Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 60222
Received Date: 10/06/2023 Received Time: 10:04 a. m Developer and Project Information Cover Sheet: Developer Company Name Address, State, Zip Code: Phone & Email: Authorized Signatory, Title: Project Name: Brief Description: Project Location: Plat Case Number: Mapsco: CFA Number: None provided 33S 23-0057 Lennar Homes of Texas Land and Construction, LTD 1707 Market Place Blvd. Ste. 210, Irving, TX 75063 469-587-5309 Jennifer.Eller(cr�,lennar.com Jennifer Eller, Authorized Agent Pecan Meadows Phase 1 Water, Sewer, Paving, Drainage, and Streetlight Northeast Quadrant of Shelby Rd and Forest Hill Dr Plat Name: None provided Council District: City Project Number: 8 CPN 104143 I IPRC22-0154 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 1 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 City Secretary Number: 60222 STANDARD COMMUNITY FACILITIES AGREEMENT WITH CITY PARTICIPATION This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a "party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Pecan Meadows Phase 1 ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Community Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City desires to participate in this Agreement in an amount not to exceed $117,824.16 to enlarge the scope of the Improvements beyond what Developer is responsible for constructing to oversize a 12-inch water main to a 16-inch water main, and an 8-in water main to a 16-in water main as authorized by the City Council through approval of M&C 23-0414 on May 23, 2023 ("City Participation"); and WHEREAS, the City Participation includes reimbursement to Developer in amounts not to exceed $109,409.96 for water construction costs and $2,188.20 for material testing costs. The remaining City Participation in the amount of $6,226.00 shall not be paid to Developer, but will be used by City to pay for the City's portion of construction inspection service fees, administrative material testing fees, and water lab testing fees; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY Page 2 of 21 Standard Community Facilities Agreement with City Participation FT. WORTH, TX Rev. 4/2/20 NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: © Exhibit A: Water ® Exhibit A- 1: Sewer © Exhibit B: Paving ® Exhibit B- 1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Standard City Conditions of the Construction Contract for Developer Awarded Projects, the Project Manual, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for City of Fort Worth, Texas Page 3 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. If the Developer's contractors: (a) are not constructing the Improvements in accordance with the Engineering Plans; (b) the contractors violate federal law, state law or local law, policies, rules or regulations in connection with the construction of the Improvements; or (c) coordination of the timing of the construction of adjacent utilities is necessary to avoid having to remove and replace Improvements that Developer's contractors are about to install, the City may temporarily suspend the construction of the Improvements by delivering a written notice to Developer and Developer's contractors. The temporary suspension of the construction of the Improvements shall only occur for the amount of time necessary for Developer's contractors to correct the violation or for the coordination of the utilities to be completed, and upon any such suspension, City agrees to reimburse Developer for the City's share of construction costs for work properly completed through the date City suspended construction. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. If the Improvements are not completed at the end of the Term, and any Extension Periods, there will be no further obligation for City Participation to be paid to the Developer. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and City of Fort Worth, Texas Page 4 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. City of Fort Worth, Texas Page 5 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. (h) Developer shall ensure the contractors are paid the City's wage rates in effect during construction of the Improvements. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights -of -Way Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCLUDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL City of Fort Worth, Texas Page 6 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES, DEATH OR DAMAGESARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. City of Fort Worth, Texas Page 7 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 15. Material Testing The City maintains a list of pre -approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand - delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: Development Coordination Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 DEVELOPER: Lennar Homes of Texas Land and Construction, LTD 1707 Market Place Blvd. Ste. 210 Irving, TX 75063 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to City of Fort Worth, Texas Page 8 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co -employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non -Waiver City of Fort Worth, Texas Page 9 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" has the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies City of Fort Worth, Texas Page 10 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 27. Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate against a firearm entity or firearm trade association," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. 28. Compliance with Public Information Act Requests The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Agreement and Developer agrees that the Agreement can be terminated if Developer knowingly or intentionally fails to comply with a requirement of that subchapter. Developer acknowledges that section 552.371 of the Texas Government Code applies to this Agreement if. (1) this Agreement has a stated expenditure of at least $1 million in public funds for the purchase of good or services by the City; or (2) this Agreement results in the expenditure of at least $1 million in public funds for the purchase of goods or services by the City in a fiscal year of the City. To the extent that section 552.371 of the Texas Government Code applies to this Agreement, Developer shall comply with section 552.372 of the Texas Government Code by: (1) preserving all contracting information relating to this Agreement as provided by the records retention requirements applicable to the City for the duration of the Agreement; (2) promptly providing the City any contracting information related to this Agreement that is in the custody or possession of Developer on request of the City; and (3) on completion of the Agreement, either (a) providing at no cost to the City all contracting information related to the Agreement that is in the custody or possession of Developer; or (b) preserving the contracting information relating to the Agreement as provided by the retention requirements application to the City. City of Fort Worth, Texas Page 11 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 29. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'SEMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 30. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 31. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 32. No Third -Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 33. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 34. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled City of Fort Worth, Texas Page 12 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 to rely on this warranty and representation in entering into this Agreement. 35. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 36. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. 37. City Participation; Fiscal Funding Limitation (a) The City shall reimburse Developer in amounts not to exceed $109,409.96 for construction costs and $2,188.20 for material testing costs. The remaining City Participation in the amount of $6,226.00 shall not be paid to Developer, but will be used by City to pay for the City's portion of construction inspection service fees, administrative material testing fees, and water lab testing fees. Developer must register as a vendor of the City in order for the City Participation to be paid to Developer. The City Participation will be paid to Developer after presentation of proper documentation by Developer to the City that the Improvements have been constructed and accepted by the City and all contractors and material suppliers have been paid. The City Participation was calculated as follows: Project - Pecan Meadows Water Department -City Participation Exhibit Unit of Contractor CFXV Unit Total City Cost IPRC2.-0154 CPS 104143 MeasureQn Unit Price Price DifferenceTotal 12" PVC WaterLme LF 646.001 $112-00 $71.34 $76.45-$71-34=55.11 $3,301-06 I16Water " PVC Lme Si�,QQ S76A5 112"Watercanierpipe (DIP) LF 202.001 $iTZ08 $138.87 $5,829-72 16"Water CarieK (p I $274.00 $167.73 5167.73-5138.87=$28.86 i24" Casing (Other w $780.00 $518S3 LF 95.00 $7,936-30 130" � cut) I $900-00 5602.07 $602o7-$sis-s3=583sa 18" PG ater $58.00 $46.54 1 16" PVC Water Lme LF 761.tx1 $22,76151 $18200 576A5 576.45-$46.54=529.91 1IS"DIP Water Lme LF 89.00 5187.00 8.52 $7,939.69 118"D� �atert. t27200 167.73 $167.73-7g.52=$8921 �8" Gate Valve EA 2.00 I $1,500-00 S1d14.66 $14,029.23 - $1,414.66 = $12,614.57 S25,229.14 116" Gate Vahe & vault 520,500.00 $14,029.23 O' bate %6 EA 100 I �,,;��, $2.390.16 511,639.07 116" Gate Vah-e & vault 5MOM0100 514,029.2.3 $14.029.23- S2.390.16= $11.639A7 18" Ductile hon Fittings w resftamt 1.03 $8 500-00 $5,562A7 1.64 tons -1-03 tons = 0.61 tons $3,39111 i¢ � TONSL64 16" Ductile Iron _ TONS 20.71 $8,500-00 $5,562A7 271 tons - 0-88 tons = $183 tons $10,17932 CTSM BadM (louwmg) convert to 13.82 CY (12-) CY $200.00 $97.16 25.61 CY -13.82 CY =11.79 CY $1,145-52 ICLS6L Backfill (loumnag) coanett to CY (16') 25.61 CI.ditackfill (lov -mg) convert to CY(8, 9-60 CLgil Backfill (loner cons-.t to CY $200-00 $9716 25.61 CY - 9.60 CY=16.01 CY $1,555-53 CY (ly') 25.61 6" Blow off Vahe (*100% roe mg) EA too $B SOOM $11,475.17 •100% City S8,500.00 I Lowest Unit prices in "BOLO" City Parti[ination Construction Cost S109AO9.96 City of Fort Worth, Texas Page 13 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 (b) In the event no funds or insufficient funds are appropriated and budgeted or are otherwise unavailable by any means whatsoever in any fiscal period for payments due under this Agreement, then the City will immediately notify Developer of such occurrence and this Agreement shall be terminated on the last day of the fiscal period for which appropriations were received without penalty or expense to the City of any kind whatsoever, except to the portions of annual payments herein agreed upon for which funds shall have been appropriated. (c) Substantial completion of the Improvements shall occur after Developer's Contractors notify the City that the Improvements are constructed and ready for their intended use, the City and Developer's Contractor inspect the Improvements, and the City concurs that the Improvements are substantially complete. This Agreement does not provide for any retainage to be withheld from the City Participation. 38. Minority Business Enterprise Compliance The City's Business Equity Division has not set a goal for this Project because the City Participation is less than $1,000,000.00. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 14 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 Project Name: Pecan Meadows Phase 1 CFA No. 23-0057 Ite ms A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total 39. Cost Summary Sheet IPRC No. 22-0154 City Project No.: 104143 Developer's Cost City's Cost Total Cost Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee F. Material Testing Cost Total Estimated Construction Fees: TOTAL PROJECT COST Financial Guarantee Options, choose one Bond = 100% Completion Aqreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Pavinq/Storm Drain = 125% Letter of Credit = 125% $ 1,320,458.04 $ 109,409.96 V$ 1,429,868.00 $ 946,763.00 $ - r$ 946,763.00 $ 2,267,221.04 $ 109,409.96 $ 2,376,631.00 $ 1,570,137.00 $ $ 1,570,137.00 $ 1,689,330.00 $ $ 1,689,330.00 $ 235,608.00 $ $ 235,608.00 $ 3,495,075.00 $ $ 3,495,075.00 $ 5,762,296.04 $ 109,409.96 $ 5,871,706.00 $ 79,750.00 $ 4,750.00 �$ 84,500.00 $ 16,954.00 $ 1,176.00 F$ 18,130.00 $ 1,650.00 $ 300.00 r$ 1,950.00 $ - $ 2,188.20 �$ 2,188.20 $ 98,354.00 $ 8,414.20 $ 106,768.20 $ 5,860,650.04 �$ 117,824.16 $ 5,978,474.20 Choice Amount (Mark one $ 5,871,706.00I X City of Fort Worth, Texas Page 15 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH basin 8cs,��Gcf7r Dana Burghdoff(Oct 2023 O4: 0 CDT) Dana Burghdoff Assistant City Manager Date: Oct 6, 2023 Recommended by: Eichfol? Nquoeli Bichson Nguyen (Oc0r,202Y08:40 CDT) Dwayne Hollars/Bichson Nguyen Contract Compliance Specialist Development Services Department Approved as to Form & Legality: Richard A. McCracken (Oct 4, 2023 09:04 CDT) Richard A. McCracken Sr. Assistant City Attorney M&C No. 23-0414 Date: 5/23/23 Form 1295: 2023-1012105 ATTEST: Jannette Goodall City Secretary DEVELOPER Lennar Homes of Texas Land and Construction, LTDnnn,'' {{AA Jennifer Eller (Oct 4, 2023 07:54 CDT) Name: Jennifer Eller Title: Authorized Agent Date: Oct 4, 2023 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Rebecca Diane Owen (Oct 4, 2023 08:44 CDT) Rebecca Diane Owen Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 16 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment © Attachment 1 - Changes to Standard Community Facilities Agreement ❑ Attachment 2 — Phased CFA Provisions ® Attachment 3 — Concurrent CFA Provisions © Location Map © Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements © Exhibit B: Paving Improvements © Exhibit B-1: Storm Drain Improvements © Exhibit C: Street Lights and Signs Improvements © Cost Estimates x❑ M&C23-0414 (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 17 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 ATTACHMENT "I" Changes to Standard Community Facilities Agreement City Project No. ] 04143 None City of Fort Worth, Texas Page 18 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 ATTACHMENT " 3" Concurrent CFA Provision City Project No. 104143 The improvements being constructed by Developer pursuant to this Agreement will connect to improvements being constructed by Legend of Hanna Ranch, Ltd. under a separate Community Facilities Agreement, City Secretary Contract No.55841 (Hereinafter the "Separate CFA"). Developer has requested and the City has agreed to allow Developer to begin the construction of the improvements contained in this Agreement before the improvements being constructed under City Secretary Contract No. 55841 are completed and accepted by the City. Therefore, this Agreement shall be considered a "Concurrent CFA" and the provision contained in this Attachment shall apply to this Agreement. The improvements being constructed under the Separate CFA shall be defined as the "Primary Project." The improvements being constructed by Developer under this Agreement shall be defined as the "Secondary Project." Developer acknowledges and agrees that due to Developer's election to construct a Concurrent CFA, the potential exists for technical, delivery, acceptance or performance problems (hereinafter "Construction Problems"). Construction Problems may include, but are not limited to: failure of the improvements to comply with the approved plans or City Specifications; failure of the improvements in the Primary Project and the Secondary Project to properly connect to each other; changes to the design or construction of the improvements in the Primary Project that impact the design and construction of the improvements in the Secondary Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the Developer or the developer of the Primary Project; failure of the improvements to pass inspection or material testing; or rejection by the City of some or all of the improvements and Developer or the developer of the Primary Project having to remove and reconstruct the improvements at the expense of Developer, developer of the Primary Project, or both. In addition, Developer understands and agrees that disputes may arise between the contractors or subcontractors for the Primary Project and the contractors or subcontractors for the Secondary Project relating to responsibility for the Construction Problems. Developer shall be solely responsible for resolving disputes between contractors, disputes between contractors and subcontractors and disputes between Developer and the developer of the Primary Project. Developer acknowledges and certifies that Developer has entered into a written agreement with the developer of the Primary Project and said agreement: (1) provides Developer with any access needed through property owned by the developer of the Primary Project; (2) that Developer and the developer of the Primary Project shall resolve all disputes regarding the design and construction of the Primary Project and the Secondary Project; and (3) the developer of the Primary Project will notify Developer of any all changes to the design or construction of the improvements in the Primary Project, including any field changes. Developer further acknowledges and agrees that Developer has notified all of Developer's contractors for the Project that Developer has elected to construct a Concurrent CFA, the provisions of this Attachment, the risks associated with a Concurrent CFA, and that the City shall not bear any responsibility for construction of the improvements or Developer's decision to proceed with a Concurrent CFA. City of Fort Worth, Texas Page 19 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 Developer shall not make the final connection of the improvements in the Secondary Project to the improvements in the Primary Project until the improvements in the Primary Project have been constructed and accepted by the City and the City has consented to Developer making the connection. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more single family residential homes or structures, the City will not record the plat related to the Project until the improvements are constructed and accepted by the City. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more commercial buildings or structures, the Developer shall not receive a Certificate of Occupancy from the City for the building(s) related to the Project until the improvements in this Agreement are constructed and accepted by the City. Developer further understands and agrees that completion of the improvements under this Agreement does not entitle Developer to obtain a final plat of the property until all other requirements of Federal law, State law, or the City Code relating to the filing and recording of a final plat have been met by Developer. BY CHOOSING TO CONSTRUCT A CONCURRENT CIA, DEVELOPER ASSUMES ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANYAND ALL DAMAGES, INCLUDINGBUTNOTLIMITED TO, ANYAND ALL ECONOMICDAMAGES, PROPERTYLOSS, PROPERTYDAMAGESAND PERSONAL INJURY (INCLUDING DEATH), OFANYKIND OR CHARACTER, WHETHER REAL ORASSERTED. DEVELOPER HEREBYEXPRESSLYRELEASESANDDISCHARGES CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT LIMITED TO, ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGE AND PERSONAL INJURY (INCLUDING DEATH) ARISING OUT OF OR IN CONNECTION WITH, DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A CONCURRENT CIA. DEVELOPER, AT ITS SOLE COST AND EXPENSE, AGREES TO AND DOESHEREBYINDEMNIFY, DEFEND, PROTECT, AND HOLD HARMLESS CITY, AND CITY'S OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SER VANTS FOR, FROMAAD AGAINST ANYAND ALL CLAIMS (WHETHER AT LA W OR INEQUITY), LIABILITIES, DAMAGES (INCL UDING ANY AND ALL ECONOMIC DA MA GES, PR OPER TY L OSS, PR OPER TY DA MA GES A AD PERSONAL INJURIES INCL UDING DEA TH), LOSSES, LIENS, CAUSES OFACTION, SUITS, JUDGMENTSANOEXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS' FEES AND COSTS OF INVESTIGA TION), OF ANY NATURE, KIND OR DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WAY RELEATED TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A CONCURRENT CFA, OR (2) BY REASON OF ANY OTHER CLAIM WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR INPART BY THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A CONCURRENT CFA, WHETHER OR NOT SUCH INJURIES. DEATH OR DAMAGES ARE CAUSED. IN WHOLE OR IN PART. BY THE ALLEGED NEGLIGENCE OF THE CITY OFFORT WORTH. ITS OFFICERS. SERVANTS. OR EMPLOYEES. City of Fort Worth, Texas Page 20 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 By signing below, Developer certifies that all statements contained in this Attachment ' ' Concurrent CFA Provision are true and correct. DEVELOPER Lennar Homes of Texas Land and Construction, LTD 4rw')'M Gq_ Jennifer Eller (Oct 4, 2023 07:54 CDT) Name: Jennifer Eller Title: Authorized Agent Date: Oct 4, 2023 City of Fort Worth, Texas Page 21 of 21 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 I� �wuwc p x REP�BL1O N y'o� _ERRI AX X o W U � CH ��� LON STEVENSON I� BUIE PROJECTROYAL CREST �� ARNDLD 1 =3,000' LOCATION; w KENNEDA 0 FE BLUEBELL > WISTERIA 3 — n COLUMBIN ENON FENQN BARRON a tF HAM ER CREES rc F P-11L SHELBY rc WILSON a BROWN w ABBOT SHELBY VICINITY MAP A w m MAPSCO NO. 33S I WHISPERING OAK < COUNCIL DISTRICT NO. 7 O PECAN MEADOWS I PHASE 1 CPN: 104143 OWNER/DEVELOPER LENNAR HOMES OF TEXAS AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD. SUITE 210 RVING, TX 75063 PHONE: (469)-587-5206 LAND LJA ENGINEERING, INC. 3017 WEST 7TH STREET SUITE 300 FORT WORTH, TEXAS 76107 PHONE: (817)-288-1900 TEXAS REGISTRATION F-1386 LJA ENGINEERING MCM JONES FAMILY I EVERMAN CEMETERY MARK A & INVESTMENTS, LTD I ASSOCIATION MARCI D JONES C.C.#D207033788 VOL. 2838, PG. 240 VOL 9212, O.P.R.T.C.T. I O.P.R.T.C.T. PG. 734 O.P.R.T.C.T. 1 2 3 4 5 6 7 8 9 10tl 1 ,2 L13 14 15 / — LILLIE LANE r 1e 16 f 17 O 15 12 1 ,4 19 3 I 11 16 II 9 I 12p2� I o 21 I 9 ,B I co I 21 MCM JONES FAMILY INVESTMENTS, LTD C.C.#D207033788 i \ O.P.R.T.C.T. GROUND LEASE AGREEMENT C.C.#D204364501 O.P.R.T.C.T. 3 3 111 1�M IF I —IT I-71 o K 12 13 i 10 2211 I B 19 I 22 0 I 2� 3 Io. III 6 21 i � L8WL6 10 8 Oy� o I N II 5 22 BULLSEYE LANE 7flTM T y Q 16 �6 l O i 4 23 i � M 7t O I S 27 I 13 24 I.N �Io �7 m l 6 I i 4 128 i II 2 ® 25 II 3 1 29 II lL 2rl I WL7 130 VOLCANO LANE 2 11 IIT T 3 I 1I 31 II I� 1 19 I I FUTURE 1I PECAN MEADOWS , , I, 3sLl 34 ��133z IJ I�I 3 © 20 it I H FRA TRU.PASE�TU E -- lL-- I J 4 22 8" WL4 OLD DINO LANE ll I 5 23 1 2 3 4 5 s 7 8 I II WL8 �JJ JJ�� 'n 8 25' 3 9 266 �I~ METRO MANUFACTURING L�1'2' w SUPPORT SERVICES 10 27 I�N I 19 VOL 1344. PG. 1100 11 o 28D, IL/WL9 2 13 14 U 15 I II 14 I 17 13 116 115 16 B., WL10—�� 11 �1" WL10 / NANDO ROAD � \ O18 � 3 1 19 2p 21 22 23 24 — 16" WL1 — — I— — 16" WL1 --� --6 SHELBY ROAD IvwwdLETHi�.w.) CONNECT TO EXISTING 16" WATER LINE WATER PROJECT NO. P265-608140131283 FILE NO. X-20930 — SCALE: 1 " = 300' LEGEND PROPOSED WATER LINE EXISTING WATER LINE LIMITS OF PROJECT PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED OWNER/DEVELOPER LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD. SUITE 210 IRVING, TX 75063 PHONE: (469) 5875206 WATER EXH I BIT 'A' PECAN MEADOWS PHASE 1 CPN: 104143 LJA Engineering, Inc. 3017 West 7th Street Suite 300 Fort Worth, Texas 76107 41A Phone 817.288.1900 Fax 713.953.5026 FRN - F-1386 MCM JONES FAMILY INVESTMENTS, LTD EVERMAN CEMETERY ASSOCIATION MARK A & MARCI D JONES W C.C. D207033788 VOL. 2838, PG. 240 O.P. R.T.C.T. VOL. 9212, 73- 0 P R.T.C.T OPT iP J W LINE A1 2 3 t`8" 5 6 7 8 9 10 11 12L13 d4l5 8" LINE C ' LINE B LILLIELANE1617 G �—�fl 1 I I 12 ® 15 1 17 13 19 II 111 i6 I11 9 O 141 II 12 0 20 Y Z 10 17 ira I 20 „ 2, 1 SCALE: 1 " = 300' 22 19 '¢J ,o 2 oCONNECT TO EXISTING ,0 22 12 I i I i- 1 I I 7 zo I w }/ SANITARY SEWER MANHOLE n 19 z� I I 3 23 FID NO. 30114-0200431-102152—EO7685 I I1 II s 21 `^ — / IPRC REORD NO. IPRC20-0005 I 8 0 2B �� I 8" LINE P / CITY PROJECT N0. 102152 5 22 - I - _ EX 30" SS 0 7 25 BULI EYE LANE T- - 9 a �• - aIr — — — 100-1R FEMA FLOODPLAIN a I IRI I g l 4 23 i w I 1 2 --_� emi 6 ¢6 Ilc� 1OIIIII I II II II (REMAINDER) 3 24 MAJONES 5 VOL. 13519, I27 7 12 25 OP2VOL.45 4 28 i T PG. 252 o l it 3 129 I II _2 IJ I �II I;, OP.R T.C.T. 2 5 I A VOLCANO LANE 8 LINE G I CIli TY OF EVERMAN _ 4 1 II 2 I 30 I{ I I CITY OF FORT WORTH I 3 I I 1 O I 31 I �( 1 19 Il T-� F w II 2 21 II RE PEC N EE WS rol 1 I 36 35 34 3 3� 13© 21 i HA ERE 2 I I MCM JONES FAMILY N T E ISTI G + B" NVESTMENTS, LTD LINE B' 8" LINE E _- 4 22 I INFRASTRUCTURE I IC.C.#D207033788 _OLD DING LANE_ + 5 23 I L `,\ O.P.R.T.C.T. 1 2 3 4 SO 6 7 8 6 II 8" LINE H I 24 1 i 2 �I 5 METRO MANUFACTURING SUPPORT SERVICES VOL 11344, PG. 1100 O.P.R.T.C.T. OWNER/DEVELOPER LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD. SUITE 210 IRVING, TX 75063 PHONE: (469) 587-5206 LEGEND PROPOSED SANITARY SEWER EXISTING SANITARY SEWER LIMITS OF PROJECT 8 Q 0 26 y ¢I 9 � --2 10 O 28 V I p I 3 _ NE I I 12 19 0 W 13 If a © 18 w I 14 I 17 II 15 i6 11�8" LINE J 8" LINE A — (VARIABLE WIDTH R.O.W.) TT Lj Z r W GROUND LEASE AGREEMENT (n C.C.#D204364501 V O.P.R.T.C.T. V) Q WASTEWATER EXHIBIT IA-1 PECAN MEADOWS PHASE 1 CPN: 104143 LJA Engineering, Inc. `A 3017 West 7th Street Phone 817.288.1900 Suite 300 Fax 713.953.5026 Fort Worth, Texas 76107 FRN - F-1386 MC JO�AMILY I EVERMAN CEMETERY MARCIR D JONSSOES INVESTMENTS, LTD VOL .A28338IATION PG. 240 VOL. 9214 / C.C.#D207033788 I O.P.R.T.C.T. PG. 73I I O.P.R.T.C.T. I O.P.R.T.O.T. — ° ° — — — — _ _ _ _ — 1 t2 L 2 4 5 6 71 8 9 1 11 12 13 14 15 LILLIE LANE_ i 16 14 15 16 17 16 I 13�- 14 1 17 17 I � 12 ® 15 I I 11 8 11 16 1 0 15 III 13 19 II�� I 10 17 III I I 19 ° 14 III 12 20 1 20 9 18 I 1� 13 III 11 21�I I I 21 12 I I p l 10 22l 1 j 18 20 I 22 T�I I T I �� �T 11 I, 9 2 l o l I I 23— Ji I� I _L I � I—L I a 6 21 10 Io,I�I B 2� I I0I 15 22 I — a 11 7 qs Il o'III 1 BULLSEYE ANE— (r �� I I N 4 23 I 1 2�IT 1� f a s.111 5 I27 I� o II 3 24 I I 110 [T M 6 I III 4 128 III III 2 ® 25 I T 5 1 III 3 I 29 11i 1 26 rtl III 2 I 30 III VOLCANO LANE 44 �I 1 3 31 �I 7 19 a T7 FT M TI T7 FT 3 11 II ° � III Q _ to 3 21 I FUT RE U — 2 I � 2 20 PNCT E STDI GS 1 I 36L,5 34 �33 32 I © IV` A E 2 _ _ 4 22 113 INFRASTRUCTURE OLD DING LANE `111 _U LL I_L I � LA L_ LU — 5 23 III 1 2 3 4T5 T6 7 B 1 1 6 I 5 ° � it 7 25 9 I' 8 26 I / 10 I I 9 I 27 n ol�10 28 METRO MANUFACTURING 12 11t SUPPORT SERVICES oN I 20 VOL. 11344, PG. 1100 13 N 12 O.P.R.P.R.T.C.T. o I t9 SCALE: 1 " = 300' LEGEND PROPOSED 29'B-B ROADWAY/50' ROW 6" CONCRETE PAVEMENT PROPOSED 1 - 23'B-B ROADWAY/110' ROW 7.5" CONCRETE PAVEMENT PROPOSED 5' SIDEWALK BY DEVELOPER PROPOSED 10' SIDEWALK BY DEVELOPER PROPOSED 5' SIDEWALK BY HOMEBUILDER PROPOSED ADA RAMPS O (BY DEVELOPER) LIMITS OF PROJECT — — 4 U 3 ° 18 PAVING S I II 14 17 III 16 1,5 T 16 , EXHIBIT 'B' 7 _ NANDOTROAD PECAN MEADOWS ° a 19 20 21 22 2�24 OWNER/DEVELOPER PHASE 1 .7 LENNAR HOMES OF TEXAS LAND CPN: 104143 /-------- --- — r AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD. LJA Engineering, Inc. &AA SHE(VARIABLE WIDTH ROAD SUITE SUITE 210 3017 West 7th Street Phone 817.288.1900 IRVING, Tx 75063 Suite 300 Fax 713.953.5026 PHONE: (469) 587-5206 Fort Worth, Texas 76107 FRN - F-1386 MAK MCM JONES FAMILY I EVERMAN CEMETERY MARCIR D JONES INVESTMENTS, LTD I ASSOCIATION VOL. 9212, 100-1R FEMA FLOODPLAIN C C #D207033768 VOL. 2838, PG. 240 pG. 734 I O.P.R. T.C.T. I O.P. R. T.0 T. O. P.R. T.C.T. - - — - 6' JUNCTION BOX 2 3 15 1 b a�9 10 11 12 13 1 2X10'LTS SD-7 24" RCP SD-2 54" RCP ��NE LLUE LANE 4' JUNCTION BOX „6'JUNCTIONI BOX s " RCP T I 2X10' INLETS 12 0 15 1 - -r 4'X4' DROP INLET 16 yI 1t 16 J 1B2X10' INLETS O 1g�I II 2X10' INLETS 19 11 1 C'19 (� 12 O3 20 ,yy i ,0 17 it } 1 20 13-Ta 1 11 21 T II� 1 9 18 1 21 X V19 i 10 I 221i 22 o II 8 20 I N o 0, 12 11 a 19 25 11 I I 23 1^ 2X10' INLETS {I 6 2, SD-1 7'X 5' RCB J—L L 10 0 8 2r 11 o II BULLSEYE LANE yI 5 10 INLEL 0. 7 5 V i li 4 23 F 2 �12 4 O 15 27 II 10' INLETr_ 1 74 X10' INiETS 28 ® 25 o I 15i INiET LLTa il— 10' INLET SD-3 27" RCP 26 Ilr 2X10' INLETS - 4 I 6' JUNCTION BOX VOLCANO LANE i t 191 i 6' JUNCTION BOX FT a 1 1 O I 31 1 SD-3 42" RCP i 2 20 FUTURE 2 I N u PEG N MEADL�WS � _ HAS 2 l 11 i 36 35 34 �L112 M321 NO EXISTNINFR STRUCT RESD-8 24" RCP 10' INLET 1 a 22 OLD DING LANE T II 4' JUNCTION BOX 5 23 iN d l 1 2 � a 5T6 7 8 I Y o' JUNCTION BOX 2X10' INLETS 24 II 2X10' INLETS 4'X4' DROP INLET M1 v 7 U 2` OWNER/DEVELOPER LENNAR HOMES OF TEXAS AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD. SUITE 210 IRVM, TX 75063 PHONE: (469)-587-5206 U PROPOSED STORM DRAIN LINE Ln PROPOSED INLET c o PROPOSED MANHOLE CD ooPROPOSED MANHOLE RISER CD EXISTING STORM DRAIN LINE LIMITS OF PROJECT N JUNC -ION BOX ro rn 4'X4' DROP INLET 6 2f a I 10 I 9 27 2X1I0' INLETS LAN D 1 , 16 I 28 ' �L 12 p I 11 �0 3 U 2 19 I T MT 1a 13 © ,82X15' INLET 15 I 114 17 1 16 I a 16 U 17 I\ � NANDO ROAD a 6 �i t9 20I 21 1121�21 � 2X10' INLET4'X4' DROP INLE I I T _ —-- 4' JUNCTION BOX SCALE: 1 " = 300' I'I _ ` 100-1R FEMA FLOODPLAIN I I (REMAINDER) MARK A JONES JONES VOL. 13519, 1 1 11MAVOL 4548 PG. 262 PG 252 O.P.RTCT. I OPRTCT I w CITY OF EVERMAN CITY OF FORT WORTH i I I MGM JONES FAMILY �\ \ IENTS, LTD C.CE#D2^07033788 I I� O.P.R.T.C.T. w� III T GROUND LEASE AGREEMENT yr ^ C.C.#D204364501 = V' OP RT.0 T. STORM DRAIN EXHIBIT 'B-l' PECAN MEADOWS PHASE 1 rpm• l nal a3 (VARIABLE WIDTH R.O_j� — LJA Engineering, Inc. -1 24" RCP 3017 West 7th Street Suite 300 Fort Worth, Texas 76107 ZAA Phone 817.288.1900 Fax 713.953.5026 FRN - F-1386 XrPf \( FA TitlPhlnrk dwn LEGEND PROPOSED SINGLE STREET LIGHT PROPOSED STREET SIGN LIMITS OF PROJECT OWNER/DEVELOPER LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD. SUITE 210 IRVING, TX 75063 PHONE: (469)-587-5206 MCM JONES FAMILY EVERMAN CEMETERY MARK A & NES INVESTMENTS, LTD I ASSOCIATION MARO.PCI D J, C.C.#D207033T.C.T. 8 VOL. 2638, PG. 240 — VOL 9217342�— I �— 0. P. R.I 0. P. 8 PG. T. PG. O 0 1 2 3 4 5 171 8 9 1 1 1 12 13 14 15 LILLIE LANE 16 14 15 16 17 1�3 14 17 16 17 1 �I 1 II 12 ® 15 1 1 13 19 1 111 16 1 19 0 SCALE: 1 " = 300' 12 O3 20 Y 1 20 13 II 11 21 1 9 18 I 21 I-1}yc- 8 19 22 f7l � ITT I -1T I—F 1 11 1 19 2J I o II 7 20 I 23 13nI o I e 0 2pII I p l l 6 21 12 I BULL EYE LANE J 1 7 I2 �5 11 5 22 T� F[ m I 6 ¢6 I I a I OTTI 7 1 5 121 1 11 3 24 I i 4 I28 I 12 ® 25 I C 2 LL _U 5 1 11 3 129 r__a - IVOLGANG LANE 4 r II ; 3° 1 9 �T T TT IT �1 3 � �I II 2 20 II FUTURE 2 IF-,jATTE,,,,,EE, MERn ' 36 3534 3 32I3©21 H OLD DINO LANE- 5 I 4 22 1 2 4 5 6 7 8 5 23 I H H I J� L 6 24 O 1 7 25 I o 8 0 9 26 ' 10 I 9 -2 i11 j 10 1 28 3 12 j 11 1 N METRO MANUFACTURING SUPPORT SERVICES 13 0 12 i o 18STREET LIGHTS & VOL. 11344, PG. 1100 � O.P.R.T.C.T. 14 13 F� IT T I 15 14 I 17 I i6 15 16 17 18 NANDO ROAD O1 19 20 21 122 1 23 124 (VARIABLE WIDTH R 0 W.) ��LL 51 Ktt 151CjN5 T---7--7- EXHIBIT'C' PECAN MEADOWS PHASE 1 CPN: 104143 LJA Engineering, Inc. &AA 3017 West 7th Street Phone 817.288.1900 Suite 300 Fax 713.953.5026 Fort Worth, Texas 76107 FRN - F-1386 UNIT PRICE BID SECTION 00 42 43 PROPOSALFORM PECAN MEADOWS PHASE 1 Project Item Information 00 42 43 Util & Pav BIDPROPOSAL Page 1 of 6 Bidder's Application Bidder's Proposal Bidlist Items Description I Specification f Unit of I Bid Unit Price Bid Value No. J Section No. Measure Quantity UNIT I: WATER IMPROVEMENTS '3305.0109 Trench Safety, 31 0510 LF 8638 $2.00 $17,276.00 _1 2 ._ —__ 3305.1105 30" Casing By Other Than Open Cut 33 05 22 LF 95 900.00 $85,500.00 3 3311.0261 8" PVC _Water Pipe _ 33 11 12 - LF 6541 _ $58.00 $379,378.00 1 4 W 3311.0251_i" DIP ater Pipe_ 33 11 10 LF 400 $187.00 $74,800.00 5 i6 3312.0001 Fire Hydrant (Assembly) 33 12 40 EA 14 $5,000.00 ,$70,000.00 �7 - 3312.2003 1"Water Service . 331210 EA 187 $1,200.0O.i$224,400.00 3312.6002 6" Blow Off Valve 33 12 60 Fro 1 $8,500.00 $8,500.00 8 3312.3003 8" Gate Valve 33 12 20 EA— 26 $1,500.00 �$39,000.00 9 3311.0541-�16" Water Pipe 3311 10, LF _ _ 3311 12 1394 $182.00 _ $253,708.00 10 3311.0551 16" DIP Water 3311 10 LF_ 2.08 $272.00 $56,576.00 11 3305.2005 16" Water Carrier Pipe33 11 10 LF 95 $274.00 _ $26,030.00 _ 12 3311.0001 Ductile Iron Water Fittings wl Restraint 3311 11 _TN 11 , $8,500.00 $93,500.00 13 3305.0203xImported EmbedmentBackfill, CLSM 33 05 10 CY— 51 $200.00 $10,200.00 14 3312.3006 16" Gate Valve w/ Vault _ 33 12 20 EA 3 $20,500.00 _$61,500.00 15— 3312.0106 _Connection to Existing 16" Water Main v� 33 12 25 EA 1. $3,500.00$3,500.00 16— 9599.0001 Flush Point 00 00 00 EA 5 $4,500.00 $22,,500.00 17 3471.0001 Traffic Control 00 00 00 LS 1 $3,500.00 $3,500.00 18 19 20 21 22 23 24 —_ 25 — - 26 -_ 27 - - — — - - 29 30 31 32 — 3334 _ 35 36 37 - — - 38— _ 39 40 41 42 _ �43 _ 44 TOTAL UNIT I: WATER IMPROVEMENTS $1 429.868.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROTECTS Form Revised 20130830 00 42 43 DAP Bid Proposal Workbook - Pecan Meadows Ph 1 UNIT PRICE BID SECTION 00 42 43 PROPOSAL FORM PECAN MEADOWS PHASE 1 Project Item Information 00 42 43 Util & Pav BID PROPOSAL Page 2 of 6 Bidder's Application Bidder's Proposal Bidlist Item Description Specification I I Unit of l Bid Unit Price Bid Value No. Section No. Measure Quantity Q UNIT I -A: ALTERNATE WATER IMPROVEMENTS. 1 3305.1104 24" Casings Other ThanOpenCut 33 05 22— — LF 95 $780.00 $74,100.00 3311.0451 12" DIP Water Pipe 3311 10 LF =LF 1_09 — $142.00- $15,478.00- —2 3 3311.0441 12" Water Pipe 3311 10, _ __ _ _ 33.11-12 — _ _ 748 _ $1.12.00 $83,776.00 4 3312.3005 12-,"date Valve _ — 33 12 20_ _ EA 1 , $4200.60 15 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TN— 2.5 $8,500.00 $21,250.00 6 7 �8 - 9 10 - -- - — - — — -- - 11 12 _ - 13 14 15 16 - - —17— 18 19 20 21 _ 22 -23 i _ _ 24 25 - 26 -- - 28! 29- -_ 30- — 31 - 32 - 33 - - - 34 35 _ - 36 - 37 � — - - - 38r — -39 - 40 _ 41� 42 _43 _ 44 TOTAL UNIT I -A: ALTERNATE WATER IMPROVEMENTS $198 804.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Forth Revised 20130830 00 42 43_DAP _Bid Proposal Workbook - Pecan Meadows PH UNIT PRICE BID SECTION 00 42 43 PROPOSALFORM PECAN MEADOWS PHASE 1 Project Item Information 00 42 43 Util & Pav BID PROPOSAL Page 3 of 6 Bidder's Application Bidder's Proposal Bidlist Item Description I Specification I Unit of I Bid Unit Price Bid Value No. I Section No. Measure Quantity I INIT II: SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post -CCTV Inspection 3301 31 LF 7358 $3.00 $22,074.00 2 3301.0101 Manhole Vacuum Testing - 33 01 30 EA - 32 $200.00 $6,400.00 3 3305.0109 Trench Safety 33 05 10 LF 7358 $2.00 _$14,716.00 i4 3331.3101 4" Sewer Service 3331 50 EA 160 $850.00 - $136,000.00 5 3331.4115 8" Sewer Pipe 3311 10, LF -7058 , $66.00 ,!$465,82800 3331.4116 8" Sewer Pipe, CSS Backfill 3311 10, $_86.00 . $25,800.00 -6 7 3339.1001 4' Manhole 33 39 10,- �LF EA i300 i..,_ __ n - 333920- 30 _$51000.00 $150000.00 8 ..•_-��_..,___,_ 3339.1003 4' Extra Depth Manhole 33 39 10,, VF- 25 $235.00 $5,875.00 9 3339.0001 Epoxy Manhole Liner 33 39 60 VF_ 14 $455.00 . $6,370.00 _ 10- 9999.0004 4' Manhole w/ Slide 33 39 10_ 1 $6,200,00 $6 200_00. 11 _Hydraulic _ 9999.0005 4' Manhole w/ Bolt Down Lid 8r Water Tight 33 39 10, =EA EA - Gasket _ - _ _ _ 33 39 20 1 $7,500s00 - $7,500.00 12 3305.0112 Concrete Collar 33 39 10, EA 33.39 20- 5 $500.00 13 3305.1003 20" Casing By Open Cut 33 05 22 LF 300 $220.00 $66,000.00 14 annel all 9999.0008 Demo &Rework Channel Wall 00 00 00 - EA 1 - $18 500.00 $18,500.00 _ ---- 15 9999.0009 Connect to Existing Manhole 33 39 10 - ... - EA- 2 :$6,500.00 s$1300000 16 - 19 __18 - 20 21 - - - 22 - -- - 23 - -24- 25 - 26 - - - - - - - 28 - 29 - 30 31 32 -33 - - - - -:: - 35 37 38 - - 39 _ 40 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $946 763.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Form Revised 20130830 00 42 43-DAP-Bid Proposal Workbook - Pecan Meadows Phi UNIT PRICE BID Bidlist Item No. SECTION 00 42 43 PROPOSALFORM PECAN MEADOWS PHASE 1 Project Item Information Description 00 42 43 Util & Pav BID PROPOSAL Page 4 of 6 Bidder's Application Bidder's Proposal Specification I Unit of I Bid Unit Nee I Bid Value Section No. Measure Quantity UNIT III: DRAINAGE IMPROVEMENTS 1 3305.0109 Trench Safety 33 05 10- LF _ 6905 $2.00 $13,810.00 2 3341.0201 21" RCP, Class III 33 41 10 _ LF - 526 75.00 - $39,450.00. - 3 - - - .. �- 3341.02_0_5 24" RCP, _Class III _.._ ..__.- 3341 10_ _�. _ LF_ ._ 962 _ $85.00 -$105.00 _ $81,770.00 _ 4� 3341.0208 27" RCP, Class 111 33 41 10 LF 220 $23,100.00 5 3341.0309 RCP, Class Ill 33 41 10- iLF 162 $150.00 $24,300.00 '6! _36" 3341.0402 42" RCP, Class III 3341 10 LF 349 $180.00 $62,820.00 7 3_341.0409 48" RCP, Class III 3341 10- LF _1273 $210.00--$2671330.00 8 3341.0502 54" RCP, Class 111 3341 10 LF 671 $270.00 $181,170.00 9 3341.0602.60" RCP, Class III 3341 10 LF 780 $3_25.00 $253,500.00 10_ 3341.1403 7'X5' RCB 3341 10 LF 147 $590.00 $86,730.00 11 3341.2002 8 X5' RCB 33 4110 LF 295 $630.00 $185,850.00 12 3305.0112 Concrete Collar 33 05 17 - EA- 4 �$1A500.00 $6,000.00. 13 3349.0001 4' Storm Junction Box 33 49 10 EA 5 _ $5,500.00 , $27,500.00. 14 3349.0001 4' Stacked Manhole 33 49 10, - EA _ 1 $4,500.00 $4,500.00 _ 15 3349.0001 5' Storm Junction Box - .._ 33 49 10 _10 - EA --2 $9,500.00 . $19,000 00 - 16 .:.. _...._._---_. 3349.0003 6' Storm Junction Box 33 49 10- - EA - 5 $12,500.00 $62 500.00 17 3349.7001 Drop Inlet 33 49 20 _ EA - 4 - $5,500_ .00 _$22,000.00 18- _4' 3349.5001 10' Curb Inlet 33 49 26 - EA _ _ 26 _„ $3,800.00 _$98,800.00 19 3349.5002 15' Curb Inlet 33 49 20- EA - _ - 3 _ $4,800.00 ^ $14,400.00 20 3349.3103 24" Straight Headwall, 2 pipes 33 49 40 EA 1 $12,500.00 $12 500.00 21 334_9.4205 24" SET, 2 pipes 334940 - EA - 1 $6,500.00 �$8,500.00 $6,500.00 _ 22 3349.4215 60" SET, 1 pipe 33 49 40 EA 1 $8,500.00 43 3349.4001-, Type 1 SETfor Box Culverts (8;X5') 33 49 40 EA 1. - $12,500_00 $12,500.00 - _ 24 9999.0010 24" Polypropylene Pipe_ 33 41 10- _ LF 1526 _ w $1_15.00 !$174 800.00 25 26 _- 27 - 28- _ .29 _... 36 --31 3- _- - - 33 34 36 - 36 _ -� 37 _ 38 - 39 - - 46 4-1 ._ 42 43 __ 44 45. TOTAL UNIT III: DRAINAGE IMPROVEMENTS $1 689, 330.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Form Revised 20130830 00 42 43_DAP_Bid Proposal Workbook - Pecan Meadows Pbl UNIT PRICE BID SECTION 00 42 43 PROPOSALFORM PECAN MEADOWS PHASE 1 00 42 43 Util & Pav BID PROPOSAL Page 5 of 6 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description I Specification I Unit of Bid I Unit Price Bid Value No. Section No. Measure Quantity UNIT IV: PAVING QYIPROVEKNTS. 1 3213.0101 6" Conc Pvmt 32 13 13 SY 20086 $58.00 $1,164,988.00 2 3211.0501 6" Lime Treatment (Jowsy) 32 11 29 SY 21411 $4.00 $85.644.00 3 _4�_ 05 3211, 624' Lime Treatment (3&Sy) 32..1129 SY 1345 $5.00 $6,725.00 3211_.0400 Hydrated Lime (30#/SY) 32 11 29 TN 322 $235.00 $75,670.00 00 Hydrated (36iiSy) 32 11 29 TN 25 $235.00 5,875.00 3,21.3.0105 10" Conc PVmt 33 13 13 SY 1255 $96. 00 _11 20 LO _6 7 3213.0302 5" Conc Sidewalk 32 13 20 SF 2442 $4.50 $10,989.00 iil S.'0506 Barrier Free Ramp, Type R-1 32 13 20 EA 8 _12,000.00 $16,000.00 9 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 16 _$2,200X0 p5,222.00_ 10 _01 60t0_FiW_ 321313 CY 53 $24.00 $1 27200 11 3292.0400 Seeding, Sodding 32 92 13 SY 318 $8.00 $2,544.00 12 3441.4003 Furnish/Install Alum Sign Ground Mount City 34 41 30 EA 21 $750.00 13 _ 4699.0011 SiSi op gn (131-1) 000000 EA 15 $500.00 _$15.750.00 $7,500.00 14 9999.0012 Speed Limit Sign (R2-1) 00 00 00 EA 4 $500.00 $2,000.00 _16 9999.0013 Street Name Blade- 00.2000 EA 34 $250.00 16 9999.0014 Construct Pvmt Header 00 00 00 EA 11 __$1,000.00 _$11,000.00 17 8__ 19 20 22 23 24 25 29 30 31 _32 33_ 34 35 36 3F7 39 40 42 — 42 44 45 TOTAL UNIT IV: PAVING IMPROVEM -_NTS $1,570,137.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECII71CATION DOCUMENTS DEVELOPER AWARDED PROJECTS Form Revised 20130830 00 42 43—DAP—Rid Proposal Workbook - Pecan Meadows Ph I SECTION 00 42 43 PROPOSALFORM PECAN MEADOWS PHASE 1 UNIT PRICE BID 00 42 43 Util & Pav BIDPROPOSAL Page 6 of 6 Bidder's Application Project Item Information Bidder's Proposal Bidlist Iteml Specification I Unit of I Bid No Description I Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHT IMPROVEMENTS UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS UNIT I -A: ALTERNATE WATER IMPROVEMENTS END OF SECTION This Bid is submitted by the entity named below: BIDDER: BY: Brock F ggins CONATSER CONSTRUCTION TX, L.P. 5327 WICHITA STREET FT. WORTH, TX 76119 TITLE: TrXident DATE: $1.429.868.00 $946,763.00 $1,689,330.00 $1,570,137.00 N/A N/A Total Construction Bid( $5,636,098.00 1 $198, 04.00 Total Alternate Bid 1 $198,804.00 f Contractor agrees to complete WORK for FINAL ACCEPTANCE within 225 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Form Revised 20130830 00 42 43_DAP _Bid Proposal Workbook - Pecan Meadows Phi UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SECTION 00 42 43 PROPOSALFORM PECAN MEADOWS PHASE 1 Project Item Information 00 42 43 Street Lights BID PROPOSAL Page 7 of 8 Bidder's Application Bidder's Proposal Description Specification Unit of I Bid Unit Price Bid Value Section No. Measure Quantity UNIT V: STREET LIGH—ING IMPROVEMENTS 2605.3015 2" Condt PVC SCH 80 (T) 26 05 33 LF 1582 19.00 $30,058 3441.3301 Rdwy Illum Foundation TY 1, 2, and 4 3441 20 EA 37 1,200.00 $44,400 3441.3341 Rdwy Illum TY 11 Pole 3441 20 EA 37 3,000.00 $111,000 3441.1633 Install Type 33B Arm 3441 20 EA 37 500.00 $18,500 9999.0015 Type R2 Luminaire 00 00 00 EA 35 850.00 $29,750 9999.0016 Type R4 Luminaire 00 00 00 EA 2 950.00 $1,900 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Fonn Revised 20130830 $235,608.00 Copy of 00 42 43_DAP_Bid Proposal Workbook - Pecan Meadows Plat CR 00 42 43 Street Lights BID PROPOSAL Page 8 of 8 SECTION 00 42 43 PROPOSAL FORM PECAN MEADOWS PHASE 1 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal IBidlist Item) I Specification I Unit of I Bid No. l Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I: WATER IMPROVEMENTS N/A UNIT II: SANITARY SEWER IMPROVEMENTS N/A UNIT III: SANITARY SEWER IMPROVEMENTS N/A UNIT IV: SANITARY SEWER IMPROVEMENTS N/A UNIT V: STREET LIGHTING IMPROVEMENTS $235.608.00 f UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS NIA Total Construction Bid l $235,608.00 1 END OF SECTION This Bid is submitted by the entity named below: BIDDER: BY: Brock Huggins CONATSER CONSTRUCTION TX, L.P. 5327 WICHITA STREET FT. WORTH, TX 76119 TITLE: Pr en DATE: Contractor agrees to complete WORK for FINAL ACCEPTANCE within 45 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Forth Revised 20130830 Copy of 00 42 43_DAP _Bid Proposal Workbook - Pecan Meadows Phl CR 6/5/23, 4:57 PM M&C Review Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FORS WRTH A_ Create New From This M&C DATE: 5/23/2023 REFERENCE **M&C 23- LOG NAME: 60PECAN MEADOWS NO.: 0414 161NCH WATER LINE CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 8 / Future CD 8) Authorize Execution of a Community Facilities Agreement with Lennar Homes of Texas Land and Construction, LTD., with City Participation in the Amount Not to Exceed $124,161.61 for Oversizing a 12-Inch Water Main to a 16-Inch Water Main and an 8-inch Water Main to a 16-inch Water Main for Anticipated Future Growth in South Fort Worth RECOMMENDATION: It is recommended that the City Council authorize the execution of a Community Facilities Agreement with Lennar Homes of Texas Land and Construction, LTD., with City participation in an amount not to exceed $124,161.61 for oversizing a 12-inch water main to a 16-inch water main and 8-inch water main to a 16-inch water main for anticipated future growth in south Fort Worth. DISCUSSION: Lennar Homes of Texas Land and Construction, LTD., (Developer) is constructing Pecan Meadows Phase 1 (Development) west of Forest Hill Drive and north of Shelby Road. The Water Department is seeking to participate in the project to oversize the offsite water line from a 12-inch water main to a 16- inch water main and the onsite water main from an 8-inch water main to a 16-inch water main. The Pecan Meadows Phase 1 project is assigned City Project No. 104143 and Accela System Record I PRC22-0154. In accordance with Chapter 212, Subchapter C of the Texas Local Government Code, the City's participation in the contract is exempt from competitive bidding requirements because the contract is for oversizing public improvements being constructed by the Developer, the Developer will execute a performance bond to cover the total project cost, including all of the City's cost participation, and the City's cost participation will be determined in accordance with the City's community facilities agreement (CFA) unit price ordinance. The City's cost participation in the construction and oversizing of the water mains is estimated to be in an amount not to exceed $124,161.61 as shown in the table below. Payments to the Developer are estimated to be $115,623.14 for construction costs and $2,312.46 for material testing costs. The City's cost participation also includes $6,226.00 to cover the City's portion of construction inspection service fees, administrative material testing service fees, and water lab testing fees. An additional $23,124.63 in contingency funds will cover the City's portion of any change orders. A. Public Improvements Developer Cost City Cost Total Cost 1. Water- 16" $1,308,776.86 $115,623.14 $1,424,400.00 2. Sewer $948,253.00 $0.00 $948,253.00 Water Contingency 20\% $0.00 $23,124.63 $23,124.63 3. Drainage $1,689,330.00 $0.00 $1,689,330.00 4. Paving $1,567,637.00 $0.00 $1,567,637.00 5. Street Lighting $253,608.00 $0.00 $253,608.00 B. Inspections & Testing (190 working days) 1. Construction Inspection Fee $54,750.00 $4,750.00 $59,500.00 2. Admin Material Testing Fee $16,954.00 $1,176.00 $18,130.00 3. Material Testing Cost $0.00 $2,312.46 $2,312.46 4. Water Lab Fee $1,650.00 $300.00 $1,950.00 Total Project Cost $5,840,958.86 $147,286.24 $5,988,245.09 *Numbers will be rounded up for accounting purposes. apps.cfwnet.org/council_packet/mc_review.asp? I D=31042&cou nciIdate=5/23/2023 1 /2 6/5/23, 4:57 PM M&C Review The reimbursement of the participation, excluding inspection and material testing fees, is not a lump - sum amount and may be less than the stated amount depending upon the actual quantities and unit prices from the Notice of Final Completion package, commonly referred to as the Green Sheet package. Funding for the Community Facility Agreement (CFA) — Pecan Meadows Phase 1 as depicted in the table below: Fund W&S Rev Bonds Series 2021 —Fund 56019 Existing Appropriations $150,000.00 Project Total $150,000.00 *Numbers rounded for presentation purposes. Additional Appropriations Project Total* $0.00 $150,000.00 $0.00 $150,000.00 FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available in the W&S Rev Bonds Series 2021 Fund CFA-Pecan Meadows Phase 1 project and upon approval of the above recommendation funds will be available in the W&S Rev Bonds Series 2021 Fund CFA-Pecan Meadows Phase 1 project to support the approval of the above recommendation and execution of the agreement. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. TO Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) Submitted for Citv Manaaer's Office bv: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Taylor Gunderman (8369) ATTACHMENTS 20230425 Form 1295.pdf (CFW Internal) 60PECAN MEADOWS 161NCH WATER LINE.docx (CFW Internal) Exhibit- Pecan Meadows Phase 1.pdf (Public) PBS 104143.Ddf (CFW Internal) Pecan Acres CP FID Table (WCF 05.03.23).xlsx (CFW Internal) apps.cfwnet.org/council_packet/mc_review.asp? I D=31042&cou nciIdate=5/23/2023 2/2