Loading...
HomeMy WebLinkAboutContract 60194CSC No. 60194 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Jacobs Engineering Group Inc. authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Water and Sanitary Sewer Replacements Contract 2021, WSM-H — Project No. 104670. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to $387,678.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 1 of 15 W&SS 2021 WSM-H 104670 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the C1TY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 2 of 15 W&SS 2021 WSM-H 104670 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the C1TY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the contract documents, the ENGINEER shall inform the CITY. When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. (3) City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 3 of 15 W&SS 2021 WSM-14 104670 F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based an the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 4 of 15 W&SS 2021 WSM-H 104670 I. Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City's Business Equity Ordinance No. 25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in Chapter 20, Article X of the City's Code of Ordinances, as amended, and any relevant policy or guidance documents), the City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. Engineer acknowledges the MBE and WBE goals established for this contract and its execution of this Agreement is Engineer's written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 5 of 15 W&SS 2021 WSM-H 104670 effect as of the time copying is performed. K. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. L. independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondeat superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. City of Fort Worth, Texas W&SS 2021 WS M-H Standard Agreement for Engineering Related Design Services 104670 Revised Date: November 23, 2021 Page 6of15 P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 7 of 15 W&SS 2021 WSM-H 104570 F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. City of Fort Worth, Texas W&SS 2021 WSM-H Standard Agreement for Engineering Related Design Services 104670 Revised Dale; November 23, 2021 Page B of 15 I. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENG1NEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 9 of 15 W&SS 2021 WSM-H 104670 D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 10 of 15 W&SS 2021 WSM-H 104670 property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. Severability and Survival if any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.E., VI.B., VI.D., VI.F., VI.H., and VI.1. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 11 of 15 W&SS 2021 WSM-H 104670 The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2274 of the City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November23, 2021 Page 12 of 15 W&SS 2021 WSM-I- 104670 Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full- time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. City of Fart Worth, Texas W&SS 2021 WSM-H Standard Agreement for Engineering Related Design Services 104670 Revised Date; November 23, 2021 Page 13 of 15 The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 14 of 15 W&SS 2021 WSM-H 104670 Duly executed by each patty's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH Dana 'w-QGtato f Dana Burghdoff (Oct 1, 02313: 8 CDT) Dana Burghdoff Assistant City Manager Date: Oct 1, 2023 ATTEST: ,n h Jannette S. Goodall City Secretary APPROVAL RECOMMENDED: Coif stoph r /carder By:Christopher Harder (Sep 25, 2023 07:00 CDT) Chris Harder, P. E. Director, Water Department BY: ENGINEER Jacobs Engineering Group Inc. Raajan Mehta, P. E. Vice President Date: 09/19/2023 APPROVED AS TO FORM AND LEGALITY Form 1295 No. N/A By:DBlack (Sep 29,202311:35CDT) M&C No.: 23-0503 Douglas W Black Sr. Assistant City Attorney M&C Date: 06/13/2023 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Brenda Oropeza Project Manager City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 15 of 15 W&SS 2021 WSM-H 104670 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM-H CITY PROJECT NO.:104670 ATTACHMENT A Scope for Engineering Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM-H CITY PROJECT NO.: 104670 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services TASK 1. DESIGN MANAGEMENT. ENGINEER shall ensure efficient and effective use of ENGINEER'S and CITY's time and resources. ENGINEER shall manage change, • communicate effectively, • coordinate internally and externally as needed, and • proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting City of Fort Worth, Texas Attachment A PMO Release Date: 07.23.2012 Page 1 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•I1 CITY PROJECT NO.:104670 • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements • Conduct review meetings with the CITY at the end of each design phase • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly MWWBE Report Form and Final Summary Payment Report Form at the end of the project • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • 12 MWBE reports will be prepared • 4 meetings with city staff: 0 1 pre -design kick-off meeting 0 3 design package review meetings: at 30%, 60%, and final • 12 monthly invoices, project reports, schedule updates, and MWBE reports will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule City of Fort Worth, Texas Attachment A PMO Release Date', 00.1.2014 Page 2 a117 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSfiTH CITY PROJECT 1.10,;10(1010 E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly MIWBE Report Form and Final Summary Payment Report Form G. Plan Submittal Checklists (See Task 9) TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to • Study the project, • Identify and develop alternatives that enhance the system, • Present (through the defined deliverables) these alternatives to the CITY • Recommend the alternatives that successfully addresses the design problem, and • Obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project. • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. • The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. 2.2. Geotechnical Investigations Two geotechnical test borings are planned for the PROJECT. The borings will be 25-ft deep. Geotechnical testing will be performed to provide design data and recommendations for the single bore for UPRR crossing. This is anticipated to be approx. 600 LF of bore for 8" sewer line L-957. The following soil sampling and testing will be performed: • Moisture content: 8 tests per boring • Atterberg Limit: 4 tests per boring • Percent passing No. 200 Sieve: 4 tests per boring City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 3 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•N CITY PROJECT NO,; 104870 • Unconfined Compressive Strength in Soil: 5 tests per boring • Unconfined Compressive Strength in Rock: 4 tests per boring • CU Triaxial Soil: 1 test per boring • One Dimensional Swell: 2 tests per boring A geotechnical data report will be provided. Following items will be included in the report: • Plan of Borings • Table of laboratory test results, • Boring logs, and • Groundwater level observations 2.3. Fire Line Reconnection (Not Included) 2.4. The Conceptual Design Package shall include the following: • Cover Sheet • Graphic exhibits and written summary of alternative design concepts considered, strengths and weaknesses of each, and the rationale for selecting the recommended design concept. • Documentation of key design decisions. • Estimates of probable construction cost. ASSUMPTIONS • 2 Geotechnical borings at an average bore depth of 25 feet each will be provided are expected for this project. • 1 copy of the conceptual design package (30% design) will be delivered. Drawings will be half size fold outs bound in the report. • 1 copy of geotechnical data report will be delivered. • DWF files created from design CAD drawings will be uploaded to the designated project folder in BIM360 • ENGINEER shall prepare the meeting minutes of the Concept Review meeting and revise the report, if needed. • ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. • No Design Report will be included in the Conceptual Design Package DELIVERABLES A. Conceptual Design Package City of Fort worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 4of17 ATTACHMENT A DESIGN SERVICES FOR WATER AN SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•N CITY PROJECT NO.:104670 TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: • Cover Sheet • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 518" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Overall project easement layout sheet(s) with property owner information. • Overall project water andlor sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. • Overall water and/or sanitary sewer abandonment sheet. • Coordinates on all P.C.'s, P.T.'s, P.l.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Bench marks per 1,000 ft of planlprofile sheet — two or more. • Bearings given on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Plan and profile sheets which show the following: proposed sanitary sewer plan/profile, manholes, and recommended pipe size. All the water lines on this project are size 8"; therefore, only plan view sheets are planned for water sheets. The plan view will also show fire hydrants, water service lines and meter boxes, gate valves, isolation valves, existing meter numbers and sizes that are to be replaced, existing sample locations, and existing fire line locations. Both water and sewer sheets will show existing utilities, utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. • The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, City of Fort Worth, Texas Attachment A PMO Release Date: 00.1.2014 Page 5 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•tl CITY PROJECT NO.: 104070 including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main, • The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de -hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. Any redesign would constitute additional service. • Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. • The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections, • Specifications. ENGINEER will utilize CITY's standard front-end and technical specifications for this project. Two supplemental technical specifications will be provided by the ENGINEER: • Pipe Bursting • Micro tunneling • Estimates of probable construction cost. 3.2. Geotechnical investigation • Utilizing the geotechnical data report, recommendation will be provided for the UPRR bore crossing. A technical specification for micro -tunneling will also be provided. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page a of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•H CITY PROJECT NO.: 104670 3.3. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4. Utility Clearance • The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. • The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in B1M360 for forwarding to all utility companies which have facilities within the limits of the project. The DWF files should be created directly from the CAD files as opposed to PDF files. 3.5. Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's BIM360 website. The typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. 3.6. TxDOT Permit • Coordinate with TxDOT for proposed work along I-35 SB Frontage Road. Apply for needed permit. 3.7. Railroad Crossing Permit • Follow UPRR Procedures and create exhibit for new pipeline crossing. • Submit online application to UPRR for review. 3.8 Public Meeting • After the preliminary plans have been reviewed and approved by the CITY, the ENGINEER shall prepare project exhibits, and attend one (1) design public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. The ENGINEER shall coordinate with CITY GIS staff to identify affected property City of Fort Worth, Texas Attachment A PM0 Release Date: 08.1.2014 Page 7 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSL1.H CITY PROJECT NO.:104670 owners/residents and develop a spreadsheet listing addresses of those to invite to the public meeting. ASSUMPTIONS • 1 public meeting(s) will be conducted or attended during the preliminary design phase. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an additional 4 project specific traffic control sheets will be developed for TxDOT 1-35 Frontage Road . • 1 set of half size plans will be delivered for the Preliminary Design (60% design). • DWF files created from design CAD drawings will be uploaded to the designated project folder in RIM360. • The CITY`s front end and technical specifications will be used. The ENGINEER shall supplement the following technical specifications: • Pipe Bursting • Micro tunneling • No hard copy of drawings will be delivered for Utility Clearance. • No hard copy of drawings will be delivered for Constructability Review. • No hard copy of specifications will be delivered for the 60% design. • Following fees will be paid to UPRR for Utility Crossing Application: • Maintenance Review Fees: $755 • Encroachment Application Fees: $3,055 (includes the Crossing Application Fee) • Right of Entry Application Fee: $1,045 • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications B. Utility Clearance drawings C. Traffic Control Plan D. Storm Water Pollution Prevention Plan E. Estimates of probable construction cost City of Fort Worth, Texas Attachment A HMO Release Date: 08.1.2014 Page 8of17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•H CITY PROJECT NO. 104070 F. Data Base listing names and addresses of residents and businesses affected by the project. TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • For projects that disturb an area greater than one (1) acre, the Contractor will be responsible for preparing and submitting the Storm Water Pollution Prevention Plan (SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM Construction Plan according to the current CITY ISM Criteria Manual for Site Development and Construction which will be incorporated into the SWPPP by the contractor. • Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. • Review of 90% submittal shall be via Webex • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS • 1 set of half _ size drawings and 0 sets of full size drawings and 0 specifications will be delivered for the 90% Design package. • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. • 1 set of half size drawings and 1 specifications will be delivered for the 100% Design package. • A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM3B0. ❑ELIVERABLES A. 90% construction plans and specifications. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the C1TY's standard bid items and format. City of Fort Worth, Texas Atlachment A PMD Release Date: 08.1.2014 Page 9 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•F1 CITY PROJECT 110.:104570 D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto B1M360 for access to potential bidders. • Contract documents shall be uploaded in a .xls file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to B1M360 in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The .dwf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on BIM360 from documents sold and from Contractor's uploaded Plan Holder Registrations in B1M360. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's BIM360 folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto BIM360 and mail addenda to all plan holders. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on BIM360. • Incorporate all addenda into the contract documents and issue conformed sets. City of Fort Worth, Texas Attachment A PMO Release Date: 00.1.2014 Page 10 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM-11 CITY PROJECT NO.: 10070 5.2 Final Design Drawings 1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf 11. Water and Sewer file name example w- "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in BIM360, 2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: 1. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name — "W-1956_SHT01.dwg", "W- 1956_SHT02.dwg" etc. 11. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155 SHT01.dwg", "X-12755_SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. My of Fort Worth, Texas Attachment A PMD Release Dale: O13.1.2O14 Page 11 43117 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•N CITY PROJECT NO,: 104670 ASSUMPTIONS • ENGINEER does not need to attend Bid Opening. • The project will be bid only once and awarded to one contractor. • 4 sets of full size and 5 sets of half size drawings plans and 5 specifications (conformed, if applicable) will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to BIM360. DELIVERABLES A. Addenda B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award E. Construction documents (conformed, if applicable) TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows, 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site as construction proceeds to observe and report on progress. Total of nine (9) site visits are assumed, • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. This task shall be supported by submittal reviews, RFIs, and change orders. See assumed quantity under ASSUMPTIONS section for Task 6. The ENGINEER shall attend the "Final" project walk through and assist with preparation of final punch list 6.2 Record Drawings City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 12 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM-H CITY PROJECT NO,: 104676 • The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As -Built Survey o Red -Line Markups from Contractor o Red -Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a PDF set of sealed Final Drawings, modified and stamped as Record Drawings. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY. 2) Record Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TRW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: 1. TPW file name example — "W-1956_rec47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "—rec" designating the file is of a record drawing plan set, "47" shall be the total number of sheets in this file. Example: W-00532ec3.pdf and K-0320—org5.pdf II. Water and Sewer file name example — "X-35667—rec36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_rec" City of Fart Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 13of17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM111 CITY PROJECT NO.: 104670 designating the file is of a record drawing plan set, "36" shall be the total number of sheets in this file. Example: X-12755_rec18,pdf Both PDF and DWF files shall be uploaded to the project's Record Drawings folder in BIM360, ASSUMPTIONS • 10 RFI's are assumed. • 20 Submittals are assumed. • 0 Change Orders are assumed. • 9 Field Visits are assumed. • Only electronic record drawing files will delivered to the CITY. DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of shop drawings D. Final Punch List items E. Electronic files of Record Drawings TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research • The ENGINEER shall determine rights -of -way, easements needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition • The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. City of Fort Worth, Texas Attachment A PMQ Release Date: 06.1.2014 Page 14 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSW] CITY PROJECT NO.: 104670 • The documentation shall be provided in conformance with the checklists and templates available on the CITY's B1M300 site. ASSUMPTIONS • 50 Easements or right-of-way documents will be necessary. • 5 Temporary right -of -entry documents will be necessary. • Right -of -Way research and mapping includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. • Any platting services are not included. o Title Reports are not included. DELIVERABLES A. Easement exhibits and metes and bounds provided on CITY forms. TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Design Survey • ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: — A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: — The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 15 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM.H CITY PROJECT NO.:104670 c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). -- Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. No less than two horizontal bench marks, per line or location. Bearings given on all proposed centerlines, or baselines. Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right of Entry Preparation and Submittal • Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of Entry for landowners to CITY PM. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. 8.3 Railroad Coordination • Includes Right of Entry, permitting, and coordination needed for Union Pacific Railroad for topographical data within rail corridor. ASSUMPTIONS • Topographic survey at intersection will include no more than 100 ft. in each direction. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: Negotiation of easements or property acquisition including temporary right -of - entries. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 16 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2021 WSM•H CITY PROJECT NO,: 10070 • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re -bidding of the contract for construction. • Construction management and inspection services • Geotechnical Design Report • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services related to Survey Construction Staking • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. • ENGINEER has developed project budget using the assumptions listed under each Task. Services requested beyond or outside those listed assumptions shall result in change of Scope of the Project and subject to an increase of ENGINEER's budget. • ENGINEER has developed project budget using schedule per Attachment D. Deviation from project schedule shall result in change of Scope of the Project and subject to an increase of ENGINEER'S budget. Any redesign as a result of SUE provided by City or Contractor shall result in change of Scope of the Project and subject to an increase of ENGINEER's budget. City of Fort Worth, Texas Attachment A PMO Release Date; 08.1.2014 Page 17 of 17 ATTACHMENT B COMPENSATION Design Services for Water and Sanitary Sewer Replacements Contract 2021,WSM-H City Project No. 104670 Lump Sum Project I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $387,678.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. 13. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item 111. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 121912022 Page i of 3 B-1 IV. Summary of Total Project Fees Firm ATTACHMENT B COMPENSATION Primary Responsibility Fee Amount Prime Consultant Proposed MWBE Sub -Consultants ARS Engineers, Inc. Design Survey $44,000 11% HVJ North Texas — Geotechnical Chelliah Consultants, Inc. $19,134 5% Non-MWBE Consultants TOTAL $ 100% Project Number & Name Total Fee MWBE Fee MWBE % 104670 -Water and Sanitary Sewer Replacements Contract 2021,WSM-H $387,678 $63,134 16 % City MWBE Goal = 10% City of Fort Worth, Taxes Attachment B Revised Date: 12)912022 Page 2 of 3 Consultant Committed Goal = 16 % B-2 IO Y L Q ) N ti „, co Q a o f a.w U ce O l— (O(34 Z 00 C ril 2 O x c U) w w 0 • of A_' • C] J F• a- foU f0 Oce }- n LA Y I7 10 o M r N y 0 0'0 I0I1 V)O0N P) 0 N Lo VI 0 0 '- N V) 0 0 I--( N N V) 0 0 N 4040000000 tih I') if) V) V) CD N N Vi N (/4(0'),N Vi N V) h 0 (0 N 0 mN 0 r N o N Cr 0Nv v) V) 0 0 co O) O) N y 0 (0 0 (0 MM VI V) N N Wl CA 0 41 N00(0 CO(�) LA 0 0 Cl- CO V) V) h 0 0 N i� Y V) o 0(0(0_0) C V) 10 0 r 0 N V) py h r W 0 V07 1) Qi Qx N U3 O 0 O H y0y l( 4) 0 0 V) V) IA IA N N M V) LA V)N v Cr;V) , ,_ V4) LA N In IA N V1 V) �0�V M 4i ✓f N VI V) 0 Le) 0010 N N Y V) 0 CO NN CO ON V3 0 V) Expense I •0 10 b 2 . 4, a 0 00 N N V) V) 6 N N 0 0 V) 0y V) N CO 0 N V) 0 0 V I V) .' 2 1- 0 o ci 0 0 0 0 in A 0 V/ 0 N 0 0 0 N 0 V) 00 N 0 V) 4 3 0 A 0 elO mN 0 Z 0) '0 m CO 0 Li, N fA r4' m of N iA 0 o )n 0 CO 2 0) 0� 0 N V) 0 2 w V) a N 0 a 0 VY 0 V1 0 N 0 CO a CO N 0 0 N a co 0 0 ni 4! 3 0) N Car Vi 0 a ca N CO CO 0 IJ V) K N LO 1 E 4 N 174 )o f N ' 0 co 0 N N ¢) v 0 Q 0 N o G0 pp V N 0 coN N )0 40 N N N N r 400 41 7 a N N O 4 CO O Ifl N 0 N 1. 0 0 C )O CO N r, V) W r '003 h s- 00 Cal -4 CO 0) 40 N04 r CON 0 C) r 4000 N N N N 0 0 a re 0I0 V 10 N N $N'" C 60 6 a W O N 4 0 r OD W Yo0 V o N 4 a ` (04 r V.0 r m[O r N N r N,- r VP Nam' N N N r N u 0 y [J a0 a NLo 69 •00 r NN r r CO0 V V 00 NN 0 NNm 4 04404 CO r 0 COrm10 0 r R a •I} 0 a` 0 m ul r- 4 N •�N 1 N. I N r N o 0 = 0 Q N 0 01 N ~ Rate Project Management Managing the Team Team Management and QA/QC Communications and Reporting Pre -Design Chartering Meeting :lesion Submittal Review Meetings _ Monthly Invoice Monthly Progress Reports Monthly Progress Schedule Updates Prepare Monthly MBE/SSE Reports Coordinate with Other Agencies Conceptual Design (30-Percent) Data Collection G eo tec hn i ral investigations Fire Line Reconnection (Not Included) Conceptual Design Package Cover Sheet Exhibits and Summary Phasing Decision Log Construction Cost Estimate Preliminary Design (lib Percent) Preliminary Design Drawings & Specs Cover, Project Control, Overall Easement Layout, Overall Water/Sewer Layout, and Water/Sewer Abandonment Sheet Water Plan Only, Sewer P&P Sheets Specifications Construction Estimate Gectechnicallnvestigation Censtnactability Review Utility Clearance Tragic Control & Detour Plan TXDOT Permit Railroad Crossing Public Meeting Final Design Final Draft (90%) Construction Plans and Specifications _ Attend Public Meeting Final (i 00%) Plans and Specifications Conswcton Estimates (90% and 100%) Bid Phase Sid Support I Upload Documents to B1M360 0 �' YVi F- t.• r Nrr r t- el n[N )•f ,I N N rrr '4? ...,..P.-r N N[V r i� r NM4IV N N IN N 4 Q OV 0, 0,. 4f a NNN (0 ale. 04 O t7 r Pi r r M NI{q r nl V) rNa M co V Cl a V1 tonm r0 07 {`1 a i r o a N V)4 4 V V •. r r0) O 0 En 77, \ in crt co o 17, 0 ro en co VI S3E0,879.00 In 0 In In §k§aG En 0 } VI en on ri En 0 CZ in in On 14 On co 4. be, VI 0000 0GO 0 r On LA to CO in VI to VI on /\ VI to r CI CV In In 0 CI On o CA ) §j /# (\ _ issue Addenda Attend Bid Cpenina (N!A) Tabulate Bids and Recommend Award Conformed Drawings Construction Phase Services Construction Support Attend Preconstruction Conference Attend Public Meeting Field Trips with Resorts RFIs, Submittals, Change Orders Record Drawings/AS Built ROW/Easement Services Easements (est. PE: 50. TCE: 5) Survey Design Survey Right -of -Entry Railroad Utilities (SUE Level C and Li.) Totals \ jj•,l\& j- A ! [ 0 En Csi oLe EFS 49 CO G 7 On 5387.67B.D0 ) ) Lo- k / / E § § § § 7 k j CD (\§ 01 0 ) \ k CO a SO \\} 0 \ ERk E [ ) 0 co ri k k SD ) To- o. EnN 0 0. 0. cF cei int \ En \ / \ 0 / } 0 Lt \ 01 On 4 $ SO ) § 0 k Project Manager 2 \ k 2 \ 0 \ a. / \ (NI @ 0 0 $ 0 $ ƒ 2 / j / k Supplier lnstructkons: City Sec Number: Jacobs Engineering Group Inc. Company Name: ) Remit Address: Vibhutl Pandey. P.E. ƒ§ Eo J01 kt / o0<0 0 0. ZL- cri FID and Work Type Description 0) @ ƒ } £ Totals This Invoice Overall Percentage Spent: Suppticy Instructions: Vlbral Pandey, P.E E CC Cri d o"o U m ?• U N •Q •.• y w 0. gin d 0 0 u N N E I6 a h 3 Totals This Unit: ercentage Spent 0 )� EE JZ \\ )tn in 0 0 R 2 a 51, Totals This Unit: Overall Percentage Spent: ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for Water and Sanitary Sewer Replacements Contract 2021,WSM-H City Project No, 104670 Add Section to Article VI General Legal Provisions: P.Consequential Damages Notwithstanding any other provision of this AGREEMENT to the contrary, the parties hereto mutually agree that neither party shall be liable to the other for any indirect, incidental, consequential, exemplary, punitive or special damages or loss of income, profit or savings of any party, including third parties, arising directly or indirectly from the parties' relationship under this AGREEMENT or applicable law. This provision does not apply in the event that the City is required to pay back any Federal grant funding or is required to pay damages to the Federal Government related to the project associated with this Agreement resulting from the negligence of ENGINEER in performance of its services, regardless of whether the damages could be considered indirect, incidental, consequential, exemplary, punitive, or special damages. City of Fort Worth, Texas Attachment C PMo Release Date: 05.19.2010 Page I of 1 } ] ! ] 1 A ) [ | | if ! ( 11 ! ! ! , || ƒ ■ r iis ! . . , . . , | § ! E k | § ( \ § § ( | § ) \ / ; §! ( § ! § | ( § § ! § \ 4 4 AI . , 1 1 1 f : I 4 , ! # . 1 I ! • ! ) ; .( § ) ] § § § | ! ! !kI ! _ _ F ; , ! ! ! ! 1 ; I|; 1 ! _ , !! I I ; ! ! | | ! ! ! ! | ! | ! ! ! ! | ! ! | ! ! ! | ! ! ! ! ! ! 1.! ! ) ! ! 111 \ i }_| • t i I |1' ! | § ; | I ,| ! | | \ ! !§! < ! ) , | ; . . [ | | ! P@ Piz 1- E* Ik R R 1 y�I k! 14.d6 4@§lit R}§ P} R@ It lTIC L d }| h h ATTACHMENT E ELMSWOOD AVE ACCFRaw THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDDIYYYY) 09/19/2023 IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s), PRODUCER LIC #0437153 Marsh Rink & Insurance Services CIRTSSupport@jacobs.com 633 W. Fifth Street Los Angeles, CA 90071 INSURED Jacobs Engineering Group Inc. C/0 Global Risk Management 555 South Flower Street, Suite 3200 Los Angeles, CA 90071 1-212-948-1306 CONTACT NAME: PHONE (A(C No Ext): E-MAIL ADDRESS: FAX (AfC, Noj: 1-212-948-1306 INSURER(S) AFFORDING COVERAGE 1NSURERA:ACE AMER INS CO INSURER B : NAIC# 22667 INSURER C : INSURER D : INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: 69674956 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPEOFINSURANCE ADDL INSR SUBR wvD POLICYNUMBER POLICY EFF (MM/DDIYYYY) POLICY EXP (MMIDDIYYYYI LIMITS A A A A A X COMMERCIALGENERALLIABILITY NIA HDO G47339273 ISA H10736262 07/01/23 07/01/23 07/01/24 07/01/24 EACHOCCURRENCE $ 1,000,000 DAMAGETORENTED PREMSES(Eeocoure nce} $ 500,000 CLAIMS -MADE X OCCUR MED EXP (Any one person) $ 5,000 X CONTRACTUAL LIABILITY PERSONAL&ADVINJURY $ 1,000,000 GENERALAGGREGATE $ 2,000,000 GEN'LAGGREGATE AUTOMOBILELIABILITY X POLICY 1_X OTHER: ANY AUTO OWNED LIMITAPPUES PEO SCHEDULED PER: LOC -OWNED ONLY OCCUR CLAIMS -MADE PRODUCTS-COMPIOPAGG 5 1,000,000 COMBINED SINGLE LIMIT (£a accidanl) 5 $ 1,000,000 BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ EACH OCCURRENCE $ $ AGGREGATE $ X STPEATUTE II _ 1EERH $ WOR1(ERSCOMPENSATION AND ANYPROPRIETORIPARTNERIEXECUTIVE OF=FICERJMEfdBEREXCI-UDED7 (MandatorylnNH) If yes, DED EMPLOYERS' describe under OF RETENT ON $ LIABILITY OPERATIONS belowE.L. YIN N 07/01/24 07/01/24 07/01/24 07/01/23 07/01/23 07/01/23E,L.DISEASE-EA WLR C50711481 (AOS) WCU C50711559 (OH)* SCF C5071164A (WI) E.L.EACHACC(DENT $ 100,000 EMPLOYEE $ 100,000 DISEASE -POLICY LIMIT $ 500, 000 A PROFESSIONAL LIABILITY EON G21655065 014 07/01/23 07/01/24 PER CLAIM/PER AGG 2,600,000 DESCRIPTION OF OPERATIONS (LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, maybe attached if more space is regnired) PROJECT MGR: Vibhuti Pandey. CONTRACT MGR: Alanna Boss. RE: Design and Services During Construction for Water Main an Sewer Main replacement in a residential neighborhood. CONTRACT NUMBER: 104670. CONTRACT END DATE: 2026-12-31, SECTOR Public. City of Fort Worth, its employees, officers, officials, and agents are added as an additional insured for general liability as respects the negligence of the insured in the performance of insured's services to cert holder under contract for captioned work, The General Liability insurance policy is primary and the certificate holder's insurance is excess and non-contributory. Waiver of subrogation is hereby granted in favor of City of Fort Worth and its agents, officers, directors and employees for GL, AL and WC. *THE TERMS, CONDITIONS, AND LIMITS PROVIDED UNDER THI CERTIFICATE HOLDER City of Fort Worth 200 Texas Street Fort Worth, TX 76102 USA CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED R EPRESENTATIVE ACORD 25 (2016/03) nyumdo_newgalexy 69674956 © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SUPPLEMENT TO CERTIFICATE OF INSURANCE DATE 09/19/2023 NAME OF INSURED: Jacobs Engineering Group Inc. Additional Description of Operations/Remarks from Page 1: CERTIFICATE OF INSURANCE WILL NOT EXCEED OR BROADEN IN ANY WAY THE TERMS, CONDITIONS, AND LIMITS AGREED TO UNDE THE APPLICABLE CONTRACT.* Additional Information: *$2,000,000 SIR FOR STATE OF: OHIO SUPP (05/04) ADDITIONAL INSURED -AUTOMATIC STATUS Named Insured Jacobs Solutions Inc. Policy Symbol HDO Policy Number G47339273 Policy Period 07/01/2023 TO 07/01/2024 Endorsement Number Effective Date of Endorsement Issued By (Name of Insurance Company) ACE American Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SCHEDULE Name of Person or Organization: Any person or organization for whom any Named Insured is required by written contract or agreement to provide insurance, entered into prior to the loss, where such written contract or agreement does not expressly identify a particular Insurance Service Organization Form to be applied to their additional insured status. Who Is An Insured (Section II) includes as an additional insured the person or organization shown in the Schedule, but the insurance shall not exceed the scope of coverage and/or limits of this policy. Notwithstanding the foregoing sentence, in no event shall the insurance provided such additional insured exceed the scope of the coverage and/or limits required by said contract or agreement; and, if such additional insured's scope of coverage is not expressly stated in such contract or agreement, then such coverage is limited to the additional insured's vicarious liability to the extent directly caused by the Named Insured's negligence during the Named Insured's ongoing operations. This insurance shall be primary insurance to the extent required by said contract or agreement, and any other insurance or self-insurance maintained by such person or organization shall be noncontributory with the insurance provided hereunder to the extent specified in said contract agreement. Where the contract or agreement provides that the additional insured's scope of coverage is for the Named Insured's indemnity obligations under such contract or agreement, then such coverage shall be limited to the extent such indemnity obligations are enforceable under applicable law. Notwithstanding the foregoing sentence, in no event shall the insurance provided such additional insured exceed the scope of coverage required by said contract or agreement Notwithstanding anything to the contrary, the coverage provided an additional insured under this endorsement shall be limited to the minimum coverage limits required to be provided by the Named Insured under the written contract or agreement. MS-15992 (07/18) ©Chubb. 2016. All rights reserved. Page 1 of 1 POLICY NUMBER: HDO G47339273 COMMERCIAL GENERAL LIABILITY CG24041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ 1T CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s) Or Organization(s):Any person or organization against whom you have agreed to waive your right of recovery in a written contract, provided such contract was executed prior to the date of loss. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV -- Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG24041219 © Insurance Services Office, Inc., 2018 Page 1 of 1 1 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS Named Insured Jacobs Solutions Inc. Policy Symbol ISA Policy Number H10736262 issued By (Name of Insurance Company) ACE American Insurance Company Endorsement Number Policy Period 07/01/2023 TO 07/01/2024 Effective Date of Endorsement Insert the policy number. The remainder of the information Is to be completed only when this endorsement Is issued subsequent to the preparation of the policy. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This Endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM MOTOR CARRIERS COVERAGE FORM AUTO DEALERS COVERAGE FORM We waive any right of recovery we may have against the person or organization shown in the Schedule below because of payments we make for injury or damage arising out of the use of a covered auto. The waiver applies only to the person or organization shown in the SCHEDULE. SCHEDULE Any person or organization against whom you have agreed to waive your right of recovery in a written contract, provided such contract was executed prior to the date of Toss. Authorized Representative DA-13115a (06/14) Page 1 of 1 Workers' Compensation and Employers' Liability Policy Named Insured JACOBS SOLUTIONS INC. 555 SOUTH FLOWER ST, STE 3200 LOS ANGELES CA 90071 Endorsement Number Pallcy Number Symbol: WLR Number: C50711481 Policy Period 07-01-2023 TO 07-01-2024 Effective Dale of Endorsement 07-01-2023 issued By (Name of Insurance Company) ACE AMERICAN INSURANCE COMPANY Insert the policy number. The remainder of the information is to be completed only when this endorsement is issued subsequent to the preparation of the policy. TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule, where you are required by a written contract to obtain this waiver from us, This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the schedule. Schedule 1. ( ) Specific Waiver Name of person or organization: ( X ) Blanket Waiver Any person or organization for whom the Named insured has agreed by written contract to furnish this waiver. 2. Operations: ALL TEXAS OPERATIONS 3. Premium: The premium charge for this endorsement shall be 2 . 0 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Authorized Representative WC 42 03 04B (06/14) O Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved. City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 13, 2023 REFERENCE NO.: **M&C 23-0503 LOG NAME: 6OWSSC21 WSMH-JACOBS SUBJECT: (CD 11) Authorize Execution of an Engineering Agreement with Jacobs Engineering Group, inc., in the Amount of $387,678.00, for the Water and Sanitary Sewer Replacements Contract 2021,WSM-H and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023- 2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Jacobs Engineering Group Inc., in the amount of $387,678.00, for Water and Sanitary Sewer Replacements Contract 2021 WSM-H; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $668,928.00, from available funds, for the purpose of funding the Water and Sanitary Sewer Replacements Contract 2021 WSM-H (City Project No. 104670) to effect a portion of Water's contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: This Mayor and Council Communication (M&C) is to authorize the execution of an engineering agreement with Jacobs Engineering Group, Inc., in the amount of $387,678.00, for the preparation of plans and specifications for the Water and Sanitary Sewer Replacement Contract 2021, WSM-H for replacement of sanitary sewer mains and water mains on the following streets and easements: Street From To Scope of Work E. Allen Avenue EppsUe East 205 feet Sewer Easement between Baltimore Avenue and Arlington Avenue I.H. 35 Service Road West 620 feet Sewer Easement between E. Powell Avenue and E. Jessamine Street I.H. 35 Service Road West 1,200 feet then 240 feet southwest Sewer I.H. 35 Service Road E. Ramsey Avenue E. Allen Avenue Water/Sewer E. Jessamine Street Epps Avenue I.H. 35 Service Road Water E. Powell Avenue Epps Avenue 1.H. 35 Service Road Water Harvey Avenue Epps Avenue I.H. 35 Service Road Water E. Davis Avenue Epps Avenue I.H. 35 Service Road Water FISCAL_ INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the Unspecified -All Funds project within the W&S Capital Projects Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the W/SS Repl Contract 2021 WSM-H project to support the approval of the above recommendations and execution of the engineering agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department Account Project IProgram ctivity Budget Reference # mount [ ID I ID J Year (Chartfield 2) FROM Fund Department ID Accounl Project J 1D CERTIFICATIONS: Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ProgramjActivity Budget Year Reference # + moun (Chartfield 2) Dana Burghdoff (8018) Chris Harder (5020) Brenda Oropeza (8271) ATTACHMENTS 1. 60WSSC21WSMH-JACOBS Comp Memo.pdf (CFW Internal) 2. 6OWSSC21WSMH-JACOBS FID Table (WCF 04.11.23).xlsx (CFW Internal) 3. 6OWSSC21 WSMH-JACOBS funds availability.pdf (CFW Internal) 4. 6OWSSC2IWSMH-JACOBS M&C Map.pdf (Public) 5. Entitylnformation-JACOBS ENGINEERING GROUP INC..pdf (CFW Internal) 6. ORD.APP 60WSSC21WSMH-JACOBS56002 A023(r2) (1).docx (Public) 7. Pages from Jacobs 10-K Annual SEC Filing 2022.pdf (CFW Internal) 8. PBS CPN 104670.pdf (CFW Internal) 6OWSSC21 W SMB-JACOBS 4 71f ■ '1 • rIgn1 M 1 0 X O m ry N CD O fV Cr. St - N O O 01 0 N 1n ) 0 N 0) rV N Q 1D m V lD N N O to rn 1D N O O 1D m ID 1-1 N O 1D rn l0 T-r N N c'te a 1111111111] C] '1"!IIlI N M L, 0 'a 11 2 0 CO 7- i'ro eCt ID Activi rn 0 N O v 0 ri m N N m 0 m N N m N 0 m N N m rV N I II HI rr O O in 0 0 N O 0 1a 1n N O N ID 0 ri ri O O 10 N Cre 0 O O 16 0 0 m O 0 0 0 O 1D 0 N 0 O 1D 1n N N 0 O 1/) N 0 O 14 <r) N 0 N a 0 ri ri ID 0 ID D) v 0 m Q O ID 0 ri 0 O 1n 0) 0 O O 0 N 0 0 10 n) N N 0 0 111 10 N 0 m O O 0 0 m O n 0 N 0 0 10 1n N N O 0 1n In N N 0 0 O 1n N N N Q} Z 1n c LLJ 0 SG 0 z Lu Z LLI Q x W 1 O LLL Z LLJ LL] CC 0 u- O 0) 10 N m 01 0) 0 m N ri 17 O 0 m a O O ID 0 ry O 4 <D ere 01 01 01 nl CV 0) cn 0) 0) 0 m N w 0 O 0 m 4-r O 0 1D O H 0 ro v 0 u Y O O 0 0 m m 411 01 O1 0 m a O O 1n O N 0 0 in D7 N m 01 01 N a1 cn 01 Q1 m 01 01 0) O N in 0 N O ID tD erl m 0) 1) 0 m .1 0 0 01 01 01 0) 0) 0) N m 0) 0) O1 0 H 0 0 0 m O 0 n O N 01 Ch 01 N rn Q1 0) N 0 0 'o 0 0 u 0 0 0 0 ri 10 m 01 0 0 O b 0 m O O n O N 0 O 1D 1f1 N