Loading...
HomeMy WebLinkAboutContract 56059-A2CSC No. 56059-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 56059 WHEREAS, the City of Fort Worth (CITY) and Caroller Engineers, Inc., (ENGINEER) made and entered into City Secretary Contract No. 56059, (the CONTRACT) which was authorized by M&C 21-0374 on the 8th day of June, 2021 in the amount of $155,200.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $450,000.00 authorized by M&C 22-0741 on September 27, 2022; and WHEREAS, the CONTRACT involves engineering services for the following project: Rolling Hills (RH) Water Treatment Plant Chlorine Scrubber Systems; WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I Of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $340,000.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $945,200.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Prof. Services Agreement Amertdmeht Template [HH Water Treatment Plant Chlorine Scrnbberl Revision hate: November 23, 2023 ICPN 1031211 Page L OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Dghq Bu�H�laff Dana Burghdoff (Oct 2, 023 13:55 CDT) Dana Burghdoff Assistant City Manager DATE: Oct 2, 2023 APPROVAL RECOMMENDED: CGcYl�lto�Gce� tta��fe� Christopher Harr (Sep 28, 2023 07:15 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Caro o Engi rs, Inc. Hutch Musallam, P.E. Vice President DATE: 9/27/2023 C— i Troy Leman, P.E. Associate Vice President DATE: 9/27/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 9/27/2023 Farida Goderya, P.E. 23-0775 Senior Professional Engineer M&C: APPROVED AS TO FORM AND LEGALITY: PaGge, I Mack (Oct 2, 2023 13:17 CDT) Douglas W. Black Senior Assistant City Attorney ATTEST: a * pORr O % p�O0000 oobppd v�o o-1d PVo °=d P�Q * °op oo *� Jannette S. Goodall oan� nexp5a4p City Secretary Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 Date: 9/12/2023 Form 12 95 : 2023-1048524 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX [RH Water Treatment Plant Chlorine Scrubber) [CPN 1031271 14755 Preston Road, Suite 500 Dallas, Texas 75254 P 972-239-9949 carollo.com September 14, 2023 Farida Goderya, PE - Sr. Project Manager Fort Worth Water Department 200 Texas Street Fort Worth, TX 76102 Subject: Rolling Hills Water Treatment Plant Scrubber Replacement Project City Project Number 103127 Amendment No. 2: Engineering Services During Construction Dear Ms. Goderya: Contract Amendment No. 2 is the Engineering Services During Construction effort for the Rolling Hills Water Treatment Plant Scrubber Replacement Project. The detailed scope of work for contract amendment No. 2 is attached to this letter. The original contract (CSC # 56059) was for the study and evaluation of the scrubber condition and replacement alternatives. Amendment No. 1 was for the design and bid phase services of the improvements. The following table identifies the original contract and the proposed current amendment •�Uouncil Approved Original Contract $155,200 $155,200 Amendment No. 1 $ 450,000 $ 450,000 Amendment No. 2 - $ 340,000 $ 340,000 Total Contract Amount: $ 945,200 - - - If you have any questions concerning this amendment, please let us know. Sincerely, CAROLLO ENGINEERS, INC. Hisham (Hutch) Musallam, PE Vice President Enclosures: Attachment A - Scope of Services Exhibit B - Fee Justification cc: Troy Laman, Carollo Engineers, Inc. File 300.421 Goderya_2023-0913,docx ATTACHMENT A ENGINEERING SERVICES DURING CONSTRUCTION FOR ROLLING HILLS WATER TREATMENT PLANT CHLORINE SCRUBBER REPLACEMENT CITY PROJECT NO.: 103127 ATTACHMENT A SCOPE OF SERVICES ENGINEERING SERVICES DURING CONSTRUCTION ROLLING HILLS WATER TREATMENT PLANT CHLORINE SCRUBBER REPLACEMENT CITY PROJECT NO.: 103127 GENERAL DESCRIPTION This Scope of Services provides the Scope of Work, the Payment Provisions, and Schedule for professional services associated with the Rolling Hills Water Treatment Plant Chlorine Scrubber Replacement. This Scope of Services identifies the professional services to be provided for engineering services during construction. ENGINEER will support the construction phase of the project as detailed below. CITY will provide the services of a qualified inspector. ENGINEER does not guarantee the CONTRACTOR'S performance, nor is ENGINEER responsible for supervision of the CONTRACTOR'S operation or employees. ENGINEER is not responsible for the means, methods, techniques, sequences, or procedures of construction selected by the CONTRACTOR, or any safety precautions and programs relating in any way to the condition of the premises, the work of the CONTRACTOR or any SUBCONTRACTOR. ENGINEER is not responsible for the acts or omissions of any person (except its own employees or agents) at the project site or otherwise performing any of the work on the Project. TASK SERIES 100 GENERAL ADMINISTRATION & COORDINATION 101. Project Administration & Coordination ENGINEER will furnish general administrative services during the anticipated project duration of up to 20 months. ENGINEER will coordinate work of subconsultants and communicate with CITY staff. ENGINEER will provide the required M/WBE or SBE submittal and progress reports. ENGINEER will provide monthly invoices summarizing the cumulative percentage of overall budget expended as well as a detailed breakdown of the hours and expenses for the period. 102. Pre -Construction Conference ENGINEER will conduct a pre -construction conference to establish communication procedures between the CITY, CONTRACTOR, and ENGINEER; to review schedule, submittal requirements, and other project requirements and procedures. ENGINEER will provide a proposed agenda and prepare minutes of the meeting. City of Fort Worth, Texas Attachment A — July 18, 2022 PMO Release Date: 08.1.2014 Page 1 of 3 ATTACHMENT A ENGINEERING SERVICES DURING CONSTRUCTION FOR ROLLING HILLS WATER TREATMENT PLANT CHLORINE SCRUBBER REPLACEMENT CITY PROJECT NO.: 103127 TASK SERIES 200 ENGINEERING SERVICES DURING CONSTRUCTION ENGINEER will provide engineering services during construction as described below. Services are based on a construction time not exceeding 18 months to substantial completion plus 2 months to final completion for a total of 20 months. 201. Monthly Progress Meetings ENGINEER will participate in up to twenty (20) monthly progress meetings. It is assumed that up to ten (10) meetings will be held virtually via MS Teams and up to ten (10) meetings will be conducted in person on site. ENGINEER will prepare minutes of progress meetings. 202. Site Visits ENGINEER will conduct up to five (5) site visits. Site visits may be concurrent with progress meetings or may be conducted separately. ENGINEER will record and distribute notes of pertinent discussion items from the site visits. 203. Part Time Resident Project Representative ENGINEER will provide the services of a part-time Resident Project Representative (RPR) to conduct on -site observation services on an as -needed basis to support the efforts of the CITY's Inspector. A total of up to two hundred (200) hours are assumed for this effort, including coordination, construction observation, and travel time. RPR will support and coordinate with CITY's inspector. A written inspection log will be prepared for each RPR site visit summarizing RPR observations on site. 204. Submittals ENGINEER will review construction submittals including shop drawings, schedules, pay applications, record data, operation and maintenance manuals. This task assumes that up to one hundred (100) submittals (including re -submittals) will be reviewed. ENGINEER will track the budget expended for submittal review beyond (2) two re -submittals for reimbursement by CONTRACTOR through CITY. 205. Request for Information (RFI) CONTRACTORS issue Requests for Information (RFIs) periodically during a construction project to clarify details associated with the design project. ENGINEER will prepare responses to substantive RFIs. It is assumed that up to ten (10) RFI responses will be prepared throughout the duration of the project. City of Fort Worth, Texas Attachment A —July 18, 2022 PMO Release Date: 08.1.2014 Page 2 of 3 ATTACHMENT A ENGINEERING SERVICES DURING CONSTRUCTION FOR ROLLING HILLS WATER TREATMENT PLANT CHLORINE SCRUBBER REPLACEMENT CITY PROJECT NO.: 103127 206. Change Orders ENGINEER will review and provide the CITY with recommendations on CONTRACTOR'S CHANGE ORDER (CO) requests. A total of two (2) change orders are assumed for this task. Change orders that are assumed for this task are for elements that do not require additional design or extensive engineering effort. 207. Start-up Assistance ENGINEER will assist the City in the start-up of the facilities. A total of up to one (1) start-up assistance visit is included in this task. Each start-up visit will include approximately three (3) ENGINEERING Personnel, one (1) day per person inclusive of travel. 208. Project Closeout ENGINEER will assist in project completion activities at the conclusion of the construction. Including observation of completed construction for general conformance with the design concept and preparation of a list of deficiencies to be corrected by the CONTRACTOR before final payment can be recommended. Services include preparing a preliminary list of deficiencies; a follow-up review of project after the punch list has been completed by the CONTRACTOR, and a final walk through with the CITY staff. 209. Record Drawings Using information obtained from CONTRACTOR's record drawings and the field set of contract documents maintained by CITY, ENGINEER will revise the Contract Documents at the end of the project to record drawing status. The drawings will be issued in draft form electronically (PDF format) for review and comment by the CITY. A final set will be prepared based on comments received. It is assumed that CONTRACTOR will provide a detailed set of drawings showing changes made throughout the construction. Three (3) reduced size (11"x17") hard copy sets of final record drawings will be provided along with electronic PDF file uploaded to BIM360. City of Fort Worth, Texas Attachment A —July 18, 2022 PMO Release Date: 08.1.2014 Page 3 of 3 EXHIBIT B-1 CITY OF FORT WO TH Rolling Hills Water Treatment Plant Chlorine Scrubber Replacement Engineering Services During Construction �carv„Q Engineers... Working Wonders With Water Category Total Hours Task Project Principal) Senior Professional 71 Project Manager 290 Project Professional 458 Assistant Professional Technician 306 40 Admin 62 Carollo Hours 1227 Carollo Labor Subtotal Carollo LABOR Subtotal Carollo PECE & EXPENSES GAI (SBE) Mark-up on Subs Subtotal 100 GENERAL ADMINISTRATION & COORDINATION 1 24 1 88 1 92 1 8 1 0 1 24 1 236 1 1 $56,200 1 $3,300 $0 $59,500 101 102 Project Administration and Coordination (10 hours per month, 20 months to final completion) Pre -Construction Conference (Includes Prep and Meeting Minutes) 20 4 80 8 80 12 8 0 0 20 4 200 36 $ 48,360.00 7,8 $ 26.00 200 ENGINEERING SERVICES DURING CONSTRUCTION 201 Monthly Progress Meetings (20, 10 virtual+10 in -person, attend+minutes) 202 Site Visits 15, 2 ppl per visit) 203 Part Time Resident Project Representative (200 hours) Submittals (100 including re -submittals: Shop Drawings, Pay Apps, RD and 204 O&Ms) 205 Requests for Information It total) 206 Change Orders (2 total` 207 Star? -up Assistance (up to 3 people on site) 208 Project Closeout 209 Record Drawings 47 20 4 12 4 2 4 1 202 40 12 40 64 8 12 10 12 4 366 40 12 120 124 16 24 10 12 8 298 40 12 40 132 16 24 10 12 12 40 0 0 8 32 38 8 24 3 2 0 1 991 148 40 200 356 47 72 30 40 58 $ 33,345.00 $ 9,035.00 $ 42,120.00 $ 71,734.00 $ 9,759.75 $ 14,599.00 $ 6,500.00 $ 9,035.00 $ 11,375.00 $207,500 $15,600 $52,150 $5,215 $280,465 $263,700 $11,9001 $5,215 1 $340,000 $52,150 Version 2 7/20/2023 MWBE/SBE% 15.3% City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, September 12, 2023 REFERENCE NO.: ""M&C 23-0775 LOG NAME: 60RHWTP SCRUBBER --EAGLE AND CAROLLO llBJEC1: (CI] 8) Authorize Execution of a Contract with Eagle Contracting, LLC, in the Amount of $5.463,247.00 for Rolling Hills Water Treatment Plant Chlorine Scrubber System, Authorize Execution of Amendment No. 2 in the Amount of $340,000.00 to an Engineering Agreement with Carollo Engineers, Inc., for Rolling Hills Water Treatment Plant Chlorine Scrubber System, Provide for Total Project Costs in the Amount of $6,330,594.00, Adopt Attached Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt, and Adopt Appropriation Ordinances to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with Eagle Contracting, LLC, Inc. in the amount of $5,463,247.00 for Rolling Hills Water Treatment Plant Chlorine Scrubber System project (City project No. 103127); 2. Authorize execution of Amendment No. 2 to an Engineering Agreement with Carollo Engineers, Inc., City Secretary Contract No. 56059, in the amount of $340,000.00 for construction support services for Rolling Hills Water Treatment Plant Chlorine Scrubber System project (City project No. 103127) for a revised contract amount of $945,200.00; 3. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds from future debt for the Rolling Hills Water Treatment Plant Chlorine Scrubber System; and 4. Adopt the attached appropriation ordinance adjusting appropriations in the W&S Commercial Paper Fund by increasing appropriations in the Rolling Hills Water Treatment Plant Chlorine Scrubber System (City Project No. 103127) in the amount of $6,330,594,00 and decreasing appropriations in the W&S Commercial Paper (City Project No. UCMLPR) by the same amount to affect a portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: On ,tune B, 2021, Mayor and Council Communication (M&C) 21-0374, authorized an engineering agreement with Carollo Engineers, Inc., City Secretary Contract No. 56059, in the amount of $155,200.00, for an evaluation and to determine whether to replace or upgrade the existing chlorine scrubber system at Rolling Hills Water Treatment Plant (RHWTP). The agreement was subsequently revised by Amendment No. 1 in the amount $460,000.00 on September 27, 2022, M&C 22-0741, that provided for the design services to replace the existing chlorine scrubber system. As part of Amendment No. 2, the engineer will provide construction phase services, including shop drawing reviews, part time Resident Project representative services, site visits, technical assistance and set up assistance. The project was advertised for bid on June 01 and 08, 2023, in the Fort Worth Star -Telegram, On June 29, 2023, the following bids were received: Bidder Eagle Contracting, LLC Crescent Constructors, Inc. Archer Western Construction, LLC Felix Construction Company _Total Bits Contract Time $5,463,247.00 600 CalendarDays $5,997,000.00 $6,220.000.00 $6,439,000.00 In addition to the contract cost, $308,817.00 is required for staff costs including project management material testing and inspection and $218,530.00 is provided for project contingency. This project will have no impact on the Water Department's operating budget when complete. This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until debt is issued. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached reimbursement resolution. Under federal law, debt must be issued within approximately three years in order for these expenses to be reimbursable. Adoption of the attached resolution does not obligate the City to sell bonds, but preserves the ability of the City to reimburse itself from tax-exempt bond proceeds. It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will amend the City of Fort Worth's Fiscal Year 2023- 2027 Capital Improvement Program as follows: 60RHWTP SCRUBBER — EAGLE AND CAROLLO Capital Project FY2023 CIP Budget Change Fund Name Appropriations Authority (Increase/Decrease) Name 103127 - 56022 - RH W&S Chlorine Commercial Scrubber Paper System Project Revised FY2023 Budget $0.00 This M&C $6,330,594.00 $6,330,594.00 Funding is budgeted in the Commercial Paper project within the W&S Commercial Paper Fund for the purpose of funding the RH Chlorine Scrubber System project. Funding for the RHW`TP Chlorine Scrubber System project is depicted below: - FUND --- i Existing Additional Project Total* Appropriations Appropriations W&S Rev Bonds Series 2022 - $190,1300.00 $0.00 $190,000.00 Fund 56020 — W&S Rev Bonds Series 2023 - $530,000.00 $0.00 $530,000.00 Fund 56021 _ W&S Commercial - Paper -Fund $0.00 $6,330,594.00 $6,330,594.00 i56022 Project Total $720,000.00 $6,330,594.00 $7,050,694.00 *Numbers rounded for presentation purposes. Business Equity — Eagle Contracting LLC. A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible. Business Equity — Carollo Engineers, Inc. agrees to maintain its initial SEE commitment of seven percent that it made on the original agreement and extend and maintain that same SBE commitment of seven percent to all prior amendments up to and inclusive of this Amendment No. 2. Therefore Carollo Engineers, Inc. remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous SBE Commitment form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICT 8. FISCAL INFORMATION ! CERTIFICATION: The Director of Finance certifies that funds are currently available in the Commercial Paper project within the W&S Commercial Paper Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial Paper Fund for the RH Chlorine Scrubber System project to support execution of the amendment to the engineering contract and the construction contract. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS_(FIDS).: TO Fun Department ceoun Project Budget Reference # mount ID r ID 112rograirnrctivity Year (Chartfield 2) r FROM (Fund bepartment IAccoun Project JProgram ctivityj Budget I Reference # rMT ID ID II Year (ChartfieId 2) CERTIFICATIONS: Submitted for City Manager's Office byi Dana Burghdoff (8018) Qflgkating_Q&partment Head: Chris Harder (5020) Additional Information Contact: Farida Goderya (13294) ATTACHMENTS, 1. 60RHWTP SCRUBBER —EAGLE AND CAROLLO 1295 (QAUAW Pdf (CFW Internal) 2. QRHWTP SCRUBBED—EAGLEAND CAROLLO 1295 (Eggg,p_df (CFW Internal) 3, ORHWTP SCRUBBER _-EAGLE AND CAROLLO APC Form (Carollo),pdf (CFW Internal) 4. 60RHWTP SCRUBBER —EAGLE AND CAROLLO Bust❑es Ldy Waiver (Eg ft),(CFW Internal) 5. 60RHWTP SCRUBBER -EAGLE AND CAi20LL0_FID_Tabe_(WCF 07.27.23) (CFW Internal) 6, 60RHV TP SCRUBBER-EAGLEAND _CAROLLO tMJs availability W (CFW Internal) 7. 60RHWTP SCRUBBER —EAGLE AND CAR-0-ILL-0 MAR,Rdf (Public) 8. Commercial Paper Balance-as_of-0Z.27.23.xlsx (CFW internal) 9, EnW nformation- Eagle Contracting.,pdf (CFW Internal) 10, Entilylnformatlon-Cerullo Enpineen g,W (CFW Internal) 11, ORD.APP 60RHWTP SGRJJBBER—EAGLE AND CAROLLO 56022 AO23(L4).dacx (Public) 12, PBS CPN03.127.pdf (CFW Internal) 13. Res.60RHWTP SCRUBBER —EAGLE -AND CAROLLO.docx (Public) 60RHMTP SCRUBBER —EAGLE AND CAROLLO F[D Table 3&4 56022 0600430 5110101 103127 005180 9999 3&4 56022 0600430 5110101 103127 005185 9999 3&4 56022 0600430 55SO102 103127 005180 9999 3&4 56022 0600430 15740010 I 103127 005180 9999 2 56022 I 0600430 15330500 103127 I 005130 9999 1 156022 0600430 15740010 103127 0051.80 I 9999 3&4 ' 56022 I 0600430 5310350 I 103127 I 005184 I 9999 3&4 56022 I 0600430 5330500 103127 005184 I 9999 56022 I 2060000 103127 RETAIN S6,330,594.00 $85,227,00 Staff Costs - Construction $153,408.00 Staff Costs - Inspection $2,000,00 Public Outreach $218,530.00 Project contingencies $340,000.00 To Pay Engineering Company $5,463,247.00ITo pay contractor $11,364.00JSoil Lab - TPw Staff Costs $56,818.00 Soil Lab -Consultant Combo Code