Loading...
HomeMy WebLinkAboutContract 56870-A4AMENDMENT NO. 4 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES OLD HEMPHILL DROP-OFF STATION SCRAP METAL AREA MODIFICATIONS STATE OF TEXAS COUNTY OF TARRANT CITY SECRETARY CONTRACT NO. 56870-A4 WHEREAS, The City of Fort Worth and Elements of Architecture, Inc., (Consultant) made and entered into City Secretary Contract No. 56870 (The Contract) which was admiratively authorized for $39,410.00 for design services and did not include the reimbursable expenses as noted in Consultant's proposal, the 17th day of December, 2021, for Scrap Metal Area Modifications at the Old Hemphill Drop -Off Station; and Amendments No. 1 & 2 were administratively executed in the amount of $3,200.00 for reimbursable expenses & in the amount of $55,801.00 for modifications to the construction documents respectively; and Amendment No. 3 for the amount of $9,092.00 was authorized on February 28, 2023 by M&C 23-0165; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design & construction administration services; NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design & construction administration services for the Old Hemphill Drop -Off Station. The cost of this additional services is $45,575.00 including $2,000.00 in additional reimbursable expenses. The scope of services is described more fully in Elements of Architecture, Inc.'s Letter dated July 21, 2023 subject: Proposal for A/E Services — Hemphill Scrap Metal Yard — Additional Services 03 — Entry Drive Modifications — Revised. 2 Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "D". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "D". However, the total fee paid by the City shall not exceed a total of $155,078.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." CFW - Standard Agreement for Professional Services AMENDMENT (Rev. 20Mar2020) EOA, Inc. - Old Hemphill DOS Scrap Metal Area Modifications, PMD2021-08 Pagi Septembi OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth: 278 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: By: Dana Burghdoff (Oct ,2� DT) Name: Dana Burghdoff, AICP Title: Assistant City Manager Date: Oct 2, 2023 Approval Recommended: )Z/( By: Name: Niki Watts Title: Sr Capital Projects Officer Approved as to Form and Legality: 5t�v By: Name: Ricardo Salazar II, Interim Title: Director, Property Management Dept. Attest: annn poE�RT as t°° .4a ,T,: � ° .p,, pzsoritvo=d A a n nEX 454gd By: Name: John B. Strong Title: Assistant City Attorney Contract Authorization: N/A M&C: Not Required Name: Jannette Goodall Title: Acting City Secretary VENDOR: Elements of Architecture, Inc. By: Name: Debbie Fulwiler, AIA Title: President Date: Sep 26, 2023 CFW - Standard Agreement for Professional Services AMENDMENT (Rev. 20Mar2020) EOA, Inc. - Old Hemphill DOS Scrap Metal Area Modifications, PMD2021-08 Page Septembi OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ELEMENTS of architecture of architecture July 21, 2023 Mr. Alfonso Meza City of Fort Worth 401 West 13th Street Fort Worth, TX 76102 Re: Proposal for A/E Services - Hemphill Scrap Metal Yard Additional Services 03 - Entry Drive Modifications - Revised ATTACHMENT "D" Dear Alfonso; Elements is pleased to provide you with this additional services proposal for A/E services associated with the Scrap Metal Yard for addressing the entry drive area modifications as defined in the sketch attached as Option A. This direction follows our discussions, communications. and various site meetings between May 10, May 17, June 07. These improvements will require an updated survey to the added areas, potential new retaining wall design along entry drive, guardrails, additional heavy duty entry paving, and updated Landscape / Irrigation / Urban Forestry improvements. Our services to date have included discussions of the scope and feasibility, producing preliminary site plan sketches for discussion and coordination with consultants to reach this option illustrated. It is important to note that the option selected assumes that Old Hemphill Road is widened with a turning lane added. We have not included any services or engineering associated with modifications to this road as we anticipate that this will have to be engineered and executed through the city directly. We have defined our additional scope of services as follows: SCOPE OF SERVICES Construction Documents Phase 1. Scoping meetings, produce preliminary site plan sketches for review, floodplain research, preliminary OPCC update, etc. 2. Revise the current Scrap Metal drawings & specifications to reflect the new entry drive improvements and retaining walls as shown in attached exhibit dated 6-07- 2023 3. This proposal includes attendance at initial COFW Pre Development Conference (PDC) meeting associated with these improvements. 4. Civil includes additional coordination with the city as defined within their attached scope. 5. Attend 4 additional design phase meetings with Owner as requested. 6. Submit Substantially Complete documents for Owner's Review. 7. Address Owner Review comments and submit final sealed construction documents. Page 1 of 3 Elements of Architecture, Inc. 11201 6th Avenue, Suite 100, Fort Worth, Texas 761041817.333.2880 Exclusions and Qualifications to This Proposal: 1. We have not included MEP Engineering, nor do we believe these are required for these additional services. If we see that these are needed, we will provide a proposal for these services. 2. This proposal is based on the remaining design phase efforts being complete within two months of NTP. If this phase extends beyond these anticipated schedules, we will provide a proposal for these extended services. 3. This proposal does not include any improvements within the ROW or to Old Hemphill Road. 4. This proposal does not include Planning Department meetings required for the Planned Development Process (PD) or its improvements, IRC or CIP exhibits, meetings, review comment updates or presentations related to the PD process. If a PD resubmission is required, we will provide a proposal for these services. PROPOSED FEE Labor Proposed Fee as follows for labor only and based on a lump sum fee which would be invoiced monthly. This amount is in addition to our original proposal. CONSTRUCTION DOCUMENTS PHASE Architectural Design Structural Engineering (2,440 x 1.1) Topographic Survey (2,500 x 1.1) Civil Engineering (14,000 x 1.1) Urban Forestry (6,000 x 1.1) CD Phase Total $ 14,250 $ 2,684 $ 2,750 $ 15,400 $ 6,600 $ 41,684 CONSTRUCTION ADMINISTRATION PHASE Architectural $ 3,000 Structural Engineering (810 x 1.1) $ 891 CA Phase Total $ 3,891 TOTAL LABOR LUMP SUM FEE $ 45,575 Expenses We anticipate an additional $2,000 in expenses associated with this changes. Preliminary Effort The labor fee listed above includes effort already incurred in addition to projected effort for the additional services identified. This incurred effort includes meetings, site visits and sketches as required to compile and coordinate the scope of work for this proposal. Per your request, we are providing the fee for this effort already incurred below: Architectural $ 3,000 Civil Engineering (1,000 x 1.1) $ 1,100 Structural Engineering (1,012 x 1.1) $ 1,113 Preliminary Total $ 5,213 Page 2 of 3 Elements of Architecture, Inc. 11201 6th Avenue, Suite 100, Fort Worth, Texas 761041817.333.2880 If you have any questions or need to discuss, please call me. Thank you for this opportunity to provide additional services to you and we look forward to working with you on this project. Sincerely, Debbie Fulwiler, AIA President Attachments: Structural Engineering Proposal by RLWA (9-19-2022) Civil Engineering Proposal by Carrillo (6-28-2023) Site Exhibit `A' (Revised 6-07-2023) Page 3 of 3 Elements of Architecture, Inc. 11201 6th Avenue, Suite 100, Fort Worth, Texas 761041817.333.2880 I _ c E...LLB — Q N 4 M2 p_41 N t o>o Ey�EE Er 9� Cr �Q� ELL