HomeMy WebLinkAboutContract 28107AM�NDMENT N0.�2
STATE OF ��XAS
COiJN1'Y O�' �ARRANT
0
�,
CITY SECRETARY CONTRAGT NO.
(Na M&C Needed)
� �
WHEREAS, the City of Fort Warth (Cityj and APM & Associates,
Inc. ,(�nginee�) made and en�ered i.nto Ci�y Secretary Cor�t�ac� No.
269D8, (the Contract) whiah was a�thor�zed b�r �he City Couneil ]�,r
M&C C-i8fi�4� on the 26�h day of June 2a01; and revised by one
previous �.enendr�rient; and
WF�REAS, the Contrac� involves eangineering services for the
�ollowing projee�: _
Water and Sani�ary Sewer Reglace�ent Contract 2001 S7.'M-�.
WHER]�,P.S ,
said Con�ract
maximum �e�;
it has beco�e neces�axy ta execute Amendtnent No. 2 to
to irio�.ude an incxeased scope � of work azici revi�ed
NOW THEREFORE, City and Engineer, acting hereiri lay and through
their duly autlzorized represen�atives, ers�er into �he foll.owing
agr�emen� which amends �he Contrac�:
1.
�rticle I of the Cont�ac� is amended to a.nclude the addi�ional
engineer� ng serva.ces speci�'a�ed in a praposal Ietter dated June 25,
2�02, a copy of which is attached he�eto and incorporated herein.
�h� cos� to Ci�y �'or the addi�ional design services �.o be performed
hy �agineer to�al $�3,St�5.00.
�
Article IT of the Cantraa� is am�nded to prav�,de for an
increase in the maxiz�►u�n �ee to be paid to ]�ngineer for a1], �work and
services performed under the Cont�act, as amended, so that the
�otal. fee paid by the Ci�y for all work and services shall not
exceed �he swn o�" $108 , 4 95 .(� 0.
� '�►I� � :� . : . ,, ,i��� �
� � � IF��Y
1 tl ; � w
u i, ��
¢
�.
A11 other pro,crisions of the Con�ract which are not expr�ssly� amended
her�in sh�ll remain in fu11 farce and effect.
R -
ExECi]TED on thi.s the da�,r of --- '�, , , 2002, in Fort
]�orth, Ta�rant County, Texas.
ATT�,�,T :
r_, _ ��.,.. ' . - �-- -�- - - -
G�.oria Pe�son, Ca��y S�cretai^y
S � ; ` '
Oantract Autho�i���io�
Date x
APPROVAL RECtJN�NDED :
� ' ' '
� %,d,�
� � - --- — --
I•1. Dougl.as Rademake�, P. E.
Hirec�or, Dapar�ment af
Engineer�ng �
�r�s & Associ�T�s , �c._� ,
�r�Grr��� , ., I
1 p �l6 ' , r i --- �.
By �r. .� �- -
7 '/ ;� �i''_ '
%
N�me: k�nald L. O'Gonell, P.E.
Vice Presiden�
_1Q1 S. JenninQs Avenue, Suite 21�
F'or� Worth, �'X 76iO4
AI�PROVED AS TO FORM AND LEC�A,LITY :
� �-���� .
/
Gary Steinberger . — _�
Assxstan� City Attarney
-2-
. ..'• R
�Ma�c A. Ott
Assistan� Ci�� Manager
. ,... _,Y �,1�T��/ �
hy,,q
�v'�i �� ���"�3�'��ib
�I� o �`%'i1.'��IIIIqQ �►�INS
� e AP�I & Associaies, Inc.
ENGIl�iEERS � PLANNERS e SURVEYURS
,lune 25, 2002
l�l�. �a�esh Ghaubey, �.E.
Project Manager
Department of Engineering
City of Fart War#h
S'I 1 Lamar Street, Suite 310
Fort Worti�, Texas 76�02
RE: Water and Sar�itary Sewer Replacement Contrac# 200fi — STM-B
Water Project No. PW53-06053417611 Q, Sewer Project No. PS�8-�70v80175440
DOE Project �fo. 3320
�ee Pr�oposal fap Confipac� �mendmeni iVo. �
Dear Mr. C�ta�bey:
Dall.as
Fort Worth
Houston
APM & Associates, lnc. is submitting �his Fee proposai for Amendment No. 2 to the contract for
t�e abo�e referenced project based or� addiiional servicas requested d�ring the design pF�ase.
The foflowing is a brief descript�on and cost for the additiona� services provided on tf�is project:
Revise comp�eted plans to incorporate the p�lverization ot al! of the streets, except for
Baylor St., Hillside A�e., an� Oakdale Dr., affected by fhe canstruc�ion of this projec#.
Svbtota! Pulverization:
iofal Con�ract Amendmenf No. 2
$'13,845.�0
$'� 3,€34a.OD
For additiona! services provided p�rsuant to this Amendrnent Na. 2, we request compensation
in an amount not ta exceed �'hirteen Yhousand �ighf l�undr�ed f�mrfy Five �olla�s
(��93,�45.00�. Such payment shall be made-in accarc�a�ce with th� payment terms specified in
the Contract.
Summa�y o�' Cant�act �ee:
Original Contract Amaunt:
Amendment No. 1 (Approvetf 03/20102)
Amendment No. 2 {Not-fa-�xceed):
$ 75,800.40
� �s,s�a.oa
$ �i 3.84�.00
Revised Contract Amoun� (Noi�to��xceed]
$9 08,��8�.00
We hope that yau find this satisfactory for yo�r �rocessing.
Sinc y
Ro . O'Cannelf, P.E.
Uce Presidenfi
100 �V. Central Expwy., Suite 210 101 S. Jennings Ave., Suife 20� 8700 Commerce Park Dr., Suite 137
Dallas, TX 752D� Fort Worfh, T�C 75104 � Houston, TX 77036
(214) 748-4888 Fax (214) 748-4991 (817) 335-2456 Pa�c {8I7) 335-2467 _ (713) 77i-1597 Fax (7i3) 777-1919
i—�, �' I j _
�1 � �1 � !
� ' , � � ��, �. —
, �� � �
T4:
FROIVI:
DATE
A. Dougias Rademaker, Director, D�E and
Marc A. Ott, Assistant City M�nager
Rakesh Chaubey, Project 1Vlas�ager, DOE
October 15, 2QQ2
RE: D�SIGll� FEE �A11�E�iTD1VIEIVT I�TO�. � Tfl WATER AI�TD �AliiiTARX SEWER
REPLACEli�IENT COl'�TRACT 2001 STM-B, BQE �4. 3320, V�ATER FROJECT
NO. P�V53�460�30176110
The propo�ed amendtnent will r�imburse APM Assaciaies, �nc. �or the following add'ztional services
they provided on t�ie project as reque5ted by the City:
The design of the necessary grades to a1low for the reconstxucti.on oi the applic�ble streets on
which th� existing water and sanitar�r sewer lir�e� a,re to be replaced.
APM 8� Associates, In.c., bas requested rei.mbursement in the amount of $13,845.00 for the additional
design services, thereby increasing ihe contract fee from $94,650.00 to $108,4�S.Q0. I believe this fee
is £air and reasonable for the additional s�rvices that ware provided.
Please authorize the addition�l fee by your signatures on the attac�ed carrt�rac� amez�dm�nt form.
Rakesh Chaubey
Attachment
cc: �erdena Hamilton, Water Department
Dan Pe�on, Water Depa�tmezrt
i� ��
t�=
ENGINEEAING D�PARTMENT
THE CITY OP FORT WDR7'H * lODO THROCKMORTON STREET *' F'ORT WORTH, T�as 761D2-631I
(81� 87J.-79�l1 * �nx ��z� s�ri-7ss�
� Printad on recycled paper