HomeMy WebLinkAboutContract 42494-CO2 (2)CITY SECRETARY 424 - CO Z
City of Fort Worth CONTRACT NO..
Change Order Request
Change Order No.
Date
TPW Project No.
Funding (FAC)
2 (two)
01 /04/2012
C 285 541200
�803490121580
Facility and Project Description
City Secretary Contract No.
RD Evans Community Center Renovation
�42494
ORIGINAL CONTRACT AMOUNT................................................................ $232,542
EXTRAS TO DATE..................................................................... $ 10,170
CREDITS TO DATE.................................................................... $ 0
CONTRACT COST TO DATE.................................................................................................
AMOUNT OF PROPOSED CHANGE ORDER...........................................................................
REVISED CONTRACT AMOUNT............................................................................................
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS..................................................:........
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS.........................................................
ADDITIONAL FUNDING (IF NECESSARY)...............................................................................
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL:
Provide all labor and materials as per attached PCR's:
$ 242,712
$ 21,664
$ 264,376
$ 58,135
$ 26,301
0
PCR-5- Refinish south hallway wood floor. $ 719
PCR-6 — Replace and paint door to storage room. $ 722
PCR-7 — Refinish the existing activity counter drawers doors and facings. $ 4,126
PCR-8 — Build millwork cabinets to enclose electric panels in activity room. $ 2,144
PCR-9 — Install new upper and lower cabinets with stainless steel counter top, 21 additional days. $ 13,561
PCR-10 — Secure existing low voltage wiring to structure to meet code. $ 392
TOTAL ADD $ 21,664
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time
and money) for all costs arising out of, or incidental to, the above Change Order
Contractor's Name
Dennett Construction
Original Contract Time
Additional Approved Time To Date
Approved Contract Time To Date
Additional Time For This Change Order
45 cd
10 cd
55 cd
21 cd
Contractor a eft construction
Date
P rks Commu Dire tor;, �I ;1,2-
Date
Archite ral Services Manager
Date
D r, Transp�orta1tion an ublic works
Date
944
Proje Arohitelt / rt W man Architects
Da
As ' anager
ate
As,, ttor
Date
Council Action (If Required)
Date
❑ Approved ❑ Disapproved r
L-
❑ Other pO.aU
���
Distribution: A "J' 'a Q
File o
Construction Manager // I 9 c
Project Manager C� -� — �o
Contractor "� "}"" '",. f ity Secrre�tw �� o
Ronald P. tlourr'.5, J� �JJ
TPW Facilities Management Division * a
J Change Order Form (12119/01) a
0
YV� o ��
00p0090
110
OSd
OFFICIAL RECORD
oo°�c d
CITY SECRETARY
'Q ppO°°° v
lww5
FT. WORTH, TX
_a
Proposed Change Request Project RD Evans
cription: Wish List Canoes
PM / Supt SM / NH Date 22-Dec
Change Request Number: 005
Scope of Work Unit Cost Total
Refinish south hallway flooring (at same time as dance rooms) $ 642
Subtotal $ 642
Overhead & profit $ 64
Bond $ 13
Tax exempt
Total $ 719
a DENNETT
C®NSTIMUCTION
Bransom Floor Service, Inc.
Ectablishcd 1937
9L71N'oodward Streit
Fort Worth, Texas 76107-1446
817-334-0321/Fai 917-335-2507
Shawn Moore c/o
Dennett Construction
2313 Cullen Street
Fort -Worth, Texas 76107
817-882=9420/Fax #817-682-9424
817-8 96-964 9
e-mail: shawnm@dennettconstuction.com
Job site: RD Evans Community Center
BID
Sand and finish hardwood floors as specced 298.40 sq. ft.
Halls (at same time as other floor)
Natural Finish: (Regular)
Resurface complete
,Fill all cracks, holes, etc.
one (1) coat Sealer
``S,w(2) coats Traffic Com.erc-'al Finish.
(Gloss, oss or Satan) •
Screen and one (1) coat Gymthane finish 7500 sq. ft. Gym -
Custom Hardwood Installation
and Refinishing Specialists
bfs@bransomfloorseryice.com
December 9, 2011
Two ;2)
$ 641.56
$ 5,625.00**
Total -- $ 6,266.56
*Shoemold, T-molds, Reducers, etc. not included unless specified.
*Prices subject to change without notice.
*Slabs requiring excessive cleaning will be charged $ 65.00 an hour.
*Float work if any is $ 65.00 a pail.
**No Warranty.
All Services Payable On Completion. We Appreciate Your Business.
►vww.bransomfloorsery ice.com
4
Proposed Change Request Project RD Evans
PM / Supt SM / NH Date 22-Dec
vebuription: Wish List Canges Change Request Number: 007
Scope of Work Unit Cost Total
Refinish existing Activity Counter
Plywood 4 sh $ 78 $ 312
Plastic laminate 6 sh $ 86 $ 516
Shop labor 28 mh $ 45 $ 1,260
Field labor 28 mh $ 57 $ 1,596
Subtotal
$
3,684
Overhead & profit
$
368
Bond
$
74
Tax exempt
Total
$
4,126
FA=M=IQk1=*M
� WO-c", I I kN I;--- vim �
Proposed Change Request Project RD Evans
PM / Supt SM / NH Date 22-Dec
Description: Wish List Canges Change Request Number: 008
Scope of Work
Unit
Cost
Total
Millwork cabinets around electrical panels in weight room
Plywood
2
sh
$ 96
$
192
Plastic laminate
2
sh
$102
$
204
Shop labor
16
mh
$ 45
$
720
Field labor
14
mh
$ 57
$
798
Subtotal
$
1,914
Overhead & profit
$
191
Bond
$
38
Tax exempt
Total
$
2,144
LJIOENNETT
CONSTRUCTION
Proposed Change Request
Description: Wish List Canges
Project RD Evans
PM / Supt SM / NH Date
Change Request Number: 009
21-Dec
Scope of Work
Unit
Cost
Total
South Kitchen
New upper cabinets
18 If
$135
$
2,430
New base cabinets
24 If
$135
$
3,240
Stainless tops fabricated & installed
$
4,538
New sink and faucet
$
1,250
Repaint south kitchen walls
$
650
Please add twenty one (21) working days to allow for
changes to this project
Subtotal
$
12,108
Overhead & profit
$
1,211
Bond
$
242
Tax exempt
Total
$
13,561
glOENNETT
CONSTRUCTION
Tr]BE
eunc.
To: ShawwMoorr.
'DerLvt =C&nstrud'Gow
IZE. 1t1:)rwwwCo»ratnumity Center
FtWor*4 TX
SheetAl.0-Ro&m45
3100 W Viv,, 6&wSbve
Arbdngtons Te"w76012
817-261-5887-Offtae,
817-861-1528 - fax.
One, (1)16 gage-S/S Top "L' Shaped-11'-0" 9, 6'-0" 9, 3"-0', {ranttoback,
wXk8" kZ#k splaska,nd waUyandmar4n&edge owopews4U*aruLcut
out{or-drop-6m9+ -, A4bs'trute, ba.Se ca&netor
waWcabi w.r. $2.625.00
On&(1)16 gag&5/5Top -45" x•30" wiliv8" higi► Splas7vatwall�and.
marCn& edge. ow 0pew si4eS: We do- not awZvd & substrutes ba*e. ca&� or
waaCA&mez. $ 638.00
Fos our shop Total $4,538
W e w Uf6eU m,eazu res and delver and settopk &-your base ca vulety
for $1.275.00
satcerezv.
4644�
Sob Reeves-
8R/jg'
Shawn Moore
Subject: FW: Wish List RD Evans
From: Philip Butler [mailto:philip@parkerplumbing.com]
Sent: Tuesday, December 20, 2011 3:19 PM
To: Shawn Moore
Subject: RE: Wish List RD Evans
ull and reset new stainless sink and new faucet $ 1,250.00
From: Shawn Moore [mailto:ShawnM@dennettconstruction.com]
Seat: Wednesday, December 14, 2011 8:38 AM
To: Carrie Mayo
Cc: omar@spd-contractors.com; philip@parkerplumbing.com;
hill.quailridge@yahoo.com; khutchins@chasfwilliams.com;
Mike.Milam@fortworthtexas.gov
Subject: Wish List RD Evans
Guys,
Please send me line item pricing on the following items at RD Evans. Figure to paint new
doors to match existing. There are a few more items to do if there is money left over in
their fund but let's start with this. And see where we end up.
Refinish South Hallway Flooring
1.)Repair or Replace Lobby Door leading into Chemical Closet
2.)Refinish Cabinets of old Control Center to match new control center cabinets
3.)Cabinets or closet built around electrical panels in Weight Room
4.)South Room Kitchen
a. New Upper and Lower Cabinets or Refurbish current cabinets. (Which
ever is least expensive).
b. Stainless counter tops
5.)Dance Room
a. Paint on Walls and Doors to match Lobby
b. Change out existing lighting to something that can work off a dimmer
system
c. Replace existing doors leading into lobby to have windows to see in
1
►S . P. X3. Resources, LP Proposal No.
105294
Commercial Paint & Drywall December 15,
2011
WBE & Texas HUB Certified Small Business
P.O. Box 364
Voice: (817) 283-7325
Hurst, Texas 76053
Fax: (817) 283-6960
To: Dennett Construction
2313 Cullen Street
Ft. Worth, TX 76107
Attn: Shawn Moore
Re: RD Evans Community Center
3242 Lackland Road
Fort Worth, TX
Request for Pricing
RFP —1 Additional Painting
1) Paint lobby door leading into chemical closet. $ 60.00
2) Repaint walls in existing south kitchen #45.
$ 650.00
3) Paint gyp board walls and one side of doors in dance room 23 and 24. $ 1,830.00
4) Paint Pair of doors into dance room 23 & 24 from lobby $ 120.00
5) Patch and repaint north kitchen #25.
If you have any questions or need further clarifications, please call me.
Submitted By:
J /�r;!s
Matt Schmidt
Project Manager/Estimator
Paint Division
$ 250.00
Proposed Change Request Project RD Evans
PM / Supt SM / NH Date 3-Jan
Description: Low voltage cabling Change Request Number: 010
Scope of Work Unit Cost Total
Ceiling work
Clean up low voltage cabling as directed by inspector $ 350
Subtotal $ 350
Overhead & profit $ 35
Bond $ 7
Tax exempt
Total $ 392
DENNETT
CONSTRUCTION
Proposed Change Request
Description: Wish List Canges
Project RD Evans
PM / Supt SM / NH Date
Change Request Number: 006
22-Dec
Scope of Work
Unit Cost
Total
New chemical closet door
Unfinished door
$
180
Hinges
1.5 pr 27
$
41
Door stop
1 ea 2
$
2
LCN Door Closure
1 ea 212
$
212
Door & hardware labor
$
150
Paint door
$
60
Subtotal
$
645
Overhead & profit
$
64
Bond
$
13
Tax exempt
Total
$
722
glOENNETT
CONSi'FiUC"t ICON
Shawn Moore
Subject: FW: Wish List RD Evans
Shawn,
See below for the different pricing options for the doors on the wish list.
ea. 3070 Rotary Cut w d Door (Non -Rated & Un-finished)
$180.00 ea.
1 ea. Pair 3070 Rotary Cut Wood Doors w/ Narrow Vision Kits (Non -Rated & Un-
finished) $5O4.00.ea. Pair
2 ea. Metal or Wood Narrow Vision Kits (6" x 27")
$100.00
Excludes: (1) Frames
(2) Hardware
(3) Glass
Best Regards,
Kevin Hutchins
Sales/Estimator
Chas. F. Williams Co., Inc.
Phone: 817-332-6363
Fax: 817-429-9320
2/22/2011 Page 1
RD Evans Community Center
Qty Qty
LH RH Description Price Ext. Price
Revised 12-12-11
Hardware
All Locks to have Interchangeable Cores with C Keyway
Unit pricing for Wish List
1.5 Pair 4 1/2" x 4 1/2" US26D Ball Bearing Butts $27.00�$2
.5
1 .00
1 EA Schlage AL80RD x SAT x 626 Storeroom $238.00 $238.00
1 EA Schlage AL70RD x SAT x 626 Classroom $238.00 $238.00
1 EA Schlage AL40S x SAT x 626 Privacy $167.00 $167.00
1 EA Schlage AL10S x SAT x 626 Passage $147.00 $147.00
1 EA.. x AT x 626 Dummy $84.00
EA LCN Closures (1261 x 689) $212.00 $212.
11 EA Cal Royal W626 x 32D Wall Stop $2.00 $22.00
2 o al 4016 x 32D x PULPL Pull Plate .00
2 EA Cal Royal 4016 x 32 x us a e $6.00 $12.00
4 EA Hager 282D x 26D Flush Bolts $43.00 $172.00
2 EA Pemko 305CN x 84" Meeting Stile Gasket $10.00 $20.00
Subtotal $1,632.50
Tax Exempt
Total $1,632.50
Note: Clerical and estimating errors subject to change. Prices good for 30 days.
►S. p. X30. Resources, LP Proposal No.
105294
Commercial Paint & Drywall December 15,
2011
WBE & Texas HUB Certified Small Business
P.O. Box 364
Voice: (817) 283-7325
Hurst, Texas 76053
Fax: (817)283-6960
To: Dennett Construction
2313 Cullen Street
Ft. Worth, TX 76107
Attn: Shawn Moore
Re: RD Evans Community Center
3242 Lackland Road
Fort Worth, TX
Request for Pricing
RFP —1 Additional Painting
Paint lobby door leading into chemical closet.
2) Repaint walls in existing south kitchen #45.
3) Paint gyp board walls and one side of doors in dance room 23 and 24
4) Paint Pair of doors into dance room 23 & 24 from lobby
5) Patch and repaint north kitchen #25.
If you have any questions or need further clarifications, please call me.
Submitted By:
�— 16 AW40 .
Matt Schmidt
Project Manager/Estimator
Paint Division
$ 60.00
$ 650.00
$ 1,830.00
$ 120.00
$ 250.00