PROJECT MANUAL
FOR
THE CONSTRUCTION OF
WATER AND SANITARY SEWER REPLACEMENT
CONTRACT 2014, WSM—C
City Project No. 02384
Water Project No. P253-609170238483
DOE No. 7310
Betsy Price
Mayor
David Cooke
City Manager
Andrew T Cronberg, P.E.
Acting Director, Water Department
Prepared for
The City of Fort Worth
Water Department
September, 2014
prepared by:
p��ICI�lL 6tECORD
+�li�` ��C�t�TAi��f
��`b dW�i�ti"�i, �"�t
Visintainer
Engineering, PLLC
� ��.�I^ 'ti \;,
'A �
p �Po��'°°";,� '�
r � e �e r-:,1� ry �V''�
� * O f '�� � t�
O0000s000e��::oe�ee�o �oor
�, �y �''-� �. �j -„-,1'�S� �
r r.:� t�� •. !
�• o���a -e�eooe ov
� O
ta ��=:+�G ,�� /
� �
a� �� "�,
�`��� �41..� � � ,1�
E 2
����. � � 1
�`�v,i; c ,
RECEIVED ��� 1 �' P�°
•" • • " .
, , � • �, �' � i, � ;
� ti�„ ,. .._ �, , _..,:> : �. �-�� , . � �. � �.,� , � . n , � .. _ ,. � �._. � _ >. .. �.r�s
COUNCIL ACTION: Approved on 12/2/2014 - Ordinance No. 21546-12-2014
; r�_ ,� ��, .t_ .n._m �,� w � � V � �., . � � .� _�
DATE: Tuesday, December 02, 2014
LOG NAME: 6014WSMCP1-TEJAS
REFERENCE NO.: **G27096
SUBJECT:
Authorize Execution of a Contract with Tejas Commercial Construction, LLC, in the Amount of $611,335.00
for Water and Sanitary Sewer Replacement Contract 2014 WSM-C, Part 1 on Donna Street, May Street,
West Spurgeon and West Hammond Street and Provide for Project Costs and Contingencies for a Project
Total in the Amount of $649,335.00 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of $649,335.00 from the Water and Sewer Operating Fund to the Water
Capital Projects Fund;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of $649,335.00 from available funds; and
3. Authorize the execution of a contract with Tejas Commercial Construction, LLC, in the amount of
$611,335.00 for Water and Sanitary Sewer Replacement Contract 2014 WSM-C, Part 1.
DISCUSSION:
On August 26, 2014, (M&C C-26933) the City Council authorized an Engineering Agreement with
Visintainer Engineering, PLLC, to prepare plans and specifications for Water and Sanitary Sewer
Replacement Contract 2014 WSM-C.
This Mayor and Council Communication is to authorize a construction contract for the replacement of the
deteriorated water mains on the following streets:
STREET FRON1 TO
Donna Street South Freeway Dead End
May Street West Biddison West Pafford
Street Street
West Spurgeon College Avenue South Adams
Street Street
West Spurgeon Ryan Avenue James Avenue
Street
West Hammond College Avenue South Adams
Street Street
The project was advertised for bid on September 25, 2014 and October 2, 2014 in the Fort Worth Star-
Teleqram. On October 16, 2014, the following bids were received:
BIDDER AMOUNT TIME OF
COMPLETION
Tejas Commercial 120 Calendar
Construction, LLC $611,335.00 Days
William J. Schultz, Inc. dba Circle ��12,654.00
C Construction Company
CD Builders, Inc. $742,435.32
A&M Construction, Company $819,954.00
R&D Burns Brothers, Inc. $879,392.25
Utilitex Construction, Company $892,360.00
Ark Contracting Services, LLC $906,763.00
Atkins Brothers Equipment �g54,910.00
Company, Inc.
Jackson Construction, Ltd. $1,031,883.00
In addition to the contract cost, $13,000.00 is required for construction staking, inspection and material
testing, and $25,000.00 is provided for project contingencies.
M/WBE Office - Tejas Commercial Construction, LLC, is in compliance with the City's BDE Ordinance by
committing to 10 percent MBE participation on this project. The City's MBE goal on this project is 10
percent. Additionally, Tejas Commercial Construction, LLC is a certified MBE firm.
The project is located in COUNCIL DISTRICT 9, Mapsco 90L, 90M, 91A and 91 B.
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations,
and adoption of the attached appropriation ordinance, funds will be available in the current capital budgets
as appropriated, of the Water Capital Projects Fund.
FUND CENTERS:
TO Fund/Account/Centers FROM Fund/Account/Centers
1&2) P253 476045 6091702384ZZ $649,335.00 1) PE45 538040 0609020 $649,335.00
2)P253 531200 609170238452
2)P253 531350 609170238452
2)P253 511010 609170238480
2)P253 531350 609170238480
2)P253 541200 609170238483
� P253 531200 609170238484
2)P253 531350 609170238484
2)P253 531350 609170238485
CERTIFICATIONS:
1 000.00 3) P253 541200 609170238483 $611,335.00
2 000.00
1 000.00
500.00
$636,335.00
2 000.00
500.00
6 000.00
Submitted for Citv Nlanaqer's Office bv: Fernando Costa (6122)
Oriqinating Department Head: Andy Cronberg (5020)
Additional Information Contact: Roberto Sauceda (2387)
ATTACHMENTS
1. 6014WSMCP-Tejas Compliance Memo.pdf (CFW Internal)
2. 6014WSMCP1-TEJAS MAP 01R.pdf (Public)
3. 6014WSMCP1-TEJAS MAP 02.pdf (Public)
4. 6014WSMCP1-TEJASC P253 A015.docx (Public)
5. FAR-00003 CIP#02384 P253.qdf (CFW Internal)
6. PE45-538040-0609020.docx (CFW Internal)
T W RTH�
OR 0 �
Cit of FortWorth
Y
Standard Construction Specification
Documents
�
�
Adopted September 2011
�J
000000-�
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 5
SECTION 00 00 00
TABLE OF CONTENTS
Division 00 - General Conditions
00 OS 10 Mayor and Council Communication
00 OS 15 Addenda
00 11 13 Invitation to Bidders
00 21 13 Instructions to Bidders
00 35 13 Conflict of Interest Affidavit
00 41 00 Bid��'orm
00 42 43 Proposal Form Unit Price
00 43 13 Bid Bond
00 43 37 Vendor Compliance to State Law Nonresident Bidder
00 45 11 Bidders Prequali�cations
00 45 12 Prequaliiication Stateinent
00 45 13 Bidder Prequalification Application
00 45 26 Contractor Compliance with Workers' Compensation Law
00 45 40 Minority Business Enterprise Goal
00 45 41 Small Business Enterprise Goal
00 52 43 Agreement
00 61 13 Performance Bond
00 61 14 Payment Bond
00 61 19 Maintenance Bond
00 61 25 Certificate of Insurance
00 72 00 General Conditions
00 73 00 Supplementary Conditions
Division O1- General
O1 11 00 Summary of Work
O1 25 00 Substitution Procedures
O1 31 19 Preconstruction Meeting
Ol 31 20 Project Meetings
O1 32 16 Construction Progress Schedule
Ol 32 33 Preconstruction Video
O1 33 00 Submittals
O1 35 13 Special Project Procedures
O1 45 23 Testing and Inspection Services
O1 50 00 Temporary Facilities and Controls
O1 55 26 Street Use Permit and Modifications to Traffic Control
Ol 5'7 13 Stonn Water Pollution Prevention Plan
O1 58 13 Temporary Project Signage
O1 60 00 Product Requirements
O1 66 00 Product Storage and Handling Requirements
O1 70 00 Mobilization and Remobilization
O1 71 23 Construction Staking and Survey
O1 74 23 Cleaning
Ol 77 19 Closeout Requirements
Ol 78 23 Operation and Maintenance Data
O1 78 39 Project Record Documents
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conh�ct 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 22, 2013
000000-2
STANDARD CONSTRUCTION SPECIFICATION DOCU1vIENTS
Page 2 of 5
Technical Specifications which have been modi�ed by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
99 99 00 Temporary Asphalt Sidewalks, Driveways, and Barrier Free Ramps
99 99 Ol Temporary Concrete Curb and Gutters
Technical Specifications listed below are included for this Project by reference and can be
viewecl/downloaded from the City's Buzzsaw site at:
htps: //pro�jectpoint.buzzsaw.corn/client/fortworth�ov/Resources/02%20-
%20ronstruction%20Documents/Specif cations
Division 02 - Existing Conditions
9� n--n—� coto,..:.,a c:�o no,r„�;,:,...
02 41 14 Utility Removal/Abandonment
02 41 15 Paving Removal
Division 03 - Concrete
' 03 30 00 Cast-In-Place Concrete
' 03 34 13 Controlled Low Strength Material (CLSM)
03 34 16 Concrete Base Material for Trench Repair
� Qn nn r�r a:�;,..,+;,..,� ,,. ��,;,.,;�,, r,.,,,.,.o�o c�.-,,,.�„•o�
,. �..,..., �., �<>.� �...b .,...,.., �., ., �. ..., �....,
l�ivisio� 26 - Electrical
Z� nc nn r ............. �x�,...�, no�„i,� �,.,. �io,.+..;,..,i
Zg�� i n r�o,,.,,.i:�;,,r �,.,. �io,....;,..,� c...,,o,.,�
Z�-o� �� n,.,.o....,.,� .,a n,..,o,. �,,.. �io,...-;,..,i c<.��o.,,�
z���--4� rr.,ao,.,,..,,,,.,a r�.,,.+� „�a v.,,.o,.,.,..� �,. �io,.�,•;,.,� c:.�+o,� _
Division 31 - Earthwork
���QB c:*o rio.,..;,,,.
�-�z� i � r Tr,.i,.��:�:ea �.,,..,.,,,,:,,,,
��ZTL� Yie1T8�f�F
��.'24-oo-�oa���a==�=�
31 25 00 Erosion and Sediment Control
�� � nn �„t,;,..,,.
�i �� nn n;r..�r
���
Division 32 - Exterior
32 O1 17 Permanent Asphalt Paving Repair
32 O1 18 Temporary Asphalt Paving Repair
32 Ol 29 Concrete Paving Repair
32 11 23 F1eYible Base Courses
32 11 29 Lime Treated Base Courses
32 11 33 Cement Treated Base Courses
32 12 16 Asphalt Paving
��2-�� n �,-.t,,,i� n.,<,;�,, r...,,.v co.,i.,,,+�
b
32 13 13 Concrete Paving
32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps
��� ?J r�,..,,...o+o v.,..:�,� r,,:,,« co..i.,.,.�
b
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 22, 2013
000000-3
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
��'-�r� �,.,,,...,,+o r-�,.,•�. .,..a �,,.,o..,. .,,.a ��„i�o<, r-„+,o,.,,
�z�T�� D...,o.,�o.,+ TR.,«L:...T� �
�z �3✓ (''1,..;,� �o., .,.a ('_.,+o�
�z2 �z� «7;,-0 �o.�..o ,,.a (:.,+o�
�� � �n �x�,.,,a �o.,,.o .,a r=.,.o..
�z�z?�� r''.,�+ ;., D1.,..0 ('',,.,,.,-oro Aor�;,,;,,�. TxT�lt�
32 91 19 Topsoil Placement and Finishing of Parkways
32 92 13 Hydro-Mulching, Seeding, and Sodding
32 93 43 Trees and Shrubs
Division 33 - Utilities
��-0����na~�-r-��^-.~Z�e� e�g
���r�� ri,.,.oa r;,,,.,,;. -ro�o..;�;,.., irr-rv� r„��o,.*:,,.,
��-0� i n �.....,�� n,,,Y.�;r,� „��.,;�}:,,,� co<„o,. c.,��o..,�
33 04 10 Joint Bonding and Electrical Isolation
33 04 11 Corrosion Control Test Stations
33 04 12 Magnesium Anode Cathodic Protection System
33 04 30 Temporary Water Services
33 04 40 Cleaning and Acceptance Testing of Water Mains
��-04 �0 r•�o,,.,;.,,. ,.� co..,o.- ra,,;,,�
33 OS 10 Utility Trench Excavation, Embedinent, and Backfill
33 OS 12 Water Line Lowering
33 OS 13 Frame, Cover and Grade Rings
33 OS 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade
33 OS 16 Concrete Water Vaults
33 OS 17 Concrete Collars
����') 1 T,,.,«.ol T; r Dl.,ro
�� v�-17 C'*ool (''..�;.... D;,�.o
�� G � i7...�..] T,,,,,,ol;.,..
33 OS 26 Utility Markers/Locators
33 OS 30 Location of Existing Utilities
33 11 OS Bolts, Nuts, and Gaskets
33 11 10 Ductile Iron Pipe
33 11 ll Ductile Iron Fittings
33 ll 12 Polyvinyl Chloride (PVC) Pressure Pipe
33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type
�� } } }q �,.,.:�a �*oo, v;,.o .,.,a �;�+;.,,.,.
b
33 12 10 Water Services 1-inch to 2-inch
� � '�''. '�-�a��e ��l�te�P�4e�ers
33 12 20 Resilient Seated Gate Valve
�� i� �� n�xnx�n n„�.�o.. co.,,oa �z„�to,.�..��.,i<.o�
33 12 25 Connection to Existing Water Mains
�� ��n r,,.,,i-,:...,+;,,., n;,. v��<.o n ��o,,.,�,�;o� �,. n„�„i,�o �z�„*o.. c<,�+o.,,�
33 12 40 Fire Hydrants
33 12 50 Water Sample Stations
33 12 60 Standard Blow-off Valve Assembly
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 22, 2013
00 00 00 - �
STANDARD CONSTRUCTION SPECIFiCATION DOCUMENTS
Page 4 of 5
.� ... ��
. �
�. � ■ � �
� ._ � �
�_ � ... �.
�
�
� . _ „
• � � ��
• � �,
� � ,
• .� . .
• � _
. � . •
. �_ �. _�� � �
. ��
. � �
. � �
.• � � „ '.
.• � �
. � . � �
Division 34 - Transportation
�� n� i n rr,.., ��:,. c: ,..,., i �
b
�4 n i� i rr �,.,,.,.,..,,... rr,.., ��: ,, c; ,,,,., i �
�4 n—,-�� n o.�,,,<,;.,,, rr,..,��;,. c; �,,.,��
�i ^i---ri i� Ao..r......,,l.,v A..,,.:.7 �1.,�1,:,,nRo�...,,,
2n n 1 1� AoAo�tr:.,,, L7.,l.r:,a C:....�1
T
��I �'� A., .a Ti t ' t:..,, A 1.1'
—r s. xcvuc�'wir`�ziraiiriircrcroxx z i$vcxnoirco
?-�li n 1 '2!1 A rl�iiili}�,iiii �i�fi&
34 '71 13 Traffic Control
Appendix
3E-�l.ni n<.,,;i.,�.:i:,..,,�r a�
-v-r—r-z�ax:a o rrx c�-orzuixao
GC-4.02 Subsurface and Physical Conditions
�E1I.nn rT„ao..,,,-,,,,..a �.,,.;�;.;o�
�r n n� u,.�,...a,..,� �,,,,;,,,,,,,,,o..+.,i r�,,,,,a:+:,.., ,.� c:�o
� .
GC-6.06.D Minority and Women Owned Business Enterprise Compliance
GC-6.07 Wage Rates
' r��� . nmr� Dre-nirresu^'�mry �'r�i�ic�
GC-6.24 Nondiscrimination
GR-Ol 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 22, 2013
00OS10-1
MAYOR AND COUNCIL COMMUNICATION (M&C)
Page 1 of 1
1 S�CTIOle100 OS 10
2 MAYOR AND COUNCIL COMMUNICATION (M&C)
3
4
5
6 [Assenabler: For Contract Doc�m�e��t execirtio�T, reniove th�is page ai�d replace �-vitl� tl��e app��ovecl
7 11�Ic4cC for tlte award of tJze p�'oject. �YI&C insert shall be on blue paper.J
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24 EI�1T� ii�' SE�Tiai�1
� ��
. . j . _ • . .. . � � ,,. y,, f '�. , . 4 5 . - . . - . - . . " _ . . � .. s-.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
� �
City of Fort Wor�h, Texas
Wafer D�partment
� � �T�1GI�Ii�ii�L:�
To the Constructir,n Pians, Specificatians, and Cantract Documents
�or
��fer �n� Sanit�r; Sev�er �e�lacemen� Carttract 2t79�, �lSl�i-�
City �roject No. 0238d
C}.a,E. Praject No. 7310
Add�ndum No. 1—lssue C?�te: October'(0, 2014
�id F��ceip� �7a��: C7cC���r �6, 2094
This Addendum No, '1 farms part af the contract docunients referenced above and modifies the
origi� �ai Contract Doc�ments and Plar,s. ,�ckn�w�cdge rcc�ipt �i ihis �c�d�ridum k�y �i�r�ir�g ir� ����
space provi•:led below, attaching it ta the �artract Docume�ts (inside) and noie receipt of the
Add�ndur�t dn the outer envelope oi ynur bid.
Prosp�ctive Bidd�rs �re her�l�y ncaiified �f th� foilowing:
1. 1"ime is of the essence. The Contractor shaN be prepared to start can�tructian by the
second week of January 2105 du� to coordina#i�n with �1"IPW pavement rehabilitatian
r�rc�jects. All tim� limits fc�r MiCestan�s, if �ny �r�rf Fi�,al Acce�t�nce within 120 da,fs as
�tated in fhe CantraGt �ocuments �re af the �ssence ta this Contr�ct.
aect�on titi 42 43 i'roposa! Form has been revised. See th� updated f�roposal s orm on
Buzzsaw under the �id Qocun��nts Pack�ge folder and tf7e individuai Propasal �nrm in
#he A,ddendum Nt�. 1 folder for revisions. Bid Items quantities that have been modified
are as foilows:
i, Modified— Part 1; Wat�r imprc�v�m�nt bid item No, 1 33�1.4261 8" �'VC
1Nater Pipe, Quantity changed fram 5,633 LF tc 5,076 LF
ii. Modified— Part I: Water Improvement bid item No. 19 3212.0304 4"
Asphatt Pvmt Type C7, Quantity changeu from 656 sy to 0 sy
iii. Modifie�— �'art 1: Water IrrYprovemeni bici item No. 2U 3211.a324 �1C}„
2:27' P�rmanent Concreie Repair, Quantity chang�d Frnm 750 sy to 0
5y
iv. Modifieci— Part I: Water lmprov�ment bici item No. 27 3292.0�900 Block
Sod Rep(acement, Quar�tity changed from 120 sy tQ 0 sy
3, Plan sheets 2, 4, 5, 6, 7, 19, 2� has been revised. See the updated Plan Sheets �n
Buzzsaw under the Bid Documents Package falder in the Addendurn Np. 1 folder far
revisians. Plan she�t changes reflect removal of proposed 8° W W-1 from Sta 6+�78.98
to Sta 12+35.85 from this cnntract.
4. Appendix GC6.09 has been r�vised. See tl�e updated r�ppendix GC 6.09 on Buzzsaw
under ii�e Bid Documents Pac'�cage folder and the individual Appendix in the Addendum
No. � folder for revisions. Tarrant County Permit Application has been remavecl fram the
appenctix.
All other prc,visions c�f t17� plans, s�ecificatians and contr•act �ncuE�i�nts far the praject which
are not expressiy amended hereir� siiali rernain in full force �nd effiect.
ADDENDIiiV{ N0. �1
Octob�r i 0. 2014
The Contractor shaii acknowledge receipt af this Addendum (1) in the space provided below,
(2} in the proposal and (3} acknowledge receipt on the outer envelope af yaur bid in upper case
letters `RECEIVEb & ACKNOWLEDGED ADDENDUM NO. 1'�.
Failure to r�turn a signed copy of the addendurn with the Propasai shail be grounds far rencaering
the bid non-responsive. A signed capy of this addendum shal( be placed into the Praposal at
the time of s��bmittal.
;
i
�
r'
RECEIPT ACKNC7WLEDGED:
, : �-
, , _ �
, �; ._
� ,.-
,,
gy;c t ��' �J , __�
' r �
Title: 4_,.t f. �- ,��� .� �:.,, ,v_� ���_�_
WAT�R DFPARTMENT �
�/--- I f
g�: t �' il �lr�. � �u �
�— � �
Tany Shalol�, P.E., Project (��anager
aoa�ra�u:v� No. �
o�to��r �,o. 2o�a
UU J2 43
�ID PROPOSAI.
r,s� i or i
SECTION 00 42 43
PROPOSALFORM
�Vntcr and Sanitary Sewer Conh•act 201d, �VS�9-C Part 1 CPN 023A4, DOC 7310
URIIT PRICE BID �idder's e4pplication
Project Item Infonnation Bidders Proposnl
l3idlist Item Specific�tion Unit of I3id
No . Description Sectiuu No. �teasure Qunntity Unit Price Bid Value
1 3311.0261 8" PVC Water Pipe 33 11 12 LF 5076
2 3305.0003 8" Waterline Lowenng 33 05 12 EA 1
3 3312.3003 8" Gate Valve 33 12 20 EA 10
4 3312.3002 6" Gate Vaive . 33 12 20 EA 6
5 3305.0112 Concrete Collar 33 05 17 EA 16
6 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 3
7 3312.0001 Fire Hydrant 33 12 40 EA 6
8 3312.2001 1" Water Service, Meter Relocation 33 12 10 EA 158
9 3312.2003 1" Water Service 33 12 10 EA 168
_ __ _ _
10 3312.2004 1" Private Service 33 12 10 LF 146
11 3312.2101 1 1/2" Water Service, Meter Reiocation 33 12 10 EA 1
_ _ _
12 3312.2103 9 1/2" Water Service 33 12 10 EA 1
_. _
13 3304.0102 2" Temporary Water Services 33 04 30 �S 1
14 0241.1001 Water Line Grouting 02 41 14 CY 3
15 3312.0102 Connection to Existing 6" & 8" Water Main 33 12 25 EA 14
16 0241.1511 Salvage 3/4" Water Meter 02 41 14 EA 161
17 0241.1510 Salvage Fire Hydrant 02 41 14 EA 5
18 3201.0400 Temporary Asphalt Paving Repair 32 01 18 LF 6550
� o�a�on�nq-4�-p�gph8{t-pym{-l.Yi3e.g.. _ o� ��L_,�,o^� � _
. �._. ������ �nzon...�n�� o o� o . . .....� r�� �,..,.-sor���,—...�.. o P�,.f vo ���—r�_z_o...'� �. .
21 3211.0324 10" 2:27 Trench Repair Concrete Base 32 11 13 LF 1000
_. . _ . _.
22 3201.0612 7" Conc Pvmt Repair 32 01 29 SY 4
_ _.
23 99 99 00 Temporary Asphait Sidewalk 99 99 00 SF 250
24 99 99 00 Temporary Asphalt Curb & Gutter 99 99 00 LF 690
25 99 99 00 Temporary Asphalt Driveway 99 99 00 SF 2125
26 3305.0109 Trench Safety 33 05 10 LF 1354
� . ��cio,�_�� o_,.on�ne_�I _ �� �o�—„t ,,oa� � _
28 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 1
_ . _ _ _.
29 3471.0001 Traffic Control 34 71 13 MO 4
'Potnl l3id
END OF SECT[ON
', CITY OF FORT NORTH
STANDARD CONSTRUCTION SPECIFlCATION DOCUMLNTS
Forni Rcciscd 2U I 2U I 211 IIU d 1 lia_00 43 13 Inl d2 d3_lio d3 37_IHI 45 12 IIII 3 i I3_Bid Proposal 14orkbook
OIEG N300
o N_
W
�
2 .-
O u -
U Woa
W �oa
O �'u
z
� m-
a
Z'oY
w m
� ��i
> moG
w90
�W�
Y��
i=
3ar
_Nz��
��sw
NYFar�
7�d„oW
s=�o--
W -_
F ��
N o���i�
Z ua�o��
� ��mhoi
Z �3�_r
� ij3���
w � »j„"<
N W -�40
� �
Z =a<�a��
m Yo y�N
3ffnE���
ZOBZZ.-X
3m �
� Yg �
_ �na ;
� _ ma%� �
> w oF
�
��:
'aoLL
��u
���
3ir
�ao
7
�
3
��
`0'�3
G�a
3n w�
;=€in
o�
�3;
��;m>
owm�n
o'ao�y
Yr��x„
m�`7��
�rt��m
m`3nwu
�04���
��a
��
g�m
ai
Ta�
���
jF�
���u
o'= W� m
o �o�
�}��oN��
g�G�so
W soo�o3?_
r�V �
O ��w4w
� §�oioo�
W ' �
w ���gu
Wz �_��RN�s
Gl s�j i��
a �g�a;N��o
Z 4a�i4�o
N �W��m��a�
m�az�o
�a��.�m��
ra�o�a.��
7 0�
'�g
au
�o -
�� �>
��
��
ay =oe�5
04 V�3
Sow
Y, U�
- o�
gw _m
a�
�� _
iN �a
�� �a
go 7<
�Y j��
si °o�
o� sY4
�< �a
�
a�N
��a ��w
o-� �a�„
�i� wUo
a�
o�� o
�� �a
o� :g�
3"'G �'au
a:w ���`�
�j� _wa3
'� �
�3�N
a�� ��y�iy<
Y�3p ���U�
_o ��ma3
4
��o s
�o� �o
u�3 -
Uos
Y�p 83
�$� �e
,NW Wa
7=
o$
a�
g�
�r
��
��
�m
o�w
�
8
M
�
a
I I "_
- a7
i��w � -
�Vy��� sY �z�
�� W�W W�o
W �0 30 �Nz
�rcm>£p _ �i�
��=a�� �p �`<:.
3w� �� ���
�i�W�� �n� Di7rc
��zj�¢ - >§
�o =�°_ °� -
-���_- ����
io oYN n� �¢�
v+ y��a� �^1 3wa3
4,�,p�N�g Ya S�ow
-�4a�a 7�ao
- w3�=_
��w�W��3�
jW�o���go
t�n��i<Z§r3
� ���s�
g�o=�3oNoo
a;Nswaw=
�ga °c��o'<
<=z�a��wj
�"4=��=s?
=3�a�����W
��< ?daao�
�i u�sia�
w r�u33av�i
Wz� _��arc�
_.�'�a3�
a§
��3
?��
N w i
�- � ° a
O �'
z 3J�J w°aW
W o�3
K
W w�o
3 owo
w;c
oir�
°�a
L 12�dd �-WSM 4LOZ 1�Vb1N0� 1N3W��rfld3b 213M3S .l2iVlINHS'S a31VM
o F-
� g 3 q�o8�FF �� o NQ � K z �
gN " b m m A � x� ¢ F
_� � am�r.lnaa�a Z w z W p, W
6 � �cm ms"cc9 � _ � � � x �
:R $ u "' U �� t11 (!J v� C
'�a � "€� � 3 a w� �
'� �� � � > � �. w rn 'a W a �
?ESg �..o- ro � KD }N F
�S � 9= a o O LL�i Q f" O2 _�
��`o� 89�� o O Q Z� � �
5<� ` �� � b � � �` y � ¢ 1—
"�€ Aw G S� I- tn
pdgpo ou ��� W=a � g�C U °tl O 2 ��
��d�`�' �F ����y���p ^k�� w U C^
� �� �5����a�ae�o � �, Q � �
}o��� €w��saz���a� ���3 � w a
_ � �o���
N p ry 4Nf ��_��
��r_� 33333_y=ooLL��N
oo� 5��5�waw ��u�o
au�rc� � :'6�u�"�"w6woo��u-•u-
�uuu i3t33�?Sww'o�gn
-��< _______�__rrp
aa
s�
��
oa
z'o
§�
o�
��r
40�
:3�
-wY
?3�
oY�
Y
��
on7
w7�o
- �«�
�
�„3
p �s�
� o�S
� m�H
o �o�
7 WYi
W }¢4
� ���
p om�
4o m�i
UJ &o�
�
�
��
3
�� - �°4
�� n� wma
3w o�Ws��
•-�omg3
� '3�0
o� � -
�i� 7�=¢�0
o�� jF�FN�
:�� � "�4�
¢�a pos5�
��� mnp��w
�3� y��o�
��°� oso`_
�W �$��U�
360 .,m:�.-.
y��� Y� � �g <xo W'= ; �yo�
43oe -- - - a4� ��'��
� - � wx " o e3oow�
��Yo GY -- � ��� �;� '=r��o�
- - � a3� 3 - a ;°�Y _ m7<
> oo�� ��g'o aw��^ � ¢
�o ��� j w��x W���� �a ���oa�g
rz� yo �a �
pW °�=�w "��=g __ � WNF��o =�go
i`4t ' �� j,`� ' �� o�o'�m = i3o'o
'��" '�4 ajw �_ -=7�- _- wY`
�jUy - 3iw- _ _ Wa~ - -_ Vp3�
��= ��<GxW -o�� Y" - �;o��� -mo} �0�>6��
iN�a o�Yo_ ��'s �' �a �og`�� �� N�'�'�j?`�
FN6 �9�h o �wg�- -r�� �3�
W� Y�� o� �� =��'� o; u��o����
m� 6� �soa � �5a-„4 >% N�_ �=_Y
�g�ga �to- 04� a� 4s '�'< ��� - oC��
-_� pY�W�� a� 04 _ �� ��;- -
��asG - mY�`.w �'1a �Y GW �iiGw �o -
��oa� i�7��� ��oo �� �•- :��93a w�.� `i�a��
i�
e�
>�m=�?
�Q�m_
__ -mG �
m'�CA� ?
�i�q=w o
F�< �3
Um3<���'1�
_ wC� ��
'��m3� �r
�oW���� '�
,-.«o£° �"s
3w
��G
��u
���
„N>
p�S�
����
�
�§
Yo
m3
�a
��
� ni
3 �3 W
#
3 �3
��
' �o �
� _
d� ��
_. �
ojw
i�
ogm
ia�
?��
jp�
m5G
��F�
Ya
£ -
Y � a� W �
o��o �� =wa �0�3
���'ao - '"`'`-� 'z��a'� sWW=
3� _� go� 4a��
-z�� 'ac� ¢ Njm� ��-_
No �a7 �w ��o
�i`x� _ � %m o�w
_o�3g' - �'o �o ¢�g�
N���� _� }�� �Q¢ >�x
zu_' "x a`_ '"s
�¢� - z`"mz Y� a`-aF-
jJus� j� o l�-o£ �3iS
r��Nz o�a -�u
_ W3- Wiw�� a�¢_
F�i: =�i�o �9W
33�go i'" _ �'ooa� oo�o_
: �Gs o�o pm� e4�w3 � w
�w�� Y$� Y�`-'� :�3� �yW�n
8�� �¢., _� �m�o7 �9��<
3
w
t
�
`s�
30
�3
s�
ti
7
sY
s�
oN_
5�a
so3
��o m m
_�Y �� �
o�pim �<W
_ aLL_ `s��
�u"��'�o� �'�
WeW=wo ��o
_=;=�w Ng
ogY000 ��
z� Wj �o_
�o:&Y=� _ -
��"��o �a>
��3�>
Wojs�w ��o
�Qas= _��
�'` _ "�
�a��og Y3o
_ - oW�
�oo�g -�
o�et uaoa zoazz-x
'•3 LLr�.
a s g -w`g
>w"�=-
�
��>..T
� # O
z �o
�`�°�: , � �
�+`�;�h�`' a
c U
�
,
���
�
�
_ 8
5 _ -
� :
o-:o °-
w o =_
w��� _�
l 12itJd �-WSM bLOZ 1�V211N0� 1N3W3�Vld�a 213M3S Ai1VlINNS'8 2131VM
o �� ��� g z
w
�9$ � �z ��d � a � � W .- t
~�_ $ �_ ��' � e �oms"mFm�� °� a g �
��F '"o�� � � G � 6AJ,'�bd� � w ~ � a
YiFl3 i tlo�€ a$ y momR ��n9 0 ~ W� U (^
p�< � cG�&izWa < "�"�$m6i U S��� Z e�i
„ m�u a . .____._.._.._ Q K� W(� O G
u�� � ��YFa��� � o � �
_� e� ��w��a�� o 0 0` � o a W� n. w�
a d. �.a
��� ��}� w�� zW ` s o > � 3 W� c �
o < d .���6oG p� € d _ �a � � O } N �
��� _ ����q��3 a G€ � ' � e o W � � � 8
�$� � a����@�� F< go �� o h o a z o �?
.a� a10 �_; Y� a; s N 3 N�
�� o��«t��g�€�tl�� a< <�"� �: o �� � �t5 z0
�:�ec c��<���<��� _< ��`�e��= ��� W � _ �
��=au3w ���b o ���
���� _�'_��_� �'s a�� � Q � �
;m'sae�R.� .,� �gms�s €a<�ssz�c�`s� a��� � w a
. j O�' I^;�-�r'�-+ '- }- - I Q .€' € � I � F� LL,'_• c
� �o .�� ¢U`� �I. o � � € IC ��� 5 � � 3 �
?`•4�-II _' � I� "�- � n 3G �I�S�S3a ���s��
a 'I� ' `�
m�. , __. �- - K g ^� C
, o �*l i s i.� � � �
�
7
y � i' ' _" .. LL � . 9�10 � � E V
'_ ... I _.. . _ .._ �. a
Hl.1IUN) �� � � � ` # � ? � .
liAL35 � `ol ° G Q € _ . ... .. ., ,. ��'.
ILI.(1()ti � .. y . .
�� I r.� i r _,— =o c� , a= I
I ' 7 �CgC;�C�� CE �.E
�L..._:�� I_1.;�1 I..l� s�y 5��_�� 3= ��i=
--
�� �� �1 �. `
I_Tn 1 i�.1_� .�_. ��� �� G
�
� o F
j� �� 9 g
j �� L�J _:. I QI, s WI 4
� � t I ,r �
I a� < y ; t _
. .1�.- ' '��� ' � � ly � � � `� E e E � S � � `
i ...�:RC -I� 3Q
�r _Li i --� ; (-i-' _.1�� _ � �� � " z # � F J a
1 � � .--T..I. � rt , t I�r t t r c � t
� i�� � �� I L i8 5�'�i�&�° $�e§cs �a
_ � 1 � .I� �_ � (�1_i � � Y t- � S � ;
� - �1 , - r' aasa ..�;:� "6� .. �Fs�.^ c
L_L� �� L L1 _�� � �;g� P 8�� ��� 8
l�� rt b
f i� �-, r Q� ;�� �i�i��� ���� �
1 �.1.._�I r i � � v � � � �� : .
� -��i�;� �� .i� ������ '�.��a�a� ,��
; ,..
�
��i � I � : ' oV 3 �n`13@3 � ? � 3 -
I I . l._.._1_� — , _ . �_ �
� L� � 1' a,j i
�_ � .1_��� � �� '
��.� I�_1 �..I_'-1��� rl or � '; �.,.. V _
��� H S t j IE S t I � K
'�-�-�-,� '��( I�( I(... .1 �-( w z � al� al,l-, _€ i o�a'o o s� a
_ T__._..__ ._�
�'—_�;� �� ��..
� � �
1; � � __
_ _ _.
_
__ _ ,� � _-'�- ��� ; - -
�. �
;; , , � �
�
_
,
: .
I� :�__� � � .
__� l_: J ____ : '
�
__� ...__ �zr____'_"; _ _..
�" .
i � : ' '
� .
' i
I � `
� I
l_ �l._1� � ��_ L ' � I ' �I.
� �— —, _- - - — �-- �
___. � _; -_�� --
; _ _.
, ---- — ---
_ -- - ---
;
-�
_ � _.
�---- � � , � — � ;—
__ ;___� -- _ N - - _ _
�-
` : _� , , o� ; - -- :-- z_-
;
;
__ � _
,,
- ZI � L
-� � I v"_
. i ...._-� `L_Is _ _ T _
. ' .. �11 —_ I - �-
; I W
-. r j r � � ..^ 'j r-
. . J� -3 I _-j - _� � �.
..�m, � � I �"s-
__.. u: � � , .
_ _.
s , � � H�. i
� .._ 'Qt-. � ia _ " _� �� .
m L_._.
� - ,o ; �. �-- ... �i�-' L _
�. ... i"__ .`- 9:1N�IAV��"I().� �:
i - 1 �� ]� �� ; I ._.
{ 2 � - I
7 I � _
- — ..i i j;�� � , -
Z � -
`' ^- �
>
; _ ,,., � �z" . ¢ . _ _
�r —, � — �
��� i � u ' � i
_i. a ;j o � ��r-
� � °
m
J _ .
� , M-
' � � ��_� i ' � � - i
� 4�
:�_ 1— i�. -{a -��
� �-ia��yv�uvti-� -
� ' n
- �- �-. � :. .. i
_ _ "". � � i ..� .
'- __
_ _! _ -, .-� — :. � 1
-�- t - - �`_.._i I
�i _ I -�� --'' �-
� - _' _
� l _. - �-. � � � � �-
, _ ._ - -, —� f —� ' H�'�' 1 _.
f1N7AV
�-�l ___ _�� -, I
� ��.� _ �- �-= 5;=� j
�`-;I-'�- -_--;�
.� � -' � -
'�--�� ;. ' -_ {' � � ' - __� __I
_ I - �J
�_ __ _—
F� �' _::_� —
snN�n�� Hav
: C—' --� � '
. ,—, . _ _
.�r � ��_ .
__.
�o�rt.T ,—__; ; � _ _ i ..
�c�.� r_�_ � �__; ;__� � -
����>'� ---- _ s _
� �-: � �
_�_ _. �_�_._ , - ; .
--- - -Y- —
�,--,
��
i
�T�_I � �� ; _-'� -=i-:N.
-1--- ,_..._. , ; ---
- z M .--- --
-T- -
�
lc�I.._f__ � _.�.. __ � _-_ 5.-��
...��r� �.�.L% . _-- -_ __'� _
�� t._.. �'_..
�
w..'— ' -7 iAvyi VA1i I�
flk'
—'i--1'_ .''u �
��.�;,. � �;��� s ra i�
. _..._
, - -
a � _
�
���>..: _...1..�.._-_. I � � �i I :—
—. ; � ;I ,
--_o. _- --� ;��� . ,.�
- __.�� �
, , ,��
� I _...._:�� . g.
'._._.. .......-i L r._..._ i _-" � i -.
-._.._.______"_."_ _ _
__._._ '___•>L ._....i
' -' } ._._ � � i i r_'
__--...._. ; ,
_-- --
-- '' -- � _�
- �
,.. ° ' --
--_- �,-..._. ; I
�
� � _...
L._. ;3;�_: I "
311N7:1V _ti3lvtll ...___'
....___..__...'__—'—_. i.. ;
o�ec Haoo zoezz-x
u sg g
� � xE n
v c ^�s _
H c amv p
> w` n°e W
�
l 12iVd �-WSM 4lOZ l�Vb1N0� 1N3W3�b'ld3a 2i3M�S �liJVlINVS '8 2i�1HM
� o k � z
€�� � �5 mE� u � ^ b� kS �'o nh �
��- � w� w�b � a g � � � €a Gm „ry W r- G
�Fa W � <� � � _ � �� •� "� � n cn U F-
'�� ���*a�' ° n � 6�m6:m�mmk �^€ w" ` b Q � d'
�"' = Yl���� o " "F��.,Ar�'d'�' � «� �o "� ��� x F- d Q
`'+,� � ��� o �a=��= " � � d'm,.,."b^""aa ° �« � �� o �,ox �� g�� _ � � c�,� Z x
w $ o �. �¢�3��� Y �os�`6 mmm � e €� j „ ��� �' � = R
�'; Z y m e y�� � "= a o< "€`T ;� r- t-- d
;."; -=,s o`� �g '" v S< y oW s S�� < K� W� ,,.7 ^` G
z U�a �w`ca3aY1 ` o
zxY UI ��W o K ��. W W
`�: . ty °- � ya„��� � � F w �_ ^ �� � €;a '� � 3 °- � � 0. 3 0 � �
M �� o U oW9 � YJ`s1i 'e� C� )� cv� m r �� ^ F, W(n f� W�
`. '" � �� CS €x�.�H6aG �� � a ,'_ m �� � �� � �:m h" K 0 } o W � �
��~ u u�i �"b �����dgGH aa G& � a g� �„8 � 3or� o� � � W Q� Q'� ' 3
� w�g � aob����` �� �� ` � � o �_ �' �a � �`� �_ „ o a z � � � � �_
" za4 ., a2o��=� � � � o N � €oG� ��� �� n
�"N � � � zg�� o\ � � ¢ F—
� ����,w.';��a€�`�� a�. u �� o��§m ��m ao� o�r u� z
a ��� � o� � c= ��GG. �'a =oae =�am � `9`m z`� omc� � W � � �
G�€����os�¢�o���� �< ��`�p �LL ��za $=�m m�°� ma�o ' �
;���4=���a3$�=�0��= �� �����a��o W= ��� " � �x�� a � �
��sae d �a�=:s�w�e cs«•.
t ..
__ � ., .� m � � <ss�zoe��� e�� a��� ���� ��<� a��� � �
w� �
p U =a�� 5 � Wjw�
=�3 m� - _;_�
ow'- -- wo3W - -
-- `3 -�} 3�3�
�"00 W - W=�` W _ w� "03�3
� w� w aa���"
oaa� _ � '"a - w�
w _ �� 3W 3�^ �- �3
3ztt� w r o3�od �3 ��d ,� 3N2__-
_ o�m - o�d � �3<�rW-
w��N �°N �=�o <���7 �� �� �m ��000�
_ � ., � � e � m
-��
- ��
'30 �sw�n
o��
(aNn
atao
,tvn+�
�I
I
�
I
i
i
�
I
i
,
�'.
III
I �
I �
I
II
'
I
II
ei
7
W
Q
�
d'
a
o�e� uaoa
zoezz-x
-a �
a ~� g
> w 4$� -
�
6 121Vd �-WSM b60Z l�H2J1N0� 1N3W3�H1d32J 2i3M3S .12iV11NdS'8 a31HM
� a� k��� a z
�9� � �o =�a a � � w .— a �
3�„ $ �� �a� o � $ ���sem�mm� o ¢ �' � °'
` -� . - . d as. ,�� � X �. � Q a
�W� �o�Bi � < mm"«�r � u Z W Z W� C
� "=F� m 3" e� ' m" d"� � ~ w h
h^'�'$��m U = rG
�.'" Z o`<� "y m��p'yWa � ��mcsca�ssi Q F� W� O n
�_ a � z &��.W F`:aH p o t= O Q�� (J G
`' z u a z�� w�=W��� �� � F< w � 3 a W� v "
C� o � o W � tlitl '"�� �€ `� � > � � � } o w
'` " � bo� � �ag��ac� �� �� 9 o Q _ o � Q � � � �g
l� ������g&C G "c 8 �' u W 1— U �
� ° "g� � �os��,��� °< �� � s '^ � ^ o Q z ¢ a � ?
�ss m � so �_� 7a w o " �" � ¢ � a
� �
� �����Wa����g����� p< ��� `� ° $.c o °c o � �
�o�=€n�E �""�a�t��= e< ���U�p��� �x3� w U j
o�4H � 5o�ws ��� �a �� a��o ..sEa Q � � �
„_,p �
a
emsa��aµ�a �a< u ��n�as�a��a: ac�3 � o 0
� �„,
�
s
0 3
5 � �iu
�
3
S
�� ;
sa
o�
1�
G 7
3
,= c
�a �a
om '
�_ � O:� m� .� J � p _ J i �
�� = � Q omz�o
cannox �u.anu� w � � �o ;$ �F
(IVn11 :IJIAN�Iti 5 u �uc o w Qm Qm
tvneaaa:i funus J - N
� z a a =_ � e �
�
�� �
�
�
�
� I I I I
�� ��"�
IIIII
�� � --
� � � � � �� �
��� �� �� �
���
-' ,"" f
�� ��
-� � �
� � �A
= = :.. �
_
C � � �V
� � � ��
�� � �
��.� �
�� � �
•� �.�
� ��
�� � �
�� � �
�� �
�� � �
�� � �
�� ��
�� �
�� ��
OtEL H300 208ZZ'X
,�_ __ _
� a � �.g � �„ sy„,�.�.".a
a � Y; ; ,.� ; �, .' ,°r�i., er
'`- i c rn yy.�i� - !; V,'�'''l.
< � m� �'.,�!K' ,".����
U � z > w ° `ti`'��''v"�'
''2a
� g �
a
L 12JVd �-WSM bIOZ l�t2ilN0� 1N3W3�t/1d321 aBM3S ,laVllNdS'8 2i31VM
H
S � � W
g�� $ i£„��� a ff 3 m�88m�,F"�� o a �� �
��� � �o�� _ � c� ^FoaA�A��`� Z W z w � �,
�F� �q�se� '� � m-- -",o�ab� a I- w� U a
i�� ° m Wg� �a g � mcccc�es� _� �� Q ^
�z F
�06 � ���ta�i� � o ! � taU- O Q � �j G'� u �,
=�p w��WoNaw€ o o e � � 3 a w d. o
'�' � �;���w�� �5F � s o > w cn
oix� ��oa���GB 8� <� � o Q °� Q t— j o
��p Y����ttapC t '3 c B � e LL W� U ¢ .. �'
��� �¢o�z��CY o' �� � � o N O Q Z� 0. �
�'�� }��zgY�'-€�g�8 �a � � �c � �� � � � z
s . _��z��� � _ �< 3�� ,� = u �s o � �
��€��o�og�:;��a�€ �� a€a������ ��W w �
����<�'sa-� =o�=�� ���a�W� € ^`�� �
„aapu s �s����= �� s�, a��o . � �
;msa��e�.o.�,�g�� � w�reg's's�� g, ���3 � o 0
�� �
>_ N � :.; � � � <�.w�<�rwa _ _
�
� .' �� -
� �a
�u 1�1
� t--� .c
wx � T �
3 �� mm pW �g �i�
F� _
W y ej .r 1`I 1
- v� .
>a I T I
1 W�� T+rt Y
�; o +-�-+ �
^� 3�� m �
p� . W
- W
3.w �
-- gz _�
- ao z
� U
'a'" W
w3 j� V
3 } 2'
w� ' _ O
�2 iy
o� g $o �
��
J
Q j�o
� W ;yw
' o °'�
�S-
pi Z _3�3
O i_
03
mg
mW i--
• � y I_
�
O
N
�m Q
� d
W I .M, (
�
�, ' j
�
0
W
Y
j O
x
- w
�
�
� �
��,�t'A
�'`r.�eJ'
1 �C:t.
\,`: .
� �::�:
�� �;
� y�w�l
�%r�
� �ti'`'*?:
� �� ;,.�
��;r :
� 'E�
I
- .A �:
.�
�
r:�l ••
��k.�
;'r� :
:�
�i�
eac� ..
�F�
3;p: _ „
__� Qzg
❑V
APPENDIX
GC-4.01 Availability of Lands: none
GC-4.02 Subsurface and Physical Conditions:
Pavement Bore Report
GC-�.04 Unclerground Facilities: none
GC-4.06 Hazardous Environmental Condition at Site: none
GG6.06.D Minority and Women Owned Business Enterprise Compliance :
MBE Good Faith Effort Form
MBE Joint Venture Form
MBE Prime Contractor Waiver Form
MBE Special Instructions Form
P�iBE �ul�cont3•actor-Supplier Utilization Form
GC-6.07 Wage Rates:
Vei�tical Wage Rate Table
GC-6.09 Permits and Utilities:
TxDOT Permit
GC-6.24 Nondiscrimination: none
GR-01 60 00 Product Requirements:
Standard Products Table
C1TY OF FORT WORTi I Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 201 I
000s �s-i
ADDENDA
Page 1 of 1
1 SECTION 00 OS 15
2 ADDENDA
3
4
5
6 [tlssenibler: Fo�� ConU�cret Docu�a�ent execittroi�, ��e»zove tl�is pnge a»d ��epl��ce tivi�tl� cir7>> acicle�Tdcr
7 issa�e�l clarf•in,� bi�d�lii��.J
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
END OF SECTION
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contiact 2014, WSM-C
STANDARD CONSTRUCTION SPECII'iCATION DOCUMENTS CPN 02384
Revised July 1, 2011
U01113-1
1NV[TATION TO BIDDGRS
I'age 1 of2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
2J
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
SECTION 00 11 13
INVITATION TO BIDDERS
RECEIPT OT BIDS
Sealed Uids for the construction of Water and Sanitary Sewer Replacement Contract 2014, WSM-
C, Part 1, CPN 02384, DOE No. 7310, Water Project Nos. P253-609170238483 and P258-
709170238483 will be received by the City of Fort Worth Purchasing Office:
City of Fort Worth
Purchasing Division
1000 Throckmorton Street
Fort Worth, Texas 76102
until 1:30 P.M. CST, Thursday, October 16, 2014, and bids will be opened publicly and read
aloud at 2:00 PM CST in the Council Chambers.
GENERAL D�SCIZIP�'ION OF WO1�K
The major work will consist of the (approximate) following:
4,680 LF 8-inch PVC Water Pipe
8-inch Gate Valve and Vault
169 1-inch Water Services
PR�QUALITICATION
The improvements included in this project inust be perfonned by a contractor who is pre-
qualified by the City at the tiine of bid opening. The pt�ocedures for qualification and pre-
qualification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS.
DOCUMENT EXAMINATION AND PROCUREMENTS
The Bidding and Contract Documents may be examined or obtained on-line by visiting the City
of Foi•t Worth's Purchasing Division website at http://www.fot-tworth o�r�;/purchasin�/ and
clicicing on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site. The
Contract Documents may be downloaded, viewed, and printed by interested contractors and/or
suppliers.
Copies of the Bidding and Contract Documents may be purchased from Visintainer Engineering
Group LLC, at:
1200 W. Freeway Suite 300
Fort Worth, TX 76102
The cost of Bidding and Contract Documents is:
Set of Bidding and Contract Documents with full size drawings: $60.00
Set of Bidding and Contract Documents with half size (if available) drawings: $40.00
CITY OF FORT WORTH Water tmd Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 201 I
001113-2
INVITATION TO BIllDERS
Page 2 of 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PREBID CONFERENCE
A prebid conference may be held as described in Section 00 21 13 - INSTRUCTIONS TO
BIDDERS at the following location, date, and time:
DATE: October 2, 2014
TIME: 9:30 AM
PLACE: City of Fort Worth Water Dept. Annex
311 W l Oth Street
Fort Worth, Texas 76102
LOCA'I'IOl�: Conference Room
CI'I'Y'S RIG�I'T TO ACC�PT OI2 R�JECT BIDS
City reserves the right to waive irregularities and to accept or reject bids.
INQUIRIES
All inquiries relative to this procureinent should be addressed to the following:
Attn: Raberto Sauceda, PE, City of Fort Worth
Email: robert.sauceda@fortworthtexas.gov
Phone: 682.432.5478
AND/OR
Attn: Ronda Visintainer, PE, Visintainer Engineering, PLLC
Email: ronda@visintainerengineering.com
Phone: 817.992.3214
A�JVERTISEIVIENT DATES
September 25, 2014
October 2, 2014
29 END OF SECTION
CITY OF' FORT WORTH Water and Sanitary Se�ver Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
0021 t3-1
INSTRUCT10N3 TU BIDDERS
Page 1 of 9
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
S�CTION 00 21 13
iNSTRUCTIONS TO BIDDERS
1. Defined Terms
1.1. Terms used in these INSTRUCTIONS TO BIDDERS, which are defned in Section 00 72
00 - GENERAL CONDITIONS.
1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are applicable to both the singular and plural thereof.
1.2.1. Bidder: Any person, firm, partnership, coinpany, association, or coiporation acting
directly through a duly authorized representative, submitting a bid for performing
the work contemplated under the Contract Documents.
1.2.2. Nonresident Bidder: Any person, finn, partnership, company, association, or
corporation acting directly through a duly authorized representative, subinittin� a
bid for perfonning the work conteinplated under the Contract Docuinents whose
principal place of business is not in the State of Texas.
1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whoin City
(on the basis of City's evaluation as hereinafter provided) makes an award.
2. Copies of Bidding Documents
2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations
resulting from the Bidders use of incomplete sets of Bidding Documents.
2.2. City and Engineer in making copies of Bidding Documents available do so only for the
purpose of obtaining Bids for the Wark and do not authorize or confer a license or �n-ant
for any other use.
3. Prequalification of Bidders (Prime Contractors and Subcontractors)
3. l. All Bidders and their subcontractors are required to be prequalified for the work types
requiring prequalification at the time of bidding. Bids received froin contractors who are
not prequalified (even if inadvertently opened) shall not be considered. Prequalification
requirement work types and docuinentation are as follows:
3.1.1. Paving — Requirements document located at;
https://proi ectpoint.buzzsaw.com/fortworth�ov/ResoLu-ces/02°/,20-
%20Construction%20Documents/Contractor°/,20Prequalification/TPW%20Pavin�
°/,20Contractor%,20Prec�ualification°/,20Pro;ram/PREQUALIFICATION%,20RE0
UIREMENTS`%20FOR`%20PAViNG%2000NTRACTORS.PDF`?public
3.1.2. Roadway and Pedestrian Lighting — Requirements document located at;
htt�s: //projectpoint.buzzsaw.con�/fortworth�ov/Resources/02%20-
°/,20Construction%20DocumentslContractor%20Prequalification/TPW%20PavinQ
%20Contractor%20Prequalification`%20Pro�n-am/PREQUALIFICATION%20REQ
UIREMENTS`%20FOR%20PAViNG%2000NTRACTORS.PDF?public
CITY OF FORT WORTH Water and Sanitary Sewer Repiacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 27, 2012
00 21 13 - 2
INSTRUCTIONS TO BIDDERS
Page 2 of 9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
3.1.3. Water and Sanitary Sewer — Requirements document located at;
https://�n�ojectpoint.buzzsaw.com/fortworth�=ov/Resources/02%20-
%20Construction%20Documents/Contractor%20Prec�uali�cation/Water%20and%2
OSanitary°/�20Sewer%20Contractor%20Prequalification°/�20Pro�•ain/W SS`%20pre
�ual°/>20requirements.doc?public
3.2. Each Bidder unless currently prequalified, must be prepared to submit to City within
seven (7) calendar days prior to Bid opening, the documentation identified in Section 00
45 11, BIDDERS PREQUALIFICATIONS.
3.2.1. Subinission of and/or questions related to prequalification should be addressed to
the City contact as provided in Paragraph 6.1.
3.3. The City reserves the right to require any pre-qualified contractor who is the apparent low
l�idder(s} for a project to submit such additional it�fo��mation as tne City, in its sole
discretion may require, including but not limited to inanpower and equipinent records,
information about key personnel to be assigned to the project, and construction schedule,
to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to
deliver a quality product and successfully coinplete projects for the ainount bid within
the stipulated time fi•ame. Based upon the City's assessment of the submitted
information, a recommendation regarding the award of a contract will be made to the
City Council. Failure to submit the additional infonnation, if requested, may be grounds
for rejecting the apparent low bidder as non-responsive. Affected contractors will be
notified in writing of a recommendation to the City Council.
3.4. In addition to prequalification, additional requirements for qualiiication may be required
within various sections of the Contract Documents.
4
EYamination of Bidding and Contract Documents, Other Related Data, and Site
4.1. Before subinitting a Bid, each Bidder shall:
4.1.1. Exainine and carefully study the Connact Documents and other related data
identified in the Bidding Docuinents (including "technical data" referred to in
Paragraph 4.2. below). No information given by City or any representative of the
City other than that contained in the Contract Docuinents and officially
promulgated addenda thereto, shall be binding upon the City.
4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and
site conditions that may affect cost, progress, performance or furnishing of the
Work.
4.1.3. Consider federal, state and local Laws and Regulations that inay affect cost,
pro�•ess, performance or furnishing of the Work.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, �'SM-C
STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS CPN 02384
Revised November 27, 2012
00 21 13 - 3
tNSTRUCTIUNS TO BlDDE1tS
Page 3 of 9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
4.1.4. Study all: (i) reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions relating to existing
surface or subsurface structures at the Site (except Underground Facilities) that
have been identi�ed in the Contract Documents as containing reliable "technical
data" and (ii) reports and drawings of Hazardous Enviromnental Conditions, if any,
at the Site that have been identified in the Contract Documents as containing
reliable "technical data."
4.1.5. Ee advised that the Contract Documents on file with the City shall constitute all of
the infoi7nation which the City will furnish. All additional information and data
which the City will supply after promulgation of the formal Contract Documents
shall be issued in thz fonn of written addenda and shall become part of the Contract
Documents just as though such addenda were actually written into the original
Contract Docuinents. No information given by the City other than that contained in
the Contract Documents and officially promulgated addenda thereto, shall be
binding upon the City.
4.1.6. Perform indepen�ieni research, investigations, tests, borings, and such other means
as may be necessary to gain a eomplete knowledge of the conditions which will be
encountered during the construction of the project. On request, City may provide
each Bidder access to the site to conduct such examinations, investigations,
eYplorations, tests and studies as each Bidder deems necessary for submission of a
Bid. Bidder must fill all holes and clean up and restor�e the site to its former
conditions upon completion of such explorations, investigations, tests and studies.
4.1.7. Detertnine the difficulties of the Work and all attending circumstances affecting the
cost of doing the Work, tiine required for its completion, and obtain all inforination
required to make a proposal. Bidders shall rely exclusively and solely upon their
own estimates, investigation, research, tests, explorations, and other data which are
necessaiy for full and complete infar•mation upon which the proposal is to be based.
It is understood that the subinission of a proposal is prima-facie evidence that the
Bidder has made the investigation, examinations and tests herein required. Claims
for additional compensation due to variations between conditions actually
encountered in construction and as indicated in the Contract Documents will not be
allowed.
4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or
between the Contract Documents and such other related documents. The Conh•actor
shall not take advantage of any gross error or omission in the Contract Documents,
and the City shall be permitted to make such corrections or interpretations as inay
be deemed necessary for fulfillment of the intent of the Contract Documents.
4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of:
4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to
the site which have been utilized by City in preparation of the Contract Documents.
The logs of Soil Borings, if any, on the plans are for general information only.
Neither the City nor the Engineer guarantee that the data shown is representative of
conditions which actually exist.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014,1��SM-C
STANDARD CONSTRUCTION SPECIF[CATION DOCUMENTS CPN 02384
Revised NovemUer 27, 2012
00 21 l3 - 4
INSTRUC'TIONS TU BIDDERS
Page 4 of 9
1 4.2.2, those drawings of physical conditions in or relating to existing surface and
2 subsurface structures (except Underground Facilities) which are at or contiguous to
3 the site that have been utilized by City in preparation of the Contract Docuinents.
4
5 4.2.3. copies of such reports and drawings will be made available by City to any Bidder
6 on request. Those reports and drawings may not be part of the Contract
'�� 7 Docmnents, but the "technical data" contained therein upon which Bidder is entitled
8 to rely as provided in Paragraph 4.02. of the General Conditions has been identified
9 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is
', ' 10 responsible for any inteipretation ar conclusion drawn from any "technical data" or
' 11 any other data, interpretations, opinions or inforination.
12
13 4.3. The subinission of a Bid will constitute an incontrovertible representation by Bidder (i)
14 that Bidder has complied with every requirement of this Paragraph 4, (ii) that without
15 exception the Bid is premised upon performing and furnishing the Work required by the
16 Contract Documents and applying the specific means, methods, techniques, sequences or
17 procedures of construction (if any) that may be shown or indicated or expressly required
18 by the Cant�-act D�cuments, (iii) that Bidder has given City written notice oi all
19 conflicts, errors, ambiguities and discrepancies in the Contract Documents and the
20 written resolutions thereof by City are acceptable to Bidder, and when said conflicts,
21 etc., have not been resolved through the interpretations by City as described in
22 Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate
23 and convey understanding of all terms and conditions for performing and furnishing the
24 Work. �
25
26 �.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated
27 biphenyls (PCBs), Petroleum, Hazardous Waste ar Radioactive Material covered by
28 Paragraph 4.06. of the General Conditions, unless specifically identified in the Conh�act
29 Doculnents.
30
31
32
33
34
35
36
37
38
39
40
41
5. Availability of Lands for Work, Etc.
5.1. The lands upon which the Worlc is to be perfonned, rights-of-way and easeinents for
access thereto and other lands designated for use by Contractor in perfonning the Work
are identi�ed in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment or storage of
materials and equipinent to be incorporated in the Worlc are to be obtained and paid for
by Contractor. Easeinents for permanent structures or perinanent changes in existing
facilities are to be obtained and paid for by City unless otherwise provided in the
Contract Docuinents.
42 5.2. Outstanding right-of-way, easements, and/ar permits to be acquired by the City are listed
43 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right-
44 of-way, easements, and/or permits are not obtained, the City reserves the right to cancel
45 the award of contraet at any time before the Bidder begins any construction work on the
46 project.
47
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 27, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
00 21 13 - 5
INSTRUCTIONS "f0 k31llDEl2S
Page 5 of 9
5.3. The Bidder shall be prepared to coinmence construction without all eYecuted right-of-
way, easements, and/or permits, and shall submit a schedule to the City of how
construction will proceed in the other areas of the project that do not require pennits
and/or easements.
6. Interpretations and Addenda
6.1. All questions about the meaning or intent of the Bidding Docuinents are to be directed to
City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions
received after this day may not be responded to. Inteipretations or clarifications
considered necessary by City in response to such questions will be issued by Addenda
delivered to all parties �ecorded by City as havi7g received the l�idding Bocuments.
Only questions answered by formal written Addenda will be binding. Oral and other
inteipretations or clarifications will be without legal effect.
Address questions to:
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
Attn: Robert Sauceda, Water Department
Faa: 817.392.8195
Einail: robert.sauceda@fortworthtexas.gov
Phone: 682.432.5478
6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by
City.
6.3. Addenda or clarifications may be posted via Buzzsaw at
htt ��s://proiectpoint.buzzsaw.con�/fortworth�ov/Infrastructure/023g4 VVater and Sewer
Replace Contract 2014 WSM-C/Bid Documents Packa�e/Addenda
6.4. A prebid conference may be held at the time and place indicated in the Advertisement or
INVITATION TO BIDDERS. Representatives of City will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. City will
transmit to all prospective Bidders of record such Addenda as City considers necessary
in response to questions arising at the conference. Oral statements may not be relied
upon and will not be binding or legally effective.
7. Bid Security
7.1. Each Bid must be accoinpanied by Bid Bond made payable to City in an ainount of five
(5) percent of Bidder's maximum Bid price on form attached, issued by a surety ineeting
the requireinents of Paragraphs 5.01 of the General Conditions.
CITY OF FOItT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 27, 2012
00 2l 13 - 6
1NSCRUC'1'IONS TO SIDDEItS
Page 6 of 9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
2�
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award
have been satisfied. If the Successful Bidder fails to eYecute and deliver the complete
Agreement within 10 days after the Notice of Award, City may consider Bidder to be in
default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited.
Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all
other Bidders whom City believes to have a reasonable chance of receiving the award
will be retained by City until final contract execution.
d. Contract Times
The number of days within which, or the dates by which, Milestones are to be achieved in
accordance with the General Requirements and the Worlc is to be completed and ready for
Final Acceptance is set forth in the A�neement or incorporated therein by reference to the
attached Bid Fonn.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement.
i�i. aubsiiiute and "t3r-Equai" iiems
The Contract, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or-equal" items.
Whenever it is indicated or specified in the Bidding Documents that a"substitute" or "or-
equal" item of material or equipment may be furnished or used by Contractor if acceptable to
City, application for such acceptance will not be considered by City until after the Effective
Date of the Agreement. The procedure for submission of any such application by Contractor
and consideration by City is set forth in Paragraphs 6.OS�v., 6.O�B, and 6.OSC. of the General
Conditions and is suppleinented in Section O1 25 00 of the General Requirements.
11. Subcontractors, Suppliers and Others
1 l.l. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020-
12-2011 (as amended), the City has goals for the participation of minority business
and/or small business enterprises in City contracts. A copy of the Ordinance can be
obtained from the Office of the City Secretary. The Bidder shall submit the MBE and
SBE Utilization Fonn, Subcontractor/Supplier Utilization Foi7n, Prime Contractor
Waiver Fonn and/or Good Faith Effort Fonn with docuinentation and/or Joint
Venture Form as appropriate. The Forms including documentation inust be received
by the City no later than 5:00 P.M. CST, five (5) City business days after the bid
opening date. The Bidder shall obtain a receipt from the City as evidence the
documentation was received. Failure to comply shall render the bid as non-
responsive.
11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person
or organization against whom Contractor has reasonable objection.
12. Bid Form
12.1. The Bid Form is included with the Bidding Documents; additional copies may be
obtained from the City.
CITY OF FOItT �VORTH Water and Sanitary Sewer Replacement Contiact 201�, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 27, 2012
00 21 13 - 7
INSTRUCTIUNS TO F3IDllERS
Page 7 of 9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
12.2. All blanks on the Bid Fonn must be coinpleted by printing in ink and the Bid Fonn
signed in ink. Erasures or alterations shall be initialed in ink by the person signing
the Bid Fonn. A Bid price shall be indicated for each Bid iteln, alternative, and unit
price item listed therein. In the case of optional alternatives, the words "No Bid,"
"No Change," ar"Not Applicable" inay be entered. Bidder shall state the prices,
written in ink in both words and numerals, for which the Bidder proposes to do the
work contemplated or furnish materials required. All prices shall be written legibly.
In case of discrepancy between price in written words and the price in written
numerals, the price in written words shall govern.
12.3. Bids by corporations shall be eYecuted in the coiporate name by the president or a
vicc-president or other corporate of�cer accampanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate address and state of
incorporation shall be shown below the signature.
12.4. Bids by partnerships shall be executed in the partnership name and signed by a
partner, whose title inust appear under the si�nature accoinpanied by evidence of
authority to si�,m. Th� official address of the partnership shall be shown below the
signature.
12.5. Bids by limited liability companies shall be executed in the naine of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of
the firm and the official address of the finn shall be shown.
i 2.b.
12.7.
12.8.
12.9.
Bids by individuals shall show the Bidder's name and of�cial address.
Bids by joint ventures shall be executed by each joint venturer in the manner
indicated on the Bid Fonn. The official address of the joint venture shall be shown.
All names shall be typed or printed in ink below the signature.
The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of
which shall be filled in on the Bid Fonn.
12.10. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of
Tesas shall be provided in accordance with Section 00 43 37 — Vendor Compliance
to State Law Non Resident Bidder.
13. Submission of Bids
Bids shall be submitted on the prescribed Bid Fonn, provided with the Bidding Docuinents,
at the time and place indicated in the Advertisement or INVITATION TO BIDDERS,
addressed to City Manager of the City, and shall be enclosed in an opaque sealed envelope,
marlced with the City Project Number, Project title, the name and address of Bidder, and
accompanied by the Bid security and other required docuinents. If the Bid is sent through the
mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope
with the notation "BID ENCLOSED" on the face of it.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised November 27, 2012
00 21 13 - 8
INSTRUCTIUNS TU BIllDERS
Page 8 of 9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
14. Modi�cation and Withdrawal of Bids
14.1. Bids addressed to the City Manager and iiled with the Purchasing Ofiice cannot be
withdrawn prior to the time set for bid opening. A request for withdrawal must be
made in writing by an appropriate document duly executed in the manner that a Bid
must be executed and delivered to the place where Bids are to be subinitted at any
time prior to the opening of Bids. After all Bids not rec�uested for withdrawal are
opened and publicly read aloud, the Bids for which a withdrawal request has been
properly filed inay, at the option of the City, be returned unopened.
142. Bidders may inodify their Bid by electronic communication at any time prior to the
time set for tl�e cicsing of Bid receipt.
15. Opening of Bids
Bids will be opened and read aloud publicly at the place where Bids are to be subinitted. An
abstract of the ainounts of the base Bids and major alternates (if any) will be made available
to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptance
All Bids will remain subject to acceptance for the tiine period specified for Notice of Award
and execution and delivery of a complete Agreeinent by Successful Bidder. City inay, at
City's sole discretion, release any Bid and nullify the Bid security prior to that date.
17. Evaluation of Bids and Award af Contract
17. L City reserves the right to reject any or all Bids, including without liinitation the rights
to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids
and to reject the Bid of any Bidder if City believes that it would not be in the best
interest of the Project to make an award to that Bidder, whether because the Bid is
not responsive or the Bidder is unqualified or of doubtful financial ability or fails to
meet any other pertinent standard or criteria established by City. City also reserves
the right to waive informalities not involving price, contract tiine or changes in the
Work with the Successful Bidder. Discrepancies between the inultiplication of units
of Work and unit prices will be resolved in favor of the unit prices. Discrepancies
between the indicated sum of any column of figures and the correct sum thereof will
be resolved in favar of the correct sum. Discrepancies between words and iigures
will be resolved in favor of the words.
17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists
among the Bidders, Bidder is an interested party to any litigation against City,
City or Bidder may have a claim against the other or be engaged in litigation,
Bidder is in arreais on any existing contract or has defaulted on a previous
contract, Bidder has perfonned a prior contract in an unsatisfactary manner, or
Bidder has uncompleted work which in the judgrnent of the City will prevent or
hinder the proinpt coinpletion of additional work if awarded.
CITY OF FORT WORTH Water and Sanitaiy Se�ver Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02334
Revised November 27. 2012
00 21 13 - 9
INS7'RUCI'IUNS "I'U B1DllERS
Page 9 of 9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and
other persons and organizations proposed for those portions of the Work as to which
the identity of Subcontractors, Suppliers, and other persons and organizations must
be submitted as provided in the Contract Documents or upon the request of the City.
City also may consider the operating costs, maintenance requirements, perfoimance
data and guarantees of major items of materials and equipment proposed for
incorporation in the Work when such data is required to be subinitted prior to the
Notice of Award.
17.3. City may conduct such investigations as City deems necessary to assist in the
evaluation of any Bid and to establish the responsibility, qualifications, and financial
ability of I3idders, proposed �ubcontractors, Suppliers and other �ersons and
organizations to perform and furnish the Work in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perform with his own organization, work of a value not less than
35% of the value embraced on the Contract, unless otherwise approved by the City.
17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and
responsive Bidder whose evaluation by City indicates that the award will be in the
best interests of the City.
17.6. Pursuant to Texas Govermnent Code Chapter 2252.001, the City will not award
contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
the lowest bid submitted by a responsible Texas Bidder by the same ainount that a
Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a
comparable contract in the state in which the nonresident's principal place of
business is located.
17.7. A contract is not awarded until formal City Council autharization. If the Contract is
to be awarded, City will award the Contract within 90 days after the day of the Bid
opening unless extended in writing. No other act of City or others will constitute
acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by
the City.
17.8. Failure or refusal to coinply with the requirements inay result in rejection of Bid.
18. Signing of Agreement
When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the
required number of unsigned counterparts of the Ab eement. Within 14 days thereafter
Contractor shall sign and deliver the required number of counterparts of the Agreement to
City with the required Bonds, Certificates of Insurance, and all other required documentation.
City shall thereafter deliver one fully signed counterpart to Contractor.
�ND OF SECTION
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, \�JSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised Nove�nber 27, 2012
00 35 13
BID FORM
Page 1 of 1
SECTION 00 35 13
CONFLICT OF INTEREST AFFIDAVIT
Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also
referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the
attached CIQ Form) and Local Government Officer Conflicts Disclosure Statemert (the attached CIS
Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City
Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also
be downloaded from the website links provided below.
http:Uwww.ethics.state.tx. us/forms/CIQ. pdf
http://www.ethics.state.tx. us/forms/CIS. pdf
�
❑
❑
❑
: �� -
CIQ Form is on file with City Secretary
CIQ Form is being provided to the City Secretary
CiS Form is on �ile with Lity Secretary
CIS Form is being provided to the City Secretary
Tejas Commercial Construction, LLC
P.O. Box 10395
River Oaks, TX 76114
By: Charles D. Allen
:, , ..
, . �-, ,
Signature: ��r�:-f�'+f /'-;r r'�__---_
0
Title: Vice President
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327
Fort Worth - Contract 2014 WSN-C DOE 7310 Bid
00 41 00
BID FORM
Page 1 of 3
SECTION 00 41 00
BID FORM
TO: The City Manager
c/o: The Purchasing Department
1000 Throckmorton Street
City of Fort Worth, Texas 76102
FOR: Water and Sanitary Sewer Replacement Contract 2014, WSM-C
City Project No.: CPN 02384
Units/Sections: Part 1, DOE 7310
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to ei�ter inta an Ar�reerient with City in the ic�rm
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions
of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.�. in submitting this Bid, Bidder accepts all of the terms and conditions of the INVIiHTic�N i � BiD�7�RS and
INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed
individuai or entity and is not submitted in conformity with any collusive agreement or rules of any group,
association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.
For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a public official in the bidding process.
b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the
bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive
levels, or (c) to deprive City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without
the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive
levels.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327 Fort Worth - Contract 2014 WSN-C DOE 7310 Bid
00 41 00
BID FORM
Page 2 of 3
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
3. Prequalification
The Bidder acknowledges that the foilowing work types must be performed only by prequalified contractors and
subcontractors:
a. Water Distribution, Urban and Renewai, Open Cut (8" and smailer)
�
c.
�
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within 120 days days after the date when the
the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete
the Work {and/or achievement of Milestones} within the times specified in the Agreement.
5. Attach�d to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. MWBE Forms (optional at time of bid)
f. Prequalification Statement, Section 00 45 12
g. Conflict of Interest Affidavit, Section 00 35 13
*If necessary, CIQ or CIS forms are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the
space provided below, please enter the total bid amount for this project. Only this figure will be read publicly
by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327
Fort Worth - Contract 2014 WSN-C DOE 7310 Bid
00 41 00
BID FORM
Page 3 of 3
subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then totaling all of the extended amounts.
6.3. , _�
�� .�,.� -----.
Total Bid �° ���j � �-% �' .
,,;�;
i --�
7. B�d Submitial
This Bid is submitted on 10/31/14
Respectfully submitted,
_, _
. a �,
:
� „ . -
_
..,� ,�� �
By: ( i% , ,,—' �-t' C" �---� � _ -
(Signature)
Charles D. Allen
(Printed Name)
Title: Vice President
Company: Tejas Commercial Construction, LLC
Address: P.O. Box 10395
River Oaks, TX 76114
State of Incorporation: Texas
Email: callen(a�telasconstruction.ne
Phone: 817-901-8499
by the entity named below.
Corporate Seal:
,,���`�°'��er��� j `;`;; ,,;
•> '� , � =;
,,��` � ••;��j�,b�r e�f� "W
�1 ���},� �yi�1J�
� ��+• e "I� i � �aF�
_ � ��o
� �', �L^� '•�,``
'�,� �°' ...o. � �•�•
0
'f..,,.� 2�ii9 � .
���i i i� i � i����eeeet���
,�
END OF SECTION
CITY OF FORT WORTH
STANpARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327
Fort Worth - Contract 2014 WSN-C DOE 7310 Bid
1111 �72 �73
�ID PROPOSAL
Pnge I of 1
SECTION 00 42 43
PROPOSALFORM
1Vnter and Sanitary Sewer Contract 2014, WS�1-C Part 1 CPN 0238J, DOG 7310
UiVIT PRI�E BID
Project I[em Infomiation
F3idlist Item
No.
Description
Specitication Unit uf
Section No. Measure
Bidder's Appiication
Bidder's Proposal
Unit Price Bid Value
1 3311.0261 8" PVC Water Pipe 33 11 12 LF 5076 $33.00 $167,508.00)
2 3305.0003 8" Waterline Lowering 33 05 12 EA 1 $4,000.00 $4,000.00
3 3312.3003 8" Gate Valve 33 12 20 EA 10 $1,200.00 $12,000.00
4 3312.3002 6" Gate Valve 33 12 20 EA 6 $1,000.00 $6,00O.00l
5 3305.0112 Concrete Coilar 33 05 17 EA 16 $150.00 $2,400.00�
6 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 3 $4,800.00 $14,400.00I
7 3312.0001 Fire Hydrant 33 12 40 EA 6 $3,000.00 $18,000.00
8 3312.2001 1" Water Service, Meter Relocation 33 12 10 EA 158 $250.00 $39,500.00
__
9 3312.2003 1" Water Service 33 12 10 EA 168 $925.00 $155,400.00'
__ _ ..
10 331?.2004 1" Private Service 33 12 10 LF 146 $30.00 $4,380.00
_, . _ _ _._ __. _ _
11 3312.2101 1 1/2" Water Service, Meter Relocation 33 12 10 EA 1 $400.00 $400.00
_ _,.. ___
12 33122103 11/2"WaterService 331210 EA 1 $1,900.00 ;`1� -.r%�'
__ . __ __. _ __ _ __ _ _ _ __ ,
13 3304.0102 2" Temporary Water Services 33 04 30 LS 1 $35,000.00 $35,000.00
_ _ __ __ _. __ _ _ _ _ _ _
14 0241.1001 Water Line Grouting 02 41 14 CY 3 __ $150,00 $450.00
__. . _ __
15 3312.0102 Connection to Existing 6" & 8" Water Main 33 12 25 EA 14 $950.00 $13,300.00
16 0241.1611 Salvage 3/4" Water Meter 02 41 14 EA 161 $75.00 $12,075.00
17 0241.1510 Saivage Fire Hydrant 02 41 14 EA 5 $250.00 $1,250.00
_ _ _ _.. __ „
I 18 3201.0400 Temporary Asphalt Paving Repair 32 01 18 LF 6550 __ $9.00 _$58,950.00
�-9 �94__4=-A&p#31�y�e-E� �o ���,_�_,_o�a cd�! _ __ _
_.. • _ __ _. . _ . . _ _.
� ��� � n��-r.._oo.z �-,_o _«an�� �•�� oG...,Y.,�.,� r..n„�o.,8�.�_«�<.�.oto oo�81F �� ��o�a �
. . ._._.. . ... ...._._. ... ,. _. .. _.
21 3211.0324 10" 2:27 Trench Repair Concrete Base 32 11 13 LF 1000 $39.00 �=7 i t'�cr°, �Y-:
__. _ _ _. _. _. - , .
22 3201.0612 7" Conc Pvmt Repair 32 01 29 SY 4 $85.00 $340.00
23 99 99 00 Temporary Asphalt Sidewalk 99 99 00 SF 250 $7.00 $1,750.00
24 99 99 00 Temporary Asphalt Curb & Gutter 99 99 00 LF 690 $7.00 $4,830.00
_ _
25 99 99 00 Temporary Asphalt Driveway 99 99 00 SF 2125 _ $5.00 $10,625.00
26 3305.0109 Trench Safety 33 05 10 LF 1354 $0.50 $677.00
_
� __ �oo�on�n8-@le&k-�ed-�{SC2RteFlE _ zo�o� �� c�
28 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 1 $1,200.00 >,' `�'•"`�
29 3471.0001 Traffic Control 34 71 13 MO 4 $1,500.00 $6,000.00
���;;.
� "- ,;
�_
To[alBid �,Il�_�i.�'��i:7<',
r �A-_./
cNo or s�c�r►oN
CITY OP fORT WORTH
STANDARD CONSI�RUCTION SPECIFICAT'ION DOCUMEN'!S
Form Recised 211120I?0 Port Nonh - Conlracl ?UI�7 NSN-� DOE 73111 6id
00 43 13
BID BOND
Page 1 of 1
SECTlON 00 43 13
BID BOND
KNOW ALL BY THESE PRESENTS:
That we, (Bidder Name) Company Name Here hereinafter
_ __ _
called the Principal, and (Surety Name) ' Surety Name l-lere
a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety,
are held and firmly bound unto the City, hereinafter called the Obligee, in the
sum of Spelk Oui N�,:�mbers Here and No/100 Dollars
($ t�dumecals Here .00), the payment of which sum will be weil and truly made and the
said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firm by these presents.
W HEREAS, the Principal has submitted a proposal to perform work for the following project of the Obligee,
identified as Water and Sanitary Sewer Replacement Contract 2014, WSM-C
0
NOVV, THEREFORE, if the Obligee shali award the Contract for the foregoi�g project to
the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the
' Contract and shall enter into the Contract in writing with the Obligee in accordance with the terms of such proposal,
' then this bond shall be null and void. If the Principal fails to execute such Contract in accordance with the terms of
such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in
accordance with the proposal or fails to satisfy all requirements and conditions required for the execution of the Contract
' in accordance with the proposal, this bond shall become the property of the Obligee, without recourse of the Principal
and/or Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between
PrincipaPs Total Bid Amount and the next selected Bidder's Total Bid Amount.
SIGNED this day of
�'�l
Company Name Here
, 2014.
(Signature and Title of Principal)
�
_ _ _
_ _ _ _
Surety Name Here
(Signature of Attorney-of-Fact)
*Attach Power of Attorney (Surety) for Attorney-in-Fact
END OF SECTION
Impressed
Surety Seal
Only
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20110627 DO 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook
00 43 37
VENDOR COMPLIANCE TO STATE LAW
Page 1 of 1
SECTION 00 43 37
VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law
provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors
whose corporate offices or principal place of business are outside the State of Texas) bid projects for
construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in
order to obtain a comparable contract in the State which the nonresident's principal place of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet
specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident
bidders must check the box in Section B.
A. Nonresident bidders in the State of , our principal place of business,
are required to be percent lower than resident bidders by State Law. A copy of the
statute is attached.
Nonresident bidders in the State of
are not required to underbid resident bidders.
, our principal place of business,
B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas. �
. s� -
Tejas Commercial Construction, LLC
P.O. Box 10395
0
River Oaks, TX 76114
By: Charles D. Allen
� .�%' _.j'/, ��. �.��� � �- "
(Signature)
Titie: Vice President
Date
END OF SECTION
� �
,� _ �;d �: /;il� J�
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20110627 Fort Worth - Contract 2014 WSN-C DOE 7310 Bid
oo�+si�-i
BIDDERS PREQUALIFICATIONS
Page 1 of 3
2
3
4
5
6
7
8
9
10
I1
12
13
14
15
lfi
17
18
19
20
21
22
23
24
25
26
2�
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
SECTION 00 45 11
BIDDERS PREQUALIFICATIONS
1. Summary. All contractors are required to be prequalified by the City prior to submitting
bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification
Statement for the work type(s) listed with their Bid. Any contractor or subcontractor wbo is
not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder
Prequaliiication Application in accordance wiCh the requirenlents below.
The prequali�cation process will establish a bid limit based on a technical evaluation and
financial analysis of the conh•actor. The information inust be submitted seven (7) days prior
to the date of the opening of bids. For example, a contractor wishing to submit bids on
projects to be opened on the 7th of April must file the information by the 31st day of March
in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's
Prequalification Application, the following must accompany the submission.
a. A coinplete set of auc�ited or revi�wed financial statements.
(1) Classified Balance Sheet
(2) Income Statement
(3) Statement of Cash Flows
(4) Statement of Retained Earnings
(5) Notes to the Financial Statements, if any
b. A certified copy of the firm's organizational documents (Corporate Charter, Articles
of Incorporation, ArticlPs of Organization, CPrtificate of Fonnation, LLC
Regulations, Certificate of Limited Partnership Agreement).
c. A completed Bidder Prequalification Application.
(1) The iirm's Texas Ta�payer ldentification Number as issued by the TeYas
Comptroller of Public Accounts. To obtain a Texas Taxpayer ldentification
number visit the Texas Comptroller of Public Accounts online at the
following web address www.window.state.tx.us/taxpermit/ and fill out the
application to apply for your Texas tax ID.
(2) The firm's e-mail address and fax number.
(3) The firm's DLTNS number as issued by Dun & Bradstreet. This number
is used by the City for required reporting on Federal Aid projects. The DLJNS
number may be obtained at www.dnb.com.
d. Resumes reflecting the construction eYperience of the principles of the firm for firnls
submitting their initial prequalification. These resuines should include the size and
scope of the work performed.
e. Other information as requested by the City.
2. Prequali�cation Requirements
a. Financial Stczte»2ents. Financial stateinent submission inust be provided in
accordance with the following:
(1) The City requires that the original Financial Statement or a certified copy
be submitted for consideration.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conh�act 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July I, 2011
oo�s ii -z
131UllE1tS 1'IZEQUALIFICATIONS
Page 2 of 3
1 (2) To be satisfactory, the financial statements must be audited or reviewed
2 by an independent, certified public accounting firm registered and in
3 good standing in any state. Current Texas statues also require that
4 accounting firms performing audits or reviews on business entities within
5 the State of Texas be properly licensed or registered with the Texas State
6 Board of Public Accountancy.
7 (3) The accounting firm should state in the audit report or review whether
8 the contractor is an individual, corporation, or limited liability company.
9 (4) Financial Statements must be presented in U.S. dollars at the current rate
10 of exchange of the Balance Sheet date.
11 (5) The City will not recognize any certified public accountant as
12 independent who is not, in fact, independent.
13 (6) The accountant's opinion on the financial statements of the contracting
14 coinpany sho�.�ld state that the audit or revie�v has bPen conducted in
15 accordance with auditing standards generally accepted in the United
16 States of America. This must be stated in the accounting firm's opinion.
17 It should: (1) express an unqualified opinion, or (2) express a qualified
18 opinion on the statements taken as a whole.
19 (7) The City reserves the right to require a new statement at any time.
20 (8) The financial statement must be prepared as of the last day of any month,
21 not mot•e than one year old and must be on file with the City 16 months
22 thereafter, in accordance with Paragraph 1.
23 (9) The City will determine a contracto►'s bidding capacity for the purposes
24 of awarding contracts. Bidding capacity is detennined by multiplying the
25 positive net working capital (working capital = current assets — current
26 liabilities) by a factor of 10. Only those statements reflecting a positive
27 net working capital position will be considered satisfactory for
28 prequalification purposes.
29 (10) In the case that a bidding date falls within the time a new financial
30 statement is being prepared, the previous statement shall be updated with
31 proper verification.
32 b. Bidder P��equcalificati.o�z Applieatio�z. A Bidder Prequaliiication Application inust be
33 submitted along with audited or reviewed financial statements by iirms wishing to be
34 eligible to bid on all classes of construction and maintenance projects. Incomplete
35 Applications will be rejected.
36 (1) In those schedules where there is nothing to report, the notation of
37 "None" or "N/A" should be inserted.
38 (2) A ininimum of �ve (5) references of related work must be provided.
39 (3) Submission of an equipment schedule which indicates equipment under
40 the control of the Contractor and which is related to the type of work for
41 which the Contactor is seeking prequalification. The schedule must
42 include the manufacturer, model and general coinmon description of
43 each piece of equipment. Abbreviations or means of describing
44 equipment other than provided above will not be accepted.
45
46 3. Eligibility to Bid
47 a. The City shall be the sole judge as to a contractor's prequalification.
48 b. The City may reject, suspend, or modify any prequalification for failure by the
49 contractor to demonstrate acceptable financial ability or performance.
50 c. The City will issue a letter as to the status of the prequali�cation approval.
CITY OF FORT WORTH Waterand Sanitary Sewer Replacement Conhact 2014, WSM-C
STANDARD CONSTRUCTION SPECI�[CATION DOCUMENTS CPN 02384
Revised July 1, 201 I
1
2
3
4
5
6
7
8
0
� 00 45 ll - 3
B1DllERS PREQUALIPICATIONS
Page 3 of 3
d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid
the prequalified work types until the expiration date stated in the letter.
E1�tD O�' SECTION
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPGCIFICATION DOCUMENTS CPN 02384
Revised July l, 2011
00 45 12
BID FORM
Page 1 of 1
SECTION 00 45 12
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by identifying the prequalified
contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed.
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are
currently prequalified for the work types listed.
BIDDER:
Tejas Commercial Construction, LLC
P.O. Box 10395
0
River Oaks, TX 76114
By: Charles D. Allen
��
� i � ,�� /�%f �--_
(Signature)
Title: Vice President
d f
r
Date: f'�"�.''; � '
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120 Fort Worth - Contract 2014 WSN-C DOE 7310 Bid
�.J' �� 'lJ �� 1�
��
SECTIOl`d 00 45 13
- BIDDER PREQUALIFICATION APPLICATION
Date of Balance Sheet
Name under which you wish to qualify
Post Of�ce Box
Street Address (required)
City
City
Mark only one:
Individual
Liinited Partnership
General Partnership
Corparation
Liinited Liability Company
State
State
Zip Code
Zip Code
Telephone Fax Email
Texas Taxpayer ldentification No.
Federal Employers Identification No.
DLJNS No. (if applicable)
MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO:
CITY OF FORT WORTH TEXAS
1000 THROCKMORTON STREET
FORT WORTH, TEXAS 76102-6311
AND MARK THE ENVELOPE: `BIDDER PREQUALIFICATION APPLICATION"
00 45 l3 - 2
BIDDGR PRGQUALIFICATION APPLICATION
Page 2 of 8
BUSINESS CLASSII+ICATION
The following should be completed in order that we may properly classify your �firm:
(Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is
checked)
� Has fewer than 100 einployees
and/or
� Has less than $6,000,000.00 in annual gross receipts
�R
� Does not meet the criteria for being designated a small business as provided in Section
2006.001 of the Texas Government Code.
The classification of your finn as a sinall ar large business is not a factor in detennining eligibility to
become prequalified.
MAJOR WORK CATEGORIES
i�ater Department
Augur Boring - 24-inch diameter casing and less
Augur Boring - Greater than 24-inch diameter casing and �-eater
Tunneling — 36-Inches — 60 —inches, and 350 LF or less
Tunneling - 36-Inches — 60 —inches, and greater than 350 LF
Tunneling — 66" and greater, 350 LF and greater
Tunneling — 66" and greater, 350 LF or Less
Cathodic Protection
Water Distribution, Development, 8-inch diameter and smaller
Water Distribution, Urban and Renewal, 8-inch diameter and smaller
Water Distribution, Developinent, 12-inch diameter and smaller
Water Distribution, Urban and Renewal, 12-inch diaineter and smaller
Water Transmission, Development, 24-inches and sinaller
Water Transinission, Urban/Renewal, 24-inches and smaller
Water Transmission, Development, 42-inches and smaller
Water Transinission, Urban/Renewal, 42-inches and smaller
Water Transmission, Development, All Sizes
Water Transmission, Urban/Renewal, All Sizes
Sewer Bypass Pumping, 18-inches and slnaller
Sewer Bypass Pumping, 18-inches — 36-inches
Sewer Bypass Pumping 42-inches and larger
CCTV, 8-inches and smaller
CCTV, 12-inches and smaller
CCTV, 1 �-inches and smaller
CCTV, 24-inches and smaller
CCTV, 42-inches and smaller
CCTV, 48-inches and smaller
CITY OF FORT WORTH Water and Sanit��y Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFiCATION DOCUMENTS CPN 0238�4
Revised December 20, 2012
004513-3
BIDDER PREQUALIFICATION APPLICATION
Page 3 of 8
MAJOR WORK CATEGaRIES, CONTINU�D
Sewer CIPP, 12-inches and sinaller
Sewer CIPP, 24-inches and sinaller
Sewer CIPP, 42-inches and smaller
Sewer CIPP, All Sizes
Sewer Collection Systein, Development, 8-inches and sinaller
Sewer Collection System, Urban/Renewal, 8-inches and smaller
Sewer Collection System, Development, 12-inches and smaller
Sewer Collection Systein, Urban/Renewal, 12-inches and smaller
Sewer lnterceptors, llevelopmenl, 24-inches and smaller
Sewer Interceptors, Urban/Renewal, 24-inches and smaller
Sewer Interceptors, Development, 42-inches and smaller
Sewer Interceptors, Urban/Renewal, 42-inches and smaller
Sewer Interceptors, Development, 48-inches and smaller
Sewer Interceptors, Urban/Renewal, 4$-inches and smaller
Sewer Pipe Enlargeinent 12-inches and smaller
Sewer Pipe Enlargement 24-inches and smaller
Sewer Pipe Enlargement, All Sizes
Sewer Cleaning , 24-inches and srnaller
Sewer Cleaning , 42-inches and smaller
Sewer Cleaning , All Sizes
Sewer Cleaning, 8-inches and smaller
Sewer Cleaning, 12-inches and smaller
Sewer Siphons 12-inches or less
Sewer Siphons 24-inches or less
Sewer Siphons 42-inches or less
Sewer Siphons All Sizes
Transportation Public Worlcs
Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards)
Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER)
Asphalt Paving Heavy Maintenance (tTNDER $1,000,000)
Asphalt Paving Heavy Maintenance ($1,000,000 and OVER)
Concrete Paving Construction/Reconstruction (LESS THAN 15,000 square yards)
Concrete Paving Construction/Reconstruction (15,000 square yards and GREATER)
Roadway and Pedestrian Lighting
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contiact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
00 45 13 - 4
BIDDER PREQUALIFICATION APPLICATION
Page 4 of 8
1. List eauininent vou do not own but which is available bv rentin�
DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER
2. How many years has your organization been in business as a general contractor under your present
name?
List previous business names:
3. How many years of experience in construction work has your organization
had:
(a) As a General Contractor: (b) As a Sub-Contractor:
n*�xn.... �.........�,. t_,.,. _.�.... .._,_...,.�......_ ..�_.._i���a t.. m___..,. __a _�_---'-----^
CLASS LOCATION NAME AND DETAILED
CONTRACT OF DATE CITY-COUNTY- ADDRESS OF OFFICIAL TO
AMOUNT WORK COMPLETED STATE WHOM YOU REFER
*If requalifying only show work performed since last statement.
5. Have you ever failed to complete any work awarded to you?_
If so, where and why?
6.Has any of�cer or owner of your organization ever been an officer of another organization that failed to
coinplete a contract?
If so, state the naine of the individual, other organization and reason.
7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her
name?
If so, state the name of the individual, name of owner and reason.
CITY OF FORT WORTH Water and Sanitaiy Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
004513-5
fi1DllER1'REQUAWF(CA'I'ION APPLICA"CION
Page 5 of 8
8. In what other lines of business are you financially interested?
9. Have you ever performed any work for the City?
If so, when and to whom do you refer?
10. State names and detailed addresses of all producers from whom you have purchased principal
materials during the ;ast three years.
NAME OF FIRM OR COMPANY DETAILED ADDRESS
1 l. Give the natnes of any affiliates or relatives currently debarred by the City. Indicate your relationship
to this person or firm.
12. What is the construction experience of the principal individuals in your organization?
PRESENT MAGNITUDE
POSITION OR YEARS OF AND TYPE OF IN WHAT
NAME OFFICE EXPERIENCE WORK CAPACITY
13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the
same household with a City employee, please list the name of the City employee and the relationship. In
addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or
director who does not live in the same household but who receives care and assistance froin that person as
a direct result of a documented inedical condition. This includes foster children or those related by
adoption or marriage.
CITY OF FORT WORTH Water and Sanitaiy Sewer Replacement Contract 2014, VdSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02354
Revised December 20, 20I2
004513-6
BIllDER PREQUALIFICA'1'ION AI'YLICA'CION
Page 6 of 8
COIZPORATION BLOCK PARTNERSHIP BLOCK
If a corporation: If a partnership:
Date of Incorporation State of Organization
Charter/File No. Date of organization
President Is partnership general, limited, or registered limited
liability partnership?
Vice Presidents
File No. (if Liinited
Partnership j
General Partners/Officers
Secretary Limited Partners (if applicable)
Treasurer
LIMI'I'EI) LIABILITY COMPANY BLOCK
If a corporation:
State of Incoiporation
Date of organization
File No. Individuals authorized to sign for Partnership
Officers or Managers (with titles, if any)
�:xcept tor limited partners, the individuals listed in the blocks above are presumed to have full
signature authority for your firm unless otherwise advised. Should you wish to grant signature
authority for additional individuals, please �ttach a certi�ed copy of the corporate resolution,
corporate minutes, partnership agreement, power of attorney or other legal documentation which
grants this authority.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
00 45 13 - 7
BIDDER PRGQUALIPICATION APPLICAT[ON
Page 7 of 8
14. Equipinent
$
TOTAL
BALANCESHEET
ITEM QUANTITY ITEM DESCRIPTION VALUE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Various-
TOTAL
�imitar types ot equipment may be luinped together. lf your tirm has more than 30 types of equipment,
you may show these 30 types and show the remainder as "various". The City, by allowing you to show
only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment.
The equiptnent list is a representation of equipment under the conh-ol of the iii-�n and which is related to
the type of work far which the firm is seeking qualification. In the description include, the manufacturer,
inodel, and general cominon description of each.
C1TY OF FORT WORTH Water �nd Sanitary Se�ver Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
00 45 l3 - 8
BIDDER PREQUALIFICATION APPLICATION
P�ge 8 of 8
BIDDER PREQUALIFICATION AFFIDAVIT
STATE OF
COUNTY OF
The undersigned hereby declares that the foregoing is a true statement of the financial condition of the
' entity herein �rst named, as of the date herein first given; that this statement is for the express purpose of
' inducing the party to whom it is submitted to award the submitter a contract; and that the a�cotmtant who
prepared the balance sheet accompanying this report as well as any depository, vendor or any other
' agency herein named is hereby authorized to supply each party with any information, while this statement
is in force, necessaty to verify said statetnent.
, being duly sworn, deposes and says that
he/she is the of , the entity
described in and which executed the foregoing statement that he/she is fainiliar with the boolcs of the said
entity showing its financial condition; that the foregoing financial statement taken from the books of the
said entity as of the date thereof and that the answers to the questions of the foregoing Bidder
Prequali�cation Application are correct and h-ue as of the date of this affidavit.
Finn Name:
Signature:
Sworn to before me this
day of _
Notary Public
Notary Public must not be an of�cer, director, or stockholder or relative thereof.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conriact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised DecemUer 2Q 2012
00 45 26 - I
CONTRACTOR COMPLIANCE W1TH WORKER'S COMPENSATION LAW
Page i of I
2
3
4
5
6
7
8
9
1U
ii
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
S�CTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORICER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worlcer's compensation insur•ance coverage for all of its employees employed on City
Project No. 02384. Contractor further certifies that, pursuant to TeYas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worl<er's compensation coverage.
CONTRACTOR:
--� - �-, �� s � �- � . . . � � ; , ; �- � __�.
Company
� t>. '�� (�. � /.,,<; s -
Address
,_ __-
_ � � � --. �'>�1 Ic_� - —t �_ ,�L-�j/�
City/State/Zip �
THE STATE OF TEXAS
�
COUNTY OF TARRANT §
By: c�_.1��,��� �, /-� ll �---
(Please Print)
,� �
Signature: � �� v= �'/_ � �i' <-'- ( ��
Title: Vi < <- (���� —� , �� --�_-� _
(Please Print)
BEFORE ME, the undersibmed authority, on this day personally appeared
C k�✓ ��J /��%"+ , known to me to be the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as
the act and deed of ?'C y e S CD ��''� • C lJ ti J 1• L � C for the purposes and
consideration therein expressed and in the capacity therein stated.
/ !�
G VEN UNDER MY HAND AND SEAL OF OFFICE this ( j � day of
�� , 20 �
,
`�r. � ( ,
,�����t_�. � , �` Il;', �
Notary Public in and for the State of Texas
\����t1N H 1 I 1111l1�,r
37 `\\���o�MA A. ,S+'9,��s''r
30 � �;.o,�P�i� �pG.G���'yi✓
:2 �••,��
_ � �•➢_
39 — ':. �rF Ph �
� �. R �F SE�' �
///���'os �5p2015 . \\``�����.
�����ii i u i u►������
�ND OF SECTION
CITY OF FORT WORTH Water and Sanitary Se�ver Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 023R4
Revised July 1, 20] 1
.__L
00 45 40 - 1
MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL
Page 1 of I
1 SECTION 00 45 40
2 MINORITY BUSINESS ENTERPRISE GOAL
3 APPLICATION OF POLICY
4 If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal
5 may be applicable. If the total dollar value of the contract is $50,000 or less, the MBE
6 subcontracting goal is not applicable.
7
8 POLICY STATEMENT
9 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority
10 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and
11 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid.
12
13 1�JI�� PROJEC'�!' GOA_L
14 The City's MBE goal on this project is 10% of the total bid (Base bid applies to Pa��ks and
15 Comn2icnitv Services). Noie: If both MBE and SBE subcontracting goals are established for this
16 project, then an Offeror inust submit both a MBE Utilization Form and a SBE Utilization Form to be
17 deemed responsive.
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
�i
COMPLIANCE TO BID SPECIFICATIONS
On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are
required to comply with the intent of the City's Business Diversity Ordinance by one of the
following:
1. Meet or esceed the above stated 1VIB� goal through IVIBE subcontracting participation, or
�. Meet or Qxceed the above stated MBE goal through MBE Joint Venture participation, or
3. Good Faith Effort documentation, or;
4. Waiver documentation.
Failure to comply with the City's M/WBE Ordinance, shall result in the Bid being considered non-
responsive. Any questions, please contact the M/WBE Office at (817) 392-6104.
SUBMITTAL OF REQ�TIRED DOCUMENTATION
The applicable documents must be received by the Managing Department, within the following
times allocated, in order for the entire bid to be considered responsive to the specifications. The
Offeror shall deliyer the MBE documentation in person to the appropriate employee of the Managing
Depai-tment and obtain a date/time receipt. Such receipt shall be evidence that the City received the
documentation in the time allocated. A faxed co y will not be accepted.
1. Subcontractor Utilization Form, if goal is met received by 5:00 p.m., five (5) City business days after
or exceeded: the bid opening date, exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after
Utilization Form, if participation is less than the bid opening date, exclusive of the bid opening date.
stated goal:
3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after
Utilization Form, if no MBE participation: the bid opening date, exclusive of the bid opening date.
4. Prime Contractor Waiver Form, if firm will received by 5:00 p.m., five (5) City business days after
erform all subcontracting/su lier worlc the bid o ening date, exclusive of the bid o ening date.
5. Joint Venture Form, if utilizing a joint venture received by 5:00 p.m., five (5) City business days after
to meet or exceed goal. the bid openinQ date, exclusive of the bid openin� date.
END OF SECTION
CITY OF FORT R�ORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
�
005243-1
Agreement
Page 1 of 4
SECTION 00 52 43
2 AGREEMENT
3 THIS AGREEMENT, authorized on lZ ?� is made by and between the City of Forth
4 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
5 ("City"), and Tejas Commercial Construction, LLC ,
6 authorized to do business in Texas, acting by and through its duly authorized representative,
7 ("Contractor").
8 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
9 follows:
10 Article 1. WORK
11
12
13
14
15
16
17
18
19
20
Contractor shall complete all Work as specified or indicated in the Contract Documents ior the
Project identified herein.
Article 2. PRO.�CT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
Water and Sanitary Sewer Replacement Contract 2014, WSM-C_CPN 02384
Article 3. CONTRACT TIME
3.1 Time is of the essence.
All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
Documents are of the essence to this Contract.
21 3.2 Final Acceptance.
22 The Work will be complete for Final Acceptance within 1?0 days after the date when the
23 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
24 33 Liquidated damages
25
26
27
28
29
30
31
32
33
34
Contractor recognizes that time is of the essence of this Agreement and that City will
suffer financial loss if the Work is not completed within the times spec�fied in Para�-�ph
3.2 above, �,lus any extension tt-iereof allowed in accof•dance with Article 12 of the
General Conditions. The Contractor also recognizes the delays, expense and difficulties
involved in proving in a legal proceeding the actual loss suffered by the City if the Work
is not completed on time. Accordingly, instead of requiring any such proof , Contractor
agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay
City Six hundred �ftv Dollars ($650.00) for each day that expires after the time specified
in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of
Acceptance.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CYN 02384
Revised August 17, 2012
00 52 43 - 2
Agreement
Page 2 of 4
35 Article 4. CONTRACT PRICE
36 City agrees to pay Contractor for performance of the Work in accordance with the Contract
37 Documents an amount in current funds of Six hundred eleven thousand three hundred thirtv-
38 five Dollars ($ 611 335.00
39 Article 5. CONTRACT DOCUMENTS
40 5.1 CONTENTS:
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
A. The Contract Documents which comprise the entire agreement between City and
Contractor concerning the Work consist of the following:
1. This Agreement.
2, Attachments to this Agreement:
a. Bid Form
1) Proposal Form
2) Vendor Compliance to State Law Non-Resident Bidder
3) Prequalification Statement
4) State and Federal documents (project specific)
b. Cun•ent Prevailing Wage Rate Table
c. Insurance ACORD Form(s)
d. Payment Bond
e. Performance Bond
£ Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's Compensation A�davit
i. MBE and/or SBE Commitment Form
3. General Conditions.
4. Supplementary Conditions.
5. Specifications specifcally made a part of the Contract Documents by attachment
or, if not attached, as incorporated by reference and described in the Table of
Contents of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
9. The follcwing which may be delivered or issued after the Effective Date af the
Agreement and, if issued, become an incorporated part of the Contract llocuments:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
CITY OF PORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDAI2U CONS1'RUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised August 1�, 2012
00 52 43 - 3
Agreement
Page 3 of 4
74 Article 6. INDEMNIFICATION
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
6.1 Contractor covenants and agrees to indemn'rfy, hold harmless and defend, at its own
expense, the city, its ofiicers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its offcers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification qrovision is specificallv intended to operate
and be effective even if it is alle�ed or nroven that all or some of the damaEes bein�
souEht were caused, in whole or in �art, bv anv act, omission or ne�li�ence of the city.
This indemnity provision is intended to include, without limitation, indemnity for
costs, expenses and legal fees incurred by the city in defending against such claims and
causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
tl�e ei#�,�, zts of�eer�, �eava�et� �e�d ee�eployees, front ana agai��t ae�y a�a al! loss, e�ar�eage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and see��iees to be �aerforaned by #lae contraetor, ats offieer�, age�ts, employees,
subcontractors, licensees or invitees under this contract. This indemnification
provision is sneci�icallv intended to onerate and be effective even if it is alle�ed or
proven that all or some of the dama�es bein� sou�ht were caused, in whole or in part,
bv any act, omission or negligence of the citv.
Article 7. MISCELLANEOUS
96 7.1 Terms.
97 Terms used in this Agreement which are defined in Article 1 of the General Conditions will
98 have the meanings indicated in the General Conditions.
99 7.2 Assignment of Contract.
100 This A�reement, including all of the Contract Documants may not be assigned by the
101 Contractor without the advanced express written consent of the City.
102 7.3 Successors and Assigns.
103 City and Contractor each binds itself, its partners, successors, assigns and legal
104 representatives to the other party hereto, in respect to all covenants, agreements and
205 obligations cantained in the Contract Documents,
106 7.4 Severability.
107 Any provision or part of the Contract Documents held to be unconstitutional, void or
108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
109 remaining provisions shall continue to be valid and binding upon CITY and
110 CONTRACTOR.
111 7.5 Governing Law and Venue.
112 This Agreement, including all of the Contract Documents is performable in the State of
113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
114 Noi�thern District of Texas, Fort Worth Division.
CITY OF PORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CYN 02384
Revised August 17, 2012
0o sa a3 - a
Agreement
Page 4 of 4
120 7.6 Other Provisions.
121 The Contractor agrees to pay at least minimum wage per hour for all labor as the
122 same is classified, promulgated and set out by the City, a copy of which is attached
123 hereto and made a part hereof the same as if it were copied verbatim herein.
124 7.7 Authority to Sign.
125
126
127
128
129
130
131
132
Contractor shall attach evidence of authority to sign Agreement, if other than duly
authorized signatory of the Contractor.
IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple
counterparts.
This Agreement is effective as of the last date signed by the Parties ("Effective Date'�
Contractor: City of Fort Worth
e.�. s co�..�.. c o N s�. . �, c., c. ��
By:
By: �% Fernando Costa
�_.�_ / C-�l-�' Assistant City Manager
(Signature)
Date / /
C,6,n�- Lc� � 1�. � l �� :� Attest: , �
(Printed Name) Mary J. Kayser,
City Secretary l -
Title: ��: c t �, �, .�:(-�
Address: � �� l�c;� 1c-�5 f��
%�, �� �,- c�.a /c, ��
�l_ // �i
(Seal)
M&C G' Z} p�6
Date: f2 -L-rY
I
City/State/Zip: J�. // j Approv as to Form and Legality:
�
' I�/L�/ ,
� Date Douglas W. Black
Assistant City Attorney
I � -
�
133
134
135
136
137
138
139
140
141
142
, t,Y����CGit�'�J�Yd'���
�N��� ���������
! �"�'�� �`{?�`�.,
, ����q ��
�
APPROVAL RECOMMENDED:
��C .
Andrew T. Cronberg, P.E.
Interim DIRECTOR,
Water Department
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICA'I'ION DOCUMENTS City Project No. 02384
�I
Revised August 17, 2012
I
�
�i
IT
r,
Bond No. 4�98548
006113-I
PERFORMANCE HOND
Pa�e 1 of 2
1
2
3
4
S
6
7
8
9
10
il
12
13
14
15
SECTION 40 61 13
PERFOR.MANCE BOND
�HE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, TICJAS COMIVI�RCIAL CONSTRUCTION. LLC , known as
"Princi al" harein and SureTec Insurance Company
p , a corporate
surety(sureiyes, if more than one) duly authorized to do business in the State of Texas, knowil as
"Surety" herein {whether one.ar znora), are held and firmly bound unto the City of For� Worth, a
municipal corporation cr�ated pursnant to tl�e laws oiTexas, known as "City" lierein, in tlae penal
sum of, Six hundred eleven thousand tUree hundred thirt�-five Dollars ($_ 611,335,00 ),
lawful money of the United States, to be paad, in Fort Wortli, Tarrant County, Texas for the
payment of which sum well and truty to be made, v�re bind ourselves, our heirs, executors,
adminzsfrators, successors and assigns, jointly and severally, firmly by these presents.
1G tiV�I�1ZEAS, the Principal has entered into a certain written contract witl�the City
17 awardec! tha ZK� day oi_ .D (�°!M s'�� , 20� which Contr�ct is hareby refarred t� and
18 macle a part hereof for all purposes as if fuUy set forth herein, to f.urniisk� all naaterials, equipment
19 labor and other accessories definad by law, in the prosecution of the Worl<, inc[uding a�iy Change
20 Orders, as provided for in said Gontract designated as Water and Sanitary Sewer Replaceia�ent
21 Contract 2014, WSM-C
22 N�W, THEREF�RE, the condition of tl�zs obligation is suck� that if the said Principal
23 shall faithfully per�orm it obligations under the Contxact and sha11 in a1l respects duly and
24 faithfully perf�rm the Work, including Change Orders, under the Contract, according to the plans,
25 specifica�ions, and contract doeuments therein referred to, and as tivell d�ring any period of
26 e}ctension of the Contract that may be granted on the part of the City, t1�er� this obligation shall be
27 and become null and void, otherwise to remain. in full force and effect.
28
29
PRO'VTDED lE`URTlF�1Z, that if any legal action be filed on tlus Bond, venue shall lie in
Taxrant Caunty, Texas or the United States Di.strict Court for the Nortlaern District of Te,�cas, Foi�t
30 Worth Division.
GI7'Y Or FORT WORTH Water and Sanitary Sewer Repl�ceinenY Contrnct 2014, WSM-C
STANDARD CONSTRUCTION SPL�CITTCATION DOCiIMENTS CPN 02384
Revised July 1,2011 .
006t 13 -2
P�RFORMANCE DONll
Pagc 2 of 2
This bond is made and executed in coinpliance v�ith the pi•ovisions of Chapter 2253 oithe
Te�as Govamment'Code, as ameiided, and all 1'aabilities on this bond shall be deternnined iv
accordance �vith the provisions of said statue.
IN VVITIVESS WHEREO�, the Princinal and the Surat}F hays SIGN�D and SEALED
this instrument by duly authorized agents and officers on this the Z k� day of __
�' P�+hc , 2a�.
7
8
9
10
11
12
13
14
15
16
27
18
19
20
21
22
23
24
25
26
27
28
29
3Q
31
32
33
34
35
36
37
38
39
A�0
PRTNCIPAL;
Te�as Commercial Construction, LLC
BY: f/'� � ���/�----
Si�naiure
ATTEST:
N/A
(Principal) Secratary
Charles Allen - Vice President
Name and Title
Address: P•O. Box 10395
River Oa s, exas 76114
SURET'Y';
SureTec Insurance Company +
I � 1
��.~� r� e � CC u�J mc,►��
Witness as to Prinpipal �
�
Witness as to Surety
�
,
B ,� �����.�
Signature `
Kimberly Morrissette Attorne•�•-in.-�Fact
Name and Title ~ �
Address: 5741 Legacy Dr. #210
Plano, Texas 75024
TelephoneNumber; 469-241-1488
4� *Note: If sign�ed by an o.fficer of the Sua•ety Campany, there muat ba on iile a cea�tified extract
42 fro�n the by-laws showin� that this person has authority to sign such obligation. If
43 Surety's physical address is diffErent from its mailing address, both must be provided.
44 The date of the bon.d shall not be prior to the date the Coniract is awarded.
45
CITY OP FQRT WORTIi Weter Aud Sa��itary Sewer Replucement Contr�act 2014, WSM-C
STANDARD CONS'1'RUC'�ION SPLCTFICATIQN DOCUMEN'l'S CPN U2384
Ravisec! 7iily 1, 2011
Bond.No. 439�648
00Gi 14-t
�'AXMBNT BOND
Page 1 of 2
r
1
2
3
4
S
6
TH� STATE OF TEXAS
S��CTION p0 61 14
PAYMENT BOND
�
COUNTY Or TAS2itANT
§
§ KNUW ALL BY THESr PR�SENTS:
§
7 That we, `�CJAS COMM�RCIAL CONSTRUCTION, LLC, known as
8 "Prineipal" herein, an� SureTec Insurance Company a
9 corporate surety (sureties), duly authorized to do business in the State of 7'exas, known as
10 "Sttrety" l�ereiii (whetUe�• one o�• tnare), are held and fixmly bound unta the City o� �oi�t Worth, a
11 inunicipal corporation created pursuant to tl�e taws oFthe St,�te of Texas, lcnown as "City" herein,
12 in tl�e penal sum of Six hundred eleven thousand three ��undrad thirtv�.five Dollars
13 ($ 611,335.00 �), Iawful maney of the United States, to be paid in Fort
14 Worth, Tai7ant County, Te�;as, far the payment of which sum well and truly be made, we bind
15 ourse]ves, our heirs, executors, administrators, successors and assigns, jointly and severally,
16 firmly by these presents:
17 W��1tEAS, Principal has entet�ed itrto a certain writl:en Contract witl� City, awarded tlle
I S tci day of �! C �^+ � t� , 20�, whiclt Contract is hereUy referred to and
t9 made a part l�ereof fox al.l pu.rposas as if fully sei forth h.erein, to f.urnisl� al1 materials, equipment,
20 labo�• and other accessories as dafined by law, in the prosecution o� the Work as provided for in
2.1 said Contract and desi.gnated r�s Water ai�d Sanitaiy Sewer Replacement Contraet 201�, WSM-C,
22 CPN 02384
23 1�10'iA�, `1CI3�REFO�tE, THE CONDITION OF TkIIS OBLIGATIC)N is snch that i�'
24 Principal shall pay all monies nwing to any (and all} payment bond beneficiary (as defned in
2S Chapter 2253 of the Texas Gavernment Code, as a�n�nded) in the prosecution of the Work under
2G the Cont�act, then thia oUligation shall be and bacome null and void; otherwise to remain 1n full
27 �'orce an.d eifect,
zs
29
30
3I
Tl�is bond is n�ade and. executed in �omplianc� with the pi•ovisions of Chapter 2253 of the
Texas Gavernment Code, as amended, a�id all liabililies on this bond shall be datermine.d ii�
accordar�ce with t1�e provisions oi'said statute,
C1TY OI' f+OItT WORTH Water aud Sanitn�y Sower Rcplaeement Contracc 2014, W5M•C
STANDATill CONSTRUCTION SPECIF�ICATION DQCUMENTS CPN 0238q
Revised July l, 2011 ,
0061 ]4-2
PAYM1iNT BONll
Page 2 of 2
1 II� WITNESS W�It�QI', tha Principal and Surety have eacli SIGNED and SEAL�D
2 this instrument hy duly authorizeii agents at�d affieers on tl�is the 7k day of
3 De«�s� ,�o,�.
�
A'I"I'EBT:
N/A
(I'rincipal) Secretary
�
1� �-� r�t � 1�'l�C �►�e-L�
Witness as to Principal
ATTEST:
N/A
(Suretyj Secretary
��� � ����=�t'
WiCness as to Surety
S
s
7
S
9
]0
11
12
P�tINCIPAL;
Tejas Commercial Construction, LLC
i
�
B�' /��� �=�
��ature
Charles Allen - Vice President
Nara�e and Titie
Address: p�0. Box 10395
River Oaks, Texas 76114
SURETY:
SureTec Insurance Company
� ! -%_.
Signature �
Kimberly Morrissette Attorney-in-ra�t
Name and Title
Address: 5741 Legacy Dr. #210
Flano, Texas 75024
Telephone Number: 469-241-1488
Note: If signed by an o�'Ficer of the Surety, there must be on file a certified extract From the
Uylaws showing that this person tzas authority ta sign such obligation. If Surety's physical
address is differetlt from its mailing address, both must be provided.
The date of the bonc� shaJl not be priar to tlae dai;e the Contt�act is awarded,
�rr� o� s�ccTzor�
CITY OF PORT' WORTH Water and Sanitury Sewer ReplAcement Contract 2014, W3M-C
STANDARD CONSTRCJCTCON SP�CIPICATION I>OCUML�NTS CPN 02384
Revised July 1, 20] i
Bond No. 4398648
00 61 19 - I
MAINTb'NANCE BOND
Page 1 of 3
��
l.
2
3
4
5
6
7
TH� STATE OF TEXAS
COU1oCTY OF TARRANT
SECTION q0 61 l.9
MAINTENANCE �OND
�
§ KNOW ALL BY THESE PR.�SENTS:
§
8 That we TEJAS CUMMERC�AL CONSTRUCTION LLC _, known as "Principal"
9 herein and SureTec Insurance Company , a corporate surety (sureties, if
10 more than one) daly authorized to do business in the State �f Texas, knawn as "�urety" herein
1] (wliether one or more), are held and firmly bound unio the City of Fot�t Worth, a municipal
�2 corporation created pursuant to the laws of tho Sta.te of Texas, knawn as "City" herein, in tha sum
13 of Six hundred eleven thousand three hundred thirty-�ve Dollars ($611,�35.00), lawful
14 monay of the United States, to be paid in Fort Worth, Tarrant County, Texas, fot• pay�nent of
15 wt�ich sum vt�ell and truly be made unto the Czty and its successars, we bind ourselves, our heirs,
16 executors, administrators, successors and assi�ls, jointly and severally, �rmly by ihese presents.
]7
18 WH�REAS, the Prz�cipal. has entered into a certain written coatract witll the City awarded
I9 the Z4! day of �� �� � S �� , , 20�, which Contract is hereby
20 xeferred to a�id a rnade part hereof for alI purposes as if fully sef fortl� herein, to furnish all
21 materials, equipment labor and other accessor. ies as defined by law, in the prosecution of the
22 Work, including any Work resulting from a duly authorized Cl�ange Order (collectively b.ereiza,
23 the "Work") as provided t'ar in said contract and design.ated as Water and Saz�itary Sawer
24
25
26
27
28
29
3�
31
32
33
34
Replacarnent Contract 2014, WSM-C, CPN 02384; and
WHER.�AS, Principal binds itself to use such tnaterials and to so construct ihe Work in
accordance with the plans, specifications and Con#ract Docuznents that the Work is and wi11
remain free fxam defects in. materials flr ;xrarkmansl�ip for and during the period of Livo (2) y�ars
after the date of Final Accepiance of the Work by the City ("Maintenance Period"); and
WHER�AS, Princi�at binds itself to repair or reconstruct the Work in whole or in part
upan receivi�g notice from the City of the need therefor at any titne �vithin the Maintenance
Period. �
CITY Or FORT WpRTH Water and Sa��itary Server Replacement Contraot 2014, WSM-C
STANDAI2D CONSTRUCTION SPECIFICATION D.�CUM�tJTS CPN 02364
Revised July S, 20l a
1
?
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1$
[L�
006119-2
MAINTENANCE BOND
Page 2 of 3
NOW THEREFORE, the condition of this obligation is such that if Principal shall
remedy any defective Work, for which timely notice was provided by City, to a completion
satisfactory to the City, then this obligation shall become null and void; otherwise to remain in
full force and effect.
PROVIDED, HOW�VER, if Principal shall fail so to repair or reconstruct any timely
noticed defective Work, it is agreed that the City may cause any and all such defective Work to
be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and
�he Surety under this Maintenance bond; and
F�(�VIDED F�J�3THER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant Couniy, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division; and
PFcJVII�EB FURTfr�ER, that this obligation shall be continuous in nature and
successive recoveries may be had hereon for successive breaches.
CPI'Y OF FORT WOR'I'H VJater and Sanitary Sewer Repiacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUIviENTS CPN 02384
Revised July t, 201 I
00.61 19 - 3
MAIN'CENANCE IIOND
Page � of 3
1 IN WITNESS WHEREOF, the I'rincipal and �he Suretx hav� each �IGNED and SEAL�D tl�is
2 inst��ument by duly authoxized agents and officers on this the Z4� day of
3 � Q( P� S-C � , 20�,,,.
5
6
7
8
9
]0
11
12
13
14
1S
lG
17
18
19
20
2 }_
22
23
24
25
2G
27
28
29
30
31
32
33
34
35
T'RINCIPAi.:
Tejas Commercial Construction, LLC
BY; ��� � ;l �
Signature
ATTEST:
N/A
(Principal) Secretary
Charles Allen - Vice President
Nazne and Ti#le
I �
� ���r � ��� �nt
Wifness as io Principal
AT`TEST:
NlA
(Surety� ecretary
c��� ��,,�
l `,li'��L
Witness as to Surety
Address: P.O. Box 10395
iver a s, exas 76114
SURETY:
SureTec Insurance Com�any _
B ,�!
Si�natur� �
Kimberly Morrissette Attorne��-in-Far.t
N�n�e Fuad Titte
Add��ess; 5741 Legacy Dr. #210
Plano, Texas 75024
TelephoneNumber; 469-241-1488
36
37 *rlote: If sigz�ed by an officer of tl�e Surety Company, there musi be on fle a certified extract
38 frara t1�e by-laws showing that this person has authority to sign sucl� obligation. If
39 Surety's pbysical address is different fro.m its rriailing address, bUth must be provided.
4o Tl�e date of tbe bond shall not be prior to the date the Contract is awax•ded.
�l
CITY qF FORT WQRTH ' Wdter and Snnitnry Sewer Rep3acement Cot7tnfct 2014, WSM-C
STANDARD CONS'TRUCTION SPECTFICATION DOCUMENTS CYN 02384
Revised July 1, ?.Ol l
POA #: 4221714
SureTec Insurance Comp�.ny
LIMITED POWER OF ATTORNEY
Rnow All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Lynda P. Hawkins, Chris Lynn Holt, Mark Mitchell, Kimberly Morrissette
its true and lawful Attomey-in-fact, with full power and authority hereby confened in its name, place and stead, to execute, aclaiowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Three Million and 00/100 Dollars ($3,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate
seal of the Company and duly attested by its Secretary, herebv ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment shall continue in force until 12/31/15 and is made under and by authority of the following
resolutions of the Board of Directors of the SureTec Insurance Company:
Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20`� ofApril,
1999.)
In Wrtness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal
to be hereto affixed this �st day of october, �,,D, zo�a .
,u�„�W�������4n�„pp, SURETEC INSURANCE COMPANY
�6V�ANCF``a
� •'''' •':C'p�'4,
tuC�, X '9 't �'_- By;
w; w ! D: John ox Jr:j� resident
State of Texas ss: ���., ,� � f' Yz' J
County of Harris �'"•••�•••••"' � � �
�°"�urniu� ��IN�p�
On this �st day of october A.D. 20�4 before me personally came John Knox Jr., to me known, who, being by me duly swom, did depose and say, that he
resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
�1�PYWB� JACaUELYN MALDONADO
,�Oy Notary Public
State oi Texas
"�oFh`� My Comm. Exp. 511812017
Jacq elyn Maldonado, Notary Public
My commission expires May 18, 2017
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURf1NCE COMPANY, do hereby certify that the above and foregoing is a hve and correct col�y
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, ser
out in the Power of Attomey are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this �. _ day of �._��r' ��,. � i 3%�'_, A.D.
. Bre t Beaty, Assistant ecretar3+
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call (713) 812-0800 any business day between 8:00 am and 5:00 pm CST.
SureTec Insurance Cc�mpany
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may call the Surety's toll fi�ee telephone number for information or to make a
complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252-
3439. You may write the TeYas Department of Insurance at
PO Bo:c 149104
Austin, TX 78714-9104
Fax#:512-475-1771
Web: http://w�vw.tdi.state.tY.us
Email: ConsumerProtection@tdi.state.tY.us
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the
Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance.
Terrorism Risks Exclusion
The Bond to which this Rider is attached does not provide coverage for, and the surety shall not be liable for,
losses caused by acts of terrorism, riot, civil insurrection, or acts of war.
Exclusion of Liability for
Mold, Mycotoxins, Fungi & Environmental Hazards
The Bond to which this Rider is attached does not provide coverage for, and the surety thereon shall not be
liable for, molds, living or dead fungi, bacteria, allergens, histamines, spores, hyphae, or mycotoYins, or their
related products or parts, nor for any environmental hazards, bio-hazards, hazardous materials, environmental
spiils, contamination, or cieanup, nor the remediation thereof, nor the consequences to persons, property, or the
performance of the bonded obligations, of the occurrence, existence, or appearance thereof.
Texas Rider 06042014
'' �`� �
STANDARD GENERAL CONDITIONS
OF THE CONSTRITCTION CONTI�ACT
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: D�e�nber2l, 2012
STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1— Definitions and Terminology ..........................................................................................................1
1.O l Deiined Terms ............................................................................................................................... l
1.02 Terminology ..................................................................................................................................6
Article2— Preliminary Matters ......................................................................................................................... 7
2.01 Copies of Documents ....................................................................................................................7
2.02 Commencement of Contract Time; Notice to Proceed ................................................................ 7
2.03 Starting the Worlc .......................................................................................................................... 8
2.04 Before Starting Construction ........................................................................................................ 8
2.05 Preconstiuction Conference .......................................................................................................... 8
2.06 Public Meeting .............................................................................................................................. 8
2.07 Initial Acceptance of Schedules .................................................................................................... 8
Article 3— Contract Documents: Intent, Amending, Reuse ............................................................................ 8
3 . 01 Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.02 Reference Standards ................................................................................
3.03 Reporting and Resolving Discrepancies .................................................
3.04 Amending and Supplementing Contract Documents .............................
3.05 Reuse of Documents ...............................................................................
3.06 Electronic Data ........................................................................................
................................... 8
................................... 9
................................... 9
.................................10
.................................10
.................................11
Article 4— Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental
Conditions; Reference Points ...........................................................................................................11
4.01 Availability of Lands ..................................................................................................................11
4.02 Subsurface and Physical Conditions ..........................................................................................12
4.03 Differing Subsurface or Physical Conditions .............................................................................12
4.04 Underground Facilities ...............................................................................................................13
4.05 Reference Points .........................................................................................................................14
4.06 Hazardous Environmental Condition at Site ..............................................................................14
Article5— Bonds and Insurance .....................................................................................................................16
5.01 Licensed Sureties and Insurers ...................................................................................................16
5.02 Performance, Payment, and Maintenance Bonds .......................................................................16
5.03 Certificates of Insurance .............................................................................................................16
5.04 Contractor's Insurance ................................................................................................................18
5.05 Acceptance of Bonds and Insurance; Option to Replace ...........................................................19
Article 6 — Contractor's Responsibilities ........................................................................................................19
6.01 Supervision and Superintendence ...............................................................................................19
C1TY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUM�NTS
Revision: December2l, 2012
6.02
6.03
6.04
6.05
6.06
6.07
6.08
6.09
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
Labor; Working Hours ................................................................................................................20
Services, Materials, and Equipment ........................................................................................... 20
ProjectSchedule ..........................................................................................................................21
Substitutes and "Or-Equals" ....................................................................................................... 21
Concerning Subcontractors, Suppliers, and Others ....................................................................24
WageRates ..................................................................................................................................25
PatentFees and Royalties ........................................................................................................... 26
Permitsand Utilities .................................................................................................................... 27
Lawsand Regulations ................................................................................................................. 27
Taxes...........................................................................................................................................28
Useof Site and Other Areas ....................................................................................................... 28
RecordDocuments ......................................................................................................................29
Safetyand Protection ..............................................................................................:................... 29
SafetyRepresentative .................................................................................................................. 30
Hazard Communication Programs ............................................................................................. 30
Emergencies and/or Rectification ............................................................................................... 30
Submittals.................................................................................................................................... 31
Continuingthe Worlc ................................................................................................................... 32
Contractor's General Warranty and Guarantee ..........................................................................32
Indemnification......................................................................................................................... 33
Delegation of Professional Design Services .............................................................................. 34
Rightto Audit .............................................................................................................................. 34
Nondiscrimination....................................................................................................................... 3 5
Article 7- Other Work at the Site ..................................................
7.01 Related Work at Site ..................................................
7.02 Coordination ...............................................................
.......................................................
.....................................................
.....................................................
...... 35
...... 35
...... 36
Article8- City's Responsibilities ................................................................................................................... 36
8.01 Communications to Contractor ...................................................................................................36
8.02 Furnish Data ................................................................................................................................ 36
8.03 Pay When Due ............................................................................................................................ 36
8.04 Lands and Easements; Reports and Tests ...................................................................................36
8.05 Change Orders .............................................................................................................................36
8.06 Inspections, Tests, and Approvals .............................................................................................. 36
8.07 Limitations on City's Responsibilities ....................................................................................... 37
8.08 Undisclosed Hazardous Environmental Condition ....................................................................37
8.09 Compliance with Safety Program ............................................................................................... 37
Article 9- City's Observation Status During Construction ........................................................................... 37
9.01 City's Project Representative .....................................................................................................37
9.02 Visits to Site ................................................................................................................................37
9.03 Authorized Variations in Worlc ..................................................................................................38
9.04 Rejecting Defective Work ..........................................................................................................38
9.05 Detertninations for Work Performed ..........................................................................................38
9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
Article 10 - Changes in the Worlc; Claims; Extra Work ................................................................................ 38
10.01 Authorized Changes in the Work ............................................................................................... 38
10.02 Unauthorized Changes in the Worlc ...........................................................................................39
10.03 Execution of Change Orders .......................................................................................................39
10.04 Extra Work ..............................:...................................................................................................39
10.05 Notification to Surety .................................................................................................................. 39
10.06 Contract Claims Process ............................................................................................................. 40
Article 11 - Cost of the Worlc; Allowances; Unit Price Work; Plans Quantity Measurement ......................41
11.01 Cost of the Work ......................................................................................................................... 41
11.02 Allowances ..................................................................................................................................43
11.03 Unit Price Worlc .......................................................................................................................... 44
11.04 Plans Quantity Measurement ......................................................................................................45
Article 12 - Change of Contract Price; Change of Contract Time ................................................................. 46
12.01 Change of Contract Price ............................................................................................................46
12.02 Change of Contract Time ............................................................................................................47
12.03 Delays ..........................................................................................................................................47
Article 13 - Tests and Inspections; Cot7•ection, Removal or Acceptance of Defective Worlc ...................... 48
13.01 Notice of Defects ........................................................................................................................ 48
13.02 Access to Work ........................................................................................................................... 48
13.03 Tests and Inspections .................................................................................................................. 48
13.04 Uncovering Worlc ........................................................................................................................49
13.05 City May Stop the Worlc .............................................................................................................49
13.06 Correction or Removal of Defective Worlc ................................................................................ 50
13.07 Correction Period ........................................................................................................................ 50
13.08 Acceptance of Defective Worlc ................................................................................................... 51
13.09 City May Correct Defective Worlc ............................................................................................. 51
Article 14 - Payments to Contractor and Completion .................................................................................... 52
14.01 Schedule of Values ......................................................................................................................52
14.02 Progress Payments ...................................................................................................................... 52
14.03 Contractor's Warranty of Title ................................................................................................... 54
14.04 Partial Utilization ........................................................................................................................ 55
14.05 FinalInspection ...........................................................................................................................55
14.06 Final Acceptance ......................................................................................................................... 55
14.07 Final Payment ..............................................................................................................................56
14.08 Final Completion Delayed and Partial Retainage Release ........................................................ 56
14.09 Waiver of Claims ........................................................................................................................ 57
Article 15 - Suspension of Worlc and Termination ........................................................................................ 57
15.01 City May Suspend Work ............................................................................................................. 57
15.02 City May Terminate for Cause ................................................................................................... 58
15.03 City May Terminate For Convenience ....................................................................................... 60
Article 16 - Dispute Resolution ........................
16.01 Methods and Procedures ...............
CITY OF FORT WORTH
STANDAItD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
........................
........................
61
61
Article17 — Miscellaneous .............................................................................................................................. 62
17.01 Giving Notice ..............................................................................................................................62
17.02 Computation of Times ................................................................................................................ 62
, 17.03 Cumulative Remedies ................................................................................................................. 62
' 17.04 Survival of Obligations ...............................................................................................................63
17.05 Headings ..................:...................................................................................................................63
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Decerober2l, 2012
00�2oo-i
General Conditions
Page 1 of 63
ARTICLE 1— DEFINITIONS AND TERMINOLOGY
1.01 Defiized Te��»2s
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed-defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or fornis.
1. A�lc�e��c�cc—Written or graphic instruments issued prior to the opening of Bids ���hieh elarify,
correct, or change the Bidding Requirements or the proposed Contract Documents.
2. Agreeme�zt—The written instrument which is evidence of the agreement between City and
Contractor covering the Work.
3. Applic�etio�� for PaymeT�t—The form acceptable to City which is to be used by Contractor
during the course of the Worlc in requesting progress or final payments and which is to be
accompanied by such supporting documentation as is required by the Contract Documents.
4. Asbestos—Any material that contains more than one percent asbestos and is fi-iable oi• is
releasing asbestos fibers into the air above cui-rent action levels established by the United
States Occupational Safety and Health Administration.
5. Awczrd — Authorization by the City Council for the City to enter into an Agreement.
6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the
prices for the Worlc to be performed.
7. Biddei=The indivic�ual or entity who submits a Bid directly to City.
8. Bidding Doccr»zents—The Bidding Requirements and the proposed Contract Documents
(including all Addenda).
9. Bidclirzg Requi��en�ents—The advertisement or Invitation to Bid, Instructions to Bidders, Bid
security of acceptable form, if any, and the Bid Form with any supplements.
10. Busi»ess D�ry — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
11. Baczzsaw — City's on-line, electronic document management and collaboration system.
12. C�cle�i�lcs�� Day — A day consisting of 24 hours measured from midnight to the next midnight.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 �a oo - i
General Conditions
Page 2 of 63
13. Change Ordei=A document, which is prepared and approved by the City, which is signed
by Contractor and City and authorizes an addition, deletion, or revision in the Worlc or an
adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date
of the Agreement.
14. City— The City of Fort Worth, Texas, a home-rule municipai coiporation, authorized and
chartered under the Texas State Statutes, acting by its governing body through its City
Manager, his designee, or agents authorized under his behalf, each of which is required by
Charter to perform specific duties with responsibility for final enforcement of the contracts
involving the City of Fort Worth is by Charter vested in the City Manager and is the entity
with whom Contractor has entered into the Agreement and for whom the Worlc is to be
performed.
15. City Attof�fzey — The afficially appointed City Attorney of the City of Fort Wcrth, Texas, or
his duly authorized representative.
16. City Coufacil - The duly elected and qualified governing body of the City of Fort Worth,
Texas.
17. City Mu��agei^ — The officially appointed and authorized City Manager of the City of Fort
Woi-th, Texas, or lus duly authorized representative.
18. Contract Cluim—A demand or assertion by City or Contractar seelcing an adjustment of
Contract Price or Contract Time, or both, or other relief with respect to the terms of the
Contract. A demand for money or services by a third party is not a Contract Claim.
19. Conti�act—The entire and integrated written document between the City and Contractor
concerning the Work. The Contract contains the Agreement and all Contract Documents and
supersedes prior negotiations, representations, or agreements, whether written or oral.
20. Corzt��uct Docam7ents—Those items so designated in the Agreement. All items listed in the
i Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and
the reports and drawings of subsurface and physical conditions are not Contract Documents.
21. Coiztract Price—The moneys payable by City to Contractor for completion of the Worlc in
accordance with the Contract Documents as stated in the Agreement (subject to the
provisions of Paragraph 11.03 in the case of Unit Price Worlc).
22. Contruct Time—The number of days or the dates stated in the Agreement to: (i) achieve
Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance.
23. Cont��acto�=The individual or entity with whom City has entered into the Agreement.
24. Cost of the Wo��k—See Paragraph 11.01 of these General Conditions for definition.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 72 00 - I
Gene�al Conditions
Page 3 of 63
25. Dan�age Clain�s — A demand for money or services arising from the Project or Site from a
third party, City or Contractor exclusive of a Contract Claim.
26. Day or day — A day, unless otherwise defined, shall mean a Calendar Day.
27. Director� of Avicztior7 — The officially appointed Director of the Aviation Department of the
City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents.
28. Di��ecto�• of Pa��l�s and Com��aticnity Se��vices — The officially appointed Director of the Parlcs
and Community Services Department of the City of Fort Worth, Texas, or his duly appointed
representative, assistant, or agents.
29. Di��ecto�� of Plann�i�zg a��.d Developme�zt — The officially appointed Director of the Planning
and Development Department of the City of Fort Worth, Texas, or his duly appointed
representative, assistant, or agents.
30. Director of Ti�anspo��•tatio�z P�ublic Worizs — The officially appointed Director of the
Transportation Public Works Department of the City of Fort Worth, Texas, or his duly
appointed representative, assistant, or agents.
31. Di��ector of Wcrte�� Departrne�at — The officially appointed Directar of the Water Department
of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents.
32. D�•ativi�zgs—That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Worlc to be perfornied by
Contractor. Submittals are not Drawings as so defined.
33. Effective Dcete of tl�e Ag��eement—The date indicated in the Agreement on which it becomes
effective, but if no such date is indicated, it means the date on which the Agreement is signed
and delivered by the last of the two parties to sign and deliver.
34. Enginee��—The licensed professional engineer or engineering firm registered in the State of
Texas pei-forming professional services for the City.
35. Exti�a Woi�le — Additional worlc made necessary by changes or alterations of the Contract
Documents or of quantities ar for other reasons for which no prices are provided in the
Contract Documents. Extra worlc shall be part of the Worlc.
36. Field Orde�� — A written order issued by City which requires changes in the Worlc but which
does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer.
Field Orders are paid from Field Order Allowances incorporated into the Contract by funded
work type at the time of award.
37. Fi�zal Acceptaizce — The written notice given by the City to the Contractor that the Worlc
specified in the Contract Documents has been completed to the satisfaction of the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 72 00 - I
General Conditions
Page 4 of 63
38. Final Inspection — Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
39. Gene��ul Reqzci��enzents—Sections of Division 1 of the Contract Documents.
40. Hazurdoirs Environn2ental Condition The presence at the Site of Asbestos, PCBs,
Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or
circumstances that may present a substantial danger to persons or property exposed thereto.
41. Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous ar
possesses one or more nazardous characierisiics as deimed in ihe federal waste reguiations,
as amended from time to time.
42. Laws und Regc�lutio�zs—Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
43. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
44. Major Ite�n — An Item of worlc included in the Contract Documents that has a total cost equal
to or greater than 5% of the original Contract Price or $25,000 whichever is less.
45. Milesto��e—A principal event specified in the Contract Documents relating to an intermediate
Contract Time prior to Final Acceptance of the Worlc.
46. Notice of Awa��d—The written notice by City to the Successful Bidder stating that upon
timely compliance by the Successful Bidder with the conditions precedent listed therein, City
will sign and deliver the Agreement.
47. Notice to Pf�oceed—A written notice given by City to Contractor fixing the date on which the
Contract Time will commence to run and on which Contractor shall start to perform the
Worlc specified in Contract Documents.
48. PCBs—Polychlorinated biphenyls.
49. Pet��oleacm—Petroleum, including crude oil or any fraction thereof which is liquid at standard
conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square
inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, lcerosene, and
oil mixed with other non-Hazardous Waste and crude oils.
50. Pluns — See definition of Drawings.
CITl' OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revisioa: Dece�nber2l, 2012
007200-I
General Conditions
Page 5 of 63
51. Project Sche�lule—A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
52. P��oject—The Work to be perFormed under the Contract Documents.
53. Project Rep��ese�2tatzve—The authorized representative of the City who will be assigned to
the Site.
54. Public MeetiJzg — An announced meeting conducted by the City to facilitate public
participation and to assist the public in gaining an informed view of the Project.
55. Radioactive Matericcl—Source, special nuclear, or byproduct material as defined by the
Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time.
56. Regula�� Worl�ir�g Hou�s — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding legal holidays).
57. Sarnples—Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Worlc and which establish the standards by which such
portion of the Worlc will be judged.
58. Schedlcle of Sccbmittuls—A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
59. Scl�edule of Valcces—A schedule, prepared and maintained by Contractor, allocating portions
of the Contract Price to various portions of the Worlc and used as the basis for reviewing
Contractor's Applications for Payment.
60. Site—Lands or areas indicated in the Contract Documents as being furnished by City upon
which the Worlc is to be performed, including ribhts-of-way, pei�rnits, and easements for
access tl�ereto, and such other lands furnished by City which are designated for the use of
Contractor.
61. Specificcations—That part of the Conh•act Documents consisting of written requirements for
materials, equipment, systems, standa�•ds and worlcmanship as applied to the Worlc, and
certain administrative requirements and procedural matters applicable thereto. Specifications
may be specifically made a part of the Contract Documents by attachment or, if not attached,
may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00)
of each Proj ect.
62. Subco�it��acto�=An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of a part of the Worlc at the Site.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
oo.�z ao - i
General Conditions
Page 6 of 63
63. Si�bmittals—All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
64. Successficl Bidde�=The Bidder submitting the lowest and most responsive Bid to whom City
makes an Award.
65. Szcpe��intendeJzt — The representative of the Contractor who is available at all times and able
to i-eceive instructions from the City and to act for the Contractor.
66. Sarpplen�e��taiy Conditions—That part of the Contract Documents which amends or
supplements these General Conditions.
67. Sarppliei=A manufacturer, fabricator, supplier, distributor, n�aterialman, or vendor having a
direct contract with Contractor or with any Subcontractor to furnish materials or equipment
to be incorporated in the Worlc by Contractor or Subcontractar.
68. Undeigrozcnd Facilities—All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements
containing such facilities, including but not limited to, those that convey electricity, gases,
steam, liquid petrol�um products, telephone or other communications, cable television,
water, wastewater, storm water, other liquids or chemicals, ar traffic or other control systems.
69. Unit Price Wo��k—See Paragraph 11.03 of these Genera] Conditions for definition.
70. Weelzend Worl�ii�g Hozus — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
71. Work—The entire construction or the various separately identifiable parts thereof required to
be provided under the Contract Documents. Worlc includes and is the result of performing or
providing all labor, services, and documentation necessary to produce such construction
including any Change Order or Field Order, and furnishing, installing, and incorporating all
materials and equipment into such construction, all as required by the Contract Documents.
72. Worlci�zg Day — A working day is defined as a day, not including Saturdays, Sundays, or legal
holidays authorized by the City for contract purposes, in which weather or other conditions
not under the control of the Contractor will permit the performance of the principal unit of
worlc underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m.
1.02 Te»�zinology
A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. b2tent of Ce��tain Te��ms o��Acjectives:
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Deceinber2l, 2012
00 72 00 - 1
General Conditions
Page 7 of 63
1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as
directed" or terms of lilce effect or import to authorize an exercise of judgment by City. In
addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," ar
adjectives of lilce effect or import are used to describe an action or determination of City as to
the Work. It is intended that such exercise of professional judgment, action, or determination
will be solely to evaluate, in general, the Work for compliance with the information in the
Contract Documents and with the design concept of the Project as a functioning whole as
shown or indicated in the Contract Documents (unless there is a specific statement indicating
otherwise).
C. Defective:
l. The word "defective," when modifying the ward "Worlc," refers to Worlc that is
unsatisfactoiy, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requireinents of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; ar
c. has been dainaged prior to City's written acceptance.
D. Firrnzsh, Install, Pe��'of7�2, Provicle:
l. The ward "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive ar usage thereof, shall mean
furnishing and incorporating in the Work including all necessaty labor, materials, equipment,
and everything n,ecessary to perform the Worlc indicated, unless specifically limited in the
context used.
E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-lcnown
technical ar construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
ARTICLE 2 — PRELIMINARY MAT'TERS
2.01 Copies ofDocacments
City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the
Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be
furnished upon request at the cost of reproduction.
2.02 Com�nefzceme�Zt of Contract Time; Notice to P��ocee�l
The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to
Proceed may be given at any time within 14 days after the Effective Date of the Agreement.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
007200-I
General Conditions
Page 8 of 63
2.03 Sta��ting the Woi�k
Contractor shall start to perform the Worlc on the date when the Contract Time commences to run.
No Work shall be done at the Site prior to the date on which the Contract Time commences to run.
2.04 Before Sta��ting Const�-acction
Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the
Worlc.
2.05 P��econsti�uction Confe�°e�zce
Before any Worlc at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.06 Pa�blic Meetzng
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
2.07 Inztial Acceptance of Schedules
No progress payment shall be made to Contractor until acceptable schedules are submitted to City in
accordance with the Schedule Specification as provided in the Contract Documents.
ARTICLE 3— CONTI2ACT DOCU1dIENTS: INTENT, �MEl�DING, REUS�
3.01 InteiZt
A. The Contract Documents are complementaty; what is required by one is as binding as if required
by a1L �
B. It is the intent of the Contract Documents to describe a functionally complete project (or part
thereo� to be constructed in accordance with the Contract Documents. Any labor,
documentation, services, materials, or equipment that reasonably may be inferred from the
Contract Documents or from prevailing custom or trade usage as being required to produce the
indicated result will be provided whether or not specifically called for, at no additional cost to
City.
C. Clarifications and interpretations of the Contract Documents shall be issued by City.
D. The Specifications may vary in form, format and style. Some Specification sections may be
written in varying degrees of streamlined or declarative style and some sections may be
relatively nat7�ative by comparison. Omission of such words and phrases as "the Contractor
shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined
sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions
may appear in various parts of a section or articles within a part depending on the foimat of the
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
oonoo-i
General Conditions
Page 9 of 63
section. The Contractor shall not talce advantage of any variation of form, format or style in
malcing Contract Claims.
E. The cross referencing of specification sections under the subparagraph heading "Related
Sections include but are not necessarily limited to;" and elsewhere within each Specification
section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on
the cross referencing provided and shall be responsible to coordinate the entire Worlc under the
Contract Documents and provide a complete Project whether or not the cross referencing is
provided in each section or whether or not the cross referencing is complete.
3.02 Referen�ce Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision of any such standard, specification, manual, or code, or any instruction of a
Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any
of their subcontractors, consultants, agents, or employees, from those set forth in the Contract
Documents. No such provision or instruction shall be effective to assign to City, or any of its
officers, directors, members, partners, employees, agents, consultants, or subcontractors, any
duty or authority to supervise or direct the performance of the Work or any duty ar authority
to undertalce responsibility inconsistent with the provisions of the Contract Documents.
3.03 Repoi�tiizg �ri2c� Resoh�i�zg Discrepancies
A. Repo��ting Discrepmzcies:
1. Co�t��acto�•'s Review of Cor�t��act Docttme��ts Befoi�e Startii�g Worlc. Before undertalcing each
part of the Worlc, Contractor shall carefully study and compare the Contract Documents and
checic and verify pertinent figures therein against all applicable field measurements and
conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity,
or discrepancy which Contractor discovers, or has actual lcnowledge of, and shall obtain a
written interpretation or clarification from City before proceeding with any Worlc affected
thereby.
2. Contf°acto��'s Review of Co�Zt��act Docac»z.e�Zts During Pe��'oi�n��nce of Wo��lz: If, during the
performance of the Worlc, Contractor discovers any conflict, error, ambiguity, or discrepancy
within the Contract Documents, or between the Contract Documents and (a) any applicable
Law or Regulation ,(b) any standard, specification, manual, or code, or (c) any instruction of
any Supplier, then Contractor shall promptly report it to City in writing. Conh-actor shall not
proceed with the Work affected thereby (except in an emergency as required by Paragraph
CITY OF FORT WORTH
STANDARD CONST[tUCTION SPECIFCATION DOCUMENTS
Revision: Decembet2l, 2012
oonoo-1
Qeneral Conditions
Page 10 of 63
6.17.A) until an amendment or supplement to the Contract Documents has been issued by
one of the methods indicated in Paragraph 3.04.
3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or
discrepancy in the Contract Documents unless Contractor had actual knowledge thereof.
B. Resolving Disc��epancies:
1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of
the Contract Documents shall talce precedence in resolving any conflict, error, ambiguity, or
discrepancy between the provisions of the Contract Documents and the provisions of any
standard, specincaiion, manuai, or the insiruction oi any Suppiier �whether or noi speciricaliy
incorporated by reference in the Contract Documents).
2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall
govern over Specifications, Supplementary Conditions shall govern over General Conditions
and Specifications, and quantities shown on the Plans shall govern over those shown in the
proposal.
3.04 Am�endi�zg and Si�pplen��enting Contract Doci�»ie�zts
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Worlc or to modify the terms and conditions thereof by a Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
2. Ciiy's review of a Submittal (subject to the provisions of Paragraph 6.18.C); oi�
3. City's written interpretation or clarification.
3.05 Reuse ofDocz�n�ents
A. Contractor and any Subcontractor or Supplier shall not:
1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or
other documents (or copies of any thereo� prepared by or bearing the seal of Engineer,
including electronic media editions; or
2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of
the Project or any other project without written consent of City and speciiic written
verification or adaptation by Engineer.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Deceinber2l, 2012
00 72 00 - 1
Genernl Conditions
Page 1 I of 63
B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract
Documents for record purposes.
3.06 Electronic Dcata
A. Unless othei-wise stated in the Supplementary Conditions, the data furnished by City or Engineer
to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the
printed copies included in the Contract Documents (also lcnown as hard copies) and other
Specifications referenced and located on the City's Buzzsaw site. Files in electronic media
format of text, data, graphics, or other types are furnished only for the convenience of the
receiving party. Any conclusion or information obtained or derived fi•om such electronic files
will be at the user's sole rislc. If there is a discrepancy between the electronic files and the hard
copies, the hard copies govern.
B. When h•ansferring documents in electronic media forniat, the transferring party malces no
representations as to long term compatibility, usability, or readability oi documents resulting
from the use of software application pacicages, operating systems, or computer hardware
differing from those used by the data's creator.
AR'I'I�L� 4— AV�LABILIT�' O�' LANI3S; SLTSSL)R�'AC� AND P�3�SICAI. CO1�DI'I'IONS;
HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS
4.01 Availabilit�� ofL�ands
A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of
general application but specifically related to use of the Site with which Contractor must comply
in performing the Worlc. City will obtain in a timely manner and pay for easements for
permanent structures or peimanent changes in existing facilities.
1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or
easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in
accordance with the schedule set forth in the Supplementaty Conditions. The Project
Schedule submitted by the Contractor in accordance with the Contract Documents must
consider any outstanding right-of-way, and/or easements.
2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site.
Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance
with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted
by the Contractor in accordance with the Contract Documents must consider any outstanding
utilities or obstructions to be removed, adjusted, and/or relocated by others.
B. Upon reasonable written t•equest, City shall furnish Contractor with a current statement of record
legal title and legal description of the lands upon which the Work is to be performed.
CITY OF FORT WORTH
STANDAf2D CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber21, 2012
00 �2 00 - i
Genetal Conditions
Page 12 of 63
C. Contractor shall provide for all additional lands and access thereto that may be required for
construction facilities or storage of materials and equipment.
4.02 Sarbszr� face and Physical Co�zditions
A. Reports and Drativings: The Supplementary Conditions identify:
1. those reports known to City of explorations and tests of subsurface conditions at or
contiguous to the Site; and
2. those drawings known to City of physical conditions relating to existing surface or
su�surfuce stracti.�r�s ut the �ite (exce�t Undergraur�� �'ucilities).
B. Li�a�ited Relia�zce by Contr�acto�� o�z Technicul Data Ai�tho�•ized: Contractor may rely upon the
accuracy of the "technical data" contained in such reports and drawings, but such reports and
drawings are not Contract Documents. Such "technical data" is identified in the Supplementary
Conditions. Contractor may not make any Contract Claim against City, or any of their officers,
directors, members, partners, employees, agents, consultants, or subcontractors with respect to:
1. the completeness of such reports and drawings for Contractor's purposes, including, but not
limited to, any aspects of the means, methods, techniques, sequences, and procedures of
construction to be employed by Contractor, and safety precautions and programs incident
thereto; or
2. other data, interpretations, opinions, and information contained in such reports or shown ar
indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such
other data, interpretations, opinions, or information.
4.03 Diffe��ing Sa�bszirfuce or Pl�ysical Conditions
A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered ar
revealed either:
1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to
rely as provided in Paragraph 4.02 is materially inaccurate; or
2. is of such a nature as to require a change in the Contract Documents; or
3. differs materially from that shown or indicated in the Contract Documents; or
4. is of an unusual nature, and differs materially from conditions ordinarily encountered and
generally recognized as inherent in work of the character provided for in the Contract
Documents;
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
oonoo-i
Genetal Conditions
Page 13 of 63
then Contractor shall, promptly after becoming aware thereof and before further disturbing the
subsurface ar physical conditions or performing any Work in connection therewith (except in an
emergency as required by Paragraph 6.17.A), notify City in writing about such condition.
B. Possible Price and Time Acljarstments
Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time i£
l. Contractor lcnew of the existence of such conditions at the time Contractor made a final
commitment to City with respect to Contract Price and Contract Time by the submission of a
Bid or becoming bound under a negotiated contract; or
2. the existence of such condition could reasonably have been discovered or revealed as a result
of the examination of the Contract Documents or the Site; or
3. Contractor failed to give the written notice as required by Paragraph 4.03.A.
4.04 Uizdeig��otin2d Facilities
A. Slzown or hulzc�rte�l: The information and data shown or indicated in the Contract Documents
with respect to existing Underground Facilities at or contiguous to the Site is based on
information and data furnished to City or Engineer by the owners of . such Underground
Facilities, including City, or by others. Unless it is otherwise expressly provided in the
Supplementary Conditions:
1. City and Engineer shall not be responsible for the accuracy or completeness of any such
information or data provided by others; and
2. the cost of all of the follo�ving will be included in the Contract Price, and Contractor shall
have full responsibility for:
a. reviewing and checicing all such information and data;
b. locating all Underground Facilities shown or indicated in the Conh-act Documents;
c. coordination and adjustment of the Woric with the owners of such Underground
Facilities, including City, diu-ing construction; and
d. the safety and protection of all such Underground Facilities and repairing any damage
thereto resulting from the Work.
B. Not Shown o�� bidicated:
1. If an Underground Facility which conflicts with the Worlc is uncovered or revealed at or
contiguous to the Site which was not shown or indicated, or not shown or indicated with
reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming
aware thereof and before further disturbing conditions affected thereby or performing any
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Decembei2l, 2012
00 �2 00 - �
Genenl Conditions
Page 14 of 63
, Worlc in connection therewith (except in an emergency as required by Paragraph 6.17.A),
identify the owner of such Underground Facility and give notice to that owner and to City.
=; City will review the discovered Underground Facility and determine the extent, if any, to
which a change may be required in the Contract Documents to reflect and document the
consequences of the existence or location of the Underground Facility. Contractor shall be
responsible for the safety and protection of such discovered Underground Facility.
2. If City concludes that a change in the Contract Documents is required, a Change Order may
be issued to reflect and document such consequences.
3. Verification of existing utilities, structures, and service lines shall include notification of all
utility companies a minimum of 4� hours in advance of construction including exploratory
excavation if necessary.
4.05 Re,f'ere�zcePoi��ts
A. City shall provide engineering surveys to establish reference points far construction, which in
City's judgment are necessary to enable Contractor to proceed with the Work. City will provide
construction stakes or other customary method of marking to establish line and grades for
roadway and utility construction, centerlines and benchmarks for bridgeworlc. Contractor shall
protect and pi•eserve the established reference points and property monuments, and shall malce no
changes or relocations. Contractor shall report to City whenever any reference point or property
monument is lost or destroyed or requires relocation because of necessary changes in grades or
locations. The City shall be responsible for the replacement or relocation of reference points or
property monuments not carelessly or willfully destroyed by the Conh•actor. The Contractor shall
notify City in advance and with sufficient time to avoid delays.
B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or
willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full
cost for replacing such points plus 25% will be charged against the Contractor, and the full
amount will be deducted from payment due the Contractor.
4.06 Hazardozrs Envi�ronn�zentcal Co�zdition at Site
A. Repo��ts and D��uwings: The Supplementary Conditions identify those reports and drawings
known to City relating to Hazardous Environmental Conditions that have been identified at the
Site.
B. Linaited Reliance by Contractor on Technical Data Aacthorized: Contractor may rely upon the
accuracy of the "technical data" contained in such reports and drawings, but such reports and
drawings are not Contract Documents. Such "technical data" is identified in the Supplementary
Conditions. Contractor may not malce any Contract Claim against City, or any of their officers,
directors, members, partners, employees, agents, consultants, or subcontractors with respect to:
1. the completeness of such reports and drawings for Contractor's purposes, including, but not
limited to, any aspects of the means, methods, techniques, sequences and procedures of
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
007200-1
Genei�al Conditions
Page I S of 63
construction to be employed by Contractor and safety precautions and programs incident
thereto; or
2. other data, interpretations, opinions and information contained in such reports or shown or
indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such
other data, inteipretations, opinions or infornlation.
C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or
revealed at the Site which was not shown or indicated in Drawings or Specifications or identified
in ihe Contrac'c i�ocumeriis tu be vviti�in `t�e sc�pe uf tiie `vJurlc. i uiiiraciur siiail �e i'es�uiisi�ic
for a Hazardous Environmental Condition created with any materials brought to the Site by _
Contractor, Subcontractors, Suppliers, or anyonP else for whom Contractor is responsible.
D. If Contractor encounteis a Hazardous Environmental Condition or if Contractor or anyone for
whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall
immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with
such condition and in any area affected thereby (except in an emergency as required by
Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing).
City may consider the necessity to retain a qualified expert to evaluate such condition or talce
corrective action, if any.
E. Contractor shall not be required to resume Work in connection with such condition or in any
affected area until after City has obtained any required permits related thereto and delivered
written notice to Contractor: (i) specifying that such condition and any affected area is or has
been rendered suitable for the resumption of Worlc; or (ii) specifying any special conditions
under which such Work may be resumed.
F. If after receipt of such written notice Contractor does not agree to resume such Work based on a
reasonable belief it is unsafe, or does not agree to resume such Worlc under such special
conditions, then City may order the portion of the Work that is in the area affected by such
condition to be deleted from the Worlc. City may have such deleted portion of the Work
pei-formed by City's own forces or others.
G. To tlze �'itillest extent pei�nztte�l b}� Lativs and Rega�lations, Contracto�� slzall in�lem�nify ai7�l hold
Iacarn��less City, firo»�. aizd against crll elczi.n�s, eosts, losses, �s�zd cda»�ctges (iizelirclii�g bt�t not lii��ited
to crll fees an�cd elaaiges of e�zgineers, cz��ehiteets, attor��.eys, aizd otl�er p��ofessionc�ls caizd a.11 eo�urt
or a��bitration o�� other dispt�te �•esolirtion. costs) arisi�ig oi�t of o�� relcztii��g to tt Haza�•dotrs
Envi�roiz»��e�ztal Conditioii c�•eated by Co�ztracto�� o�� by �aizyoiae fo�• wliom� Co�at��uctor is
��esponsible. Notl�.zng in tlzis Pa��ag�°�rph 4. 06. G s7iall oblig�ite Co�itrczcto�� to i�zde»znify aizy
individital o�• entity fi�oni and against the coizseqire�zces of that iiulividual's oi° er�tity's ow�i
negligefzce.
H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental
Condition uncovered or revealed at the Site.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
007200-I
Generat Conditions
Page 16 of 63
ARTICLE 5— BONDS AND INSURANCE
5.01 Licensed Sureties and Insu�•ers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverages so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided in the Supplementary Conditions.
5.02 Pe� fo�m�.aizce, Payrnent, and Maintena�2ce Bonds
A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government
Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as
security for the faithful performance and payment of all of Contractor's obligations under the
Contract Documents.
B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security
to protect the City against any defects in any portion of the Worlc described in the Contract
Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final
Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney-in-fact signed each bond.
, D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
• its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 5.01 and 5.02.C.
5.03 Cet�tificates ofbzsacrance
Contractor shall deliver to City, with copies to each additional insured and loss payee identified in
the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested
by City or any other additional insured) which Contractor is required to purchase and maintain.
1. The certificate of insurance shall document the City, and all identified entities named in the
Supplementary Conditions as "Additional Insured" on all liability policies.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: DecemUer21, 2012
00 72 00 - 1
Geneial Conditions
Page 17 of 63
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Rislc Management. If the rating is below that
requireci, written approval of City is required.
5. All applicable policies shall include a Waiv�r of Subr•ogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in the Supplementary
Conditions
6. Failure of the City to demand such certificates or other evidence of full compliance with the
insurance requirements or failure of the City to identify a deficiency from evidence that is
provided shall not be construed as a waiver of Contractor's obligation to maintain such lines
of insurance coverage.
7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with
or priar to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims-made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Conn•act and for three (3) years following Final
Acceptance provided under the Contract Docutnents or for the wat��anty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are deteimined to be unacceptable or the City desu•es additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 �z oo - �
General Conditions
Page 18 of 63
lieu of traditional insurance, alternative coverage maintained through insurance pools or rislc
retention groups, must also be approved by City.
11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first-dollar basis, must be acceptable to and approved by the City.
12. City, at its sole discretion, reserves the right to review the insurance requirements and to
malce reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Orc�er.
13. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either party or the underwriter on any such policies.
14. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
5.04 Contractor's b�sat��ance
A. Wof�kers Compe��sation and Enzployers' Liabzlity. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Worlcers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor's
performance of the Work and Contractor's other obligations under the Contract Documents,
whether it is to be perFormed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Worlc, or by anyone for whose acts
any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
B. Commercial Gene��al Liability. Coverage shall include but not be limited to covering liability
(bodily injuiy or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services
Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other
CITY OF FORT WORTH
STANDARD CONSTRUCTiON SPECIFCATION DOCUMENTS
Revision: December2l, 2012
oonoo-1
Genet�al Conditions
Page 19 of 63
insurance ar self-insurance programs afforded to the City. The Commercial General Liability
policy, shall have no exclusions by endorsements that would alter of nullify premises/operations,
products/completed operations, contractual, personal injury, or advertising injury, which are
normally contained with the policy, unless the City approves such exclusions in writing.
For construction projects that present a substantial completed operation exposure, the City may
require the contractor to maintain completed operations coverage for a minimum of no less than
three (3) years following the completion of the project (if identified in the Supplementary
Conditions).
C. Automobile Liabilit��. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non-owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any mo�or vzhiclz by the �onti•actor, any SuUcontractor or �upplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
D. Raih�oad Proteetive Licrbilit��. If any of the worlc or any warranty worlc is within the limits of
railroad i-ight-of-way, the Contractor shall comply with the requirements identified in the
Supplementary Conditions.
E. Notifi.catioi�� of Policy Cc�r2cellatio�z: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractoi� shall stop worlc until replacement insurance has
been procured. There shall be no time credit for days not worlced pursuant to this section.
5.05 Acceptai�.ce of Boiids and b7st���a�zce; Option to Replczce
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing
within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor
shall provide to the City such additional information in respect of insurance provided as the City may
reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance
required by the Contract Documents, the City shall notify the Contractor in writing of such failure
prior to the start of the Worlc, or of such failure to maintain prior to any change in the required
coverage.
ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES
6.01 Supei��isio��. a�zd Sirperi�zten�clen�ce
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such slcills and expertise as may be necessary to perform the
Worlc in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 72 00 - I
Genei�al Conditions
Page 20 of 63
B. At all times during the progress of the Worlc, Contractor shall assign a competent, English-
spealcing, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall ha�e authority to act on
behalf of Contractor. All communication given to or received fi�om the Superintendent shall be
binding on Contractor,
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
6.02 Labor ; Worl�ing Ho�irrs
A. i oniracior snail proviue campeien�, suiiably qualified personnei io perform construciion as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Worlc
at the Site shall be performed during Regular Worlcing Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perfonn Work:
1. for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weelcend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
6.03 Ser�vices, Mate��ials, and Equipinent
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
i•esponsibility for all seivices, materials, equipment, labor, transportation, construction equipment
and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities,
temporary facilities, and all other facilities and incidentals necessary for the performance,
Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Wark shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of mater-ials and equipment.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
oo�zoo-i
General Conditions
Page 21 of 63
C. All materials and equipment to be incorporated into the Worlc shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
D. All items of standard equipment to be incorporated into the Worlc shall be the latest model at the
time of bid, unless otherwise specitied.
6.04 Pr•oject Sche�lule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07
and the General Requirements as it may be adjusted from time to time as provided below.
l. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and
the General Requirements) proposed adjustments in the Project Schedule that will not result
in changing the Contract Time. Such adjustments will comply with any provisions of the
General Requirements applicable thereto.
2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment
for the duration of the Contract in accordance with the schedule specification Ol 32 16.
3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Ai�ticle 12. Adjustments in Contract Time
may only be made by a Change Order.
6.05 S�a�bstitz�tes crnd "Or-Equals"
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no lilce, equivalent,
or "or-equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
l. "Or-Eqz�al" Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Worlc will be required, it may be considered by City as an "or-equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 6.OS.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. the City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 72 00 - 1
General Conditions
Page 22 of 63
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Sarbstitt�te Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or-equal" item under Paragraph 6.OS.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material ar equipment that Contractor seelcs to furnish or use. The application shall
comply with Section O1 25 00 and:
1) shall certify that the proposed substitute item will:
a) perform adequately the functions and achieve the results called for by the general
design;
b) be similar in substance to that specified;
c) be suited to the same use as that specified; and
2) will state:
a) the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
b) whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Proj ect) to adapt the design to the proposed
substitute item;
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Deceinber2l, 2012
007200-1
Genernl CondiCions
Page 23 of 63
c) whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
a) all variations of the proposed substitute item fi•om that speciiied;
b) available engineering, sales, maintenance, repair, and replacement services; and
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
�lai���s cf other ccr�t:act:,.s affe�ted by a�y r�sultir�g change.
B. Szcbstitute Const��tctioTz Metl�ods of� Pirocedzci•es: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall malce written application to City for
review in the same manner as those provided in Paragraph 6.OS.A.2.
C. Cit��'s EvcrlLrcttzo�z: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 6.OS.A and 6.OS.B. City may require
Contractar to fur7lish additional data about the pro�osed substitute. City will be the sole judge of
acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or-equal." City will advise Contractor in writing of its determination.
D. Special GLcar�a��tee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Cont��acto�� sl�all
inc�einnify a��d h�old h�ar�nless City an�d a.iayon�e clif�ectly or indij�ectly employed by them� firom tand
�ag�ai�zst a�zy a�z�l all claims, da»�ages, losses a�2d e�penses (i��cl�iidin�g attorizeys fees) arisiizg o�ut
of the irse of stibstitute�l m�ate��ials or� eqi�ipnae�zt.
E. City's Cost Rein7�birrse»�eizt: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 6.OS.A.2 and 6.OS.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for malting changes in the Contract Documents (or in the
provisions of any other direct contract with City) resulting from the acceptance of each proposed
substitute.
F. Coi�tr�acto�°'s E�pe�zse: Contractor shall provide all data in support of any proposed substitute or
"or-equal" at Contractor's expense.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Deceinber2l, 2012
00 �z oo -1
General Conditions
Page 24 of 63
• 1.
G. City Sicbstitzite Reimbiirseme�zt: Costs (savings or charges) attributable to acceptance of a
substitute shall be incorporated to the Contract by Change Order.
H. Time Extensions: No additional time will be granted for substitutions.
CoiZcerniizg Sa�bco�2ti•actors, Sztppliers, and Others
A. Contractor shall perform with his own organization, worlc of a value not less than 35% of the
value embraced on the Contract, unless otherwise approved by the City.
B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether
+ • r• �,� �; r ,.. ,- ,
iiiitiu j/ �T aS a T�j', aC�.iii�,ii�� u�uiilSt �%JIIvTil �itjr iT'iaj� ilaJ�. i�$SGIla�'i1C Q�v��C�iOiI. �,vii�ilC�t'ii Silai�
not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or
perform any of the Wark against whom Contractor has reasonable objection (excluding those
acceptable to City as indicated in Paragraph 6.06.C).
C. The City may frorn time to time require the use of certain Subcontractors, Suppliers, or other
individuals or entities on the project, and will provide such requirements in the Supplementary
Conditions.
D. Business Diversity Erateiprise O�•dinance Con�pliance: It is City policy to ensure the full and
equitable participation by Minority and Small Business Enterprises (MBE)(SBE) in the
procurement of goods and services on a contractual basis. If the Contract Documents provide for
a MBE and/or SBE goal, Contractor is required to comply with the intent of the City's Business
Diversity Ordinance (as amended) by the following:
1. Contractor shall, upon request by the City, provide complete and accurate information
regarding actual worlc performed by a MBE and/or SBE on the Contract and payment
therefor.
2. Contractor will not malce additions, deletions, or substitutions of accepted MBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any boolcs,
records, or files in the possession of the Contractor that will substantiate the actual wark
performed by an MBE and/or SBE. Material misrepresentation of any nature may be grounds
for termination of the Contract in accordance with Paragraph 15.02.A. Any such
misrepresentation may be grounds for disqualification of Contractor to bid on future
contracts with the City for a period of not less than three years.
E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 �z oo - i
General Conditions
Page 25 of 63
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
F. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities perfoiming or furnishing any of the
Worlc under a direct or indirect contract with Contractor.
G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any
of the Worlc shall communicate with City through Contractor.
H. All Worlc pei�orn�ed for Contractor by a Subconh•actor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract
Documents for the benefit of City.
6,07 W�age Rates
A. Dcrt�� to pay P��evaili��g Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Gover7unent Code (as alnended), i�lcluding the payment of not less than the
rates determined by the City Couricil of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penulty fo�� Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worlcer employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258,023.
C. Conzplai�its of Violcitions c�nd City Detei�n7�incition of Good Cccerse. On receipt of infortnation,
including a complaint by a worlcer, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall malce an initial
determination, before the 31 st day after the date the City receives the inforn�ation, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's
determination that there is good cause to believe the Contractor or Subcontractor has violated
Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the
difference between wages paid and wages due under the prevailing wage rates, such amounts
being subtracted from successive progress payments pending a final determination of the
violation.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 72 00 - I
General Conditions
Page 26 of 63
D. A��bit��atio�z Reqzcired if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worlcer does not resolve the issue by agreement before the 15th day after the date the
City malces its initial determination pursuant to Paragraph C above. If the persons required to
' arbitrate under this section do not agree on an arbitrator before the l lth day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Reco��ds to be Maintazned. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the narne and
occupation oF each worlcer employed by the Coniractor in the construction of the Worlc provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Pirogr•ess Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posti��g of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Sacbco��t�•actor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
6.08 Patent Fees und Royalties
A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the
perfortnance of the Work or the incorporation in the Work of any invention, design, process,
product, or device which is the subject of patent rights or copyrights held by others. If a
particular invention, design, process, product, or device is specified in the Contract Documents
for use in the perFormance of the Work and if, to the actual knowledge of City, its use is subject
to patent rights or copyrights calling for the payment of any license fee or royalty to others, the
existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City
to disclose such information does not relieve the Contractor from its obligations to pay for the
use of said fees or royalties to others.
B. To the,firllest extent pei�rnitted by Laws and Regttlatzons, Con�tracto�� shall i�ic�emnify and hold
h�armless City, fi�o�n. arad against all claims, costs, losses, a�zd �lca�nages (i�zcli�ding bi�t �2ot limitecl
to all fees and cha�ges of enginee��s, architects, attorneys, and othe�• p�rofessionals a�2d all coa�rt
or a��bitration or oth�er dispirte resolution costs) arisi�ag out of or relatin�g to any ii�fringen2ei�t of
patent rights or copy��ights i�zcident to tlze use in the perf'or�mance of the Wo��Iz o�• resiilting fi•o�n.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 �z oo - i
Genei.il Conditions
Page 27 of 63
the inco��o��ation i�z the Wo��k of ai�y inve�ztion, desig�z, p�rocess, p�°oclttct, or device jZot specified
in. tlZe Cont�•actDoctrT�ients.
6.09 Permits a�Zd Utilities
A. Coiztractor obtciinecl pe��rz.its a�acl licenses. Contractor shall obtain and pay for all construction
permits and licenses except those provided far in the Supplementary Conditions or Contract
Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses.
Contractor shall pay all governmental charges and inspection fees necessary for the pi•osecution
of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the
Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B.
City snail pay all cnarges of utiiity owners for connections for providing permanent service to the
Worlc.
B. Ciry obt�lin.ed pe»�zits crn�l �lace�zses. City will obtain and pay for all permits and licenses as
provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's
responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the
Contract and the City approves the changes, the Contractor is responsible for obtaining
clearances and coordinating with the appropriate regulatory agency. The City will not reimburse
the Contractor far any cost associated with these requirements of any City acquired permit. The
following are permits the City will obtain if requireci:
1. Te�as Department of Transportation Permits
2. U.S. Army Corps of Engineers Permits
3. Texas Commission on Environmental Quality Permits
4. Railroad Company Permits
C. OLctsta��ding peJ���.its a�zcl licenses. The City anticipates acquisition of and/or access to permits
and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance
with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by
the Contractor in accardance with the Contract Documents must consider any outstanding
pernlits and licenses.
6.10 Laws an�d Regt�lcztioizs
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Worlc knowing or having reason to lcnow that it is contrary to Laws or
Regulations, Contractor shall bear all claims, costs, losses, and daniages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
C[TY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: DecemUer21, 2012
00 �a oo - i
General Conditions
Page 28 of 63
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
' Contractor's obligations under Paragraph 3.02.
C. Changes in Laws or Regulations not lcnown at the time of opening of Bids having an effect on
the cost or time of performance of the Worlc may be the subject of an adjustment in Contract
Price or Contract Time.
6.11 Taxes
A. vn a connaci awarded by ihe Ciiy, an organization whicn qualiries for exempiion pursuant to
Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractar may
purchase, rent or lease all materials, supplies and equipment used or consumed in the
performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax,
said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption
certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the
provision of State Comptroller's Ruling .Ol l, and any other applicable rulings pertaining to the
Texas Tax Code, Subchapter H.
B. Texas Tax pernlits and infoi7nation may be oUtained from:
1. Comptroller of Public Accounts
Sales Tax Division
Capitol Station
Austin, TX 78711; or
2. http://www.window.state.tx.us/taxinfo/taxforms/93-forms.html
6.12 Use of Site and Other Areas
A. Li�nitation on Use of Site uizd Othe�• Ar�eas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not urueasonably encumber the Site and other areas with const�uction equipment or
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, ar to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
CITI' OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 �z oo -1
General Conditions
Page 29 of 63
3. Should any Damage Claim be made by any such owner or occupant because of the
perfoimance of the Worlc, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pu�sitant to P�srctg���tph 6.21, Co�ztr�actor shall indem��zify a�zd hold hczi�nless Cit��, fi�om. c�nd
agairzst all clai�ns, costs, losses, ancl d�ri��ages a��ising oi�t of of• relating to a��y cic�i�n o��
caciio�i, legal or eqi�it�able, b��ozrglit by any sirch. owner oi� occa�pa���t agai��st Cit��.
B. Re���oval of Debris Dtr��ii�g Pe� formance of the Wo��k: During the progress of the Worlc
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Muintenance Cle���az»g: 24 hours after written notice is given to the Conh•actor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor
fails to con�ect the unsatisfactory procedure, the City may take such direct action as the City
deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written
notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of
such costs, shall be deducted from the monies due or to become due to the Contractor.
D. Fii�al Site Cdea��ing.• Prior to Final Acceptance of the Worlc Contractor shall clean the Site and
the Work and make it ready far utilization by City or adjacent property owner. At the completion
of the Worlc Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Worlc.
E. Loadi�zg Sti�trctcn�es: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Worlc
or adj acent property to stresses or pressures that will endanger it.
613 Recorcl Doccrin�eizts
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and
approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated to
show changes made during construction. These record documents together with all approved
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Worlc, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
6.14 S�afet�! and P��otectio��
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subconh•actors of their responsibility for the safety of persons or property in the performance of
their worlc, nor for compliance with applicable safety Laws and Regulations. Contractor shall
CITY OF FORT WORTH
STANDAI2D CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Decembei2l, 2012
00 �2 00 - i
General Conditions
Page 30 of 63
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Worlc;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractar shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requuements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 ar 6.14.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Worlc, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Worlc.
6.15 Safety Represe��tative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site,
6.16 Huza��d Commutzication P��ograms
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or among
employers in accordance with Laws or Regulations.
6.17 Eme�gencies and/o��Rectificatio�Z
A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or
adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss.
Contractor shall give City prompt written notice if Contractor believes that any significant
CITY OF FORT W02TH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber21, 2012
00 72 00 - 1
Geneial Conditions
Page 31 of 63
changes in the Work or variations from the Contract Documents have been caused thereby or are
required as a result thereof. If City deteimines that a change in the Contract Documents is
required because of the action taken by Contractar in response to such an emergency, a Change
Order may be issued.
B. Should the Contractor fail to respond to a request $�om the City to rectify any discrepancies,
omissions, or correction necessary to conform with the requirements of the Contract Documents,
the City shall give the Contractor written notice that such worlc or changes are to be performed.
The written notice shall direct attention to the discrepant condition and request the Contractor to
talce remedial action to correct the condition. In the event the Contractor does not talce positive
steps to fulfill this written request, or does not show just cause for not talcing the proper action,
within 24 hours, the City may talce such remedial action wit� City forces or by contract. 1 he City
shall deduct an amount equal to the entire costs for such remedial action, plus 25°/o, from any
funds due or become due the Contractor on the Proj ect.
6.18 Sub�nittals
A. Contractor shall submit required Submittals to City for review and acceptance in accordance
with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be
identified as City may require.
l. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
seivices, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 6.18.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For-Information-Only submittals upon which the City is not expected to conduct review or
talce responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 6.18,C.
�ITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Deceml�21, 2012
00 �z oo - i
Geneial Conditions
Page 32 of 63
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Worlc performed prior to City's review and acceptance of the pertinent submittal will be
� at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Worlc, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
17ocuments.
2. City's rPview and acceptanc� will not extend to means, methods, techni�ues, s�quen�es, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or progra�ns incident thereto. The review and acceptance
of a separate item as such will not indicate approval of the assembly in which the item
functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section Ol 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
6.19 Continui�zg the Wo��lz
Except as otherwise provided, Contractor shall carry on the Wark and adhere to the Project Schedule
during all disputes or disagreements with City. No Work shall be delayed or postponed pending
resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in
writing.
6.20 Contracto�^'s General Wa�^��af2ty aizd Gua��antee
, A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its ofiicers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 72 00 - 1
Geneial Conditions
Page 33 of 63
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Worlc in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Worlc that is
not in accordance with the Contract Documents or a release of Contractor's obligation to perForm
the Work in accordance with the Contract Documents: -
l. observations by City;
2. recommendation or payment by City of any progress or final payment;
3. thP ISS�»�T:C� nf 1 CP:�:f C�u:P �f �'lll`'u� QCC�pt''uT:�� �) j' (..'lt j� or any Ya;�m�11t T:�wt�� tI1C',T�t�J �,' j'
Cliyi
4. use or occupancy of the Worlc or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
7. any correction of defective Worlc by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other worlc or property resulting therefrom which shall appear within a period of two (2) years
from the date of Fina1 Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
5.02.B. The City will give notice of observed defects with reasonable promptness.
6.21 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the City, its officers, servants and employees, from and against any and all claims
arising out of, or alleged to arise out of, the work and services to be performed by the
Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this
Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO
OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL
OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN
PART BY ANY ACT OMISSION OR NEGLIGENCE OF THE CITY. This indemnity
provision is intended to include, without limitation, indemnity for costs, eYpenses and legal
fees incurred by the City in defending against such claims and c�uses of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the
City, its officers, servants and employees, from and against any and all loss, damage or
destruction of property of the City, arising out of, or alleged to arise out of, the worlc and
services to be performed by the Contractor, its officers, agents, employees, subcontractors,
licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISiON iS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 72 00 - 1
Geneial Conditions
Page 34 of 63
SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS
ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT
WERE CAUSED IN WHOLE OR IN PART BY ANY ACT OMISSION OR
NEGLIGENCE OF THE CITY.
6.22 Delegation ofProfessio�zal Design Se��vices
A. Contractor will not be required to provide professional design setvices unless such services are
specifically required by the Contract Documents for a portion of the Worlc or unless such
services are required to carry out Contractor's responsibilities for construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials ar equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified by
such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for confornlance with performance and
design criteria given and the design concept expressed in the Contract Documents. City's review
and acceptance of Submittals (except design calculations and design drawings) will be only for
the purpose stated in Paragraph 6.18.C.
6.23 Right to Audit
A. The Contractor agrees that the City shall, until the expiration of three (3) years after fmal
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving n•ansactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Worlcing Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Deceii�ber21, 2012
00�2oo-i
Genei�al Conditions
Page 35 of 63
Subcontractor facilities, and shall be provided adequate and appropriate worlc space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
6.24 Noiadisc��in�.ination.
A. The City is responsible for operating Public Transportation Programs and implementing transit-
1"cia�cu �iG�jECiS� WiilCli aPE itlilC�i2u lii YaTi Wiili i cucial liiiaiiCiai aSSiSiaiiCc awaiucd �y tric U.�.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, coloi•, or national
origin.
B. Title VI, Civzl Rigllts Act of 1964 as a»�.e�2ded: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
Ai�TICL�E '7 —�TI��I� WOI?I� AT THE SITE
7.01 Reluted Wo��Iz at Site
A. City may perform other worlc related to the Project at the Site with Citys employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other worlc is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other worlc with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Worlc with theirs. Contractor shall do all cutting, fitting, and patching of
the Worlc that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any worlc of
others by cutting, excavating, or otherwise altering such worlc; provided, however, that
Contractor may cut or alter others' worlc with the written consent of City and the others whose
worlc will be affected.
C. If the proper execution or results of any part of Contractor's Worlc depends upon worlc performed
by others under this Article 7, Contractor shall inspect such other work and promptly report to
City in writing any delays, defects, or deficiencies in such other work that render it unavailable
or unsuitable far the proper execution and results of Contractor's Worlc. Contractor's failure to so
report will constitute an acceptance of such other work as fit and proper for integration with
Contractor's Work except for latent defects in the worlc provided by others.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 �2 00 - i
Generai Conditions
Page 36 of 63
7.02 Coo��difzation
A. If City intends to contract with others for the pei-formance of other work on the Project at the
Site, the following will be set forth in Supplementary Conditions:
l. the individual or entity who will have authority and responsibility for coordination of the
activities among the various contractors will be identified;
2. the speciiic matters to be covered by such authority and responsibility will be itemized; and
3. the extent of such authority and responsibilities will be provided.
B. Unless otherwise provided in the Supplementary Conditions, City shall ha�e authority far such
coordination.
ARTICLE 8 — CITY'S RESPONSIBILITIES
8.01 Commiinications to Cont��actor
Except as otherwise provided in the Supplementary Conditions, City shall issue all con�ununications
to Contractor.
8.02 Fic��fzish Data
City shall timely furnish the data required under the Contract Documents.
8.03 Pay Wlaen Due
City shall malce payments to Contractor in accordance with Article 14.
8.04 Lands a�zd Easemerzts; Repo��ts and Tests
City's duties with respect to providing lands and easements and providing engineering surveys to
establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's
identifying and making available to Contractor copies of reports of explorations and tests of
subsurface conditions and drawings of physical conditions relating to existing surface or subsurface
structures at or contiguous to the Site that have been utilized by City in preparing the Contract
Documents.
8.05 Clzange Orders
City shall execute Change Orders in accordance with Paragraph 10.03.
8.06 b�spections, Tests, aTzd App��ovals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
13.03.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00�2oo-i
General Conditions
Page 37 of 63
8.07 Limitations o�z Ciry's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be res�onsible for, -
Conti•actor's means, methods, techniques, sequences, ar procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Worlc. City will not be responsible for
Contractor's failure to perfornl the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14.
8.08 U�zclisclosec�Hc�z�cf�dozrs Envi��o�Zmental Co�zclition
City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth
in Paragraph 4.06.
8.09 Complian.ce with Scrfety Prog��am.
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 6.14.
ARTICLE 9— CITY'S OBSERVATION STATUS DURING CONSTRUCTION
9.01 Citv's Pi�oject Rep��esen�tative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents. The Project Representative(s) will be as provided in the
Supplementary Conditions.
9.02 Visits to Site
A. City's Project Representative will malce visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Worlc. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in general, if the Worlc is proceeding in accordance with the Contract Documents.
City's Project Representative will not be required to malce exhaustive or continuous inspections
on the Site to checic the quality or quantity of the Worlc City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Worlc
will conform generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents including those set forth in Paragraph
8.07.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 �a oo - �
General Conditions
Page 38 of 63
9.03 Attthoi�ized Ilca�•iations in Wo��lc
-- City's Project Representative may authorize minor variations in the Work from the requirements of
' the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City and also on Contractor, who shall perform the Worlc involved promptly.
9.04 Rejecti��g Defective Work
` City will have authority to reject Work which City's Project Representative believes to be defective,
or wi11 not produce a compie�ed Frojeci tnat coniorms io ine i oniraci �ocumen�s or ihai wiii
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or
; completed.
9.05 Determinationsfor Y�ot•IzPe�fonned
Contractor will determine the actual quantities and classifications of Work perFormed. City's Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
9.06 Decisions on Reqi�irements of Co�ztr•actDoci�m�ents andAcceptability of Work
A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the
acceptability of the Work thereunder.
B. City will render a written decision on any issue referred.
C. City's written decision on the issue referred will be final and binding on the Contractor, subject
to the provisions of Paragraph 10.06.
ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK
10.01 Atiatlaoi�ized Cl��anges irz tlze Wo��k
A. Without invalidating the Contract and without notice to any surety, City may, at any time or fi•om
time to time, order Extra Worlc. Upon notice of such Extra Worlc, Contractor shall promptly
proceed with the Worlc involved which will be performed under the applicable conditions of the
Contract Documents (except as otherwise specifically provided). Extra Work shall be
memorialized by a Change Order which may or may not precede an order of Extra work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field
Order may be issued by the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Lkcember2l, 2012
00�2oo-i
Geneial Conditions
Page 39 of 63
10.02 Uf�autl2o��ized Chc�fzges in the Worli
Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract
Time with respect to any work performed that is not required by the Contract Documents as
amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an
emergency as provided in Paragraph 6.17.
10.03 Execi�tion of Cha�ige O��cle� s
A. City and Contractor shall execute appropriate Change Orders covering:
1. changes in �.h� «��rU which are: (i) �r�ered by r'ity pursu�rt to Paragr�rh l�.�l.°, (ii;
required because of acceptance of defective Worlc under Paragraph 13.08 or City's correction
of defective Worlc under Paragraph 13.09, or (iii) agreed to by the parties;
2. changes in the Contract Price ar Contract Time which are agreed to by the parties, including
any undisputed sum or amount of time for Worlc actually performed.
10.04 Ext��u Work
A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment
thereof, and the City insists upon its performance, the Contractor shall proceed with the worlc
after making written request for written orders and shall lceep accurate account of the actual
reasonable cost thereo£ Contract Claims regarding Extra Worlc shall be made pursuant to
Paragraph 10.06.
B. The Contractor shall furnish the City such installation records of all deviations from the original
Contract Documents as may be necessary to enable the City to prepare for permanent record a
corrected set of plans showing the actual installation.
C. The compensation agreed upon for Extra Worlc whether or not initiated by a Change Order shall
be a full, complete and final payment for all costs Contractor incurs as a result or relating to the
change or Extra Work, whether said costs are lcnown, unlcnown, foreseen or unforeseen at that
time, including without limitation, any costs for delay, extended overhead, ripple or impact cost,
or any other effect on changed or unchanged worlc as a result of the change or Extra Worlc.
10.05 Notzficatioi�� to Su�•ety
If the provisions of any bond requu•e notice to be given to a surety of any change affecting the
general scope of the Worlc ot• the provisions of tlie Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 �a oo - �
General Conditions
Page 40 of 63
10.06 Cont��act Clainzs P��ocess
-;- A. Ciry's Decision Reqticir�ed: All Contract Claims, except those waived pursuant to Paragraph
14.09, shall be referred to the City far decision. A decision by City shall be required as a
condition precedent to any exercise by Contractor of any rights or remedies he may otherwise
have under the Contract Documents or by Laws and Regulations in respect of such Contract
Claims.
B. Notice:
1. Written notice stating the general nature of each Contract Claim shall be delivered by the
i,oniracior to Ciiy no iater ihan 15 days aner the start of the event giving rise thereto. i he
responsibility to substantiate a Contract Claim shall rest with the party making the Contract
Claim.
2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered
to the City on ar before 45 days from the start of the event giving rise thereto (unless the City
allows additional time for Contractor to submit additional or more accurate data in support of
such Contract Claim).
3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with
the provisions of Paragraph 12.01.
4. A Coniract Claim for an adjustment in Contract Time shall be prepared in accordance with
the provisions of Paragraph 12.02.
5. Each Contract Claim shall be accompanied by Contractor's written statement that the
adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a
result of said event.
6. The City shall submit any response to the Contractor within 30 days after receipt of the
claimant's last submittal (unless Contract allows additional time).
C. City's Actiorz: City will review each Contract Claim and, within 30 days after receipt of the last
submittal of the Contractor, if any, take one of the following actions in writing:
1. deny the Contract Claim in whole or in part;
2. approve the Contract Claim; or
3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's
sole discretion, it would be inappropriate for the City to do so. For purposes of further
resolution of the Contract Claim, such notice shall be deemed a denial.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
oo�aoo-i
Genera] Conditions
Page 41 of 63
D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or
Contractor involce the dispute resolution procedure set forth in Article 16 within 30 days of such
action or denial.
E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not
submitted in accordance with this Paragraph 10.06.
ARTICL� 11— COS'� OF TI�E WORK; ALL0�3'ANCES; LT1�tIT PI2IC� WORK; PLAle1S
QUANTITY MEASUREMENT
ll.Ol Cost of the Work
A. Costs b�cicccled: The term Cost of the Worlc means the sum of all costs, except those excluded in
Paragraph 11.O1.B, necessarily incurred and paid by Contractor in the proper performance of the
Worlc. When the value of any Worlc covered by a Change Order, the costs to be reimbursed to
Contractor will be only those additional or incremental costs required because of the change in
the Worlc. Such costs shall not include any of the costs itemized in Paragraph 1 l.Ol.B, and shall
include but not be limited to the following items:
l. Payroll costs for employees in the direct employ of Contractor in the performance of the
Worlc under schedules of job classifications agreeti upon by City and Contractor. Such
employees shall include, without limitation, superintendents, foremen, and other personnel
employed full time on the Worlc. Payroll costs for employees not employed full time on the
Work shall be apportioned on the basis of their time spent on the Worlc. Pa�i•oll costs shall
include;
a. salaries with a 55% marlcup, or
b. salaries and wages plus the cost of fringe benefits, which shall include social security
contributions, unemployment, excise, and payroll taxes, worlcers' compensation, health
and retirement benefits, bonuses, sicic leave, vacation and holiday pay applicable thereto.
The expenses of performing Worlc outside of Regular Worlcing Hours, Weelcend
Working Hours, or legal holidays, shall be included in the above to the extent authorized
by City.
2. Cost of all materials and equipment furnished and incorporated in the Worlc, including costs
of transportation and storage thereof, and Suppliers' field services required in connection
therewith.
3. Rentals of all construction equipment and machinery, and the parts thereof whether rented
from Contractar or others in accordance with rental agreements approved by City, and the
costs of transportation, loading, unloading, assembly, dismantling, and removal thereo£ All
such costs shail be in accordance with the terms of said rental agreements. The rental of any
such equipment, machinery, or parts shall cease when the use thereof is no longer necessary
for the Worlc.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 �2 00 - i
General Conditious
Page 42 of 63
4. Payments made by Contractor to Subconh•actors for Work performed by Subcontractors. If
required by City, Contractor shall obtain competitive bids from subcontractors acceptable to
City and Contractor and shall deliver such bids to City, who will then determine, which bids,
if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on
the basis of Cost of the Worlc plus a fee, the Subcontractor's Cost of the Worlc and fee shall
be determined in the same manner as Contractor's Cost of the Worlc and fee as provided in
this Paragraph 11.01.
5. Costs of special consultants (including but not limited to engineers, architects, testing
laboratories, surveyors, attorneys, and accountants) employed for services specifically related
to the Wark.
6. Supplemental costs including the following:
a. The proportion of necessaiy transportation, travel, and subsistence expenses of
Contractor's employees incurred in discharge of duties connected with the Work.
b. Cost, including transportation and maintenance, of all materials, supplies, equipment,
machinery, appliances, office, and temporary facilities at the Site, and hand tools not
owned by the workers, which are consumed in the performance of the Work, and cost,
less market value, of such items used but not consumed which remain the p�•operty of
Contractor.
c. Sales, consumer, use, and other similar taxes related to the Worlc, and for which
Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and
Regulations.
d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or
anyone directly or indirectly employed by any of them ar for whose acts any of them may
be liable, and royalty payments and fees for permits and licenses.
e. Losses and damages (and related expenses) caused by damage to the Work, not
compensated by insurance or otherwise, sustained by Contractor in connection with the
performance of the Work, provided such losses and daniages have resulted from causes
other than the negligence of Contractor, any Subcontractor, or anyone directly ar
indirectly employed by any of them or far whose acts any of them may be liable. Such
losses shall include settlements made with the written consent and approval of City. No
such losses, damages, and expenses shall be included in the Cost of the Work for the
purpose of determining Contractor's fee.
f. The cost of utilities, fuel, and sanitary facilities at the Site.
g. Minor expenses such as telegrams, long distance telephone calls, telephone and
communication services at the Site, express and courier services, and similar petty cash
items in connection with the Work.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dacember2l, 2012
oo�aoo-i
Genera] Conditions
Page 43 of 63
h. The costs of premiums for all bonds and insurance Contractor is required by the Contract
Documents to purchase and maintain.
B. Costs Exclticclec�: The term Cost of the Work shall not include any of the following items:
1. Payroll costs and other compensation of Contractor's officers, executives, pi-incipals (of
partnerships and sole proprietorships), general managers, safety managers, engineers,
architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents,
expediters, timelceepers, clerlcs, and other personnel employed by Contractor, whether at the
Site or in Contractoi�'s principal or branch office for general administration of the Worlc and
not specifically included in the agreed upon schedule of job classiiications refened to in
Faragraph i i.ul.I�.i or specincaiiy covered by raragrapn 1 i,vi.�i.4, all oi wnicn are io oe
considered administrative costs covered by the Contractor's fee.
2. Expenses of Contractor's principal and branch offices other than Contractot•'s off'ice at the
Site.
Any part of Contractor's capital expenses, including interest on Contt•actor's capital
employed for the Worlc and charges against Contractor for delinquent payments.
4. Costs dt�e to the negligPnce of Contractor, any Subcontractor, or anyone directly or indirectly
employed by any of thezn or for whose acts any of them may be liable, including but not
limited to, the correction of defective Worlc, disposal of materials or equipment wrongly
supplied, and malcing good any damage to propez-ty.
5. Other overhead or general expense costs of any lcind.
C. Coi�t��acto��'s Fee: When all the Worlc is performed on the basis of cost-plus, Contractor's fee
shall be determined as set forth in the Agreement. When the value of any Warlc covered by a
Change Order for an adjustment in Contract Price is deternzined on the basis of Cost of the
Worlc, Contractor's fee shall be determined as set forth in Paragraph 12.O1.C.
D. Docacrn.erztatio�z: Whenever the Cost of the Worlc for any puzpose is to be detei7nined pursuant to
Paragraphs 11.O1.A and 11.O1.B, Contractor will establish and maintain records thereof in
accordance with generally accepted accounting practices and submit in a form acceptable to City
an itemized cost breakdown together with supporting data.
11.02 Allowa�zces
A. Spec f ed Allowa»ce: It is understood that Contractor has included in the Contract Price all
allowances so named in the Contract Documents and shall cause the Worlc so covered to be
perFormed for such sums and by such persons or entities as may be acceptable to City.
B. Pi�e-bicl Allotivarzces:
1. Contractor agrees that:
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 �2 00 - �
General Conditions
Page 44 of 63
a. the pre-bid allowances include the cost to Contractar of materials and equipment required
by the allowances to be delivered at the Site, and all applicable taxes; and
b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead,
profit, and other expenses contemplated for the pre-bid allowances have been included in
the allowances, and no demand for additional payment on account of any of the
foregoing will be valid.
C. Co�atinge�zcy Allotivance: Contractor agrees that a contingency allowance, if any, is for the sole
use of City.
D. rrior io imal payment, an appropriate �hange �rder wiil be issued io reiieci acil.tai amounts due
Contractor on account of Work covered by allowances, and the Contract Price shall be
' correspon�ingly adjusted.
11.03 Unit Price Woriz
A. Where the Contract Documents provide that all or part of the Worlc is to be Unit Price Worlc,
initially the Contract Price will be deemed to include for all Unit Price Worlc an amount equal to
' the sum of the unit price for each separately identiiied item of Unit Price Work times the
estimated quantity of each item as indicated in the Agreement.
B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the
purpose of coinparison of Bids and determining an initial Contract Price. Detertninations of the
actual quantities and classifications of Unit Price Work performed by Contractor will be made by
City subject to the provisions of Paragraph 9.05.
C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to
cover Contractor's overhead and profit far each separately identified item. Work described in the
Contract Documents, or reasonably inferred as required for a functionally complete installation,
but not identified in the listing of unit price items shall be considered incidental to unit price
worlc listed and the cost of incidental work included as part of the unit price.
D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if:
l. the quantity of any item of Unit Price Work performed by Contractor differs materially and
significantly from the estimated quantity of such item indicated in the Agreement; and
2. there is no corresponding adjustment with respect to any other item of Work.
E. Inc��eased or Decreased Qticantities: The City reserves the right to order Extra Worlc in
accordance with Paragraph 10.01.
1. If the changes in quantities or the alterations do not significantly change the character of
work under the Contract Documents, the altered worlc will be paid for at the Contract unit
price.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIPCATION DOCUMENTS
Revision: December2l, 2012
oo�zoo-i
General Conditions
Page 45 of 63
2. If the changes in quantities or alterations significantly change the character of work, the
Contract will be amended by a Change Order.
If no unit prices exist, this will be considered Extra Worlc and the Contract will be amended
by a Change Order in accardance with Article 12.
4. A significant change in the character of worlc occurs when:
a. the character of worlc for any Item as altered differs materially in lcind or nature from that
in the Contract or
Zi, a jyTa�nr TtPni nf wrJrl{ variPc hv irnTP i}7?ll �S% fl'�IT? thP r�riginal ("nntT•ar.t �iiaptitv,
5. When the quantity of worlc to be done under any Major Item of the Contract is more than
125% of the original quantity stated in the Contract, then either party to the Contract may
request an adjustment to the unit price on the portion of the work that is above 125%.
6. When the quantity of worlc to be done under any Major Item of the Contract is less than 75%
of the original quantity stated in the Contract, then either party to the Contract may request
an adjustment to the unit price.
11.04 Plans Quun�tit�� Measir�•efnent
A. Plans quantities may or may not represent the exact quantity of work peiFormed or material
moved, handled, or placed during the execution of the Contract. The estimated bid quantities are
designated as final payment quantities, unless revised by the governing Section or this Article.
B. If the quantity measured as outlined under "Price and Payment Procedw�es" varies by more than
25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total
estimated quantity for an individual Item originally shown in the Contract Documents, an
adjustment may be made to the quantity of authorized worlc done for payment purposes. The
party to the Contract requesting the adjustment will provide field measurements and calculations
showing the final quantity for which payment will be made. Payment for revised quantity will be
made at the unit pi-ice bid for that Item, except as provided for in Article 10,
C. When quantities are revised by a change in design approved by the City, by Change Order, or to
correct an error, or to correct an error on the plans, the plans quantity will be increased or
decreased by the amount involved in the change, and the 25% variance will apply to the new
plans quantity.
D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than
$250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans
quantity Item if the City and Contractor agree in writing to fix the �mal quantity as a plans
quantity.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 �2 00 - i
General Conditions
Page 46 of 63
E. For callout work or non-site specific Contracts, the plans quantity measurement requirements are
not applicable.
ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
12.01 Change of Contract Price
A. The Contract Price may only be changed by a Change Order.
B. The value of any Work covered by a Change Order will be determined as follows:
1, �z�hPrP t11P Wprk ipy�ll�?� ?c �OV�Pe� b� U:?:t �:'iCeS C�JI1ta:T:�� 111 t�2e ContruCt �CCi:n'le:liS� b j'
' application of such unit prices to the quantities of the items involved (subject to the
provisions of Paragraph 11.03); or
, 2. where the Work involved is not covered by unit prices contained in the Contract Documents,
by a mutually agreed lump sum or unit price (which may include an allowance for overhead
and profit not necessarily in accordance with Paragraph 12.O1.C.2), and shall include the cost
of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work;
' or
3, where the Work involved is not covered by unit prices contained in the Contract Documents
and agreement to a lump sum or unit price is not reached under Paragraph 12.01.B.2, on the
basis of the Cost of the Worlc (determined as provided in Paragraph 11.01) plus a
Contractor's fee for overhead and profit (detertnined as provided in Paragraph 12.01.C).
C. Contracto��'s Fee: The Contractor's additional fee for overhead and profit shall be determined as
follows:
1. a mutually acceptable fixed fee; or
2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various
portions of the Cost of the Worlc
a. for costs incurred under Paragraphs 11.Ol.A.I, 11.O1.A.2. and 11.O1.A.3, the
Contractor's additional fee shall be 15 percent except for:
1) rental �fees for Contractor's own equipment using standard rental rates;
2) bonds and insurance;
b. for costs incurred under Paragraph 11.O1.A.4 and 11.01.A.5, the Contractor's fee shall be
five percent (5%);
1) where one or more tiers of subcontracts are on the basis of Cost of the Worlc plus a
fee and no fixed fee is agreed upon, the intent of Paragraphs 12.O1.C.2.a and
12.O1.C.2.b is that the Subcontractor who actually performs the Worlc, at whatever
CITY OF FORT WORTH
STANDARD CONSTRUCT[ON SPECIFCATION DOCUMENTS
Revision: Deceinl�21, 2012
oo�aoo-�
Geneial Conditions
Page 47 of 63
tier, will be paid a fee of 15 percent of the costs incun•ed by such Subconfiractor under
Paragraphs 11.Ol.A.I and 11.O1.A.2 and that any higher tier Subcontractor and
Contractor will each be paid a fee of five percent (5%) of the amount paid to the next
lower tier Subcontractor, however in no case shall the cumulative total of fees paid be
in excess of 25%;
c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.O1.A.6, and
ll.OI.B;
d. the amount of credit to be allowed by Contractor to City for any change which results in
a net decrease in cost will be the amount of the actual net decrease in cost plus a
deduction in Contractor's fee by an amount equal to five percent (5"/oj of such net
decrease.
12.02 Chaizge of Coizt��act Ti»a�e
A. The Contract Time may only be changed by a Change Order.
B. No extension of the Contract Time will be allowed for Extra Worlc or for claimed delay unless
the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project
Schedule or Contractor can show by Critical Path Method analysis how the Extra Worlc or
claimed delay adversely affects the critical path.
12.03 Delays
A. Where Contractor is reasonably delayed in the performance or completion of any part of the
Worlc within the Contract Time due to delay beyond the control of Contractor, the Contract Time
may be extended in an amount equal to the time lost due to such delay if a Contract Claim is
made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts
or neglect by City, acts or neglect of utility owners or other contractars performing other worlc as
contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God.
Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in
this Paragraph.
B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays
within the control of Contractor. Delays attributable to and within the control of a Subcontractor
or Supplier shall be deemed to be delays within the control of Contractor.
D. The Contractor shall receive no compensation for delays or hindrances to the Worlc, except when
direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide
information or material, if any, which is to be furnished by the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIPCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 �2 00 - i
General Conditions
Page 48 of 63
ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
13.01 Notice of Defects
Notice of all defective Work of which City has actual lcnowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
13.02 Access to Wof°Iz
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
�iuJ�. uC���S tv tii� .Ci1t� ciTli� t�l� �vr�vi�i ui i�aSviiariie iIT11CS ivi t�'iciT' OvS2iJaiivit, iiiSYC:Cti0i1� aiiu
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
13.03 Tests und hzspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereo� to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certiiicates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Worlc; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to
City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Worlc, as determined solely by
City.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 13.03 D result in a"fail", "did not pass" or other
similaz• negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
2evision: Dace�nber2l, 2012
oo�aoo-i
General Conditions
Page 49 of 63
3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all invoices for retests to Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing
Lab is paid.
E. If any Work (or the worlc of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense.
G. Contractor shall have the right to malce a Contract Claim regarding any retest or invoice issued
under Section 13.03 D.
13.04 Uncove�-iizg Wo��lc
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contt•actor's
expense.
B. If City considers it necessary or advisable that covered Work be obseived by City or inspected or
tested by others, Contractor, at City's request, shall uncover, expose, or otherwise malce available
for observation, inspection, or testing as City may require, that portion of the Work in question,
furnishing all necessary labor, material, and equipment.
If it is found that the uncovered Worlc is defective, Contractor shall pay all claims, costs,
losses, and damages (including but not limited to all fees and charges of engineers, architects,
attorneys, and other professionals and all court or other dispute resolution costs) arising out
of or relating to such uncovering, exposut•e, observation, inspection, and testing, and of
satisfactory replacement or reconstruction (including but not limited to all costs of repair or
replacement of worlc oF others); or City shall be entitled to accept defective Work in
accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all
costs associated with exposing, observing, and testing the defective Worlc.
2. If the uncovered Worlc is not found to be defective, Contractor shall be allowed an increase
in the Contract Price or an extension of the Contract Time, ar both, directly attributable to
such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction.
13.05 City May Stop the Wor�Ic
If the Worlc is defective, or Contractor fails to supply sufficient slcilled worlcers or suitable materials
ar equipment, or fails to perform the Worlc in such a way that the completed Worlc will confoim to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Worlc shall not
give rise to any duty on the part of City to eYercise this i7ght for the benefit of Contractor, any
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 72 00 - 1
General Conditions
Page 50 of 63
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of
any of them.
13.06 Coi�rection or Removal of Defective Wo��Iz
A. Promptly after receipt of written notice, Contractor shall co�rect all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Worlc has
been rejected by City, remove it from the Project and replace it with Worlc that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (inclucling but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Worlc under the terms of this Paragraph 13.06 or Paragraph 13.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee, if any, on said Worlc.
13.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
Documents), any Worlc is found to be defective, or if the repair of any damages to the land or
areas made available far Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Worlc, to the warlc
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Worlc corrected or repaired or may ha�e the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 �a oo - i
Gene��al Conditions
Page 51 oF63
C. In special circumstances where a particular item of equipment is placed in continuous seivice
before Final Acceptance of all the Woric, the con•ection period for that item may start to run from
an earlier date if so provided in the Contract Documents.
D. Where defective Warlc (and damage to other Worlc resulting therefrom) has been corrected or
removed and replaced under this Paragraph 13.07, the correction period hereunder with respect
to such Warlc may be required to be extended for an additional period of one year after the end of
the initial correction period. City shall provide 30 days written notice to Contractor should such
additional warranty coverage be required. Contractor may dispute this requu•ement by filing a
Contract Claim, pursuant to Paragraph 10.06.
E. i,ontractor�'s obligations under this raragraph I:s.0 / are in addition to any other obligation or
warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a
waiver of, the provisions of any applicable statute of limitation or repose.
13.08 Accept�znce ofDefective Wo��lz
If, instead of requiring correction or removal and replacement of defective Worlc, City prefers to
accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but
not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or other dispute resolution costs) attributable to City's evaluation of and determination to
accept such defective Worlc and for the diminished value of the Worlc to the extent not otherwise
paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be
issued incorporating the necessary revisions in the Contract Documents with respect to the Worlc,
and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished
value of Work so accepted.
13.09 Cit�� M�iy Cor��ect Defective Wor�Iz
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Worlc, or to remove and replace rejected Worlc as required by City in accardance with Paragraph
13.06.A, or if Contractor fails to perfonn the Worlc in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor, correct, or remedy any such deficiency.
B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contraetor from all or part of the Site, talce possession of all or part of the Worlc and suspend
Contractor's services related thereto, and incorporate in the Worlc all materials and equipment
incorporated in the Worlc, stored at the Site or for which City has paid Contractar but which are
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the i-ights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENT3
Revision: December2l. 2012
00 72 00 - 1
Gei�eral Conditions
Page 52 of 63
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Worlc; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 13.09.
ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMFLETION
14.�1 5chedule of va�ii�es
The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve
as the basis for progress payments and will be incorporated into a form of Application for Payment
acceptable to City. Progress payments on account of Unit Price Work will be based on the number of
units completed.
14.02 Progress Payments
A. Applicatio��s fo�� Payments:
1. Contractor is responsible for providing all information as required to become a vendor of the
City.
2. At least 20 days before the date established in the General Requirements for each progress
payment, Contractor shail submit to City for review an Application for Payment filled out
and signed by Contractor covering the Work completed as of the date of the Application and
accompanied by such supporting documentation as is required by the Contract Documents.
3. If payment is requested on the basis of materials and equipment not incorporated in the Work
but delivered and suitably stored at the Site or at another location agreed to in writing, the
Application for Payment shall also be accompanied by a bill of sale, invoice, or other
doclunentation wan•anting thai City has received the materials and equipment free and clear
of all Liens and evidence that the materials and equipment are covered by appropriate
insurance or other arrangements to protect City's interest therein, all of which must be
satisfactoiy to City.
4. Beginning with the second Application for Payment, each Application shall include an
affidavit of Contractor stating that previous progress payments received on account of the
Work have been applied on account to discharge Contractor's legitimate obligations
associated with prior Applications for Payment.
5. The amount of retainage with respect to progress payments will be as stipulated in the
Contract Documents.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nbe�21, 2012
00�2oo-i
Gene�al Conditions
Page 53 of 63
B. Review ofApplications:
1. City will, after receipt of each Application for Payment, either indicate in writing a
recommendation of payment or return the Application to Contractor indicating reasons for
refusing payment. In the latter case, Contractor may malce the necessary corrections and
resubmit the Application.
2. City's processing of any payment requested in an Application for Payment will be based on
City's observations of the executed Worlc, and on City's review of the Application for
Payment and the accompanying data and schedules, that to the best of City's knowledge:
aL � L .7 �.. L,.._ .7:,.,.�,.,.1.
a. �iiE v�Gl"1{ iiaS iiiO�iESScU w iii� j�Gliit Iiiui�a«u,
b. the quality of the Work is genet•ally in accordance with the Contract Documents (subject
to an evaluation of the Worlc as a functioning whole prior to or upon Final Acceptance,
the results of any subsequent tests called for in the Contract Documents, a final
deterniination of quantities and classifications for Worlc performed under Paragraph 9.05,
and any other qualitications stated in the recommendation).
3. Processing any such payment will not thereby be deemed to have represented that:
a. inspections made to checic the quality or the quantity of the Worlc as it has been
performed have been exhaustive, extended to every aspect of the Work in progress, or
involved detailed inspections of the Work beyond the responsibilities specifically
assigned to City in the Contract Documents; or
b. there may not be other matters or issues between the parties that might entitle Contractor
to be paid additionally by City or entitle City to withholci payment to Contractor, or
c. Contractor has complied with Laws and Regulations applicable to Conh•actor's
performance of the Worlc.
4. City may refuse to process the whole or any part of any payment because of subsequently
discovered evidence ar the results of subsequent inspections or tests, and revise or revolce
any such payment previously made, to such extent as may be necessary to protect City from
loss because:
a. the Worlc is defective, ar the completed Worlc has been damaged by the Contractor or his
subcontractors, requiring correction or replacement;
b. discrepancies in quantities contained in previous applications for payment;
c. the Contract Price has been reduced by Change Orders;
d. City has been required to correct defective Work ar complete Worlc in accordance with
Paragraph 13.09; or
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCAT[ON DOCUMENTS
Revision: December2l, 2012
00 �z oo - i
General Conditions
Page 54 of 63
e. City has actual knowledge of the occurrence of any of the events enumerated in
Paragraph 15.02.A.
C. Retainage:
1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent
(10%).
2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent
(5%).
Tl T:..,.. E 71�.._ P L 7 .7_.__ ,1.,_. �t_�.i t t� � i r,
L. Lcc1ciic Ci�Gc� LCl/%PLZ�'�J. t`Gi E2Cii C;alci3uat uay �11d1. �Iily WUi-1C Sildll I'CII1diI1 UIIGOI11p1eLeQ aIZe2' t11e
time specified in the Contract Documents, the sum per day specified in the Agreement, will be
deducted from the monies due the Contractor, not as a penalty, but as liquidated damages
suffered by the City.
E. Payme�zt: Contractor will be paid pursuant to the requirements of this Article 14 and payment
will become due in accordance with the Contract Documents.
F. Recluctio��. iTZ Paymen.t:
1. City may refuse to malce payment of the amount requested because:
a. Liens have been filed in connection with the Work, exc�pt where Contractor has
delivered a specific bond satisfactory to City to secure the satisfaction and discharge of
such Liens;
b. there are other items entitling City to a set-off against the amount recommended; or
c. City has actual lcnowledge of the occurrence of any of the events enumerated in
Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A.
2. If City refuses to make payment of the amount requested, City will give Contractor written
notice stating the reasons for such action and pay Contractor any amount remaining after
' deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or
any adjustment thereto agreed to by City and Contractor, when Contractor remedies the
reasons for such action.
14.03 Cont�°actor's Warf°anty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment, whether incorporated in the Project or not, will pass to City no later than
the time of payment free and clear of all Liens.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCllMENTS
Revision: Dece�nber2l, 2012
00 �z oo - i
General Conditions
Page 55 of 63
14.04 Pa��tial Utilizcitio�Z
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Worlc that can be
used by City for its intended purpose without significant interference with Contractor's
performance of the remainder of the Worlc. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Worlc which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the W orlc ready for its intendeci use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.OS.A.1, City and
Contractor shall malce an inspection of that part of the Worlc to determine its status of
completion. If City does not consider that part of the Worlc to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
14.05 Fi��allnspection�
A. Upon written notice from Contractor that the entire Worlc is complete in accordance with the
Corltract Documents:
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Worlc is incomplete or defective. Contractor shall inmlediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
B. No time charge will be made against the Contractor between said date of notification of the City
and the date of Final Inspection. Should the City determine that the Worlc is not ready for Final
Inspection, City will notify the Contractor in writing of the reasons and Contract Time will
resume.
14.06 Fiizal Acceptc�nce
Upon completion by Contractor to City's satisfaction, of any additional Worlc identified in the Final
Inspection, City will issue to Contractor a letter of Final Acceptance.
C1TY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Decembe�21, 2012
007200-I
General Conditions
Page 56 of 63
14.07 Fiizal Payrnent
A. Application for Payme�zt:
1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for
final payment following the procedure for progress payments in accordance with the
Contract Documents.
2. The final Application for Payment shall be accompanied (except as previously delivered) by:
a. all documentation called for in the Contract Documents, including but not limited to the
eViti�ncC �i inSuraiic2 P�Ciiiii2u vy r uia�ia�i .�i.vj;
b. consent of the surety, if any, to final payment;
c. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
d. affidavits of payments and complete and legally effective releases or waivers
(satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the
Work.
B. Payment Becoines Di�e:
l. After City's acceptance of the Application for Payinent and accompanying documentation,
requested by Contractor, less previous payments made and any sum City is entitled,
including but not limited to liquidated damages, will become due and payable.
2. After all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
3. The malcing of the final payment by the City shall not relieve the Contractor of any
guarantees or other requirements of the Contract Documents which specifically continue
thereafter.
14.08 Final Co�npletion Delayed ancl Partial Retaznage Release
A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon
receipt of Contractor's final Application for Payment, and without terminating the Contract,
make payment of the balance due for that portion of the Worlc fully completed and accepted. If
the remaining balance to be held by City for Work not fully completed or corrected is less than
the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in
Paragraph 5.02, the written consent of the surety to the payment of the balance due for that
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
oonoo-�
General Conditions
Page 57 of 63
portion of the Worlc fully completed and accepted shall be submitted by Contractar to City with
the Application for such payment. Such payment shall be made under the terms and conditions
governing final payment, except that it shall not constitute a waiver of Contract Claims.
B. Pa��tial RetaiJzage Release. For a Contract that provides for a separate vegetative establishment
and maintenance, and test and performance periods following the completion of all other
construction in the Contract Documents for all Worlc locations, the City may release a portion of
the amount retained provided that all other work is completed as determined by the City. Before
the release, all submittals and final quantities must be completed and accepted for all other work.
An amount sufiicient to ensure Contract compliance will be retained.
14.Oy Wuiver� of Claims
The acceptance of final payment will constitute a release of th� City from all claims or liabilities
under the Contract for anything done or furnished or relating to the worlc under the Contract
Documents or any act or neglect of City related to or connected with the Contract.
ARTICLE 15 — SUSPENSION OF WORK AND TERNIINATION
15.01 City Mcry Suspe»��l Wo��k
A. At any time and without cause, City may suspend the Worlc or any portion thereof by written
notice to Contractor and which may fix the date on which Worlc will be resumed. Contractor
shall �•esui��e the Woilc on the date so fixed. During temporaiy sus�ension of the Worlc eovered
by these Contract Documents, for any reason, the City will malce no exh•a payment for stand-by
tirne of construction equipment and/or construction crews.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Worlc for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the worlc performed; he shall provide suitable drainage about the worlc, and ereet
temporary structures where necessary.
D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the
necessary equipment to the job when it is determined by the City that construction may be
resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the
equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is
moved to another construction project for the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nber2l, 2012
00 72 00 - 1
General Conditions
Page 58 of 63
15.02 City May Tei�minate for Cati�se
A. The occurrence of any one or more of the following events by way of example, but not of
limitation, may justify termination for cause:
l. Contractor's persistent failure to perfoim the Work in accordance with the Contract
Documents (including, but not limited to, failure to supply sufficient slcilled worlcers or
suitable materials or equipment, failure to adhere to the Project Schedule established under
Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere
to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under
Paragraph 6.06.D);
2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction;
3. Contractor's repeated disregard of the authority of City; or
4. Contractor's violation in any substantial way of any provisions of the Contract Documents;
or
5. Contractor's failure to promptly malce good any defect in materials or worlcmanship, or
defe�ts of any nature, the correction of which has been directed in writing by the City; or
6. Substantial indication that the Contractor has made an unauthorized assignment of the
Contract or any funds due therefrom for the benefit of any creditor or for any other purpose;
or
'7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise
financially unable to carry on the Worlc satisfactorily; or
8. Contractor commences legal action in a court of competent jurisdiction against the City.
B. If one or more of the events identiiied in Paragraph 15.02A. occur, City will provide written
notice to Contractor and Surety to arrange a conference with Contractor and Surety to address
Contractor's failure to perfornl the Worlc. Conference shall be held not later than 15 days, after
receipt of notice.
1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to
perform the construction Contract, the City may, to the extent permitted by Laws and
Regulations, declare a Contractor default and formally terminate the Contractor's right to
complete the Contract. Contractor default shall not be declared earlier than 20 days after the
Contractor and Surety have received notice of conference to address Contractor's failure to
perform the Work.
2. If Contractor's services are teiminated, Surety shall be obligated to talce over and perform the
Work. If Surety does not commence performance thereof within 15 consecutive calendar
days after date of an additional written notice demanding Surety's performance of its
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nUer21, 2012
oo �a oo - i
General Conditions
Page 59 of 63
obligations, then City, without process or action at law, may take over any portion of the
Work and complete it as described below.
a. If City completes the Worlc, City may exclude Contractor and Surety from the site and
take possession of the Work, and all materials and equipment incorporated into the Worlc
stored at the Site or for which City has paid Contractor or Surety but which are stored
elsewhere, and finish the Worlc as City may deem expedient.
3. Whether City or Surety completes the Work, Contractar shall not be entitled to receive any
further payment until the Work is finished. If the unpaid balance of the Contract Price
exceeds all claims, costs, losses and damages sustained by City arising out of or resulting
from completing tile Woric, such excess wiil �e paid to Contractor. If such ciaims, costs,
losses and damages exceed such unpaid balance, Contractor shall pay the difference to City.
Such claims, costs, losses and damages incurred by City will be incorporated in a Change
Order, provided that when exercising any rights or remedies under this Paragraph, City shall
not be required to obtain the lowest price for the Worlc performed.
4. Neither City, nor any of its respective consultants, agents, officers, directors or employees
shall be in any way liable or accountable to Contractor or Surety for the method by which the
completion of the said Worlc, or any portion thereof, may be accomplished or for the price
paid therefor.
5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right
to recover damages from Contractor or Surety for Contractor's failure to timely complete the
entire Contract. Contractor shall not be entitled to any claim on account of the method used
by City in completing the Contract.
6. Maintenance of the Worlc shall continue to be Contractor's and Surety's responsibilities as
provided for in the bond requirements of the Contract Documents or any special guarantees
provided for under the Contract Documents or any other obligations otherwise prescribed by
law.
C. Notwithstanding Paragraphs 15.02.B, Conti•actor's seivices will not be terminated if Contractor
begins within seven days of receipt of notice of intent to terminate to coirect its failure to
perform and proceeds diligently to cure such failure within no more than 30 days of receipt of
said notice.
D. Where Contractor's services have been so terminated by City, the termination will not affect any
rights or remedies of City against Contractor then existing or which may thereafter accrue. Any
retention or payment of moneys due Contractor by City will not release Contractor from liability.
E. If and to the extent that Contractor has provided a performance bond under the provisions of
Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this
Article.
CITY OF FORT W02TH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
oonoo-i
General Conditions
Page 60 of 63
15.03 Czty May Ter�ninate Fo�� Co�zvenience
A. City may, without cause and without prejudice to any other right or remedy of City, terminate the
Contract. Any termination shall be effected by mailing a notice of the termination to the
Contractor specifying the extent to which performance of Work under the contract is terminated,
and the date upon which such terniination becomes effective. Receipt of the notice shall be
deemed conclusively presumed and established when the letter is placed in the United States
Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and
established that such termination is made with just cause as therein stated; and no proof in any
claim, demand or suit shall be required of the City regarding such discretionary action.
B. After receipt of a notice of termination, and except as otherwise directed by the City, the
Contractor shall:
l. Stop work under the Contract on the date and to the extent speciiied in the notice of
termination;
2. place no further orders or subcontracts for materials, services or facilities except as may be
necessary for completion of such portion of the Worlc under the Contract as is not terminated;
3. terminate all orders and subcontracts to the eYtent that they relate to the performance of the
Work terminated by notice of termination;
4. transfer title to the City anci deliver in the manner, at the tirnes, and to the exient, if any,
directed by the City:
a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and
other material produced as a part of, or acquired in connection with the performance of,
the Worlc terminated by the notice of the termination; and
; b. the completed, or partially completed plans, drawings, information and other property
which, if the Contract had been completed, would have been required to be furnished to
the City.
5. complete performance of such Worlc as shall not ha�e been terminated by the notice of
termination; and
6. talce such action as may be necessary, or as the City may direct, for the protection and
preservation of the property related to its contract which is in the possession of the
Contractor and in which the owner has or may acquire the rest.
C. At a time not later than 30 days after the termination date specified in the notice of termination,
the Contractor may submit to the City a list, certified as to quantity and quality, of any or all
items of termination inventory not previously disposed of, exclusive of items the disposition of
which has been directed or authorized by City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: D�e�nber2l, 2012
00�2oo-i
Geneial Conditions
Pnge 61 of 63
D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list
submitted shall be subject to verification by the City upon removal of the items or, if the items
are stored, within 45 days from the date of submission of the list, and any necessary adjustments
to correct the list as submitted, shall be made prior to final settlement.
E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination
claim to the City in the form and with the certification prescribed by the City. Unless an
extension is made in writing within such 60 day period by the Contractor, and granted by the
City, any and all such claims shall be conclusively deemed waived.
F. In such case, Contractor shall be paid for (without duplication of any items):
1. completed and acceptable Work executed in accordance with the Contract Documents prior
to the effective date of termination, including fair and reasonable sums for overhead and profit on
such Worlc;
2. expenses sustained prior to the effective date of termination in performing services and
furnishing labor, materials, or equipment as required by the Contract Documents in connection
with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses;
and
3. reasonable expenses directly attributable to termination.
G. In the event of the failure of the Contractoi and City to agree upon the whole amount to be paid
to the Contractor by reason of the tennination of the Worlc, the City shall determine, on the basis
of information available to it, the amount, if any, due to the Contractor by reason of the
termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid
on account of loss of anticipated profits or revenue or other economic loss arising out of or
resulting from such termination.
ARTICLE 16 — DISPUTE R�SOLUTION
16.01 Methods af�tl P�•ocedt�r�es
A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision
under Paragraph 10.06 before such decision becomes final and binding. The request for
mediation shall be subinitted to the other party to the Contract. Timely subinission of the request
shall stay the effect of Paragraph 10.06.E.
B. City and Contractor sha11 participate in the mediation process in good faith. The process shall be
commenced within 60 days of filing of the request.
C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a
denial pursuant to Paragraphs 10.0.6.C.3 or 10.06.D shall become final and binding 30 days after
termination of the mediation unless, within that time period, City or Contractor:
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 �z oo - i
General Conditions
Page 62 of 63
l. elects in writing to invoke any other dispute resolution process provided for in the
Supplementary Conditions; or
2. agrees with the other party to submit the Contract Claim to another dispute resolution
process; or
3. gives written notice to the other party of the intent to submit the Contract Claim to a court of
competent jurisdiction.
ARTICLE 17 — MISCELLANEOUS
�%.�ii vlViiZ�; lvrOiiCe
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
l. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address lcnown to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
17.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the iirst and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
17.03 Ca�miilative Rein�ec�ies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: December2l, 2012
00 �a oo - i
Genei�al Conditions
Page 63 of 63
17.04 Sui��ival of Obligatioi�s
All representations, indemnifications, warranties, and guarantees made in, required by, ar given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Worlc or
termination ar completion of the Contract or termination of the services of Contractor.
17.05 Headin�gs
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS
Revision: Dece�nbel•21, 2012
00 73 00 - 1
SUPPLEMENTARY CONDITIONS
Page 1 of 5
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
SECTION 00 73-00
SUPPLEMENTARY CONDITIONS
TO
GENERAL CONDITIONS
Supplementary Conditions
These Supp]ementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other
provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are
modified or supplemented remain in full force and effect as so modified or supplemented. All provisions
of the General Conditions which are not so modified or suppiemented remain in full force and effect.
Defined Terms
The terms used in these Supplementary Conditions which are defined in the General Conditions have the
meaning assigned to them in the General Conditions, unless specifically noted herein.
Modifications and Supplements
The following are instructions that modify or supplement specific paragraphs in the General Conditions and
other Contract Documents.
SC-3.03B.2, "Resolving Discrepancies"
Plans govern over Specifications.
SC-4.OlA
Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding.
Upon receiving the �nal easements descriptions, Contractor shall compare them to the ]ines shown on the
Contract Drawings.
SG4.OlA.1., "Availability of Lands"
The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of
Outstanding Right-Of-Way, and/or Easements to Be Acquired
PARCEL OWNER TARGET DATE
NZJMBER OF POSSESSION
none
The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed,
and do not bind the City.
If Contractor considers the final easements provided to differ materially from the representations on the
Contract Drawings, Contractor shall within five.(5) Business Days and before proceeding with the Work,
notify City in writing associated with the differing easement line locations.
SC-4.O1A.2, "Availability of Lands"
Utilities or obstructions to be removed, adjusted, and/or relocated
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conh�act 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised Aprii i, 2013
007300-2
SUPPLEMENTARY CONDITIONS
Page 2 of 5
The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated
as of 9/17/2014
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
EXPECTED
OWNER
ATMOS
UTILITY AND LOCATION
Gas
TARGET DATE OF
ADNSTMENT
The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed,
and do not bind the City.
SC-4.02A., "Subsurf�ce and Physicll Conditions"
Tlie following are reports of explor•ations and tests of subsurface conditions at the site of tlie Work:
none
SC-4.06A., "Hazardous Environmental Conditions at Site"
The following are reports and drawings of existing hazardous environmental conditions ]cnown to the City:
none
SG5.03A., "Certificates of Insurance"
The entities listed below ar•e "additional insureds as theii• inteY•est may appeat•" including theit• 1•espective
officers, dii•ectors, agents and employees.
(1) City
(2) Consultant: None
(3) Other: None
SG5.04A., "Contractor's Insurance"
The limits of liability for the insurance required by Paragraph GG5.04 shall provide the following
coverages for not less than the following amounts or greater where required by laws and regul�tions:
5.04A. Worl<ers' Compensation, under Paragraph GC-5.04A.
statt�to�y Itnttrs
Employe��'s liability
$100,000 eacJT accident/occin•re�2ce
$100,000 Disease - each enTployee
$500,000 Disease -policy lin�it
SG5.04B., "Cont►•acto�'s Insurance"
5.04B. Commei•cial General Liability, undei• Paragraph GC-5.04B. Contractor's Liability Insui•ance
under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with
rninimum limits of:
$1,000,000 each occ�a•f�ence
$2,000,000 aggregate limit
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised April 1, 2013
007300-3
SUPPLEMENTARY CONDITIONS
Page 3 of 5
1
2
3
4
5
6
7
8
9
10
11
12
l:i
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the
General Aggregate Limits apply separately to each job site.
The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's.
Verification of such coverage must be shown in the Remarlcs Article of the Certi�cate of Insurance.
SC 5.04C., "Contractor's Insurance"
5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under
Paragraph GC-5.04C., which shall be in an amount not less than the following amounts:
(1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto",
defined as autos owned, hired and non-owned.
$1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at
least:
$250, 000 Bodily Injury per pe�son /
$500,000 Bodily Injtny per accide�2t /
$100,000 ProperryDamage
SG5.04D., "Contractor's Insurance"
The Contractor's co�istruction activities will require its employees, agents, subcontractors, equipment, and
material deliveries to cross railroad properties and tracks -none
The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with,
hinder, or obstruct the railroad company in any manner whatsoever in the use oi• operation of its/their trains
or other property. Such operations on railroad properties may require that Contractor to execute a"Right of
Entry Agreement" with the particular railroad company or companies involved, and to this end the
Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute
the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate
to the Contractor's use of private and/or construction access roads crossing said railroad company's
properties.
The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide
coverage for not less than the following amounts, issued by companies satisfactory to the City and to the
Railroad Company for a term that continues for so long as the Contractor's operations and work cross,
occupy, or touch railroad property:
(1) General Aggregate:
(2) Each Occun•ence:
Required for this Contract
$Confirm Limits with Railroad
$Confrm Limits with Railroad
X Not required for this Contract
With respect to the above outlined insurance requirements, the following shall govern:
L Where a single raiL•oad company is involved, the Contractor shail provide one insurance policy in
the name of the raih•oad company. However, if more than one grade separation or at-gT•ade
crossing is affected by the Project at entirely separate locations on the line or lines of the same
railroad company, separate coverage may be required, each in the amount stated above.
2. Where more than one railroad company is operating on the same right-of-way or where several
railroad companies are involved and operated on their own separate rights-of-way, the Contractor
may be required to provide separate insurance policies in the name of each railroad company.
CITY OF FOI2T WORTH Water and Sanitary Sewer Replacement Contract 2014, VVSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised April i, 2013
00 73 00 - 4
SUPPLEMENTARY COND[TIONS
Page 4 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Zl
22
23
24
25
26
27
Zs
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
3. If, in addition to a grade separation or an at-grade crossing, other work oi• activity is proposed on a
railroad company's right-of-way at a location entirely separate from the grade separation or at-
grade crossing, insurance coverage for this work must be included in the policy covering the grade
separation.
4. If no grade separation is involved but other worlc is proposed on a railroad company's right-of-
way, all such other work may be covered in a single policy for that railroad, even though the work
may be at two or more separate locations.
No worlc or activities on a railroad company's property to be performed by the Contractar shall be
commenced until the Contractoi• has furnished the City with an ariginal policy or policies of the insul•ance
for each railroad company named, as required above. Ali such insurance must be approved by the City and
each affected Raiiroad Company prior to the Contractor's beginning work.
The insurance specifed above must be cairied until ali Work to be performed on the railroad right-of-way
has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition,
insurance must be can•ied during all maintenance and/or repair work performed in the railroad right-of-way.
Such insurance must name the raih�oad company as the insured, together with any tenant or lessee of the
raih•oad cornpany operating over tracks involved in the Project.
SC-6.04., "P►•oject Schedule"
Project schedule shall be tier 3 for the project.
SC-6.07., "W�ge Rates"
The following is the pi•evailing wage rate table(s) applicable to this project and is provided in the
Appendixes:
Vertical Wage Rate Table
<Buz,-sury locatio�z, Resources/02-Construction Docc�ments/S�ecifrcations/Div 00-General
Conditio�ts/CFYV yVage Rate Table 20050708.pc1f>
SC-6.09., "Permits and Utilities"
SC-6.09A., "Contractor obtained permits and licenses"
The following are known permits and/or licenses required by the Contract to be acquired by the Contractor:
None
SG6.09B. "City obtained permits and licenses"
The followinb are lrno�m pei�rnits and/or licenses required by the Contract to be acquired by the City: None
SC-6.09C. "Outstanding �ermits and licenses"
The following is a list of ]cnown outstanding permits and/or licenses to be acquired, if any as of 9/17/2014:
Outstanding Permits and/or Licenses to Be Acquired
OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE
OF POSSESSION
TxDOT Utility Installation - Donna Street 10/15/2014
Tarrant County Utility Permit - Echo �ake Drive 30 days prior to
construction
SC-7.02., "Coordinntion"
CITY OF FORT WORTH Water and Sanita�y Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02334
Revised April 1, 2013
007300-5
SUPPLEMENTARY COND[TIONS
Page 5 of 5
1 The individuals or entities listed below have contracts with the City for the performance of other worl< at
2 the Site:
Vendor Sco e of Work Coordination Authority
None
3
4
5 SC-S.Ol, "Communications to Contractor"
6
7 Contractor shall notify Tarrant County Engineers Office (Doug ICeesey at (817) 229-3217) prior to
8 construction activities and after cessations of construction on Donna WL-1Bcho Lake Drive
9
10 SC-9.01., "City's �'roject Representative"
11
12 The following firm is a consultant to the City responsible for constniction management of this Project:
13 None
14
15 SG13.03C., "Tests and Inspections"
16 None
17
18 SG16.O1C.1, "Methods and Procedures"
19
20 None
21
22
23
24 END OF SECTION
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised April 1, 2013
ol iioo-i
SUMMARY OF WORK
Page 1 of 3
1
2
3 PART 1- GENERAL
4 1.1 SUMMARY
G7
7
8
9
10
11
SECTION O1 1100
SUMMARY OF WORK
A. Section Includes:
l. Summaty of Work to be performed in accordance with the Contract Documents
B. Deviations from this City of Foi�t Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0- Bidding Requirements, Contract Forms, and Conditions of the Contract
2. Division 1- General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measureinent and Payment
14 1. Work associated with this Item is considered subsidiaiy to the various items bid.
15 No separate payinent will be allowed for this Item.
16 l.3 REFERENCES jNOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A. Worlc Covered by Conh�act Documents
l. Work is to include furnishing all labar, materials, and equipment, and performing
all Work necessary for this construction project as detailed in the Drawings and
Specifications.
B. Subsidiary Work
l. Any and all Work specifically governed by documentary requirements for the
project, such as conditions imposed by the Drawings or• Contract Docuinents in
which no specific item for bid has been provided for in the Proposal and the itein is
not a typical unit bid item included on the standard bid item list, then the item shall
be considered as a subsidiaiy item of Work, the cost of which shall be included in
the price bid in the Proposal for various bid items.
C. Use of Premises
1. Coordinate uses of premises under direction of the City.
2. Assume full responsibility for protection and safekeeping of inaterials and
equipment stored on the Site.
3. Use and occupy only portions of the public streets and alleys, or other public places
or other rights-of-way as provided for in the ordinances of the City, as shown in the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equipment for construction
purposes may be stored in such space, but no more than is necessary to avoid
delay in the construction operations.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 20 f 4, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
oi iioo-a
SUMMARY OF WORK
Page 2 of 3
1
2
3
4
5
6
7
8
9
10
ii
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
b. Excavated and waste materials shall be stored in such a way as not to interfere
with the use of spaces that may be designated to be left free and unobstructed
and so as not to inconvenience occupants of adjacent property.
c. If the street is occupied by railroad tracks, the Work shall be carried on in such
manner as not to interfere with the operation of the railroad.
1) All Work shall be in accordance with railroad requirements set forth in
Division 0 as well as the railroad permit.
D. Work within Easements
1. Do not enter upon private property for any purpose without having previously
obtained permission from the owner of such property.
�. Tio not store equipment or material on private property uniess and until the
specified approval of the property owner has been secured in writing by the
Contractor and a copy furnished to the City.
3. Unless specifically provided otherwise, clear all rights-of-way or easements of
obstructions which must be removed to make possible proper prosecution of the
Work as a part of the project construction operations.
4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,
lawns, fences, culverts, curbing, and all other types of structures or improvements,
to all water, sewer, and gas lines, to all conduits, overhead pole lines, or
appurtenances thereof, including the construction of temporary fences and to all
other public or private property adjacent to the Work.
5. Notify the proper representatives of the owners or occupants of the public or private
lancis of interes� in lands which might be affected by the Work.
a. Such notice shall be made at least 48 hours in advance of the beginning of the
Work.
b. Notices shall be applicable to both public and private utility companies and any
corporation, company, individual, ar other, either as owners or occupants,
whose land or interest in land might be affected by the Work.
c. Be responsible for all damage or injury to property of any character resulting
fi•om any act, omission, neglect, or misconduct in the manner ar method or
execution of the Work, or at any time due to defective work, material, or
equipment.
6. Fence
a. Restore all fences encountered and removed during construction of the Project
to the original or a better than original condition.
b. Erect temporary fencing in place of the fencing removed whenever the Worlc is
not in progress and when the site is vacated overnight, and/or at all times to
provide site security.
c. The cost for all fence work within easements, including removal, temporary
closures and replacement, shall be subsidiary to the various items bid in the
project proposal, unless a bid item is specifically provided in the proposal.
C1TY OF FORT WORTH Water and Sanitary Sewer Reptacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
O1 11 00-3
SUMMARY OF WORK
Page 3 oF3
1
2
3
4
5
6
7
8
9
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 TIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT US�D]
10 PART 3- EXECUTION [NOT USED]
il
12
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
13
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conh•act 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
oiasoo-1
SUBSTITUTION PROCEDURES
Page i of 4
i
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION Ol 25 00
SUBSTITUTION PROCEDURES
5 A. Section Includes:
6 l. The procedure for requesting the approval of substitution of a product that is not
i ECjU1tia12Ilt ii� a yT'vCiUCt W�liC�'i 1S S�'i8C1�2ti �'iy' C�ZSCilyiiVc Gi j32I'f�TTiiaiiCc CYitcl'la OT'
8 defined by reference to 1 or more of the following:
9 a. Name of manufacturer
10 b. Name of vendor
11 c. Trade name
12 d. Catalog number
13 2. Substitutions are not "or-equals".
14 B. Deviations from this City of Fort Worth Standard Specification
15 l. None.
16 C. Related Specification Sections include, but are not necessarily limited to: �
17 1. Division 0— Bidding Requirements, Contract Fonns and Conditions of the Contract
18 2. Division 1— General Requirements
19 1.2 PRICE AND PAYMENT PROCEDURES
20 A. Measurement and Pa}nnent
21 l. Work associated with this Item is considered subsidiary to the various items bid.
22 No separate payment will be allowed for this Item.
23 1.3 REFERENCES [NOT USED]
24 1.4 ADMINISTRATIVE REQUIREMENTS
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A. Request for Substitution - General
1. Within 30 days after award of Contract (unless noted otherwise), the City will
consider formal requests from Contractor for substitution of products in place of
those specified.
2. Certain types of equipment and kinds of material are described in Specifications by
means of references to names of manufacturers and vendors, trade names, or
catalog numbers.
a. When this method of specifying is used, it is not intended to exclude from
consideration other products bearing other manufacturer's or vendor's names,
trade names, or catalog numbers, provided said products are "or-equals," as
determined by City.
3. Other types of equipment and kinds of material may be acceptable substitutions
under the following conditions:
a. Or-equals are unavailable due to strike, discontinued production of products
meeting specified requirements, or other factors beyond control of Contractor;
or,
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
012500-2
SUBSTITUTION PROCEDURES
Page 2 of 4
1
b. Contractor proposes a cost and/or time reduction incentive to the City.
2 LS SUBMITTALS
3 A. See Request for Substitution Forn� (attached)
4 B. Procedure for Requesting Substitution
5 1. Substitution shall be considered on�y:
6 a. After award of Contract
7 b. Under the conditions stated herein
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
2. Submit 3 copies of each written request for substitution, including:
a. Documentation
1) Coinplete data substantiating compliance of proposed substitution with
Contract Documents
2) Data relating to changes in construction schedule, when a reduction is
proposed
3) Data relating to changes in cost
b. For products
1) Product identification
a) Manufacturer's name
b) Telephone number and representative contact name
c) Specification Section or Drawing reference of originally specified
product, including discrete name or tag number assigned to ar•iginal
product in the Contract Documents
2) Manufacturer's literature clearly marked to show coinpliance of proposed
product with Contract Docuinents
3) Itemized comparison of original and proposed product addressing product
characteristics including, but not necessarily limited to:
a) Size
b) Composition or materials of construction
c) Weight
d) Electrical or mechanical requirements
4) Product experience
a) Location of past projects utilizing product
b) Name and telephone number of persons associated with referenced
projects knowledgeable concernin� proposed product
c) Available �'ield data and reports associated with proposed product
5) Samples
a) Provide at request of City.
b) Samples become the property of the City.
c. For construction methods:
1) Detailed description of proposed method
2) Illustration drawings
C. Approval or Rejection
42 l. Written approval or rejection of substitution given by the City
43 2. City reserves the right to require proposed product to comply with color and pattern
44 of speciiied product if necessary to secure desib intent.
45 3. In the event the substitution is approved, the resulting cost and/or time reduction
46 will be documented by Change Order in accordance with the General Conditions,
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 201 I
012500-3
SUBSTITUTION PROCEDURES
Page 3 of 4
1
2
3
4
5
6
7
8
9
4. No additional contract time will be given for substitution.
5. Substitution will be rejected if:
a. Submittal is not through the Contractor with his stamp of approval
b. Request is not made in accordance with this Specification Section
c. In the Ciry's opinion, acceptance will require substantial revision of the original
design
d. In the City's opinion, substitution will not perform adequately the function
consistent with the design intent
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
10 1.7 CLOSEOUT SUBMITTALS (NOT USEDI
ll 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
12
13
14
15
16
17
1�
19
20
21
22
23
24
25
26
27
1.9 QUALITY ASSURANCE
A. In making request for substitution or in using an approved product, the Contractor
represents that the Contractor:
1. Has investigated proposed product, and has determined that it is adequate or
superior in all respects to that specified, and that it will perfonn function for which
it is intended
2. Will provide same guarantee for substitute item as far product specified
3. Will coordinate installation of accepted substitution into Work, to include building
modifications if necessary, making such changes as may be required for Work to be
complete in all respects
4. Waives all claims for additional costs related to substitution which subsequently
arise
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
L11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PAIaT 2 - PRDDUCTS [NOT USEI)]
28 PART 3- EXECUTION [NOT USED]
29
30
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
31
CITY OF FORT WORTH Water and Sanita�y Sewer Replace�nent Contract 201 �1, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCU1v1ENTS CPN 02384
Revised July 1, 2011
012500-4
SUBSTITUTION PROCEDURES
Page 4 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
EXHIBIT A
REQUEST F012 SUBSTITUTION FORM:
TO:
PROJECT: DATE:
We hereby submit for your consideration the following product insteaci of the speciiied item for
the above project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Substitution:
Reason for Substitution:
Include complete infoi7nation on changes to Drawings and/ar Specifications which proposed
substitution will require for its proper installation.
Fill in Blanks Below:
A. Will the undersigned contractor pay for changes to the building design, including engineering
and detailing costs caused by the requested substitution?
B. What effect does substitution have on other trades?
C. Differences between proposed substitution and speci�ed itein?
D. Differences in product cost or product delivery time?
E. Manufacturer's guarantees of the proposed and specified items are:
Equal Better (explain on attachment)
The undersigned states that the function, appearance and quality are equivalent or superior to the
specified item.
Submitted By: For Use Uy City
Signature
as noted
_ Recommended _ Recoinmended
Firm
Address
Date
Telephone
Not recommended Received late
By
Date
Remarks
For Use by City:
Approved
City
Date
Rej ected
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised Jttly 1, 2011
Water and Sanitary Sewer Replacement Contract 2014, WSM-C
CPN 02384
013119-1
PRECONSTRUCTION MEETING
Page 1 of 3
1
2
3 PA12T 1- GENERAL
4 1.1 SUMMARY
5
6
i
8
9
10
11
12
13 1.2
SECTION 013� 19
PRECONSTRUCTION MEETING
A. Section Includes:
1. Provisions for the preconstruction meeting to be held prior to the start of Work to
Claiiij� CGilSiiaCtiOii COiliiaCt aCiilliiiiStiaii0il YPGCBCiliicS
B. Deviations from this City of Fart Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES
14 A. Measurement and Payment
15 1. Work associated with this Item is considered subsidiaty to the various items bid.
16 No separate payment will be allowed for this Item.
17 �.3 �2: F� '�'l:T�L� [rdt�'I' i.J��D]
18 1.4 ADMINISTRATIVE REQUIREMENTS
19 A. Coordination
20 l. Attend preconstruction meeting.
21 2. Representatives of Contractor, subcontractors and suppliers attending meetings
22 shall be quali�ed and authorized to act on behalf of the entity each represents.
23 3. Meeting administered by City may be tape recorded.
24 a. If recorded, tapes will be used to prepare minutes and retained by City for
25 future reference.
26 B. Preconstruction Meeting
27 1. A preconstruction meeting will be held within 14 days after the execution of the
28 Agreeinent and before Work is started.
29 a. The meeting will be scheduled and administered by the City.
30 2. The Project Representative will preside at the meeting, prepare the notes of the
31 meeting and distribute copies of same to all participants who so request by fully
32 completing the attendance form to be circulated at the beginning of the meeting.
33 3. Attendance shall include:
34 a. Project Representative
35 b. Contractor's project manager
36 c. Contractor's superintendent
37 d. Any subcontractor or supplier representatives whom the Contractor may desire
38 to invite or the City may request
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised August 17, 2012
O1 31 19 -2
PRECONSTRUCTION MEETING
P�ge 2 of 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
2�
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
e. Other City representatives
f. Others as appropriate
4. Construction Schedule
a. Prepare baseline construction schedule in accardance with Section O1 32 16 and
provide at Preconstruction Meeting.
b. City will notify Contractor of any schedule changes upon Notice of
Preconstruction Meeting.
5. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances; easements or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
£ Notice to Proceed
g. Construction Staking
h. Progress Payments
i, Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter far Waste Material
1. Insurance Renewals
m. Pa;n•oll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Docuinentation of Pre-Construction Conditions
q. Weekend Work Notiiication
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative far operations of eYisting water
systems
v. Stonn Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff. Teinporary construction facilities
gg. M/WBE or MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
jj. Questions or Comments
CITY OF FORT WORTH Water and Sanitary Sewer 2eplacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised August 17, 2012
013119-3
PRECONSTRUCTION MEETING
Page 3 of 3
1 1.5 SUBMITTALS [NOT USED]
2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
3 1.7 CLOSEOUT SUBMITTALS [NOT USED]
4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.9 QUALITY ASSURANCE [NOT USED]
6 L10 DELIV�RY, STORAGE, AND HANDLING [NOT USED]
7 l.11 FIELD [SITE] CONDITIONS [NOT USED]
8 1.12 WARRANTY [NOT USED]
9 PART 2- PRODUCTS [NOT USED]
10 PART 3- EXECUTION [NOT USED]
11 END OF SECTION
12
13
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised August 17, 2012
013120-i
PROJECT MEETINGS
Page 1 of 3
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
5
6
%
8
9
10
11
12
13
14 1.2
15
16
17
SECTION 0131 20
PROJECT MEETINGS
A. Section Includes:
1. Provisions for project meetings throughout the construction period to enable orderly
I'2V1CW Gi i`�1C �'iiv�f,SS Gf t�2� ��Jv^Yii ai1C� t^v �iTCVi�� f02' SySte2Tlc'1iiC C�ISCUSSIGTI ^v�
potential problems
B. Deviations this City of Fort Worth Standard Specification
1. None.
C. Related Speciiication Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requireinents, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURCS
A. Measureinent and Payment
l. Work associated with this Itetn is considered subsidiary to the various items bid.
No separate payinent will be allowed for this Item.
18 1.3 RErERENCES [NOT USED]
19 1.4 ADMINISTRATIVE REQUIREMENTS
20 A. Coordination
21 l. Schedule, attend and administer as specified, periodic progress meetings, and
22 specially called meetings tlu•oughout progress of the Work.
23 2. Representatives of Contractor, subcontractors and suppliers attending meetings
24 shall be qualified and authorized to act on behalf of the entity each represents.
25 3. Meetings administered by City may be tape recorded.
26 a. If recorded, tapes will be used to prepare minutes and retained by City for
27 future reference.
28 4. Meetings, in addition to those specified in this Section, may be held when requested
29 by the City, Engineer or Contractor.
30 B. Pre-Construction Neighborhood Meeting
31 l. After the execution of the Agreement, but before construction is allowed to begin,
32 attend 1 Public Meeting with affected residents to:
33 a. Present projected schedule, including construction start date
34 b. Answer any construction related questions
35 2. Meeting Location
36 a. Location of ineeting to be determined by the City.
37 3. Attendees
38 a. Contractor
CITY OF FORT WORTH Water and Sanitary Sewer Replacement ConUact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
013120-2
PROJECT MEETINGS
Page 2 of 3
1
2
3
4
5
6
b. Project Representative
c. Other City representatives
4. Meeting Schedule
a. In general, the neighbarhood meeting will occur within the 2 weeks following
the pre-construction conference.
b. In no case will consh•uction be allowed to begin until this meeting is held.
7 C. Progress Meetings
8 l. Formal project coordination meetings will be held periodically. Meetings will be
9 scheduled and administered by Project Representative.
10
il
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
2. Additional pro�•ess meetings to discuss specific topics will be conducted on an as-
needed basis. Such additional meetings shall include, but not be limited to:
a. Coordinating shutdowns
b. Installation of piping and equipment
c. Coordination between other construction projects
d. Resolution of construction issues
e. Equipment approval
3. The Project Representative will preside at progress meetings, prepare the notes of
the meeting and distribute copies of the saine to all participants who so request by
fully completing the attendance form to be circulated at the beginning of each
meetinb.
4. Attendance shall include:
a. Contractor's project manager
b. Contractor's superintendent
c. Any subcontractor or supplier representatives whom the Contractor may desire
to invite or the City may request
d. Engineer's representatives
e. City's representatives
f. Others, as requested by the Project Representative
5. Preliminary Agenda may include:
a. Review of Work prob ess since previous meeting
b. Field observations, problems, conflicts
c. Items which impede construction schedule
d. Review of off-site fabrication, delivery schedules
e. Review of construction interfacing and sequeneing requirements with other
construction contracts
£ Corrective measures and procedures to regain projected schedule
g. Revisions to construction schedule
h. Progress, schedule, during succeeding Work period
i. Coordination of schedules
j. Review submittal schedules
k. Maintenance of quality standards
l. Pending changes and substitutions
m. Review proposed changes for:
1) Effect on construction schedule and on completion date
2) Effect on other contracts of the Project
n. Review Record Documents
o. Review monthly pay request
p. Review status of Requests for Information
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
013120-3
PROJECT MEETINGS
Page 3 of 3
1
2
3
4
5
6
7
8
9
10
il
12
13
14
15
16
17
18
fL•�
6. Meeting Schedule
a. Progress meetings will be held periodically as detennined by the Project
Representative.
1) Additional meetings may be held at the request of the:
a) City
b) Engineer
c) Contractor
7. Meeting Location
a. The City will establish a meeting location.
1) To the e�tent practicable, meetings will be held at the Site.
i.0 �.CiiJLl:iiriir�ii.v �l�Tvri iJ�uij
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT US�D]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSUI2ANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
l.11 FI�LD [SITE] CONDITIONS [NOT US�D]
1.12 V6�ARRAI�ITY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
20 PART 3- EXECUTION [NOT USED]
21
�.�a
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
23
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conh�ct 2014, WSM-C
STANDARD CONSTRUCTION SPECIF[GATION DOCUMENTS CPN 02384
Revised July 1, 2011
013216-1
CONSTRUCTION PROGRESS SCHEDULE
Page 1 of 5
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 0132 16
CONSTRUCTION PROGRESS SCHEDULE
5 A. Section Includes:
6 l. General requirements for the preparation, subinittal, updating, status reporting and
7 manage�r�ert af th;, Canstracti�n Prc�n�ess S�h:.u'ul�
8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance
9 Document
10 B. Deviations from this City of Fort Worth Standard Speciiication
11 1. None.
12
13
14
15 1.2
16
17
18
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requireinents, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
19 1.3 REFERENCES
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A. De�nitions
1. Schedule Tiers
a. Tier 1- No schedule submittal required by contract. Small, brief duration
projects
b. Tier 2- No schedule submittal required by contract, but will require some
milestone dates. Small, brief duration projects
c. Tier 3- Schedule submittal required by contract as described in the
Specification and herein. Majority of City projects, including all bond program
projects
d. Tier 4- Schedule submittal required by contract as described in the
Specification and herein. Large and/or complex projects with long durations
1) Examples: large water pump station project and associated pipeline with
interconnection to another governmental entity
e. Tier 5- Schedule submittal required by contract as described in the
Specification and herein. Large and/or very complex projects with long
durations, high public visibility
1) Examples might include a water or wastewater treatment plant
2. Baseline Schedule - Initial schedule submitted before work begins that will serve
as the baseline for measuring progress and departures from the schedule.
3. Progress Schedule - Monthly subinittal of a progress schedule documenting
progress on the project and any changes anticipated.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contiact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
013216-2
CONSTRUCTION PROGRESS SCHEDULE
Page 2 oF5
1
2
3
4. Schedule Narrative - Concise narrative of the schedule including schedule
changes, expected delays, key schedule issues, critical path items, etc
B. Reference Standards
4 1. City of Fort Worth Schedule Guidance Document
5 1.4 ADMINISTRATIVE REQUII2EMENTS
6
7
s
9
10
11
12
13
14
15
16
17
18
19
A. Baseline Schedule
1. General
a. Prepare a cost-loaded baseline Schedule using approved software and the
Critical Path Method (CPM) as required in the City of Fort Worth Schedule
Guidance Document.
b. Review the draft cost-loaded baseline Schedule with the City to demonstrate
understanding of the worlc to be perfonned and known issues and constraints
related to the schedule.
c. Designate an authorized representative (Project Scheduler) responsible for
developing and updating the schedule and preparing reports.
B. Progress Schedule
l. Update the prog��ess Schedule montl�ly as required in the City of Fort Worth
Schedule Guidance Document.
2. Prepare the Schedule Narrative to accompany the monthly progress Schedule.
20 3. Change Orders
21 a. Incoiporate approved change orders, resulting in a change of contract time, in
22 the baseline Schedule in accordance with City of Fort Worth Schedule
23 Guidance Document.
24 C. Responsibility for Schedule Compliance
25 l. Whenever it becomes apparent from the current progress Schedule and CPM Stah.is
26 Report that delays to the critical path have resulted and the Contract completion
27 date will not be met, or when so directed by the City, make some or all of the
28 following actions at no additional cost to the City
29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule
30 outlining:
31 1) A written statement of the steps intended to take to remove or arrest the
32 delay to the critical path in the approved schedule
33 2) Increase construction manpower in such quantities and crafts as will
34 substantially eliminate the baciclog of worlc and return current Schedule to
35 ineet projected baseline completion dates
36 3) Increase the number of working hours per shift, shifts per day, worlcing
37 days per week, the ainount of construction equipment, or any combination
38 of the foregoing, sufficiently to substantially eliminate the backlog of work
39 4) Reschedule activities to achieve maximum practical concun�ency of
40 accomplishment of activities, and comply with the revised schedule
41 2. If no written statement of the steps intended to take is submitted when so requested
42 by the City, the City inay direct the Contractor to increase the level of effort in
43 manpower (trades), equipment and work schedule (overtime, weekend and holiday
44 work, etc.) to be employed by the Contractor in order to remove or an•est the delay
45 to the critical path in the approved schedule.
46 a. No additional cost for such work will be considered.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
013216-3
CONSTRUCTION PROGRESS SCHEDULE
Page 3 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
D. The Contract coinpletion time will be adjusted only for causes specified in this
Contract.
a. Requests for an extension of any Contract completion date must be
supplemented with the following:
1) Furnish justification and supporting evidence as the City may deem
necessary to determine whether the requested extension of time is entitled
under the provisions of this Contract.
a) The City will, after receipt of such justification and supporting
evidence, make �ndings of fact and will advise the Contractor, in
writing thereof.
2) If the City finds that the requested extension of time is entitled, the City's
detennination as to the total number of days allowed for the extensions
shall be based upon the approved total baseline schedule and on all data
relevant to the extension.
a) Such data shall be included in the next updating of the Progress
schedule.
b) Actual delays in activities which, according to the Baseline schedule,
do not affect any Contract completion date shown by the critical path in
the network will not be the basis for a change therein.
2. Submit each request for change in Contract completion date to the City within 30
days after the beginning of the delay for which a time extension is requested but
before the date of iinal payment under this Contract.
a. No time extension will be granted for requests which are not submitted within
the foregoing time limit.
b. From time to time, it may be necessary for the Cantract schedule or completion
time to be adjusted by the City to reflect the effects of job conditions, weather,
technical difiiculties, strikes, unavoidable delays on the part of the City or its
representatives, and other unforeseeable conditions which may indicate
schedule adjustments or completion time extensions.
1) Under such conditions, the City will direct the Contractor to reschedule the
work or Contract completion time to reflect the changed conditions and the
Contractor shall revise his schedule accordingly.
a) No additional compensation will be made to the Contractor for such
schedule changes except for unavoidable overall contract time
extensions beyond the actual completion of unaffected work, in which
case the Contractor shall take all possible action to minimize any time
extension and any additional cost to the City.
b) Available float time in the Baseline schedule may be used by the City
as well as by the Contractor.
3. Float or slack time is defined as the amount of time between the earliest start date
and the latest start date or between the earliest finish date and the latest finish date
of a chain of activities on the Baseline Schedule.
a. Float or slack time is not for the exclusive use or benefit of either the
Contractar or the City.
b. Proceed with work according to early start dates, and the City shall have the
right to reserve and apportion float time according to the needs of the project.
CITY OF FORT WORTH R�ater and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
013216-4
CONSTRUCTION PROGRGSS SCHEDULE
P�ge 4 of 5
1
2
3
4
5
6
7
8
9
10
11
E. Coordinating Schedule with Other Contract Schedules
c. Acicnowledge and agree that actual delays, affecting paths of activities
containing float time, will not have any effect upon contract completion times,
providing that the actual delay does not exceed the float time associated with
those activities.
1. Where work is to be perfornied under this Contract concurrently with or contingent
upon work perforined on the satne facilities or area under other contracts, the
Baseline Schedule shall be coordinated with the schedules of the other contracts.
a. Obtain the schedules of the other appropriate contracts from the City for the
preparation and updating of Baseline schedule and make the required changes
in his schedulP i��hen indicatPd b;� changes ir. c�rres�on�ir.� schedules.
12 2. In case of interference between the operations of different contractors, the City will
13 deteru�ine the work priority of each contractor and the sequence of worl< necessary
14 to expedite the completion of the entire Project.
15 a. In such cases, the decision of the City shall be accepted as final.
16 b. The temporary delay of any work due to such circumstances shall not be
17 considered as justification for claims for additional compensation.
18 1.5 SUBMITTALS
19 A. Baseline Schedule
20
21
22
23
24
25
1
2.
Submit Schedule in native file format and pdf format as required in the City of Fort
Worth Schedule Guidance Document.
a. Native file format includes:
1) Primavera (P6 or Primavera Contractor)
Submit draft baseline Schedule to City prior to the pre-constiuction ineeting and
bring in hard copy to the meeting for review and discussion.
26 B. Progress Schedule
27 l. Submit progress Schedule in native iile format and pdf format as required in the
28 City of Fort Worth Schedule Guidance Document.
29 2. Submit progress Schedule monthly no later than the last day of the month.
30
31
32
33
34
C. Schedule Narrative
l. Submit the schedule narrative in pdf format as required in the City of Fort Worth
Schedule Guidance Document.
2. Submit schedule narrative monthly no later than the last day of the month.
D. Subinittal Process
35 l. The City administers and manages schedules through Buzzsaw.
36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule
37 Guidance Document.
38 3. Once the project has been coinpleted and Final Acceptance has been issued by the
39 City, no further progress schedules are required.
CITY OF FORT WORTH Water and Sinit�lry Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS CPN 02384
Revised Jtily 1, 2011
013216-5
CONSTRUCTION PROGRESS SCHEDULE
Page 5 of 5
1
2
3
4
S
6
7
8
9
10
11
12
13
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSUI2ANCE
A. The person preparing and revising the construction Progress Schedule shall be
experienced in the preparation of schedules of similar complexity.
B. Schedule and supporting documents addressed in this Specifcation shall be prepared,
updated and revised to accurately reflect the performance of the construction.
C. Contractor is responsible for the quality of all submittals in this section meeting the
standard of care for the construction industry for similar projects.
110 D�LIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
14 PART 2- PRODUCTS jNOT USED]
15 PART 3- EXECUTION [NOT USED]
16
17
18
END OF SECTION
Revision Log
DATE NAME SIJMMARY OF CHANGE
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 201 I
Water and Sanitary Sewer Replacement Contract 2014, WSM-C
CPN 02384
013233-1
PRECONSTRUCTION VIDEO
Page 1 of 2
i
2
3 PART 1 - GENERAL
4 1.1 SUMMARY
5
6
7
8
9
10
11
12
13
SECTION Ol 32 33
PRECONSTRUCTION VIDEO
A. Section Includes:
1. Administrative and procedural requireinents for:
a. Preconstruction Videos
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requireinents, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDUR�S
14 A. Measurement and Payment
15 1. Woric associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT US�D]
18 1.4 AI)MINISTRATIVE REQUIREMENTS
19
20
21
22
23
24
25
A. Preconstruction Video
l. Produce a preconstruction video of the site/alib inent, including all areas in the
vicinity of and to be affected by construction.
a. Provide digital copy of video upon request by the City.
2. Retain a copy of the preconstruction video until the end of the maintenance surety
period.
SUi3rvliTiALS (NGT iTS�I�]
ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
i.5
26 1.6
27 1.7 CLOSEOUT SUBMITTALS [NOT USED]
28 1.8 MAINT�NANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCE [NOT USED]
30 1.1G i3ELIVEI2Y, S'I'ORA��, AP�D I�AN�LING (liTa'T fiJS�D]
31 111 FIELD [SITE] CONDITIONS [NOT USED]
32 1.12 WARRANTY [NOT USED]
33 PART 2- PRODUCTS [NOT USED]
CITY OF FORT WORTH Water and Sanit�ry Sewer Re}>lacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02334
Revised July i, 2011
013233-2
PRECONSTRUCTION VIDEO
Page 2 of 2
1 PART 3- EXECUTION [NOT USED]
2
3
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conhact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
013300-1
SUBMITTALS
Page 1 of 8
1
2
3 PARTl- GENERAL
4 1.1 SUMMARY
SECTION 0133 00
SUBMITTALS
5 A. Section Includes:
6 l, General methods and requirements of submissions applicable to the following
7 �x�c:k-re?ateu submittals:
8 a. Shop Drawings
9 b. Product Data (including Standard Product List subinittals)
10 c. Samples
11 d. Mock Ups
12 B. Deviations from this City of Fort Worth Standard Specification
13 l. None.
14
15
16
17 1.2
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Fonns and Conditions of the Contract
2. Division 1— General Requireiuents
PRICE AND PAYM�NT PROCEDURE�
18 A. Measurement and Payment
19 l. Work associated with this Item is considered subsidiaiy to the various items bid.
20 No separate payinent will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A. Coordination
1. Notify the City in writing, at the time of subinittal, of any deviations in the
submittals from the requirzments of the Contract Docu�nents.
2. Coordination of Submittal Times
a. Prepare, prioritize and transmit each submittal sufiiciently in advance of
performing the related Work or othet• applicable activities, or within the time
speci�ed in the individual Work Sections, of the Specifications.
b. Contractor is responsible such that the installation will not be delayed by
processing times including, but not liinited to:
a) Disapproval and resubmittal (if required)
b) Coordination with other submittals
c) Testing
d) Purchasing
e) Fabrication
fl Delivery
g) Similar sequenced activities
c. No extension of time will be authorized because of the Contra�tor's failure to
transmit subinittals sufficiently in advance of the Work.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised DecemUer 20, 2012
013300-2
SUBMITTALS
Page 2 of 8
1
2
3
4
5
6
7
8
9
10
li
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
d. Make submittals promptly in accordance with approved schedule, and in such
sequence as to cause no delay in the Work or in the work of any other
contractor.
B. Submittal Nuinbering
1. When submitting shop drawings or sainples, utilize a 9-character submittal cross-
reference identification numbering system in the following manner:
a. Use the iirst 6 digits of the applicable Specification Section Number.
b. For the next 2 digits number use numbers 01-99 to sequentially number each
initial separate itein or drawing submitted under each specific Section number.
c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e.
ti=�ilCi Suviii1SS20I1� �i=3i� SU�'iT'i'i1SSIv21� �=�ri�i JtaV1111JJ1O11� i.iC. j. �i t�iCul
submittal nuinber would be as follows:
1 1 11 1: :
1) 03 30 00 is the Specification Section for Concrete
2) 08 is the eighth initial submittal under this Specification Section
3) B is the third submission (second resubmission) of that particular shop
drawing
C. Contractor Certification
1. Review shop drawings, product data and samples, including those by
subcontractors, prior to submission to determine and verify the following:
a. Field measurements
b. Field construction criteria
c. Catalog numbers and similar data
d. Confonnance with the Contract Documents
2. Provide each shop drawing, sample and product data submitted by the Contractor
with a Certification Statement affixed including:
a. The Contractor's Company name
b. Sib ature of submittal reviewer
c. Certification Statement
1) "By this submittal, I hereby represent that I have determined and verified
field ineasurements, field construction criteria, materials, dimensions,
catalog nuinbers and sirnilar data and I have checked and coordinated each
item with other applicable approved shop drawings."
D. Submittal Format
1. Fold shop drawings larger than 8'/z inches x 11 inches to 8'/z inches x 11 inches.
2. Bind shop drawings and product data sheets together.
3. Order
a. Cover Sheet
1) Description of Packet
2) Contractor Certification
b. List of items / Table of Contents
c. Product Data /Shop Drawings/Samples /Calculations
E. Submittal Content
1. The date of subinission and the dates of any previous submissions
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conh•act 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013300-3
SUBMITTALS
Page 3 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
2. The Project title and number
3. Contractor identification
4. The names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section number, page and
paragraph(s)
6. Field dimensions, clearly identified as such
7. Relation to adjacent or critical features of the Work or inaterials
8. Applicable standards, such as ASTM or Federal Specification nuinbers
9. Identification by highlighting of deviations from Contract Documents
10. Identification by highlighting of revisions on resubmittals
11. An 8-inch x 3-inch blank space far Contractar and City stamps
F. Shop Drawings
1. As speciiied in individual Work Sections includes, but is not necessarily limited to:
a, Custom-prepared data such as fabrication and erection/installation (workiug)
drawings
b. Scheduled information
c. Setting diagrams
d. Actual shopwork manufacturing instructions
e. Custom templates
f. Special wiring dia�•ams
g. Coordination drawings
h. Individual systein or equipment inspection and test reports including:
1) Perforinance curves and certifications
i. As applicable to the Work
2. Details
a. Relation of the various parts to the main members and lines of the structure
b. Where correct fabrication of the Work depends upon field measurements
1) Provide such measurements and note on the drawings prior to submitting
for approval.
G. Product Data
l. For submittals of product data for products included on the City's Standard Product
List, clearly identify each item selected for use on the Project.
2. For submittals of product data for products not included on the City's Standard
Product List, subinittal data inay include, but is not necessarily limited to:
a. Standard prepared data for manufactured products (sometimes refen•ed to as
catalog data) �
1) Such as the manufacturer's product specification and installation
instructions
2) Availability of colors and patterns
3) Manufacturer's printed statements of compliances and applicability
4) Roughing-in diagrams and templates
5) Catalog cuts
6) Product photographs
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDA2D CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013300-4
SUBMITTALS
Page 4 of 8
1
2
3
4
5
6
7
8
9
10
�l
12
13
14
15
16
17
7) Standard wiring diagrams
8) Printed performance curves and operational-range diagrams
9) Production or quality control inspection and test reports and certi�cations
10) Mill reports
11) Product operating and maintenance instructions and recoinmended
spare-parts listing and printed product warranties
12) As applicable to the Worlc
H. Samples
1. As specified in individual Sections, include, but are not necessarily li�nited to:
a. Physical examples of the Work such as:
i j .CieCiiGiiS vi iiidiiuiaCtUl'ct� GT' iaviiCaicu �vJGiiC
2) Small cuts or containers of materials
3) Complete units of repetitively used products color/texture/pattern swatches
and range sets
4) Specimens for coordination of visual effect
5) Graphic symbols and units of Work to be used by the City for independent
inspection and testing, as applicable to the Work
18 I. Do not start Work requiring a shop drawing, sample or product data nor any inaterial to
19 be fabricated or installed prior to the approval or qualified approval of such item.
20 1. Fabrication performed, materials purchased or on-site construction accomplished
21 which does not conform to approved shop drawings and data is at the Contractor's
22 risk.
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
2. The City will not be liable for any expense or delay due to coiTections or remedies
required to accomplish conformity.
3. Complete project Work, materials, fabrication, and installations in conformance
with approved shop drawings, applicable samples, and product data.
J. Submittal Distribution
1
2
Elech•onic Distribution
a. Confinn development of Project directory for electronic submittals to be
uploaded to City's Buzzsaw site, or another external FTP site approved by the
City.
b. Shop Drawings
1) Upload submittal to designated project directory and notify appropriate
City representatives via einail of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
b) If Contractor requires more than 1 hard copy of Shop Drawings
returned, Contractor shall submit more than the number of copies listed
above.
c. Product Data
1) Upload submittal to designated project directory and notify appropriate
City representatives via einail of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
1) Distributed to the Project Representative
Hard Copy Distribution (if required in lieu of electronic distribution)
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 201�}, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013300-5
SUBMITTALS
Page 5 of 8
1
2
3
4
5
6
7
8
9
10
11
Il
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
a. Shop Drawings
1) Distributed to the City
2) Copies
a) 8 copies for mechanical submittals
b) 7 copies for all other submittals
c) If Contractor requires more than 3 copies of Shop Drawings returned,
Contractor shall submit mare than the number of copies listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
c. Sampies
1) Distributed to the Project Representative
2) Copies
a) Submit the number stated in the respective Specification Sections.
3. Distribute reproductious of approved shop drawings and copies of approved
product data and samples, where required, to the job site �le and elsewhere as
directed by the City.
a. Provide number of copies as directed by the City but not exceeding the number
previously specified.
K. �ubmittal Review
1
29 2.
30
31
32
33
34 3.
35
36
37
38
39
40
41
42
43
44
45
46
47
48
4.
5,
The review of shop drawings, data and samples will be for general conforinance
with the design concept and Contract Documents. This is not to be construed as;
a. Pennitting any departure from the Contract requirements
b. Relieving the Contractar of responsibility for any en•ors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, except as otherwise
provided herein
The review and approval of shop drawings, samples or product data by the City
does not relieve the Contractor from his/her responsibility with regard to the
fulfillment of the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City will
have no responsibility therefore.
The Contractor remains responsible for details and accuracy, for coordinating the
Work with all other associated work and trades, for selecting fabrication processes,
for techniques of assemUly and for performing Work in a safe manner.
If the shop drawings, data or samples as submitted describe variations and show a
departure from the Contract requireinents which City iinds to be in the interest of
the City and to be so minor as not to involve a change in Contract Price or time for
performance, the City inay return the reviewed drawings without noting an
exception.
Submittals will be returned to the Contractor under 1 of the following codes:
a. Code 1
1) "NO EXCEPTIONS TAICEN" is assigned when there are no notations or
comments on the subinittal.
a) When returned under this code the Contractor may release the
equipment and/or inaterial for manufacture.
b. Code 2
CITY OF FORT WORTH Water and Sanitary Sewer Rep(aceinent Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013300-6
SUBMITTALS
Page 6 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
c.
��
1) "EXCEPTIONS NOTED". This code is assigned when a confinnation of
the notations and comments IS NOT required by the Contractor.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the
final product.
Code 3
1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is
assigned when notations and comments are extensive enough to require a
resubmittal of the package.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incoiporated into the
tinal product.
b) This resubmittal is to address all coinments, omissions and
non-conforming items that were noted.
c) Resubmittal is to be received by the City within 15 Calendar Days of
the date of the City's transmittal requiring the resubmittal.
Code 4
1) "NOT APPROVED" is assigned when the submittal does not meet the
intent of the Contract Documents.
a) The Contractor must resubmit the entire package revised to bring the
submittal into confonnance.
b) It may be necessary to resubinit using a different manufacturer/vendor
to meet the Contract Documents.
6. Resubmittals
a. Handled in the same manner as first submittals
1) Corrections other than requested by the City
2) Marked with revision triangle or other similar inethod
a) At Contractor's risk if not marked
b. Submittals for each item will be reviewed no more than twice at the City's
expense.
1) All subsequent reviews will be performed at times convenient to the City
and at the Contractor's expense, based on the City's or City
Representative's then prevailing rates.
2) Provide Contractor reimbursement to the City within 30 Calendar Days for
all such fees invoiced by the City.
c. The need for more than 1 resubmission or any other delay in obtaining City's
review of subinittals, will not entitle the Contr`actor to an extension of Contract
Time.
7. Partial Submittals
a. City reserves the right to not review submittals deemed partial, at the City's
discretion.
b. Submittals deemed by the City to be not complete will be returned to the
Contractor, and will be considered "Not Approved" until resubmitted.
c. The City may at its option provide a list or mark the submittal directing the
Contractor to the areas that are incomplete.
8. If the Contractor considers any correction indicated on the shop drawings to
constitute a change to the Contract Documents, then written notice must be
provided thereof to the City at least 7 Calendar Days prior to release for
inanufacture.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, R�SM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013300-7
SUBMITTALS
Page'7 of8
1 9. When the shop drawings have been completed to the satisfaction of the City, the
2 Contractor may carry out the construction in accordance therewith and no further
3 changes therein except upon written instructions from the City.
4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days
5 following receipt of submittal by the City.
6 L. Mock ups
7 1. Mock Up units as specified in individual Sections, include, but are not necessarily
8 limited to, coinplete units of the standard of acceptance for that type of Work to be
9 used on the Project. Remove at the completion of the Work or when directed.
10 M. Oualifications
i l 1. If specifically required in other Sections of these Specifications, submit a P.E.
12 Certification for each item required.
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30 1.5
N. Request for Inforination (RFI)
l. Contractor Request for additional information
a. Clarification or interpretation of the contract docuinents
b. When the Contractor believes there is a conflict between Contract Documents
c. When the Contractor believes there is a conflict between the Drawings and
Specifications
1) Identify the conflict and request clarification
2. Use the Request for Information (RFI) form provided by the City.
3. Numbering of RFI
a. Prefix with "RFI" followed by series number, "-xxa", beginning with "01" and
increasing sequentially with each additional transmittal.
4. Sufficient information shall be attached to pei�rnit a written response without further
information.
5. The City will log each request and will review the request.
a. If review of the project information request indicates that a change to the
Contract Documents is required, the City will issue a Field Order or Change
Order, as appropriate.
SUBMITTALS [NOT USED]
31 1.6 ACTION SUBMITTALS/INFORMATIONAI, SOBMITTALS [NOT USEDJ
32 1.7 CLOSEOUT SUBMITTALS [NOT US�D]
33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
34 1.9 QUALITY ASSURANCE [NOT USED]
35 1.10 D�LIVERY, STORAGE, AND HANDLING [NOT USED]
36
1.11 I'IEI�D [SITE] C01�1DI'I'IONS [NOT USED]
37 1.12 WARRANTY [NOT USED]
CITY OF FORT W02TH Water and Sanitary Sewer Replacement Conhact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013300-8
SUBMITTALS
Page 8 of 8
1 PART 2- PRODUCTS [NOT USED]
2 PART 3- EXECUTION [NOT USED]
3 END OF SECTION
4
Revision Log
DATE NAME SUMMARY OF CHANGE
12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days
5
CITY OF FORT WORTH Water and Sanitary Se�ver Replacement Contract 2014, 4��SM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013513-1
SPECIALPROJECTPROCEDURES
Page 1 of 8
2
3 PART1- ENERAL
4 1.1 SUMMARY
5
6
i
8
9
10
11
12
13
14
15
16
17
18
19
A. Section Includes:
SECTION 0135 13
SPECIAL PROJECT PROCEDURES
1. The procedures far special project circuinstances that includes, but is not liinited to:
a. �^vOi�lTicltlCi, �J1��1 �il� Texas ���)u��ll'i8rit Of TYaTiS702'iclilOT1
b. Work near High Voltage Lines
c. Con�ned Space Entry Program
d. Air Pollution Watch Days
e. Use of Explosives, Drop Weight, Etc.
£ Water Department Notification
g. Public Notification Prior to Beginning Construction
h. Coordination with United States Arzny Corps of Engineers
i. Coordination within Railroad permits areas
j. Dust Control
k. Employee Parlcing
B. Deviations from this City of Fort Warth Standard Specification
1. None.
20 C. Related Specification Sections include, but are not necessarily limited to:
21 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
22 2. Division 1— General Requirements
23 3. Section 33 12 25 — Connection to Existing Water Mains
24 1.2 PRICE AND PAYMENT PROCEDUR�S
25
26
2'7
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
A. Measurement and Payment
l. Coordination within Railroad perinit areas
a. Measurement
1) Measureinent for this Itein will be by lump sum.
b. Payment
1) The work performed and materials furnished in accordance with this Item
will be paid for at the lump sum price bid for Railroad Coordination.
c. The price bid shall include:
1) Mobilization
2) Inspection
3) Safety training
4) AdditionalInsurance
5) Insurance Certiiicates
6) Other requirements associated with general coordination with Railroad,
including additional employees required to protect the right-of-way and
property of the Railroad fiom damage arising out of and/or froin the
construction of the Project.
2. Railroad Flagmen
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013513-2
SPECIALPROJECTPROCEDURES
Page 2 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
a. Measurement
1) Measurement for this Item will be per working day.
b. Payment
1) The work performed and materials furnished in accordance with this Item
will be paid for each working day that Railroad Flagmen are present at the
Site.
c. The price bid shall include:
1) Coordination for scheduling flagmen
2) Flagmen
3) Other requirements associated with Railroad
3. All other items
a. Work associated with these Items is considered subsidiary to the various Items
bid. No separate payment will be allowed for this Item.
14 1.3 REFER�NCES
15
16
17
18
19
20
21
22
23 1.4
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
A. Reference Standards
1. Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specification, unless a date is specifically cited.
2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752.
High Voltage Overhead Lines.
3. Narth Central TeYas Council of Govermnents (NCTCOG) — Clean Construction
Specification
ADMINISTRATIV� REQUIREMENTS
A. Coordination with the Texas Department of Transportation
l. When work in the right-of-way which is under the jurisdiction of the Texas
Department of Transportation (TxDOT):
a. Notify the Texas Departinent of Transportation prior to commencing any work
therein in accordance with the provisions of the pennit
b. All work performed in the TxDOT right-of-way shall be performed in
compliance with and subject to approval from the Texas Department of
Transportation
B. Work near High Voltage Lines
l. Regulatory Requirements
a. All Work near High Voltage Lines (more than 600 volts measured between
conductors or between a conductor and the ground) shall be in accordance with
Health and Safety Code, Title 9, Subtitle A, Chapter 752.
2. Warning sign
a. Provide sign of sufficient size ineeting all OSHA requirements.
3. Equipment operating within 10 feet of high voltage lines will require the following
safety features
a. Insulating cage-type of guard about the boom or arm
b. Insulator links on the lift hook connections for back hoes or dippers
c. Equipment must meet the safety requirements as set forth by OSHA and the
safety requirements of the owner of the high voltage lines
4. Work within 6 feet of high voltage electric lines
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contr�ct 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013513-3
SPECIALPROJECTPROCGDURES
Page 3 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
a.
Q
c.
Notification shall be given to:
1) The power company (example: ONCOR)
a) Maintain an accurate log of all such calls to power company and record
action taken in each case.
Coordination with power coinpany
1) After notification coordinate with the power company to:
a) Erect temporary mechanical barriers, de-energize the lines, or raise or
lower the lines
No personnel may work within 6 feet of a high voltage line before the above
requirements have been met.
C. Confined Snace Entry Program
1. Provide and follow approved Coniined Space Entry Program in accordance with
OSHA requireinents.
2. Confined Spaces include:
a. Manholes
b. All other confined spaces in accordance with OSHA's Permit Required for
Confined Spaces
D. Air Pollution Watch Days
1
2.
General
a. Observe the following guidelines relating to working on City construction sites
on days designated as "AIR POLLUTiON WATCH DAYS".
b. Typical Ozone Season
1) May 1 through October 31.
c. Critical Emission Time
1) 6:00 a.m. to 10:00 a.m.
Watch Days
a. The Texas Coinmission on Environmental Quality (TCEQ), in coordination
with the National Weather Service, will issue the Air Pollution Watch by 3:00
p.m. on the afternoon prior to the WATCH day.
b. Requirements
1) Begin work after 10:00 a.m. whenever construction phasing requires the
use of motorized equipment for periods in excess of 1 hour.
2) However, the Contractor nlay begin work prior to 10:00 a.m. if:
a) Use of motorized equipinent is less than 1 hour, or
b) If equipment is new and certified by EPA as "Low Emitting", or
equipinent burns Ultra Low Sulfiu Diesel (ULSD), diesel emulsions, or
alternative fuels such as CNG.
E. TCEQ Air Permit
1. Obtain TCEQ Air Pei�nit for construction activities per requirements of TCEQ.
F. Use of Explosives, Drop Weight, Etc.
1. When Contract Documents permit on the project the following will apply:
a. Public Notification
1) Submit notice to City and proof of adequate insurance coverage, 24 hours
prior to commencing.
2) Minimum 24 hour public notification in accordance with Section O1 31 13
46 G. Water Department Coordination
CITY OF FORT WORTH Water and Sanita�y Sewer Replacement Contract 2014, W3M-C
STANDARD CONSTRUCTION SPECIFICATION DOCUM�NTS CPN 02384
Revised December 2Q 2012
013513-4
SPECIAL PROJECT PROCEDURES
Page 4 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
1. During the construction of this project, it will be necessary to deactivate, for a
period of time, existing lines. The Contractor shall be required to coordinate with
the Water Department to detennine the best tiines for deactivating and activating
those lines.
2. Coordinate any event that will require comlecting to or the opet•ation of an existing
City water line system with the City's representative.
a. Coordination shall be in accordance with Section 33 12 25.
b. If needed, obtain a hydrant water meter from the Water Department for use
during the life of named project.
c. In the event that a water valve on an existing live system be turned off and on
to accominodate the construction of the project is required, coordinate this
activity through the appropriate City representative.
1) Do not operate water line valves of existing water system.
a) Failure to coinply will render the Contractor in violation of Texas Penal
Code Title 7, Chapter 28.03 (Criminal Mischie fl and the Contractor
will be prosecuted to the full extent of the law.
b) In addition, the Contractor will assume all liabilities and
responsibilities as a result of these actions.
H. Public Notification Prior to Beginning Construction
1. Prior to beginning construction on any block in the project, on a block by block
basis, prepare and deliver a notice or flyer of the pending construction to the front
doar of each residence or business that will be impacted by construction. The notice
shall be prepared as follows:
a. Post notice or flyer 7 days prior to beginning any construction activity on each
block in the project area.
1) Prepare flyer on the Contractor's letterhead and include the following
information:
a) Name of Project
b) City Project No (CPN)
c) Scope of Project (i.e. type of construction activity)
d) Actual construction duration within the block
e) Name of the contractor's foreman and phone number
� Naine of the City's inspector and phone number
g) City's after-hours phone number
2) A sample ofthe `pre-construction notifcation' flyer is attached as Exhibit
A.
3) Submit schedule showing the construction start and finish time for each
block of the project to the inspector.
4) Deliver flyer to the City Inspector for review prior to distribution.
b. No construction will be allowed to begin on any block until the flyer is
delivered to all residents of the block.
I. Public Notification of Temporary Water Service Interruption during Construction
1. In the event it becomes necessary to temporarily shut down water service to
residents or businesses during construction, prepare and deliver a notice or flyer of
the pending interruption to the front door of each affected resident.
2. Prepared notice as follows:
a. The notification or flyer shall be posted 24 hours prior to the temporary
interruption.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013513-5
SI'ECIAL PROJECT PROCEDURES
Page 5 of 8
1
2
3
4
5
6
7
8
9
10
il
iL
13
14
15
16
�
c.
d.
e.
f.
Prepare flyer on the contractor's letterhead and include the following
information:
1) Name of the project
2) City Project Number
3) Date of the interruption of service
4) Period the inten-uption will take place
5) Naine of the contractor's foreman and phone nuinber
6) Name of the City's inspector and phone number
A sample of the temporary water service interruption notification is attached as
Exhibit B.
Deliver a copy of the temporary interruption notification to the City inspector
ior review prior io being distributed.
No interiuption of water service can occur until the flyer has been delivered to
all affected residents and businesses.
Electronic versions of the sample flyers can be obtained from the Project
Construction Inspector.
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
J. Coordination with United States Army Corps of Engineers (USACE)
1. At locations in the Project where construction activities occur in areas where
USACE pennits are required, meet all requirements set forth in each designated
pennit.
K. Coordination within Railroad Perinit Areas
1. At locations in the project where construction activities occur in areas whei•e
raih�oad permits are required, meet all reqttirements set forth in each �esignated
railroad permit. This includes, but is not limited to, provisions for:
a. Fla�nen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
£ Other einployees required to protect the right-of-way and property of the
Railroad Company from dainage arising out of and/or from the construction of
the project. Proper utility clearance procedures shall be used in accordance
with the permit guidelines.
2. Obtain any supplemental information needed to comply with the railroad's
requirements.
3. Railroad Flaginen
a. Submit receipts to City for verification of working days that railt•oad flaginen
were present on Site.
L. Dust Control
1. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose of waste water.
b. If wet saw cutting is perforined, capture and properly dispose of slurry.
M. Employee Parking
l. Provide parlcing for employees at locations approved by the City,
N. {Coordination with North Central TeYas Council of Govermnents (NCTCOG) Cle�u
Conshuction Specitication [if required for the project — verify with City]
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Continct 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
013513-6
SPECIAL PROJECT PROCEDURES
Page 6 of 8
1 1. Coinply with equipment, operational, reporting and enforcement requi�•ements se�t
2 forth in NCTCOG's Clean Construction Specification.�
3 1.5 SUBMITTALS [NOT USED]
4 1.6 AC'I'I�N SUBP,�IITTALS/IN'f+0'�1`✓IATIOl`IAi. STJBMITTAL� [NOT US�+D]
5 1.7 CLOSEOUT SUBMITTALS [NOT USED]
6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
7 1.9 QUALITY ASSURANCE [NOT USED]
8 1.11! 1)�1.1V�.id�', S'1 UIZAGE, A1Vll HANI)LING [1�OT USED]
9 1.11 FIELD [SITE] CONDITIONS [NOT USED]
10 1.12 WARRANTY [NOT USED]
11 PART 2- PRODUCTS [NOT USED]
12 PART 3- EXECUTION [NOT USED]
13 END OF SECTION
14
15
Revision Log
DATE NAIv1E SUMMARY OF CHANGE
1.4.B — Added requirement of compliance with Health and Safety Code, Title 9.
8/31 /2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised Deceinber 20, 2012
01 35 13 -'1
SPECIAL PROJECT PROCEDURES
P�ge 7 of 8
1
2
3
4
5
6
7
8
9
lo
11
12
13
14
IS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
EXHIBIT A
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construction:
'
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY O� FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE
OF THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
m
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITl' OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
O1 3S 13 - 8
SPECIAL PROJECT PROCEDURES
Page 8 of 8
1
2
EXHIBIT B
FORTWORTH
Date:
noe Ho. xxxx
Project xame:
I�O,?I�E OF TEMPORARY 'Vo��►TER �ERVICE
II�I?ERBLIPTIOI�I
DIIT TO i7TILITX IMPROVEM�NTS IN YOUR NEIGHBORHOOD, YOiTR
WATER SERVICE WILL BE iNTERRUPTED ON
BETWEEN THE HOURS OF AND
IFYO[I �IAVF �U�STIONS ABOUT THIS SHUT-OUT, PLEASE CALL:
M I2. AT
(CONTRACTOKS SUPE7t7PITENDLNT) (TF.LEPHON� NUMB�R)
OR
MR. AT
(CITY INSPECTOR) (TELGPFION� NU147B�R)
THIS INCONVENIENCE WILL 13E AS SHdi2T AS POSSIBL�.
THANK YO[l,
CONTRACTUR
3
4
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised Dece�nber 20, 2012
014523-1
TESTING AND INSPECTION SERVICES
Page 1 of 2
1
2
3 PART 1- GENERAL
SECTION Ol 45 23
TESTING AND INSPECTION SERVICES
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Testing and inspection services procedures and coordination
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9
10
11
12 1.2
13
14
15
16
17
18
19
20
21
22
23
24
25 1.3
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requireinents, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES
A. Measureinent and Payinent
1. Work associated with this Item is considered subsidiary to the various Iteins bid.
No separate payment will be allowed for this Item.
a. Contractor is responsible for performing, coordinating, and payment of all
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the first Quality Assurance test performed by the City fails, the
Contractor is responsible far payment of subsequent Quality Assurance
testing until a passing test occurs.
a) Final acceptance will not be issued by City until all required payments
for testing by Contractor have been paid in full.
REFERENCES (NOT US�D]
26 1.4 ADIVIII+1ISiI�AA'I'iV� REQ�JIR�li�IlEliTiS
27
28
29
30
31
32
33
34
35
36
37
38
A. Testing
1. Complete testing in accordance with the Contract Documents.
2. Coordination
a. When testing is required to be performed by the City, notify City, sufficiently
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, notify City,
sufficiently in advance, that testing will be performed.
3. Dish•ibution of Testing Repot•ts
a. Electronic Distribution
1) Confirm development of Project directory for electronic submittals to be
uploaded to City's Buzzsaw site, or another eYternal FTP site approved by
the City.
CITY OF FORT WORTH Water and Sanitaiy Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS CPN 02384
Revised July l, 2011
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
014523-2
TESTING AND INSPECTION SERVICES
Page 2 of 2
2) Upload test reports to designated project directory and notify appropriate
City representatives.via einail of submittal posting.
3) Hard Copies
a) 1 copy for all submittals submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to Cit��'s Project Representative
4. Provide City's Project Representative with trip tickets for each delivered load of
Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Inspection
l. Inspection or lack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Docuinents.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
i.o P+�E`iiNT�+ 1`+tAl`+TC� 10'IA�i'ER'�ti` L�iJ'i3I`r''�iTTAI.� [1�1�T U��D]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 TIELD [SIT�] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
27 PART 3- EXECUTION [NOT USED]
28
F�
f �I ►11Z�] �I.`19[�111i [��� I
Revision Log
DATE NAIvIE SUMMARY OF CHANGE
30
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, R�SM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July i, 2011
ois000-i
TEMPORARY FACILITIES AND CONTROLS
Page 1 oP4
1
2
SECTION O1 50 00
TEMPORARY FACILITIES AND CONTROLS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Provide temporary facilities and controls needed for the Work including, but not
% I1�Ci.SSuYli`y' I11iIii�.� t0:
8 a. Temporary utilities
9 b. Sanitary facilities
10 c. Storage Sheds and Buildings
11 d. Dust control
12 e. Teinporary fencing of the construction site
13 B. Deviations from this City of Fort Worth Standard Specification
14 1. None.
15
16
17
18 1.2
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES
19 A. Measurement and Payment
20 l. Work associated with this Item is considered subsidiaiy to the various Items bid.
21 No separate payment will be allowed for this Item.
22 1.3 R�FER�NCES [NOT US�D]
23 1.4 ADMINISTRATIVE REQUIREMENTS
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A. Temporary Utilities
1. Obtaining Temporary Service
a. Make arrangements with utility service companies for temparary services.
b. Abide by rules and regulations of utility service companies or authorities
having jurisdiction.
c. Be responsible for utility service costs until Work is approved for Final
Acceptance.
1) Included are fuel, power, light, heat and other utility services necessary for
execution, coinpletion, testing and initial operation of Work.
2. Water
a. Contractor to provide water required for and in connection with Work to be
performed and for specified tests of piping, equipment, devices or other use as
required for the completion of the Work.
b. Provide and maintain adequate supply of potable water for domestic
consumption by Contractor personnel and City's Project Representatives.
c. Coordination
1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 20ll
015000-2
TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
l
2
3
4
5
6
7
8
9
10
it
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
d. Contractor Payment for Construction Water
1) Obtain construction water meter from City for payment as billed by City's
established rates.
3. Electricity and Lighting
a. Provide and pay for electric powered service as required for Work, including
testing of Work.
1) Provide power for lighting, operation of equipment, or other use.
b. Electric power service includes temporary power service or generator to
maintain operations during scheduled shutdown.
4. Telephone
�, Provicl� ei�,ergency telenh�ne> service at Site for »se by Cn_n_tractor personnel_
and others perfonning work or furnishing services at Site.
5. Temporary Heat and Ventilation
a. Provide temporary heat as necessary for protection or completion of Work.
b. Provide temporary heat and ventilation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persons on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclose anci anchor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and waste so as not to cause nuisance or health
problem.
d. Haul sewage and waste off-site at no less than weekly intervals and properly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at completion of Project
C. Storage Sheds and Buildings
l. Provide adequately ventilated, watertight, weatherproof storage facilities with floor
above ground level for materials and equipment susceptible to weather damage.
2. Storage of matei�ials not susceptible to weather damage may be on blocks off
ground.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to permit easy access for identification,
inspection and inventory.
4. Equip building with lockable doors and lighting, and provide electrical service for
equipment space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
5. Fill and grade site for temporary structures to provide drainage away from
temporaty and zxisting buildings.
6. Remove building from site prior to Final Acceptance.
42 D. Temporary Fencing
43 l. Provide and maintain for the duration or construction when required in contract
44 documents
45 E. Dust Control
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
01 50 00 - 3
TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
l. Contractor is responsible for maintaining dust control through the duration of the
proj ect.
a. Contractor remains on-call at all times
b. Must respond in a timely manner
F. Teinporary Protection of Construction
1. Contractor ar subcontractors are responsible for protecting Work from damage due
to weather.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INI+ORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
l.� MAINTElVANCE MATERIAL �UB10�IITTAI,S [1�tOT US�I)]
1.9 QUALITY ASSURANCE [NOT US�D]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT US�D]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PItODUCTS [NOT USED]
PART 3 - �XECUTION [NOT USED]
3.1 INSTALLERS [NOT US�D]
3.2 EXAMINATION [NOT US�D]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A. Temporaiy Facilities
l. Maintain all temporary facilities for dm�ation of construction activities as needed.
3.5 [REPAIR] / [RESTORATION]
3.6 RE-INSTALLATION
3.7 FIELD (o►t) SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES
A. Temporary Facilities
CIT1' OF FORT WORTH Water and Sanitary Sewer Replacement Conh�act 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02334
Revised July l, 2011
1
2
3
4
5
C�
7
8
oi s000-a
TEMPORA2Y FACILITIES AND CONTROLS
Page 4 of 4
l. Remove all temporary facilities and restore area after completion of the Work, to a
condition equal to or better than prior to start of Work.
3.12 PROTECTION [NOT USED]
3.13 10'IAINTENANC� [N�T iJ��D]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DAT� NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July l, 2011
01 55 2G - 1
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
P1ge 1 of 3
1
2
SECTION Ol 55 26
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
3 PART1- GENERAL
4 l.l SUMMARY
5 A. Section Includes:
6 1. Administrative procedures for:
7 a. �treet TJse Permit
8 b. Modification of approved trafiic control
9 c. Removal of Street Signs
10 B. Deviations from this City of Fort Worth Standard Specification
i l 1. None.
12 C. Related Specification Sections include, but are not necessarily limited to:
13 1. Division 0— Bidding Requirements, Contract Fonns and Conditions of the Contract
14 2. Division 1— General Requirements
15 3. Section 34 71 13 — Traffic Control
16 1.2 PRICE AND PAYMENT PROCEDURES
17 A. Measurement and Payment
18 l. Work associated with this Item is considered subsidiary to the various Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 REFERENCES
21 A. Reference Standards
22 1. Reference standards cited in this specification t•efer to the current reference standard
23 published at the tiine of the latest revision date logged at the end of this
24 speciiication, unless a date is specifically cited.
25 2. Texas Manual on Unifoi�rn Traffic Control Devices (TMUTCD).
26 1.4 ADMINISTRATIVE REQUIREMENTS
27
28
29
30
31
32
33
34
35
36
37
38
A. Traftic Control
1. General
a. When traffic control plans are included in the Drawings, provide Traffic
Control in accordance with Drawings and Section 34 71 13.
b. When traffic conh•ol plans are not included in the Drawings, prepare traffic
control plans in accordance with Section 34 71 13 and submit to City for
review.
1) Allow minimum 10 working days for review of proposed Traffic Control.
B. Street Use Permit
1. Prior to installation of Traffic Control, a City Street Use Permit is required.
a. To obtain Street Use Permit, submit Traffic Conhol Plans to City
Transportation and Public Works Department.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contr<�ct 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMGNTS CPN 02384
Revised July 1, 2011
015526-2
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
1) Allow a minimum of 5 working days for permit review.
2) Contractor's responsibility to coordinate review of Traffic Control plans for
Street Use Permit, such that construction is not delayed.
C. Modification to Approved Traffic Control
l. Prior to installation traffic control:
a. Submit revised traffic control plans to City Department Transportation and
Public Works Department.
1) Revise Traffic Control plans in accordance with Section 34 71 13.
2) Allow minimum 5 working days for review of revised Traffic Control.
3) It is the Contractor's responsibility to coordinate review of Traffic Control
YIaT1S fvT' �°itiEE� TiJSc i�ZI"irili, SUCu tiiai CviiSiiaCiiOT] iS iiGi d�laj��u.
D. Reinoval of Street Sign
1. If it is deter�nined that a street sign must be removed for construction, then contact
City Transportation and Public Works Department, Signs and Markings Division to
remove the sign.
E. Temporary Signage
l. In the case of regulatory signs, replace permanent sign with temporary sign meeting
requirelnents of the latest edition of the Texas Manual on Uniform Traffic Control
Devices (MUTCD). �
2. Install temporary sign before the removal of permanent sign.
3. When construction is coinplete, to the extent that the permanent sign can be
reinstalled, contact the City Transportation and Public Works Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Traffic Control Standards
1. Traffic Control Standards can be found on the City's Buzzsaw website.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 NIA�N'I'ENA_NCE 1VIA'�EI�IAL SULIVTIT'I'AT �[NO'T USE�)
30 1.9 QUALITY ASSURANCE [NOT USED]
31 L10 DELIVERY, STORAGE, AND HANDLING [NOT USED)
32 1.11 FIELD [SITE] CONDITIONS [NOT USED]
33 1.12 WARRANTY [NOT USED]
34 PART 2- PRODUCTS [NOT USED]
35 PART 3 - �XECUTION [NOT USED]
36 END OF SECTION
CITY OF FORT WORTH R�ater and Sanitary Sewer Replaceinent Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02354
Revised July 1, 20ll
01 55 26 - 3
STREET USE PERMIT AND MODIFICATIONS TO TRAFF[C CONTROL
Page 3 of 3
Revision Log
DATE NAIVIE SiJMMARY OF CHANGE
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July l, 20ll
015713-1
STORM WATER POLLUTION PREVENTION
Page 1 of 3
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
5
6
7
8
9
10
11
12
13
14
SECTION O1 57 13
STORM WATER POLLUTION PREVENTION
A. Section Includes:
1. Procedures for Storm Water Pollution Prevention Plans
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
l. Division 0— Bidding Requirements, Contract Forms and Conditions of the
Contract
2. Division 1— General Requirements
3. Section 31 25 00 — Erosion and Sediment Control
1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measureinent and Payment
16 1. Construction Activities resulting in less than 1 acre of disturbance
17 a. Work associated with this Item is considered subsidiary to the various Items
18 bid. No separate payment will be allowed for this Item.
19 2. Construction Activities resulting in greater than 1 acre of disturbance
20 a. Measurement and Payment shall be in accordance with Section 31 25 00.
21 1.3 REFERENCES
22 A. Abbreviations and Acronyms
23 1. Notice of Intent: NOI
24 2. Notice of Termination: NOT
25 3. Storm Water Pollution Prevention Plan: SWPPP
26 4. Texas Commission on Environmental Quality: TCEQ
27 5. Notice of Change: NOC
28 A. Reference Standards
29 1. Reference standards cited in this Specification refer to the current reference
30 standard published at the time of the latest revision date logged at the end of this
31 Specification, unless a date is specifically cited.
32 2. Integrated Storm Management (iSWM) Technical Manual for Construction
33 Controls
34 1.4 ADMINISTRATIVE REQUIREMENTS
35 A. General
36 1. Contractor is responsible for resolution and payment of any fines issued associated
37 with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July i, 2011
015713-2
STORM WATER POLLUTION PREVENTION
Page 2 of 3
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
B. Construction Activities resulting in:
2
3.
l. Less than 1 acre of disturbance
a. Provide erosion and sediment control in accordance with Section 31 25 00 and
Drawings.
1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Small Construction Site Notice Required under general perinit
TXR150000
a) Sign and post at job site
b) Prior to Preconstruction Meeting, send 1 copy to City Department of
Transportation and Public Works, Enviromnental Division, (817) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 31 25 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
5 acres or mare of Disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI fonn and submit to TCEQ along with required fee
a) Sign and post at job site
b) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
2) TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 31 25 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
4) Once the project has been completed and all the closeout requireinents of
TCEQ have been met a TCEQ Notice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
40 1.5 SUBMITTALS
41
42
43
44
45
46
47
[��. �� . . .
Subinit in accordance with Section Ol 33 00, except as•stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as follows:
1) 1 copy to the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Warks, Environmental Division for review
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 201 I
015713-3
STORM WATER POLLUTION PREVENTION
Page 3 of 3
1 B, Modified SWPPP
2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
3 in accordance with Section Ol 33 00.
4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
5 1.7 CLOSEOUT SUBMITTALS [NOT USED]
6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
7 1.9 QUALITY ASSURANCE [NOT USED]
g 1,1(1 TIFT iVFRV� CTl1RAf'F� A�TTI NA�,TTIT T�Tl�;' ijV(1T TTCTL�'Tl�
9 1.11 FI�LD [SITE] CONDITIONS [NOT USED]
10 1.12 WARRANTY [NOT USED]
11 PART 2- PRODUCTS [NOT USED]
12 PART 3- EXECUTION [NOT USED]
13 END OF S�CTION
14
Revision Log
DATE NAIvIE St.JMMARY OF CHANGE
15
CITY OF F02T WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 201 I
015813-1
TEMPORARY PROJECT S[UNAGE
Page 1 of 3
1
2
3 PART1- GENERAL
4 l.l SUMMARY
SECTION O1 58 13
TEMPORAIZY PROJECT SIGNAGE
5 A. Section Includes:
6 1. Temporary Project Signage Requirements
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
ll 2. Division 1— General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payinent
14 1. Work associated with this Item is considered subsidiary to the various Items bid.
15 No separate payinent will be allowed for this Item.
16 1.3 REFERENCF.,S [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
18 1.5 SUBMITTALS [NOT US�D]
19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
20
21
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINT�NANCE MATERIAL SUBMITTALS [1�OT US�D]
22 1.9 QUALIT'Y ASSIJI�NCE [NO'I' U�FT>]
23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
24 l.11 FIELD [SITE] CONDITIONS [NOT US�D]
25 1.12 WARRANTY [NOT USED]
26 PART 2 - PRODUCTS
27
28
29
30
31
Z.1 OWNER-FURNISHED [oa] OWNER-SUPPLI�DPRODUCTS (NOT USED]
2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS
A. Design Criteria
1. Provide free standing Project Designation Sign in accordance with City's Standard
Details for project signs.
CITY OF FORT WORTH W�ter and Sanit�ry Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
015813-2
TEMPORARY PROJECT SIGNAGE
Page 2 of 3
r
i
1 B. Materials
2 l. Sign
3 a. Constivcted of 3/-inch fir plywood, grade A-C (exterior) or better
4 2.3 ACCESSORIES [NOT USED]
5 2.4 SOURCE QUALITY CONTROL [NOT USED]
6 PART 3 - EXECUTION
7 3.1 INSTALLERS [NOT USED]
8 3.2 EXAMINATION [NOT USED]
9 3.3 PREPARATION [NOT USED]
10 3.4 INSTALLATION
11 A. General
12 l. Provide vertical installation at extents of project.
13 2. Relocate sign as needed, upon request of the City.
14 B. Mounting options
15 a. Skids
16 b. Posts
17 c. Barricade
18 3.5 REPAIR / RESTORATION [NOT USED]
19 3.6 RE-INSTALLATION [NOT USED]
20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED]
21 3.8 SYST�M STARTUP [NOT USED]
22 3.9 ADJUSTING [NOT USED]
23 3.10 CI,EA.�Ii�1� [i�tOi �JSED]
24 3.11 CLOSEOUT ACTIVITIES [NOT USED]
25 3.12 PROTECTION [NOT USED]
26 3.13 MAINTENANCE
27 A. General
28 1. Maintenance will include painting and repairs as needed or directed by the City.
29 3.14 ATTACHMENTS [NOT USED]
30
31
END OF SECTION
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conhact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
015813-3
TEMPORARY PROJECT SIGNAGE
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July l, 20l 1
Water and Sanitary Sewer Replacement Contract 2014, WSM-C
CPN 02384
016000-1
PRODUCT REQUIREMENTS
Page I of 2
1
2
3 PART1- GENERAL
4 Ll SUMMARY
5
6
7
8
9
10
11
12
SECTION O1 60 00
PRODUCT REQUIREMENTS
A. Section Includes:
1. References for Product Requirements and City Standard Products List
B. Deviations fiom this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requireinents, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYNIENT PROCEDURES [NOT USED]
13 1.3 REFERENCES [NOT USED]
14 1.4 ADMINISTRATIVE REQUIREMENTS
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
A. A list of City approved products for use is located on Buzzsaw as follows:
1. Resources\02 - Construction Documents\Standard Products List
B. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
l. Any subsequently approved products will only be allowed for use upon specific
approval by the City.
C. Any specific product requirements in the Contract Docuinents supersede similar
products included on the City's Standard Product List.
1. The City reserves the right to not allow products to be used for certain projects even
though the product is listed on the City's Standard Product List.
D. Although a specific product is included on City's Standard Product List, not all
products from that manufacturer are approved for use, including but not limited to, that
manufacturer's standard product.
E. See Section O1 33 00 for submittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NOT USED]
1.6 A�TI�N SUBIi'�ITTALS/ili�FaRMATIala1AL SUBMITiAI.S [Nai �ISEi3]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contiact 2014, WSM-C
STANDARD CONSTRUCTiON SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
01 60 00 - 2
PRODUCT REQUIREMENTS
Page 2 of 2
1 1.10 DELIVERY, STORAGE, AND HANDLING (NOT USED]
2 1.11 FIELD [SITE] CONDITIONS [NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2- PRODUCTS [NOT USED]
5 PART 3- EXECUTION [NOT USED]
6 END OF SECTION
7
Revision Log
DATE NAME SUIvIMARY OF CHANGE
10/12/12 D. Johnson Modified Location of City's Standard Product List
8
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
016600-1
PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 1 of 4
1
2
SECTION Ol 66 00
PRODUCT STORAGE AND HANDLiNG REQUIREMENTS
3 PART1- GENERAL
4 Ll SUMMARY
5
6
7
8
9
10
11
12
13
14
15
16
A. Section Includes:
1. Scheduling of product delivery
2. P2rlr2a na pf prnrliirt� fcT �eliVPry
3. Protection of products against damage from:
a. Handling
b. Exposure to elements or harsh environments
B. Deviations from this City of Foi�t Worth Standard Specification
l. None.
C. Related Speciiication Sections include, but are not necessarily limited to:
l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
17 A. Measurement and Pa�rrient
18 l. Work associated with this Item is considered subsidiary to the various Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 REFERENCES [NOT USED]
21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
22 1.5 SUBMITTALS [NOT USED]
23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
24
25
26
27
28
29
30
31
32
33
1.7 CLOSEOLT'I' SLT�Ii�Ii'I"TA1LS [NQT I1SE�]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY AND HANDLING
A. Delivery Requirements
1. Schedule delivery of products or equipment as required to allow timely installation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3. Delivery trucks will not be permitted to wait extended periods of time on the Site
for personnel or equipment to receive the delivery.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTiON SPECIFICATION DOCUMENTS CPN 02384'
Revised July 1, 2011
016600-2
PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other
2 containers designed and constructed to protect the contents from physical or
3 enviromnental damage.
4 5. Clearly and fully mark and identify as to manufacturer, item and installation
5 location.
6 6. Provide manufacturer's insh�uctions for storage and handling.
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
B. Handling Requirements
1. Handle products or equipment in accordance with these Contract Docutnents and
manufacturet•'s recommendations and instructions.
C. Stcrage Requirements
1. Store materials in accordance with manufacturer's recommendations and
requirements of these Specifications.
2. Malce necessary provisions for safe storage of materials and equipinent.
a. Place loose soil materials and materials to be incorporated into Work to prevent
damage to any part of Work or existing facilities and to maintain free access at
all times to all parts o� Work and to utility service company installations in
vicinity of Work.
3. Keep materials and equipment neatly and coinpactly stored in locations that will
cause ininimum inconvenience to other contractors, publi� travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide easy access for inspection.
�. Restrict storage to areas availaUle on construction site for storage of i��aterial and
equipment as shown on Drawings, ar approved by City's Project Representative.
5. Provide off-site storage and protection when on-site storage is not adequate.
a. Provide addresses of and access to off-site storage locations for inspection by
City's Project Representative.
27 6. Do not use lawns, grass plots or other private property for storage purposes without
28 written pennission of owner or other peison in possession ar control of premises.
29 7. Store in manufacturers' unopened containers.
30 8. Neatly, safely and compactly stack materials delivered and stored along line of
31 Work to avoid inconveuience and damage to property owners and general public
32 and maintain at least 3 feet from fire hydrant.
33 9. ICeep public and private driveways and street crossings open.
34 10. Repair or replace damaged lawns, sidewallcs, streets or other improvements to
35 satisfaction of City's Project Representative.
36 a. Total length which materials may be distributed along route of construction at
37 one time is 1,000 linear feet, unless otherwise approved in writing by City's
38 Project Representative.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
016600-3
PRODUCT STORAGE AND HANDLING REQUIRGMENTS
Page 3 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED)
2 1.12 WARRANTY [NOT USED]
3 PAgZT 2- I'I2aD�JCTS [NOi USED]
4 PART 3 - EXECUTION
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
3.1 INSTALLERS [NOT USED]
s.� �xnlviilVr� 1IvN [Nu 1 USEi� j
3.3 PR�PARATION [NOT USED]
3.4 ERECTION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.7 FIELD [oa] SITE QUALITY CONTROL
A. Tests and Inspections
l. Inspect all products or equipment delivered to the site prior to unloading.
B. Non-Conforming Worlc
l. Rejec� all products or equipment that are damaged, used or in any other way
unsatisfactory for use on the project.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED)
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Protect equipment from exposure to elements and keep thoroughly dry if required by
the manufacturer.
3.13 1!'IAINTENANCE [1�TOT USED]
3.14 ATTACHMENTS [NOT USED]
END OT SECTION
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
01 66 00 - 4
PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE NAME SIJMMARY OF CHANGE
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conti�act 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
o i �o 00 - i
MOBILIZATION AND REMOBILIZATION
Page 1 of 4
2
3 PART1- GENERAL
SECTION Ol 70 00
MOBILIZATION AND REMOBILIZATION
4 1.1 SUMMARY „
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
A. Section I�icludes:
1
2
3
Mobilization and Demobilization
a. P�Iabilizatioi�
1) Transportation of Contractor's personnel, equipment, and operating supplies
to the Site
2) Establishment of necessary general facilities for the Contractor's operation
at the Site
3) Premiums paid for performance and payment bonds
4) Transportation of Contractor's personnel, equipment, and operating supplies
to another location within the designated Site
5) Relocation of necessary general facilities for the Contractor's operation
from 1 location to another location on the Site.
b. Demobilization
1) Transportation of Contractot's personnel, equipment, and operating supplies
away from the Site including disassembly
2) Site Clean-up
3) Removal of all buildings and/or other facilities assembled at the Site for this
Contract
a Mobilization and Demobilization do not include activities for specific items of
work that are for which payrnent is provided elsewhere in the contract.
Remobilization
a. Remobilization for Suspension of Work specifically required in the Contract
Documents or as required by City includes:
1) Demobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly or temporarily securing
equipment, supplies, and other facilities as designated by the Contract
Documents necessary to suspend the Work.
b) Site Clean-up as designated in the Contract Documents
2) Remobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site necessary to resume the Work.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site necessary to resume the Work.
3) No Payments will be made for:
a) Mobilization and Demobilization from one location to another on the
Site in the normalprogress of performing the Work.
b) Stand-by or idle time
c) Lost profits
Mobilizations and Demobilization for Miscellaneous Projects
a. Mobilization and Deinobilization
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conhact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
ol �000-a
MOBILIZATION AND REMOBILIZATION
Page 2 oF4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1) Mobilization shall consist of the activities and cost on a Work Order basis
necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site for the issued Wark Order.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site for the issued Work Order
2) Demobilization shall consist of the activities and cost necessary for:
a) Transportation of Contractot•'s personnel, equipment, and operating
supplies froin the Site including disassembly for each issued Work
Order
b) Site Clean-up for each issued Work Order
c j Kemoval of ali buildings or other faciliCies assembled at the Site for
each Work Oder
b. Mobilization and Demobilization do not include activities for speciiic items of
work for which payment is provided elsewhere in the contract.
4. Emergency Mobilizations and Demobilization for Miscellaneous Projects
a. A Mobilization for Miscellaneous Projects when directed by the City and the
mobilization occurs within 24 hours of the issuance of the Work Order.
B. Deviations from this City of Fort Worth Standard Specification
1. None.
21 C. Related Specification Sections include, but are not necessarily limited to:
22 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
23 2. Division 1— General Requireinents
24 1.2 PRICE AND PAYMENT PROCEDU�2ES
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
A. Measurement and Payment
1. Mobilization and Demobilization
a. Measure
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and materials furnished in accordance with this Item
are subsidiary to the various Items bid and no other compensation will be
allowed.
2. Remobilization for suspension of Worlc as specifically required in the Contract
Documents
a. Measurement
1) Measurement for this Item shall be per each remobilization performed.
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Specified Remobilization" in accordance with Contract
Documents.
c. The price shall include:
1) Demobilization as described in Section 1.1.A.2.a.1)
2) Remobilization as described in Section 1.1.A.2.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
017000-3
MOBILIZATION AND REMOBILiZATION
Page 3 of 4
1
2
3
4
5
6
7
s
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
3. Reinobilization for suspension of Work as required by City
a. Measurement and Payment
1) This shall be submitted as a Contract Claim in accordance with Article 10
of Section 00 72 00,
2) No payments ���ill be made for standby, idle time, ar lost profits associated
with this Item.
4. Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Mobilization" in accordance with Contract
Documents. Demobilization shall be considered subsidiary to mobilization
and shall not be paid for separately.
c. The price shall include:
1) Mobilization as described in Section l.l.A3.a.1)
2) Demobilization as described in Section l.l.A.3.a.2)
d. No payinents will be made for standby, idle time, or lost profits associated this
Item.
5. Emergency Mobilizations and Demobilizations far Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Payment
1) The Work perfortned and materials furnished in accordance with this Item
and measured as pr•ovided under "Measurement" will be paid for at the unit
price per each "Work Order Emergency Mobilization" in accordance with
Contract Docuinents. Demobilization shall be considered subsidiary to
mobilization and shall not be paid for separately.
c. The price shall include
1) Mobilization as described in Section 1.1.A.4.a)
2) Demobilization as described in Section l.l.A.3.a.2)
d. No payments will be made for standby, idle time; or lost profits associated this
Item.
37 1.3 REFERENCES [NOT USED]
38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
39 1.5 SUBMITTALS [NOT USED]
40 1.6 INFORMATIONAL SUBMITTALS [NOT USED]
41 1.7 CLOSEOUT SUBMITTALS [NOT USED]
42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
43 1.9 QUALITY ASSURANCE [NOT USED]
44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
oi �o 00 - a
MOBILIZATION AND REMOBILIZATION
Page 4 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PAI�i 2 - �R�D�JCTS [N�T �TSEI)]
4 PART 3- EXECUTION [NOT USED]
5 END OF S�CTION
C�
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
017123-1
CONSTRUCTION STAKING AND SURVEY
Page 1 of4
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION O1 71 23
CONSTRUCTION STAKING AND SURVEY
5 A. Section Includes:
6 l. Requirements for construction staking and construction survey
7 B. Deviations from this City of Fort Worth Standard Specification
8 l . None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1— General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Construction Staking
15 a. Measurement
16 1) This Item is considered subsidiary to the various Items bid.
17 b. Payinent
18 1) The work performed and the materials furnished in accordance with this
19 Item are subsidiary to the various Items bid and no other compensation will
20 be allowed.
21 2. Construction Survey
22 a. Measurement
23 1) This Item is considered subsidiary to the various Items bid.
24 b. Payment
25 1) The work performed and the materials furnished in accordance with this
26 Item are subsidiary to the various Items bid and no other compensation will
27 be allowed.
28 1.3 REFERENCES [NOT USED]
29 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
30 1.5 SUBMITTALS
31 A. Submittals, if required, shall be in accordance with Section O1 33 00.
32 B. All submittals shall be approved by the City prior to delivery.
33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS
34 A. Certificates
35 1. Provide certificate certifying that elevations and locations of improvements are in
36 conformance or non-conformance with requirements of the Contract Documents.
37 a. Certificate must be sealed by a registered professional land surveyor in the
38 State of Texas.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS � CPN 02384
Revised December 20, 2012
017123-2
CONSTRUCTION STAKING AND SURVEY
Page 2 of 4
1 B. Field Quality Control Submittals
2 1. Documentation verifying accuracy of field engineering work.
3 1.7 CLOSEOUT SUBMITTALS [NOT USED]
4 1.8 1`✓iAll�'I'Ll�tAN�E A:IATE3tIAL �U�1:'IITTA�.S [I`IOT US�D]
5 1.9 QUALITY ASSUItANCE
6 A. Construction Staking
7 l. Construction staking will be performed by the City.
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
2. Coordination
a. Contact City's Project Representative at least 2 weelcs in advance for
scheduling of Construction Staking.
b. It is the Contractor's responsibility to coordinate stalcing such that construction
activities are not delayed or negatively impacted.
3. General
a. Contractor is responsible for preserving and inaintaining stakes furnished by
City. '
b. If in the opinion of the City, a sufficient number of stakes or markings have
been lost, destroyed or disturbed, by Contractor's neglect, such that the
contracted Work cannot take place, then the Contractor will be required to pay
the City for new staking with a 25 percent marlcup. The cost for staking will be
deducted from the payment due to the Contractor for the Project.
B. Construction Survey
1. Construction Survey will be performed by the City.
2. Coordination
a. Contractor to verify that control data established in the design survey remains
intact.
b. Coordinate with the City prior to field investigation to detennine which
horizontal and vertical control data will be required for construction survey.
a It is the Contractor's responsibility to coordinate Construction Survey such that
construction activities are not delayed or negatively impacted.
d. Notify City if any control data needs to be restored or replaced due to damage
caused dui•ing construction operations,
1) City shall perfonn replacements and/or restorations.
3. General
a. Construction survey will be performed in order to maintain complete and
accurate logs of control and survey work as it progresses for Project Records.
b. The Contractor will need to ensure coordination is maintained with the City to
perform construction survey to obtain construction features, including but not
limited to the following:
1) All Utility Lines
a) Rim and flowline elevations and coordinates for each manhole or
junction structure
2) Water Lines
a) Top of pipe elevations and coordinates for waterlines at the following
locations:
(1) Every 2501inear feet
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised Deceinber 20, 2012
O1 7l 23 - 3
CONSTRUCTION STAKiNG AND SURVEY
Page 3 of 4
1
2
3
4
5
6
7
8
9
10
11
i2
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
c.
�
(2) Horizontal and vertical points of inflection, curvature, etc. (All
Fittings)
(3) Cathodic protection test stations �
(4) Sampling stations
(5) Meter boxes/vaults (All sizes)
(6) Fire lines
(7) Fire hydrants
(8) Gate valves
(9) Plugs, stubouts, dead-end lines
(10) Air Release valves (Manhole rim and vent pipe)
(11) Blow off valves (Manhole rim and valve lid)
(12j Fressure plane vaives
(13) Cleaning wyes
(14) Casingpipe (each end)
b) Storm Sewer
(1) Top of pipe elevations and coordinates at the following locations:
(a) Every 250 linear feet
(b) Horizontal and vertical points of inflection, curvature, etc.
c) Sanitary Sewer
(1) Top of pipe elevations and coordinates for sanitary sewer lines at
the following locations:
(a) Eveiy 250 linear feet
(b) Horizontal and vertical points of inflection, curvature, etc.
(c) Cleanouts
Construction survey will be performed in order to maintain complete and
accurate logs of control and survey work associated with meeting or exceeding
the line and grade required by these Specifications.
The Contractor will need to ensure coordination is maintained with the City to
perform construction survey and to verify control data, including but not
limited to the following:
1) Established benchmarks and control points provided for the Contractor's
use are accurate
2) Benchmarks were used to furnish and maintain all reference lines and
grades for tunneling
3) Lines and grades were used to establish the location of the pipe
4) Submit to the City copies of �eld notes used to establish all lines and
grades and allow the City to check guidance system setup prior to
beginning each tunneling drive.
5) Provide access for the City to verify the guidance system and the line and
grade of the carrier pipe on a daily basis.
6) The Contractor remains fully responsible for the accuracy of the work.and
the correction of it, as required.
7) Monitor line and grade continuously during construction.
8) Record deviation with respect to design line and grade once at each pipe
joint and submit daily records to City.
9) If the installation does not meet the specified tolerances, immediately notify
the City and eorrect the installation in accordance with the Contract
Documents.
49 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
017123-4
CONSTRUCTION STAKING AND SURVEY
P�ge 4 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 112 WARRANTY [NOT USED]
3 PAl2'i' 2- nR�BUCTS [1��T LTSED]
4 PART 3 - EXECUTION
5
s
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
3.1 INSTALLERS [NOT USED]
;.2 L�r.��r.T� � ��r,T ,r; � � TJ�L�;
3.3 PREPARATION [NOT USED]
3.4 APPLICATION
3.5 REPAIR / RESTORATION [NOT USED]
3.6 R�-INSTALLATION [NOT USED]
3.7 FIELD [oa] SITE QUALITY CONTROL
A. It is the Contractor's responsibility to maintain all stalces and control data placed by the
City in accordance with this Specification.
B. Do not change or relocate stakes or control data without approval from the City.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT US�D]
3.10 CLEANING [NOT US�D]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 1VIAINT�NANCE [NOT USED)
3.14 ATTACHMENTS [NOT USED]
�ND OT SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D.Johnson
24
CITY OF FORT WORTH Wnter and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
017423-1
CLEANING
Page 1 of 4
1
2
3 PART1- GENERAL
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
SECTION O1 74 23
CLEANiNG
1.1 SUMMARY
A. Section Includes:
l. Intermediate and final cleaning for Work not including special cleaning of closed
sysictYis spccliled elseWlieic
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
3. Section 32 92 13 — Hydro-Mulching, Seeding arid Sodding
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
l. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 RE�'ERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Scheduling
1. Schedule cleaning operations so that dust and other contaminants disturbed by
cleaning process will not fall on newly painted surfaces.
2. Schedule final cleaning upon completion of Work and immediately prior to final
inspection.
1.5 SUBMITTALS [NOT USED]
3.6 ai,iitiliT SIJB�ITiALS/II+IFO�Z1ViA i It�i�1Ai, SZTBMiiTAZ.S [I�1GT �JSEDj
1.7 CLOS�OUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. Storage and Handling Requirements
l. Store cleaning products and cleaning wastes in containers specifically designed for
those materials.
CITY OF FORT WORTH Water and Sanitary Sewer Repllcement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
01 74 23 - 2
CLEANING
Page 2 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PAR'Y' 2 - PR��iUC'Y'S
4 2.1 OWNER-FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
5 2.2 MATERIALS
6 A. Cleaning Agents
� l. Coinpatible with surface being cleaned
8 2. New and uncontaminated
9 3. For manufactured surfaces
10 a. Material recoinmended by manufacturer
11 2.3 ACCESSORIE5 [NOT USED]
12 2.4 SOURCE QUALITY CONTROL [NOT USED]
13 PART 3 - EXECUTION
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.7 FIELD (oR] SITE QUALITY CONTROL [NOT USED]
3.o a`�a7'��+,1`�i ��'Aii�'UP [Iv1��' u��D]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING
A. General
1. Prevent accumulation of wastes that create hazardous conditions.
2. Conduct cleaning and disposal operations to comply with laws and safety orders of
governing authorities.
3. Do not dispose of volatile wastes such as mineral spir7ts, oil or paint thinner in
storin or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Conti�act 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July I, 2011
01 74 23 - 3
CLEANING
Page 3 of 4
1 6. Handle materials in a controlled manner with as few handlings as possible.
2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with
3 this project.
4 8. Remove all signs of temporary construction and activities incidental to construction
5 of required permanent Work.
6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to
7 have the cleaning completed at the expense of the Contractor.
8 10. Do not burn on-site.
9 B. Interinediate Cleaning during Construction
10 i. liecp WOik areas clean sa as not to hir,cici' ile2ltri, Safctjj vi COiiVei]icilu� Oi
11 personnel in existing facility operations.
12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish.
13 3. Confine construction debris daily in strategically located container(s):
14 a. Cover to prevent blowing by wind
15 b. Store debris away from construction or operational activities
16 c. Haul from site at a minimum of once per week
1'7 4. Vacuum clean interior areas when ready to receive finish painting.
18 a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance.
19 5. Prior to slorm events, thoroughly clean site of all loose or unsecured iteins, which
20 may become airborne or transported by flowing water during the stonn.
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
C. Interior Final Cleaning
l. Remove grease, mastic, adhesives, dust, dirt, stains, iingerprints, labels and other
foreign materials from sight-exposed surfaces.
2. Wipe all lighting iixture reflectors, lenses, lamps and trims clean. '
3. Wash and shine glazing and mirrors.
4. Polish glossy surfaces to a clear shine.
5. Ventilating systems
a. Clean permanent filters and replace disposable iilters if units were operated
during construction.
b. Clean ducts, blowers and coils if units were operated without filters during
construction.
6. Replace all burned out lamps.
7. Broom clean process area floors.
8. Mop ofiice and control room floors.
D. Exterior (Site or Right of Way) Final Cleaning
1. Remove trash and debris containers from site.
a. Re-seed areas disturbed by location of trash and debris containers in accordance
with Section 32 92 13.
2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
that may hinder or disrupt the flow of trafiic along the roadway.
3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
junction boxes and inlets.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
1
2
3
4
5
6
7
8
9
� oi�aa3-�
CLEANING
Page 4 of 4
4. If no longer required for maintenance of erosion facilities, and upon approval by
City, remove erosion control from site.
5. Clean signs, lights, signals, etc.
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
313 MAINTENANCE [NOT USED]
3.14 ATTACHM�NTS [NOT USED]
E1�ID O�' SE�'d'Ii)1�I
Revision Log
DATE NAME SUMMARY OF CHANGE
10
CIT1' OF FORT WORTH Water and S�nitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
017719-1
CLOSEOUT REQUIREMENTS
Page I of 3
1
2
3 PARTl- GENERAL
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
SECTION Ol 77 19
CLOSEOUT REQUIREMENTS
l.l SUMMARY
A. Section Includes:
l. The procedure for closing out a contract
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Speciiication Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 • PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
l. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 I�FER�NCES [NO'T USE�D]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Guarantees, Bonds and Affidavits
1. No application for final payment will be accepted until all guarantees, bonds,
certificates, licenses and affidavits required for Work or equipment as specified are
satisfactorily filed with the City.
B. Release of Liens or Claims
1. No application for iinal payment will be accepted until satisfactory evidence of
release of liens has been submitted to the City.
1.5 SUBMITTALS
A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
017719-2
CLOSEOUT REQUIREMENTS
Page 2 of 3
1 1.6 INFORMATIONAL SUBMITTALS [NOT USED]
2 1.7 CLOSEOUT SUBMITTALS [NOT USED]
3
4
�AIZT 2 - PRODiJc.iS [Ii1�T USEYi]
PART 3 - EXECUTION
5 3.1 INSTALLERS [NOT USED]
6 3.2 LXA_ivilNAlluN (Ivul 11�L�1j
7
�
3.3 PREPARATION [NOT USED]
3.4 CLOSEOUT PROCEDURE
9 A. Prior to requesting Final Inspection, submit:
10 l. Project Record Documents in accordance with Section O1 78 39
11 2. Operation and Maintenance Data, if required, in accordance with Section Ol 78 23
12 B. Prior to requesting Final Inspection, perfonn final cleaning in accordance with Section
13 O1 74 23.
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
C
Final Inspection
1. After final cleaning, provide notice to the City Project Representative that the Work
is completed.
a. The City will make an initial Final Inspection with the Contractor present.
b. Upon completion of this inspection, the City will notify the Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Work is defective or incomplete.
2. Upon receiving written notice from the City, immediately undertake the Work
required to remedy deiiciencies and complete the Work to the satisfaction of the
City.
3. Upon completion of Work associated with the items listed in the City's written
notice, infoi-�n the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, will make a subsequent
Final Inspection of the project.
4. Provide all special accessories required to place each item of equipment in full
operation. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oil and grease as required for the first lubrication of the equipment
c. Initial fill up of all chemical tanks and fuel tanks
d. Light bulbs
e. Fuses
f. Vault keys
g. Handwheels
h. Other expendable items as required for initial start-up and operation of all
equipment
Notice of Project Completion
39 D
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUM�NTS CPN 02384
Revised July 1, 2011
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
m
017719-3
CLOSEOUT REQUIREMENTS
Page 3 of 3
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affdavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Repoi�t (if required)
f. ^oi�t;•act��'s Evaluaii�n �f �iiy
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
L Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT US�D]
3.7 FIELD [oa] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contiact 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 201 I
017823-1
OPERATION AND MAINTENANCE DATA
Page 1 of 5
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
5
6
7
8
9
10
11
12
13
14
15
16
17 1.2
18
19
20
21 1.3
SECTION Ol 78 23
OPERATION AND MAINTENANCE DATA
A. Section Includes:
l. Product data and related information appropriate for City's maintenance and
o�,eration of �rodacts �Zrr�isl,ed under Cor,tract
2. Such products may include, but are not limited to:
a. Traffic Controllers
b. Irrigation Controllers (to be operated by the City)
c. Butterfly Valves
B. Deviations from this City of Fort Worth Standard Specification
l. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requireinents, Conh•act Forms and Conditions of the Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
l. Work associated with this Itein is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Itein.
R�FER�NCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23 A. Schedule
24 1. Subinit manuals in �nal form to the City within 30 calendar days of product
25 shipment to the proj ect site.
26 1.5 SUBMITTALS
27 A. Submittals shall be in accordance with Section O1 33 00 . All submittals shall be
28 approved by the City prior to delivery.
29 1.6 INFORMATIONAL SUBMITTALS
30
31
32
33
34
35
36
37
A. Submittal Fonn
1. Prepare data in form of an instructional manual for use by City personnel.
2. Fonliat
a. Size: 8 1/2 inches x i 1 inches
b. Paper
1) 40 pound minimum, white, for typed pages
2) Holes reinforced with plastic, cloth or metal
c. Teat: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Cont�act 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
017823-2
OPERATION AND MAINTENANCE DATA
Page 2 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
d. Drawings
1) Provide reinforced punched binder tab, bind in with text
2) Reduce larger drawings and fold to size of text pages.
e. Provide fly-leaf for each separate product, or each piece of operating
equipment.
1) Provide typed description of product, and major component parts of
equipment.
2) Provide indexed tabs.
£ Cover
1) Identify each volume with typed or printed title "OPERATING AND
MAlNTENANCE INSTRUCTIONS".
2) List:
a) Title of Project
b) Identity of separate structure as applicable
c) Identity of general subject matter covered in the manual
16 3. Binders
17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers
18 b. When multiple binders are used, correlate the data into related consistent
19 groupings.
20 4. If available, provide an electronic form of the O&M Manual.
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
B. Manual Content
1. Neatly typewritten table of contents for each volume, arranged in systematic order
a. Contractor, name of responsible principal, address and telephone number
b. A list of each product required to be included, indexed to content of the volume
c. List, with each product:
1) The name, address and telephone number of the subcontractor or installer
2) A list of each product required to be included, indexed to content of the
volume
3) Identify area of responsibility of each
4) Local source of supply for parts and replacement
d. Identify each product by product name and other identifying symbols as set
forth in Contract Documents.
2. Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identify data applicable to installation
3) Delete references to inapplicable information
3. Drawings
a. Supplement product data with drawings as necessary to clearly illustrate:
1) Relations of component parts of equipment and systems
2) Control and flow diagrains
b. Coordinate drawings with information in Project Record Documents to assure
correct illustration of completed installation.
c. Do not use Project Record Drawings as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent fonnat under separate headings for different procedures.
b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
01 78 23 - 3
OPERATION AND MAINTENANCE DATA
Page 3 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
5. Copy of each warranty, bond and service contract issued
a. Provide infonnation sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties ar bonds
C. Manual for Materials and Finishes
l. Submit 5 copies of complete manual in final fonn.
2. Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) lnformation required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
3, Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full infonnation on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
l. Submit 5 copies of complete manual in final forn1.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut-down and emergency instructions
3) Summer and winter operating instiuctions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checicing
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH Water and Sanitary Se�ver Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
01 78 23 - 4
OPERATION AND MAINTENANCE DATA
Page 4 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
IS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
3
4
i.
k.
Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1) Function, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Controls
3) Coimnunications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
f. Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare �al•ts, manufacturer's cut•rent prices, aud
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
Charts of valve tag numbers, with location and function of each valve
List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
Other data as required under pertinent Sections of Specifications
30 1.7 CLOSEOUT SUBMITTALS [NOT USED]
31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
32 1.9 QUA�ITY ASSUIt.ANCE
33 A. Provide operation and maintenance data by personnel with the following criteria:
34 l. Trained and experienced in maintenance and operation of described products
35 2. Skilled as technical writer to the extent required to communicate essential data
36 3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised DecemUer 20, 2012
01 78 23 - 5
OPERATION AND MAINTENANCE DATA
Page 5 of 5
1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
2 l.11 FIELD (SITE] CONDITIONS [NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2- PRODUCTS [NOT USED]
5 PART 3- EXECUTION [NOT USED]
�
fll
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D. Johnson 1.S.A. ]— title of section removed
�
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
01 78 39 - 1
PROJECT RECORD DOCUMENTS
Page 1 of 4
1
2
�,7���f_� _0 ► _ . :
4
5
6
7
8
9
10
11
12
13
14
15
16
17
l.l SUMMARY
SECTION Ol 78 39
PROJECT RECORD DOCUMENTS
A. Section Includes:
l. Work associated with the documenting the project and recording changes to project
documents, including:
a. Record Drawings
b. Water Meter Service Reports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specifcation
l. None.
C. Related Specification Sections include, but are not necessarily liinited to:
l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various Items bid.
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
23 1.5 SUBMITTALS
24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
25 City's Project Representative.
26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
27 1.7 CLOSEOUT SUBMITTALS [NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
�
30
31
32
33
34
35
36
1.9 QUALITY ASSURANCE
A. Accuracy of Records
1. Thoroughly coordinate changes within the Recard Documents, making adequate
and proper entries on each page of Speciiications and each sheet of Drawings and
other pocuments where such entry is required to show the change properly.
2. Accuracy of records shall be such that future search for items shown in the Contract
Documents may rely reasonably on infoi7nation obtained from the approved Project
Record Documents.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised luly 1, 20ll
017839-2
PROJECT RECORD DOCUMENTS
Page 2 of 4
1 3. To facilitate accuracy of records, malce entries within 24 hours after receipt of
2 information that the change has occurred.
3 4. Provide factual information regarding all aspects of the Work, both concealed and
4 visible, to enable future modification of the Work to proceed without lengthy and
5 expensive site measurement, investigation and examination.
6 1.10 STORAGE AND HANDLING
7
8
9
l�
11
12
13
14
15
fGf
A. Storage and Handling Requirements
l. Maintain the job set of Record Documents completely protected from deterioration
and from loss and damage until completion of the Work and transfer of all recorded
uata t0 ti12 �lil"al i�iOjECt i�2COiCi i�iOCliiii2lltS.
2. In the event of loss of recorded data, use means necessary to again secure the data
to the City's approval.
a. In such case, provide replacements to the standards originally required by the
Contract Documents.
1.11 I'IELD [SITE] CONDITIONS [NOT USED]
1.12 WARItAN'iY [NOT USED]
17 �AiZ3' � - PRODLTCTS
18 2.1 OWNER-I+URNISHED [o�z] O�VNER-SUPPLIED PRODUCTS [NOT USED]
19
20
21
22
23
24
25
26
27
2.2 RECOt�D i)t7CZJIvIEI�iS
A. Job set
1. Proinptly following receipt of the Notice to Proceed, secure froin the City, at no
charge to the Contractor, 1 complete set of all Documents comprising the Contract.
B. Final Record Documents
l. At a time nearing the completion of the Work and prior to Final Inspection, provide
the City 1 complete set of all Final Record Drawings in the Contract.
2.3 AC��SSJ�3I�S [N�JT US�I)]
2.4 SOURCE QUALITY CONTROL [NOT USED]
28 PART 3 - EXECUTION
29
30
31
32
33
34
35
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 MAINTENANCE DOCUMENTS
A. Maintenance of Job Set
l. Iinmediately upon receipt of the job set, identify each of the Docuinents with the
title, "RECORD DOCUMENTS - JOB SET".
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July l, 201 I
017839-3
PROJECT RECORD DOCUMENTS
Page 3 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable method for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for review
by the City, until start of transfer of data to final Project Record Documents.
c. Maintain the job set at the site of work.
3. Coordination with Construction Survey
a. At a minimum, in accordance with the intervals set forth in Section O1 71 23,
clearly mark any deviations from Contract Documents associated with
installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a"cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
5. Conversion of schematic layouts
a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
ducts, and similar items, are shown schematically and are not intended to
portray precise physical layout.
1) Final physical an•angement is determined by the Contractor, subject to the
City's approval.
2) However, design of future modifications of the facility may requi�`e
accurate information as to the final physical layout of items which are
shown only schematically on the Drawings.
b. Show on the job set of Recard Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) Show, by symbol or note, the vertical locaiion of the Item ("under slab", "in
ceiling plenum", "exposed", and the like).
3) Make all identification sufficiently descriptive that it may be related
reliably to the Specifications.
c. The City may waive the requirements for conversion of schematic layouts
where, in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Record Documents
1. Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Drawings to the
corresponding final documents, coordinating the changes as required.
b. Clearly indicate at each affected detail and other Drawing a full description of
changes made during construction, and the actual location of items.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July l, 2011
oi �a s9 -a
PROJECT RECORD DOCUMENTS
Page 4 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
l5
16
17
1�
19
20
21
22
23
24
25
a Call attention to each entry by drawing a"cloud" around the area or areas
affected.
d. Make changes neatly, consistently and with the proper media to assure
longevity and clear reproduction.
2. Transfer of ciala lo other pocuments
a. If the Documents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as final
Record Docutnents.
b. If any such Document is not so approved by the City, secure a new copy of that
Document from the City at the City's usual charge far reproduction and
handling, and carefully transfer the change data to the new copy to the approval
of the City.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.'7 FIELD [oa] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.� ADJ�T�'I'IlOTG [NOT iJS�D]
3.10 CLEANING [NOT USED]
3.11 CI,OSEOUT ACTIVITIES [NOT USF.D]
3.12 PROTECTION [NOT USED)
3.13 MAINTENANC� [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAIv1E SUMMARY OF CHANGE
�
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
99 99 00
Temporary Asphalt Sidewalks, Driveways, and Barrier Free Ramps
Page 1 of 5
1
2
SECTION 99 99 00
TEMPORARY ASPHALT SIDEWALKS, DRNEWAYS AND BARRIER FREE RAMPS
3 PAR'I' 1- GE1�1EI2AL
4 1.1 SUMMARY
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19 1.2
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
A. Section Includes:
l. Teinporary Asphalt sidewalks
2. Temporary Asphalt Driveways
3. Temporary Asphalt Barrier free ramps
B. Deviations from this City of Fort Worth Standard Specification
1. Placement of temporary asphalt sidewalks, driveways and barrier free ramps for
utility construction prior to street, curb and gutter, sidewalk and driveway
reconstruction. Materials and construction shall be per Section 32 12 16 Asphalt
Paving.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0- Bidding Requirements, Contract Forms, and Conditions of the Contract
2. Division 1- General Requirements
3. Section 02 41 13 - Selective Site Demolition
4. Section 32 12 16 - Asphalt Paving
PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Sidewalk
a. Measurement
1) Measurement for this Item shall be by the square foot of completed and
accepted Sidewalk in its final position for various:
a) Thicknesses
b) Types
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price bid per square foot of Sidewalk.
c. The price bid shall include:
1) Excavating and preparing the subgrade
2) Furnishing and placing all materials
2. Driveway
a. Measurement
1) Measurement for this Item shall be by the square foot of coinpleted and
accepted Driveway in its iinal position for various:
a) Thicknesses
b) Types
2) Dimensions will be taken from the back of the projected curb, including the
area of the curb radii and will extend to the limits specified in the
Drawings.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, �VSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised April 30, 2013
99 99 00
Temporaiy Asphalt Sidewalks, Driveways, and Barrier Free 2amps
Page 2 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
�2
23
24
3) Sidewalk portion of drive will be included in driveway measurement.
4) Curb on drive will be included in the driveway measurement,
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price bid per square foot of Driveway.
c. The price bid shall include:
1) Excavating and preparing the subgrade
2) Furnishing and placing all materials
3. Barrier Free Ramps
a. Measureinent
l) Measurement for this ltem shall be per each Barrier Free Itamp completed
and accepted for various:
a) Types
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided undec "Measurement" will be paid for at the unit
price bid per each `Barrier Free Ramp" installed.
c. The price bid shall include:
1) Excavating and preparing the subgrade
2) Furnishing and placing all materials
3) Curb Ramp
4) Landing and detectable warning surface as shown on the Drawings
5) Adjacent flares or side curb
25 1.3 REF�ItEiT�CES
26 A. Abbreviations and Acronyms
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
1. RAP (reclaimed asphalt pavement)
2. SAC (surface aggregate classification)
3. BRSQC (Bituminous Rated Source Quality Catalog)
4. AQMP (Aggregate Quality Monitoring Program)
5. H.M.A.C. (Hot Mix Asphalt Concrete)
6. WMA (Warm Mix Asphalt)
B. Reference Standards
1
2
3
4
Reference standards cited in this specification refer to the current reference standard
published at the time of the latest revision date logged at the end of this
specification, unless a date is specifically cited.
National Institute of Standards and Technology (NIST)
a. Handbook 44 - 2007 Edition: Speci�cations, Tolerances, and Other Technical
Requirements for Weighing and Measuring Devices
ASTM International (ASTM):
a. ASTM D6084 - 06 Standard Test Method for Elastic Recovery of Bituminous
Materials by Ductilometer
American Association of State Highway and Transportation Officials
a. MP2 Standard Specification for Superpave Volumetric Mix Design
b. PP28 Standard Practice for Superpave Volumetric Design for Hot Mix Asphalt
(HMA)
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIF[CATION DOCUMENTS CPN 02384
Revised April 30, 2013
99 99 00
Tempotary Asphalt Sidewalks, Driveways, and Barrier Free Ramps
Page 3 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
c. T 201, Kineinatic Viscosity of Asphalts (Bitumens)
d. T 202 Standard Method of Test for Viscosity of Asphalts by Vacuum Capillary
Viscometer
e. T 316 Standard Method of Test for Viscosity Determination of Asphalt Binder
Using Rotational Viscometer
£ TP 1-93 Test Method for Detennining the Flexural Creep Stiffness of Asphalt
Binder Using the Bending Beam Rheoineter (BBR)
5. Texas Department of Transportation .
a. Bituminous Rated Source Quality Catalog (BRSQC)
b. TEX 100-E, Surveying and Sampling Soils for Highways
c. Tex 106-E, Calculating the Plasticity Index of Soils
d. Tex 107-E, Determining the Bar Linear Shrinkage of Soils
e. Tex 200-F, Sieve Analysis of Fine and Coarse Aggregates
£ Tex 203-F, Sand Equivalent Test
g. Tex-204-F, Design of Bituminous Mixtures
h. Tex-207-F, Determining Density of Compacted Bituminous Mixtures
i. Tex 217-F, Determining Deleterious Material and Decantation Test for Coarse
Aggregates
j. Tex-226-F, Indirect Tensile Strength Test
k. Tex-227-F, Theoretical Maximum Specific Gravity of Bituininous Mixtures �
l. Tex-243-F, Tack Coat Adhesion
m. Tex-244-F, Thermal profile of Hot Mix Asphalt
n. Tex 280-F, Determination of Flat and Elongated Particles
o. Tex 406-A, Material Finer Than 75 µm (No. 200) Sieve in Mineral Aggregates
(Decantation Test for Concrete Ag�•egates)
p. Tex 408-A, Organic Impurities in Fine Aggregate for Concrete
q. Tex 410-A, Abrasion of Coarse Agb egate using the Los Angeles Machine
r. Tex 411-A, Soundness of Aggregate by Using Sodiuin Sulfate or Magnesium
s. Tex 460-A, Detei�rnining Crushed Face Particle Count
t. Tex 461-A, Degradation of Coarse Aggregate by Micro-Deval Abrasion
u. Sulfate
v. Tex-530-C, Effect of Water on Bituminous Paving Mixtures
w. Tex-540-C, Measurement of Polymer Separation on Heating in Modifed
Asphalt Systems
x. Tex-541-C, Rolling Thin Film Oven Test for Asphalt Binders
y. Tex-920-K, Verifying the Accuracy of Drum Mix Plant Belt Scales
z. Tex-921-K, Verifying the Accuracy of Hot Mix Plant Asphalt Meters
aa. Tex 923-K, Verifying the Accuracy of Liquid Additive Metering Systems
39 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
40 1.5 SUBMITTALS [NOT USED]
41 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS
42
43
44
A. Mix Design: submit for approval. Section 32 12 16
B. Product Data: submit product data and sample for pre-cast detectable warning for
barrier free ramp.
45 1.7 CLOSEOUT SUBMITTALS [NOT USED]
46 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised Apri130, 2013
99 99 00
Temporary Asphalt Sidewalks, Driveways, and Barrier Free Ramps
Page 4 of 5
1 1.9 QUALITY ASSURANCE [NOT USED]
2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
3 1.11 FIELD CONDITIONS
4 A, Weather Conditions: Placement of asphalt shall be as specified in Section 32 12 16.
5 1.12 WARRANTY [NOT USED]
6 PART 2 - PRODUCTS
7 2.1 OWNER-FURNISHED PRODUCTS [NOT USED]
3 2.2 E(�LTIDA�I�NT AND ld'IATE�' ALS
9 As specified in Section 32 12 16
10 2.3 ACCESSORIES [NOT USED]
11 2.4 SOURCE QUALITY CONTROL [NOT USED]
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
PART 3 - EXEC�7TION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION
As specified in Section 32 12 16.
3.4 INSTALLATION
A. General
1. Sidewalks shall have a ininimum thickness of 4 inches.
2. Sidewalks constructed in driveway approach sections shall have a miniinum
thickness equal to that of driveway approach or as called for by Drawings and
specifications within the limits of the driveway approach.
3. Driveways shall have a minimum thicicness of 6 inches
4. All pedestrian facilities shall comply with provisions of TAS including location,
slope, width, shapes, texture and coloring. Pedestrian facilities installed by the
Contractor and not meeting TAS must be reinoved and replaced to meet TAS (no
separate pay).
B. Fonns: Forms shall be securely staked to line and grade and inaintained in a true
position during the depositing of concrete.
C. Placement: see Section 32 12 16.
D. Finishing
l. Temporary asphalt sidewalks, driveways and barrier free ramps shall be finished to
a true, even surface.
34 E. Joints
35 Not applicable
36 F. Barrier Free Ramp
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised Apri130, 2013
99 99 00
Temporary Asphalt Sidewalks, Driveways, and Barrier Free Ramps
Page 5 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
l. Furnish and install brick red color pre-cast detectable warning Dome-Tile,
manufactured by StrongGo Industries or approved equal by the City.
2. Detectable warning surface shall be a minimum of 24-inch in depth in the direction
of pedestrian travel, and extend to a minimum of 48-inch along the curb ramp or
landing where the pedestrian access route enters the street.
3. Locate detectable warning surface so that the edge nearest the curb line is a
minimum of 6-inch and maximuin of 8-inch from the extension of the face of the
curb.
4. Detectable warning Dome-Tile surface may be cuived along the corner radius.
5. Install detectable warning surface according to manufacturer's instructions.
3.5 REPAIR/RESTORATION [NOT iISED]
3.6 RE-INSTALLATION [NOT USED)
3.7 FIELD QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTI�dITIES [NOT USED]
3.12 PROTECTION [NOT USED] '
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHME1vTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
12/20/2012 D. Johnson 1.2.A.3 — Measurement and Payment for Barrier Free Ramps modified to matcli
updated City Details
4/30/2013 F. Griffin Corrected Part 1, 1.2, A, 3, b, 1 to read; from ... square foot of Concrete Sidewalk.
to . . .each "Barrier Free Ramp" installed.
���
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICAI'ION DOCUMENTS CPN 02334
Revised April 30, 2013
99 99 O1 - i
TEy1PORARY ASPHALT CURB AND GUTTERS
Page 1 of 3
1
2
3
SECTION 99 99 O1
TEMPORARY ASPHALT CURB & GUTTERS
4 PART1- GENERAL
5 L1 SUMMAR�'
6 A. Section Includes:
7 1. Temporary Asphalt Curbs and Gutters
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. Placeinent of temporary curb and gutter for utility construction prior to street, curb
10 and gutter, sidewalk and driveway reconstruction. Materials and construction
11 means and inethods shall be per Section 32 12 16 Asphalt Paving.
12 C. Related Specifcation Sections include, but are not necessarily limited to:
13 1. Division 0- Bidding Requirements, Contract Forms, and Conditions of the Contract
14 2. Division 1- General Requirements
15 3. Section 02 41 13 - Selective Site Demolition
16 4. Section 32 12 16 - Asphalt Paving
17 1.2 PRICE AND PAYMENT PROCEDURES
18
19
20
21
22
23
24
25
26
27
28
29
30
31
A. Measurement and Payinent
l. Concrete Curb and Gutter
a. Measurement
1) Measurement for this Item shall be by the linear foot of Concrete Curb and
Gutter.
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price bid per linear foot of Concrete Curb and Gutter complete and in place
by curb height.
c. The price bid shall include:
1) Preparing the subgrade
2) Furnishing and placing all materials, including foundation course,
reinforcing steel, and expansion material
CITY OF FORT WORTH Water and Sanitary Sewer Replacements Contract 2014, V✓SM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 0238�}
Revised December 2Q 2012
999901-2
TEtviPORARY ASPHALT CURB AND GUTTERS
Page 2 of 3
1
2
3
4
5
6
7
8
9
10
11
12
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 ACTION SUBMITTALS (NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.II NiAINTENANCE MATERIAL SUBMITTALS [I�tOT US�D]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAG�, AND HANDLING [NOT USED]
l.ii FiELi� Cf31iT�5IiYONS
A. Weather Conditions: See Section 32 13 13.
�i.�2 �JaAiip�Eirlii �rT'�� U��iani�
PART 2 - PROI)ITCTS
13 2.1 OWNER FURNISHED PRODUCTS [NOT USED]
14 2.2 EQUIPMENT AND MATERIALS
15 A. Forms: See Section 32 13 13.
16 B. Asphalt: See Section 32 12 16.
17 2.3 ACCESSORIES [NOT USED]
18 2.4 SOURCE QUALITY CONTROL [NOT USED]
19 PART 3 - EXECUTION
20
21
22
23
24
25
26
27
28
29
30
3.1 INSTALLERS [NOT USED]
3.2 EX��'ii II>tATI�ii [1>1�T USE�]
3.3 PREPARATION
A. Demolition / Removal: See Section 02 41 13.
3.4 INSTALLATION
A. Forms
l. Extend forms the full depth of asphalt.
2. Metal Foi7ns: a gauge that shall provide equivalent rigidity and strength
3. Use acceptable metal forms for curves with a radius of less than 250 feet.
4. All forms showing a deviation of 1/8 inch in 10 feet froin a straight line shall be
rejected.
CITY OF FORT WORTH Water and Sanit�lry Sewer Replacements Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02334
Revised December 20, 2012
999901 -3
TEMPORARY ASPHALT CURB AND GUTTERS
Page 3 of 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
B. Placement
1. Deposit asphalt to maintain a horizontal surface.
2. Work asphalt into all spaces to form a dense mass free fi�oin voids.
3. Work coarse aggregate away fi•om contact with the forms
4. Hand-Laid Curb and gutter
a. Shape and compact subgrade match existing as removed
b. Lightly sprinkle subgrade inaterial immediately before asphalt placement.
c. Deposit asphalt into forms.
d. Strike off with a template 1/4 to 3/8 inch less than the dimensions of the
�nished curb, unless otherwise approved.
C. Curing: see Section 32 12 16.
3.5 REPAIR/RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.7 F'IEiI,D QUAI.IT�' CO�IT120L [1�Vfl�' iJSED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTI�iTG [I�OT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITI�S [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
24
CITY OF FORT WORTH Water and Sanitary Sewer Replacements Coutract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised December 20, 2012
APPENDIX
GC-4.01 Availability of Lands: none
GC-4.02 Subsurface and Physical Conditions:
Pavement Bore Report
GG4.04 Underground Facilities: none
GC-4.06 Hazardous Enviromnental Condition at Site: none
GC-6.06.D Minority and Women Owned Business Enterprise Compliance :
MBE Good Faith Effort Form
MBE Joint Venture Form
MBE Prime Contractor Waiver Foi7n
MBE Special Instructions Form
MBE Subcontractor-Supplier Utilization Foi�rn
GC-6.07 Wage Rates:
Vertical Wage Rate Table
GC-6.09 Permits and Utilities:
TxDOT Permit
Tarrant County Permit
GC-6.24 Nondiscrimination: none
GR-Ol 60 00 Product Requirements:
Standard Products Table
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
GC-4.01 Availability of Lands
THIS PAGE LE�'T INTENTIONALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised, July 1, 2011
GC-4.02 Subsuriace and Physical Conditions
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 201 ]
1
CITY OF FORT WORTH
T/PW
SOIL LAB �ERVICES
LABORATORY RESULTS FOR
TEST HOLE AND PLASTICITY INDEX
Project: WATER&SEWER REPLACE CONT 2014 WSM-C PT 1
Project# 02384
DOE No: 7310
Fund Code: 03
Contractor:
HOLE 1 Donna St
LOCATION: 50'E of Evans Ave C/4
2.25" HMAC
6.75" Grayish Brown Sandy Clay W/gravel
7.00" Brown Sandy Clay
ATTERBURG LIMITS: LL:36.4 PL:18.4 PI:18.0 SHRKG:
MUNSELL COLOR CHART: 10 Yr. Lt Brownish Gray Clay
HOLE 2
LOCATION: 720 Donna St N/4
1.00" HMAC
11.00" Lt Brown Sandy Clay W/gravel
4.00" Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 1 May St
LOCATION: 3841 May St E/4
2.50" HMAC
7.50" Lt Brown Sandy Clay W/gravel
6.00" Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 2
LOCATION: 3820 May St W/4
2.50" HMAC
9.50" Lt Brown Sandy Clay W/gravel
4.00" Brown Sandy Clay W/gravel
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 3
LOCATION: 3809 May St E/4
3.00" HMAC
6.00" Lt Brown Sandy Clay W/gravel
7.00" Brown Sandy Clay W/gravel
2
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 4
LOCATION: /4
2.50" HMAC
8.00" Lt Brown Sandy Clay W/gravel
5.50" Brown Sandy W/gravel
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 5
LOCATION: 3717 May St W/4
3.00" HMAC
7,00" Lt Brown Sandy Clay W/gravel
6.00" Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 6
LOCATION: 3701 May St E/4
3.00" HMAC
7.00" Lt Brown Sandy Clay W/gravel
6.00" Brown Sandy Clay W/gravel
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 7
LOCATION: 3635 May St W/4
1.75" HMAC
8.00" Lt Brown Sandy Clay W/gravel
6.25" Brown Sandy Clay W/gravel
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 8
LOCATION: 3616 May St W/4
1.00" HMAC
11.00" Lt Brown Sandy Clay W/gravel
4.00" Dark Brown Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 9
LOCATION: 3601 May St E/4
.75" HMAC
10.50" Lt Brown Sandy Clay W/gravel
4.75" Dark Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 10
LOCATION: 3532 May St E/4
5.25" HMAC
6.00" Lt Brown Sandy Clay W/gravel
4.75" Dark Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 11
LOCATION: 3517 May St E/4
4.50" HMAC
6.00" Lt Brown Sandy Clay W/gravel
5.50" Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 12
LOCATION; 3501 May St W/4
1.50" HMAC
6.50" Concrete (4912.0 psi)
8.00" Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 1 W Spurgeon St
LOCATION: 1008 W Spurgeon St/4
4.00" HMAC
8.00" Concrete (3547.0 PSI)
4.00" Grayish Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 2
LOCATION: 1028 W Spurgeon St S/4
6.00" HMAC
6.00" Lt Brown Sandy Clay W/gravel
4.00" Brown Sandy Clay W/gravel
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 3
LOCATION: 1117 W Spurgeon St N/4
5.50" HMAC
7.50" Lt Brown Sandy Clay W/gravel
3.00" Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 4
LOCATION: 1504 W Spurgeon St N/4
3.75" HMAC
8.00" Lt Brown Sandy C1ay W/gravel
4
5.00" Brown Sandy Clay W/gravel
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 5
LOCATION: 1600 W Spurgeon St N/4
.50" HMAC
7.50" Lt Brown Sandy Clay W/gravel
8.00" Dark Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 6
LOCATION: 1625 W Spurgeon St S/4
2.50" HMAC
9.00" Lt Brown Sandy Clay W/gravel
4.50" Brown Sandy Clay G1/gravel
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 1 Whitmore St
LOCATION: 300'W of Carroll St N/4
2.00" HMAC
7.00" Lt Brown Sandy Clay W/gravel
7.00" Dark Brown Clay
ATTERBURG LIMITS: LL:44.3 PL:22.9 PI:21.4 SHRKG:13.0
MUNSELL COLOR CHART: 10 Yr. 5/2 Grayish Brown Clay
HOLE 2
LOCATION: 75'W of Foch St S/4
1.75" HMAC
8.00" Lt Brown Sandy Clay W/gravel
6.25" Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 3
LOCATION: 90'E of Wimberly St S/4
1.00" HMAC
8.00" Lt Brown Sandy Clay
7.00" Brown Sandy Clay
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
HOLE 1 Hammond St
LOCATION: 1009 Hammond St N/4
5.00" HMAC
11.00" Concrete (1581.0 PSI)
ATTERBURG LIMITS: LL: PL: PI: SHRKG:
MUNSELL COLOR CHART: 10 Yr.
tipproval. :
5
Routing:
Ryan Jeri
'' Date Tested: 4/14/14-9/9/14 Superintendent
Requested by: Robert Sauceda
Tested by: Soil Lab File
GC-4.04 Underground Facilities
THIS PAGE LEFT INTENTIOl�ALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
GC-4.06 Hazardous Environmental Condiiion at Site
THIS PAGE LEFT INTENTIOl�TTALLY �LANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIPICATION DOCUMENTS CPN 02384
Revised July 1, 20ll
GC-6.06.D Minority and Women Owned Business
Enterprise Compliance
�'HIS P'��� L�F'�' Il��El�T'�'IOl�1�LL�' ��Al�T�
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
F�T W �T H
u
Ci#y o� Fcrt !!`dor#h
Minority Business Enterprise Specifications
SPIECIAL If�STRUCTIONS FOR BIDDERS
APPLICATION OF POLICY
If the total dollar value of the contract is greater than $50,000, then a MBE subcantracting goal may be
applicable. If the total dollar value of the contract is $50,000 or less, then an MBE subcontracting goal is not '
applicable.
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises
(MBE) in the procurement of al� goods and services. All requirements and regulations stated in the City's current
Business Diversity Enterprise Ordinance applies to this bid.
.��, �i
The City's MBE gr�af on this projecf is � 0
% oT tFle tOtal bld (Base bid appiies to Parks and Community Services).
Note: if both MBE and S�E subcontracting goals are established for this project, then an Offeror m�sst
subrnifi both a M�E Uti(ization �orm and a SB� Utilization Form �o be deerneci responsive.
COMPLIANCE TO BID SPECIFICATIONS
On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required to comply
with the intent of the City's Business Diversity Enterprise Ordinance by one of the following:
1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or
2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or;
3. Good Faith Effort documentation, or;
4. Waiver documentation.
SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department, within the following times allocated, in order
for the entire bid to be considered responsive to the specifications. The Offerar shall deliver thP MBE documenta#ion in
person to the appropriate employee of the rnanag'ing tlepartment'and obfain a date/time receipt. Such receipf shall be
evidence that the City received the dacumentatian in the time allocated. A faxed copy wili noi be accepted:
1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid
met or exceeded: opening date, exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid
Utilization Form, if participation is less than opening date, exclusive of the bid opening date.
stated goal:
3. Good Faith Erfort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid
Utilization Form, if no MBE participation: opening date, exclusive of the bid opening date.
4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid
perform all subcontracting/supplier work: opening date, exclusive of the bid opening date.
5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid
to met or exceed goal. opening date, exclusive of the bid opening date.
FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE, WILL RESULT IN
' THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS
Any cquestions, please con�act the M/WBE Office at (�'i7) 212-2674.
Rev. 5/30/12
�OFz.T �►WORTH
City of Fort Worth
Prime Contractor Waiver Form
ATTACHMENT 1B
Page 1 of 1
PRIME COMPANY NAME: Check applicable block to describe prime
PROJECT NAME: ❑ M/W/DBE NON-M/lWDE3E
Water and Sanitary Sewer Replacement Contract 2014, WSM-C B�D DATE
10/9/2014
City's MBE Project Goai: Prime's MBE Project Commitment: PROJECT NUMBER
10 0�0 0�o C P N 02384
If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on
' this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is
�l�, then you must complete ATTACNMENT 1C. This form is only applicable if �szs`13 answers are yes.
Failure to complete this form in its entirety and be received by the Managinq Department on or before
5:00 p.m., five (5) Citv business days after bid openinq, exclu�ive of the bid opening date, will result in the
bid bzi��g ccns9dered �o7-�z�pon�ive to bid s�eeifii�ati��s.
Will you perform this entire contract without subcontractors? YES
If yes, please provide a detailed explanation that proves based on the size and scope of this NO
project, this is your normal business practice and provide an operational profile of your business.
Wili you perForm this eniire contraci withoui suppiiers?
YES
If yes, please provide a detailed explanation that proves based on the size and scope of this
project, this is your normal business practice and provide an inventory profile of your business. NO
The bidder further agrees to provide, directly to the City upon request, complete and accurate information
regarding actual work performed by all subcontractors, including MBE(s) on this contract, the payment therefore
and any proposed changes to the original MBE(s) arrangements submitted with this bid. The bidder also agrees
to allow an audit and/or examination of any books, records and files held by their company that will substantiate
the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any
intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment
from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local
laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract
may result in a determination of an irresponsible offeror and barred from participating in City work for a period of
time not less than one (1) year.
Authorized Signature
Title
Company Name
Address
City/StatelZip
Printed Signature
Contact Name (if different)
Phone Number Fax Number
Email Address
Date
Rev. 5130112
FORT WORTH
CITY OF FORT WORTH
lO�IBE Joint Venture Eli�ibility Form
AI! questio►rs nwst be «�rswered; use "N/A" if not npplicnble.
Name of City project' water and Sanitary Sewer Replacement Contract 2014, WSM-C
A joint venture fonn must be completed on each project
RFP/Bid/Purchasing Number:
1. Joint venture information:
Joint Venture
Page 1 of 3
Joint Venture Name:
Joint Venture Address:
(If aPplicable)
Telephone: Facsimile: E-mai] address:
Cellular:
Identify the firms that comprise the joint venture:
Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the
'oint venture
MBE i►rm Non-MBG firm
name: name:
Business Address: Business Address:
City, State, Zip: City, State, Zip:
Telephone Facsimile E-mail Telephone Facsimile
Cellular Cellular
Certification Status: E-mail address
Name of Certifying Agency:
2. Sco e of worlc erformed b the Joint Venture:
Describe the sco e of work of the MBE: Describe the sco e of worlc of the non-MB�:
Rev. 5/30/12
Joint Venture
Page 2 of 3
3. What is the percentage of MBE participation on this joint venture that you wish to be counted toward
meeting the project goal?
4. Attach a copy of the joint venture agreement.
5. List components of ownership of joint venture: (Do not complete if ilris info,•madon is desc,•ibed i�r joint ve,tt�u•e ag,•een2e�it)
Profit and loss sharing:
Capital contributions, including
equipment:
Other applicable ownership interests:
6. Identify by name, race, sex and firm those individuals (witli titles) who are responsible for the day-to-day
management and decision maldng of the joint venture:
Financial decisions
(to include Account Payable and Receivable):
Management decisions:
a. Estimating
b. Marketing and Sales
c. Hiring and Firing of management
personnel
d. Purchasing of major equipment
and/or supplies
Supervision of field operations
The City's Minority and Women Business Enterprise Office will review your joint venture submission and
will have final approval of the MBE percentage applied toward the goal for the project listed on this form.
NOTE:
From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar
amounts/percentages change from the originaliy approved information, then the participants must inform the City's
M/WBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and
may result in debarment in accord with the procedures outlined in the City's BDE Ordinance.
:Z�1F'i[c7�7lir►a
Joint Venture
Pa e3of3
AFFIDAVIT
The undersigned affirms that the foregoing statements are true and correct and include all material information
necessary to identify and explain the terms and operation of the joint venture. Furtherinore, the undersigned shall
agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments
herein.
The City also reserves the right to request any additional infonnation deeined necessary to determine if the joint
venture is eligible. Failure to cooperate and/or provide requested infonnation within the time specified is grounds
for termination of the eligibility process.
The undersigned a�•ee to permit audits, interviews with owners and examination of the bool<s, records and �les
of the joint venture by any authorized representatives of the City of Fort Worth. Failure to coinply with this
provision shall result in the tennination of any contract, which may be awarded under the provisions of this joint
venture's eligibility and may initiate action under Federal, State and/ar Local laws/ordinances concerning false
_statements or willful misre�resentation of facts.___ __
- --------------------------------------- - -- - - -- - - - -- ---------- -----------------------------------------------------------------------------------------------------------
Name of MBE Yinn Name of non-MBE finn
Printed Name of Owner Printed Name of Owner
Signature of Owner Signature oFOwner
Printed Name of Owner Printed Name of Owner
Signature of Owner Signatw�e of Owner
Title Title
Date Date
1�lotarization
State of
On this
day of
County of
20 , before me appeared
and
to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were
properly authorized to execute this affidavit and did so as their free act and deed.
Notary Public
Print Name
Notary Public
Signature
Commission Expires _
(senl)
Rev. 5/30/12
ATTACHMENT 1C
Page 1 of 3
FORT �ORTH City of Fort Worth
MBE Good Faith Effort Form
PRIME COMPANY NAME: Check applicable block to describe prime
' PROJECT NAME: M/W/DBE NON-M//WDBE
Water and Sanita Sewer Re lacement Contract 2014, WSM-C B�D DATE
� p 10/9/2014
, City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER
10 0�0 ��o C P N 0? 384
If the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror must complete this
form. �
If the Offeror's method of compliance with the MBE goal is based upon demonstration of a
"��od f�iih effs�rt", the Offeror vv�l! have the burden of correctly ar�d accura#�ly pr�parir�g an�i
submitting the documentation required by the City. Compliance with each item, 1 thru 11 below,
� shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing
misrepresentation oT the facis or inieniional discrimination by the Offeror.
Failure to complete this form, in its entirety with supporting documentation, and it being submitted to and
received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening,
excl�asive of bid openir�g date, wil! result in the bid being considered non-responsive to bid specifications.
1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this
project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NOT LIST NAMES OF
FIRMS) On all projects, the Offeror must list each subcontracting and or supplier opportunity
regardless of tier.
(Use additional sheets, if necessary)
List of Subcontracting Opportunities List of Supplier Opportunities
Rev. 5/30/12
ATTACHMENT 1C
Page 3 of 3
9. Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set?
Y@S (If yes, attach all copies of quotations.)
No
10.) Was the contact information on any of the listings not valid?
�_Yes (If yes, attach the information that was not valid in order for the M/WBE Office to address the corrections
needed.)
�_N o
11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the
forms of an affidavit, include a detailed explanation of why the MBE was rejectetl and any sup�orting
documentation the Offieror wishes to be considered by the City. In the event of a bona fide dispute
concerning quotes, the Offeror will provide for confidential in-camera access to and inspection of any
relevant documentation by City personnel.
Please use additional sheets, if necessary, and attach.
C9mqanv Name T�I�gi1911� C9n#act Pers�n SGO�@ Of �I4!'� Rp�sen f�r !�p�sct��r.
ADDITIONAL INFORMATION:
Please provide additional information you feel will further explain your good and honest efforts to obtain
MBE participation on this project.
The Offeror further agrees to provide, directly to the City upon request, complete and
accurate information regarding actual work perFormed on this contract, the payment
thereof and any proposed changes to the original arrangements submitted with this bid.
The Offeror also agrees to allow an audit and/or examination of any books, records and
files held by their company that will substantiate the actual work performed on this
contract, by an authorized ofFicer or employee of the City.
Any intentional and/or knowing misrepresentation of facts will be grounds for
terminating the contract or debarment from City work for a period of not less than three
(3) years and for initiating action under Federal, State or Local laws concerning false
statements. Any failure to comply with this ordinance shall creat� a material b►-each ofi
Rev. 5130/12
ATTACHMENT 1C
Page 4 of 3
contract and may result in a determination of an irresponsible offeror and debarment
from participating in City work for a period of time not less than one (1) year.
The undersigned certifies that the information provided and the MBE(s) listed was/were
contacted in good faith. It is understood that any MBE(s) listed in Attachment 1 C will be
contacted and the reasons for not using them will be verified by the City's M/WBE
Office.
Authorized Signature
Ti�ic?
�ompany Name
Address
City/State/Zip
Printed Signature
�oniaci i�ame and Tiile (ifi difTereni)
Phone Number Fax Number
Email Address
Date
Rev. 5130/12
Reinforcing Steel Setter Helper
Roofer
Roofer Helper
Sheet Metal Worker
Sheet Metal Worker Helper
Sprinkler System Installer
Sprinkler System Installer Helper
Steel Worker Structural
Steel Worker Structural Helper
Waterproofer
Equipment Operators
Concrete Pump
Crane, Clamsheel, Backhoe, Derrick, D'Line Shovel
� Forklift
Foundation Drili Operator
Front End Loader
Truck Driver
Weld2r
Welder Helper .
S
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
11.08
16.90
11.15
16.35
13.11
19.17
14.15
17.00
13.74
15.00
18.50
19.31
16.45
22.50
16.97
16.77
19.96
13.00
The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted
and published by the North Texas Construction Industry (Fall 2012) independently compiled by the Lane Gorman
Trubitt, PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's (The
Construction Association) website. www.texoassociation.org/Chapter/wagerates.asp
Page 2 of 2
� ' .`"�`� u.�a�"'i�3tt rr• = ,�-��� � � -.����..
� � � �4 �
� � � � � �
� � � �, ��=e
���� � ��`� � � �
�.�� ��e�
��t � '�+ y � .
� 'Ys t°.�i ,�
r�.�,y. �
-0. y��s ,�' „. ��, r+� �* �" ..��- .
�0��.��.......�?�......�::��.�i�1I��.9�A� _ �_ � , �_:
� _. : i � k� ,
_ k.� �f..,�.�. I . _ �,._���i..� t� ..... � ,.� �..f� E_�v.'•._.,.E 9j.,.-,j .�� .f _. ,..�
� ,.w,.�_._.....,.� _. ,
_�� ..� .�._ �.._ � _!..,� ...._ . _,,,u �� .. e.. r, .. „� r.,E
, : 1. : �,'.�t�l +.. w: h a,., i��� G y E: z��'F°�r j i�L`: t_� a r�...,'� _. . r,
L. x . � t< < i ( .. , � x .� _, , e.. E � .,, ... .. . . » � � +.., �.. ? � ,. .. . s .� �.. �. ��
.�-� t , v , , 1 � .>: ' t � �� �` �..� � 3 �...� o , . , ..., 4 _. � i� .
3 f �� � .. _. _, . __ .. �. � . � � _. ��
i , '".".: i � , a e^i �_ �.,r : , . �;.�.. .. �, I k ,�;: �.4 �, �.._, _ ; ; �. � ��: t i t . 0�g'`� t r E k. �t 4 r,.
...,. � �.. _. . �4 �. r $ ��s � � s �.. �,' i , ^.�, ��1 I h �..��' i � Cu E � ..S c. ¢ '_: �� � �
. I"
4� , _�.�.€� ...v3�-
5 . ,. � �. _ . � � � ` . t .�, � v �
( � j6,i=7t � .-i� i °
; ._ . .�
w, 3 �
� � � �_ _ � _'
. - . -
: � i ;: : : �!� � F,<<? �"° : � � �> "' `�� �
7i ' -
f S . " �j � '�l . , _ � _ �
;
. : .. ._ ,� � k �.. , __. - .
� � � . : � ...� !��
. � + � . �. � . ,
. < ^
i . .. . t
i.:..; .. . � .�. . � i
� �, t � �:. " # � � R �x �s. 4 :1 .? �e
�t �
�y�,�y �;.
■ � �
@ � � V�.� a � � i:z t... , i, :i i f��::, I , ` � .e.; _ j;.
., .. �._ .� .,,. . . , .,. ...s-. .,..-,,.......
) 7 ��+ i � t�� t F '-' y (- c`" 3
�, i Ff . t� � x� t.
� .< . ,� f . . K , .. . _
x
I`� �.'.:���k`� � x��� � - ' �� {�:� {�� �
�
� .
� �
�� #��'4 � �`,_ � g , f ,. �'g ;. ' ^. . #�� "..�, E � �� " ' � � b.
� � A
_ �., 4�¢ ,.3 . ..,�. s '
� • � ` [ a'� : , . � n
, ., }. .. , , ... r , ... { . .. .� < - : �,r .
� : F ,, �
£ ... _ .r _. . . > _ ' - �- , -
f sz ' .� � � � . � ; , _ .. � ',� � �' ° .. .. � .. p � � .� .�� > �'� s
�,g �f �� �/Ii .:.. � -�. � '�.� a� �. �t s � - �} ;�' �`,, 9R,� � ��
,,�
� �.. . . . ". ,.._ . ... _ .. � i . � °:... . ` . .. .. ..
Texa�
����r�'���l�
Transportation
_- t : -- _- - :_ _ � � �
-I __
. .
te �
.
In t � n
saato�
Fort Worth District (revised November 2009)
Specificatis�ns for lJtility Inst�llations
Fort Worth District
TxDOT Director For Utilities 3,4
TxDOT's Mission Statement 5
Safet 5
Protection of Hi hwa Facilities 5
Use of Ex losives 5
Protection of Existing Facilities 5
Deviation From Approved Plans 5
Stakin of Utilit Lines in Advance of Construction 5
Full-Time Su ervision and Inspection 5
Notification of Job Start 5
TxDOT Locates 6
Stockpiles on TxDOT ROW 6
Coordination of Work With Highway Contractor or State Forces 6
Work Da Restrictions 6
Inclement Weather 6
Pits 6
Bore and Tunnelin O erations 7
Markers 7
Above-Ground Appurtenances 8
Back-Fill of Utilit Trenches 8
Site Clean-Up S
Re air and Replacement of Rip-Ra and Earth Slopes 8
Special Precautions For Erosion Control 8
Seedin S ecifications 9
Aesthetics 10
Required Prunin Practices 10
Prunin Su estions 11
S�recific:�lious inr C�tiEit7� Eust:ill:iiiuiis 2 Furt 1;`oreh Districl
TXDOT DIRECTORY FOR UTILITIES
rR.O.W. UT/LITY OFF/CE
J. D. GREENHILL UTILITY AGREEMENT / PERMIT
COORDINATOR
BUZZ KYLER
F AUL �i�RRd
JIMMY VAUGHAN
STACY CLACK
CLARA ELLIOTT
BREND� WATTS
UTILITY COORDINATOR
UTIUiY �D�RDINATOR
UTILITY OBSERVER
UTILITY OBSERVER
UTILITY PERMITS for S. TARRANT
JOHNSON, ERATH, HOOD & SOMERVELL,
UTILITY PERMITS for N. TARRANT
PARKER, PALO PINTO, JACK & WISE,
(50) JOHiVSON COUNTY,4RE,4 OFFICE
RONALD ROBINSON AREA ENGINEER
RANDY BOWERS ASSISTANT AREA ENGINEER
JERRY STOUT UTILITY COORDINATOR
(51) W/SE & JACK COUNTYAREA OFF/CES
BILL NELSON AREA ENGINEER
VACANT ASSISTANT AREA ENGINEER
VACANT UTILITY COORDINATOR
(52) NORTH TARRANT COUNTY AREA OFFICE (N. OF IH30)
RALPH BROWNE AREA ENGINEER
OSCAR CHAVEZ ASST AREA ENGINEER
� (54) SOUTH TARRANT COUNTYAREA OFFICE (S. OF IH30)
GREG CEDILLO AREA ENGINEER
DAVID NEELEY ACTING ASSISTANT AREA ENGINEER
I (56) ERATH, HOOD & SOMERVELL COUNTYAREA OFFICES
MARC Mc ENDREE AREA ENGINEER
DAVID BULLARD ASST AREA ENG. /UTILITY COORD.
5peci['scatiuus for C�tiiih� lnst:iliatiuns 3
817-370-6588
817-370-6827
817-370-6865
817-307-1617
817-313-3873
817-370-6585
817-370-6589
817-202-2900
817-202-2900
817-202-2900
940-626-3400
940-626-3400
940-626-3400
817-399-4302
817-399-4302
817-370-6638
817-370-6638
254-965-3511
254-965-3511
Fae't !i"urtli i)istrit�
l (57) PARKER & PALO P/NTO COUNTYAREA OFFICES
JOHN CORDARY AREA ENGINEER
VACANT ASST AREA ENG. /UTI�ITY COORD.
JOHNSON COUNTY MAINTENANCE
RALPH GARZA MAINTENANCE SUPERVISOR
BRYAN ANDERSON UTILITY OBSERVER
WISE & JACK COUNTY MAINTENANCE
RICKY T�iivlPKivS MHIN I ENANCE SUPERViS�R
KEITH PROCHNOW UTILITY OBSERVER (WISE)
GERRY STONE UTILITY OBSERVER (WISE)
JANA ROBINSON UTILITY OBSERVER (JACK)
NORTH TARRANT COUNTY MAINTENANCE
GARY PHILLIPS MAINTENANCE SUPERVISOR
STACY CLACK UTILITY OBSERVER
SOUTH TARRANT COUNTY MAINTENANCE
RALPH GARZA MAINTENANCE SUPERVISOR
JIMM`t VAUGHAN UTILIT�f OBSERVEr2
ERATH, HOOD, SOMERVELL COUNTY MAINTENANCE
JAMES PARKER MAINTENANCE SUPERVISOR
TONY MUNOZ UTILITY OBSERVER
PARKER & PALO PINTO COUNTY MAINTENANCE
ALAN DONALDSON MAINTENANCE SUPERVISOR
WAYNE FRAIZER UTILITY OBSERVER (PARKER)
BRYAN RIGGS UTILITY OBSERVER (PALO PINTO)
682-229-2800
682-229-2800
817-202-2900
817-202-2905
940-626-3400
940-626-3400
940-626-3400
940-567-6611
817-283-2731
817-313-3873
817-235-3416
817-307-1617
254-897-2647
254-897-26�7
682-229-2804
682-229-2806
940-325-2414
IN CASE OF EMERGENCIES, CONTACT J.D. GREENH/LL AT 897-370-6588; LIGHTS AND
TRAFFIC CONTROL DEVICES SHALL ALWAYS BE USED, AND WILL BE lN STRICT
ACCORDANCE WITH THE GUIDELINES OF THE TMUTCD.
TXDOT'S MISSION STATEMENT
The mission of the Texas Department of Transportation is to provide safe, effective and efficient movement of
people and goods.
SAFETY
Please refer to the Texas Manual on Uniform Traffic Control Devices for questions concerning traffic control.
While working on TXDOT right of way hard hats and fluorescent safety vest are required at all times.
PROTECTION OF HIGHWAY FACILITIES
[ipec3fic;�tlnns far OtiilE�� Eus'fal{,itinns 4'
I�oi� �l'�i��th Uislrict
Ail construction operations relative to installation of the Utility shall be conducted in such manner as to protect
highway facilities from damage at all times. In addition, all work must be done in strict accordance with all
', applicable regulations of the occupational Safety and Health Administration (OSHA) of the US Department of
' Labor.
USE OF EXPLOSIVES
N� explosives shall be used within limits of highway right-of-way without written permission.
PROTECTION OF EXISTING UTILITIES
' Prior to beginning actual construction operations the Utility shall notify all other Utility Companies who may have
'' facilities in the area so they can determine if the proposed construction will conflict with or otherwise damage their
facilities.
��M`h1�4�r2: 1-3C0-DIGT��S
DEVIATION FROM APPROVED PLANS
No changes shall be made to the approved location of utilities without prior authorization of TxDOT. The Utility
shali make necessary arrangements with other Utility Owners for moving facilities and/or supporting same during
trenching operations.
Any poles, anchors, etc. relocated to clear the proposed underground utility line shail be moved toward the
highway right-of-way line and location shall be subject to TxDOT approval. All utility lines incorrectly instailed shall
be removed and laid in proper location at the entire expense of the Utility.
STAKING OF UTILITY LINES IN ADVANCE OF CONSTRUCTION
Utility lines shall be staked weil in advance of construction so that TxDOT can inspect staking to verify that the
alignment conforms to requirements set out herein and that there is no conflict with highway facilities.
FULL TIME SUPERVISION AND IN�PE�TION
The Utility shall provide competent full-time supervisors or inspectors for all utility instailations.
NOTIFICATION OF JOB START
48 Hour notification is required for utility instaliations.
Please have the following information ready when you cail:
• APPROVED PERMIT NO.
• STATE HIGHWAY NO.
• UTILITY COMPANY
• UTILITY SUPERVISOR OR INSPECTOR'S NAME
and UTILITY MOBILE NO.
• GENERA� CONTRACTOR'S NAME
• NAME OF FOREMAN and MOBILE PHONE NO.
• START DATE
TXDOTLOCATES
48 Hour notification is required for TXDOT locates. BE AWARE!! TXDOT has a considerable investment in
tra�c signals, lighting, and traffic management system. These systems include underground electric and fiber
optic lines. If any of the above facilities are within the limits of the utility project, the utility is required to call the
phone numbers listed below:
Signals and lighting:
Phone # (817) 370-6671
Traffic Management:
Phone # (817) 370-6745
S��ceiSlc;�tinus foR� t'filihd In�ti4aif,�timis S Gar¢ tG'nr.lo 17istric!
AERIAL CROSSINGS
72 Hour (3 business days) notification is required for aerial crossings.
Crossings on controlled access highways and/or high volume roadways can only be performed on Sunday,
between the hours of 3 a.m. to 7 a.m. with police assistance and traffic control.
Crossings on non-controlled access roadways and/or low volume roadways can be performed anytime during the
week, Monday thru Friday, between the hours of 9 a.m. and 4 p.m. with proper tra�c control.
LANE CLOSURES
72 Hour (3 business days) notification is required for lane closures prior to the alteration of traffic flow.
If a lane closure is required due to an unforeseen situation and after a utility perrnit has been approved, it will be
necessary to call the TxDOT Utility Permit Office at 817/370-6588. A traffic control plan must be submitted and
approved by TxDOT prior to lane closures.
Note: An Engineer's seal may be required for lane closures o� controlied access highways and high volume
roadways.
STOCKPILES ON TXDOi ROW
Stockpiling will be allowed with permission from TxDOT. Once, permission has been granted, stockpiling can
start forty-eight hours prior to construction. The stockpile shall be placed on the right o� way line or as close as
possible without obstructing the curb, pavement, or line of site. All materials must be removed from TxDOT right
of way completion of the utility project.
COORDINATION OF WORK WITH HIGHWAY
CONTRACTOR OR STATE FORCES
All work related to the installation of utilities shail be conducted in such manner as not to interfere in any way with
highway construction or TxDOT maintenance operations.
WORK DAY RESTRICTIONS
Except, in cases of emergency, no work wili be allowed on Saturdays, Sundays, Federal or State Holidays or at
night.
EXCEPTIONS MAY BE GRANTED BY TXDOT IF the Utility shows that "off day" work is necessary to avoid
service interruptions to the public and the Utility agrees to the following conditions:
Obtain TxDOT approval at least 48 hours in advance. The Contractor is required to have sufficient personnel and
equipment on the job to efficiently execute the work. The utility will have a supervisor or inspector present on the
job at all times while the work is in progress.
INCLEMENT WEATHER
To ensure the safety of the traveling public, as well as the contractor and his crew and TxDOT agents, no work
shali be allowed during inclement weather such as, but not limited to rain, fog, snow and sleet effects visibility
andlor traction.
PITS
Ali pits shall be excavated and closed within 48 hours. If the utility wishes to leave pits open overnight, reflective
barricades must be employed.
BORE AND TUNNE�ING OPERATIONS
GENERAL REQUIREMENTS
Utilities crossing under surfaced roads within the limits of highway right-of-way shail be placed by auger bore or
tunnel method, unless otherwise specificaily authorized by TxDOT.
SCmeiitc:itious for Utilih� i�is[allnfluiis 6 [�u��'�i"uo�tli i)i�tric(
Bores or tunnels shall be placed at depths below the roadway structure which are sufficient for superimposed live
and dead loads and also prevent collapse of supporting soil between hole and roadway.
Boring and tunneling operations shall extend outside of the front slope and clear zone of the highway.
Bores
Where material be�eath pavement is sandy or unstable and will be subject to caving, the hole for the casing
shall be bored and cased simultaneousiy and bored materiai removed through casing. Cutting face of auger or
drill shali not project more than six (6) inches ahead of casing and no water shall be used in connection
with drilling.
Where material beneath pavement is stabie and not subject to caving, and aliowed by TxDOT, the hole for the
casing nay be boreu fiist and casing ins�rteci in the hole immediately after compietion ofi boring. If allowed by
TxDOT, water may be used in conjunction with boring.
Scrs P9t Locat;on
Pits excavated for boring or tunneling operations shall be located so that any possible sloughing of sides of pit will
not endanger shoulders or pavements and so that barricades can be placed as specified in the TMUTCD.
Bore pits should be located at least thirty feet from the edge of the nearest through traffic lane and not less than
twenty feet from the edge of pavement on ramps. On low traffic roadways and frontage roads, bore pits should
not be less than ten feet from the edge of pavement or five feet from face of curb.
Tunneling
While hole is being tunneled, casing shali normally be jacked into place as operations progress.
Working face of excavation shall not precede advancing end of casing by more than two and one half (2'�z) feet
unless otherwise allowed by TxDOT.
Grouting
All voids around casing shall be pressure grouted. The grout shall consisting of Portland Cement and washed
sand and containing not less than two (2) sacks or Portland Cement per cubic yard of grout. Additional cement
shall be added if workability and/or stability cannot be obtained. An air-entraining agent may also be added to the
grout mixture to facilitate flow if necessary.
Grouting shall be done imFnediately after casing has been instailed in hole in order to avoid any shearing of soil
and settlement of over burden above casing.
Means shall be provided for proving that voids are filled around 24" diameter and larger casings in the event there
is some doubt by TxDOT. TxDOT may require the Utility to install removable plugs at intervals inside the casing.
No holes shali be drilled in pavement or shoulders for grouting operations.
MARKERS
The Utility shall place a readily identifiable and suitable marker at each right-of-way line for highway crossings.
Utilities that parailel the right of way shall place a marker every 1500 feet, at intersecting streets, and highway
drainage culverts.
ABOVE-GROUND APPURTENANCES
Above-ground appurtenances, such as pedestals, fire hydrants, meters, etc., shall be located at the right-of-way
line.
BACKFILL OF UTILITY TRENCHES
DESCRIPTION
This specification shall govern backfill of trenches, which have been opened for the removal, adjustment, or
instaliation of utility lines within the limits of highway right-of-way. Except when permission is granted,
compacted backfill will be used for utility installations. Backfill shall consist of compacted material obtained
;pecirieation5 t'os i=d[it�' Inst:i;l:�tiuns 7 l+�irt 1'varth Districl
from suitable soil excavated from the trench, or from sources outside the highway right-of-way. Material shail be
free of rock, lumps, or clods that wili not break down under compaction.
Backfill material shall be placed in the trench in layers not to exceed 6" in depth and compacted. Water shall be
added as required to facilitate compaction.
Compaction shall be done with rollers or mechanical tamps. Use of rollers will be allowed oniy when such use is
not believed detrimental to any highway facility. The type of rolier used must be acceptable to TxDOT. When
rollers are used, mechanical tamps shall be used along the sides of trench to compact any backfill that cannot be
reached with rollers. Compacting shall be continued until a backfill density is equal to that of the adjacent,
undisturbed material. Where trenches lie within the limits of drainage ditches and channels, which are in solid
rock, TxDOT may require 1' of concrete backfill, struck off flush with the top of rock.
SITE CLEAN UP
The Utility is responsible for site clean up at the end of each workday.
Roadways adjacent to the utility construction site shail be kept free from debris, construction materials, and mud.
At the end of each day, construction equipment and materials shall be moved as far from the roadway as feasible
within the safety rules. If mudding of the roadway occurs at any time, the roadway shail be cleaned immediately.
When the utility installation is complete, the right-of-way shall be reshaped to its original condition and
the area reseeded or re-sodded to reduce erosion.
Shouid settlement or erosion occur within one (1) year of the utility installation, TxDOT may specify prompt
replacement at the utility's expense for bringing the construction site to a satisfactory condition.
TxDOT will restore sites that are left at an unsatisfactory condition after notification has been sent to the utility.
These sites will be restored to originai condition. The utility shall fully reimburse all costs incurred by TxDOT for
all repairs made by TxDOT. These costs include, but are not limited to matters of traffic safety, right of way
contour, restoration and repairs to all highway structures: including, but not limited to roads, driveways, terrain,
landscaping, fences, etc.
REPAIR AND REPLACEMENT OF RIPRAP AND EARTH SLOPES
Any existing riprap cut by trenching operations shall be replaced and surface of new riprap finished to match that
of existing riprap. Concrete riprap shall contain not less than three (3) sacks of cement per cubic yard of
concrete. Reinforcing steel shail conform to that of existing riprap.
SPECIAL PRECAUTIONS FOR EROSION CONTROL
Special precautions should be taken during utility installations to avoid disturbing existing drainage courses. In
addition, soil erosion should be held to a minimum and sediment from the construction site should be kept away
from the roadway and drain inlets.
During construction the roadbed and ditches shall be maintained in such condition to insure proper drainage at all
times. Ditches and channels shall be maintained to avoid damage to the roadway.
To avoid soil erosion, it is advised and encouraged that the Utility Contractor use all applicable means (i.e. silt
fences, hay bails, rock filter dams, etc.) to detour soil from eroding into roadway, ditches, and adjacent property.
SEEDING SPECIFICATIONS
RURAL AREA WARM-SEASON SEEDING RATE
In pounds, Pure Live Seed (PLS.)
Mixture for Clay or Tight Soils Mixture for Sandv Soils
Eastern Section � Western Section I All Sections
4pecii�ic:tti�rnx f«�� Utilih� Iustsl�.�[ianm 0 rurf 4t���rfh t7isiri�t
Green Spra�gleiop 0.6 Green Sprangietop 0.6 Green Sprangleton 0.7
Sideoats Grama (EI Reno) 1.8 Sideoats Grama (Haskell or EI Reno) 1.8 Sideoats Grama (Haskeil) 2.2
Bermudagrass 0.8 Little Bluestem 1.1 Bermudagrass 0.9
Liitle Bluestem 1.1 Indiangrass (Lometa or Cheyenne) 1.5 Little Bluestem 1.4
K-R Bluestem 0.7 K-R Bluestem 0.7 Sand Dropseed 0.2
Swiichgrass 1.2 Switchgrass (Alamo or Blackwell) 1.2
Totai 6.2 Total 6.9 Total 5.4
URBAN AREA WARM-SEASON SEEDING RATE
In Pounds, Pure Liye Seed (PLS)
Niixture for Clay or iight Soils Mixture for
Dates Eastern Section Western Section All Sections
Feb 1 Green Sprangletop 0.9 Green Sprangletop 1.1 Green Sprangiet
TO germudagrass 1.2 K-R Bluestem 1.3 K-R Biuestem
May 1 K-R Biuestem 1.0 Buffalograss 10.7 Buffalograss
Buffalograss 8.0
( I Total 11.1 � Total 13.1 �
' TEMPORARY COOL-SEASON SEEDING RATE
In �ounds, Pure Live Seed (PL�1
Dates All Sections
Feb 1 Tall Fescue 4.0
To Western Wheatgrass 5.0
May 1 Wheat (Red, Winter) 30.0
Total 39.0
TEMPORARY COOL-SEASON LEGUME SEEDING RATE
In pounds. Pure Live Seed (PLSI
Dates
Aug 15 Crim.
to
Nov 30 Total
TEMPORARY WARM-SEASOiV SEEDING RATE
In pounds. Pure Live Seed (PLS)
May 1 Foxtaii Millet
to
Nov 30 Total
Note: Names in parenthesis () represent "improved" varieties of ihe species shown.
SE�ccif':c:�tiuizs �Por C�tilit�� tnst:�ilatiaus
�
7.0
7.0
30.0
30.0
�
�
�
1�urt A�4�urth f1i=,.[rict
AESTHETICS
� To preserve and protect trees, shrubbery, and other aesthetic features on the highway right-of-way, TxDOT may
specify the extent and methods of tree removal, tree trimming, or their replacement. TxDOT may also specify the
installation methods of the underground or overhead utility in order to protect and preserve trees and other
aesthetic features.
REQUIRED PRUNING PRACTICES
PRIOR TO CUTTING
• Locate utility lines with the least possible interference with trees.
• Amount of clearance should be determined by the rate of tree growth.
• Remove minimum number of branches to provide adequate clearance.
• Maintain adequate clearance for lines, NOT EXCESSIVE CLEARANCE.
• ALL pruning shall conform to recognized tree surgery practice.
• Preserve natural character of tree.
ViIH�Rt i ci c:Ui
In removing a limb, the cut should be made at a fork where the remaining branch will be at least one third the
diameter of the one removed.
LiMB R�MOVAL
1. In removing branches the cut should be made at a fork with the remaining branch at least one-third the
diameter of the one removed.
2. Undercut 1/3 of the way through the limb, 8 to 12 inches from the main stem.
3. Remove limb 4 to 6 inches out from the first cut.
4. Remove stub with an even cut so that a trace (called a"collar") stili protrudes (about'/2 inch).
5. Ail cuts two (2) inches or over shall be painted with an approved tree dressing or paint. * See pg 11.
DISPOSAL OF CUTTINGS
All pruned wood and brush must be removed from the right of way and disposed of in accordance with the laws
and regulations of the community, county, and state.
Disease branches (especially those infected with oak wilt) must be properly disposed of to prevent the further
spread of the disease.
Speriiic:rtious {��r L'�tilif}• tnst;�llatintts 1� l+urt'�4�nt•tl� i)istrief
S K�1
� �.4
�� ' s wy
�J �. ,..
, r,
� ��.
>i
�4 {J
V � Y � �
—i � „ "^:L�,r
PRUNING 5UGGESTIONS
�' . —/ �,.� �:rY � f .
, i
� ��f� � o;'r+, � �:;� F�� t li
� � � f `�
: ,�- � t t �r r
�� ,"
��� �� � � �" ..
� �
� ' t1 +�� � �.�51,�, 4.*'` r ��'--'F1
a � �
i � ,� :: . ��q
r ��;;i °".�:1.. �--..
/
� ,
�
i � }
z '"� 1
� �'L-'- —
�: .
5�90��mtnt lo
Farm Iq�j
J,�
; �� .
r< I 'L
r ' 1 ��
`� n—
� �-,.�. ���
r-<: y \ '
f z ,i�
� �
;,X�r�s -k,.. �,-�, '� `'� �>� ��,��i�
t � '° �, .`.;p �,� r; �'' :� � �_;j �4 �' �� s
. 4 � n,..'"5: _ � i � �' ; y " 4 � ..r .I �
., �':,,� n.� f
�� ::I.: - �.�:y :� �.
DF_SIRkBI.£ TREE MODIF;CATIONS ,'�w:� � �'" � � ;"� � �
PftC5ERVING SYMMETRY. �F �ti. .�.' ... �y'� .. .. � ... ,.
UN�ESIRA@LE TREc IJOO�FICATIONS
5uch trep-iine r�intionsMps o, illustrated pnrpetualas high
mafnienance costs and �ight.of-woy unsightliness.
t�,� il
4� �.:
'. �
�
�, �
� • ,,, � ,�,
x • �
1
�.'���..~�` I
I
�
��.<-�:'�`� ..
UNDESIRf.[�LE
UNDES,+RABI.E DESIRABLE
(7� Remove Ilmb
��'-6 lrpm �?�l
� 151 CU1 i� J
�, i -- ;f� 4�.� ,�,�
; _�
ir. �t:l�; unaercut ,i{j�i�`�
f��� I/3 wa� �hrouqn �. y�'�
wf IHnb S'12' frorn 1;it.
main stpm.
�3,i r�emove 51uG ;s; Fin.shpQ v�
f� Nrth an even, .J� H�dh nc �rarC
r,�..� i ilush cut. ._;�:��{�'...- uf st.G.
� '1
i;j.' .?i��
t s � `^'!��},. ,;
4�r �� ��
PhC�PER Lild9 REIAOVAL ('L' dia. or mo�e;
tipecificatlons frfr t'�1'slih� ins¢:illatio��s 11 !�urt �°.�u�-fh I>i�ir�ct
DESIi3+Y8LE DESIRkBLE
GC-6.24 Nondiscrimination
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 201 I
GR-Ol 60 00 Produci Requirements
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-C
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 02384
Revised July 1, 2011
0
ciry
OF
FORT WORTH WATER DEPARTMENT'S UPDATED:2-29-2012
STANDARD PRODUCTS LIST
Approval SpecNa ' Classsification Manufacturer Model No. National Spec Size
WASTEWATER
Manhole Inserts
* EI-IS Manhnle Insert Knutson En�erprises TAade m Orcier Plnllic ASTM D 1248 For 24" dia.
. . .EI-14 �. Manhole Inscn . � . . . South Westem Packaging . � . . Made to Order - Plastic � . � ASTM D 124R � For 24" diu. .
EI-14 M�mho�e Insen NoFlnw-Inflow Atade �o Order- Pl.�stic ASTM D 124A For?4" din.
119/'_3PI6 EI-I4 IvlanMde Insert Saulhwestem P�cAine & Seais, Inc. LifeSaver- Sminla�s S�eel Fnr 24" din.
(XI/23PJG ELI4 hianin�le insert Snuthwc��ern Pneking.K Sc is, inc Te�hert,ok - Stainless Sieel For 24" din
Manholes & Bases/Frames & Covers/Rectan�ular
' Manhole Fr,�mes aMl Covers Western iron WorAs, Bass Fc Hays Fou�dry IIX)I 24"xJ0" ND
' Manhnle Frames a�xl Covers Vulc:m Foimd fi780 24"x40"\\'D
Manholes & Bases/Frames & Covers/Standard (Round)
EI-IJ Manhole�Fmme.c und Covers Westem Iron Wurks, Bass S Hays FouMl 3002J 24" Dia.
EI-14 Mnnbole Fr �rns and Cnvers McKinley Iron Works Ine. A 2J AM 24" Dia.
EI-14 Manhole Fmmes aMl Covers Nernah Casting 24" Dia.
EI-14 Manhole Fmmes aMf Covers Vulcan Found 1312 ASTM A 48 2S" Dia.
EI-14 MunholeFmmesandCovers � Sigm.+Corparntion MH-IJ4N
EI-14 M:mholePnmesandCovers SigmaCorporation MH-IJ3N
EI-14 ManholePramesandCnvers PonbA-hinusson GTS-STD 24"diu.
EI-14 ManholeFrnmesandCorers Neen�hCue�ing 24"diu,
7/25fU3 EI-14 Manhnle Fmmes nnd Covers Saint-6ohain Pipelinec (Pamrert/rexus) RG32-RSFS 30" Dia.
01/3110u GI-14 30"UTAiH�'innandCnve� Lutlo�d:mlmn�Vorks Vld3.'-':indV14R3Drsiuiu A,1SHT(1h13�IG-1�1 30'.Diu.
11/U2/IO EI-lJ 30"DIMHRinc:mdCuver SicmaCurpuration MHIfiiIFWNI\IH16iU2 30"Dix
07/19/11 8I-14 30" DI A9H Rinc und Coeer S�ar Pi c Pnu�ucts MH32FI'N'SS-DC .lq" Dia
OR/IO/11 EI-14 30" DI ;�9H Rinn arul Cm�er Accuc�.et 2071N1 He:rvv Uut � wiih Gaskel Ring 111" Din
Manholes & Bases/Frames & CoversJWater Ti�ht & Pressure Tieht
� E1-14 ManhafeFmmesandCovers Pom-A-Mousson Pamtight 24"Dia_
EI-14 Manhule Fmmes nnd Cavers Neenah C,vain5 24" Din.
EI-IS M,mhole Franxs and Covers Vulcan Foimdry 2342 ASTM A JR 23" Dia.
' EI-14 Manhole Frnnxs and Covers Nestem lmn WorAs,Bnss S Ha s Foundry 300-23P ?4" Dia.
ELIS Mnnhole Frames and Covers McKinley Uon Wor4:s Inc. \VPA24AM 23" Dia.
03/OSl00 EL14 Mnnhoie Frames a�d Covers Amicast RG21fH1 AST�1 A 48 24" Dia.
0.M1/2Up)i EI-14 Manhole Fmmu and Covers Serampore I�duslries Ri�vte Ltd. 3W-24-2395 Ring and Cover ASTM A 4R 24" Dia.
Manholes & Bases/New/Components
07/23%)7 Urethnre H dm hiiir \Vacers�o Asxhi Kne �o K.K. AdeAu Uhra-Seul P-201 ASTM D?2J0/D412/D792
lki/26/W Offset )oint for 4' Diam_ DiH Hanson Concrete Produas Dr:nving Nu. 3$-IX)48-Q01
0�1/26/W Profile GazAe[ for 4' Dimn. h1H. Ress-Seai Gasket Com. 250-4G Gusket ASTA1 C-J43/C-3C 1 SS MN
1/26l99 HDPH M:mhole adjustment Ring Ladtech, 1� HDPE A�ijustment Ring Non��m�c are�
5/13/O5 h9anhole flzamul N4vp Cunuxa. CP� �Yr.ipl�Srul \9anhole [�x:ipsulu[ion Rste�n
Manholes & Bases/New/Precast Concrete
EI J4 Mnnhale, Precast Concrete Hvdm Conduit Com SPL I�em #49 ASTM C 478 48"
EI-IS Manhole, Precast Canerete Wnll Concrete Pi Co. Inc. ASTA7 G�43 48"
E1-14 Manhole.Precas�Cancrete H:uuonffonoedyGiffurd-Hi10 ASTkICJ7R 4R"
W/26/00 EJ 4 MH, Sinele Offset SeaUoint Hanson T e F Dwg 35-IXIdR-U01 ASTM C S78 4N" Dium MH
09/23/96 EL tJ Munhole. Prxac� Concre�e Corrcrete Proetuc� Inr. 48" I.D. htanhole w/ 3�" Cone AS9'M C 173 43" w/32" cn�
(tY!�l)illl� [:I- IJ M1t�nih��le. I'rn�:isl C'�in�rztr 'i'IieTurnur C�+inpan' 4ti' I.D. M:anin�le wi 24" Cu�k ,itiTAi C 17N 9M"
il)/'_?Alfi [:i-13 n�l:+nlr�le.l'rca;..iC��nire�c ()I�k:i.tlePiec�i:Cl����. ln"I.U.,\t�nh��Ir��J�1'Currc AS'1'�iCa7r 1t;"Uiunix�?w'l:'inu
04/lYd/IO 81-14 T4qnhule, Pren�st (Reinfo¢e Pnlv���erlConeme US Cnmpnsi�e Pi Reinfurc-ed PolwnerCu�crste ASTAf C-7fi SH" tu 72"
Nlanholes & Bases/New/Fiberelass
1/26/99 Fiherelass Manhole Fluid Containmen4 Inc. Flo�mite ASTM 3753 Non-tr.ifhe area
Ugi3pp10 Pil:eiclass �ianhoic L.P. M1iunuiaaurine Nnn-tn�ttl.:�rea
Manholes & Bases/Rehab SVstems/Cementitious
EI-14 MnnholeRehahSystems Quadex
04/23/01 EI-14 Manhole Rehab 5ycte�nc SiandnrdCement Alnterials, ine. Reli�r h15P
EL 14 Manhnle Rehah S: tems AP/M Permafnm�
J/20/OI EI-14 Manhole Rehah S stem Strone -Seal S. mms Strone Seal MS2A Rehah S�Stem
5/IJ03 Et-IJ MnnholeRehabSvstem Paly-triplexTe<hnoioeies MHrepairpn�uctmstopinfihra�ion AST�iD5Sl3
OX/3U/OP Geueml Cnncre�e RzP:,ir llesFrete Technnineies Vinvi Po��-aster RzPuir ProJuct Afi;c. Llse
Manholes & Bases/Rehab Svstems/NonCementitious
OS/20P)6 EI-14 M1lanhale Rehab S•stems 5 ravroy, Spm Null Polyurethnne CominS AST�f D639/D790
' EI-IY ManhnleRehubS s�em SunCoaa
Uli?IiUo C�uvinesfnrCum,siunProtcaiun Chexirnnn :1tt�.77I.SIHR,S1.5^_ Acidltr:is���niccl'est Se�ver:\npiica�inns
H<<v(�Inlfi ('��at�ui,� i„r C��rn�.i�in 1'mtcctinn �\':irzcn Em�ir��nnwnini ti��11I ini� 11-:i111 \��v�cr A��,I�c�ii��n.:
114/,.11/�I�� (`n,itin,!.v tnr C'�im,.iiin I'��neninn C'it:i�icl tiL.l'.":�I inli�� [�n<v �ener �1���I�ic:��ii�i�c
Pipe/New/Centrifueallv Cast Fiberalass Reinforced Pipe/Polvmer Modified Concrete
7/2I/97 Cem. Cast Fiberelass � Hobas Pi e USA, Inc. Hnbas Pipe fNomPassure� ASTM D32h2/D3754
10/30/03 Plowtite Amilech USA
Prepared 2/29/2072 Page 7
CITY
OF .
FORT WORTH WATER DEPARTMENT'S UPDATED:2-29-2012
STANDARD PRODUCTS LIST
Prepared 2/29/2012 Page 2
CITY
OF
FORT WORTH WATER DEPARTMENT'S UPDATED:2-29-2012
STANDARD PRODUCTS LIST
Prepared 2/29/2012 Page 3
CITY
OF
FORT WORTH WATER DEPARTMENT'S UPDATED:2-29-2012
STANDARD PRODUCTS LIST
Approval ; Spec No. : Cl�sssiFication , Manufacturer Model No. National Spec Size
02/'_�1/1'_ 33-I?.''S T:i i�nc Sire�e IStainle.+. S[eeil � R�imnc SST 111 Stainlrs.a Steel �: . AW1VA C-''''i LI� ta 311" n�/_'I^_'. nut�.
n5/IIIII I luint Repair Cl:nnp Powe��eai 323'' CielUuim Rcpair Cinmp d" tu 311.'
n8/28/u6 Plntitic �icier Bo,� wCl LiJ ACCUCpj i� Clus. ":A" Ptrotir ft��x �ti9 CI Lid Cl,;n,, "A'
U%131v06 Pl:diic \ietzr Cinz �c' Phutic G� UP\tl Pl��iir_, ina Cln..�',�" I'I;a�i: bua w/ Pinntic Lid CJ.�x .?1..
Polyethvlene Encasement
ll5/IJ(�S EI-1.3 I'�ilv�tlivl��in Fn�,i.ment 17��ca��l 1�,��}:nc�i�i� F=ul« �n t�i�e�Pn��uc :\\\'�VFl CI�1� � mi( I I_I)
p5/i'JUi 61-13 Pnl�ethvlem• Fiw,r.mm�t A7uumuin st:ur.. PL�.tiiv 1�151+) �ud A�1' InJ. Swixl:vd kl;mlw�rr :AW WA C125 s mii I_I,D
2�lI^_/RS GI-13 Pai�ethviznc [ncnurcem AEP Indusviz> 6�di.mrnnrl�vCmwmcn R���II ti Gasl:r� A\V\\'A Cli)5 n�ii LLD
Meters
----- -- � - — — --- — --- - ---
02/OS/93 E�pj.$ IktecmrCheck Meter Ames Cnmpnny Mndel IIHN) Delec�or Check Valve AIVR'A CSSO 4" - 10"
0'J/OS/04 Mngnetic Drive Venicai Turhine Herse �ingne�ic Drive Vertical ANWA C701, Class I 3/4" - G"
NOTES. ..� ' . . � FmmOricinnl Standard Prtducts Lis� .. .. .:.. . . . ' . . . . . .. . . . .. . . .. .. . .. .��.�;
<i> Cartier Pi e I.D.
<:> Ahove JR" A rvned nn case hv c:ue hn is
<3> ProductSus nded 1-5.2-12
e nr � er epu men s, r u, is s een ece np o �mnun¢e . i ev�ew o pn uc s w ic mee or e er pu inen s, pm� �c� �ons urmS a i � y a�rts nic iun pro�ec s. en c nica
Specifications for specifie pre�ucts, are indodni as pnn of Ihe Constmetion Contract Documents`ih� reyuirements of the Technical SpcYifirntion will overtide Ihe Fext Worth Wu1er�Depanment's Standanl Specific:itinns and the Fort North Wa�er Depnttmen['s
Standard PrMlocts List nnd.�pproval of the specific pn�ucts wili be based on �Ix reyuirements of the Technicul Specifica[ion w�hether or nw the specific pnduct meets ihe Port Nnnh Wa1er DepartmenPs Standard Specifications or is on the Fon North Wu1er
Departmem's Sia�ard Prcniucts Lisl.
Prepared 2/29/2012 Page d