HomeMy WebLinkAboutContract 56655-FP1-FP1
City Secretary 56655
Contract No.
FORT WORTH.
Date Received 10/06/2023
AT
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: 7-Eleven #41631
City Project No.: 103031
Improvement Type(s): x❑ Paving ❑ Drainage x❑ Street Lights ❑ Traffic Signals
Original Contract Price: $102,408.17
Amount of Approved Change Order(s): $7,099.00
Revised Contract Amount: $109,507.17
Total Cost of Work Complete: $109,507.17
Jos Galy • t 5, 202308:44 CDT) Oct 5, 2023
Contractor Date
Project Manager
Title
Verdad Real Estate and Construction Services
Company Name
Oct 5, 2023
JeremYRbonce(Oct 5.202308:47 CDT)
Project Inspector
Date
Oct 5, 2023
ramram ti 16:43 CDT)
Project Manager
Date
A'^
Oct 6 2023
Rebecca Diane Owen f0ct 6.2023 08:58 CDTI
CFA Manager
Date
Oct 6, 2023
Lauren Prieu r (Oct 6, 2023 09:04 CDT)
TPW Director
Date
okj-`-" Oct 6 2023
Willi—I.hnsnn (0 6. 202115.02 CDT) )
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: 7-Eleven #41631
City Project No.: 103031
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 56 WD
Work Start Date: 4/4/2022
Completed number of Soil Lab Test: 80
Completed number of Water Test: 2
Days Charged: 226
Work Complete Date: 4/10/2023
Page 2of2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name 7-ELEVEN #41631 CHAPEL CREEK & WESTPOINT BLVD
Contract Limits
Project Type PAVING IMPROVEMENTS
City Project Numbers 103031
DOE Number 3031
Estimate Number 1 Payment Number 1 For Period Ending 4/10/2023
WD
City Secretary Contract Number Contract Time 5WD
Contract Date Days Charged to Date 226
Project Manager NA Contract is 100.00 Complete
Contractor VERDAD CONSTRUCTION SERVICES
1211 S WHITE CHAPEL BLVD
SOUTHLAKE , TX 76092
Inspectors G.DEYON / J. KOONCE
Wednesday, September 6, 2023 Page 1 of 4
City Project Numbers 103031
Contract Name 7-ELEVEN #41631 CHAPEL CREEK & WESTPOINT BLVD.
Contract Limits
Project Type PAVING IMPROVEMENTS
Project Funding
UNIT IV: PAVING IMPROVEMENTS
Item
Description of Items
Estimated Unit
No.
Quanity
1
6" LIME TREATMENT
772 SY
2
9" CONC PVMT
36 SY
3
4" CONC SIDEWALK
278 SY
4
7" CONCRETE DRIVEWAY
236 SY
5
BARRIER FREE RAMP, TYPE C-3
4 EA
6
6" CONC CURB & GUTTER
620 LF
7
6" SLD PVMT MARKNG TAPE (W)
193 LF
8
8" SLD PVMT MARKING HAS (W)
49 LF
9
24" SLD PVMT MARKING HAE (W)
30 LF
10
LANE LEGEND ARROW
2 EA
11
LANE LEGEND ONLY
2 EA
12
TOPSOIL (6")
13.5 CY
13
BLOCK SOD PLACEMENT
285 SY
14
TRAFFIC CONTROL
1 MO
15
FURNISH/INSTALL ALUM SIGN GROUND
1 EA
MOUNT CITY STD
Sub -Total of Previous Unit
-------------
UNIT V: STREETLIGHTS
DOE Number 3031
Estimate Number 1
Payment Number 1
For Period Ending 4/10/2023
Unit Cost
Estimated
Completed
Completed
Total
Quanity
Total
$3.00
$2,316.00
772
$2,316.00
$85.00
$45,560.00
536
$45,560.00
$5.50
$1,529.00
278
$1,529.00
$60.00
$14,160.00
236
$14,160.00
$1,971.00
$7,884.00
4
$7,884.00
$37.00
$22,940.00
620
$22,940.00
$2.19
$422.67
193
$422.67
$2.00
$98.00
49
$98.00
$12.00
$360.00
30
$360.00
$258.00
$516.00
2
$516.00
$217.00
$434.00
2
$434.00
$23.00
$310.50
13.5
$310.50
$6.00
$1,710.00
285
$1,710.00
$3,768.00
$3,768.00
1
$3,768.00
$400.00
$400.00
1
$400.00
---------------
$102,408.17 $102,408.17
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 ELECTRICAL FACILITIES (CO #2) 1 LS $7,099.00 $7,099.00 1 $7,099.00
Sub -Total of Previous Unit $7,099.00 $7,099.00
Wednesday, September 6, 2023 Page 2 of 4
City Project Numbers 103031
Contract Name 7-ELEVEN #41631 CHAPEL CREEK & WESTPOINT BLVD.
Contract Limits
Project Type STREETLIGHTS
Project Funding
Contract Information Summary
Original Contract Amount
Chanhe Orders
Change Order Number 2
Total Contract Price
DOE Number 3031
Estimate Number 1
Payment Number 1
For Period Ending 4/10/2023
$109,507.17
$7,099.00
$109,507.17
Total Cost of Work Completed $109,507.17
Less % Retained $0.00
Net Earned $109,507.17
Earned This Period $109,507.17
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$109,507.17
Wednesday, September 6, 2023 Page 3 of 4
City Project Numbers 103031
Contract Name 7-ELEVEN #41631 CHAPEL CREEK & WESTPOINT BLVD.
Contract Limits
Project Type STREETLIGHTS
Project Funding
Project Manager NA
Inspectors G.DEYON / J. KOONCE
Contractor VERDAD CONSTRUCTION SERVICES
1211 S WHITE CHAPEL BLVD
SOUTHLAKE , TX 76092
DOE Number 3031
Estimate Number 1
Payment Number 1
For Period Ending 4/10/2023
City Secretary Contract Number
Contract Date
Contract Time 56 WD
Days Charged to Date 226 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $109,507.17
Less % Retained $0.00
Net Earned $109,507.17
Earned This Period $109,507.17
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$109,507.17
Wednesday, September 6, 2023 Page 4 of 4
PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT#
DOE #
IPRC #
X-FILE #
FILE #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
REVIEWED
By Kiran Konduru at 3:17 pm, Oct 21, 2022
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
7-Eleven #41631 Chapel Creek & Westpoint CHANGE
Pavinq, Water and SanitaSewer ORDER No:
21-0120 I CITY PARTICIPATION: No
103031
30114-0200431-103031-E07685
IPRC 20-0171
X-26805
K-2741
Jeremy Koonce Phone No: 817-527-5406
Kiran Konduru Phone No: 817-392-2237
CONTRACT UNIT
WATER
SEWER
PAVING
DRAINAGE STREET LIGHTS
Developer
Developer
Developer
Developer Developer
Cost City Cost
Cost City Cost
Cost City Cost
Cost City Cost Cost City Cost
$75,252.92
$41,227.96
$102,408.17
$75,252.92 $0.00
$41,227.95 $0.00
$O.00 $0.00
$0.00 $0.00 $0.00 $0.00
($3,001.87)
$15,174.00
$72,251.05 $0.00
$56,401.95 $0.00
$102,408.17 $0.00
$0.00 $0.00 $0.00 $0.00
$72,251.05
$56,401.95
$102,408.17
$0.00 $0.00
Dev. Cost:
$231,061.17
City Cost:
$0.00
$231,061.17
I
]CONTRACT
1 DAYS
56
56
REVIEWED
By Kiran Konduru at 3:17 pm, Oct 21, 2022
You are directed to make the following changes in the contract documents
CITY BID ITEM
PAY ITEM #
# QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
TOTAL
UNIT I WATER
2
3311.0001 -0.614
TON
DUCTILE IRON FITTINGS
$5,562.00
-$3,415.07
3
3311.0261 8.32
LF
8" PVC WATER PIPE
$60.00
$499.20
5
3312.0001 -1
EA
FIRE HYDRANT
$4,000.00
-$4,000.00
*11
3312.3003 2
EA
8" GATE VALVE
$1,957.00
$3,914.00
UNIT TOTAL
-$3,001.87
UNIT II SANITARY SEWER
1
3305.0112 1
EA
CONCRETE COLLAR
$425.00
$425.00
7
3301.0002 24.86
LF
POST CCTV INSPECTION
$1.95
$48.48
8
3301.0101 1 I
EA
MANHOLE VACCUUM TESTING
$175.00
$175.00
9
3305.0109 24.86 1
LF
TRENCH SAFETY
$1.12
$27.84
12'
3305.0113 1
EA
TRENCH WATER STOP
$465.00
$465.00
13`
3331.4116 24.86 I
LF
8" SEWER PIPE$ BACKFILL
$100.00
$2,486.00
14'
3339.1001 1 1
EA
4' MA 0 E
$7,748.71
$7,748.71
15"
3339.1003 9.14 1
VF
4' EXTRA DEPTH MANHOLE
$295.69
$2,702.61
16"
3339.0001 13.14 1
VF
EPDXY MANHOLE LINER
$80.00
$1,051.20 1
17'
3292.0101 5.52 1
SY UTILTY SERVICE SURFACE RESTORATION SODDING
1 $8.00
$44.16 I
UNITTOTAL
I
$15,174.00 1
TOTAL
I
I
1 $12,172.13 1
UNIT 1 WATER
Water conflict between proposed FH location and existing light pole. The conflict was discussed with Water department and The
construction plans
reflect The
revisions to The Water improvements approved by Water department.
UNITII SANITARY SEWER
The project had a Conflict between existing 60" storm culvert that crosses under westpoint blvd and connection point to existing 8" Sanitary sewer. There is no
room to set the manhole per field conditions. The conflict was discussed with water department and the sewer alignment was shifted to tie in to the manhole
REASONS FOR CHANGE ORDER
upstream. Additional sewer easement was dedicated for the new sewer alignment. The construction plans reflect the revisions approved by water department.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
(Consulting Engineer)
By: _ ���
Name: Samantha Renz
Title: Engineer
APPROVED:
(Develo By:
Name. acob MOSS
Title: Project Manager
APPROVED:
(Contractor) n
N me:�J �o5e G Q ar
Title: '��,� < < .� A4- C . ,
PROJECT NAME:
1 CONTRACT:
CFA #
CITY PROJECT #
IFID #
IPRC #
JX-FILE #
FILE #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
7-Eleven #41631 Chapel Creek and Westpoint
Pavinq, Water, and Sanitary Sewer
21-0120 CITY PARTICIPATION:
103031
30114-0200431-103031-E07685
IPRC 20-0171
X-26805
K-2741
No
Jeremy Koonce Phone No: 817-527-5406
Kiran Konduru Phone No: 817-392-2237
WATER
Developer
Cost City Cost
$75,252.92
$3,001.87
$72,251.05
$0.00
$72,251.05 1 $0.00
$72,251.05
Dev. Cost:
(APPROVED )
CHANGE
ORDER No:
2
CONTRACT UNIT
SEWER
PAVING
I DRAINAGE
STREET LIGHTS
Developer
Developer
Developer
Developer
Cost City Cost
Cost City Cost
Cost City Cost
Cost City Cost
$41,227.95
$102,408.17
$0.00
$15,174.00
$56,401.95 $0.00
$102,408.17 $0.00
$0.00 $0.00
$0.00 $0.00
1
$7,099.00
$56,401.95 $0.00
$102,408.17 $0.00
$0.00 $0.00
$7,099.00 $0.00
$56,401.95
$102,408.17
$0.00
$7,099.00
$238,160.17
City Cost:
$0.00
$238,160.17
CONTRACT
DAYS
56
56
56
Revised: 10-12-2011 Page 1
You are directed to make the following changes in the contract documents:
CITY BID ITEM
PAY ITEM # # QUANTITY UNIT
1" 2605.0101 1 LS
REASONS FOR CHANGE ORDER
TOTAL
Electric pull box relocation to be removed from proposed right turn lane
ITEM DESCRIPT19N
Electrical Facilities
(APPROVED )
UNIT PRICE TOTAL
$7,099.00 $7,099.00
(Delete if there is City Participation) NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
(Consulting Engineer)
By: _� e
Name: Samantha Renz
Title: Project Manager
APPROVED:
(Developer)
By: /Vi I�GdO.O� Ci e.O (t &
Name: Moises Castro
Title: Project Manager
APPROVED:
(Contractor)
By: ��d
5t,-S Jose Galvan
N me:
Title: Construction Manager
$7,099.00
Revised: 10-12-2011 Page 2
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
July 17, 2023
Verdad Construction Services
1211 South White Chapel Blvd.
Southlake, TX 76092
RE: Acceptance Letter
Project Name: 7-Eleven #41631
Project Type: Developer
City Project No.: 103031
To Whom It May Concern:
On April 10, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on July 16, 2023. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on July 16, 2023, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at
Jeremy.Koonce@fortworthtexas.gov.
Sincerely,
ram tiwari pc (Oct5, 20A 16A3 CDT)
Ram Tiwari, Project Manager
Cc: Jeremy Koonce, Inspector
Troy Gardner, Inspection Supervisor
Gary Deyon, Senior Inspector
Andrew Goodman, Program Manager
Evolving Civil Engineering + Planning, Consultant
Verdad Construction Services, Contractor
Verdad Construction Services, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TX
COUNTY OF Tarrant
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared rose Galvan, Project
Manager Of Verdad, known to me to be a credible person, who being by
me duly sworn, upon his oath deposed and said;
That all personas, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
7-Eleven #41631 Chapel Creek CPN 1 D3431
BY
ose alv , Project Manager
Subscribed and sworn before me onkhis d 13th of September, 2023.
otary Public
County, State
vyWt' i-uas
Nenu.�
- G. LAN► E HENLEY
r . • . , sr Notary public
}' * STATE OF TOM
NS
P#13J i�01my
CONSENT OF SURETY
TO FINAL pAYMENT ,
SAND NO.: 445Di85
TO OBLIGEE:
(Name and AddreO)
City at Fort Worth Ste B2U
420 Trn
hrocka�n St.,
Fort Worth, Tx 76102
PROJECT:
{ darne and AA*e-)
T-Eleysn #41831
PRINCIPAL: Verdad Construction Services
OWNER
0
ARCtigEC
OR
0
o
SURETY
❑
OTHER
coNTRACF FOIL:
Water Pipe and U04 Work
CO-NTRACT DATED:
August 11, 21321
At the rem of the Obligee and the Principal indicated above, {lasert,�dmddi�ss njs�rtyl
SUMTec Insurable CoInpany
2I03 CityWest Blvd-, Suite 1300 , SURETY,
14oustm 'lam T7442
on band of
(lnscrr rwma endodrlrest of cm.tracivrl Verd&d construction Services
12y Z s. W lite ChaW stYd., Southlake. TX 76092 (;ONTRACfO&
iorr Obligee that all Cataract provisions relating to the payTiie Offmal
and conditioned on the represcattat by as of the date of final payment, and that no cfairns
payment undo the Cantr= have been satisfied by poncigal
by Ohl;cee oc any third party are known or believed by Obligee or its representatives to exist as of the date of
by Obligee in
final payrtt$ttI, rep rat,ons as to tic u m dud Am.�Wmmy of d.o �ao;^s �-.,.�,.t.ei—c es doomed finalal
been have
tmade wtinmlion withis thr�teest for with Count of '. hereby Opp
payinmt to the Principal, and agrees that dal payment in accosdar� with the terms hereoFshall nv# relieve the
Surety of its obiigatinns to
(lrrsrn n-me and eddrrss of Ohirgre) City o[ 1=ort Worth
421DThrackmorton St., Ste 620 Fort Worth, Tx Tbioz
,OEI.dGEEt
as set forth in said 5urdy's l md-
IN WITNESS WHEREOF, the Suren; has hereunto set its hand on this date: Aprit 19, 2023
(insert in wrifing the mmnk fallmred br the rlumerre date and.sear)
Sur+t'Fec ittaarattcc Company
(Surety)
AP
(Signxure of aurhor&ed represerrWW) `
Trenae Marsh
Attest: . Amyrney-in- Fact
(Sea]):(% (Fringed nrnue and title)
CONSFNT 1-0 FINAL PAYMENT REV. 1.1.2004