HomeMy WebLinkAboutContract 56816-A1CSC No. 56816-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 56816 WHEREAS, the City of Fort Worth (CITY) and Kiml.ey-Horn Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 56816, (the CONTRACT) which was authorized by M&C 21-0924 on the 30th day of November, 2021 in the amount of $696,800.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2019, WSM-I; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $265,616.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $962,416.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [W&SS Repl. Contract 2019 WSM-I] Prof Services Agreement Amendment Template [1034151 Revision Date: November 23, 2021 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth DGi`(Gt Ewgh,I O, - Dana Burghdoff (Oct 2`,-`02313:f4 CDT) Dana Burghdoff Assistant City Manager DATE: Oct 2, 2023 APPROVAL RECOMMENDED: ChKs-fovher Harder Christopher Harder (Sep 26, 202315:33 CDT) Christoher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Kimley-HornAssociates, Inc. 100 4i11 d Scott R. Arnold, P.E. Vice President DATE: September 25, 2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Brenda Oropeza Project Manager APPROVED AS TO FORM AND LEGALITY: pjav� I Mack (Oct 2, 2023 13:15 CDT) Douglas W. Black Sr. Assistant City Attorney ATTEST: 4,�'64UpIl�� v°�� o. � FORto 0 �o OBo o=0 *0% oo�vo p �m % .�S�a3 a�a� nEXA?oti Jannette Goodall City Secretary M&C: 23-0704 Date: 08/22/2023 Form 1295: 2023-1046809 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [W&SS Repl. Contract 2019 WSM-I] Prof Services Agreement Amendment Template [1034151 Revision Date: November 23, 2021 Page 2 of 2 Kimley»>Horn September 25, 2023 Ms. Brenda Oropeza Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 RE: Water and Sanitary Sewer Replacement Contract 2019, WSM-1 Amendment No. 1 KHA No. 061018411 City Secretary No. 56816 — City Project No. 103415 Dear Brenda: This letter is in reference to a contract between Kimley-Horn and Associates, Inc. (ENGINEER) and the City of Fort Worth (CITY) dated 12-6-2021 referred to herein as the "Contract". ENGINEER is pleased to submit our Amendment No. 1 for the City's Water and Sanitary Sewer Replacement Contract 2019, WSM-I. The fees for this Amendment are not to exceed $265,616.00, increasing the total not to exceed fee to $962,416.00. The ENGINEER was previously authorized to design the Riverside Drive water line plans and contract documents to be bid separately from the TxDOT CSJ 0902-90-019 Riverside Drive Bridge Rehabilitation project. In order to streamline and meet the TxDOT bridge rehabilitation construction schedule, the bridge design team (TxDOT) requested that the CITY consider joint bidding the project. The CITY believed this to be acceptable, therefore this amendment is being proposed to continue moving the project forward. In addition, this amendment adds the design of 428 linear feet of 12-inch water line, 451 linear feet of 8-inch water line, and 757 linear feet of sanitary sewer on Haltom Road, Booker Road, Huffman Street, and 850 linear feet of roadway resurface design on Goddard Street from Beach Street to Woodrose Drive. ENGINEER will continue the services outlined as follows and as directed by the CITY: CONTRACT TASK 1. DESIGN MANAGEMENT ENGINEER will complete Design Management in accordance with the Original Contract for the following: • 12-inch water line, 8-inch water line, and sanitary sewer line on Haltom Road, Booker Road, and Huffman Road. 817 335 6511 Kimley>>> Horn Page 2 CONTRACT TASK 3. PRELIMINARY DESIGN ENGINEER will complete Preliminary Design in accordance with the Original Contract for the following: • 879 linear feet of water line and 757 linear feet of sanitary sewer on Haltom Road, Booker Road, and Huffman Road. • The revision of the engineering plans, specifications, and construction contract documents for implementation into the TxDOT bid set. Plans will consist of 11"x17" plan and profile sheets. Technical specifications will be modified special specifications into the TxDOT contract documents. CONTRACT TASK 4. FINAL DESIGN ENGINEER will complete Final Design in accordance with the Original Contract for the following: • 879 linear feet of water line and 757 linear feet of sanitary sewer on Haltom Road, Booker Road, and Huffman Road. • 850 linear feet of Roadway Design with horizontal plan and vertical profile layout for implementation into the original contract plan set for Goddard Street from Beach Street to Woodrose Drive. • The revision of the engineering plans, specifications, and construction contract documents for implementation into the TxDOT bid set. Plans will consist of 11"x17" plan and profile sheets. Technical specifications will be modified special specifications into the TxDOT contract documents. CONTRACT TASK 5. BID PHASE SERVICES ENGINEER will complete Bid Phase Services in accordance with the Original Contract for the following: • Bid support for the Riverside water line implemented into the TxDOT Riverside Drive Bridge Rehabilitation bid set. CONTRACT TASK 6. CONSTRUCTION PHASE SERVICES ENGINEER will complete Construction Phase Services in accordance with the Original Contract for the following: • Construction Support for the Riverside water line implemented into the TxDOT Riverside Drive Bridge Rehabilitation bid set. CONTRACT TASK 8. SURVEY AND SUE SERVICES ENGINEER will complete Survey and SUE Services in accordance with the Original Contract for the following: Kimley>>> Horn Page 3 • 428 linear feet of water line and 757 linear feet of sanitary sewer on Haltom Road. CONTRACT TASK 9. PERMITTING ENGINEER will complete Permitting in accordance with the Original Contract for the following: • TxDOT Permitting including Exceptions to Policy, AFA Review, TxDOT monthly coordination and Environmental Categorical Exclusion - for the Riverside water line implemented into the TxDOT Riverside Drive Bridge Rehabilitation plan set. CONTRACT TASK 10. ADDITIONAL SERVICES ENGINEER will apply additional services fee from the Original Contract to the Amendment No. 1 services performed. The following table summarizes the fee for this amendment by project phase Original Amendment Revised Description Fee No.1 Contract Task 1 - Design Management $35,500 $1,200 $36,700 Task 2 - Conceptual Design $52,260 - $52,260 Task 3 - Preliminary Design $152,170 $24,800 $176,970 Task 4 - Final Design $117,500 $71,400 $188,900 Task 5 - Bid Phase Services $20,730 $14,100 $34,830 Task 6 - Construction Phase Services $47,820 $40,200 $88,020 Task 7 - ROW/Easement Services $11,100 - $11,100 Task 8 - Survey and SUE $119,700 $31,516 $151,216 Task 9 - Permitting $120,020 $102,400 $222,420 Task 10 -Additional Services $20,000 ($20,000) $0 Total Project $696,800 $265,616 $962,416 Water Fee Sewer Fee Paving Fee Total Original Contract $480,792 $216,008 $0 $696,800 1 Amendment No. 1 $121,220 $104,396 $40,000 $265,616 Total $602,012 $320,404 $40,000 $962,416 kimley-horn.com Kimley>»Horn Page 4 The total MBE/SBE participation was revised to $121,235 (12.6%) for this amendment. The following tables summarize our revisions to the MBE/SBE percentages: Original Amend. Revised Firm Primary Fee No. 1 Fee Fee Revised Responsibility Amount Amount Amount Prime Consultant Civil Kimley-Horn and Engineering/ $464,640 $179,056 Assoc., Inc. CCA MBE/SBE Sub -Consultants Gorrondona and Survey/ $73,900 $24,560 Associates, Inc. Easements Subsurface The Rios Group Utility $22,775 $0 Engineering Non-MBE/SBE Sub -Consultants CMJ, Inc. Geotechnical $56,850 $0 Report Cox McLain Archeological $12,455 $62,000 Services Bennett Trenchless Trenchless $66,180 $0 Engineers Engineering TOTAL $696,800 $265,616 Total Contract Description Original Revised I` Contract Amount $696,800 $962,416 Total Contract $96,675 $121,235 MBE/SBE Total Contract 13.9% 12.6% MBE/SBE Percentage City's MBE/SBE Goal 10.0% 9.0% $643,696 66.9% $98,460 10.2% $22,775 2.4% $56,850 5.9% $74,455 7.7% $66,180 6.9% $962,416 100% Horn Page 5 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Texas Registration No. F-928 �W'4wd Scott R. Arnold, P.E. Vice President S RA/a re Copy to: Tony Sholola, P.E., City of Fort Worth Attachments - Level of Effort Spreadsheet - Form 1295 KAFTW_Utilities\061018411-CFW-2019-WSM-I\PPP\POST_ NTMAmendment-10SM-1 Amendment 1 Summary Ltr_W.docx or,.com 1 801 Cherry Street, Unit 11, Suite 1300, Ft. Worth, TX 76102 EXHIBIT B-2 3/27/2023 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Amendment 1 LOE Design Services for Water Only Water and Santary Sewer Replacements Contract 2019, WSM-1- Amendment No. 1 City Project No. 103415 Labor(hours) Expense Total Task No. Task Description Project Project Total Labor Subconsultant Travel / Expense Task Sub Completed Percent Principal Manager Engineer EIT Admin1l Cost Reproduction / Cost Total Amount Complete MWBE Non-MWBEI Markup Fees/Pertnittinq 1.0 Desi n Management(18 Months Design) 9 4 I 0 0 0 0 I I $1,200 $0 $0 $D $0 I $0 $1.200 �Wa 1.1 Managing the ream 1 I I S I $D SO 1.1.2. CA/QC I 41 1 I 51,200I $D $1,200 1 1.2 Communications and Reporting I I I SO 1 1 $0 $0 1 2.0 (Conceptual Design 01 01 of 01 01 Sol Sol So Sol $ OI SO 2.1 iData Collection I I I I $0 I $101 0 SO So 3.0 Preliminary Design (60%) + Dl 61 341 711 2 $24,800 Sol Sol $0 SD to 5-4,800 I 3.1 Preliminary Design Drawings I $0 I 1 $0 $0 3.1.1 Cover I I $0 I I $0 $0 I 3.1.2 Sheet Index and General Notes -TxDOT l l 1l 31 $900 1 1 1 SO S900 l 3.1.3 Shutdown & Phasing Notes -TxDOT l 11 11 31 $1,200 I I $0 $1.200 1 3.1.4 I Control and Benchmarks -TxDOT l 1 11 31 $900 1 1 $01 $900 1 3.1.5 I Overall Loc & Prop Sht Ref (1) - TxDOT I 1 11 2 $700 I I I I s0 $700 1 3.1.6 I Overall Existing Map (W) (1) - TxDOT 1 11 21 1 $700 1 1 l $DI 5700 l 3.1.7 1 Abandonment (W)(1)-TxDOT ( 11 2 1 $7001 1 S01 $700 I 3.1.8 1 Prop Easement Layout I I I 1 I I Sol I 1 1 $01 $0 I 3.1.9 I Easement Vacations I I I 1 1 $01 1 1 1 Sol $o I 3.1.10 1 Prop Plan & Profile (4) 1 1 4 201 321 I $12,2001 1 1 $0 $12,200 1 1 1 Haltom Or (B-inch SS) (757 LF) (1) 1 l l 1 l $01 1 1 I $0 $0 I Booker (8-inch W Crossing Riverside) (387 LF) (1) 1 I 1 1 I Sol 1 I 1 $0 $0 1 1 Huffman (8-inch W Crossing Riverside) (64 LF) (1) 1 1 1 I 1 Sol I I 1 SDI SO Haltom Dr (12-inch W) (428 LF) (1) 1 1 1 1 1 1 Sol I 1 I 1 $01 $D 3.1.11 1 Standard Details (17)-TxDOT 1 1 1 2 141 I $3,3001 1 1 1 S01 $3,300 3.1.13 (a) I Surface Repair (1) - TxDOT l 1 I 1 21 I $7001 1 $01 $700 1 3.1.13 (b) I Surface Repair (1) I 1 1 11 21 1 S7001 I I I Sol S700 1 3.7 IOPCC-TxDOT I 1 11 41 41 1 $2,1001 1 1 1 1 Sol $2,100 1 3.8 1Deliverables -TxDOT 1 I I 1 21 21 $7001 1 1 1 1 Sol S700 1 City of Fort Worth, Texas Attachment S - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Page 1 of4 EXHIBIT B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Amendment 1 LOE Design Services for Water Only Water and Santary Sewer Replacements Contract 2019, WSM-1- Amendment No. 1 I City Project No. 103415 Labor (hours) I Expense Total Task No. Task Description Project Project Total Labor Travel/ Subconsultant Expense Task Sub Principal EIT Admin Manager Engineer J Cost Reproduction / Cost Total MWBE J Non-MWBE) Markup IFees/ Permiitin/I 4.0 Final Design (90 and 100%) D 131 br 2 $31.400 $0 $OI $DI $6 $0 $31,400 4.1 Preliminary Design (60%) Comments -TxDOT 1 i 81 $2,400 $0 $2,400 4.2 90% Design Drawings 1 1 so so $0 4.2.1 Cover 1 I 1 1 $0 I $0 s0 4.2.2 Sheet Index and General Notes -TxDOT I1 11 11 $500 1 $0 $500 4.2.3 Shutdown & Phasing Notes -TxDOT 11 11 1f $800 1 $0 S800 4.2.4 Control and Benchmarks -TxDOT I 1 11 I $500 I $o $500 4.2.5 Overall Loc & Prop Sht Ref (1) - TxDOT I I 1 11 $500 s0 $500 4.2.6 Overall Existing Map (W) (1)-TxDOT 1 I 1 1 $500 1 1 $O $500 4.2.7 Abandonment (W)(1)-TxDOT I I 11 $2001 I $0 $200 4.2.8 Prop Easement Layout 1 I I Sol 1 1 $0 so 4.2.9 I Easement Vacations I I I sol I I $0 $0 4.2.10 I Prop Plan & Profile (4) 1 1 31 81 161 $5,9001 I 1 1 I SDI $5,900 Haltom Or (8-inch SS) (757 LF) (1) I I 1 1 1 Sol I I I I Sol so Booker (8-inch W Crossing Riverside) (387 LF) (1) I I I I 1 Sol I Sol so Huffman (8-inch W Crossing Riverside) (64 LF) (1) I I I I 1 1 Sol I 1 $0 $0 1 Haltom Or (12-inch W) (428 LF) (1) I 1 1 1 1 Sol I I 1 1 $0 $0 4.2.11 I Standard Details (17) - TxDOT I 11 21 1 S7001 I I I I Sol S700 4.2.13(a) I Surface Repair (3)-TxDOT 1 11 5 1 $1,3001 1 I Sol $1,300 4.2.13 (b) I Surface Repair (1) I 1 1 1I 11 1 $5001 1 1 I $DI $500 1 4.2.14 I Traffic Control (City/TxDOT Standard) 1 I 1 1 I Sol I so So 1 4.2.15 I Erosion Control and Details I s01 4.2.16 TxDOT- Technical Specs 41 304I 5,9S1 $0 $8,9so 00 4.2.17 (Quantities/OPCC -TxDOT I 1 21 21 1 11.20001 1 1 1 Sol $1,200 4.2.18 (Deliverables I I I I I I SDI I I I I $DI $0 4.2.19 ublic Meeting Prep/Exhibits I 1 I I I Sol I I $01 so 4.2.20 onstruction Plan Review (0) 1 1 1 1 1 1 Sol 1 I I $01 $0 4.3 1100% Design Drawings 1 1 21 41 81 1 $3,1001 1 1 1 1 Sol $3,100 4.3.1 1100% OPCC - TxDOT I I 1 11 21 1 S7001 1I I 1 $01 S700 4.3.2 1100% TxDOT-Technical Specs I 11 81 41 1 $3,0001 I S01 $3,000 4.3.3 (Deliverables I I 1 I 21 21 $7001 1 1 1 1 Sol $700 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 3/27/2023 Completed Percent Amount Complete Page 2 of 4 Amendment 1 LOE Water Only Task No. 5.0 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 5.1.6.1 5.1.7 5.2 6.0 6.1 6.1.a 6.1.b 6.1.c 6.1.d 6.1.e 6.1.f 6.1.g 6.1.h 6.2 Task Descriptic laid Phase Services -TxDOT Bid Support U�load Plans to BIM 360 Print Hardcopies Maintain Plan holders List Answer/Respond to Biddinq Questions Issue Addenda Pre for and Attend Pre -Bid Meeting tTabulate bids and review Recommend/References Final Design Drawings EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Water and Santary Sewer Replacements Contract 2019, WSM-I - Amendment No. 1 City Project No. 103415 Labor (hours) T ta IL b Expense Project Project o a or Subconsultant Principal EIT Admin Cost Manager Engineer MWBE Non-MWBE Markup 0 11 31 15 4 $14,100 $0 $0 $0 $0 1 $300 I $0 I I I $0 I 41 8 $3,000 I 21 51 5 $2,800 1 I 21 41 41 $2,300 1 1 I 1 41 1 4 $1,500 1 1 1 21 61 1 $2,000 1 1 I 11 31 61 $2,200 1 1 +Construction Phase Services -TXDOT 1 g1 351 1011 331 Construction Support I I I I Attend Precon & Public Meeting Exhibit _ I I 11 11 Public meeting exhibit I I I I TxDOT Coordination Meetings (1/MO for 12 MO) _ 1 121 241 1 Eight (8) Site Visits w/Reports _ 1 81 121 161 Two (2) RFI _ 1 21 61 61 Change Orders (0) I 1 1 1 TxDOT Coordination (2hrs/wk for 6 MO) 1 121 481 One (1) Final Walk Through I1 41 4 1 Shop Drawings (Riverside Bridge) included in original agreement I II I I IRecord Drawings (3 sheets) I 1 11 61 61 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 $40,200 $01 $01 $01 $o I I I $5001 1I $Ol I I $9,0001 1I $8,3001 1 I 1 $3,2001 1I $ol 1 I $14,5001 1 $1,8001 1 Sol 1 I $2,9001 1 I Total Travel / Task Sub Reproduction I Expense Total Fees IPermitti� Cost $0 $01 S01 so l $1 3/27/2023 Completed I Percent Amount Complete Page 3 of 4 EXHIBIT B-2 Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for Amendment 1 LOE Water Only Water and Santary Sewer Replacements Contract 2019, WSM-I - Amendment No. 1 City Project No. 103415 Labor (hours) I Expense Total Task No. Task Description Project Project Total Labor Subconsultant Travel / Expense Task Sub Principal EIT Admin Manager Engineer J Cost Reproduction / Cost Total MWBE Non-MWBE Markup Fees/ Permittin 8.0 Survey and SUE Services 0 1, 0 $4,500 $24,560 $0 $2,4561 fi $27,01 $31,516'i 8.1 Design Survey 51 151 $4,500 $24,560 $2,4561 $27,016 $31,516 8.2 Temporary Right of Entry (see Task 7.2) I 1 1 $0 1 $0 $0 8.3 Subsurface Ulility Excava ion I I I $o I I $0 $O 9.0 (Permitting I o1 271 671 551 0 $34,200 $ol $62,000 $6,2001 $0 $68,200 $102,400 9.1 USACE 408 Permit I I I I $o 1 1 $o $0 TRWD Coordination I I 1 1 $0 1 $0 $0 9.2 TxDOT Permit (Grace) I I I I $o I I $o SO 9.2 TxDOT Permit (Riverside) 1 1 $0 I I I $0 s0 Exceptions to Policy/AFA Review 12 1 4J 241 I $8,700 1 1 $0 $8,700 TxDOT monthly coordination meetings (15) 1 1 1 151 71 $9,200 1I $0 $9,200 UIR (inlcuded in original agreement) I I1 1 $0 1 $0 $0 Environmental Categorical Exclusion 1 81 401 241 $16,300 I $62,0001 $6,2001I 1 $68,200 $B4,500 I I I I 1 1 $0 I I $ol $o 10.0 Additional Services I 01 -81 -401 -401 -41 -$20,0001 $01 $01 $01 $01 $01 -$20,000 10.1 Additional Services as directed by the City I -81 -401 -401 -41 -$20,0001 1 1 1 S01 -520,000 Subtotall 41 851 2611 2091 41 $130,4001 $24,5601 $62,0001 $8,6561 $01 $95,2161 $225,616 1 Water Line Footage 879 54% 1 Totals:) $225.616 1 Sewer Line Footage 7571 46 % Non -Standard Design Items 1.636 100 % Riverside Bridge Water Line (TxDOT): $91,200 TxDOT Permit (Exceptions Request; $17,900 This Amendment AFA; Coordination): (A) Total Fee $225,616 Environmental (TxDOT) $84.500 (B) Survey Fee $31,516 I Standard Design (1,636 L Total: $32,016 (C) Total Fee (-) survey Fee $194,100 This Amendment S/LF: $19.57 I Water Fee (54% of C) I Sewer Fee (46 % of C)I `/.00 Original Contract I Standard Design (14,815 LF) Total: $332, 190 1 $104,2 $89,813.00 I Original Contract (Non-TxDOT) $/LF: $22.42 Total Contract Standard Design (16,452 LF) $364.2.6 (Original + Amendment) Total Contract (Non-TxDOT) ($/LF) $22.14 Description ect Summary ProtTotal ConceptualDes Design Ir30%) l 31 $3 286.00 $26,944.00 Hou si 563 Preliminary Design (60%) 32 $52,572.00 $53,888.00 Total Laborl $130,400 Final Design 710 a) 1 33 $10.429.00 $8,981.00 Total Expense) $95,216 Survey 1 51 $16,933.00 $14.583.00 MWBE Subconsultant) $24,560 Subtotal $121,220.00 $104,396.00 Non-MWBE Subconsultantl $62,000 Total l S225,816.00 MWBE Participation 1 10.9 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 3/27/2023 Completed I Percent Amount Complete I I l I I I 0.00 Page 4 of 4 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Amendment 1 LOE Transportation & Public Works Department Design for Roadway Only Water and Santary Sewer Replacements Contract 2019, WSM-1- Amendment No. 1 City Project No. 103415 Labor(hours) JTot.10L.bor Expense Travel / TotalTask No. Task Description Principal Project Project EIT Admin Cst Subconsultant Reproduction ! Expense Manager Engineer MWBE I Non-MWBE I Markup Fees/Permitting Cost 0.0 (Final Roadway Design (90%and 100%) I 7 26 83I 55 0 $40,000 $0 so! $0 $0 $f 4.2 90% Design Drawings 4.2.13a Roadway Design (Beach to Woodrose - 850 LF) Horizontal Plan Vertical Profile Layout Vertical Profile Layout (Driveways - 13 residential, 3 industrial) Paving Plan & Profile Sheets Geotech Report 4.3 100% Design Drawings One Round of City Comments Final Drawings subtotarj City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 1 I $0 1 $0 $0 1 $0 11 31 221 $6,300 $0 21 61 151 1 $5,800 I $o 21 61 201 1 $7,000 I I $0 1 31 10 301 $9,200 $0 1 I I $0 I $0 I I 1 1 $0 I $0 1 21 61 10 $4,000 1 I $0 21 61 101 151 $7,700 I $0 71 261 831 551 of $40,0001 sot sot sot sol $0 I Roadway Lane Miles 0.16 Task DesiQQp Survey and SUE Total Paving $40%%01 S40,000 Drainage $01 $0 Bid Phase Services $01 $0 Construction Phase Services $01 I SOI $40,000 I Totals: Project Summary Total Hours Total Labor Total E-f ense MVBE Subconsultant Non-MWBE Subconsultanf MWBE Participation 3/27/2023 Task Sub Completed Percent Total Amount Complete $40,000 $0 $0 $6.300 1 $5,800 $7,000 $9,200 $0 $0 $4,000 1 $7,700 1 $40,000 $40.0001 ' 0.00%I 0.0 .I 171 $40,000 so $0 $0 0.0 % Page 1 of 1 9125/23. 5:36 PM M&C Review CITY COUNCIL AGENDA Create New From This M&C DATE: 8/22/2023 REFERENCE NO.. CODE: C TYPE: Official site of the City of Fort Worth, Texas FORTRTI1 **M&C 23- LOG NAME: 60WSSC19WSMIAI-KHA 0704 CONSENT PUBLIC NO HEARING: SUBJECT: (CD 11) Authorize Execution of Amendment No. 1 in the Amount of $265,616.00 to an Engineering Agreement with Kimley-Horn and Associates Inc. for the Water and Sanitary Sewer Replacement Contract 2019, WSM-I, and Adopt Appropriation Ordinances to Effect a Portion of Water's Contribution to and Amend the Fiscal Years 2023-2027 Capital Improvement Program (2022 Bond Program) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 1 in the amount of $265,616.00, to City Secretary Contract No. 56816, an engineering agreement with Kimley-Horn and Associates Inc. for the Water and Sanitary Sewer Replacement Contract 2019, WSM-I project for a revised contract amount of $962,416.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $225,616.00, transferred from available funds within the Water and Sewer Fund, for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2019, WSM-I project (City Project No. 103415) and to effect a portion of Water's contribution to the Fiscal Years 2023-2027 Capital Improvement Program; 3. Adopt the attached appropriation ordinance adjusting appropriations in the 2022 Bond Program Fund by increasing appropriations in the Water and Sanitary Sewer Contract 2019, WSM-I project (City Project No. 103415) in an amount of $70,000.00 and decreasing appropriations in the Street Improvements -Deteriorating Streets programmable project (City Project No. PB0019) by the same amount; and 4. Amend the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: On November 30, 2021 Mayor and Council Communication (M&C) 21-0924, the City Council authorized an engineering agreement in the amount of $696,800.00 with Kimley-Horn and Associates, Inc. (City Secretary Contract No. 56816) for the Water and Sanitary Sewer Replacement Contract 2019, WSM-1 project. Amendment No. 1 will provide for additional survey and design for the replacement of the deteriorated water and sanitary sewer mains on the following streets as well as environmental studies and permits encountered with the Riverside Bridge. Street To I From Scope rBooker Street Riverside Drive S Retta Street Water Haltom Drive E 1 st Street Goddard Street Sewer Goddard Street Arnold Court Woodrose D-rive—10aving Goddard Street is part of the 2022 Bond Year 3- Contract 16 project. However, due to the close proximity to the Water Department's Contract 2019, WSM-1 project, the street will be included in this project for design and construction. The Transportation & Public Works Department's share on this contract is $40,000.00. The Water Department share on this contract is $225,616.00 will be available in the Water & Sewer Capital Projects Fund for the project (City Project No. 103415). apps.cfwnet.org/council_packet/mc_review.asp?ID=31331 &councildate=8/22/2023 1 /3 9/25/23, 5:36 PM M&C Review In addition to the contract amount, $30,000.00 (TPW) is required for project management, utility coordination, and material testing. This project will have no impact on the Transportation and Public Works' annual operating budget nor on the Water Department's operating budget when completed. The action in this M&C will amend TPW's contribution to the Fiscal Years 2023-2027 Capital Improvement Program as follows: Project FY2023 CIP Budget Change Capital Revised Fund Name Name Appropriations Increase/Decrease Budget 2022 Street Bond Imprv- Program Deteriorating $291051,678.00 $(70,000.00) $28,981,678.00 — Fund 34027 Sts- PB0019 It is the practice of the Water Department to appropriate its CIP p an throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows: 60WSSC19WSMIA1-KHA Capital project FY2023 CIP Budget Change Revised Fund Name Appropriations Authority (Increase/Decrease) FY2023 Name Budget Fund W/SS 56002 - REPL W&S Contract $0.00 This M&C $225,616.00 $225,616.00 Capital 2019 Projects WSM-I Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget and in the Street Improvement -Deteriorating Streets programmable project within the 2022 Bond Program Fund for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2019, WSM-1 project. Appropriations for Water/Sanitary Sewer Replacement project are as depicted below: Existing Additional Fund Appropriations Appropriations Project Total W&S Capital Projects - Fund $1,032,355.00 $225,616.00 $1,257,971.00 56002 2022 Bond Program -Fund $0.00 $70,000.00 $70,000.00 34027 Project Total $1,032,355.00 $295,616.00 $1,327,971.00 *Numbers rounded for presentation purposes. This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP) (M&C 22-0607; Ordinance 25675-08-2022) provides liquidity to support the appropriation. Available resources will be used to actually make any interim progress payments until debt is issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022). Business Equity: Kimley-Horn and Associates, Inc. is in compliance with the City's Business Equity Ordinance by committing to nine percent MWBE participation on this project. The City's MWBE goal on this project is nine percent. apps.cfwnet.org/council_packet/mc_review.asp?ID=31331 &councildate=8/22/2023 2/3 9/25/23, 5:36 PM M&C Review This project is located in COUNCIL DISTRICT 11. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the W&S Capital Projects Fund, and 2022 Bond Program Funds for the W/SS REPL Contract 2019 WSM-1 project. Prior to any expenditure being incurred, the Transportation & Public Works and Water Department has the responsibility to validate the availability of funds. Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department I Account Project I Program Activity I Budget Reference # Amount ID ID Year (Chartfield 2) Submitted for Citv Manager's Office bv: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Brenda Oropeza (8271) ATTACHMENTS 60WSSC19WSMIAl-KHA funds availabilitv.pdf (CFW Internal) 60WSSC19WSMIAl-KHA FID Table (WCF 06.21.23) (1)Rev.xlsx (CFW Internal) 60WSSC19WSMIAlKHA-MAP (1).pdf (Public) 60WSSC19WSMIA1KHA-MAP (2).pdf (Public) 60WSSC19WSMIAl KHA-MAP Form 1295.pdf (CFW Internal) Entitylnformation-KHA.pdf (CFW Internal) ORD.APP 60WSSC19WSMIAl-KHA 34027 A023(r3) (1).docx (Public) ORD.APP 60WSSC19WSMIA1-KHA 56002 A023(r2).docx (Public) PBS CPN 103415.pdf (CFW Internal) Signed Compliance Memo 6.12.23 Al.pdf (CFW Internal) apps.cfwnet.org/council_packet/mc_review.asp?ID=31331 &councildate=8/22/2023 3/3 6019WSMIAl-KHA FID Table 2 56002 0600430 4156001 103415 2 56002 0600430 103415 2 56002 0700430 4956001 I 103415 2 56002 0700430 103415 3 34027 020043.1 PB0019 3 34027 I 0200431 I I 103415 2023 2023 2023 2023 2023 22010199 2023 122010199 $121,220.00 $121,220.00 $104,396.00 $104,396.00 ($70,000.00) $70,000.00 2 56001 0609020 5956001 I $121,220.00 1 2 56002 0600430 4956001 103415 001730 1 9999 ($121,220.00)1 I 2 56001 I 0709020 5956001 I I I $104,396.00 2 56002 0700430 4956001 I 103415 001730 I 9999 ($104,396.00) 1 56002 I 0700430 5330500 I 103415 1 I 34027 0200431 5330500 103415 3 I 34027 I 0200431 15330500 I 103415 001730 9999 I $104,396.00 To pay contract 002430 1 9999 I 220101991 1 $40,000.00 To pay contract 002430 I 1 1 9999 I 220101.991 1 1 1 1 I $30,000.00 1