-1AS-R.0-1990 Review (HBS)-RO-221319- Sanitary Waste Piping Specialties 10d 10d 0% 14-Nov-23 29-Nov-23 P-1AS-A.0-1990 Approval (A/E) - RO - 22 13 19 - Sanitary Waste Piping Specialties 10d 10d 0% 30-Nov-23 13-Dec23 P-IASS.1-1990 Submittal-R1-221319- Sanitary Waste Piping Specialties 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-1990 Approval (A/E) - R1 - 22 1319- Sanitary Waste Piping Specialties 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-1990 Fabricate&Deliver/Store -221319-SanitaryWaste Piping 1d 1d 0% 15Jan-24 15Jan-24 22 13 23 - Sanitary Waste hte rcepb 1 61Of 61d 0% 17-W-23 15Jan-24 rrrrrrrrrrrr. Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort <! Actual Work O Remaining Work <! Critical Remaining Work J GJI AIB OI `JI-6171�I3I ,il-`L L1I1 �34I516 171 F�9I 1nI11tG1 I1Ad11I1I16I 111J8111L21I `LI LI24 LI26I LI ZI2�3I31 ZUi 'Zb 3I34I I ;Fabricate',& Deli ✓er%Stare - 22 0719 - Plumbing Pipe Insulation I 0 Submittal - M-22;11 16, Domestic Water Piping b Review:(HI IS)!- RO - 2211 16-Do i Water Piping p Approval ,A/E) -:RO - 2p 11 16 - bormestic Water'ipini ❑ Subnnin 11-,R71-2? 11 16 -Domestic Water Piping ❑ ;Approral (A/E) - R1;- 22 11 16 - Domestic We er Piping I Fabricata& Deli ✓er[Stare - 22 11:16 - Domestic Water Piping 17 Submittal - M-122:11 19 : Domestic Water Piping anecialtles d ReviEwl(HXfS)', RO - 2211 19 -Domestic Water Pi ping Specialties p APpraral ;A/E) -;RO - 2♦? 1119 - Ijoprestic Water -iping ,Spedaltiep ❑ Submittal - R1:-2? 11 19 - Domestic Water Piping Specialties ❑ ',ApproEal (A/F) - R1;- 22 11 19 - Domestic Wa er Piping Spocalties I Fabricate', & Deli mr%Stare - 22 11:19 - D,onlesl is Water Piping Specialties I O Submittal - M-22:11 23 r PlUmbin� Pumps q Review;(HI IS)'r RO - 2211 23 - Plumbing Pumps : p Approval ;A/P) -:RO - 2p 1123 - Plurtrbing Purnix ,❑ Subyniffal-'Rl:-2?112$-Plurbing Pumps ❑ Appro ral(A/E)-R1;-221123-Plumbing Punps, I ;Fa6d ate'&Deli✓er%Stare-2211,23-Plumbing Pumps O (Submittal-FM-122:1316FSs' nitary:Waste&VertPping d Reviewl(HI IS); RO - 2213 16 - Sanitary Waste;&'lent Piping p Alp rmrval Al(),-'RO - 2p 1$ 16 - $arlltary Wash E Vent piping ; ❑ Submittal-'R7;-2? 13 16 - Saritary Waste & VE nt Piping ❑ (Approval (A/P) - R1;- 22 13 16 - Sanitary Vrlas e & Vent Piping I IFabricita& Deli ✓erlStare-221316-Santlan, Waste & Vent Piping ' O Submittal-M-122:1319�Sanitary;Waste Pipng Sleciakbs b Reviewj(HIIS)'r221319-Sanitary Waste: RF ing Specialties 13 Approval ;A/p)-;RO -2p 1$ 19 -$a6ftaryWash F'pF g $peciat;ies ❑ Subkirt:il-';Rl:-2?- 1$ 10- Sariftary Waste Ripng Specaltes ❑ ApprovalCA/E)-R11-221319-Sanitar�Wase Pphg "alies I :Fa6dmte', & Deli ✓erStare- 22 1319 - Sanhan, Wasto Pphg Speciatb s; TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To SER " EJ SMITH r' Page 23 of 48 CONSTRUCTION Acts ity ID P-1ASS.0-2000 Activity Name I Submittal - RO -22 13 23 - Sanitary Waste Interceptor Crig Dur 20d Remaining Duration 20d %I Complete 0% Start 17-Cct-23 Finish 13-Nov-23 P-1AS-R.0-2000 Review(HBS)-RO-221323-SanitaryWastelnteroeptos 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2000 Approval (A/E) - RO - 22 13 23 -San" Waste Interceptors, 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2000 Submittal - R1 -22 13 23 - Sanitary Waste Intercwtos 10d 10d 0% 14-Dec-23 28-Dec23 P-1AS-A.1-2000 Approval (A/E) - R1 - 22 1323-Sanitary Waste Interceptors 10d 10d 0% 29-Deo-23 12Jan-24 P-1AS-FO-2000 Fabricate &Deliver/Store -221323-Sanitary Waste lnerceptors 1d 1d 0% 15Jan-24 15Jan-24 2 1413 -Facility Storm Drainage Piping 61d 61d 0% 17-Oct-23 15Jan P-1ASS.0-2010 Submittal - RO -22 14 13 - Facility Storm Drainage Piping 20d 20d 0% 174)ct-23 13-Nov-23 P-1 AS-R.0-2010 Review (HBS) - RO - 22 14 13 - Facility Stone Drainage Piping 10d 10d 0% 14-Nov-23 29-Nov-23 P-1AS-A.0-2010 Approval (A/E) - RO - 22 14 13 - Facility Storm Drainage Piping 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2010 Submittal - R1 -22 14 13 - Facility Storm Drainage Piping 10d 10d 0% 14-Deo-23 28-Dec23 P-1AS-A.1-2010 Approval (A/E) - R1 - 22 1413- Facility Storm Drainage Piping 10d 10d 0% 29-Deo-23 12Jan-24 P-1AS-FO-2010 Fabricate & Deliver/Store - 22 14 13 - Facility Storm Drainage Pinino 1d id 0% 15Jan-24 15Jan-24 22 14 23 - Storm Drainage Piping Specialties 61d 61d 0% 17-W-23 15Jan-24 P-1ASS.0-2020 Submittal - RO -22 14 23 - Storm Drainage Piping Specialties 20d 20d 0% 17-0W-23 13-Nov-23 P-1AS-R.0-2020 Review HBS) -RO-221423- Storm Drainage Piping Specialties 10d 10d 0% 14-Nov-23 29-Nov-23 P-1AS-A.0-2020 Approval (A/E) - RO - 22 14 23 - Storm Drainage Piping Specialties 10d 10d 0% 30- Nov-23 13-Deo-23 P-1ASS.1-2020 Submittal - R1 -22 14 23 - Stone Drainage Piping Specalties 10d 10d 0% 14-Dec-23 28-Deo-23 P-1AS-A.1-2020 Approval (A/E) - R1 - 22 1423- Storm Drainage Piping Specialties 10d 10d 0% 29-Deo-23 12Jan-24 P-1A-S-FO-2020 Fabricate &Deliver/Store -221423- Stone Drainage Piping 1d 1d 0% 15Jan-24 15Jan-24 22 14 29 - Srarip Pumps 61d 61d 0% 17-0ct-23 15Ja-2-24 P-1ASS.0-2030 Submittal - RO -22 14 29 - Sump Pumps 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2030 Review (HBS) - RO - 22 14 29 - Sump Pumps 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2030 Approval (A/E) - RO - 22 14 29 - Sump Pumps 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2030 Submittal - R1 -22 14 29 - Sump Pumps 10d 10d 0% 14-Deo-23 28-Dec23 P-1AS-A.1-2030 Approval (A/E) - R1 - 22 1429-Sump Pumps 10d 10d 0% 29-Deo-23 12Jan-24 P-1AS-F0-2030 Fabricate &Deliver/Store -221429-Sump Pumps 1d 1d 0% 15Jan-24 15Jan-24 22 16 23 - Natural -Gas Piping 61d 61d 0% 174)ct-23 15Jan-24 P-1 ASS.O-2040 Submittal - RO - 22 16 23 - Natural -Gas Piping 20d 20d 0% 17-W-23 13-Nov-23 P-1AS-R.0-2040 Review (HBS) - RO - 22 16 23 - Natural -Gas Piping 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2040 Approval (A/E) - RO - 22 16 23 - Natural -Gas Piping 10d 10d 0% 30-Nov-23 13-Deo-23 P-1AS.S.1-2040 Submittal - R1 -22 16 23 - Natural -Gas Piping 10d 10d 0% 14-Deo-23 28-Dec23 P-1AS-A.1-2040 Approval (A/E) - R1 - 22 1623- Natural -Gas Piping 10d 10d 0% 29-Dec-23 12Jan-24 P-1AS-F0-2040 Fabricate & Deliver/Store - 22 16 23 - Natural -Gas Piping 1 d 1d 0% 15Jan-24 15Jan-24 22 34 00 - Fuel -Fired, Domestic Water Healers 61d 61d 0% 174W-23 15Jan-24 P-1ASS.0-2050 Submittal - RO - 2234 00 - Fuel -Fired, Domestic Water Heaters 20d 20d 0% 174)ct-23 13-Nov-23 P-1AS-R.0-2050 Review (HBS)-RO-223400-Fuel-Fired, Domestic Water Healers 10d 10d 0% 14-Nov-23 29-Nov-23 - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work Zb IJGJIAIS OI-`JI-E5171�I3I ,il JL1I1 13I4 dflI tt 9 1^I11t G1I1Ad11I1I16I 111J611L A Z124I[26I�ZI2�3 313�'3I-1 I� I11" 1 i� iT� (Submittal-f J� 2 323-S2nitaryiWaste lnt�rclep d Ravi: ai )h RO - 2213 23 - Sanitary Waste:Int -rc epbs 0 Approi A/E)-:RO -2� 1$ 23-$apitaryWash I lteraeptors ❑ Sbbmitttl-'R1:-2? 13 23 - SariRary Waste lntei ■ (Approval (A/F) - R1;- 22 13 23 - Sanitary Vitas e I ketlwptorp I FabricateA Dellmr%Stdre-221323-Sanftan,Wasta lrterGeptors O Submittal - M-122:14 13',Fadlity Storfn Drainage 1 ing b Revswl(HI IS)'r RO - 2214 13 - Facility Storm Drainage Piping j C1 Approval ;A/�) -:RO - 22 14 13 - ragldy Stgrtn: Dn tingge, Pipin4 ❑ Subkintl-'Rl:-2?1413-Facility Storm'Dr$inyge!Piping ❑ ;Approval,(A/S)-R1;-221413-Facility lStdnn Dr4inAge Piping) I ;Fabric-tte'& Deli ✓er%Store - 22 14113 - FadGty ilotcn Dmina�e Piping 0 Submittal - FZ0 -122114 23, Stone Drainage Piping L-)edialtles d ReviEwl(HXfS)', RO - 214 23 - Stpml Drainage Piping SpecaltieS El Approval A/O -;RO - 2R 14 23 - $topn Drainage °ipingSpedaltieg ❑ Sbbmittul-'R7'-2? 14 23 - Stoirn Drainage Piping Specialties ❑ ;Appro gal ,(A/S) - R1;- 22 14 23 -Storm Drains to Piping Sp4d�l6a I ;FabricA1el& Deli ✓er%Store-2214;23- Storm Draihage Piping Specialties O Submittal - M-122:14 29, Sump Pumps ❑ Reviewl(HIiii RO - 2214 R9 - SOmp Pumps El Approval A/0) -:RO - 20 14 29 - $urpp Pumps ❑ SubGnitti tl-'Ri:-2? 14 2h - Sump Pumps ❑ ;Appnoal(A/E)-R1;-221429-Sump Puchp: I :Fabricate' & ©eli ✓eristcire - 22 14 29 - Sump lV mlps l 0 Submittai - FD-122,16 23'- Natural-bas Piping d ReviEwl(H►S)h RO - 2216 23 - Natural-GasIPipinc El Approval A/E) -;RO - 20 1$ 23 - Nat$ralGas Piping ❑ Sbbmitt tl-'R7'-2? 16 23 - Natbral-Gas Piping ❑ Appro,,al (A/E) - Rl:- 22 16 23 - NaturalG4s [ liping I ;Fabdottel& Deli ✓er%Store - 22 18 23 - Natural Gas Piping O Submittal - F O-122:34 00 � Fuel -Fired, ©omestic Wad Heaters d Reviewi(HIS)', RO - 22 94 00 - Fuel -Fred, Dome,,* Water Heaters TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU Ti. 'ER " EJ SMITH 1' Page 24 of 48 CONSTRUCTION Acts ity ID P-lAS-A.0-2050 Activity Name I Approval (A/E) - RO - 22 34 00 - Fuel -Fired, Domestic Water Crig Dur 10d Remaining Duration 10d %I Complete 0% Start 30-Nov-23 Finish 13-Dec23 P-1ASS.1-2050 Submittal - R1 -22 34 00 - Fuel -Fired, Domestic Water Heaters 10d 10d 0% 14-Dec23 28-Dec23 P-IAS-A.1-2050 Approval (A/E) - R1 - 22 3400 - Fuel-Rred, Domestic Water Heaters 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2050 Fabricate &Deliver/Store -223400-Fuel-Fired, Domestic Water Heaters 22 40 00 - Plumbing Fixtures immiIIIIIIIIIII P-1A-S-S.0-2060 Submittal - RO -22 40 00 - Plumbing Fixtures ld 1d 0% 15Jan-24 15Jan-24 61d 61d 0% 174)ct-23 15Jan-24 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2060 Review (HBS) - RO - 22 40 00 - Plumbing Fixtures 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2060 Approval (A/E) - RO - 22 40 00 - Plumbing Fixtures 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2060 Submittal - R1 -22 40 00 - Plumbing Fixtures 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-2060 Approval (A/E) - R1 - 22 40 00 - Plumbing Fixtures 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2060 Fabricate &Deliver/Store -224000-Plumbing Fixtures Ventilating and Air Conditioning & Electrical Coordination ld 1d 0% 15Jan-24 15Jan-24 Division 23 - Heating, 23 05 01 - Mechanical 61 dr 61d • • L gra",j:Q 61d 0% 174)ct-23 15Jan-24 P-1ASS.0-2070 Submittal - RO -23 05 01 - Mechanical & Electrical Coordination 20d 20d 0% 174)ct-23 13-Nov-23 P-1 AS-R.0-2070 Review (HBS) - RO - 23 05 01 - Mechanical & Electrical 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2070 Approval (A/E) - RO - 23 05 01 - Mechanical & Electrical Coordarintnir 10d 10d 0% 30-Nov-23 13-Dec-23 P-IASS.1-2070 Submittal - R1 -23 05 01 - Mechanical & Electrical Coordination 10d 10d 0% 14-Dec23 28-Deo-23 P-1 AS-A.1-2070 Approval (A/E) - R1 - 23 05 01 - Mechanical & Electrical Coord' 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2070 Fabricate & Deliver/Store - 23 05 01 - Mechanical & Electrical Coordination 23 05 02 - Basic Mechanical Requirements 1W 1 Of 1d 0% 15Jan-24 15Jan-24 61d 61d 0% 174M-23 15Jan-24 P-1ASS.0-2080 Submittal - RO -23 05 02 - Basic Mechanical Requirements 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2080 Review (HBS) - RO - 23 05 02 - Basic Mechanical Requirements 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2080 Approval (A/E) - RO - 23 05 02 - Basic Mechanical Requirements 10d 10d 0% 304Jov-23 13-Dec-23 P-1ASS.1-2080 Submittal - R1 -23 05 02 - Basic Mechanical Requirements 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-2080 Approval (A/E) - R1 - 23 05 02 - Basic Mechanical Requirements 10d 10d 0% 29-Deo-23 12Jan-24 P-lAS-F0-2080 Fabricate & Deliver/Store - 23 05 02 - Basic Mechanical Reouirements 23 05 03 - Basic Mechanical Materials & Methods 1 d 1d 0% 15Jan-24 15Jan-24 61d 61d 0% 17-0W-23 15Jan-24 P-1 ASS.O-2090 Submittal - RO - 23 05 03 - Basic Mechanical Materials & Methods 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2090 Review (HBS) - RO - 23 05 03 - Basic Mechanical Materials & 10d 10d 0% 144Jov-23 29-Nov-23 P-1 AS-A.0-2090 Approval (A/E) - RO - 23 05 03 - Basic Mechanical Materials & 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2090 Submittal - R1 -23 05 03 - Basic Mechanical Materials & Methods 10d 10d 0% 14-Deo-23 28-Deo-23 P-1 AS-A.1-2090 Approval (A/E) - R1 - 23 05 03 - Basic Mechanical Materials & 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-FO-2090 23 05 13 - Motors Fabricate &Deliver/Store - 23 05 03 -Basic Mechanical Materials & Methods 1d 1d 0% 15Jan-24 15Jan-24 & Starters 61d 61d 0% 17-W-23 15Jan-24 P-1 ASS.O-2100 Submittal - RO - 23 O5 13 - Motors & Starters 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2100 Review (HBS) - RO -23 05 13 - Motors & Starters 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2100 Approval (A/E) - RO -23 05 13 - Motors & Starters 10d 10d 0% 30-Nov-23 13-Dec-23 r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort fs Actual Work O Remaining Work FS Critical Remaining Work GZb JJI II-I I41I1I 11L31I7FI1IAI934 `L�ItGdII1JI t ' 0 Approval A/E)-;RO-223400-Fuel-Fired,! D6musti6 Wate r Heats IS I■ SUbmitttl-IRl:-2>3400-Fuel-Fimd,Dgmestir.Water Heaters ■%lppro'fal(A/�)-R1j-2�3400-puel-Fired;D(impstip WaL-jHpatersj , I Fabricate!& Deli ✓erlStdre-223400- Fuel" Fir a d,'Domestic:Water Heeds =1 Submittal-M-'�22I4000' PlumbingFi Wres', ❑ Reviewl(HI iS)I, RD - 22 40,00 - Pltimhing FDdutes ❑ AppmVal ;A/E) -;RO - 22 40 00 - Plumbing FortUr�_ ❑ SUbmittal-IR71-2 2 40 00 - Plumbing Fixtures ❑ APPro ral '(aD)- Rl,- 2Q 40 00 - �lumbing pxt ureS I jFabdcite!& Pet ✓erlStore-2g40;00-Plurebikig Fixtures Ell Submittal- M-23:05 Dl - Mgchanical j& Eleclricnl Gootdination j El Re*wl(HI IS)'- Ric - 23 05 01 - Mechanical 0 Filewrcal Coordination ❑ Appm4al;AIE)-;RO-230501- Mechanical iit Eli ctrical!Coordination ❑ Sbbmitttl-IR7;-230501- Mechanical &IElsctrn;aI Cobrdinalfonl ❑ Approval(A/E) - R11- 23 05 07 -Mechanical & EICctrical Conrdinationl I ;Fahricate,& Deli ✓er/Stgre - 21 OP,, 01 - Machaical & Electrigal Goordinatipn lam ,Submittal- lZ-;23:0502' Basic Mpchanical lhequir.-mgntg , j Q Review:(HI IS)'!- RO - 23 1)5 02 - Basic:Mechanical l3equirement4 ❑ Approval ;A/E) -;RO - 23 05 02 - Basic Mechariice I RagJiremerits ❑ SUbCmOal-IRl:-2 3 05 02 - Banc Mechanical Requirements ❑ iAppro, ral (A/E) - Rl:- 23 05 02 - Basic Mechanical Requirements I :Fabricate,& Deli ✓er%Stgre- 210P,, 02 - Basra K�--chanjcal Requirements Submittal - FZ)-';23:05 D3- Bisic Mpeh nical Matedi tis � klethod3 , j Q Reviewl(HKS)', Ft0 - 23 b5 03 - Basic:Mechanical I Aatedals & Methods ❑ Approval ;A/E) -;RO - 23 05 03 - Basic Mechaaice I Materials & Methods ❑ SUbmitt tl - IRt- 2105 03 - Bask Mechanical M Metals & Methods ❑ Fppro'ral (A/E) - R1:- 2$ 05 09 - Basic Mechanical Materials & Methods I ;Fabricate, & Deli ✓ed,Stgre- 21 05, 03 - Basig Kr--chanjcal Mgtegals & Nlethod s j Submittal- RE) -,23j0513' Motors 4 Starters , Q Review:(HI iS)',- RO - 23 05 13 - Motor's & Starters ❑ Approval A/E) -;RO - 23 05 13 - Motors & Ste er; TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns Ru To 'ER " EJ SMITH r' Page 25 of 48 CONSTRUCTION Acts ity ID P-1ASS.1-2100 Activity Name Submittal - R1 -23 05 13 - Motors & Starters Orig Dur 10d Remaining Duration 10d %I Complete 0% Start 14-Dec23 Finish I 28-Dec23 P-1 AS-A.1-2100 Approval (A/E) - R1 - 23 05 13 - Motors & Starters 10d 10d 0% 29-Dec-23 12Jan-24 P-1 AS-FO-2100 Fabricate & Deliver/Store - 23 05 13 - Motors & Starters 1 d 1 d 0% 15Jan-24 15Jan-24 23 05 21 - Pipe &Pipe Fittings E 61 d 61 d 0% 17-Oct-23 15Jan-24 P-1 ASS.O-2110 Submittal - RO - 23 05 21 - Pipe & Pipe Fittings 20d 20d 0% 17-0Wt 23 13-Nov-23 P-1 AS-R.0-2110 Review (HBS) - RO - 23 05 21 - Pipe & Pipe Fittings 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2110 Approval (A/E) - RO - 23 05 21 - Pipe & Pipe Fittings 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2110 Submittal - R1 -23 05 21 - Pipe & Pipe Fittings 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2110 Approval (A/E) - R1 - 23 05 21 - Pipe & Pipe Fittings 10d 10d 0% 29-Dec-23 12Jan-24 P-1 AS-FO-2110 Fabricate & Deliver/Store - 23 05 21 - Pipe & Pipe Fittings 1 of 1 d 0% 15Jan-24 15Jan-24 230522-Pipe Accessodes 61d 61d 0% 17-W-23 15Jan-24 P-1A-S-S.0-2120 Submittal - RO -23 05 22 - Pipe Accessories 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2120 Review (HBS) - RO - 23 05 22 - Pipe Accessories 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2120 Approval (A/E) - RO - 23 05 22 - Pipe Accessories 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2120 Submittal-R1-230522- Pipe Accessories 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2120 Approval (A/E) - R1 - 23 05 22 - Pipe Accessories 10d 10d 0% 29-Dec-2312Jan-24 P-1AS-F0-2120 Fabricate & Deliver/Store - 23 05 22 - Pipe Accessories 1d 1d 0% 15Jan-24 15Jan-24 23 05 23 - Valves 61 d 61 d 0% 17-0,1-23 15Jan-24 P-1ASS.0-2130 Submittal - RO -23 05 23 - Valves 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2130 Review (HBS) - RO - 23 05 23 - Valves 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2130 Approval (A/E) - RO - 23 05 23 - Valves 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2130 Submittal - R1 -23 05 23 - Valves 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2130 Approval (A/E) - R1 - 23 05 23 - Valves 10d 10d 0% 29-Dec-2312Jan-24 P-1 AS-FO-2130 Fabricate & Deliver/Store - 23 05 23 - Valves 1 d 1 d 0% 15Jan-24 15Jan-24 23 05 29 - Pipe Su pports & Anchors 61 d 61 d 0%, 17-Oct-23 15Jan-24 P-1ASS.0-2140 Submittal - RO -23 05 29 - Pipe Supports &Anchors 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2140 Review (HBS) - RO - 23 05 29 - Pipe Supports & Anchors 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2140 Approval (A/E) - RO - 23 05 29 - Pipe Supports & Anchors 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2140 Submittal - R1 -23 05 29 - Pipe Supports &Anchors 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2140 Approval (A/E) - R1 - 23 05 29 - Pipe Supports & Anchors 10d 10d 0% 29-Dec-23 12Jan-24 P-1 AS-FO-2140 Fabricate & Deliver/Store - 23 05 29 - Pipe Supports & Anchors 1 d 1 d 0% 15Jan-24 15Jan-24 23 05 30 - Electronic Speed Controllers 61 d 61 d 0% 17-W-23 15- an-24 P-1ASS.0-2150 Submittal - RO -23 05 30 - Electronic Speed Controllers 20d 20d 0% 174)ct-23 13-Nov-23 P-1 AS-R.0-2150 Review (HBS) - RO - 23 05 30 -Electronic Speed Controllers 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2150 Approval (A/E) - RO - 23 05 30 - Electronic Speed Controllers 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2150 Submittal - R1 -23 05 30 - Electronic Speed Controllers 10d 10d 0% 14-Deo-23 28-Deo-23 P-1 AS-A.1-2150 Approval (A/E) - R1 - 23 05 30 - Electronic Speed Controllers 10d 10d 0% 29-Dec-23 12Jan-24 - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I,il-`L L1I1 �34ISI6I /I tt 9I1^I11tG1 I1Ad11I1I16I 111J8I 1I�21I LI 2124I [I26I L1212*3I 31'3I4I �I ❑ Submittal-IRl:-230513-Motors:&Starters ❑ Appm ral (A/E) - Ri:- 2$ 05 19 - Motors:& Starters I :Fabricate, & Oeli rer%Stgre - 21 0�,,13 - Motorsi S,ta"rs , So Submittal- M-';23:05 21'- Pipe & Pipe; Fftting's j Q Re*w;(HHS)':- R0 - 23 05 21 -Pipe & Pipe'�Fg4ng> 0 Approval ;A/E) -:RO - 23 06 21 - Pip& & Pipe Fittikgs I I ❑ Submittal-IRt1-2 3 05 21 - Pipe &:Pipe Fittings ❑ APpro'ral (A/E) - R11- 2$ 05 27 - Pipe &:Pipe Yittirlgs I !Fabricate, & Oeli ✓erl,Stgre - 21 05, 21 - P,ipe, & 'ipe Fittings j Subm0a(-FE)-,23j0522' Pipe Acgseories , Q Review:(HI IS)',- RO - 23 1)5 22 - Pipe Accessories 0 ApproLd ;A/E) -:RO - 23 05 22 - Pipe AccetsoheE ❑ Subcnitt il-IR71-230522- Pipe Accessories: ❑ Apprc ral (A/E) - RI:- 2S 05 22 - Pipe Accesso ies�� I;Fab0eite,&Oelirer%Stgre-210w,22-P,ipeAeesgorjes , Subm0al-fJ-';23:0523,Velves j Q Review:(HI IS)',- Rb - 23 b5 23 - Vgves 0 Approbat ;A/E) -,RO - 23 05 23 - Valves ❑ Submtttal-!R1:-230523-Valdes; ❑ Approval(A/E)- R1 j- 29 05 29 -'Valves I ;Fabricate,&4eli ✓erl,Stgre-2105,23-Valves E�] , Subm0a(- rJ-23:05 29' Pipe Supports &Apoors Q Review:(HI IS)',- RO - 23 1)5 29 - Pipe Supports 4 Ai rchors! ❑ Approval ;A/E) -:RO - 23 05 29 - Pip& Supportfi & Anchors ❑ Subrhitt al-IR7;-230529-Pipe Supports&Anchors ❑ Appro,ral(A/E)-R1;-230529-Pipe Support; &Anchors I :Fabri(ate,, & peli ✓erlStgre - 21 O� 29 - Pipe, St ppgrts, & Ancporg Submittal- rZ) -';23:05 30' Electronic Speed Qorltrol hers, j Q Review:(HI IS)',- RP - 23 05 80 - Electronic Speed Controllers 0 Approval ;A/E) -IRO - 23 05 30 - Electronic Speer Controllers ❑ S61omittal-IR11-230530-Electronic SpeedC(ntrollers ❑ 'Appro ral (A/E) - R11- 23 05 30 -Electronic Sp ed Controllers TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU Tio SER " EJ SMITH 1' Page 26 of 48 CONSTRUCTION Acin ity ID Activity Name P-1AS-F0-2150 Fabricate & Deliver/Store - 23 05 30 - Electronic Speed Controllers Orig Dur 1d Remaining Duration 1d %I Complete 0% Start 15Jan-24 Finish 15Jan-24 23 05 48 - Vibration Control Mrs 61d 61d 0% 174)ct-23 15Jan-24 P-1 ASS.O-2160 Submittal - RO - 23 05 48 - Vibration Control 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2160 Review (HBS) - RO - 23 05 48 - Vibration Control 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2160 Approval (A/E) - RO - 23 05 48 - Vibration Control 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2160 Submittal - Rl -23 05 48 - Vibration Control 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2160 Approval (A/E) - R1 - 23 05 48 -Vibration Control 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2160 Fabricate & Deliver/Store - 23 05 48 - Vibration Control 1 d 1d 0% 15Jan-24 15Jan-24 23 05 53 - Mechanical Identification 61d 61d 0% 17-0W-23 15Jan-24 P-1ASS.0-2170 Submittal - RO -23 05 53 - Mechanical Identification 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2170 Review (HBS) - RO - 23 05 53 - Mechanical Identification 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2170 Approval WE) - RO - 23 05 53 - Mechanical Identification 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2170 Submittal-R1-230553-Mechanical Identification 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-2170 Approval (A/E) - R1 - 23 0553- Mechanical Identification 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-FO-2170 Fabricate & Deliver/Store - 23 05 53 - Mechanical Identification ld 1d 0% 15Jan-24 15Jan-24 23 05 93 - Testing and Balancing P-lA-S-S.0-2180 Submittal - RO - 23 05 93 - Testing and Balancing 61d 61d 0% 174)ct-23 15Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 P-lAS-R.0-2180 Review (HBS) - RO - 23 05 93 - Testing and Balancing 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2180 Approval (A/E) - RO - 23 05 93 - Testing and Balancing 10d 10d 0%. 30-Nov-23 13-Deo-23 P-1ASS.1-2180 Submittal-R1-230593-Testing and Balancing 10d 10d 0% 14-Deo-23 28-Dec23 P-lAS-A.1-2180 Approval (A/E) - R1 - 23 0593- Testing and Balancing 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2180 Fabricate &Deliver/Store -230593- Testing and Balancing ld 1d 0% 15Jan-24 15Jan-24 23 07 00 - Mechanical Insulation Jill 61d 61d 0% 17-W-23 15Jan-24 P-1ASS.0-2190 Submittal - RO - 23 07 00 - Mechanical Insulation 20d 20d 0% 17-Oct-23 13-Nov-23 P-lAS-R.0-2190 Review (HBS) - RO - 23 07 00 - Mechanical Insulation 10d 10d 0% 14-Nov-23 29-Nov-23 P-IAS-A.0-2190 Approval (A/E) - RO - 23 07 00 - Mechanical Insulation 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2190 Submittal-R1-230700-Mechanical Insulation 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-2190 Approval (A/E) - R1 - 23 0700- Mechanical Insulation 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2190 Fabricate & Deliver/Store - 23 07 00 - Mechanical Insulation ld 1d 0% 15Jan-24 15Jan-24 23 08 00 - Building Mechanical System Commissioning P-1A-S-S.0-2200 Submittal - RO - 23 08 00 - Building Mechanical System Comm ss on no 61d 61d 0% 174W-23 15Jan-24� 13-Nov-23 20d 20d 0% 17-Oct-23 P-1 AS-R.0-2200 Review (HBS) - RO - 23 08 00 - Building Mechanical System 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2200 Approval (A/E) - RO - 23 08 00 - Building Mechanical System Commass On no 10d 10d 0% 30-Nov-23 13-Dec23 P-IASS.1-2200 Submittal - Rl -23 08 00 - Building Mechanical System 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-2200 Approval (A/E) - R1 - 23 08 00 - Building Mechanical System 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2200 Fabricate & Deliver/Store - 23 08 00 - Building Mechanical System Commissionina 1 Of 1d 0% 15Jan-24 15Jan-24 23 08 01 - Commissioning Agent RequiremM 61d 61d 0% 17-Cct-23 15Jan-24 r- Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I,il-`L L1I1 �34I516I71 F�9I 1nI11tG1 I1Ad11I1I16I 111J8111�211 `LI LI24 [I26I LI ZI243I318�'3I34I I ;Fabricate'! & Deli ✓er%Store - 23 OB 30 - Blectronc Speed Controllers 0 Submittal - M-123;05 48 F Vibration Cdntrol b Review:(Hl IS)!- RO - 23 05 48 - Vibration Cgntrbl C1 APproval ;A/E) -IRO - 20 0$ 48 - Vibration Oogtrol ❑ Subgnilt it -'�R1 i-2 3 00 40 -Vibration Control ❑ ;Approcal (A/E) - Rl:-23 05 48 -Vibration Conroy! I ;Fabricaate & Deli ✓er[Stdre - 23 OS 48 - Vibrdtio i Control 17 Submittal. - M-123I05 53 Mbchanical ildentificadon d ReviEwl(HHS)', RO - 23 b5 53 - Mechanical Idebtifi ztlon El APproyad ;A/E) -IRO - 2l. 0$ 53 - Mechanical Iden ificatign ❑ Submittal-Rl:-230653-McManical lden6lic tioh ❑ Appro cal (A/F) - R1;- 23 05 53 - Mechanicol Isentifieotion I Fabricates& bell mr%Store - 23 OS 53 - Mechaical Identificaitiorl O Submittal. - M-123;05 93, Testing and;Balanting ❑ Review;(HI IS)'r RO - 23 05 93 - Testing and Batan(ing C1 Approval ;A/O) -IRO - 20 0$ 93 - Tes ki g ano 0ala, cF g ❑ Subrnittal-'Rl:-230590-Testing: and B;alahaiug ❑ l.gpproval,(A/E)-R1;-230593-Testhg!aiid Ealahchg I ;Fabricate& Deli ✓er%Store-230593- Tasting and Belanchp O ISubmittal-fZ)-123107 DOF Mechanical;InsulaCbrY d Review:(HI IS); RO - 2307 00 - Mechanical Insulation! p APpm'ral Al()-:RO - 20 0� 00 -Mechanical lr sul atign ❑ Submittal-'Rl:-230700-Me6hahical Insulhtirn ❑ 'Appro ral (A/F) - R1;- 23 07 00 - MechanVAI lGsulotidn I 'Fabricate & Deli ✓er%Store - 23 07 00 - Mechaical lnaulatioi5 O Submittal. - M-123;08 00 '� Building Nlebhanical Sysi-m'!Commissioning b Reviaw;(HI IS)L RO - 23 O8 00 - Brlildipg Meohanic l System Commissioning 13 APbroyal;A/ )-IRO-200$00-OuioingMechanicatsystemQommissioninb ❑ Subynittil-'Rl:-2 3 00 00 - Building Mechanical System Conimigsioning j ❑ 'Approcal (A/E) - Rl:- 23 08 00 - Buildino Med ian,ical! Systerh Commi4sichin I I ;Fabricate!& Deli ✓er%Stare - 23 08 00 - Buiklinc Mechanical System Commis;iorling TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To SER " EJ SMITH 1' Page 27 of 48 CONSTRUCTION Acts ity ID P-1ASS.0-2210 Activity Name I Submittal - RO -23 08 01 - Commissioning Agent Requirements Crig Dur 20d Remaining Duration 20d %I Complete 0% Start 17-W-23 Finish 13-Nov-23 P-1AS-R.0-2210 Review (HBS)-RO-230801- Commissioning Agent 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2210 Approval (A/E) - RO - 23 08 01 - Commissioning Agent Rem. em is 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2210 Submittal-R7-230801- Commissioning Agent Requirements 10d 10d 0% 14-Dec23 28-Deo-23 P-1AS-A.1-2210 Approval (A/E)-R1-230801 - Commissioning Agent 10d 10d 0% 29-Deo-23 12Jan-24 P-1AS-FO-2210 23 09 01 - Building Fabricate&Deliver/Store-230801- Commissioning Agent ReOU rement5 Automatic Temperature Control Systems 1d 1d 0% 15Jan-24 15Jan-24 61dj 61d 0% 17-Oct-23 15Jan P-1ASS.0-2220 Submittal - RO - 23 09 01 - Building Automatic Temperature 20d 20d 0% 17-0ct-23 13-Nov-23 P-1AS-R.0-2220 Review (HBS) - RO - 23 09 01 - Building Automatic Temperature 10d 10d 0% 14-Nov-23 29-Nov-23 P-1AS-A.0-2220 Approval WE) - RO - 23 09 01 - Building Automatic Temperature 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2220 Submittal 1-230901- Building Automatic Temperature 10d 10d 0% 14-Dec23 28-Deo-23 P-1AS-A.1-2220 Approval(AVE)-R1-230901 - Building Automatic Temperature Control 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-FO-2220 Fabricate &Deliver/Store -230901- Building Automatic Temperature Control Svstems_ 23 21 13 - Hydronic Piping Systems 1d 1d 0% 15Jan-24 15Jan-24 61d 61d 0% 17-W-23 15Jan-24 P-1ASS.0-2230 Submittal - RO -23 21 13 - Hydronic Piping Systems 20d 20d 0% 17-0ct-23 13-Nov-23 P-1 AS-R.0-2230 Review (HBS) - RO - 23 21 13 - Hydronic Piping Systems TOO! 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2230 Approval WE) - RO - 23 21 13 - Hydronic Piping Systems 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2230 Submittal - R1 -23 21 13 - Hydronic Piping Systems 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2230 Approval (A/E) - R1 - 23 21 13 - Hydronic Piping Systems 10d 10d 0% 29-Dec23 12Jan-24 P-1A-S-FO-2230 Fabricate & Deliver/Store - 23 21 13 - Hydronic Piping Systems 1d 1d 0% 15Jan-24 15Jan-24 232123-HVAC Pumps 61d 61d 0% 17-0ct-23 15Jan-24 P-1ASS.0-2240 Submittal - RO -23 21 23 - HVAC Pumps 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2240 Review (HBS) - RO - 23 2123 - HVAC Pumps 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2240 Approval (A/E) - RO - 23 2123 - HVAC Pumps 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2240 Submittal-R1-232123-HVAC Pumps 10d 10d 0% 14-Deo-23 28-Dec23 P-1AS-A.1-2240 Approval WE) - R1 - 23 21 23 - HVAC Pumps 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-2240 Fabricate &Deliver/Store -232123-HVAC Pumps 1d 1d 0% 15Jan-24 15Jan-24 23 23 00 - Refrigerant Piping Systems is 61d 61d 0% 17-0ct-23 15Jan-24 P-1ASS.0-2250 Submittal - RO -23 23 00 - Refrigerant Piping Systems 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2250 Review (HBS) - RO - 23 23 00 - Refrigerant Piping Systems 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2250 Approval (A/E) - RO - 23 23 00 - Refrigerant Piping Systems 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2250 Submittal - R1 -23 23 00 - Refrigerant Piping Systems 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2250 Approval (A/E) - R1 - 23 23 00 - Refrigerant Piping Systems 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-2250 Fabricate & Deliver/Store - 23 23 00 - Refrigerant Piping Systems 1 d lid 0% 15Jan-24 15Jan-24 23 31 13 - Ductwork 61d 61d 0% 174W-23 15Jan-24 P-1 ASS.0-2260 Submittal - RO -23 31 13 - Duchuork 20d 20d 0% 174)ct-23 13-Nov-23 P-1 AS-R.0-2260 I Review (HBS) - RO - 23 31 13 - Ductvork 10d 10d 0% 14-Nov-23 29-Nov-23 r- Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJZb I"IS OI-`JI-6171SI3I ,il-`L L1I1 �34ISI6I/I F�9I 11I11t G1 I1Ad11I1I16I 111J8111L21I `LI LI24 [I26I LI ZI203I313�t31341 Submittal - FE) -:23:08 01 F Commissioning Agent Rrqulrements �d ReviEw!(HIIS)'; RO-23 p801-COmrlTissiogingAgenf, Requirements 0 APPm'cal ,A/E) -'RO - 2'3 0$ 01 - Oorj misspning Agent kequire mgnts ❑ Sbbmitttl-87:-230801- Commissioning Age it Requirements, ■ IAppro'ral (A/F) - R1:- 23 08 01 - Commissibning Agent Requinments I IFabdcate & Deli er%Stdre - 23 0& 01 - Commi, sidning Agent R'equireineiits O Submittal-M-:23;09 DI Building'>utbmatid Temp amture Contrbl Systems d Reviswl(HI IS)'r RO - 23 b9 01 - BUildipg Automatic Temperature: Control *stBmn j C1 App6val;A/E)-:RO-200001- Ouilping A4toina is 7empemtuje Control, Systei is j ❑ Solokitt tl-'R7:-2) 00 01 - Building Automatic �imperpture Control Systems ❑ Ylpproral,(A/f)-R1:-230901-BuildingAbtoinaticTempeotuireControl:SyI rhs: I ;Fabnc-rte''& Deli ✓er%Stcire- 23 09 01 - Buiklinc Automatic T&mpemture C:ont cl Systems ; 0 Submitai - rJ -:2321 131- Hydronid Piping Systdm= d ReviEwl(HHS)', RO - 23 21 13 - Hydronic Piping S�51 ems: p APDroval A/() -;RO - 2$ 21 13 - Hyc tunic OiPIPg 3y%enls ❑ Sbbmitt,tl-'R1:-23211$- Hydronic Piping$ysenis ❑ Approgal (A/F) - R1;- 23 21 13 -Hydronic Piping Systems I ;Fabricate:& Deli ✓er%Stdre - 23 21:13 - Hydtoni c Piping Systams O I Submittal - M-I23:21 23, HVAC Pumps ❑ Review:(HIlS)'r R0 - 23 R1 R3 - HVAC Pumps El Approval ;A/0) -:RO - 20 2123 - NVAC Pumpg ❑ SubGnitt tl-'R1:-212123-HVAC Pumps, ❑ Approval (A/E)-R1;-232123-HVAC Pump!, I ;Fabricsts&Deli ✓eristore-2321:23-HVAC Pumps: 0 Submitai - M -12323 00'- Rdfrigerant Piping ISyStei ns d Review:(HI IS); RO - 23 23 00 - Refrigerant Piping Systems El APDroval ;A/E) -;RO - 20 2$ 00 - Oe%erant PIPin 0 Systems ❑ Submittal-'R1:-2 3 2$ 00 - Refiigemnt Pipinp S ystems ❑ ;Appro, cal (A/E) - R1;- 23 23 00 - Refrigerant P ping S,ystem9 I ;Fabricate: & Deli ✓er%Stdre- 23 23 00 - Refngei ant Piping Systems O Submitai - M-123:31 13 '� Ddctewrk d Rev" iiawl(HI S)!- RO - 23 91 13 - Doctwork . TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To SER " EJ SMITH 1' Page 28 of 48 CONSTRUCTION Acts ity ID P-1 AS-A.0-2260 Activity Name I Approval (A/E) - RO - 23 31 13 - Ductvrork Orig Dur 10d Remaining Duration 10d %I Complete 0% Start 30-Nov-23 Finish 13-Dec-23 P-1ASS.1-2260 Submittal-R1-233113-Ductwork 10d 10d 0% 14-Dec23 28-Dec23 P-IAS-A.1-2260 Approval (A/E) - R1 - 23 31 13 - Ductwork 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-2260 Fabricate & Deliver/Store - 23 31 13 - Ductwork ld ld 0% 15Jan-24 15Jan-24 23 33 00 - Ductwork Accessories 61d 61d 0% 17-Oct-23 15Jan-24 P-1 A-S-S.0-2270 Submittal - RO - 23 33 00 - Ductwork Accessories 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2270 Review (HBS) - RO - 23 33 00 - DuctworkAocessories 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2270 Approval (A/E) - RO - 23 33 00 - DuctworkAocessories 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2270 Submittal-R1-233300- DuctworkAccessodes 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-2270 Approval (NE) - R1 - 23 33 00 - DuctworkAocessories 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2270 Fabricate & Deliver/Store - 23 33 00 - DuctworkAccessorles ld 1d 0% 15Jan-24 15Jan-24 23 34 00 - Fans 61 d 61d 0%. 17-W-23 15Jan-24 P-IASS.0-2280 Submittal - RO -23 34 00 - Fans 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2280 Review (HBS) - RO - 23 34 00 -Fans 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2280 Approval (A/E) - RO -23 3400 -Fans 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2280 Submittal - R1 -23 34 00 - Fans 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2280 Approval (A/E) - R1 - 23 34 00 - Fans 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-2280 Fabricate & Deliver/Store - 23 34 00 - Fans 1 d 1 d 0% 15Jan-24 15Jan-24 23 36 00 - Air Terminal Units P-1ASS.0-2290 Submittal - RO -23 36 00 -Air Terminal Units 61d 61d 0% 17-Oct-23 15Jan-24 20d 20d 0% 17-0W-23 13-Nov-23 P-lAS-R.0-2290 Review (HBS) - RO - 23 36 00 -Air Terminal Units 10d 10d 0% 14-Nov-23 29-Nov-23 P-lAS-A.0-2290 Approval (A/E) - RO - 23 36 00 -Air Terminal Units 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2290 Submittal-R1-233600- Air Terminal Units 10d 10d 0% 14-Dec23 28-Dec23 P-lAS-A.1-2290 Approval (A/E) - R1 - 23 36 00 -Air Terminal Units 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2290 Fabricate &Deliver/Store -233600- Air Terminal Units 1d 1d 0% 15Jan-24 15Jan-24 233700-Otr Inks k&Outlets 61d 61d 0% 17-W-23 15Jan-24 P-1 ASS.O-2300 Submittal - RO - 23 37 00 -Air Inlets & Outlets 20d 20d 0% 174Oct-23 13-Nov-23 P-1 AS-R.0-2300 Review (HBS) - RO - 23 37 00 -Air Inlets & Outlets 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2300 Approval (A/E) - RO - 23 37 00 -Air Inlets & Outlets 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2300 Submittal - R1 -23 37 00 -Air Inlets & Outlets 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2300 Approval (A/E) - R1 - 23 37 00 -Air Inlets & Outlets 10d 10d 0% 29-Dec-23 12Jan-24 P-lAS-F0-2300 Fabricate & Deliver/Store - 23 37 00 -Air Inlets & Outlets ld 1d 0% 15Jan-24 15Jan-24 23 73 24 - Split System Dx Air Handing Units 61d 61d 0% 174M-23 15Jan-24 P-1ASS.0-2310 Submittal - RO -23 73 24 - Split System DxAir Handling Units 20d 20d 0% 17dW-23 13-Nov-23 P-lAS-R.0-2310 Review (HBS) - RO - 23 73 24 - Split System Dx Air Handling Units 10d 10d 0% 14-Nov-23 29-Nov-23 P-1AS-A.0-2310 Approval (A/E) - RO - 23 73 24 - Split System Dx Air Handling Units 10d 10d 0% 3Mov-23 13-Deo-23 P-IASS.1-2310 Submittal - R1 -23 73 24 - Split System DXAIr Handling Units 10d 10d 0% 14-Dec23 28-Dec23 — Remaining Level of Effort ♦ ♦ Milestone — Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I ,il-`L L1I1 ?4I516 171 F�9I 11I11tG1 I1Ad11I1I16I 111J8i 1I�21I LI Z124 [I26I LI ZI2*3I313�'3I34I ■ Approval A/E) -;RO - 23 31 13 - DuCtwork ■ Submittal-IR1!-233113-DuCMQrk ■ Apbro'ral(A/�)-R1I- 2$ 311$- Duclwgrkj I Fabricate & Deli ✓erlStore - 23 31:13 - Ductm k 0 Submittal-M-';23i3300' DoctworkAgcessories ❑ Review,(HI G)I, RO - 23 33,00 - DuctJorkAccedsol ies' D AporoVal ;A/E) -;RO - 23 33 00 - DuctworkAccasEDrios ❑ Submittal-IR1I-233300-Duc'twgrk Acc-s sDd Ss ❑ Approval'(A/D)-R1;-2$330p-DuctwgricA—ssprips I jFabricate!& Deli ✓erlStore-2137u, 00- buctwo kAccessorieg Q Submittal -rJ/-!23i34 Do' Fans 0 Revibwl(HI lS)I- R0 - 23 34 00 - Fans I 11 AporoVal ;A/E) -IRO - 23 34 00 - Farts ❑ SubmfttiI-IR1I-233400-Farts ❑ APproral(A/�)-R1;-2$3404-1`ans I Fabricate! & Deli ✓erlStore - 2134 00 - Fans E;3 Submittal -1Z-'�23i36 00' Air TermhaWnits ❑ Review,(HI S)I- RO - 23 36 00 -Aid Terminal Units D AporoVal ;A/E) -IRO - 23 36 00 -Air Terminal Unit: ❑ Submifal-,!R1:'-233600-Air TertPinal Unit$ ❑ Approval '(A/�)-Rl:-2$360p-Air Terninnllnits I iFabricate!&Deli ✓eoStore-233G00-Air Temrinal Units Q Submittal - RD-!23:37 00 Air Inlets; & Outlets' ❑ Revibwl(HNS)I, RO - 23 37 00 -Ait Inlbts & Outlets D Approval A/E) -'RO - 23 37 00 -Air Ihlets & Outle s ■ SnbiniHul-IR1I-2 3 37 00 -Air Inlets & Outlets e%kppm"al'(A/1)-Rl:-2$3700-AirinleSsAC4itle(s I 'Fabricate & Deli ✓erlStore - 23 37 00 -Air Wet; &;Outlets 0 Submittal-FZD-!23i7324 Split System Dx Air Hpnc ling' Units ❑ Reviewl(H )'- RO - 23 73 24 - S{Slit System, Dx Ad Handling Units' ■ Approval A/E)-IRO-237324- Spli[Syste'm Dx, \ir Waddling Units ■ Submittal-IR7!-2 3 73 24 - Split System Dx Air Handling Units TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update NS Ru To SER " EJ SMITH r' Page 29 of 48 CONSTRUCTION Acts ity ID P-1AS-A.1-2310 Activity Name Approval (Ai -R1-237324- Split System Dx Air Handling Units Crig Dur 10d Remaining Duration 10d %I Complete 0% Start 29-Dec23 Finish 12Jan-24 P-1AS-17.0-2310 Fabricate &Deliver/Store -237324- Split System Dx Air Handling 1d 1d 0% 15Jan-24 15Jan-24 23 75 00 - Outdoor Alr Handing Units With Coils M 61d 61d 0% 17-W-23 15Jan-2 P-1ASS.0-2320 Submittal - RO -23 75 00 - OutdoorAir Handling Units With Coils 20d 20d 0% 17-0W-23 13-Nov-23 P-1AS-R.0-2320 Review (H&S)-RO-237500- OutdoorAir Handling Units With 10d 10d 0% 14-Nov-23 29-Nov-23 P-1AS-A.0-2320 Approval WE) - RO - 23 75 00 - OutdoorAir Handling Units With Col 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2320 Submittal-R1-237500- OutdoorAir Handling Units With Coils 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2320 Approval (A/E) - R1 - 23 75 00 - OutdoorAir Handling Units With Coils 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-FO-2320 Fabricate & Deliver/Store - 23 75 00 - OutdoorAir Handling Units With COits 23 8126 - Split System Ai rCondtionars P-IASS.0-2330 i Submittal - RO -23 81 26 - Split System Air Conditioners 1d 1d 0% 15Jan-24 15Jan-24 61d 61d 0% 17-Oct-23 20d 20d 0% 17dW-23 13-Nov-23 P-1 AS-R.0-2330 Review (HISS) - RO - 23 81 26 - Split System Air Conditioners 10d 10d 0% 144Jov-23 29-Nov-23 P-1 AS-A.0-2330 Approval (A/E) - RO - 23 8126 - Split System Air Conditioners 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2330 Submittal - R1 -23 81 26 - Split System Air Conditioners 10d 10d 0% 14-Deo-23 28-Deo-23 P-1AS-A.1-2330 Approval (Ai -R1-238126- Split System Air Conditioners 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-17.0-2330 Fabricate&Deliver/Store -238126- Split System Air Conditioners 1d 1d 0% 15Jan-24 15Jan-24 23 82 39 - Heating Terminal Units 1 61d IL 0% 17-W-23 15Jan-24 P-1ASS.0-2340 Submittal - RO -23 82 39 - Heating Terminal Units 20d 20d 0% 17-W-23 13-Nov-23 P-1AS-R.0-2340 Review (H BS) - RO - 23 82 39 - Heating Tettn ins Units 10d 10d 0% 14-Nov-23 29-Nov-23 P-1AS-A.0-2340 Approval (A/E) - RO - 23 82 39 - Heating Terminal Units 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2340 Submittal - R1 -23 82 39 - Heating Terminal Units 10d 10d 0% 14-Dec23 28-Deo-23 P-1AS-A.1-2340 Approval (A/E) - R1 - 23 82 39 - Heating Terminal Units 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-F.0-2340 Fabricate & Deliver/Store - 23 82 39 - Heating Terminal Units 1 d Id 0%1 15Jan-24 15Jan-24 26 05 00 - Electrical Requirements P-1 ASS.O-2350 Submittal - RO - 26 05 00 - Electrical Requirements 61d 20d 61d 0% Lflr�. a 0% 17-Oct-23 0% 17-01 15Jan-24 13-Nov-23 20d P-1 AS-R.0-2350 Review (HISS) - RO - 26 05 00 - Electrical Requirements 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2350 Approval (A/E) - RO - 26 05 00 - Electrical Requirements 10d 10d 0% 30-Nov-23 13-Deo-23 P-IASS.1-2350 Submittal - R1 -26 05 00 - Electrical Requirements 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2350 Approval (A/E) - R1 - 26 05 00 - Electrical Requirements 10d 10d 0% 29-Deo-23 12Jan-24 P-1AS-17.0-2350 I Fabricate & Deliver/Store - 26 O5 00 - Electrical Requirements 1 d 1d 0% 15Jan-24 15Jan-24 26 05 01 - Mechanical & Electrical Coordination I 1A 61d 61d 0% 17-Cci 15Jan-24 P-1ASS.0-2360 Submittal - RO -26 05 01 - Mechanical & Electrical Coordination 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2360 Review (HISS) - RO - 26 05 01 - Mechanical & Electrical ronrcloni 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2360 Approval (A/E) - RO - 26 05 01 - Mechanical & Electrical f%.nnrrlqnnt on 10d 10d 0% 304Jov-23 13-Dec23 P-1ASS.1-2360 Submittal - R1 -26 05 01 - Mechanical & Electrical Coordination 10d 10d 0% 14-Dec23 28-Deo-23 P-1 AS-A.1-2360 Approval (A/E) - R1 - 26 05 01 - Mechanical & Electrical 10d 10d 0 % 29-Deo-23 12Jan-24 r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work Zb JGJI AIS OI-91-F317IEI3I:il-`L L1I1 �34IS I6I/I tt 9I1^I11tG1 I1Ad11I1I16I 111J8111�211 `LI LI24 `LI26I LI ZI2d 3I 31ZUi '3I34I ❑ Approral (A/E)-R1;-237324-Split System )xAir Handling Units I :Fat ic-tte',&Deli✓er(Store-A7324-Split;SyitemDxAirHandlingUirrits 0 : Submittal - FZ-123;75 00,, OutdoorAir Handling Old s With Coils; b Revi w:(HHS),- F(O - 23 y5 00 - OUtdgorAir Handling Units Wah:Cgils El Approval A/E) -:RO - 23 76 00 - but000rAir Hendlin9 Units With Coils '❑ Subdnittul-IRT-217600- CutdodrAir Handlinc; Units With Coils ❑ 'Appm,,al (A/E) - R1;- 23 75 00 - Outdo(JrAlr Fkandling Units; Wdh Coils I IFabncqte, & Deli rerlStore- 23 7 00 - Qu[doo'Air, Handling; Units Wi[h Cpils n Submittal-170-12318126;-SplitSystemAirConctkioners j b Revipw:(HM),- RO - 23 01 �6 - Split $ysterl Aiq Cc ndj io"ers i7 Approval ;A/E) -:RO - 28 8126 - Split System Air Uonditioners ❑ Sub6tit-IR7;-2381' 26- Split S3istem Air Conditibners M 'Appro ral (A/E) - R11- 23 8126 -Split System rr Corlditioners I iFabdvata& Deli ✓er%Store-2381:26-Split:Sy--tom Air Conditioners Q :Submittal-FJ-:23;8239,Heating ;Terminal Units j b Revibw:(HI IS)'; 0-2323132 $9 - Hnati6g Tenping 1 l lnits d Approval ;A/E) -:RO - 28 84 39 - Heating Tgmina Units: ❑ Slrbdni0al -IRT-23 82 39 - HeAtini Terminal Uft ❑ Appro ral (A/E) - R1;- 23 82 39 - Heating Terrral Units I ;Fabricate,&belt ✓erlStore-2d 82 39 - Heatinc Terni Urigs M :Submittal - M-:26;05 DO' Electrical Requirements 1111111 Revipw;(HI IS)!- RO - 26 05 00 - Electdcal Requiren cents M APProval ;A/E) -:RO - 2$ 0$ 00 - �Iectrical keguin Imgntg S SubGnitt tl-'�Rl:-2 3 06 OQ - EleOdcul Requiremt nts, S Y1pproral (A/�) - R1;- 26 05 00 - Electncpl F3ec uirements I ;Fabricata& Deli ✓er%Store-260500- Electric if Requirements! M9 Submittal - F /J-:26i05 01 Mechanical Electric2l (ooidiftation d Revibw!(HI IS)', FA - 260501 - Mi:ch7nical & Hleuical Coordin7tion El Alp ror6d ;A/H) -jR0 - 20 0$ 01 - Me0anicgl & Eluctrlcal,Coordjnaton ■ Submittrl-'R1:-230501-Mechanical&'!Electr.:al'Coordination': ■ ;Appro'rat (A/F) - R1;- 26 05 01 - Mechi 8 Electrical Cobrd,inationl TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To SER " EJ SMITH r' Page 30 of 48 CONSTRUCTION Acts ity ID Activity Name P-1AS-F0-2360 Fabricate & Deliver/Store - 26 05 01 - Mechanical & Electrical Orig Dur 1d Remaining Duration 1d %I Complete 0% Start 15Jan-24 Finish 15Jan-24 260502-Basic Material &Methods 61d 61d 0% 174)ct-23 15Jan-24 P-1 A-S-S.0-2370 Submittal - RO - 26 05 02 - Basic Material & Methods 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2370 Review (HBS) - RO -26 05 02 -Basic Material & Methods 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2370 Approval (A/E) - RO - 26 05 02 - Basic Material & Methods 10d 10d 0% 30-Nov-23 13-Dec-23 P-1ASS.1-2370 Submittal - R1 -26 05 02 - Basic Material & Methods 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2370 Approval (A/E) - R1 - 26 05 02 - Basic Material & Methods 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-2370 Fabricate & Deliver/Store - 26 05 02 - Basic Material & Methods 1 d 1 d 0% 15Jan-24 15Jan-24 26 05 03 - Manufacturers 61d 61d 0% 17-0W-23 15Jan-24 P-1ASS.0-2380 Submittal - RO -26 05 03 - Manufacturers 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2380 Review (HISS) - RO - 26 05 03 - Manufacturers 10d 10d 0% 144Nov-23 29-Nov-23 P-1 AS-A.0-2380 Approval WE) - RO - 26 05 03 - Manufacturers 10d 10d 0% 304Nov-23 13-Dec23 P-1ASS.1-2380 Submittal - R1 -26 05 03 - Manufacturers 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2380 Approval (A/E) - R1 - 26 0503-Manufacturers 10d 10d 0% 29-Dec-23 12Jan-24 P-1AS-FO-2380 Fabricate &Deliver/Store -260503-Manufacturers 1d 1d 0% 15Jan-24 15Jan-24 26 05 04 - Food Service Equipment Wiring P-1A-S-S.0-2390 Submittal - RO - 26 05 04 - Food Service Equipment Wiring 61d 61d 0% 17-Oct-23 15Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 P-1AS-R.0-2390 Review (HISS) - RO - 26 05 04 - Food Service Equipment Wiring 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2390 Approval (A/E) - RO - 26 05 04 - Food Service Equipment Wiring 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2390 Submittal - R1 -26 05 04 - Food Service Equipment Wiring 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2390 Approval (A/E) - R1 - 26 05 04 - Food Service Equipment Wiring 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-2390 Fabricate & Deliver/Store - 26 05 04 - Food Service Equipment 1d 1d 0% 15Jan-24 15Jan-24 26 05 05 - Electrical Demolition&Relocation 61d 61d 0% 17-W-23 15Jan-24 P-1 A-S-S.0-2400 Submittal - RO - 26 05 05 - Electrical Demolition & Relocation 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2400 Review (HBS) - RO - 26 05 05 - Electrical Demolition & Relocation 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2400 Approval (A/E) - RO - 26 05 05 - Electrical Demolition & Relocation 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2400 Submittal - R1 -26 05 05 - Electrical Demolition & Relocation 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2400 Approval (A/E) - R1 - 26 05 05 - Electrical Demolition & Relocation 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-2400 Fabricate & Deliver/Store - 26 05 05 - Electrical Demolition & 1d 1d 0% 15Jan-24 15Jan-24 26 05 10 -Testing & Certification 61d 61d 0% 174W-23 15Jan-24� P-1A-S-S.0-2410 Submittal - RO - 26 05 10 - Testing & Certification 20d 20d 0% 17-Oct-23 13-Nov-23 P-1AS-R.0-2410 Review (HBS)-RO-260510-Testing &Certificatlon 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2410 Approval (A/E) - RO - 26 05 10 -Testing & Certification 10d 10d 0% 30-Nov-23 13-Dec23 P-IASS.1-2410 Submittal-R7-260510-Testing &Certification 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2410 Approval (A/E)-R1-260510-Testihg&Certification 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-2410 Fabricate & Deliver/Store - 26 05 10 - Testing & Certification 26 0519 -Electrical Power Conductors & Ca 1 d 1d 0% 15Jan-24 15Jan-24 61d 61d 0% 17-Cct-23 15Jan-24 r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort fi Actual Work O Remaining Work Critical Remaining Work Zb JGJI AIS OI JJJ�I�I .IL1I1 �34I516 17I F�9I 1nI11tG1 I1Ad11I1I16I 111J8111L21I LI LI24 `LIL6I LI ZI243I313�'3I34I -cfl' dl':il I ;Fabdcata&©eli ✓er%Store-260601-Mechaical& Electrical Coordinatibn 0 Submittal - M-126:05 D2',Basic Mdtedel & Method: r l b Reviawl(HI O)'r RO - 26 05 02 - Basic:Matedal & M athods Approval ;A/E) -:RO - 20 0$ 02 - Oasic Matgria) & Methods ❑ SpbhiiR il-',R7:-2 i 05 02 - Ba* Materal, & Me hops ❑ ;Approral (A/E) - R1;- 26 05 02 -Basic Matbria I & Methods I ;Fabrictta & Deli ✓edStdre - 26 OS 02 - Basib hateriall& Methods 0 Submittal - M-126:05 03 M2nufadturars d ReviEwl(HHS)!- RO - 26 05 03 - Manufacturers El Approval ;A/E) -:RO - 2$ 0$ 03 - Manufacturer$ ❑ Submitt il-'R7:-2 i O6 OS - Manufacturers ❑ Appro ral (A/F) - R1:- 26 05 03 - ManufactOre► I Fabdcata & bell mr%Store - 26 05 03 - Manf^tuter5 O Submittal - M-�26;05 D4, Food SehicB Equipmbnt Wifing, ❑ Reviaw;(HI O)'r FtO - 26 05 04 - Fgod;Servioe Equipment,Widngl C1 Approval ,A/0) -:RO - 20 0$ 04 - rood Service:Eq ✓iprnent Widdg ❑ Subinitttl-'R1:-2 i 05 04 - Food Service ,Equipment Wiring ❑ lgpproval (A/E) - R1;- 26 05 04 -Food Senhce Egbipment Wiring I, I :Fabricate'& Deli ✓er%Store - 26 OS 04 - Food S mAite Equipment Wirin� I I O Submittal - fM-126105 D5 F Eldctrical Ditmolttidn & R alodatidn d Reviaw!(HI IS); RO - 26 p5 05 -Electrical DdmglRin &Relocation i7 APProyal Al(),-'RO - 2$ 0$ 05 - Vler�[rical Oerpoli iory & 0elocatiori ❑ Submittal-'R7:-2 i 05 05 - Electrical Demolition & Relocatiod ❑ ';Appro rat (A/F) - R1:- 26 05 05 - Elecdcal Demolition, & Relbcation I 'Fabricate' & beli ✓erriStore - 26 OS 05 - Electric d D'emolition 8 Relocation' I O Submittal-FJr-126;0510 �Tdstirg &Cortificatiori ;b Re*w:(HIO)'r RO-26O5p0-Telling&Cert0cakon, 13 APproyal ;A/ ) -:RO - 2$ 0$ 10 - 7es(n g & oertdk align ❑ Subkittil-R7:-230510-Tesjingl&CeOficetirn ❑ 'Approral (A/E) - Rl:- 26 05 10 - Testhg! & Ceitific�itidn I :Fabdmte'' & beli ✓edStdre- 26 0610 - Testing & Certlfication TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update NS RU To SER " EJ SMITH r' Page 3 t of 48 CONSTRUCTION Acts ity ID P-1 ASS.O-2420 Activity Name I Submittal - RO - 26 05 19 - Electrical Power Conductors & Cables Orig Dur 20d Remaining Duration 20d %I Complete 0% Start 17-W-23 Finish 13-Nov-23 P-1 AS-R.0-2420 Review (HBS) - RO - 26 05 19 - Electrical Power Conductors & 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2420 Approval (A/E) - RO - 26 05 19 - Electrical Power Conductors & 10d 10d 0% 304Nov-23 13-Dec23 P-1ASS.1-2420 Submittal - R7 -26 05 19 - Electrical Power Conductors & Cables 10d 10d 0% 14-Dec23 28-Deo-23 P-1 AS-A.1-2420 Approval (A/E) - R1 - 26 05 19 - Electrical Power Conductors & a 10d 10d 0% 29-Deo-23 12Jan-24 P-1AS-FO-2420 Fabricate & Deliver/Store - 26 05 19 - Electrical Power Conductors & (ahlec 26 05 26 - Grounding and Bonding 1d 1d 0% 15Jan-24 15Jan-24 61d 61d 0% 17-Oct-23 15Jan P-1ASS.0-2430 Submittal - RO -26 05 26 - Grounding and Bonding 20d 20d 0% 174)ct-23 13-Nov-23 P-1AS-R.0-2430 Review (HBS) - RO -26 05 26 -Grounding and Bonding 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2430 Approval (A/E) - RO - 26 05 26 - Grounding and Bonding 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2430 Submittal -R7-260526- Grounding and Bonding 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2430 Approval (A/E) - R1 - 26 05 26 - Grounding and Bonding 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-FO-2430 Fabricate & Deliver/Store -26 05 26 -Grounding and Bonding 1d id 0% 15Jan-24 15Jan-24 26 05 29 - Hangers & Supports 61d 61d 0% 17-W-23 15Jan-24 P-1 ASS.O-2440 Submittal - RO - 26 05 29 - Hangers & Supports 20d 20d 0% 17-0W-23 13-Nov-23 P-1 AS-R.0-2440 Review (HBS) - RO - 26 05 29 - Hangers & Supports 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2440 Approval (A/E) - RO - 26 05 29 - Hangers & Supports 10d 10d 0% 304Nov-23 13-Dec23 P-1ASS.1-2440 Submittal - R1 -26 05 29 - Hangers & Supports 10d 10d 0% 14-Dec23 28-Deo-23 P-1 AS-A.1-2440 Approval (A/E) - R1 - 26 05 29 - Hangers & Supports 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-2440 Fabricate & Deliver/Store - 26 05 29 - Hangers & Supports 1 d 1 d 0% 15Jan-24 15Jan-24 26 05 33 - Raceways & Boxes a 61d 61d 0% 17-0W-23 15Jan-24 P-1 ASS.O-2450 Submittal - RO - 26 05 33 - Raceways & Boxes 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2450 Review (HBS) - RO - 26 05 33 - Raceways & Boxes 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2450 Approval (A/E) - RO - 26 05 33 - Raceways & Boxes 10d 10d 0% 30-Nov-23 13-Dec23 P-1 ASS.1-2450 Submittal - R1 - 26 05 33 - Raceways & Boxes 10d 10d 0% 14-Deo-23 28-Dec23 P-1 AS-A.1-2450 Approval (A/E) - R1 - 26 05 33 - Raceways & Boxes 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-2450 Fabricate & Deliver/Store - 26 05 33 - Raceways & Boxes 1 d 1 d 0% 15Jan-24 15Jan-24 26 05 48 - Vibration Controls 61d 61d 0% 174)ct-23 15Jan-24 P-1ASS.0-2460 Submittal - RO -26 05 48 - Vibration Controls 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2460 Review (HBS) - RO - 26 05 48 - Vibration Controls 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2460 Approval (A/E) - RO - 26 05 48 - Vibration Controls 10d 10d 0% 304Nov-23 13-Dec23 P-1AS.S.1-2460 Submittal - R7 -26 05 48 - Vibration Controls 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2460 Approval (A/E) - R1 - 26 05 48 -Vibration Controls 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-2460 Fabricate & Deliver/Store - 26 05 48 - Vibration Controls 1 d 1d 0% 15Jan-24 15Jan-24 260553-Identification 61d 61d 0% 174W-23 15Jan-24 P-1ASS.0-2470 Submittal - RO -26 OS 53 - Identification20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2470 Review (HBS) - RO- 26 05 53 - Identification 10d 10d 0% 14-Nov-23 29-Nov-23 r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work Zb JGJI AIS OI JJJ�I�I .I-`L L1I1 �34ISI6I/I F�9I 11I11tG1 I1Ad11I1I 16I 111J8111�211 `LI LI24 LI26I LI ZI2�3I313�'3I34I -cfl' dl':il Submittal-FE)-126;0519 i-Electrical Pdwer Conducmrsl&Cables: d Re: view:(HI IS)'; RO - 26 05 '19 - Electrical Power Cnnducors & Cables 0 APPr6d ,A/E) -IRO - 20 0$ 19 - �Ieptrical Oovfer �,00duptors & Cables j ❑ SUbini t rl -87:- 2 i 05 19 - Electrical Power Cor ductois & Cables ■ IAppro'ral (A/9) - R1:- 26 05 19 - Electrical Rover Conductors &'� Cable's I IFabd(mte': & Deli ✓edStdre - 26 0519 - Elechia d Power Conductors & Cable; O Submittal - M-:26:05 26, Grounding 8nd Bonding b Review:(HI lS)'r RO - 26 b5 26 - Grounding a'nd:Bolding j C1 Approval ;A/E) -IRO - 2¢ 0$ 26 - Oropnding a6d bonding ❑ Solokitt tl-'R7:-2 i 06 26 - Grounding and Bonding ❑ ;Appro'ral (A/B) - R1:- 26 05 26 - Grounding arJ Bonding I :Fabricate'! & Deli ✓er[Stdre - 26 OS 26 - Ground ng and Bonding! I 0 Submittal - FD-',26:05 29, HAnger5 & Supports d Review:(HHS)', RO - 26 55 29 - Hangers & Supports El Alp ror6d A/O -;RO - 25 0$ 29 - Naggers & SGPport9 ❑ Submitt, d -'R7:- 2 i 0$ 29 - Harigeis & Support: ❑ Appm gal (A/B) - Rl:- 26 05 29 - Hangers & Suppbrts I, I ;Fabdratel& Deli ✓edStdre - 26 OS 29 - HanpeC &ISupports: O Submittal - M-I26:05 33, Raceways & Boxes ❑ Review:(HRS)'r RO - 26 O5 $3 - Raceways &' Boxe; El Approval ;A/B) -IRO - 20 0$ 33 - Oaaewraysl & i'o=s ❑ SubGnittit -'R1:- 2 i o6 3$ - Raov*ys & Boxes ❑ Approval (A/E) - R1;- 26 OS 33 - Racewhya & 3oXes I I ;Fabricate'! & Deli ✓edStdre -26 0633 - RaO2wys & Boxes 0 Submittal - M-126'OS 48'- Vibration Controls d Review:(HI IS); RO - 26 55 48 - Vibration Cc trels p APProval ;A/E) -;RO - 2$ 0$ 48 - Vibration Corjtrol s ❑ Submittal-'R7:-2 i OS 49 - Vibration Controls ❑ ;Appro ral (A/E) - R1;- 26 05 48 - Vibretidn 6omrol5 I ;Fabricitel & Deli ✓edStdre - 26 OS 48 - U,ibratio i Controls O Submittal - FJ(-126:05 53 F Idientificetion : d Review:(HI S)', RO - 26 55 53 - Identification TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update NS Ru no SER " EJ SMITH r' Page 32 of 48 CONSTRUCTION Acts ity ID P-1 AS-A.0-2470 Activity Name I Approval (A/E) - RO - 26 05 53 - Identification Odg Cur 10d Remaining Duration 10d %I Complete 0% Start 30-Nov-23 Finish 13-Dec23 P-1ASS.1-2470 Submittal - R1 -26 05 53 - Identification 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2470 Approval (A/E) - R1 - 26 05 53 - Identification 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2470 Fabricate & Deliver/Store - 26 05 53 - Identification ld 1d 0% 15Jan-24 15Jan-24 26 05 73 - Electrical P-1A-S-S.0-2480 Studies 61d 61d 0% 17-0ct-23 15Jan-24 Submittal - RO -26 05 73 - Electrical Studies 20d 20d j 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2480 Review (HISS) - RO - 26 05 73 - Electrical Studies 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2480 Approval (A/E) - RO - 26 05 73 - Electrical Studies 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2480 Submittal - R1 -26 05 73 - Electrical Studies 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2480 Approval (A/E) - R1 - 26 05 73 - Electrical Studies 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2480 Fabricate & Deliver/Store - 26 05 73 - Electrical Studies ld ld 0% 15Jan-24 15Jan-24 26 09 13 - Electrical Power Monitoring P-IASS.0-2490 Submittal - RO - 26 09 13 - Electrical Power Monitoring 61d 61d 0% 17-W-23 15Jan-24 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2490 Review (HISS) - RO - 26 09 13 - Electrical Power Monitoring 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2490 Approval (A/E) - RO - 26 09 13 - Electrical Power Monitoring 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2490 Submittal - R1 -26 09 13 - Electrical Power Monitoring 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2490 Approval (A/E) - R1 - 26 09 13 - Electrical Power Monitoring 10d 10d 0% 29-Dec23 12Jan-24 P-lAS-F0-2490 Fabricate & Deliver/Store - 26 09 13 - Electrical Power Monitoring ld ld 0% 15Jan-24 15Jan-24 26 09 43 - Lighting Control System 61d 61d 0% 17-0ct-23 15Jan-24 P-IASS.0-2500 Submittal - RO -26 09 43 - Lighting Control System 20d 20d 0% 17-Oct-23 13-Nov-23 P-1 AS-R.0-2500 Review (HISS) - RO - 26 09 43 - Lighting Control System 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2500 Approval (A/E) - RO - 26 09 43 - Lighting Control System 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2500 Submittal - R1 -26 09 43 - Lighting Control System 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2500 Approval (A/E) - R1 - 26 09 43 - Lighting Control System 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-2500 Fabricate & Deliver/Store - 26 09 43 - Lighting Control System 1 of ld 0% 15Jan-24 15Jan-24 26 22 13 - Low Voltage Distribution Transformers 61d 61 d 0% 17-W-23 15Jan-24 P-1ASS.0-2510 Submittal - RO -26 22 13 - Low Voltage Distribution Transformers 20d 20d 0% 174Oct-23 13-Nov-23 P-1 AS-R.0-2510 Review (HISS) - RO - 26 22 13 - Low Voltage Distribution Transform— 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2510 Approval (A/E) - RO - 26 22 13 - Low Voltage Distribution 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2510 Submittal - R1 -26 22 13 - Low Voltage Distribution Transformers 10d 10d 0% 14-Dec23 28-Dec23 P-IAS-A.1-2510 Approval (A/E) - R1 - 26 22 13 - Low Voltage Distribution Transformers 10d 10d 0% 29-Dec-23 12Jan-24 P-lAS-F0-2510 Fabricate &Deliver/Store -262213- Low Voltage Distribution Transformers ld ld 0% 15Jan-24 15Jan-24 262413- Distribution Switchboards i Submittal - RO -26 24 13 - Distribution Switchboards 61d 61d 0% 174M-23 _ 15Jan-24 P-1 ASS.0-2520 20d 20d 0% 17dW-23 13-Nov-23 P-1AS-R.0-2520 Review (HBS) - RO - 26 24 13 - Distribution Switchboards 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2520 Approval (A/E) - RO - 26 24 13-Distribution Switchboards 10d 10d 0% 3Mov-23 13-Deo-23 P-1ASS.1-2520 Submittal - R1 -26 24 13 - Distribution Switchboards 10d 10d 0% 14-Dec23 28-Dec23 — Remaining Level of Effort ♦ ♦ Milestone r— Actual Level of Effort ft• Actual Work O Remaining Work Critical Remaining Work JGJZb I AIB OI `JI-6171�I3I ,il-`L L1I1 �4I516 171 F�9I 11I11tG1 I1Ad11I1I16I 111J8I 1I�21I LI Z124 [I26I LI ZI2*3I31 '3I34I 0 Approval A/E) -;RO - 26 05 53 - Identification ■ SPbmittal-IR1I-2 i 05 53 - Ident'rfination ■ APoro'ral (A/�) - R1:- 2$ 05 5$ - Oentifination I Fabricate! & Deli rerlStore - 26 05 53 - Identification 0 Submittal - M-',26105 73' Electrical Sty dies ❑ Review,(HI iS)I, RP - 26 05,73 - Elbctdcal Studies ❑ Approval ;A/E) -;RO - 26 05 73 - Electrical Studies ❑ Submittal-IR1I-2 i O'57$ - Electrical Studies ❑ Approcal '(A/D) - R1:- 2$ 05 7$ - Dlectdopl $tw lies, I jFabricate! & Deli ✓erlStore - 26 05 73 - E,Iedria if Studies Q Submittal - Q-!26:09 13' Electrical Power Moniforiug p Revibwl(HI IS)I, Fin - 26 09 13 - Electrical PoMt M� mftbddg 0 Approval ;A/E) -IRO - 26 09 13 - Electrical Power ✓lonkodng ❑ Submitttl-IR1I-2 i 09 1$- Electrical Power Moukoting ❑ Approval (A/�) - R1I- 2a 09 1$ - �lectdcpl Power Monitoring I Fabriate! & Deli ✓erlStore- 26 0513 - E,led 'ita k Power Monitoring =1 Submittal - FZ-'�26109 43' Lighting Cohtrol System ❑ Revibw,(HI S)I- RO - 26 D9 43 - Lohting Control S stem 0 Approval ;A/E) -IRO - 26 09 43 - Lighting Control 3yslern ❑ Spbmittrl-,Rl:-2 i 09 4$ - Lighting Contmi Sy: terrl ❑ Appro cal '(A/�) - Rl:- 2$ 09 4$ -fighting Conrol $ystem I IFabriate!& Deli ✓er(Store -24 0543 - Lghiinc Control System Q Submittal -RD-!26:2213 Low Voltegd Distdb tibn Fmnsformersl ❑ Revibwl(HKS)I, RO - 26 22 13 - Ldw Voltage DiStdfiutidn Transfd"brs 0 Approyal A/E) -'RO - 26 22 13 - Low Voltage Distiodtion Transformers ■ Submittal-IR11-2 i 22 1$ - Low Vgkage f7istabc lion TransfortnerS faJ%kppm^al'(A/�)-Rl:-2$221$-�owvakage Distubytion Trpnyforme� j I 'Fabdc%te!& Deli ✓erlStore- 26 2D 13 - LowlVol lage Distdbution'!Transfonmer 0 Submittal - FZD -!26:24 13' Distribut(on Switchboard; ❑ ■ Revibwl(H )'- RD - 26 24 13 - DilStdbution Svdchl marls! Approval A/E) -IRO- 26 24 13 - Distribution SM' , ib6ard' ■ SUbmftttl-IR7!-2 i 24 13 - Dislnbation Swkchbuards TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns Ru To SER " EJ SMITH 1' Page 33 of 48 CONSTRUCTION Acth ity ID P-1AS-A.1-2520 Activity Name Approval (A/E) - R1 - 26 24 13 - Distribution Switchboards Orig Dur 10d Remaining Duration 10d %I Complete 0% Start 29-Dec23 Finish 12Jan-24 P-1AS-F0-2520 Fabricate &Deliver/Store -262413- Distribution SvAchboards I 1d 0% 15Jan-24 15Jan-24 26 2415 - Service En rance Switchboard T—rWW 61 d 61 d 0% 17-W-23 15Jan-2 P-1 ASS.O-2530 Submittal - RO - 26 24 15 - Service Entrance Switchboard 20d 20d 0% 17-0W-23 13-Nov-23 P-1 AS-R.0-2530 Review (HBS) - RO - 26 24 15 - Service Entrance Swtchboard 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2530 Approval WE) - RO - 26 24 15 - Service Entrance Sitchboard 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2530 Submittal - R1 -26 24 15 - Service Entrance Switchboard 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2530 Approval (A/E) - R1 - 26 24 15 - Service Entrance Switchboard 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-2530 Fabricate &Deliver/Store -262415-Service Entrance SmItchboard 1d ld 0% 15Jan-24 15Jan-24 26 2416 - Panelboards 61 d 61 d 0% 17-Oct-23 P-1 ASS.O-2540 Submittal - RO - 26 24 16 - Panelboards 20d 20d 0% 17dW-23 13-Nov-23 P-1 AS-R.0-2540 Review (HBS) - RO - 26 24 16 - Panelboards 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2540 Approval (A/E) - RO - 26 24 16 - Panelboards 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2540 Submittal-R1-262416-Panelboards 10d 10d 0% 14-Dec23 28-Deo-23 P-1 AS-A.1-2540 Approval (A/E) - R1 - 26 24 16 - Panelboards 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F.0-2540 Fabricate & Deliver/Sore - 26 24 16 - Panelboards 1d id 0% 15Jan-24 15Jan-24 26 25 00 - Enclossed Bus Assembles 61d EL 0% 17-W-23 15-Jan-24 P-1ASS.0-2550 Submittal - RO -26 25 00 - Enclossed Bus Assemblies 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2550 Review (HBS) - RO - 26 25 00 - Enclossed Bus Assemblies 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2550 Approval (A/E) - RO - 26 25 00 - Enclossed Bus Assemblies 10d 10d 0% 30-Nov-23 13-Deo-23 P-1ASS.1-2550 Submittal - R1 -26 25 00 - Enclossed Bus Assemblies 10d 10d 0% 14-Dec23 28-Dec23 P-1AS-A.1-2550 Approval (A/E) - R1 - 26 25 00 - Enclossed Bus Assemblies 10d 10d 0% 29-Dec23 12Jan-24 P-1A-S-FO-2550 Fabricate & Deliver/Sore - 26 25 00 - Enclossed Bus Assemblies 1d 1d 0% 15-Jan-24 15-Jan-24 26 27 26 - Wiring Devices 61 d 61 d 0% 174W-23 15Jan- P-1 ASS.0-2560 Submittal - RO - 26 27 26 - Wiring Devices 20d 20d 0% 17-0ct-23 13-Nov-23 P-1 AS-R.0-2560 Review (HBS) - RO - 26 27 26 - Wiring Devices 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2560 Approval (A/E) - RO - 26 27 26 - Wiring Devices 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2560 Submittal-R1-262726-Wiring Devices 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2560 Approval (A/E) - R1 - 26 27 26 - Wiring Devices 10d 10d 0% 29-Dec23 12Jan-24 P-1AS-F0-2560 Fabricate & Deliver/Sore - 26 27 26 - Wiring Devices 1d 1d 0% 15Jan-24 15Jan-24 26 28 00 - Overcurrent Protect1w Devices 61 d 61 d 0% 17dW-23 15Jan-24 P-1 ASS.O-2570 Submittal - RO - 26 28 00 - Overcurrent Protective Devices 20d 20d 0% 17-W-23 13-Nov-23 P-1 AS-R.0-2570 Review (HBS) - RO - 26 28 00 - Overcurrent Protective Devices 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2570 Approval WE) - RO - 26 28 00 - Overcurrent Protective Devices 10d 10d 0% 30-Nov-23 13-Dec23 P-1ASS.1-2570 Submittal - R1 -26 28 00 - Overcurrent Protective Devices 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2570 Approval (A/E) - R1 - 26 28 00 - Overcurrent Protective Devices 10d 10d 0% 29-Deo-23 12Jan-24 P-1 AS-FO-2570 Fabricate & Deliver/Store - 26 28 00 - Overcurrent Protective 1 d 1 d 0% 15-Jan-24 15-Jan-24 — Remaining Level of Effort ♦ ♦ Milestone — Actual Level of Effort f� Actual Work O Remaining Work f� Critical Remaining Work JGJI AIB OI `JI-E5171�I3I,il-`L L1I1 �3I4ISI6I /I tt 9I1^I11tG1 I1Ad11I1I16I 111J8111L21I `LI LI24 [I26I LI ZI2�3I 31'3I34Zb I �I ❑ Approral (A/E) - R1;- 26 24 13 - DistnbUtioh S vitehboards I :Fabriate',& Deli ✓er(store- 29 24;13 - Distgbu ion SWitchboardIs 0 Submittal - FJ -12624 15,, Service Entrance 3witcchhoafd b Reviaw;(H14%- RO - 26 p4 15 - Service Entrance'+ dphboard El Approval A/E) -;RO - 20 24 15 - Servce EntrahOE Switchboard: ❑ Sbbfnitt; tl-IRT-2 i 24 15 - Service Entmhce Sustchbosrd ❑ 'Appm, ,al(A/E) - R1;- 26 24 15 - Service Erltra ieSvntchboardl I IFabricgte, & Deli ✓erlSore - 29 24;15 - 9,er 6ce Entrance Switchboard ISubmittal-M-1262416;-PanelboardS b Review:(Hrs)'r RO - 26 �4 16 - Paneboardg Q Approval ;A/E) -:RO - 26 24 16 - Panelboards ❑ SbbMitttl-IR7;-232416-Padelboards M Approval (A/E) - R1;- 26 24 16 - Panelbbarda I ;Fabdmte, & Deli ✓er!Store- 26 24;16 - P,anelbuards Q (Submittal-FZ)-126I2590�Enclossed6us Assenlblius j b Reviaw:(HI IS)'; RO - 26 p5 00 - E6doased Bus f snntiligs L1 Approval ;A/E) -;RO - 26 2� 00 - Endlossed!Bus Rspmblies ❑ Sbbenitt it -IRT-2 i 25 00 - Endosted Bus Aksc-nblies! ❑ Appro cal (A/E) - R1;- 26 25 00 - Enclosed Bt s Assemblies; Fabricate,& Deli ✓eriSore- 2Q 2 00 - Endbs--d Su3Assemblres Submittal - M-126:27 26 Wiring Dovioes b Revipwj(HF IS), Fj0 - 26 �7 �6 - Widng Devices Q Aporoval ;A/E) -:RO - 26 27 26 - ,Wirihg Devices ❑ Shbinittil-IR1:-2 i 27 26 - Wirihg Devices ❑ Approval (A/E) - R1'- 26 27 26 - Wiring DeVics I iFabriate! & Deli ✓er%Store - 29 27.26 - Wiring ►evice3 0 Submittal-FZ0-126I2800,OvercurrentlProteotive D,Mces b Revipw:(HI lS)', RO - 26 �8 p0 - Over4urrent Ntec live, Dpvices j Q APProval ;A/E) -:RO - 20 28 00 - Overcurrent Prof ;dive Devicea ❑ SbbMitttl-IR7'-2i2800-Ovdraubent PFot"ire Devices ❑ Appro cal (A/E) - R1;- 26 28 00 - Ovemurmrit F rol4dive DeAmt, I !Fabdmte�! & Deli ✓erl tore - 26 2$ 00 - Ovetcui rent Piptectiva Devices: I TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 A COM HUNTin Phase 1 Schedule Update Ns RU To SER " EJ SMITH 1' Page 34 of 48 CONSTRUCTION Activity ID Activity Name 26 28 16 - Enslosed Switches, Fuses and Circuit Breakers P-1 A-S-S.0-2580 Submittal - RO - 26 28 16 - Enslosed Switches, Fuses and Circuit Smakers P-1 AS-R.0-2580 Review (HBS) - RO - 26 28 16 - Enslosed Switches, Fuses and P-1 AS-A.0-2580 Approval (A/E) - RO - 26 28 16 - Enslosed Switches, Fuses and P-1ASS.1-2580 Submittal - R1 -26 28 16 - Enslosed Switches, Fuses and Circuit Rreakens P-1 AS-A.1-2580 Approval (A/E) - R1 - 26 28 16 - Enslosed Switches, Fuses and rs P-1 AS-F0-2580 Fabricate & Deliver/Store- 26 28 16 - Enslosed Switches, Fuses make c 26 29 13 - Enclosed Motor Controllers P-1 ASS.O-2590 Submittal - RO - 26 29 13 - Enclosed Motor Controllers P-1 AS-R.0-2590 Review (HBS) - RO - 26 29 13 - Enclosed Motor Controllers P-1 AS-A.0-2590 Approval (A/E) - RO - 26 29 13 - Enclosed Motor Controllers P-1ASS.1-2590 Submittal - Rl -26 29 13 - Enclosed Motor Controllers P-1 AS-A.1-2590 Approval (A/E) - R1 - 26 29 13 - Enclosed Motor Controllers P-1 AS-FO-2590 Fabricate & Deliver/Sore - 26 29 13 - Enclosed Motor Controllers 26 33 23 - Emergency Lighting Inverter P-1ASS.0-2600 Submittal - RO -26 33 23 - Emergency Lighting Inverter P-IAS-R.0-2600 Review (HBS) - RO - 26 33 23 - Emergency Lighting Inverter P-1 AS-A.0-2600 Approval WE) - RO - 26 33 23 - Emergency Lighting Inverter P-1ASS.1-2600 Submittal - R1 -26 33 23 - Emergency Lighting Inverter P-1AS-A.1-2600 Approval (A/E) - R1 - 26 33 23 - Emergency Lighting Inverter P-1AS-F0-2600 Fabricate & Deliver/Store - 26 33 23 - Emergency Lighting Inverter 26 41 13 - Surge Protective Device P-1ASS.0-2610 Submittal - RO -26 41 13 - Surge Protective Device P-1 AS-R.0-2610 Review (HBS) - RO - 26 41 13 - Surge Protective Device P-1 AS-A.0-2610 Approval (A/E) - RO - 26 41 13 - Surge Protective Device P-IASS.1-2610 Submittal - Rl -26 41 13 - Surge Protective Device P-1 AS-A.1-2610 Approval (A/E) - R1 - 26 41 13 - Surge Protective Device P-1 AS-F0-2610 Fabricate & Deliver/Sore - 26 41 13 - Surge Protective Device 26 50 00 - lighting Fixtures P-1ASS.0-2620 Submittal - RO -26 50 00 - Lighting Fixtures P-1 AS-R.0-2620 Review (HISS) - RO - 26 50 00 - Lighting Fixtures P-1 AS-A.0-2620 Approval (A/E) - RO - 26 50 00 - Lighting Fixtures P-1ASS.1-2620 Submittal - R1 -26 50 00 - Lighting Fixtures P-1 AS-A.1-2620 Approval WE) - R1 - 26 50 00 - Lighting Fixtures P-1 AS-FO-2620 Fabricate & Deliver/Store - 26 50 00 - Lighting Fixtures 0500 - RO - 27 05 00 - Common Work Results for - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work Remaining Work Critical Remaining Work Orig Dur 61d 20d R Duratlon 61d 20d Complete 0% Start 17-W-23 Finish J GJ I A I S OI J JJSIS I .! -`L L1 I 1 3 4 I 6 17I Fi 9 111I,J JJ1AdI 1 I 1 I16I 1J81 11 L 21I `LI L124 `LI26I L I Z I29 3I 31 tZb 15Jan-24 -cfll /I ill 31341 318 13-Nov-23 p Submittal - M-:26,28 16', Enslosed Stitches, Fbs(-- and Circuit Breakers ' 29-Nov-23 : ❑ ReviIsw;(HI IS)�- RD - 26 28 16 - Erslosed SWitcli FUses and Circuit Breakeirs 13-Dec-23 , b Approval ;A/E) -IRO - 20 29 16 - Enslosed $witch rs, Fuses and Circuit Bteaken 28-Dec-23 O SNbrnittrl-';R1;-2 i 2$ 16 - Enjos�d Svi(chds, -uses find Cijc Breaker} 121an-24 IAppro ral '(A/E) - R1:- 26 28 16 - Enslosed Swi Chas, ,ruses end Cirouif Boal ere 15Jan-24 I :Fabricate& Deli ✓edStore - 26 2816 - Enslbsc-1 Swift as, Fuses and:Cirbuft Breakers 15Jan-24 13-Nov-23 D Submittal - F7-12629 13 Enclosed Mbtor Cbntloll¢ rs l 29-Nov-23 11 Rev&B :(HI IS)'- R0 - 26 29 13 - Er(clomd Motot Ct intrblle'rs 13-Dec-23 b Approval ;A/E) -IRO - 26 29 13 - Enclosed Motor ;ootrollers ! 28-Dec-23 ❑ Spbrnitt il-Rl:-2 i 2$ 1$ - Encjosgd Motpr oor troilerg , 12Jan-24'' ❑ ;Appro ral '(A/E) - R1:- 26 29 16 - Enclosed Moor Controllers 15Jan-24 I, I :Fabdcite�&Deli ✓erlStdre-262913-encbsdMotbr Controllers 13-Nov-23 O Submittal - R-126:33 23, Erhergebcy,Lightirg lhvEtee 29-Nov-23 ❑ Review;(HI IS)b FCO - 26 33 23 -Emergency L'ghtin g Irfve,ter 13-Dec-23 p Approtal ;A/E) -:RO - 20 39 23 - Emergency Ligh ing! Inverter 28-Deo-23'' ❑ Spbrnittr1-';Rl:-2 i 3$ 2$ - Emgrg�ncy Lightng Invertpr 12Jan-24 ❑ gpPro'ral '(A/E)-R1:-263326-Emergency Lgh�'ing,lnverter 15Jan-24 I:Fabdrate!& Deli ✓rIStore-263323- Emdrge ncyl Lighting Inverter 13-Nov-23 ', O'Submittal -M-',26I4113', Surge Plotecive Device 29-Nov-23 ❑ Revawi(HI IS)!- R0 - 26 41 13 - Surge ProtehtivE Lvice 13-Dec23 b Approval ;A/E) -IRO - 20 41 13 -Surge Protective Device 28-Dec-23 ❑ Spbrnittrl-07:-234j 1$-Surgel�rotectivebulcq 12Jan-24'' ❑ ;ApPro'ra1'(A/E)-R1:-264119- Surge Protec ive'!Devioe 15Jan-24 I :Fabrieite! & Deli ✓er(Sdre - 26 41:13 - Surge kotdcti4e Device'! 15Jan-Jan 13-Nov-23 =1 Submittal-f�-126:5000: Li0hting,FxBures 29-Nov-23 ❑ Revibw;(HI IS)'. RA - 26 50 00 - L4hting Rxthreis 13-Dec-23 ', b Approval ;A/E) -IRO - 20 50 00 -1-g1 Ing RMules 28-Dec-23 ❑ Spbrnittr1-';Rl:-2 i 50 00 - Lighting Fixtures; 12Jan-24 ❑ !Approval (A/E) - R1:- 26 50 00 - Lighting Fixtu es' 15Jan-24 I :Fabricate! & Deli ier/Store-265000-Llghtinc Fixtures 19-Mar-24 22-Jan-24 0 I Sj bn iitlel - RO 27 05 00 - Corr(mon Woi C Results for Coinmunicafi n I 0% 17-Oct-23 10d 10d 0% 14-Nov-23 10d 10d 0% 30iNov-23 10d 10d 0% 14-Deo-23 10d 10d 0% 29-Dec-23 1d 1d 0% 15Jan-24 61d 61d 0% 17-Oct-23 20d 20d 0% 17-W-23 10d 10d 0% 14iNov-23 10d 10d 0% 304dov-23 10d 10d 0% 14-Dec23 10d 10d 0% 29-Dec-23 1d 1d 0% 15Jan-24 61d 61d 0% 17-0W-23 20d 20d 0% 17-Oct-23 10d 10d 0% 144Jov-23 10d 10d 0% 30-Nov-23 10d 10d 0% 14-Dec23 10d 10d 0% 29-Dec-23 1d 1d 0% 15Jan-24 61d 61d 0% 20d 20d 0%17dc1-23 10d 10d 0% 14iNov-23 10d 10d 0% 30-Nov-23 10d 10d 0% 14-Dec-23 10d 10d 0% 29-Dec-23 1d 1d 0% 15Jan-24 61d 61d 0% 17-W-23 20d 20d 0% 17-Oct-23 10d 10d 0% 14-Nov-23 10d 10d 0% 30-Nov-23 10d 10d 0% 14-Dec23 10d 10d 0% 29-Dec-23 1d 1d 0% 15Jan-24 6 d I 6 d 20d r' 0% 0 % - 22-Deo-23 22-Deo-23 20d TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update Data Date: 31-Aug-23 q=WM HUNT NS RuNS Ru f i SMITH Page 35 of 48 CONSTRUCTION activity ID Activity Name Orig Dur Remaining % Start Duration Complete P-lAS-R.0-2630 Review (HBS) - RO - 27 05 00 - Common Work Results for 10d 10d 0% 23Jan-24 rnmmunirafin" P-1 AS-A.0-2630 Approval (A/E) - RO - 27 05 00 - Common Work Results for 10d 10d 0% 06-Feb-24 r.nmmun rarinn P-1A.SS.1-2630 Submittal-R1-270500- Common Work Results for 10d 10d 0%20-Feb-24 rnm rarinn P-lAS-A.1-2630 Approval (A/E) - R1 - 27 05 00 - Common Work Results for 1 Od 10d 0% 05-Mar-24 r`nmmnninarinn P-1AS-F0-2630 Fabricate &Deliver/Store-270500- Common Work Results for 1d 1d 0% 19-Mar-24 r U—ninarinn 27 05 26 - Telecorrmunication Grounding &Bonding 61d 0% 22-Dec23 P-IA-SS.0-2640 Submittal - RO - 27 05 26 - Telecommunication Gnu ndirg & _61dj 20d 20d 0% 22-Dec23 Rnrldinn P-lAS-R.0-2640 Review (H BS) - RO - 27 05 26 - Telecommur ication GRound ng& 10d 10d 0% 23Jan-24 Rnndlnn P-lAS-A.0-2640 Approval (A/E)-RO-270526- Telecomm unicatb IT Glo and ing& 10d 10d 0% 06-Feb-24 RnndlnrL P-1ASS.1-2640 Submittal-R1-270526- Telecommunication G'ou ndirg& 1Od 10d 0%20-Feb-24 Rnnrlinn P-lAS-A.1-2640 Approval (A/E) - R 1 - 27 0526- Telecomm unicatb IT Gm and ing& 10d 10d 0%05-Mar-24 Rnndinn P-lA-S-FO-2640 Fabricate &Deliver/Store -270526- Telecomm unicatio n 1d 1d 0% 19-Mar-24 C—indinm & Bondinn 27 05 33 - Telecommunication Raceways & Boxes 61d 61d 0% 22-Dec23 P-lA-SS.0-2650 Submittal - RO - 27 05 33 - Telecommunication Raceways & Boxes 20d 20d 0% 22-Dec-23 P-lAS-R.0-2650 Review (HBS) - RO - 27 05 33 - Telecommtn iration Raceways & 10d 10d Rnxea _ _ P-lAS-A.0-2650 Approval (A/E) - RO - 27 05 33 - Teleoomm unicatb n Raceways & 10d 10d Rnvaa P-1ASS.1-2650 Submittal-R1-270533- Telecommunication Raceways&Boxes 10d 10d P-lAS-A.1-2650 Approval (A/E)-R1-270533- Telecomm unicatb IT Raceways& 10d 10d Rnxae P-1AS-FO-2650 Fabricate&Deliver/Store -270533- Tela comm unicatb In I 1d R.__ R Rnvac 2711 00 - Communication Equipment Room Flti 61d 61d P-lA-S-S.0-2660 Submittal - RO - 27 11 00 - Communication Equipment Room 20d 20d Fd-CLd � P-IAS-R.0-2660 Review (HBS) - RO - 27 11 00 - Communication Equipment Room 10d 10d Fd-('M rt P-lAS-A.0-2660 Approval (A/E) - RO - 27 1100 - Communication Equipment Room 10d 10d P-1ASS.1-2660 Submittal -R7-271100- Communication Equipment Room 10d 10d Fd-CL it P-IAS-A.1-2660 Approval (A/E)-R1-27 It 00- Communication Equipment Room IOd 1Od Fd-d1,t P-lA.S-F0-2660 Fabricate &Deliver/Store -271100- Communication Equipment ld ld Rnnm Fd-0d 2713 23 - Commu tications Opdral Fiber Backbone Cabling 61d 61d P-IASS.0-2670 Submittal - RO - 27 13 23 - Communications ticel Fber Op 20d 20d Rath— rahlinn P-lA.S-R.0-2670 Review (HBS) - RO - 27 13 23 - Communications Optical Fiber Rarkhnna rahlinn 10d 10d P-1 AS-A.0-2670 Approval (A/E) - RO - 27 13 23 - Communications Optical Fiber 10d 10d Rankhnna Cahlinn P-1ASS.1-2670 Submittal - R1 - 27 13 23 - Communications Optical Fiber Rankhnna rahlinn 10d 10d P-lAS-A.1-2670 Approval (A/E) - R1 - 27 13 23 - Communications Optical Fiber 10d 10d Rankhnne rahlinn P-1AS-FO-2670 Fabricate &Deliver/Store -271323- Communications Optical 1d 1d Fihar Rankhnne Cablinn 27 5100 - Communications Horizontal Cabling 61d 61d P-lA-S-S.0-2680 Submittal - RO - 27 51 00 - Communications Horizontal Cabling 20d 20d P-lAS-R.0-2680 Review (HBS) - RO -27 5100 -Communications Horizontal 10d 10d rahlinn P-lAS-A.0-2680 Approval (A/E) - RO - 27 5100 - Communications Horizontal 10d 10d r Wynn — Remaining Level of Effort ♦ ♦ Milestone — Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work Finish 'L ' L J J I Ll'L' J j� 2 ' y4� y� Q I }� J 2UL Z,2 - JIAIS OI��S J/ F/MI��� IA �9INIUIbIFJM Al MI 11A)1111N/�ltl FIM A17 11��11 D .�M .�MI� I 1= IS1-5 I`I-1- 1 13 4 5 8 9 1 7 rl tic 7 11 Y21 I 124 `1261'I'Iz9 I`13'13a E 05-Feb-24 ❑ Rek ieW (HBS - RO -127 05: 00:- Common Volk Results for Commhnicatinn 19-Feb-24 I, ';❑ j Alproval (A F) k RO - 27 05 00 - Common Work Results for Commupicciom oa Mar-2a Id m k r Ma Sutim'tlal R1 - 705 0-Com onjWUrk s eul[sfo'vCmmuri tior 18-Mar-24 ;❑ Approval (A/E) R7 - 27 05 00- CoinnonWolk Results for Commuicadiori 19-Mar-24 I Fabricate&Deliver/Stbm:270500- Commbn Wofk Resultslfor:Co nmunkalion: 22Jan-24 05-Feb-24 19-Feb-24 04-Mar-24 I B-Mar-24 19-Mar-24 19-Mar-24 22Jan-24 0% 23Jan-24 05-Feb-24 0% 06-Feb-24 19-Feb-24 0% 20-Feb-24 04-Mar-24 0% 05-Mar-24 18-Mar-24 0% 19-Mar-24 19-Mar-24 0% 22-Deo-23 19-Mar-24 0% 22-Dec23 22Jan-24 0% 23Jan-24 05-Feb-24 0% 06-Feb-24 19-Feb-24 0% 20-Feb-24 04-Mar-24 0% 05-Mar-24 18-Mar-24 SObn uttal -RO .27 05 26 - Telebommundatwn Grounding,& Bondlno ❑ Re\iew(HIBS -RO:2705;26;-Teleconlmtnicdtia'nGrodnd:ng&Bondinc ❑ I ASlroval (A F)' RO - 27 O5 26 - Teleccnm uilcatb n Giourid ing & Bgrd i lg 0 :iugmitlal Rj-270526-re lecepnrqun cation, Gnu riding &Bojdipg i❑ Approval(A/lE) R1-27o;526-7elocrAimunicatbn:Glqurdinb&:Bodih91 Fdbrcate & Deliver/Stbre: 27 O5 26 - elecahmun"' tbn Grobndir & Bon irg bi Si/bn dial - RO 27 05 33 - Telebommundatiun Raceways ;& Boxes ❑ Ret iew(H:BS -RO �12705133;-Telec'bMML n ii Raceways &Bbxas :El: Alproval (A—;:) } RO - 27 65 33 - Teleamm urricatb n Raceways &: BDxeE E) Supmitlal R1-�70523- re lecomrpun cation, Racewayg&Boi :❑ Approval(A/E)-R1-270;533-TeleculmunicatbnRacevays&:Boxes: Fst it;atE & Deliver/Stbn;:27 O5 33 - eb,corhmunicatbn Radeu,+ays & Bmfes =I: Shbn dial - RO 27 11: 00 - Cordmunicatidn lquipment Rdorti, Ft-OUt ❑ Rek iew (H!BS - RO �127 11:00 k Commuhicrtioh Equipment IRoom:Rt Ou I❑ : Ali (A F) : RO - 27 11 QO - Commun cation Equiprnent Rootn FdL/t 0 liubmitlal R1-2711 J,0-Oommunicat on';Egpipmegt Room Fl-Out :❑ Approval(Ai=) ;R1-271.100-ComrunicationEquipment Ro4nR­O,ut 0% 19-Mar-24 19-Mar-24 FebrcatE & Deliver/Stbre> 27 11: 00-►ontmunicatidn Equipment R( orrl Fti It 0% 22-Dec23_ 19-Mar-24� 0% 22-Dec23 22Jan-24 1111111 : Sbbn littal - RO 27 13 23 - Communications Optical Fber:Babkbono Cablil Ig 0% 23Jan-24 05-Feb-24 ❑ Re%ieW(HBS -RO �12713'23'-Communications Optical' Filler Backbone Cabling 0% 06-Feb-24 19-Feb-24 j❑ j Alproval (A F) k RO - 27 13 23 - Commun cations Optical Fiber Backbone Cablinc 0% 20-Feb-24 04-Mar-24 0 tiupmltlal R1-�713 �3-Comnjunjcaliong Optical Aber Backlrode Cabling 0% 054Mar-24 184v1ar-24 :❑ rdval A/� R7 - 97 13 23 - Conn unications tical Fbel Badd lone Cab in APP ( ) aP g 0% 19-Mar-24 19-Mar-24 I Fabrii & Deliver/Stbre.,27 13 23 - I'ommunicai Opticdl Fiber Babkb;onl Chbling 0% 22-Dec23 19-Mar-24 +I, 0% 22-Dec23 22Jan-Jan p : Sbbn dial - RO 27 54 00 - Communications Horizontal CA ling 0% 23Jan-24 05-Feb-24 ❑ Rek ieW (HBS - RO -127 51:00;- Commlmic tiohs HOrizontat Cabling 0% 06-Feb-24 19-Feb-24I, I❑ Allproval (A F) i RO - 27 31 00 - Commun cations Horizontal Cabling FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update TASK filter: All Activities Data Date: 31-Aug-23 A=COM HUNT BYRII1111111111i CONSTRUCTION SERVICES EJ SMITH Page 36 of 48 CONSTRUCTION Activity ID Activity Name Orig Dur Remaining %I Start Finish Duration Complete P-1ASS.1-2680 Submittal-R1 -27 51 00 -Communications Horizontal Cabling 10d 10d 0% 20-Feb-24 04-Mar-24 P-1AS-A.1-2680 Approval (A/E) - R1 - 27 5100- Communications Horizontal 10d 10d 0% 05-Mar-24 18-Mar-24 P-1AS-FO-2680 Fabricate&Deliver/Store -275100- Communications Horizontal 1d 1d 0% 19-Mar-24 19-Mar-24 1 28 46 00 - Addressable P-1A-S-S.0-2690 Fire Alarm System Submittal - RO - 28 46 00 -Addressable Fire Alarm System 1•• Itla'aW1118 17-Oct-23 15Jan- 17-Oct-23 13-Nov-23 61Of 61d 0% 20d 20d 0% P-1 AS-R.0-2690 Review (HBS) - RO -28 46 00 -Addressable Fire Alarm System 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2690 Approval (A/E) - RO - 28 46 00 -Addressable Fire Alarm System 10d 10d 0% 30-Nov-23 13-Dee23 P-1ASS.1-2690 Submittal - R1 -28 46 00 -Addressable Fire Alarm System 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2690 Approval (A/E) - R1 - 28 46 00 -Addressable Fire Alarm System 10d 10d 0% 29-Dec23 12Jan-24 P-1 AS-FO-2690 Fabricate &Deliver/Store - 28 46 00 -Addressable Fire Alarm 1 d 1 d 0 % 15Jan-24 15Jan-24 28 5010 - Area of Rescue Assistance System 61d 61d 0% 17-W-23 15Jan-24 P-1ASS.0-2700 Submittal - RO -28 50 10 -Area of Rescue Assistance System 20d 20d 0% 17-0ct-23 13-Nov-23 P-1 AS-R.0-2700 Review (HBS) - RO - 28 50 10 -Area of Rescue Assistance 10d 10d 0% 14-Nov-23 29-Nov-23 P-1 AS-A.0-2700 Approval (A/E) - RO - 28 50 10 -Area of Rescue Assistance 10d 10d 0% 30-Nov-23 13-1)eo-23 P-1ASS.1-2700 Submittal - R1 -28 50 10 -Area of Rescue Assistance System 10d 10d 0% 14-Dec23 28-Dec23 P-1 AS-A.1-2700 Approval (A/E) - R1 - 28 50 10 -Area of Rescue Assistance 10d 10d 0% 29-Dec-23 12Jan-24 P-1A.S-F0-2700 Fabricate & Deliver/Store - 28 50 10 -Area of Rescue Assistance 1d 1d 0% 15Jan-24 15Jan-24 3163 29 - Drilled Piers 7d 7d 0% 01 ep-23 1 26 ep-23 P-1 ASS.0-2710 Submittal - RO - 31 63 29 - Drilled Piers 5d 5d 0% 01 Sep-23 08Sep-23 P-1 AS-R.0-2710 Review (HBS) - RO-31 6329 -Drilled Piers 2d 2d 0% 11 Sep-23 12Sep-23 P-1 AS-A.0-2710 Approval (A/E) - RO - 31 63 29 - Drilled Piers 5d 5d 0% 13Sep-23 19Sep-23 P-1AS-F0-2710 Fabricate & Deliver/Store - 31 63 29 - Drilled Piers 5d 5d 0% 20Sep-23 26Sep-23 1 321314-Concrete Paving-ArchillecLral Finish 1' 1 • uY1JY�r 61d 61d 0% 09Sep-24 I 04-Dec-24 20d 20d 0% 09Sep-24 04-Oct-24 P-1ASS.0-2720 Submittal - RO -32 13 14 - Concrete Paving -Architectural Finish P-1AS-R.0-2720 Review (HBS) - RO - 32 13 14 - Concrete Paving - Architectural 10d 10d 0% 07-0Wt24 1840ct-24 P-1AS-A.0-2720 Approval (A/E) - RO - 32 13 14 - Concrete Paving - Architectural Rnkh 10d 10d 0% 214)ct-24 01-Nov-24 P-1ASS.1-2720 Submittal - R1 -32 13 14 - Concrete Paving-Archtectural Finish 10d 10d 0% 04-Nov-24 15-Nov-24 P-1AS-A.1-2720 Approval (A/E) - R1 - 32 1314-Concrete Paving - Archtectural Finis 10d 10d 0% 18-Nov-24 63-Dec24 P-1AS-F0-2720 Fabricate &Deliver/Store -321314- Concrete Paving- Arehtecfuml Finis 321413- Precast Concrete Unit Paving 1d 1d 0% 04-Dec-24 04-Dec-24 61d 61d 0% 09Sep-24 I 04-Deo-24 P-1ASS.0-2730 Submittal - RO -32 14 13 - Precast Concrete Unit Paving 20d 20d 0% 09Sep-24 04-Oct-24 P-1 AS-R.0-2730 Review (HBS) - RO - 32 14 13 -Precast Concrete Unit Paving 10d 10d 0% 07-W-24 184W-24 P-1 AS-A.0-2730 Approval (A/E) - RO - 32 14 13 - Precast Concrete Unit Paving 10d 10d 0% 21-W-24 01-Nov-24 P-1ASS.1-2730 Submittal - R1 -32 14 13 - Precast Concrete Unit Paving 10d 10d 0% 04-Nov-24 15-Nov-24 P-1 AS-A.1-2730 Approval (A/E) - R1 - 32 14 13 - Precast Concrete Unit Paving 10d 10d 0% 18-Nov-24 03-Dec-24 - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work JZb GJI AIB OI `JI-6171�I3I L1I1 �34I516I/I E�9I 1nI11t G1 I1Ad11I1I 16I 111J8111�211 `LI LI24 LI26I 11 LI2�3I31 '_I4I31E ❑ 1iubmttal R1-275100-tvommunicalions Hbrizontal Cabling ;❑ Apprdval (A/E) -I R1 -27 Q1 00 - Coinn un'leatlons Horizontal Cabling I FabricacatE & peljver/Store' 2751 OQ - I'ommpnicatipns, Hotlzgntal CIblipg j 0 Submittal - fZ-128;46 00; AQdressdble Fire Alarm °vrstoml', j b Revilaw:(HI IS)', rj0 - 28,46 00-M.dressable, Rre AanQt System: P Approval ;A/E) -:RO - 29 46 00 -Addressable ,Fire AAmr',System ❑ ShbMitt rl-'ARV-234600-AdclesSable RrelAlenn System ❑ 'Approral (A/E) - Rl:- 28 46 00 -Addressable 19re IAlanm System I !Fabricate, & Deli ✓eriStbre - 23 4Q 00-Addrastable Fire Alain System C Submittal - FZ) -128150 10' Area of Rescue Assistan *system j b Review:(HI O)', F(O - 28 b0 10 -Arga 9f Rescue Ahistanee System, P Aporovat ;A/E) -;RO - 29 56 10 -Area of Resclre , tssWahceSystem ❑ SiUbfnitt rl-IRT-235010-AreA of: Reseda Ass stance, System ❑ Apprc ral (A/E) - R1;- 28 50 10 -Area of'. Resa le Assistance System I .Fabricate', & Deli ✓erIStdre - 23 5Q 10 -Aree of Rescue Assistance System Submittal - RO -31 113 29 ; Dr lied Piers I Review (HBS) - RO 3163 2E - Drilled Piers 0 ABprRval (A/E) : Rh - $1 $3 2) ,Drilled Piers 0 Fabricate &:D61'Ive/S,ore - 31 63 29 - Drilled:Piers IIIIIIII $uhmiltal , RQ -;12 13 14 - Coj crate Paying -1 rcllteaur al 1;inish ■ Review (HBS) - RO, - 32 13 14 - Concrete PaN ing, -A'reh teoturAl Fini 'q ApprovAl(A/E-RO;3213:14I-CondretAPaviing :AnhfbCt6ralF '0 'Submittal - F11 -!32,13 14,- CbncretB PSvik4g -!ArChti lctdraCFnisl r Approval ( VET - R1 - 32'13'' 14 - Qoncret a Pavlrr Arc 'its ur l Fab*ete 1. Dplivpr/Store - 02 13 )4 ; Cc ncretE Pz�vrq -Pmhii 10 Submittal , RQ - 02 14 13 - Prycast Cont;re(e L nt',PaNn4 ❑ Review (HBS) - Rd, - 32 14 13 - ,Precast Concrete Unit laving: ❑ ApprovAl (A/E - RO, 32 14;131- Precast Oo cr4te Un t PAvidg I❑ :Submittal - F 11 -13114 13:- Precast bohcn le Unit P, rvirig C) Approval (VE) - R1 - 321413 - Precast Concrete Unit Pavinc FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update TASK filter: All Activities Data Date: 31-Aug-23 ALCOM HUNT NS NU fl0 s€li €5 EJ SMITH Page 37 of 48 CONSTRUCTION Ac ivity ID Activity Name P-lAS-F0-2730 Fabricate & Deliver/Store - 32 14 13 - Precast Concrete Unit Orig Dur ld Remaining Duration ld %I Complete 0% Start 04-Dec24 Finish 04-Dec24 32 33 00 - Site Furnishings 61 d 61 d 0% 09Sep-24 04-Deo-24 P-1A.S.S.0-2740 Submittal - RO -32 33 00 - Site Furnishings 20d 20d 0% 09-Sep-24 04-Oct-24 P-1 AS-R.0-2740 Review (HBS) - RO - 32 33 00 - Site Furnishings 10d 10d 0% 07-0W-24 18-0ct-24 P-lAS-A.0-2740 Approval (A/E) - RO - 32 33 00 - Site Furnishings 10d 10d 0% 21-Oct-24 01-Nov-24 P-1A.S.S.1-2740 Submittal - R1 -32 33 00 - Site Furnishings 10d 10d 0% 044Nov-24 15-Nov-24 P-lAS-A.1-2740 Approval (A/E) - R1 - 32 33 00 - Site Furnishings 10d 10d 0% 18-Nov-24 03-Dec24 P-lAS-F0-2740 Fabricate &Deliver/Store -323300-Site Furnishings I 1d 0% 04-Dec-24 04-Dec24 32 84 00 - Planting Irrigation 0 P-1ASS.0-2750 Submittal - RO -32 84 00 - Planting Irrigation 61d 51d 0% 09Sep-24 04-Dec24 20d 20d 0% 09Sep-24 04-Oct-24 P-1 AS-R.0-2750 Review (HBS) - RO - 32 84 00 - Planting Irrigation 10d 10d 0% 07dW-24 154)ct-24 P-lAS-A.0-2750 Approval WE) - RO - 32 84 00 - Planting Irrigation 10d 10d 0% 21-W-24 01-Nov-24 P-1ASS.1-2750 Submittal-R1-328400- Planting Irrigation 10d 10d 0% 04-Nov-24 15-Nov-24 P-lAS-A.1-2750 Approval (A/E) - R1 - 32 8400- Planting Irrigation 10d 10d 0% 18-Nov-24 03-Dec24 P-lAS-FO-2750 Fabricate & Deliver/Store - 32 84 00 - Planting Irrigation ld 1d 0% 04-Dec24 04-Dec24 32 92 00 - Turf and Grasses P-1 A-S-S.0-2760 Submittal - RO - 32 92 00 - Turf and Grasses 61 d 61 d 0% 09Sep-24 04-Dec24 04-Oct-24 20d 20d 0% 09-Sep-24 P-1 AS-R.0-2760 Review (HISS) - RO - 32 92 00 - Turf and Grasses 10d 10d 0% 07-W-24 1 S-W-24 P-1 AS-A.0-2760 Approval (A/E) - RO - 32 92 00 - Turf and Grasses 10d 10d 0% 21-Oct-24 01-Nov-24 P-1 ASS.1-2760 Submittal - R1 - 32 92 00 - Turf and Grasses 10d 10d 0% 04-Nov-24 15-Nov-24 P-1 AS-A.1-2760 Approval (A/E) - R1 - 32 92 00 - Turf and Grasses 10d 10d 0% 1 B-NOV-24 03-Dec24 P-lAS-F0-2760 Fabricate & Deliver/Store - 32 92 00 - Turf and Grasses 1d 1d 0%0% 04-Dec24 04-Deo-24 Division 33 - Utilities P-1ASS.0S310 I Submittal -RO - Site Utilities 75d 15d • 15d 0% �IrS31tir9E 01-Sep-23 �5'r►�u11�5' 22-Sep-23 P-lAS-R.03310 Review(HBS)RO - Site Utilities 5d 5d 0% 25Sep-23 29Sep-23 P-IAS-A.03310 Approval (A/E)RO-Site Utilities 10d 10d 0% 02-Oct-23 134M-23 P-1ASS.13310 Submittal R1 -Site Utilities 5d 5d 0% 164W-23 204W-23 P-lAS-A.13310 Approval (A/E) R1 -Site Utilities 5d 5d 0% Delivery 5d Sd 0% r Phase l Construction 68•d 6 5d 23-Oct-23 27-Oct-23 P-lAS-FO3310 30-W-23 c 17-Aug-23A 03-Nov-23 M 17-Apr-26 CONSTRUCTION SunnimaryActivites 'Phase FIWI-1155 FTN1-1025 Phase Substantial Completion Od od 0% 06-Mar-26 FrW1-1030 Project Closeout 30d 30d 0% Final Completion Od Od 0% 09-Mar-26 17-Apr-26 FrW1-1035 17-Apr-26 — Remaining Level of Effort ♦ ♦ Milestone r— Actual Level of Effort FS Actual Work O Remaining Work FS Critical Remaining Work I IIiL alc A zRlIF-T.bA� 'Ll'[2 I JIAIS ff JJ ��Ltl'LyyJ OI-9i-Ff 7IEi-5 di 31 �1 -1I1 � 4I5 �I7I8 L��l'Gy4� f y� Q f ' }� f J Ll'L� J g J 9I 1it111 1I1Ad11 1I1N611 78I 1I L 21I `LI�24 `LI2 LIZI2 i ►abticaYe .. Deliver/1-:tom - 32 14 13, Pr ' J L')L�b :il3l :i 3I34I� icast ConaeYe Unil Submit at ,' R© -:12 33 00 - Site Fomi 3hings: ❑ Review (HBS) - R0, - 32 3 Op -Site FUmiShi s b APp oval WE - ♦#0 , 32 33:00',- S to rurpist ingts 0 Submittal-F11 �'32'3300:- Site l=uruisging 111 4ppiovel (VE) - Rll 323300 -Site Fur ishinIs I Vabticaite .. Dalivis -tom - 32 33 00 : S' Furnish ng8 10 SUIJMR a1,' R© -:12 84 00 - Planting I Tigatios ❑ Review (HBS) - RO - 32 84 Op - Pla rtirip Img pion App oval WE i - F,i01, 32 84:00,- P antin>j Irri laton: ❑ Submittal-F11-',32'!8400:-Planling:I*at n! 0 4ptovel (VE) - Rl 32 84, 00 - Plantin lydgatbn 1 3�abficale i Deliver/' —Rom - 32 34 00 : Planting Irription C I Submft al RO -:12 92 00 - Tud and irasses ❑ Review (HBS) - RO - 32 g 00 - Tud and dra0es b Appoval WEB-A0%3292:00,-TIrf ync Grll asi 0'Submittal F11 -�32'!9200'-Tud tnd'Gras s, El Gppbx/pl (VE) - R1 32 92, 00 - TUrt en Grass'es i Nabficale . : Daliver/-tons - 32 )2 00 : Tu f and Or_ses ■ SUbmftte I - RO' SI a Utilities 1 Fleview (HBS):R -Site Util ties 1 :Appro ral j(ARE) 110 Site l Itill$es, 1: SubrAttal R!1 - 3fte Utiliti 1: Appr rval (! /E) Rt - Site Jitlitied 1 Deli tery r j Phase j Real i7Proje, TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 ALCOM HUNT Phase 1 Schedule Update NS NU TI SER " EJ SMITH r' Page 38 of 48 CONSTRUCTION Activity ID F1W1-1010 Activity Name Phase IA- Kitchen/Vault Orig Dur 275d Remaining Duration 289d %I Complete 0% Start 17-Aug-23A Finish 13-Dec24 FNd1-1065 Phase l A Mobilization 15d 4d 0% 17-Aug-23A 07Sep-23 FNd1-1075 Phase l A Demolition 69d 69d 0% 18-Oct-23 15-Feb-24 FrW1-1095 Phase l A Foundations/ Ll Concrete 90d 90d 0% 09-Nov-23 12-Apr-24 FNd1-1085 Phase 1AVauh Tunnel 51d 51d 0% 20-Nov-23 22-Feb-24 FW1-1105 Phase 1AStructure 28d 28d 0% 27-Feb-24 10-Apr-24 FrW1-1115 Phase lA Enclosure 46d 46d 0% 26-Mar-24 04Jun-24 FNd1-1125 Phase lA Roughin/Rnishes 136d 136d 0% 29-Apr-24 06-Deo-24 FTW1-1135 Phase l A Commissioning 22d 22d 0% 01-Nov-24 13-Dec24 FNd1-1220 Phase l A Substantial Completion Mezzanine Od Od 0% 07-Nov-24* FTN1-1165 Owner Occupy Mezzanine 10d 10d 0% 08-Nov-24 04-Dec-24 FrW1-1300 Phase l A Substantial Completion Kitchen Od Od 0% 13-Dec24* FWd1-1400 Client/User Kitchen Bum -in period 30d 30d 0% 16-Dec-24 28Jan-25 FTW1-1015 Phase lB -BOH/Loading Docks 373d 373d 0% 01 Jul-24 06-Feb-26 FNd1-1045 Phase IB- Electrical Upgrades/ BOH Renovations 225d 225d 0% 01Jul-Jul 19Jun-Jun FTN1-1055 Phase 1 BAnnex Demolition / Loading Docks 318d 318d 0% 04-Oct-24 06-Feb-26 FTW13000 Phase 1 B - BE Comer Complete Od Od 0% 03Jan-25* FTN1-1200 Phase 1 B BOH Restroom Renovations Complete Od Od 0% O5Jun-25 FTW1-1210 Phase 1 B South Loading Docks Complete Od Od 0% 02Sep-Sep F W1-1240 Phase 1 B North Loading Docks Complete Od Od 0% 06-Feb-26 FNd1-1145 Phase 1 B Substantial Completetion Loading Docks / BOH I Odl Od 0%1 06-Mar-26 -1020 (Phase IC- Commerce Street Demo 6$dl 6$dl a%I 20-Nov-25 20-Feb-26 -1022 Phase 1 C Substantial Completion Road & Site Improvements Odl Od 0%, 20-Feb-26 FWT73000 Copeland 07/27/23-08/06/23 7d Od 100% 27Jul-23A Mary Kay 01/08/2024-01/25/24 14d 14d 0% 08Jan-24* FWT73010 PArr1-5020 TX Technology Student Association 04/02/2024 - 04/06/2024 4d 4d 0% 02-Apr-24* FWT1-5030 Copeland 07/24/2024 - 08/08/2024 12d 12d 0% 24Jul-24* FWT73040 Nat'l Agri Aviation& TX EMS 1111612024 - 11/27/2024 8d 8d 0% 1B-Nov-24* PArr1-5050 TX Technology Student Assoc 04/02/2025 - 04/05/2025 3d 3d 0% 02-Apr-25* FWT73060 Copeland 07/23/2625 - 08/03/2025 1 8d 8d 0% 23Jul-25* FWT73070 1 TX EMS 11/21/25-11/26/2025 1 4d 4d 1 0% 121-Nov-25* FW71-6000 I Weather Days r- Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work Zb e-weZibLZI IStG1Z0 :il3l ' IJ JlA S ON :l1 "NI�I/I1I1AMIL9d21`I2`I21Zi33I2A 1I IIN11)j I14ILI3 II r Phas91A- Kitchen /Vault! 1h8se11AMobilila1iun Ph asp l A Drmplltipn 'Phase 1AFoundatibns/L1 Condretu Ill�rl Phase 1AVault Tuhnel (Phase 1AStructure: --wp Phase I Endosure Ph4se:1A Ropgh-in / Fipistjes Phasd 1F.Commissioning'! phase'4ASu tstanhal Completion Mezzeni to I Own r Ocrup� Mezzanihe I I ;♦ Phase 11, Substantial Completion l6tch an M', OlieuUU,ser, Kltchpn Oum-in period Pfiase 1B- Electrical UpdremsV BOH F Phaeil &Ann, ♦ Phase 1 BBE Confer Complete; Phase 11 B BOH Res mom Renovations C * Phase 1 B Tooth Lo: ding Rock ph.:l B:Nod Phase BB; �r PI ase IC - C Phase 1C St ■: Mary Kay 01/(S/2024-01/25/24 I TX Teo tndlogy Stud bnt.Association 64/02/2024 - 04/06/2024 Copeland107/24%2OP4 08/08/2024: j I Naflggp AAatlon&TXrM$11/1q/2tj24-1j/2(/2112d, 04-Apr-25 I 7X Technology Studert!A=c;04/022025 -'04/( 01-Aug-25 Copeland 07/L2/2025 - )8/03/202', 26-Nov-25 111 rBMS 11 121%251-11, �I O6-Mar-26 I NJ Nepthgr DE TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date:31-Aug-23 /ECOM HUNT Phase 1 Schedule Update NS NU TI SER ES EJ SMITH 1' Page 39 of 48 CONSTRUCTION 20d I 20d 1 0%1 09-Feb-26 04-Aug-23 A 25Jan-24 O5-Apr-24 08-Aug-24 27-Nov-24 ity ID Activity Name Ong Dur Remaining %I Start Finish I Duration Complete MILEIA-1005 Building Dry -in 100% Od Odl 0% 04Jun-24 MILEIA-1035 Level 1 Building Dry -in Od Od 0% 17Jun-24 MILEIA-1025 Permanent Power to New Switch Gear Od Od 0% 14-Aug-24 MILEIA-1015 Conditioned Air Available Od Od 0% 03Sep-24 MILEIA-1010 Elevator Ready for Temp U sage Ode Od 0% 04-Sep-24 Constr .i..iwd'J'.r. t:r'.du Sne�a•YkiinlY.iimaYr- 11. �� '®� Mobilization M0131A-1000 Mobilzation 10d ld 100% 17-Aug-23A 01-Sep-23 M0B1A-1010 Site security - temp fence 2d Od 0% 22-Aug-23A r23Aug-23A M0131A-1030 Install Temp Protection at Frt. Elev / Fire Pump R m 4d 4d 0 % OSSep-23 3 MOBIA-1020 Install SWPPP Countermeasures 2d 2d 0% O6-Sep-23 07-Sep-23 Demolition DEM01A-1025 Demo Existing Annex Walls/Doors or ass 4d 4d 0% 18-Oct-23 23-Oct-23 DEM01A-1005 Demo Facia at Switchgear Room 2d 2d 0% 24-Oct-23 25-Oct-23 DEM01A-1015 Sawout/Remove Concrete Strips at Dock 2d 2d 0% 26-Oct-23 274)ct-23 DEM01A-1010 Demo Existing Paving 5d 5d 0% 30-W-23 03-Nov-23 DEM01A-1000 Locate/layout Existing Utilities 2d 2d 0% 06-Nov-23 07-Nov-23 DEM01A-1030 Excavate/Grade Footprint to subgrade 605.33 3d 3d 0% 06-Nov-23 687Nov-23 DEM01A-1035 Demo Ramp / Loading Dock 3d 3d 0% 154Nov-23 17-Nov-23 DEM01A-1050 Demo Existing Stucco Facia 15d 15d 0% 26Jan-24 15-Feb-24 Site Utilities 56d • r®�; Electrical 5d .�r. r U IIL1A-1010 Install ONCOR Ductbank to Tunnel 3d 3d 0% 06-Nov-23 08-Nov-23 UT1L1A-1040 Install ONCOR Manhole 2d 2d 0% 09-Nov-23 10-Nov-23 Sanitary 15d 15d �fL IS1101Y°' •n U IIL1 A-1000 Install Sanitary Sewer/ Bypass 15d 15d 0% 13-Nov-23 05-Deo-23 Storm rd r. r•. r'®' UT1L1A-1020 Relocate 18"Storm Drain 1Od 10d 0% 26Jan-24 08-Feb-24 UTILIA-1030 Install 12" Domestic Water Line 5d 5d 0% 09-Feb-24 15-Feb-24 Concrete 92d • ". r FND1A-1005 Install Drill Piers at Existing Dods 5d 5d 0% 01-Nov-23 07-Nov-23 FNDIA-1030 Install Grade Beams at Exiisting Doric 5d 5d 0% 08-Nov-23 14-Nov-23 FND1A-1000 Install Drill Piers 6d 6d 0% 094Nov-23 16-Nov-23 FND1A-1020 F/R/PC-rade Beams/Pier Caps 15d 15d 0% 17-Nov-23 11-Dec23 FND1A-1010 F/R/P Elevator Pit Walls 4d 4d 0% 04-Mar-24 07-Mar-24 r- Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work LGIb-L G�'LAJI AS OI-9F/�l�:�I5�I1I 2�ZZ1II1Ad1I1I1,178IMI7IL31 48912�i3334I� Iluildincj Dry-ir1100% Level:1 Building Dry -in', ♦ ♦!Permanent Powerto Pew Swftch Gear! t Codcfrtipned Air Avai able Elevator Ready for -brnp Usage 1111111 1101jilzdtion I I I ! I !! I! ! I !! I I I I I nstall Temp Rrotect onat Frt. Ele4 / Fire Pdmp:Rm ns1'all SWPPR Oountehneasr e5 1: demo Ei isting 4nmex: Wt ills? Doors foiA*ss C Demo F2da at Switchga tr Room 1: Sawcut/Retno, a Concise Strips at Dock I I I I I 11 Demo t4inl l Paving �I Locate%layout Existing Iltilijies; Excavate/Greye'Foctpmt to subgrade 605.33! 1 Demo Rhmp / Loading D'odE, ■ DE and Existiug Stucco Fade jl install (aNCO4 Ougba ilk to Tunnel j ';Install PNCM Manho a j 1111I Install 5ar Lary Sewmr/ Bypass Q Rebcap )8" Stomr'Drain i0 In!1ali 12iDomestic Water Uhe ' 1 Install ©rill Pk rs at Exis ing Dock Install Grade Beams a Exiisting Doric I Installbrill P arse, j F/R/P Grde'!Beam,;/PierCaps: j :1 -/PJP EIeratOr Plt Wallg TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 ALCOM HUNT B'YM in Phase 1 Schedule Update CONSTRUCTION SERVICES EJSMITH 1' Page 40 of 48 CONSTRUCTION Activity ID Activity Name Orig Dur P Elevator 11111 FND1A-1025 I WP/Elevator Pit 5d Slab 5d DOCKIA-1000 F/R/P Dock & Ramp Walls DOCKIA-1005 Install Select Fill for Slab on Grade DOCKIA-1010 F/P/F Dock/ Ramp Slab on Grade Remaining %I Start Finish Duration Complete 2d 0% 1 08-Mar-24 1 11-Mar-24 5d 0% 1 12-Mar-24 18-Mar-24 15d 15d 1 0% 12-Dec23 03Jan-24 4d 4d 0% 19-Mar-24 22-Mar-24 7d I 7d 0% 1 25-Mar-24 I 08-Apr-24 VLT1A-1000 Excavate Vault Tunnel 3d 3d1 0% 20-Nov-23 22-Nov-23 VLT1A-1010 InstallVault Underpin Support / Foundation Strengthening 5d 5d 0% 27-Nov-23 01-Deo-23 VLT1A-1015 Install Concrete Seal Slab 2d 2dl 0% 04-Dec23 05-Dec23 VLT1A-1020 I F/R/P Tunnel Walls 15d 15d 0% 06-Dec23 27-Deo-23 VLT1A-1025 I Pour Tunnel Slab 5d 5dl 0% 28-Dec23 04Jan-24 VLT1A-1030 I Oncor Install Vault Safety Barrier 3d 3dl 0% 05Jan-24 29Jan-24 VLT1A-1035 Sawcut Vault Door openings 3d 3d 0% 30Jan-24 01-Feb-24 VLT1A-1040 Install Vault Doors/ Hardware 5d Ed 0% 02-Feb-24 08-Feb-24 VLT1A-1045 F/R/P Tunnel Lid 10d 10d 0% 09-Feb-24 22-Feb-24 VLT1A-1050 Foundation Drainage / WP Tunnel Walls 6d 6d 0% 15-Feb-24 22-Feb-24 VLT1A-1055 Baddill Tunnel Walls 6d 6dl 0%23-Feb-24 01-Mar-24 VLT1A-1060 Install Tunnel Grating 2d 2d 0% 23-Feb-24 26-Feb-24 Steel• STRCIA-1000 1Erect Ll Columns/Beams 3d 3dl 0•..v�aa �i:IlriSrL': 0%27-Feb-24 29-Feb-24 STRCIA-1005 Mezzanine Level Deck &Detail 8d 1 0% 01-Mar-24 12-Mar-24 STRCIA-1010 Erect Mezz Columns/Beams 3d 3d 0% 01-Mar-24 05-Mar-24 STRCIA-1015 Erect L2 Columns/ Beams 5d 5d 0% 06-Mar-24 12-Mar-24 STRCIA-1020 Second Floor Deck & Detail 8d 8d 0% 13-Mar-24 22-Mar-24 STROIA-1025 Roof Deck & Detail 8d 8d 0% 25-Mar-24 09-Apr-24 STRCIA-1030 P/F Mezzanine Deck 1d id 0% 25-Mar-24 25-Mar-24 STRCIA-1035 IP/F Second Floor Deck 1d 1d 0% 26-Mar-24 26-Mar-24 STRCIA-1050 I F/P/F Mezzanine Ramps 10d 10d1 0% 27-Mar-24 15-Apr-24 RTRC7 A-1 1140 P/F Rnnf Deck 1d 1d 0/ 1n-Anr-94 1n-Anr-94 ENCLIA-1010 I Install Face Brick ENCLIA-1015 1 Install HIM Doors / Hardware - Remaining Level of Effort - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work ♦ Milestone 30d 30d1 0% 29-Apr-24 10Jun-24 5d 1 0% 11Jun-24 17Jun-24 5d 5d 0% 11Jun-24 17Jun-24 I ziil Ll'LJ L 4 LULb L'1L�b JIAIS pp f y� Q f J J �� J f OI-91$ 7I8I3 dl :il-`L/ 1I1 3 4I5 Ll 6I7I F, 9I 1t111 1I1Ad11 1I16I 1f 1J8I 1IL21I LIL24 LI26 LIZI29 3I 31 ;i 3I 4I J._E :1 Ele Pit.-.abiIT TI TI �I F/R/P ratOr 1 WPEev.itor,Pit: ■ 1 F/R%P I lock &: Ra-mpq Walls j 1 Install Sdegt Fi(I fo Slpb pn 3rajie: M F/Pj F I lock / Ral np Slab o f Grade 1 E;oaaate V.I :T, ins 0 I tstall[Vautl Underpin Support/ Foundation $trE ng herring :1 I nstall Cor Crete Sea I Sleb' 1E FIR/P T rnnel Wal s M PoUr Ti innal Slat WI Qno rt Instill Vu@ Safet, Banner $av cut: Vabrt I )oVr oiler ings Insv111 Vault Lois / He dware: ■; FN/P Tdnni it Lid 1 Foundation Drainage I WP Tunnel Wails Eaddlll Turnell Walls 1: Ir stRII T4nn al (rating E`,edt Ll C )IuMn6 / E earns: ■ Mezzanin; Leve'I D;ck& Detail I Srec[ Mez; Column: / deans :1 Ergctl2--4pmns/Beams ■ Secobd -loor did, &'DefaiI 11 Robf E eclk &:De ail;''''' PYF Mezanine D7 ck: I P/F gecnnd Floor 3edk ';F/P/F Vlepzanin: games {ek I ';P/F Rk of bedk IlnS Il Exteric-CMU W dls t- 7 nsiall Fat? ddck II Install, HE l Doors/iardware 1 Inoalli Rk II Up Poo s FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update TASK filter: All Activities Data Date: 31-Aug-23 A=COM HUNT NS NU fl0 s€n €5 EJ SMITH Page 41 of 48 CONSTRUCTION Activity ID Activity Name Orig Dur Remaining l %I Start Finish nzZ 2UZ4 ZJUeJ) Duration Complete I J JA 1 N If J AS 046I5l JF45 6I�lr9MJJ1111A)I M MZJZt A J J T N FA )1A i IJ6r1J)11r1rj2426 �l7129 71 71 3M4i Mezzanine 79d 79d' 0% ENCUA-2005 Install Exterior Framing Sheathing WP Install EIFS 5d 5d 0% 27-Mar-24 0% 09-Apr-24 0% 16-Apr-24 0% 30-Apr-24 0% 11-Jun-24 0% 18 Jun-24 0% 1 0,Jul-24 0% 17,Jul-24 0%, IfilikhAil 08-Apr-24 1 8-Apr­24 29-Apr-24 56-My.24 17-Jun-24 09,Ju1-24 16-Jul-24 23-Jul-24 Install -_Xt,ldol, Fhaming Y S ieathirig VP! LI Instal EIFS 0 Inst4l durtain N4 0 Inst all Pedmt(,r ldecl{ Hi mclial: 0 Woteipioof Me#anine DO* El Install IlatterlSoffit! 0 Install GRRG Cill Wrill I Insta I PiiidiSlal -averg ENCUA-2010 8d 8d ENCUA-2000 Install Curtain Wal 10d 10d ENCLIA-2020 Install Perimter Deck Handrail 5d 5d ENCUA-2040 Whtepioolf Mezzanine Deck 5d 5d ENCUA-2050 Install Plaster Soffit 15d 15d ENCUA-2060 Install GFRG Column Wraps 5d 5d ENCLIA-2030 Install Pedistal Pavers Sol 5d Level 2 0d 3 30d Install Exterior Framing Sheathing WP i 10d 10dj 0% 1 09-Apr-24 0% 23-Apr-24 30-Apr-24 0% ay-24 0% 31 -May-24 0% 26-Jun-24 0% 22-Apr-24 1 0-May-24 20-May24 17-Jul-24 304v1ay-24 04,Jun-24 17-Jul-24 Ut51jUI_Z4 Ircsta E*tenorra I --ming/ 31­reathint WP . , , 10 :In all �IFS *:In all Curia n Wal: No li Still MEF Corbi I loofin4 I ►orhpldte 'eiimdter Ralshihg Cd in p !g I I CHW & WHIN F ipirig fron MO nil ie I Set!Rc:)f ToPM6zhanloal I --.quipmen ENCUA3010 Install EIFS 14d 14d ENCLIA3000 Install Curtain Wal EINCUA-4000 Install MEP Curbs/ Roofing 48d 15d 48d 15d ENCUA-4005 Complete Perimeter Flashing Coping 3d 3d ENCLIA-4020 CHW & HHW Piping from Mezzanine 15d 15d Root Top Mechanical 33d 33d ENCUA-4 Set Roof Top Mechanical Equipment I 5d i 10d 0% 1 5-Aug-24 28-Aug-24 0! FDwiar to Mechanical Ecuipme it ENCUA-4040 Powerto Mechanical Equipment 10d ENCUA-4030 Start-up Mechanical Equipment 3d 3d 0% 29-Aug-24 03-Sep-24 0 I—taft-u6 Machanical Ecuipmei it 1� 74d 155d 74d 0% 27-Mar 24 0% 15-Apr-24 06-Dec 24 14-Aug-24 Finishes Level 1 Fit Out FIN1A-1010 Install Electrical Room Vault Exhaust 4 Hr Demising Wall 10d 10d 0% 15-Apr-24 0% 29-Apr-24 0% 13-May-24 0% 13-May-24 0% 28-May-24 0% 13-May-24 0% 13-May-24 0% 13-May-24 0% 01,Jul-24 0% 29-Apr-24 0% 29-Apr-24 0% 20-May-24 0% 1 28-May-24 0% 1 28-May-24 0%1 18-Jun-24 26-Apr-24 1 0-May-24 T4 M 24 10,Jun-24 10,Jun-24 14-Aug-24 24-Jun-24 17-May-24 14-Aug-24 17-Jun-24 17-May-24 17-Jun-24 01-Jul-24 17,Jun-24 01-Jul-24 TASK filter: All Activities IF IrIstaq Electrical Rbort Vieult BKh-%jst4 HirDerfising Wall :Ins all Elettrial Rodin, RAMI? D?mlsing "I: 0: Ir ataj Eleva or MaChime Rodin Nails 00 nstall dire Riper?Trash, Rkj:o n Wglls� 0 nsjall Elevator Shalt Wald Ellin Electca RrA o g i6 M Rdu I I In! : I Inmall: Door i HdrdvLanr InEmll:Pa6l Boardi Witch Gear In -alb Rated 36ilinp Asemlbly ONCOR Install .VaillitVantialowSyssin/ Lourveis Elevator loom MP Roughwir Establish OerniIan gnt! Nwe Fqedfor Elevator I ist�ll FIN11A-1000 Install Electrical Room Ramp Demising Wail 10d 10d FIN1A-1020 Instal Elevator Machine Room Walls 10d 10d FIN1A-1035 Install Fire Riser / Trash Room Walls 20d 20d FINIA-1060 Install Elevator Shaft Wal 13 10d 10d Electrical Room 54d 54d _F 01 IN1A-1 MEP Rough In 30d 30d FINIA-1025 Install Door/ Hardware 5d 5d FIN1A-1045 Install Panel Boards/ Switch Gear 20d 20d Vault Exhaust 35d 35d FIN1A-1005 Install Rated Ceiling Assembly 15d 15d FINIA-1040 ONCOR Install Vault Ventilation System/ Louvers 20d 20d for Machine Room 25d 25d FIN1A-1030 Elevator Room MP Rough -in 15d 15d FINIA-1050 Establish Permanent Power Feed for Elevator Install 10d 10d — Remaining Level of Effort Milestone — Actual Level of Effort Actual Work FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 �LECOM HUNT O Remaining Work Phase 1 Schedule Update Ns Ru To ER ES EJ SMITH 42 Page of 48 CONSTRUCTION Critical Remaining Work Activity ID FIN1A-2000 Activity Name Install Overhead MEP rough4ns Orig Dur 20d Remaining Duration 20d %I Complete 0% Start 27-Mar-24 Finish 29-Apr-24 FIN1A-2095 Install Rated Partitions at Existing Bldg 10d 10d 0% 31-May-24 13Jun-24 FIN1A-2140 Install Eelvator Shaft Wei Is 10d 10d 0% 11Jun-24 24Jun-24 FINIA-2005 Frame and l Side Interior Partitions & set door frames 12d 12d 0% 14Jun-24 01Jul-24 FIN1A-2010 Frame Drywall Ceilings 8d 8d 0% 02Jul-24 12Jul-24 FIN1A-2015 In -Wall MEP Rough -in and Inspections Sd 8d 0% 02Jul-24 12Jul-24 FIN1A-2030 Close Interior Partitions 6d 6d 0% 15Jul-24 22Jul-24 FIN1A-2020 Install Light Fixtures and Air Devices at Drywall Ceilings 5d 5d 0% 15Jul-24 19Jul-24 FIN1A-2025 Close Drywall Ceilings 8d 8d 0% 22Jul-24 16-Aug-24 FIN1A-2120 Install FRP Panels at Storage 10d 10d 0% 23Jul-24 21-Aug-24 FIN1A-2035 Tape &Float 12d 12d 0% 19-Aug-24 04Sep-24 FIN1A-2130 Install Epoxy Floor at Kitchen Storage 8d 8d 0% 22-Aug-24 03Sep-24 FIN1A-2040 Prime Paint 6d 6d 0% 05Sep-24 12Sep-24 FIN1A-2110 Set Kitchen Coll and Dry Storage Equipment 15d 15d 0% 05Sep-24 25Sep-24 FIN1A-2045 Install Milwork/Countertops 5d 5d 0% 13Sep-24 19Sep-24 FINIA-2050 Install Ceiling Grid 10d 10d 0% 13Sep-24 26Sep-24 FIN1A-2055 Finish Paint 10d 10d 0% 13Sep-24 26Sep-24 FIN1A-2060 Install Flooring 15d 15d 0% 20Sep-24 10-Oct-24 FIN1A-2065 Install Ceramic Tile Bd 8d 0% 20Sep-24 01-Oct-24 FIN1A-2070 Install Light Fxtures & Air Devices at Grid Ceilings 8d 8d 0% 27Sep-24 08-Oct-24 FINIA-2075 Install Plumbing Fixtures 5d 5d 0% 02-Oct-24 08-Oct-24 FIN1A-2080 Install Restroom Accessories 4d 4d 0% 09-W-24 14Zc-24 FIN1A-2085 Install Ceiling Tile 4d 4d 0% 09-Oct-24 14-Oct-24 FINIA-2100 Install Doors/Hardware 5d 5d 0% 11-Oct-24 17-Oct-24 FIN1A-2090 Final Clean/Punch 10d 10d 0% 18-Oct-24 31-0ct-24 HN1A3000 Install trench dmins &floor pour -backs Od 10d l % 27ar-24 . •- 15-Apr-24 FIN1A3005 Install overhead MEP rough -ins 20d 20d 0% 30-Apr-24 28-May-24 FIN1A3120 Install Elevator Shaft Wei Is 10d 10d 0% 25Jun-24 09Jul-24 FIN1A3010 Frame / One Side Interior Partitions & Set Door Frames 10d 10d 0% 02Jul-24 16Jul-24 FINIA3015 In -wall MEP roughins&inspections 12d 12d 0% 17Jul-24 19-Aug-24 FINIA3020 Frame Drywall Ceiling 5d 5d 0% 17Jul-24 23Jul-24 FIN1A3025 Install Rated Partitions at Exising Bldg 15d 15d 0% 17Jul-24 22-Aug-24 FIN1A3030 Install Light Fixtures / Ceiling evices in Drywall Ceiling 5d 5d 0% 09-Aug-24 15-Aug-24 FINIA3035 Close Walk & Ceing 8d 8d 0% 20-Aug-24 29-Aug-24 r— Remaining Level of Effort ♦ ♦ Milestone r— Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work J GJI"IS 0I-`JI-E5171SI3I ,il-`L L1I1 � 3 4 516I7It3 9 1^I11uL1 I1Ad11I1INI111J8 1I�21IL Z124 [ 26I LI ZI2� 3 31 '3I34I T���� �T IfIstAi Overhead MEP rough -ink ■ In5all:Ratedl Paltf[ions:at Eci„tin$ Bldg : ■ Install Eelvator,Shaft Wall j ■ game and l $ide Intedgr KCa iogs & sat dgor frame3 , 1 :Frame Dryoll Ceilings 1 ;In -Wall MEP Rough;dn anx Inspections; 1; Close Interdr Partitions 1 Install Light Fixtures and, Ur Devices at: Drywall Collings 10' ,Close: Drywall Ceilings',',',', ON: Instao FRP Panels at Storage 0 Tape &; Float ❑ Install Epoxy ROor a Kitchen Storage II PrimeiPaint ❑ Set K dehen,Cgld ; and Diy Stordge',Equiprrxent , A InstalFMillwork/Cmntertops ■ Install Ceiling Gdc ■ Finish Paint E ;Install Roorirg ■ Install Ceramic TiL , ■ Install Light F;xtu as ;& Air Devices, at Grd Ceilir gs'! 1 Install Plumbing Rxt as 1 iInstall Rest on Accessories: 1 Install Ceiling TiL 1 Install Doorp / F irc{wafe , Final Clean / F'unch M ' Inotall trehch� drains & floor pour -backs Is I.taII o4ertreed MEP rowgli-in: M install Elevator Shaft Wails I Frame /Oriel Side Iry[egor Partitions & Set poor Flames 00 In -wall M)EP rough -ins-_ ipspectlong E Frame Drywall Ceiling D Instal Reted Partigorn; at, Uisitng Bldo I ❑ !Install: Light Fixtures / ►eilingavicesl in Drywall Ceiling FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update TASK filter: All Activities Data Date: 31-Aug-23 A=COM HUNT NS NU fl0 s€n €5 EJ SMITH Page 43 of 48 CONSTRUCTION Ac ivity ID FIN1A3040 Activity Name Install FRP wall panels Crig Dur 10d Remaining Duration 10d %I Complete 0% Start 30-Aug-24 Finish 13Sep-24 FIN1A3045 Install Chef Kitchen Window 3d 3d 0% 30-Aug-24 04Sep-24 FINIA3050 Tape & Float Chef Kitchen 6d 6d 0% 30-Aug-24 09Sep-24 FIN1A3055 Prime Paint 4d 4d 0% 10Sep-24 13Sep-24 FIN1A3060 Install vent hoods&Ansul systems 10d 10d 0% 16Sep-24 27Sep-24 FIN1A3065 Install Epoxy Flooring Bd 8d 0% 16Sep-24 25Sep-24 FINIA3070 Install Millwork/Countertops 8d 8d 0% 16Sep-24 25Sep-24 FINIA3075 Finish Paint/Wall Coverings 5d 5d 0%26Sep-24 02-W-24 FIN1A3080 Install Plumbing Fxtures/Tim 2d 2d 0%26Sep-24 27Sep-24 FIN1A3085 Install Ceiling Grid 6d 6d 0% 30Sep-24 07-0ct-24 FINIA3090 Install Flooring 3d 3d 0% 03-0ct-24 07-W-24 FINIA3095 Install Lights & Ceiling Devices 5d 5d 0% 08-Oct-24 14-Oct-24 FIN1A3100 Install Ceiling Tile 5d 5d 0% 15-0ct-24 21-00-24 FIN1A3105 Set Kitchen Equipment 10d 10d 0% 22-W-24 04-Nov-24 FINIA3110 Connect Kitchen Equipment 10d 10d 0% 294W-24 11-Nov-24 FINIA3115 Final Clean / Punch 10d 10d 0% 12-Nov-24 06-Dec-24 MEP Infrastructure MEPIA-1010 Demo / Extend CCH / HHW Piping from 1301-11 to 1 A Mezzanine ' • 60d 109d 0% :fIK11.IGi 60d 0% 27-Mar-24 ' 25Jun-24 BOH1 B-1020 Extend FP Standpipes to Fire Riser Room 60d 60d 0 % 11 Jun-24 I 20Sep-24 ELEVIA-1010 Install Elevator#7 25d 5d % 10Ju1-24 29-Aug-24 ELEVIA-1015 Set Elevator Fronts 3d 3d 0% 09-Aug-24 13-Aug-24 ELEVIA-1020 Complete Shaft Wall at Bev Fronts 6d 6d 0% 14-Aug-24 21-Aug-24 ELEVIA-1025 Site Improvements SITEI A-1000 Elevator Testing / State Inspection 3d 3d 0% 30-Aug-24 04-Sep-24 ' 'yiil�iGlll F/R/P Paving 12d f2d % 21-May-24 06Jun-24 Install Dock Trench Drains 3d 3d 0% 07Jun-24 11Jun-24 SITEIA-1005 COMMIA-1000 I Test & Balance Mezzanine COMMIA-1005 Functional Testing& I rspections Mezzan ine COMMIA-1015 I Test & Balance Kitchen COMMIA-1020 Functional Testing& I rspections Kitchen Site Demolition - Remaining Level of Effort ♦ ♦ Milestone r- Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work ��r�r�r��neome•��r.wa�rsv�� �'• LIr►a1�:I d d % 01-Nov-24 Slrasilril 07-Nov-24 5d 5d 10 014dov-24 07-Nov-24 5d 5d Z.09-Dec24 13-Dec24 Sd 5d 0% 09-Dec24 13-Dec-24 0% r r 01 Sep 22 rim 61i5astE "®' 15d 15d 0% 26Jan-24 15-Feb-24, zt:-!Z J J A S O NJ J Ff AJ MJ Gtl'G:1 FJ -9I-Uff=f/I8I3 �I:il�_�I; �94I5 �I7I8 FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update Ll'Gy4� f y� Q f ' �I f J 9IMI1 lI1Ad1 1I1N6 Is L21I `LI�L4 LI2 ZIZI25 Inslall;FRWall panels!I, 0 1 nstall ChFF Kitchen Window tape & Ruat ;Chef KitclheQj I Prime :Pa not ■ Install" mt hc6ds&Ansel s04ind ■ Install Epoxy Roo ingl Install viiMprO CwrlteI I I Amish Faint / We I Cgverinjrs j Iristall P umbing Fdures;d Tin InstbiIl Ceiling,Ghd Install Ilodrino 1 i Install Lights;& I:elling!DeAces 1: Ingtal Ceiling Ile Set Kitqheh L-4uipmgnt 111111 ,Co indet Kitmeri EquiF mdnt Ill 19nal des i / Punch Demo, / Extend CCH d H;FIV r Piping fmm:BO;H t) 1AMez. : QrExtedd F P Sta6dt ipefi to, Fir- Riset R(Qom II istill OIev 1tor, 0, 0 ';Se. Elevator Fronts: 0 C)mpleta haft Well BeN, Rmt 0 12IeVatar Ti Isthg l St atialnspe, tioi) 1111 /R%P Pav ng j 1 nstall Do:k Trench 3rains 0 Tes & Balanl a IVlezzaina 0 run-Iignal Tc--tirg Alnlpegtiore degzaiin TASK filter: All Activities Data Date: 31-Aug-23 Page 44 of 48 1 Test Be lanpe Kftc heq Function• Tasting h I r*pi#ctiars:Kk0 anipe ALCOM HUNT C NS NUC NS To SIR EJ SMITH CONSTRUCTION Acth fry ID Activity Name Orig Dur Remaining % Start Finish Duration Complete DEM01 B-2005 Install Temp Protection at SE Entry Door 3d 3d 0% 26Jan-24 30Jan-24 DEMOIB-2010 Remove Existing Trees 2d 2d 0% 31 Jan-24 01-Feb-24 DEMO16-2015 Demo Planters / Steps / Pavers 10d 10d 0% 02-Feb-24 156d 156d 0% 01Sep-23 15-Feb-24 08-May-24 Building Demolition DEMOIB3025 Demo Rm 100 Entry Wall 5d 5d 0% 01Sep-23 08Sep-23 DEMO1133010 Install Temp Partitions at Rm 100 /Condor 5d 5d 0% 18-Apr-24 24-Apr-24 DEM0183015 Demo South Entry 3d 3d 0% 25-Apr-24 29-Apr-24 DEMOI B3020 Demo South and East Wall; 10d 10d 0% 25-Apr-24 08-May-24 Site Utilities rd 30d UT1L1 B-1005 Re-route Sanitary / Storm Sewer 15d 15d 0% 16-Feb-24 07-Mar-24 UT1L76-1010 Re -mute WalerLine 8d 8d 0%08-Mar-24 19-Mar-24 UT1L713-1015 Reinstall Plaza Pavers at Wale it h e 7d 7d 0% 20-Mar-24 28-Mar-24 FND18-2025 Install Piers @ CL 1A Terrace Extension 1d 1d 0% 17-Nov-23 17-Nov73 FND7 B-2030 F/R/P Grade Beams / Pier Caps at CL to Terrace Extension 8d 8d I 0% 12-Dec23 21-Deo-23 FND7 B-2005 Install Fill / Grading - SE Entry / Terrace 3d 3d 0% 08-Mar-24 12-Mar-24 FND76-2010 Install Dril Piers - SE Entry/Terrace 4d 4d 0% 13-Mar-24 18-Mar-24 FND7 B-2015 F/R/P Grade Beams / Piers Caps -Terrace / SE Entry 12d 12d 0% 19-Mar-24 09-Apr-24 FNDlB-2020 F/R/P SOG-SE Entry 10-Apr-24 17-Apr-24 65 6d 07 FNDIB-2035 R/R/P Terrace SOG 6d 6d 18-Apr-24 25-Apr-24 0% r STRC7 B-2005 Install SE Extended Mezzanine Tenaee Structure / Deckirg 8d 8d 0% 13-Mar-24 22-Mar-24 STRC1 B-2020 Install SE Level Extended Structure / Decking 8d 8d 0% 27-Mar-24 11-Apr-24 STRCI B-2025 Install SE Extended Roof Structure / Decking Sd 8d 0% 12-Apr-24 23-Apr-24 STRC18-2010 - Install SE Entry Structure 0% 30-May-24 15d 15d 09-May-24 STRC16-2015 Install Terrace Stair 20d 20d 0% 02Jul-24 15-Aug-24 AM if 4lb.'Y ENCLI B-2030 Install L2 SE Extension Roofing 5d 5d 0% 24-Apr-24 30-Apr-24 ENCL76-2025 Install Stair 4 Corridor Extension 15d 15d 0% 13-May-24 03Jun-24 ENCLI B-2005 Install Curtain Wall L2 SE Extension 10d 10d 0% 21-May-24 04Jun-24 ENCLIB-2015 Instal Exterior Framing / Sheathing / WP 11Jun-24 8d 8d 0% 31-May-24 ENCLIB-2020 Install Face Brick Sd 8d 0% 12Jun-24 21Jun-24 ENCLI B-2010 Install SE Lobby Curtain Wall 15d 15d 0% 24Jun-24 15Jul-24 Fit Out 00d 1 rr 0% FINlb-2005 SE Comer Elevators/Finishes mori_ _ _ 100d 100d 0% 16Jul-24 03Jan-25 SITE? B-2010 I Install SE Plaza Steps/Pavers - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work 12d 12d1 0%116-Aug-24 I03-Sep-24 FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update 1I,�I4I��I/IS 9IMIT7G1 I1Ad1111116118111L21I LI1I LI261 ZI Z�Z�:il3l'3 �34I It IhstAl Temp Protection at SE Entry Door I Remove Exist ng:Treos p Demq Planturs r Steps / Pavers )erno;Rm 10b entr Wall j Il Irista I Temp Pa4ft" at Rm 1Q0 rCerrgor 1, Raw South Entry ■ Del no South and Ehst Walls ie,'routa Car4tar /Storm Sewer :0 Re-route Weter,Line a 0.e n:st4I Pjazq Paves it Walla,tlha j I , Install; Pigs � g) CL'pA rerrpcz, Extension I F/R/P Gl ader Beams / Pier Cape at:CL 1A'Terrace Extension :1 Install Fill' Gtading - SE Entry / Terace :1 InStallDrIPiers' SEEntry/Terrdcel C I F/R/P 3rdtle Beams / Piers Caps --irrace / SE Entry 0 F/A/P SQG%SE Entry: 0', Rj R/' Terrace SCG D Instal SH Extended Mezzanine,, Tenl a Structure /:Depkirg j [] ',Install SE:Level 2 Ektehded Struttui a / Det:king ❑ I Irista I SE Extended Roof Structure / Deckng d II ist3ll SE Entry Structure Install:Terrace Srair, q Ipsta ll SE Extgnsipn Rogfing P I Tstall Stair 4 Condor Extehsk In ❑ I Tst2ll Curtain, Wdl L2 SE Extrnsbn! ❑ Instal Exterior Framing I SheE ihiog /'WP G] :Install So Lobby Contain Val( $E Cosner Elpvatorq / FInisheq j ■ Ipstgll Masonry' Wall at 7emice,Stgir Q Install SE Plaza $teps/Pavgrs TASK filter: All Activities Data Date: 31-Aug-23 A=COM HUNT BYM in CONSTRUCTION SERVICES EJ SMITH Page 45 of 48 CONSTRUCTION Activity ID Activity Name SITE? B-2015 Install Exterior Column Covers Orig Dur Remaining %I Start Finish Duration Complete 5d 5d 0%116-Aug-24 I22-Aug-24 : • Docks••. :• B0H1B-1000 Install Bus Duct/Switch Gear/Panels/Raceways . 130d 130d 0% 01 Jul-24 31 Jan-25 BOH7 B-1010 Complete Exhibit Hall Lighting Control / Electrical Redistribution 150d 150d 0 % 01-Nov-24 19Jun-25 Annex '' Install temporary protection/ Separation Walls, etc. 10d 10d (j• 0%17-W-24 DEM01B-1005 DEM01 B-1010 Cut & Cap / Make Safe MEP Systems CL XF-XB 20d 20d 0%07-Nov-24 727-Dec-24 DEMOIB-1020 Demo Designated MEP Piping / Equipment CL XF-XB 10d 10d 0%04-Dec-24 DEMOIB-1015 Demo Annex Foundation/Structure CL XF-XB 15d 15d 0%Dec26-Dec24 DEM01B-1030 Demo Annex Slab CL XF-XC.5 15d 15d 0%17Jan-25 DEM0113-1070 Install Temporary Dodos 5d 5d 0% 27-Dec24 03Jan-25 DEM018-1080 Install Temporary Road to Temp Docks 10d 10c1 0% 27-Dec24 10Jan-25 DEM01 B-1050 Install temporary protection (demising walls, etc.) 5d 5d 0 • :u.AA.21 0% 29Jan-25 uGrSom J 04-Feb-25 DEM01 B-1055 Cut / Cap / Make Safe Remaing MEP Systems CL XB-XA 10d 10d 0% 05-Feb-25 18-Feb-25 DEM01 B-1060 Demo Remaining Portion of Annex Bldg CL XB-XA 15d 15d 0% 19-Feb-25 11-Mar-25 DEM0113-1085 Demo CMU Wall CLXB-XA 5d 5d 0%03Sep-25 09Sep-25 DEM0113-1025 Demo CMU WaII CLXF-XC 5d 57 0% 05-Dec-24 26-Dec24 DEM018-1035 Demo Hall B Corridor to Annex Lobby 5d 5d 0% 27-Dec24 03Jan-25 DEMOI B-1040 Sawcut & Remove BOH Slab CL 4.75 / XF-XC 20d 20d 0% 27-Dec24 24Jan-25 DEMOI B-1045 Demo Hall C Men's Restroom & Concession Stand 10d 10d 0% 06Jan-25 17Jan-25 DEMO-1 B115 Build New Restroom Hall B 55d 55d % 184Oct-24 17Jan-25 DEMO-1 B35 Demo / Rebuild Hall C Restroom 60d 60d 0% 12-Deo-24 07-Mar-25 DEM0-1 B125 Demo / Rebuild Hall D Restroom 60d 60d 0% 27Jan-25 23-Apr-25 DEMO-1 B65 Demo/Rebuild Hall E Restroom Loading .. Foundations - FND1 B-1000 Drilled Install New Foundations (Piers & Grade Beams) 60d 60d 0% 10-Mar-25 r . 25d 0% 27Jan-25 05Jun-25 28-Feb-25 25d FND113-1005 Install Underground Utililies 15d 15d 0% 06-Feb-25 26-Feb-25 FND76-1010 F/R/P Dock Walls/Slab infill 25d 25d 0% 27-Feb-25 07-Apr-25 Paving PAV1 B-1000 Prep Subgrade ' 0d 10d 40d r• • �SuriGG 10d 0% 08-Apr-25 r 21-Apr-25 PAV1 B-1005 Install Paving 30d 30d 09% 22-Apr-25 03Jun-25 —Exterior Enclosure •. r:. trvcuro-r UUU i msran urou ucxz war — Remaining Level of Effort ♦ ♦ Milestone — Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work sua auaI urolub-Apr-eO Ira-may-eo zwz I JIAIS Gl'G:1 OI J� JJ J�If J J� _yil; 'PI4I5 �I7I6 dll �I 1 ZUL�4I f $ Q ' }� f J LULb 9I 1^I11 1I1Ad17 1I1Nbl if 78I 1IL21I `LILL4 LI2 ZIZI2 0 I Install Ekttencr Colum I Covers L')L�b :il3l ;i 3I34I� E Ipst III0US,DLct/:Switch GGar(P nejs/Paxe*yg Cpmplet: Ei hi4R all'tioth g Oontrol / ■ Install tempomt (protecticn / Sepan lion Viral , eic. M Cut & Calb / I Aake Safu MEP Sysems CL F-XB: IIiN Wemo De: lgn'ate'd A IER Pipin4 / EgGipnerlt CL) -XB N Donor Annex Fou rdation / Qmptute L XFXB D6mi I Agnej(S ab CL,XF XO.5j , I;nstell emponary Dodos, Install Tern or r Rbad to rertrp Doss'! Ins;all 1empol ary pmtec9od (dl:m 'no "Ils etb.) ; IIIIII ' C it / Cap / Make Safu Remain MEP: Sy rteMs CL X Ir DetnoIRfnalnirgl f-brtion ofl inex 81111 CL XB-AA III )etno:CluU Wall C _ X0- XA ;■ D;errto CtvU Wall )L-XF%XC berho -]all B Co ridor to Arrek Lob Stiweit & Remov4 BOH Slab CL 1 75/ XF- (CI ■ Dem, I Hall C I--,n'S Rest ootn & C noossion St2nd1 Build New Resrmoln Wall B ; I )emo % R;brAkf Hal C Rest ro m, m)/ke6uilil Hpill b stroojn )emo/Rebuild Hall R;estroo-n IN I rstall New Foondatiuna(Piti is (Smtle 1lea in I! II (stall Und :rg6und utilities: NN F/R/P )oc k Wall;: / $la6 in II , ❑ 'I Prep Su$grAde L� I nstell Pav ng: In rtall CMU Dock W21, TASK filter: All Activities FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Data Date: 31 -Aug-23 ALCOM HUNT Phase 1 Schedule Update NS NU TI SER " EJ SMITH 1' Page 46 of 48 CONSTRUCTION Acti ity ID ENCLI B-1005 Activity Name Install OF Doors Crig Dur 20d Remaining Duration 20d %I Complete 0% Start 1 06-May-25 Finish 03Jun-25 ENCLI B-1010 Install Horizontal Truss/Mist Steel 15d 15d 0% 20-May-25 10Jun-25 ENCLI B-1015 Install Wall Framing &BIRS 20d 20d 0% 11Jun-25 09Jul-25 ENCLI B-1020 Install Plaster Soffit 20d 20d 0% 10Jul-25 IB-Aug-25 ENCLI B-1025 Roof Tie-in / Flashing & Coping 10d 1 Od 0% 10Jul-25 04-Aug-25 FINIB-1000 Install Dock Equipment Ocl Od 11. % 19- ug-25 102-$ep-25 1'. 1 Commerce Street Install New Commerce Street Section11• 1R-nN irlw. �W!111111111111W Road113-1005 Install new underground utilities 60d 60d 0% 10-Feb-25 02-May-25 Road1 B-1010 Install structural fill for road base 15d 15d 0% 05-May-25 23-May-25 Road1B-1015 Rough grading / Stabilization 15d 15d 0% 27-May-25 16Jun-25 Road1B-1020 Install curb &gutters 15d 15d 0% 17Jun-25 08Jul-25 Road1 B-1030 Install road paving / Sidewalks 30d 30d 0% 09Jul-25 19-Aug-25 Road1B-1035 Pavement Markings 2d 2d 0% 20-Aug-25 21-Aug-25 Road1B-1065 Install/Bollards/Lighting 10d 10d 0% 20-Aug-25 03Sep-25 1 100d 100d 0% 05-May-25 Road1B-1025 Install new underground utilities 30d 30d 0% 05-May-25 16Jun-25 Road1 B-1040 Install structural fill for road base 10d 10d 0% 17Jun-25 30Jun-25 Road1B-1045 Rough grading / Stabilization 15d 15d 0% 01Jul-25 22Jul-25 Road1B-1050 Install curb &gutters 15d 15d 0% 23Jul-25 12-Aug-25 Road1 B-1055 Install road paving / Sidewalks 20d 20d 0% 13-Aug-25 10Sep-25 Road1B-1060 Pavement Markings 2d 2d 0% 11 Sep-25 12Sep-25 Road1B-1070 Install Bollards/Lighting 10d 10d 0% 11 Sep-25 24Sep-25 Commerce Street Road Tle-Irm 40d 40d 0% 25Sep-25 19-Nov-25 Road1 B-1000 Utility Tie-ins / Final Road Paving Connections 40d 40d 0% 25Sep-25 1�9-Nov •' • DEM41C05Install temporary traffic control at Commerce Street 3d 3d 1•• 0% :u11JE11�G 20-Nov-25 v--2}55 24-Nov-25 DEMOA C10 Demo existing paving, curb & gutters 20d 20d 0% 25-Nov-25 24-Dec25 DEM0-1C20 Remove Abandoned Utilities 20d 20d 0% 26-Dec25 I 23Jan-26 Repair East Side of Commerce Street •d 1.-3.9a{w KOAU-1 C05 Install new hill ROAD-1C75 Final Grading / Hydromulch Install New Foundations (Piers & FND113-1025 I Install underground utilities - Remaining Level of Effort ♦ ♦ Milestone - Actual Level of Effort Actual Work O Remaining Work Critical Remaining Work 'LU[2 J JIAISIO 1 Ud 100 U % 2bJan-26 116-Feb-26 10d 10d 0 % 09-Feb-26 20-Feb-26 11• 11• � 1 -. 1: -. 5r10Sep-25 30Sep-25 10d 10d 0% 1 17Sep-25 I 30Sep-25 FWCC Phase 1 - CMAR Amendment 1 Update 08.31.2023 Phase 1 Schedule Update � ff J � Ltl'LyJ 7IEi-5�I:il1 _ll 1 � 4I5 I7I6 L�l G�4I f $ Q ' }� f J 2U2b Z)L�b 9I 1^I11 1I1Adi7 1I1Nfil if 78i 11 L 21I `LiL241`Li2 212124:ii 3lM 3134I E IO Install ©H Doors: lljIrst:all Horizontal Th. as i Misc heel InstallNa11Flamng;&OR; MpIn::tall Plast(rSoffit 0 Foot Tb4d / RashinO & CdpinO 0 1 lstall Doc E4ui0mi Int: ICE Ihss tl inewun, lerqrownd utilities 0 Irtall stluct nal filllfor oad bast R6ug6 gladipg ( iliza(ion 0 Install rurb & �ut ers 0 In::tall road raving 7 S iewalks I'. Pvement N larldnqs EJ Install /! Beards /I Lighting Its Installne'v und9rg and utilites I E Install s w4ur�l fil for ropd )aae j ■ : Rough grating Stabilizaioh ❑ '!Ins all curb 8 gutters 0 nstall Ica I paving / Sidewalk: I Pavemen Marking; ❑ Install B Ilajds Y Lifting: [ Ulility,Teeinr / final Rus 1: I all temprary tfaff c Demb a (isting'pair ' Rbm )vA Abanl Ic ■ Insall nevi FiI 1: R 1al Grading Ir stall Nlew,, Faun iations: (Pi 91 Irist411 u�nd4rgroui d utilities TASK filter: All Activities Data Date: 31-Aug-23 A=COM HUNT C NS NU TI sEn €5 EJ SMITH Page 47 of 48 CONSTRUCTION Activity ID I Activity Name FND1 B-1030 I F/R/P Dock Walls / Slab Infills Orig Dur Remaining % Start Finish Duration Complete 20d 20d 1 0% 1 24-Sep-25 I21-Oct-25 PAV1 B-1010 Prep Subgrade 10d 10d 0%122-Oct-25 04-Nov-25 PAVIB-1015 III Install Paving 20d 20d 0% 05-Nov-25 10-Deo-25 Exterior Enclosure •1• •1• 0% ENCL76-1030 Install CMD Dock Wall 20d 20d 0% 22-Oct-25 18-Nov-25 ENCL78-1040 Install Horizontal Truss /Misc Steel 10d 10d 0% 19-Nov-25 10-Deo-25 ENCL78-1035 Install OH Doors — d 5d 0% 19-Nov-25 03-Dec-25 ENCL1 B-1045 Install Wall Framing &8FS 15d 15d 0% 11-Dec25 02Jan-26 ENCL1 B-1050 Install Plaster Soffit 15d 15d 0% 05Jan-26 23Jan-26 ENCL1 B-1055 Roof Tie-in / Flashing & Coping 5d 5d 0% 05Jan-26 09Jan-26 • 1• 1• 1'• '1i1.&AI 11 1• -• FINIB-1005 Install Dock Equipment 10d 10d 0% 26Jan-26 06-Feb-26 LJI AIS O191-F51=f/�bl3l�l:il-�L1I1�4I�I7�8 9I 11I1I1Ad111111611�8111L21I LI1I LI261 ZI Z�2;l :il3l :i'3 �34I SIb F/R/F D6ck:V& US % Slab Inl ■ Prep Shbgrave 4 nstall Paing jE Im Aall CMU Dods Wal I 10 nstall Hoi izoptal Tors 10 I Tstgll PH Doors; ; ■I Ihst211 Vall Frdminc ■ In;ta I Phast6r So 1 Roof 1 e-in / Flashi IIII Install book Eqi — Remaining Level of Effort ♦ ♦ Milestone - Actual Level Actual orkofEffort FWCC Phase 1 - WAR Amendment 1 Update 08.31.2023 O Remaining Work Phase 1 Schedule Update Critical Remaining Work TASK filter: All Activities Data Date: 31-Aug-23 A COM HUNT o■■�■i CONSTRUCTION SERVICES EJ SMITH Page 48 of 48 CONSTRUCTION M&C Review Page 1 of 3 Official site of the City of Fort Worth, Texas A CITY COUNCIL AGEND FORTWORTH Create New From This M&C DATE: 9/12/2023 REFERENCE NO.: CODE: C TYPE: M&C 23-0768 LOG NAME: NOW PUBLIC CONSENT HEARING: 21 FORT WORTH CONVENTION CENTER CMAR REVISED GMP NO SUBJECT: (CD 9) Authorize Execution of Amendment #1 to the Construction Manager at Risk Contract with Hunt/Byrne/Smith, a Joint Venture, in an Amount Not to Exceed of $43,000,000.00, Including an Owner's Construction Contingency Allowance, for a Total Contract Value of $73,000,000.00, for Phase 1 of the Fort Worth Convention Center Renovation and Expansion Project RECOMMENDATION: It is recommended that the City Council authorize execution of amendment #1 to the construction manager at risk contract with Hunt/Byrne/Smith, a joint venture, in an amount not to exceed of $43,000,000.00, for a total contract value of $73,000,000.00, including an owner's construction contingency allowance, for phase 1 of the Fort Worth Convention Center Renovation and Expansion project (City Project No. 102582) DISCUSSION: On November 29, 2022, City Council authorized (Mayor and Council Communication (M&C) 22- 0971) the execution of a Construction Manager at Risk (CMAR) contract with Hunt/Byrne/Smith, a Joint Venture, in an amount not to exceed of $30,000,000.00, including an owner's construction contingency allowance, for the Fort Worth Convention Center Renovation and Expansion project (City Project No. 102582). This CMAR contract allowed the multi -phased project to start and time sensitive tasks to be started. The original Mayor and Council Communication stated that the project would advance through incremental Notices to Proceed for various tasks. This allows the contractor to order material that have long lead times, and initiate other tasks such as site work, utilities, demolition, relocation of building functions and elements, etc. as required. The M&C stated that other amendments to this contract will be required and will be recommended to City Council for approval. Based on the current progress of the design and project at this time staff recomends execution of amendment #1 in the amount of $43,000,000.00 The overall project costs are expected to be as described in table below: PROJECT COST 11 TOTALS Professional Services (Project Management & II $10,293,527.00 Design Contracts) CMAR Construction Contract (Including Owner's II$30,000,000.00� Construction Contingency Allowance) I CMAR Construction Contract Amendment #1 11$43,000,000.001 Administrative Costs (Staff Time, Additional ITS, AV, Security, Building Infrastructure, Major Maintenance, $7,706,473.00 FF&E, and Moving Costs) Project Contingency II $4,000,000.00 PROJECT TOTAL 11 $95,000,000.00 1 http://apps.cfwnet.org/council_packet/mc review.asp?ID=31394&councildate=9/12/2023 9/29/2023 M&C Review Page 2 of 3 The project was initially funded through a $52,000,000.00 ARPA Grant (M&C 21-0934). Based on current scope requirements the additional $43,000,000.00 increase to the contract will be funded through both ARPA and 2023 Combination Tax and Revenue Certificates of Obligation bonds (M&C 23-0250). Waiver of Building Permit Fees - In accordance with the City Code of Ordinances, Part II, Chapter 7- 1 Fort Worth Building Administrative Code, Section 109.2.1, Exception 2; "Work by non -City personnel on property under the control of the City of Fort Worth shall be exempt from the permit fees only if the work is for action under a contract that will be or has been approved by City Council with notes in the contract packages stating the fee is waived." DIVERSITY AND INCLUSION BUSINESS EQUITY OFFICE: Hunt/Byrne/Smith, a Joint Venture agrees to maintain its initial Business Equity Firm commitment of 30\%, for Construction, that it made on the original contract and extend and maintain that same Business Equity Firm commitment of 30\ %, for Construction, to this first change order. Therefore Hunt/Byrne/Smith, a Joint Venture remains in compliance with the City's Business Equity Ordinance and attests to its commitment by its signature on the Acceptance of Previous Business Equity Firm Commitment from executed by an authorized representative of its company. The Fort Worth Convention Center is to be located in COUNCIL DISTRICT 9 but will benefit all council districts. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Grants Cap Projects Federal Fund and the Certificate of Obligation 2023 Fund for the FWCC Expansion & Prj Mgmt project to support the approval of the above recommendation and execution of the amendment to the contract. Prior to any expenditure being incurred, the Public Events Department has the responsibility to validate the availability of funds. TO Fund Department Account Project ID ID FROM Fund Department I Account Project ID ID Submitted for Citv Manaqer's Office bv: Originating Department Head: Additional Information Contact: ATTACHMENTS Program Activity Budget Reference # Amount Year (Chartfield 2) Program Activity Budget Reference # Amount Year (Chartfield 2) Dana Burghdoff (8018) Steve Cooke (5134) Brian Glass (8088) 21 FORT WORTH CONVENTION CENTER CMAR REVISED GMP funds availabilitv.r)df (CFW Internal) 21 FORT WORTH CONVENTION CENTER CMAR REVISED GMP Updated FID.XLSX (CFW Internal) Acceptance of Previous MWBE Committment Form - Executed 230804.pdf (CFW Internal) http://apps.cfwnet.org/council_packet/mc review.asp?ID=31394&councildate=9/12/2023 9/29/2023 M&C Review Page 3 of 3 Form 1295 Certificate 101064035 - Executed.pdf (CFW Internal) FORT WORTH CONVENTION CENTER MAP.Ddf (Public) SAM E J Smith Construction & Enaineerina Inc.r)df (CFW Internal) SAM Hunt Construction Group Inc.Ddf (CFW Internal) SAM Thos S Bvrne Ltd.Ddf (CFW Internal) http://apps.cfwnet.org/council_packet/mc review.asp?ID=31394&councildate=9/12/2023 9/29/2023