Loading...
HomeMy WebLinkAboutContract 58509-A158509-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 58509 WHEREAS, the City of Fort Worth (CITY) and Quiddity Engineering, LLC, (ENGINEER) made and entered into City Secretary Contract No. 58509, (the CONTRACT) which was authorized by M&C 22-0846 on the Ilth day of October, 2022 in the amount of $ 425,645.00; and WHEREAS, the CONTRACT involves engineering services for the following project: South Hulen Street and West Risinger Road Intersection Improvements Project, CPN 103312; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $18,693.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $444,338.00. OFFICIAL RECORD CITY SECRETARY 3. FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas S Hulen St & W Risinger Rd Intersection Improvements Prof Services Agreement Amendment Template CPN 103312 Revision Date: November 23, 2021 Page 1 of 5 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth William Johnson (S 29,202315:20 CDT) William Johnson Assistant City Manager DATE: Sep 29, 2023 APPROVAL RECOMMENDED: ENGINEER Quiddity Engineering, LLC Mark Holliday (Sep 17, 2023 32 CDT) Mark Holliday, P.E. Vice President DATE: Sep 17, 2023 _A.. Lauren Prieur (Sep 26, 202317:16 CDT) Lauren Prieur Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. PAW1 v Ka bA, Fanta Kaba, P.E. Professional Engineer OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas S Hulen St & W Risinger Rd Intersection Improvements Prof Services Agreement Amendment Template CPN 103312 Revision Date: November 23, 2021 Page 2 of 5 APPROVED AS TO FORM AND LEGALITY: DBlack (Sep 29, 202311:37 CDT) Douglas W. Black Sr. Assistant City Attorney Q,d4vvop�� ATTEST: .00 °moo o 9 d $tea o=°d °°`�`� Qm,,�.rmdca, % xs aa�� nEX pv6°.0 Jannette Goodall City Secretary City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 3 of 5 M&C: N/A Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX S Hulen St & W Risinger Rd Intersection Improvements CPN 103312 FUNDING BREAKDOWN SHEET City Secretary No. 58509 Amendment No. 1 Department Fund -Account -Center Amount TPW 34027-0200431-5330500-103312-003930-9999- $ 18,693.00 22010204 Total: $ 18,693.00 City of Fort Worth, Texas S Hulen St & W Risinger Rd Intersection Improvements Prof Services Agreement Amendment Template CPN 103312 Revision Date: November 23, 2021 Page 5 of 5 FORT WORTH® ATTACHMENT "A" Amendment No. 1 Scope for Enaineerina Design Related Services for Intersection Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The obiective of the Hulen Street / W. Risinqer Road Intersection Proiect is to improve capacity of intersection bv: Median work to relocate all left turn lanes to create zero offset. construct NB riaht turn lane and channelized island, uparade traffic sianals, detection, and communications, upgrade pedestrian sianals, warade pedestrian ramps for ADA compliance, sianinq, striping, and utilitv adjustments. WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design (30%) Task 3. Preliminary Design (60%) Task 4. Final Design (90% and 100%) Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Permitting Task 10. Quality Control/ Quality Assurance TASK 1. `1-C6IGNI MANAGEMENT. ENIC_INEE •ill manage the weFk e„tlined in thio o^epe to ensuFe effinient and effeGtive use of ENGI .EER'a 3 n � tm a aRcFe Se„Pees. ENGINEER �.A." manage GhaRge, eemm„n0Gate the CITY's Prelegt Manager and ethers ti noeessary to make nregress en the werL 9 Lead, manage and d!Fenf design team aGt!Vitiec 1 0 Gommunisate internally among team members Tools and alleeate team rese„Fees 1.2. C Attend a pFe_rdesign pFeieet LinLgff/nharter meeting with CITY Yti' G!aFofy s E)pe , `d „RderstanCITY ebientnies andanens„re enenemieal anandf„ngtienal des+gna that meet CITY requirements City of Fort Worth, Texas S Hulen St at W Risinger Rd Intersection Improvements Attachment A CPN 103312 PMO Release Date: 07.23.2012 Page 1 of 21 FORT WORTH® • Attend two (2) field meetings with CITY representatives iRGI ilding Traffin Managemep#e 0�prier #e the 30/ and 9010E oubmittalo. • GGRd6IGt and deGUment n9enthiv prejeGt update meetings with CITY PFE)jeGt Managef • GGR dUst review mee#ipgs with the ('ITY at the end of each • ( `design ph03& GR d6IGt and ides amen# hiwee 4y design teem meetings ``JJ • Conduct QC/QA reviews and dowment those aGtiVitieG. Refer to TaSk 10 f0r fUI4he-F details • Prepare RVEA'oes e in aooerldanoe with A44erhment Q to thio Standard Agreement aR d submit mep#hly in the format requested +by, the CITY • Prepare and submit men#hly Preie3t StQtUO R9p3rto in th-e formal pravided by the FeSpeGtiV3 Trsnopertation anld Pu blio Works Department. Standard Agreement1 - with the Gity's SpeGifiGatien 00 31 15 eRtitled ..0 ..pril lip Prejeot Riolt- -ir, preliminalry Stakehelder Gemplete Men#hly M/VVBF Peper# Cerm and Final Summory Payment Pepert Ferrvm at the eR d of the nreieot �T.♦T.1:Fi:ES7iAfLi�.T.Si. _ �'il:T7:R7rR:1rSf7. _ deSigR With respent to ngerdinatien with permitting autherities CAI(_ FFP I�l�" , ohall GommUnioate with permitting autherities si soh that their regula+epy requirements are appropriately refleoterd in the ldesigno. ENGINEER ohsll work with regulate Fy autherities to obtain appraval of the designs, andanmake changes neeessaFy #e meet their req iirementr Qc pvt of the design mope legatione a the EN INFER ar-f Ito oub into Shall Germ readily visible 0 nformatmon 0deRtifYiRg the Rame of the company and the company representative. ASSUMPTIONS • One (1) pre design nreieet kinkeff/nhar+ering meeting • Two (`) field review meetings • Three (`) monthly proient update meetings during design phase • Two 2) plan review meetings • CeVenteen (17) biweekly design team meetings (301 minutes for each meeting) *--All oabmittslo to the City will he Quality shesked prier +o oubmissien. City of Fort Worth, Texas Page 2 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 2 of 21 FORT WORTH® Project ,design ph-ms is 1m+isi • Project sons+r,,s+ion phone io untispated to take Twelve (12) men+hs.r �} • Ton ('10) mePthly updates of Preieot it--V-\j Paperts t\AVV f� rr�,, TPDE, rli& Register, andannreies+ Csheydule DELIVERABLIES A. Meeting oummsriec `"'i+h as+inn i+ems C. Bao9line design sshedwle D. P climinary-Pfe}eot Riok Rs-g+ster-,�liminsry StakefalreF Register, and iMiRaly Pr�`Jmmunic-aticane `rs Plan E. Monthly SGheydl,Ie updates with cnho,lu k narrs:iVe decnrihing nn" nurren+ nr antioipateld soherd,,Ie ohanoes F. n+hly Prejeot ctstSV` Reports G. MORthl TPQE opreadsheet updates rI"1,--Menthly PFejc`Jt RiOk Register updates �-.—Plsn Eiibmittal r`hesLlis+s (coo Task 1-9) j . Menthly ORYGOGes� K. Men+hly IVINVRC Pener+ Cerm ai4d Final ✓Jmmsry- Payment Pervert Corm TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The -Gen optaal Pasign ohsll ba submitted to GITV per the nnnro"ed Proion+ Cashed Flo. The pwpese of the senseptual design is fer the EN INGER to identify, n, rvmrvmde"eleneuninate threugh the defined ydelnyerablesandanreGGI`nmend the design nennopt th1 auGGessfully addresses the design problem anrd to obtain the CITY's eR dersemePt of this nennopt ENGINEER will !develop the sepseptual rdesigR of tho infr&\3trb'.etwre as follows. 2.1. its SslleetiE)R raffic Aisrer.eft CVsel spreadsheet of Pain, 24 heur an = T�Gount Data: A d Turning Me"emeRt ( OURt data gathered st 15 minut R�slo St s minim,,m OR all raw data GGI!eGted. Pre"irde tinily ✓urnmaries by Apprennh and Peak Perieyd- ✓immaries-by Appreaoh. ✓areadsheot ohall be "pleaded +e the rlesUrnen+ Management felyder 'TPVV Traffio amount E-Nsts' t In addutien te data ebtawned frem theCITY, ErTGNCSGR �enll research nnyd male efforts to obtain Pertinent information to and in seerrdiPatiep of the prepeserd imnre"eme its with any planner) futwe imprevemn ntl th1 micy infl,,ense the preient. ICCP will also ildePtify aR d seek to obtain data fer existing nePrditi t ��.. � ono t s< msy Plano, and prepeirty ewpmnchip '� Q\yallablle fc fre r'mti-e T�cssesssr''s effricc City of Fort Worth, Texas Page 3 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 3 of 21 FORT WORTH, • Th�GINCCR \yW consi il+ w #h the CITY'o TrsnopeY#a#ien and Public; VVerl/O Department, Water Department and ether CITY departmonto, public utilities, pri�ia to utilities,utilities, private utilities and government ag8R686 te determine the approximate IGGatien of above and undergFeund and other fadlities (GuFrent and future) th1 havo sn impae+ or influence en the nreiec+ • The data GGIIeGtien efforts will also inGlude Gen&Gting SpeGial GOOrdination meetings. reuting li 2.2. Csbo�:rface Utility Engineering Prevoclo Cubour-Face Utility Engineering /b'ILIC1 per Task 2.3. Utility Glearance • EN II\CCC will develep the design of CITY fscilities to avoid or minimize conflicts with existing utilities, and where kReWR and possible Gensider potential future Utilities in designs Where ennflietc Gannet he avoided, Utility cenrdina+ien of GOnflietc Will begin at thq Seneoptusl P'as+gn phao�-. • In the case of a public Utility conflict the ENI (`,NEER will design CITY faGili+iec to ave'd er minimize GeRfliGtS with existing utilities, and where I"newn and pessible Gensider etontial fut�rs utilities in designs • In the nose of a private Utility Genflic# the ENGINEER w4kpmvida a PDF e# of plans with the Utility eenfliets highlighted and a 1\ilit�`GE)Rflioto T"blq of these GoTni-fi!"etS to be wed in a UtiRy Glea,ra!RoeLetter feFoeeFdina+fen. The ENGINEER mayTeed4e ceerdina#ien directly with the private utility previd er if thct provider needs +o undertake Le ^design to adjust their utility's lenatien • Th�aINFaFe . Ch-1uplea� s PDF file of the appreved pr0minrry plan set #e the designa+ed+preiert folder in the GitY's i � decmcnt m"ncgement system (BIM 360 fer forwardingtoall Utility cerrpanies which have facilities within tho limito "f the prefer# The PDF file should he created dirertl y frCADm the CAfiles T 7 e Gen t ual design age shall inchide the fellewing• Dr 1i i ceder and indev �. ��TEep�.y,, ��,-r�r„ r :� i m m ark of sheets including prefect limlto, area lca-leGatiion map snd beginning and end station limits table. Summary page and each design sheet shall incl ude a quantity take off tam InterseGtion Control Evaluation Revert /li`C\ cerridor a. nolvsis sheer al ig nmen#/feasibility st idv •--Serte0ptU0I iSWM-Ghectliot in aGcordance with the ci irren+ CITY i(SIA(M CC,IrI as Manual for Site Development and GORStrUGtion, GonsideriRg intended projeGt SGepe is Only +e medif y evicting inle+s affected by the additien of +ho torn lance -Full i nterceGtien drainage review er design ion't proposed. (zJJC plan sheets sealed by a licensed prnfeccinnal engineer registered in the C+a+e v of vrTe car. City of Fort Worth, Texas Page 4 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 4 of 21 FORT WORTH. t C)(lot;nn typical sections of the roadway to he constri acted aleng with propesed typical seGtlgns which of Udine the proposed improyemont... Typ'Gal seGt V Ia7 existing and prepesed lane widths and direGtien a rro�ns eviexicting and proposed ourbo�, oirlewalks earl retaining walls •eeoptu,-.l plan cnd prefile sheets showing existing and preposed herlZontal utilities,readway aligRimeRtS, existing and proposed ROW, eXiStiRg and proposed sidewalks alignments (profiles). Don,,mentatinn of kepi design decisions t EoVrnctes of prehahle constn,ctien nest Three (`) sets of 11 "xi 7" so nl&+nc will be delivered fer the ` 00/ design DDC files created from design CAD drawings will he uploaded to the designated project folder in the City's doci imvrlt monSii Dement system (RIBA 360). ENGINES- 7 shall net proceed with Preliminary design activities without on opproyal.�-vul by the CITY of the Goncopt.�0l D8S'gn Package A. Coontioptual Design DaGkane B. Conooptual JDosigort Tr��*�oount &�s D. Traffic Gngineeripg Study E. GovnGoptuol iC\NM Chedilist TASK 3. PRELIMINARY DESIGN (60 PERCENT). Rr1; iminruy plsno and spedfiGativnc chsa -bo ✓`;bmittad to CITY per the appre„ed Drojent S c hvch e Buie. ENGINEER well develep the preliminary design of the infrastn icfi ire as follows 3.1. Th9-P4:\1iminory Design Drawings and Spedfinafiom ohs'.II invli ide the fnlloWinn• Preliminary cover and index of sheets inch ding prefect limits area location map and beginning and rvi� 31,,,ati3n limito. t SUE IC ets sealed by a licensed prefessinnal engineer registered in the State � c n a .,res ofof Tvrar. table. Summary page and each design sheet shall inch ide a ni iantity take eff o b� City of Fort Worth, Texas Page 5 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 5 of 21 FORT WORTH® • Prellminar„ iSVVM CheGkIist in asgordanse with the g,,rrent CITY ICW�Aw-Glck*ia Full I' onl„ to mod if„ existing inlets affegted by the addition of tho turn Icnes. Full i ntnsestien drainage re„iew er design ion't prey • Traffic Control PIcn inGluding all GGRGtF6IGti9R SigRage and pavemvit mcrkiRg_ - ..ill b �+� �n ,�,.+�hr}hn_ latest nt + n of the Texas �Ann� nl en I Inif n-re latest rr-ef the Texas `Jrm Tra A PrejeGt GeRtFGI Sheet, showing all GentFel Peints, used er set while gathering da Generally on a mole of not Ic+--\c thCn 1 :A00 The follo,e,ing information shall he i ndisated for eagh Control Point: Identified (existing City I\Aon,,rv,ent ifQlM PK Nksi1 5/8" Iron Pod\• Y V and 7 Ceerdinat identified seerd•nate system and a oa, in an iQep�,Tre� tea;,-,� , rfe red beaFiRg base. Z r—\&tNM 9RI„�cGGICiptive !ggatign (i.e. set in the GeRteFliRe E)f the iRlet OR the 90161th GUrb IiRe of North Side [Drove at the East eRd E) radius at the Se,,theast server of North Side Drive and Alerth Main Street\ Updated readwa plsn snd Prefile sheets displaying statign and goorrdinate data for all heri alignment D C 's D T 's D ' Fen and ele„atien data of all „ertinal Tr.�,-r�81�rn1„�21�T,--����� .I. 9; Ot�l nrgfpr &e-� 1...`.'c.� I-.T.'O P.I.'O 19W Points and high Points• lengths of „ertinol c ryeo , , , , , grades K values, a, and „etigal olearanges where required. •ENE) le thin t".ve-bepGh markspaariprefil�et. • Bearings given on all Pro Posed genterlines er baselines , • Overall PrGjent easement la„e, ,t sheet(s) Preliminary traffin signal and readwa„ details to include s,,rhs s,,rh v`FQn j.77n_einfs d iveways sidewalks and Pa„eMent details Pam` `�� • Preliminary signing pavement ma 4Ri3> illuminsti lighti��g GR Sig„al peles\ and Signalsl layer Ne sepia illumination plana sre pFepesed. t Cotim(atss of nrehahle GenstIFUGtien ,+ost 2.2. /DCSCD /Cr1\ 2.3. Constr,,stahilit„ De„ie,n, • Drier to the 60 Percent review meeting With the CITY, the-€PSG-IDEER shall sg�heddule and attend a nreiest site visit with the CITY Preiegt Manager and CenSor,,stion P song to walk the e I!� ICCD I ze the CITY's per�„,T one-�refeE� � �" . 0 a, 9umman��� gomments from the field visit and Oubmit thin Information to the CITY in \y4 City of Fort Worth, Texas Page 6 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 6 of 21 FORT WORTH® After the preliminar„ plsno have been reviewed and cpprov e-CITY, the ENG IEER 9hall prepare prefect exhibits aR d atteR d ope (1) public mooting to help o)cp;sin the onto. The -CITY ohs!! seleot a ouitsble IGGatiGR tip,e and date. The Engineer needs W GGGrdinate with the Git p eieot manager t f„rmat tl4o mailing list of all affented prepert„ ewners annerdingl„ 2f. Utility Glearanee � N INEER will .de„elep the design of CITY facilities to a„eird er minimize cenflicts utilities,with exi6tiRg identified at the Gencnr-#QQl _NhQcq and begin at the Preliminary Desio- n phaosa- In the ease of a public Utility conflict the ENGINEER will design CITY facilities to GGIRIsidep petontial futbre Utilities OR desigRG ffi In the ease of a private Utility GGRfllct the Will kill pre„ide a PDF= set of plans .. with the 11tilit„ eopfliets highlighted an,d P. �Rillty `G44oto Tsbla of those conflicts to he incl� „der! ifi, (`I ranee Letter for eeerdina n at ch design milestene The rcrcu In a Utllrcv—vTeararrc�rvrcvvra-rnutf8rru�ea c II`1ECU msy utility need to eoerdinatien directl„ with the private pre„ider if that �.. provider Reeds to undertake design to adjust their 6.`Illty Th�GINEER ohsll aplead a PDF= file of the appre„ed preliminary plan set to the designated prefect folder in the Git„'s rdocl lRgVgt m&nrbgement s„stem (RINA 260) for �h ing to all Utility eempanies which have facilities within tho Ilmlto of the prefect. The PDF= file sheuld he Greated d!Fectly frem the CAD files CN(` INEER lit„ as_b� gilts an`d(er de field „isits to confirrvm relocation is =��IN��.. te-obtsin :�tiR�o - �� ��o�-r-I����} r�omngletee as i4n d the the utility has been relocaterd in accorrdance with the plsno, rG004 • N INEER tq upload all ut&v w builto in the City's ,dg,.,,mi\nt m,�n Qgemept s„stem (Rion San) �-vrrvi-vcm 3.6. Tree Mitigation • ENGINEER will engage the services of a licensed Landscape Architect to provide the following: • Scenario Planning -The Landscape Architect (LA) with work with the ENGINEER and City to explore three scenarios for landscape and irrigation improvements as described: Option 1 — replant in the existing Hulen and/or Risinger medians using an active water meter, if there is one. Option 2 — replant in the existing Hulen and/or Risinger medians even if there is no active water meter. Option 3 — replant along the walking trails in a nearby City park such as: • Chisholm Trail Park City of Fort Worth, Texas Page 7 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 7 of 21 FORT WORTH® • CP Hadley Park • Hulen Meadows Park For each scenario the LA will provide a brief Opinion of Probable Cost of Construction. Landscape Design - The LA will use the site plan provided by the Client to produce preliminary and construction documents that detail the Project's construction requirements as it relates to landscape planting. Plan sheets will include landscape plans, material list, and landscape specifications and details. Additionally, this document will include any City/County required landscape calculations and will serve as a site plan submittal document for the City/County. The LA will coordinate with the ENGINEER and CITY for elements related to conceptual plan/layouts for 60%. The LA will provide preliminary design plan sheets at 60 and 90%. LA will provide construction drawings at 100%. Special specifications and details will be provided at 90 and 100%. Irrigation Design — The LA will use the site plan provided by the Client to produce an irrigation design. Specific documents will include: Irrigation Plans, Irrigation Specifications and Details — Including schematic location of pvc mainline pipe, pvc lateral lines, irrigation heads, drip zones, controllers, sleeves, valves, meter and backflow devices. All drawings will be signed and sealed by a Licensed Irrigator in the State of Texas. The LA will coordinate with the ENGINEER and CITY for elements related to conceptual plan/layouts at 60%. The LA will provide preliminary design plan sheets at 60 and 90%. AWR will provide construction drawings at 100%. Special specifications and details will be provided at 90 and 100%. • Opinion of Probable Construction Cost — The LA will provide OPCC at 60%, 90%, and 100%. • Construction Administration and General Meetings — The LA will assist the ENGINEER AND CITY in construction administration through shop drawing reviews as it relates to AWR's services. Throughout the project, AWR will be available as needed for conference calls or virtual meetings. This scope includes two (2) site visits or meetings completed upon request, up to 4 hours each including travel time. • Additional Services - Any services not described in the Basic Services will be billed as Additional Services, on an hourly basis as described in Compensation section of this proposal. • Excluded Services - Excluded Services are not a part of the Basic or Additional Services and are the responsibility of others. Excluded Services include but are not limited to the following: Installation; subsurface conditions; soil issues (including suitability for plant material, soil content, level of compaction); lot line location; drainage; utilities' location; signage; security; and lighting. Excavation, survey, installation, diagnostics and as -built drawings related to irrigation are excluded services. The Landscape Architect agrees to provide its professional services in accordance with general accepted standards of its profession. City of Fort Worth, Texas Page 8 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 8 of 21 FORT WORTH® ASSUMPTIONS • Three (3) sets of 11"xi 7size p!&-no will be delivered for the 60 design for review (ine (1 ) set of spesifisatiens will be delivered fer the 601% design PCF fileG Greated frorn design CAD drawings will be uploaded to the desigRated preleGt folder in the Gity doG 1YY1iznt management system (BIM 360) *--All oubmitted des"ments and nheddists will he u pleaded +e the designated preies+ folder in the Git y's door MVgt mi&rwgement system /RIBA 36!11 The CITY's fren d to I spesikatiens will he used. The CAI!_ IFFY =�T �eR��rc�+C—a,�rsccrrr � ed�„�� I ��", o h a l I 611pplement the teohnlgal spedfioations if needed • GRe (I) Public Meeting iy &XNJ--' 124-ffi • EN INFER ohs!! net nreseeh Final Pesign as+iVities without written approval by the CITY of the PFellminaj lle ioSn plano. DELIVERABLES G. GeeteGhRiGal Report D . P 0minery iSVVM GheGk st E. Eotimst F. Public Meeting exhibits TASKI. FINAL DESIGN (DA PERCENT) AND FINAL CONSTRUCTION DOCUMENTS /100 DCCT 1pon appreyal of the Dreliminoni plans ENGINEER will prepare oonstruGtion plsno s3 felle Ys + Finsl draft GGRStFIJ on Wi1cm (90'%) innli ding spenifinotiono ohcll bo oubmitted to CITY per the appreved Dreiest Cshedl ale • The ENGINEER will previde a PDF set of plane with the Utility nenflints highlighted anr! a Utility GE)Rfl+oto Table of those oonfliots to he insli ided in C l;t✓Ii; Glearanoe Letter for final • Follow Rig a 90 oonstn iotion plsn review meeting With the CITY, the EN WEER ohclt oubmit Final Plans (1000 ) to the CITY peF appreyed Dreiest`shed Ie Ea oh r���Tr� �p thc�� �-,-�cc � ��Qoh plan oheet shall c oQmp9d dater! and signed by the FAI!'_I I\JFFR rimed in Sate ef�.s. t Final iCRlipA Gc,hTecnckmlrist�eEe,rdunse =with the cen t ivvrGFgeFiaManua! for Cite rc City of Fort Worth, Texas Page 9 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 9 of 21 FORT WORTH. evicting inlets affegterd by the addition of tho tarn lanoo. ,Vll intersegtion rdrni sr --design ion't pro � A QN sntity ✓immary Dacie will be !RGludedin beth the 90-O and 1001% desian n.,nl�s. Cagh design sheet of these pagLau insl irde a q iantmty take eff table The CAI%'INEER shall cl:`bmmt an estimate of probable geps�gtion nest With bath the 900% The � � � . nTC�rr',� � Gvrr7 ri [rvrrCivJTwT 17v Zl'R�v'7v and 100 design �pa� kaggee? T4i, t— J Imll wce standard CITY er TxDOT hid items as appligable ASSUMPTIONS Three (3) sets of 1 1"x17" size drawings and eRe (1) set ef speGifiGatiens will be delivered fer the Q-00- Design paGkage C rd DVVF file fer the 90 Design will he greater) from design CAD drawings anrd Will he uploaded to the proiegt folder in the Gitv's rdogi rnent mcns+nernent system /RIBA 36(1\ 0 Ten (10) sets ef ee the 1 nnoi Design paGkago n-r��vv�-o-vc��n�crcrc�c�� 0 Desigil will be Greated frern design CAD drawiRgs and will he i iplearderd to the preiegt felrler in Gity's rleG imvnt monogement system /RIBA 3601 DELIVERABLES A 90' ns n plans and sp gL irding QG/QA rleGl im tatien r-�v7�EArr..rt1"� EtF e ��f8�}$��} carrr�n�crcrvrr. D. Utility r Gatfien QeG Qm IItQtifenr C. Final iS\NIM plan ( Final gheGk list) D. 100' c�n�rEtian pass and spegifigatiens ingli irding Q /QA rleGl imentatien � E. Detailed estimates of probable rnstri i en sts ORGI irlin ries of bid items and ��efa-iT � Ee„�ac��E�.�-,n�,,,s o u m m s quantities using the (MTV's or TvnOT'o standard bird items and format, s\9 applicable F. Original 11 "xi 7" size Gever mylar for the signatures of ai itherized CI�ffi Dial . TASK 6. RID PHASE SERVICES. The CITY reserves the right to bird the preiegt either via traditional preiegt bird to .4S unit priv- alternative delivery. ENGINEER will si ippert the bird phase of the proiegt as follows 5.1. QiS Ssppe-rt Th�GINEER shall aplaad all plans and "entrant rdogi iments onto the Gity's Celt management system (RIBA ` 60) fer aggess to petential bidders Gentragt dens MEXItg.:i'?Ibe upleaded in c .nlo fill 4 Unit prise Drepesal dogs iments are to he greaterd wtilizina the giWo snit price -tee) enly anrd gembinedl in s opeg,fie,d spreadsheet werkbeeL Rid prepesal Vverksheet Template, that will he pops slater! and Genfigi fired sa ftt all pages are gomplete and r City of Fort Worth, Texas Page 10 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 10 of 21 FORT WORTH® t#o ✓immary Werkshee+/s\ in the werkbeek detail and auterna+ieally oummariza the totals from the inserte. Unit Pri^e Proposal doo,,ment werksheets. Plan gets are +e be ,,pleaded +e the Cit y's deGui: ent mcnsgerrien+ says+enq (BIM 360 df and d��yf files a pdf Will p+ of on file of the tiro plan orm��, . pa, tea, �r eeaa� o,�,T �,�ea�, r,T set. The wf Will sepsis+ of indw yid, gal files ene fer each plan ohee+ and w 11 be , , numbered and nanged in a mannor oimilsr ta that ef ths ; LQn aot�.r Th�GINEER fFE)PR � Plan P ona in this c.nt mane^omen+ system (BIM 36 Th�GINEER Will develop and implement preeed„res for resenrino and ans,nyerino thereto The Inn ohall be housed and maintained in the nrnie^t'c folder titled Request o Information The ENGINEER Will pmyide teehnieal interpretation of the ^o ntra nt feWooto, in theyam ef addenda. The IPICr'P chcll uplsad all ap onto the Git y's deGIJ e+nt mansgemen+ says+ern (BIM 360) and mail addenda +o all plan heldeFs. ��iEilTT:E�:7T.rTw:�:�:4 � • a • • . . f7T��lYr�� *- \ )lct ft CITY in determining the nualifi^atiens and a^^b FiLklllty ^f nrecpe^ti�ie Moro, 3Nb , and suppliers, •— Whon 3ub3titutuen prieF te awaFd Gf Ge oto io all9wed in the ^en+ra^+ de^„men+^ the EN Will advise the CITY &\c to the aooeptabilit y of alternate maiviIQ mnrd Attend the hid opening in ouppart of the CITY. I to apd review all bids reoeiyed for the ^onstr,,stion prole a CITY a u�c ot, aooiot t erin r evaluating bids,and reGGIFFIlmend award of the GE) tetraGt. A eepY-afthe Bid Tabulatiso and the GFW - Uts Spreadsheet are to he ,,pleaded into the proieot's Rid Results ant mycn9gemen+ says+em (RInA 360) Ineorpora+e all addenda into the ^^ntra^t den,,ments and issue senfermed sets with all anioraved addenda GG RStrUetien desUmen+s Will only he made available en the Gity's den,,men+ mapaoemen+ s ys+em /RInA 3a^.n\ for plan holders and/or niVep to plan VieWiRg rooms. PiNc, !:'\ sent rmmnege�Me C says+em /QInA man\ DELIVERABLES City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 11 of 21 S Hulen St at W Risinger Rd Intersection Improvements CPN 103312 Page 11 of 21 FORT WORTH® A. Addenda B. Bid tabulatians G. ReGGIFFIrriendatmen P, Final iCWnn (`he^Lrs+ E. (lenstr,,stien i-des,,rvmentS (spnfermeld\ I=. GF= Data .Crprea.J-srrhee��t a ENGINEER will support the senstr, on phoog of the preiest as fellews. 6.1. GGRStreEt+on ✓jppart The ENGINEER ohall prepare one \l) took orrder pa^La^e for the CITY'o Unit Priee GentraGtGr. Th�GINCCR ohall attend the pre seas+r„s+ien senferense. After the ^e the CAI('_ ICC� �rre--�'2-C�ln$t�I�C�F9F�C� erC�nc�c,-ram. �,-�v ��.. ohs!! and attend ene (I ) p,,blis meeting +e help onplain the prepesei-d preies+ +e residents. ThA CITY ohs!! seleot s ouitsble Ire^n+i^n and mail the iRyitatiron letters to the aff^n+^r7 Th�GINCCR ohall atteR d monthly or bi_weekly ^opstr„^tiop progress Mee+iRg (during the rd,,ratien of senstr,,stien The EN INEER will prepare Meeting notes .with as+ion items and distribute to the proie^t team Th�GINCCR will prepare a G9F1Str,,stien i`emm,,nisatien Plan detailing the ammuni^a+inn bet deep the Droie^t Delivery Team members and the Th�GINCCR ohall review shop rdrawiRSO eJsmples aReth3r oubmittclol oubrn#te4 by the sentraster fer general senfermanse with the design ^ensepts and general ^`+mplian^e with the requirements of the sentrast fern C 8yiew shall onotruotion. ✓.soh r�,c�v-�r,urr net relieVe the Goptra Gtor from its res^onoibili, for perfermaRGe in a^^orrdan^e with the ^r)ntra^t for ^en641 i^tiGR , nor is s, ,^h review a Sucrcntao thst the the shep a, oamplas-and oubmittalo io frpe of errer^ nmissi^ns. The CAI%`INCCR ohall I , osmples and other oubmittea!o in Qu----osw-. As requested by the UTY, the CAI%'IAI CCU 9yirde nesessara interpretatiens . c-�rv-vrr,��. , ahall pr and ^larifi^atiops of ^ontra^t r+o^,,meRts , rd resp^nto Request for IpformatieR (DCI) f„ rn the centraEter, FeyieW Chan e eraers and make reGeMmendat;ono ao to the aGGeptability of the work. The ENUNEI_I? will meet with the Dreiest delivery Team and Gentrastor on site to review any field ^hanges City of Fort Worth, Texas Page 12 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 12 of 21 FORT WORTH. The CN Q - Ordinate inn ZTPW depar#min •��, n C E l? will ee�th tkx, r,�a�a-rcr,�� nt ate, n9eessa Fy. The Engineer will update and oubmit monthly the Droie- Ot& W\i Resort, Riok I� Register TDQC and relent C'nhedi ile "h' Th�GIINCCR ohsll 3tt8ndtk►o "Final" prnient walk through and assist with preparation of -final pun h lost. E2 Clennrd Drawings Th�GINCCCI ohsll pr-apare renord drawings from information previded by the CITY depin#inn aR y nhanges made to #ho Final Drawings during nenstri in#inn Infermatinn provided by the CITY may ORGIUCIO, but io not limited to the fellewing- • o Quilt Sure e Red _Line Markups from the Gen#ranter 6 Red _I inn n�srkupo from Gity Inspenter e Cepies of Approved (change Orders e Appreved 8ubotitNtioos Th�GINCCCI ohsll m9dify tho Final Drawings ele^trenina4--,snd ohall plssGe a stamp on the plans indina" that they represent Renard Drawings of the prnient as GonStrUGtedo stomp oh�whether Athere signed and dated by #hn Nlr_ EINEER and oh all b2 planed en eash plan sh9e , ether are any r� i/ ...... en the sheet or net Canh sheet shall nlearly indina#e all changehi #o that oheet by Glee iding and numbering ✓�I��a�`1�means.s.. e nr ether m The fellewinn disnlaimor shall ba inGl uded with the Qennrd DraWing ststmp.- Th�GINCCCI ohsll o:�bmit a set of soaled Final Drawings, modified and otomped as Renerd Drawings in Adobe Anrehat PDF format (version 6.0 or higher) and in DWF format The ENNIGINEER may keep nepies of the information provided by the ( ITV for their filoo, but cll original red_lined drawingo ohall ba refi hoed to the CITY with the digital filer • he c --hall Ine one (1 ) D11C file and one (1) DWF file for the planset and C d DWF file for the \Nat e# if required. sir C sepaKato � and or plan s� eq� Eaoh o � and file shall Gontoin all ornconia#ed sheets of the partio�r plan set. cinciular PDF and DWF files for eaGh sheet of a plan set � mil not he aGeent� DIDF and DVVF files v�.a--�vr sheet rc�. r. rrrr-rrvr�.-cfcrirp shall nonferm to naming nonyen#inns as fnllews• 1. TPWfri n�naammcexample "\A/_1956 ndf" whereiW-1956" is the assigned file number obtained from the CITY as —erne designating the file is of an original plan set,"4Z" ohsll ba the otal number of shooto in fts file. City of Fort Worth, Texas Page 13 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 13 of 21 FORT WORTH® IlWater and C e name ample ��Y_2r667 ern4Q p df" where ��Y_2GGG7" �zer-a„a-oewf �„�-r,�e�-��-��a�,--�ner{�-�� is the assigned file nU Umber ebtainerd from the CITY "_erg" .designating the file is e��,insl plan set "3 " shall be the t3tcl numbeF of sheato in thio file �Tt.7:LTI - 1a:fiIII Qn,4h PDF and DWF file` &ell k . the Gity's ideeU U„,ent mcnsgemen+ sys+ern (BIM 360 For iRfOrmatiOR OR the 3r mcnner to submit files aR d to obtain a file RIUmber for the preiee+ the CAIr_INFCP cheU i d neerrdina+e with the City preieot manager. File nU Umbers Will no+ he issued to a preieet U Unless the appropriate preieot numb have been assigned aR d are in the Department of Trcnop fie. ASSUMPTIONS • Gne (1) PU Uhlin Meeting i J s oume4-. • Twenty _Four (24) site visits a wJimed-. •--Sox (E) --,bmittal reviews c ccum-ed-. • Two 2) RFI's arc o3v ime4-. • One (1) Change Order arc &\3rjv.. &d-. DELIVERABLES A. PubnG Fneet!Rg exhibits B. GenstrU Untien GemrvmU Uninatien Plan v. Resppoonse e[e GentraGter's-Req �n Request fer Informa D. Review of Ghange ilrlders "``11 E. Review of shop rdraings F. Final Pv.neh ! ict iten}s G. Redigital f ernmaa,tt ENGINEER will suppert and perferm aGtivities related te RQVV and land as eut"Red belew, per r� seeping ldireetien aR d gU Uirdanee from +he CITY'3 Praieet Manager 7.1. Right _of_Way Peseareh Th�GINCCP ohsll determine Fights _of_way, easement needs fer eons+rU Uetien of en�Tayailable infermatien and re GGIFnmenfdations will he made fer appreval by the CITY. City of Fort Worth, Texas Page 14 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 14 of 21 FORT WORTH. 7 0 Right _nf_\A/ay/Gassman# Drenaratien and ✓.abmittsl. 7 The ldnni imenta#inn shall be provided in nonfnrmanne with the nhenLlists and templates available en the City's rdnni MIXIt mi nonemen# system (BIM 360 reset ernes felyder. 7 '2 Tempnrani Right of Cp#ni Drepara#inn anral Submittal Drier #o nenstrUGtien the Cnl(_IKIICCE.D ohOU' d neerrdinate with the Gity prnient mananer to irdentifV all needed Temnorary Dinht of Entries from Ianr!o\e/naM. It is assumed that letters will only be required for land OWRers adjaGeRt to temporary The dOGIUMeRtatien shall be provided OR GeRfermanGe with the Ghedldists and templates available en the City's dIGGIAmcnt m"nagement system /RIBA 360 resnwees folyder. ■ 1 ■ ) infermatien available at the start ef the projeGt and available en ground pFeperty en reds-, feRGes, stakes, etG.). it does net indude effort fGF Ghain of title reseaFGh, pareRt traGk 1 ■ FeGeFds, Fight street Glesure-&-. A Cet (4 ) Easement rh' tnnrmeets and het nls preyiieren CITY ferms TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. � N INNER will perform field surveys to nnllent horizontn..l cnjyertinal elevations and other infermation needed by ENGINEER in design anld preparatien of plans far the prejeGt. Infermatien gathered during the survey shall iRGlude tepegraphiG data-, eleyatiens of all tonitary and adianen# s#erm sevVars rim/iRyer# eleva#iens Jena#inn of utilities,buirmed 0 trees (measure 0 identify overall 0 qualified arbori6t identify spedes of and ether features relevant to the final and have plan C n drainage at in#e rse s will heverified by field surveys. Cpo# its. �xiotin9����c�+s���i�-,T���:-op� elevations will be shOWR on inteFseGtien layeluts with GrOSS slope to fit interseGtiRg grade lines.. City of Fort Worth, Texas Page 15 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 15 of 21 FORT WORTH® •—mho minimum ours Icicnc ahcll innl„de the fellearRg: A Prel et she,�i•na ALL 1 Gen�l Deints used or set whole ��e e�r,��rr TT'vl'fTL.��JccrVr.Tr. �wrtrfr. gathering data. Generally OR a onale of net lv-c then 1 A W- 1 kj b. X, Y and Z GeAFdona+oo, in an identified GGGrdina a system and a referred hearing horn % neerrlinate en''ITY r—\,&tum aRly-. ��■TtTl�I:Et:�I��TSS�.'.tll��dtil:�i".*-TITS. TTi11:TT.S�7:77i:1rE'�i:�iT��%�iL7TiR7. Coordinates an all P.C.'o, P.T.'o, P.I.'s, Manholes, `/�s, etc., in the same GGerdina+e &.atom = theme Nec3o thL\n +w heFozental benoh msrks per lino er leea+ien Statlan equa+lens relating utilities +e paying •-hon apprapriate. 8.2. Temperary Right of En+pr Drepara+ien and ✓abmittsl • Drier to entering prepeFty'r�r the CAI!]I NEER ohsll oFdinate with the Gity's preient manager+e identify, mailrd anobtain Tomperar„ Right of Entry frern landowners r:r_�:. :sou::rratrrrfr:�r.*srts�:sr:--errsrsrr. 8.3. S/ibourfano Utility Cng,neer,ng Previclo Sijb3urfose Utility Engineering (SUE) te QuLevel n G Q and n a. described bel"�ec.�vw. Tho iUE `\hell be perfopmed�a GGE)Fa'nno With GI/ASGE 38 02 end UGtaate •nyec a e g n rds Geunty4ATV r Via«„-ro-��tlg�, ' ��ea�;rrer�eee, eeards, peroenal inope^+ienc e+n.\ to help ir•len+ify Utility GwRwo that may have fadlities Within the preieot limito or that may he affe Gted by the preiee+ • GollectappliEable FeGGFdS (e-g., Utility rter base -rya, "aa built" or reesrd r•Iraw!Rgc, r+permit renerc , field notes, geegraphrm ue infea+ien cw3m d&& afej utilities. •Develop JJE plan ohaets and tranafar infprma+ion on all invel"err „+ili+iec +„ appropriate n plan oheetc elentrenin filet and/or ether rlen,,mv9 c en required. depiGted, indiGate: utility type and ewnership; date ef depiGtieR; quality level(s); end City of Fort Worth, Texas Page 16 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 16 of 21 FORT WORTH® neint& of any utility data; I i rs �t tw a (e.g., active ahandened,eurof venvirse); lrnine size and GGIRIdition; number of joint , I ierd nobles; aR d encasement.- y Level c t+c tw),/z ec described for Quality I ey W identify surface feat,,res from nreiect tenegranhic fiats and from field ebseryatiens that ore supface ann,,rtenances of oubourfa^e utilities. Survey surface features of oubourface , itilit y facilities or Systems, , , if sch features have net already been swye yei-d by a nrefessional ourveyer. If nreyieusly surve yei-d , check survey data fer acc,,ra Gy and cemnletene6 The s,�y ok�cll OIL o oubourfcGe utility feats Tres visible at the rrreunrd sugace\• `Jetc+rminskir'n of invert elevations of any manheles and Vaults• , kKaulto; any surface markings .meting oaboarface utilities furnished by Utility eWner& • CVercise nrefessienal judgment to correlate data from different se,,rces and to reselve conflicting information • Update date (er nreparo) plan oheet&, elentrenin files, l'danther ether eGurnents to reflect the ORiteffation of Quality (Level D aR d Quality Level G information. • Recemmenrd fellow up investigatiens�g., a onal ourvey& con&,,(+a+ien with utilify rrCT owners t he needeto f,,rther reselve rdiscrepancies e�o. � ms�i rd • Provocle Quality Level G to ideRtify overhead utilities OR the PFOjeGt and ppovide the overheard utility information en tho JJC plan oheets. I eVel Q (incl,,rdes tasks as de&cribed for Qualoty Level G) s„bsudace Utilities within the nreieot lirl ones a psrtioulsr a`ility lip Based on an internretatien of data� mark the ,nrdiGatinns of utilities en the gre,,ni-d surfaGeTor subsegUeRt SUFVey. Utilize paint or other Rq art aGGentab„le for marking Of InRes. of multi sendwit systems RecommeRd additional meas, Tres to reselve rdifferences if they still evict CeceM menrlationo may incl, „de ai-d`Jitienal er different &,,dace geephy&ical Methelds , explerate Fy evcayation or upgrade to Quality Level A data. *--AG un .a,.1t9matuye to the physiool marking of lines the EN InCCR may, with CITY'& apppeval, utilize other R;eaRS of data GOI!eGtOOR, storage, retrieVal, and , that enables the nerrelatien of &,,dace geephy&ical data to the preie ' e- control of o aur�. City of Fort Worth, Texas Page 17 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 17 of 21 FORT WORTH. Level A • Evnese and Innate i itilitito 1 3p • T�zontal and Vertinal Innati ASSUMPTIONS Two Level A test holes have been added to the five (5) originally in the contract. A total of seven (7) Level A test holes (4-8 ft depth) are included. °. ff iDraw'Rg of the proient layot with dimensiono and Geerdinate list A. B. JJE plan drawings sealed by a professional engineer regicctered in the State of Texas. TASK ENGINEER will previde permitting ci�i+nner+t�fer the CITY #e obtain any and all agreements and/nr pormito normally r required fer�va preejeGt of this size and type a Tfrell�3 9.1 Texas Department the the Texas °r�rncrhiteotural Barriers An+ Ghapter 69 Texas Admini&native- Cede0 mhaving �and henee fcmilisr with the governmental ov`harities havg irisdintien +n appreve the design of the Rrnient • EN INEER io responsible far providing plano that TAR requirements-. • Submit nuns#ri in#ien dens invents to #ho TD R • Semple#ing cll TLll R ferms/applina#iens nenessary •—�toin the^Ia+ref Subotsntisl remplianne frem #ho Tnl R •--Req c-sit an ina.p from TS`R or TRLF! Innally approved Registered I Annessihility Spenialist ne la+or than 40 nalendar days after pens#n in#i1V1 r►V a',nt�s.� nemple#ien Advise the CITY in Writing of the results of the inspen#inn • Respending to agennY nnmmen#s and requests •--All 6CNtC nN,-'nniated with TIiiR plan rgview and inspentiens are to he paid by the ICED during the nei arse of the preien# J.2 C'-tarm Water Relli Linn Prev on Plan City of Fort Worth, Texas Page 18 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 18 of 21 FORT WORTH. • For pprrovjeoto thot diot,A cn area greater than one (� (1) aGre, the GeT;ran ^+� will resnnnsihle for preparing -and oubmitting the Storm Water Pollution Dreyen+inn Plan (C\A/DDD\ Lei' I Ila+eFy ag e e r will prepare +h C\vv�-vlM GGIRSt�,—r,-7�it appropriate-re���genc�es. � �er�,�ep�-�,�e� {-LIIG+inn PlanaGGOrding to the GUrren+ CITY iCIAW Gri+oria Manual for Site Ileyelnpment and GenstFyGtien which will be inGorperatnrJ into the C\A/DDD by the Gen+ r. 9.3 Elaedplsin CerVises bnreWde detailed scene if ('I (1AA17/l QA,4R anG//or floodpia n permit is requirelI . ITT glPl.V.T_76\ No fens are required fer City Elnodplain parmit DELIVERABLES A. Genies of Permit lie+iens D.eples of Approved Permits ENG NEED t Plan (QG/nn Dlan) e I+linipg the CAI(_`INCCD'o methe d of ensl Iripg the highest levels of design and aGGI IraG y ern i Merpera+eid in+e the GaIGI Ila+i3na, plsno, OPSGifiGa+inns and estimates ENGIICED espensihle fer and shell Goerldina+e all sl Ihn ide quality .��.. is r anou tsnt s.,s+iyity +e inGl r avid sensis+en Gy of plans Ifi f at during the Ge Irse of reviewing & submittsl of any item it hesom Cn apparent to theCITY that the submittal Contains errn rs nm iss inns and i nsnnsiste n Gies +hn CITY msy Gera review and ret Ire +ha oubmittal to +h IGINGGP, immediately fer apprepria+e aG+ien n + �.a�amI Irn ittd ma+erd +e the ENGINEER fer this reason may he reieG+ed by +he CITY Praj&c4 Manager. 10.1. QG1QA of Survey d JJ E Rats • The TEED' Cen all ��.. s Sury,.✓Iran �, �+ prnGeldl Tres field sl Iryevs A1� and prn`dl IGts prior to delivery to the JTY. ThY may else require the Eel(_ NEED' C ie yer +e perform a Q lality ♦ se review ��.. o ��:r� ...�iran�-r�,�� of the survey y and/or oub91'rfa% utility engineering (SUE) work performed by ether surveyors d JJ E p raviders. • EN INEED'o Surieyer shall Ger+if y in writing via a le++or the the survey y inferma+inn previded has un PrOGess. City of Fort Worth, Texas Page 19 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 19 of 21 FORT WORTH. � N INCCD'o Cubsurf2se Utility Engineering provider shall ^ertify in wri+inn �iia a le#or that tho JJE inf"rma+inn provided has undergone a Quality Centre!/ Quality &v.,7/-- n se preGess. 0 EN INSGP, chall perform a QGQA review of all rdGGLImepts hniRg oubmitte revie of t all ctoges of the design Or inghe ` 00/ (. 01 and 900/ anrd Final lieeU inept design review oubmitt---�o. nA should be performed by an irl diyirdi ial within the fiwho io not nn the design team 0 EN INSFnP iC to aeLnewlerdne that each item ep the Detailed GhHot hao baeR i nGluded by he Linn "rdene" on the ^hno lldist. If a pertib-u!ar pheGklist item is net appliGablo, this should -be by Ghe^Linn "NA". If an entire GhenLli��SRoT appliGalo, thio ohoulyd he inrdi^aterdbhh y GIe^Linn every item en tho lick ci "I'VA" and Still ORGIlu derd with tho s�bmittsl. The -€NG-lNGGP ^hall 6�re the Detailed GheoLlist A Gernment Resell ition Log mwt be used to rdeG invent ^onfli^}inn ^emmen}s between reviewers and to highlight ^nmments made by the UTY that ths io n design ICC� o} ipsnrpnra}inn into the rdnriimrdents alma with the assn^iate ��.. o;#r-nation The ENGINEER shCm17 ll use the Gement eselutien Leg preyirderd by CITY. i—�"` The rdeG imentatien of a nG/nA review insli irdes (1) a Gepy of the ooler_^erderd er+glnsl marked _Lip rdn^i invent (er "^heok print") rdeyelepert during the nA she^Linn PFOGess and/er review forms wh!Gh sequentially lost dGGIAments and aSSE)Giated nGemmTx V, ci nd (2) a�gn_o�beet with gRaatti ire�bpperSeRnel inyelyerd in the ohe^Linn pre Gess V `pc moy also he rdeGl imenterd i icing the Comment Resell ltinn I —En. Evn den^e of the QG/nA review will he required to a^^empaRy A sNbmitt &-. DOGUmenta+ion ohsll inGdo, but io not limited to the fellewipn items. PDF of the ^nmple+erd Detailed GhesLlists PDF of the of /nA rheGk print of the oslouls�ions, plans, op86fTcatiens, arnra estimates rdemonoti"ot;ngi thct a review has been i inrderta LenL, PINF of previous review ^emments (if any) and the EN In espenses to those so Monts in the (comment Reselutien Log, If any of the abe„e information is missingis incomplete or if any nomments are net adequately addressed; the CITY mad' rnntart the ENGINEER and rent lest the missing information. If the ENGINEER does not respond to the request within 'ail houro, the -CITY ohsll rejeGt tho submittal. No additional time will he granted fer a wed oAmittsl. If the Fnl('_I CER so not adeqataddressed i the Eemm enis, the sbm' + o ^. m be reie^terd anrd returned to the ENGINEER imma diateli to address the issues. •—�'�II oubmittalo to the City will he Quality Ghe^Lerd prier +o submi�ie� City of Fort Worth, Texas Page 20 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 20 of 21 FORT WORTH® Iik:,0'111aAl. Add'f' nr. oGes r. f ir,oluded in the tinci none of nr-iio d ENGINES ,� �e�at- ���e��a-�,T�e�i-sue,, ���or ��es CITY an ag-reo thst the . ICC� an provide the a if n i Ines he sure to frank ohanoes However, ��.. �,rcee-se�+�s�ee ter— the-.ITY'o writtearequest. Any addonsl amounto paid fe the ENGINEER ao a result of any material change to the Ceepe of the Pro jot ohall ba agreed "pen he s„re to traek ehanees in itiRg by both parties before the se. A -es -.- Berformed. These additiGRal GeFViGeS ORGIUde the WF fellewing • Appraisal and negotiation of easements er preperty annuicitien • Ceryiees related to development of the CITY'o pre1ent finaneiRg and/or budget. e bid e bid FejeGtien and re bidding of the oentraot for eenstri lotion • Co on msnsgemenf and insnoetien 6e44%6 • Ceryiees beyond the antioinafed twelve (12) month eonstn Ietion d� gyration • Ceryiees related to eleetrieal engineering design for illuminstion of proieet area • Perfermanoe of materials testing er sneoialty testing seniines • Ceryiees necessary due to the default of the GG Rtraeter • Cer\Ilees related to damage `+r+WCgd by fire flood earthquake er ether ants of red. • Cer\Ilees related to warra Rty OlQlmo enfernement and inspection after final eempletien. ont, bring, defend or as int in litigation Undertaken or defended by the GITV requested by the GITV City of Fort Worth, Texas Page 21 of 21 Attachment A S Hulen St at W Risinger Rd Intersection Improvements PMO Release Date: 02.06.2015 CPN 103312 Page 21 of 21 ATTACHMENT B COMPENSATION AMENDMENT NO. 1 Design Services for S Hulen St at W Risinger Rd Intersection Improvements City Project No. 103312 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateaory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2022 Rate 2023 Rate ($/hour) ($/hour) Project Director (PE V) $275 $290 Project Manager (PE IV) $255 $270 Project Engineer (PE 1) $175 $185 Engineer -in -Training (DE 11) $145 $155 Designer/CADD (Designer 1) $130 $140 Administration (Admin 11) $100 $105 ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 1 of 4 S Hulen St at W Risinger Rd Intersection Improvements 103312 AM ATTACHMENT B COMPENSATION iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 2 of 4 S Hulen St at W Risinger Rd Intersection Improvements 103312 AM ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Prime Consultant Quiddity Engineering Coordination and delivery of project Proposed MWBE Sub -Consultants The Rios Group Subsurface Utility Engineering Gorrondona & Assoc. Survey Gorrondona & Assoc. Easement Documents (if needed) Gorrondona & Assoc. Utility Clearance (if needed) CJ Hensch Traffic Counts AWR Designs, LLC Tree Mitigation Non-MWBE Consultants TBD TDLR Review and Inspection TOTAL ORIGINAL AGREEMENT Fee Amount $363,688.00 81.85 $41,050.00 9.24 $21,500.00 4.84 $6,400.00 1.44 $4,000.00 0.90 $2,000.00 0.45 $4,800.00 1.08 $900.00 0.20 $444,338.00 100% Project Number & Name Total Fee MWBE Fee MWBE % S Hulen Street and West Risinger Road $425,645.00 $68,700.00 16.14% Intersection Improvements TOTAL (Original Agreement + Amendment No. 1) Project Number & Name Total Fee MWBE Fee MWBE % S Hulen Street and West Risinger Road $444,338.00 $79,750.00 17.90% Intersection Improvements City MBE/SBE Goal = 15% City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 3 of 4 Consultant Committed Goal = 17.90 % (depending on services required) S Hulen St at W Risinger Rd Intersection Improvements 103312 LIM EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 4 of 4 S Hulen St at W Risinger Rd Intersection Improvements 103312 Level of Effort Spreadsheet Task/Hour Breakdown AMEND. 1 Design Services for July 26, 2023 S HULEN STREET AT W RISINGER RD INTERSECTION IMPROVEMENTS (includes right turn lanes from NB and SIB Hulen Street) City Proiect No. 103312 Task No. Task Description Rate 1.0 Project Management MaRagiRg iae� ease 1.1.1 Internal Team Meetings (bi-weekly-22) a- 2 1. .2 1.2.2 PreFi.l .ringisk-eff Meeting Field Mee ings (before so/ and 90/) 1 2 2 1 2 o.�eet Update MeetiRgS (47 YiFtwal...,,et ng) ai a .• 4 1 2 a MeetV....s Des gn Submittal Rey Prepare Baser Re e..l e t Ie o.epaFe nneethl„LD.ee.eee Reee.t6With 4--2-.6 eehed le n R v 127 11EaS6€-RBp9rEs 9RthIy-AA�.,) 1 17 a--24 �6IrJ@F @QisteF S9R iRveisiRg 1 2-0 Ie519R (30 P8FG8Rt) '1.4 B3 B6H0R — -- e Task - 2� Utility Glearanooe 24 SeRseptual D88 gR 2-4a e�SW PA-Gheckl st gFBJ9 61SIBR�9Q �1 3B PFetma Bs+ n (600H_ Pyre^nt) v3-.-1- RFBkR#F I \RQS 34a nu o.en.., neaee r. 3-2 Reserved City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 1 of 8 Level of Effort Spreadsheet Task/Hour Breakdown AMEND. 1 Design Services for July 26, 2023 S HULEN STREET AT W RISINGER RD INTERSECTION IMPROVEMENTS (includes right turn lanes from NB and SIB Hulen Street) City Proiect No. 103312 Task No. Task Description Project Director Project Manager Labor (hours) Project EIT CADD Admin Engineer Expense Total Labor Subconsultant Total Expense Task Sub Total Cost Travel Reproduction Cost MWBE Non-MWBE $4,740 $4,000 $4,000 $8 740 $0 $4.700 $100 $4,800 $4,800 $1-0,830 $0 $40�30 $1,248 $0 $4,240 $1948 $0 $949 Rate 3.5 Utility GleaFanGe 3.6 tree Mitigation Plan r� $275 $255 $175 $145 $130 $100 4 8 46 20 40 4 8 6 2 2 4� €ina�rat�0�/�-Sep stwstien�l aas-apd- 44 4.4a e l srF nLaAe)4 4-2 €ipa 00 /e} Wags and Spesifisatiens 4-2a nal Desigp{wBasQo o.eje, t ne..o.-ie., Legs s (90 and 190 ) 4 56 43T 2 0 3 $ 265 $0 $0 $0 $400 $"0 $7-1- " 4 30 65 400 4 42 30 20 40 2 4 6 20 40 4 1-2 $33,900 $1-00 $300 $100 $34,000 4 $7 74a $0 $7 74a 4 8 $4�, $349 $42, 4 2 $2,646 $0 $2;643 6 $—lm $0 $40,830 2 $1-,21-0 $0 $1,240 4 $3120 $0 U42-0 1 5$ FUd Phase 5.4 Bid Suppe ra 1 4 BIM 5:1-:2 5A-3 e t a o, ti a r F. 5 1 4 Attend c d Opening 54.5 Iew bidder 5 1 6 5�7 2 241 34 381 2 $47-,-565 $8 $0 $200 $2,000 $2,200 $WIM 4 12 4-2 4 4 4 8 40 48 2 Mi 48 -12 4 $1-00 $10W $2,000 $0 $0 $2,00 1 $1$0 $2 760 $0 $24W 3 $2,86a $0 $2,865 4 $4-,, 2 $400 $1-19W 4 $1-728 $100 $4,9W 2 $1 240 $0 $ , ^ 4 2 $4b45 $0 $4 945 4-1 2 $5,345 $2,000 $7-,,345 6..0 6.4 611 Construction Phase Spryonp-g Construct on Supper 1 41 $53,875 $2;$00 $56,675 I 1 41 I 4 $1-00 Q^''n City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 2of8 Level of Effort Spreadsheet Task/Hour Breakdown AMEND. 1 Design Services for July 26, 2023 S HULEN STREET AT W RISINGER RD INTERSECTION IMPROVEMENTS (includes right turn lanes from NB and SB Hulen Street) City Proiect No. 103312 Labor (hours) Expense Task No. Task Description Project Project Project EIT CADD Admin Total Labor Subconsultant Total Expense Task Sub Total Director Manager Engineer Cost Travel Reproduction Cost Rate $275 $255 $175 $145 $130 $100 MWBE Non-MWBE 61 2 Attend Pub". Meeton _ ---- 41 4 42 4 $3,3801 $100 $1001 $2e01 $3,580+ 64.3 e e 361 444 64-4 Sular.,o« Reyi (...,.,,.,..es4%,2,e.. .s ) 1 6 42 7:2 7-.3 temporary R ght of ln„t.., e� �bR4i#a4 2 4 4 2 6$ 8.1 6-2 8.3 Design urvey 4., , o, ,.f -„t.., S-brn ttal Subsurface Utility Engineering 0 2 2 1 1 1 1 0b 0^�;••;^s 9.4 2WIDPIP 9-2 o..,d......,,,...f.,i c.... d..,... 9b €aeedglain Sewises 9d 4.�nr 9� Ram -read 36 tB6R 9 9 61 4 2 4 21 2 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 43 48 $41 $900 $2,400 $3617W $0 $3630 $0 $2,340 $400 $3,030 $0 $5,495 $6,499 $>f�829 $6400 $7-;640 $0 $62 660 $63,440 $21,500 $21,930 $41,050 $41,480 $900 $64 0 $0 $3,420 $0 $540 $900 $2,440 $0 $7;445 0 3of8 Level of Effort Spreadsheet Task/Hour Breakdown AMEND. 1 Design Services for July 26, 2023 S HULEN STREET AT W RISINGER RD INTERSECTION IMPROVEMENTS (includes right turn lanes from NB and SIB Hulen Street) City Project No. 103312 Labor(hours) Expense Task No. Task Description Project Project Project EIT CADD Admin Total Labor Subconsultant Total Expense Task Sub Total Director Manager Engineer Cost Travel Reproduction Cost Rate $275 $255 $175 $145 $130 $100 MWBE Non-MWBE 40-2 QC1QA of Des qn Do 4 42 1 4 2 $4,145 $0 $4,11€ Totals 15 391 7061 804 60 11 $352,8601 $79,650 $9001 $4,1001 $2,800 $87,450 $440,31C City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Project Summary Total Hours 1,987 Total Labor $352,860 Total Expense $87,450 MBE/SBE Subconsultant $79,750 Non-MBE/SBE Subconsultant $900 5% Sub Markup $4,028 MBE/SBEParticj ation 17.9% Total Project Cost $444,338 4of8 ID Task Name Duration Baseline Start Baseline Actual Start Finish NTP/Project Setup/Kick-off S days Mon 12/5/22 Fri 12/9/22 Mon 12/5/22 Topographic Surveys 23 days Mon 1/16/23 Mon 2/6/23 Mon 1/16/23 SUE (QL-B) 34 days Wed 2/1/23 Fri 3/3/23 Wed 2/1/23 Traffic Study 43 days Fri 12/9/22 Mon 2/6/23 Mon 12/12/22 City Review (Traffic Study) 4 days Tue 2/7/23 Wed 2/15/23 Thu 2/9/23 Conceptual Design (30%) 40 days Thu 2/16/23 Wed 4/12/23 Thu 2/16/23 City Review (30%) 13 days Thu 4/13/23 Fri 4/21/23 Thu 4/13/23 Site Visit w/City 1 day Tue 5/16/23 Tue 5/16/23 Tue 5/16/23 Pre-60%Exhibit 15 days Wed 5/17/23 Tue 6/6/23 Wed 5/17/23 SUE (QL-A)-Partl 29 days Mon 4/24/23 Fri 5/12/23 Fri 6/16/23 Fee Amendment #1 58 days Wed 6/14/23 Fri 9/1/23 NA SUE (QL-A)-Part 2 28 days Wed 8/16/23 Fri 9/22/23 NA Preliminary Design (60%) 45 days We 6/7/23 Fri 10/6/23 NA City Review (60%) 7 days Mon 10/9/23 Tue 10/17/23 NA Final Design (90%) 23 days Wed 1./18/23 Fri 11/17/23 NA City Review (90%) 7 days Mon 11/20/23 Tue 11/28/23 NA Final Design (100%) 18 days Wed 11/29/23 Fri 12/22/23 NA S HULEN STREET & W RISINGER ROAD INTERSECTION IMPROVEMENTS City of Fort Worth, Texas Quiddity Engineering August 11, 2023 - DRAFT Actual Finish I% (Complete Nov'22 I Dec'22 I Jan '23 I Feb'23 I Mar'23 I ADr'23 I Fri 12/9/22 100% t Wed 2/15/23 100% Mon 3/20/23 100% Wed 2/8/23 100% Tue 2/14/23 100% Wed 4/12/23 100% Mon 5/1/23 100% Tue 5/16/23 100% Tue 6/6/23 100% Wed 7/26/23 100% NA 0% NA 0% NA 0% NA 0% NA 0% NA 0% NA 0% Nov'23 Dec'23 Jan'24 S Hulen St & W Risinger Rd - Intersection Improvements CPN 103312 103312-EPAM-S Hulen St & W Risinger Rd Intersection Improvements Engineering Contract Amendment #1 Final Audit Report 2023-09-21 Created: 2023-09-11 By: Andrea Munoz (Andrea. Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAUWx1 hZ7D179DUxZvePcOejteoKzieRNQ "103312-EPAM-S Hulen St & W Risinger Rd Intersection Improv ements Engineering Contract Amendment #1" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2023-09-11 - 7:02:21 PM GMT- IP address: 204.10.90.100 Document emailed to ann.estes@fortworthtexas.gov for filling 2023-09-11 - 8:41:53 PM GMT Document emailed to fanta.kaba@fortworthtexas.gov for signature 2023-09-11 - 8:41:53 PM GMT Document emailed to Mark Holliday (mholliday@quiddity.com) for signature 2023-09-11 - 8:41:54 PM GMT Email viewed by fanta.kaba@fortworthtexas.gov 2023-09-11 - 8:42:32 PM GMT- IP address: 75.32.196.26 do Signer fanta.kaba@fortworthtexas.gov entered name at signing as Fanta Kaba 2023-09-11 - 8:43:25 PM GMT- IP address: 75.32.196.26 Document e-signed by Fanta Kaba (fanta.kaba@fortworthtexas.gov) Signature Date: 2023-09-11 - 8:43:27 PM GMT - Time Source: server- IP address: 75.32.196.26 Email viewed by ann.estes@fortworthtexas.gov 2023-09-11 - 8:48:54 PM GMT- IP address: 204.10.90.100 Signer ann.estes@fortworthtexas.gov entered name at signing as Ann Estes 2023-09-11 - 9:03:26 PM GMT- IP address: 204.10.90.100 FLIRT WORTHS 1 Powered t'y Adobe Acrobat Sign Form filled by Ann Estes (ann.estes@fortworthtexas.gov) Form filling Date: 2023-09-11 - 9:03:28 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by Mark Holliday (mholliday@quiddity.com) 2023-09-14 - 1:12:59 PM GMT- IP address: 216.215.96.130 Email viewed by Mark Holliday (mholliday@quiddity.com) 2023-09-18 - 2:32:11 AM GMT- IP address: 23.121.202.244 Document e-signed by Mark Holliday (mholliday@quiddity.com) Signature Date: 2023-09-18 - 2:32:49 AM GMT - Time Source: server- IP address: 23.121.202.244 Document emailed to Chad.Allen@fortworthtexas.gov for filling 2023-09-18 - 2:32:51 AM GMT Signer Chad.Allen@fortworthtexas.gov entered name at signing as Chad Allen 2023-09-21 - 7:08:54 PM GMT- IP address: 204.10.90.100 Form filled by Chad Allen (Chad.Allen@fortworthtexas.gov) Form filling Date: 2023-09-21 - 7:08:56 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lissette.Acevedo@fortworthtexas.gov for filling 2023-09-21 - 7:08:58 PM GMT Document declined by Lissette.Acevedo@fortworthtexas.gov Decline reason: I need to meet to discuss the amendment. Why are we designing irrigation? Who is paying for the meter and water bill?Why are they adding internal meetings? that's is part of managing the project 2023-09-21 - 10:47:23 PM GMT- IP address: 204.10.90.100 FORTWORTH. 1 POHeY"Y Adobe Acrobat Sign FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: S Hulen St & W Risinger Rd Intersection Improvements Engineering Contract Amendment #1 M&C: CPN: 103312 CSO: 58509 DOC#: Date: To: Name Department Initials Date Out 1. Ann Estes TPW - initial Sep 11, 2023 2. Fanta Kaba TPW - signature Sep 11, 2023 3. Mark Holliday, Consultant Consultant M MH Sep 17, 2023 4. Chad Allen TPW - initial C C�*- Sep 21, 2023 5. Lissette Acevedo TPW -initial C�v Sep 26, 2023 6. Patricia Wadsack TPW - initial -Pz_ Y Sep 26, 2023 7 Lauren Prieur TPW - signatures Sep 26, 2023 8 Doug Black Legal - signature �,4 Sep 29, 2023 9 William Johnson CMO - signature W Sep 29, 2023 10. Jannette Goodall CSO - signature S � I-W Sep 29, 2023 11. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ❑ Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts(a,FortWorthTexas.izov at ext. 7233 or 8363, for pick up when coma_ leted. Thank you! Updated 08.22.2022, mdhm