PROJECT MANUAL
FOR
THE CONSTRUCTION OF
WATER AND SANITARY SEWER REPLACEMENT CONTRACT
2014, WSM-D, PART 3
City Project No. 02385
DOE No. 7354
Water Project No. P253-605170238588
Sewer Project No. P258-705170238588
Betsy Price
Mayor
OFPICI�� ��GOR�
G!'��` a��'��'TA�.�`�
��e ��� f H19 9 d0
David Cooke
City Manager
Andrew T. Cronberg, P.E.
Interim Director, Water Department
Prepared for
The City of Fort Worth
Water Department
����%�
2014
E
RIM
TX REG ENGINEERING FIRM F-8794
R�C�I�`ED D�C � 6 PMo
� �'� � i �' �" 1
��
��
,
�
U
Cit of FortWorth
Y
Standard Construction Specification
Documents
Adopted September 20l 1
000000-�
STANDARD CONSTRUCTION SPECIF[CATION DOCUMENTS
Page 1 of 5
SECTION 00 00 00
TABLE OF CONTENTS
Division 00 - General Conditions
00 OS 10 Mayor and Council Communication
00 OS 15 Addenda
00 11 13 Invitation to Bidders
00 21 13 Instructions to Bidders
00 35 13 Conflict of Interest Affidavit
00 41 00 Bid Form
00 42 43 Proposal Form Unit Price
00 43 13 Bid Bond
00 43 37 Vendor Compliance to State Law Nonresident Bidder
00 45 11 Bidders Prequalifications
00 45 12 Prequalification Statement
00 45 13 Bidder Prequalification Application
00 45 26 Contractor Compliance with Workers' Compensation Law
00 45 40 Minority Business Enterprise Goal
00 52 43 Agreement
00 61 13 Performance Bond
00 61 14 Payment Bond
00 61 19 Maintenance Bond
00 61 25 Certi�cate of Insurance
00 72 00 General Conditions
00 73 00 Supplementary Conditions
Division Ol
01 11 00
O 1 25 00
O1 31 19
O1 31 20
O13216
O1 32 33
O13300
O1 35 13
O 1 45 23
O1 50 00
O1 55 26
O1 57 13
O1 58 13
O 1 60 00
O 1 66 00
O1 70 00
O1 71 23
01 74 23
017719
O1 78 23
O 1 78 39
- General Requirements
Summary of Work
Substitution Procedures
Preconstruction Meeting
Project Meetings
Construction Progress Schedule
Preconstruction Video
Submittals
Special Project Procedures
Testing and Inspection Services
Temporary Facilities and Controls
Street Use Permit and Modifications to Traffic Control
Storm Water Pollution Prevention Plan
Temporary Project Signage
Product Requirements
Product Storage and Handling Requirements
Mobilization and Remobilization
Construction Staking and Survey
Cleaning
Closeout Requirements
Operation and Maintenance Data
Project Record Documents
CITY OF FORT WORTH 6Ynter nnc( Sunilari� Se�ver Repltrcement Conh•ac/ 2014, Gf'S��f-D
STANDARD CONSTRUCTION SPEC[F[CAT[ON DOCUM6NTS Ciq� Projecl Na. 03385
2evised November 22, 2013
00 00 00 - ?
STANDARD CONSTRUCTION SPECIFICATION DOCUIvtENTS
Page 2 of 5
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
99 99 00 Temporary Asphalt Sidewalks, Driveways and Barrier Free Ramps
99 99 O1 Temporary Asphalt Curb and Gutter
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's Buzzsaw site at:
htps:Uproj ectt�oint. burrsaw. com/client/fortworthgov/Resaurces/02`%20-
%20Construction%2�Documents/S��ecifications
Division 02 - Existing Conditions
02 41 13 Selective Site Demolition
02 41 14 Utility Reinoval/Abandonment
02 41 15 Paving Removal
Division 03 - Concrete
03 30 00 Cast-In-Place Concrete
93-�4�� r„�.,.,,tioa r,,.., c�,.o,,,.+�. �,r,,.o,.;,,i irr cr,n
03 34 16 Concrete Base Material far Trench Repair
03 80 00 Modifications to Existing Concrete Structures
. _
_ � �. ..
_ . . ._.--
. . ..
. , _ • • -
Division 31 - Earthwork
31 10 00 Site Clearing
3 � �� �-� r T�,.�„��:r.oa �.,,.,,.,.,.:,.,,
��i csc� �oi-io'vd
��z� nn ❑,v.�.,.,i� �s�
31 ZS 00 Erosion and Sediment Control
��a�o-.�bio}�s
Division 32 - Exterior Improvements
32 O1 17 Permanent Asphalt Paving Repair
32 Ol 18 Temporary Asphalt Paving Repair
32 Ol 29 Concrete Paving Repair
32 11 23 Flexible Base Courses
32 11 29 Lime Treated Base Courses
32 11 33 Cement Treated Base Courses
32 12 16 Asphalt Paving
�.,���—,� n��t,.,i* v.,.,;.,,. �..,,,,t. co.,i,,.,��
32 13 13 Concrete Paving
32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps
CITY OF FORT WORTH Water anc( Scrnilui,�� Se�ver 2eplaceme�rt Cor�h•uc! 20/4, WS�Y!-D
STANDARD CONST2UCTION SPEC[F[CATION DOCUMENTS Citp Projecl No. 03385
Revised November 22, 2013
000000-3
S'CANDARD CONSTRUCT[ON SPECIFICAT(ON DOCUMENTS
Page 3 of 5
3�3�3 r,,,,,.«oro n.,,.;.,,. r,.:.,+ co„i,.�.�
���4 � u..:,.i. r r�;� v...,:.,,.
�� �-? �-5 r�,,,.� n aa..o�� n..:.,*:,,,.
�� � i � � r�.,,:., �or,.o� ,,.,a �.,,o�
���
z� � i � �z�:..o � a r_..�o
� z�z— �.-irc-r@�3C-2S-&iicry acc9
�i�J � i�l �x/.,.,fl T7o,,..o� .,.a !'_..�o�
��z�� �usc iix rniu-S�coiicr�.cc i�ccczmiur�ran�
32 91 19 Topsoil Placement and Finishing of Parkways
32 92 13 Hydro-Mulching, Seeding, and Sodding
32 93 43 Trees and Shrubs
Division 33 - Utilities
33 Ol 30 Sewer and Manhole Testing
33 O1 31 Closed Circuit Television (CCTV) Inspection
33 03 10 Bypass Pumping of Existing Sewer Systems
33 04 10 Joint Bonding and Electrical Isolation
33 04 1 I Corrosion Control Test Stations
33 04 12 Magnesium Anode Cathodic Protection System
33 04 30 Temporary Water Services
33 04 40 Cleaning and Acceptance Testing of Water Mains
33 04 50 Cleaning of 5ewer Mains
33 OS 10 Utility Trench Excavation, Embedment, and Back�ll
33 OS 12 Water Line Lowering
33 OS 13 Frame, Cover and Grade Rings
33 OS 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade
33 OS 16 Concrete Water Vaults
33 OS 17 Concrete Collars
?�.vT� � •r,,.,,,o'�e�-��e
��-�� �� fi���g�t''pe
r � r • n' • r • rr oi r• ni ro
-z�—rir3 6F�8i c.aiiici x ipc-iircu3iicg�i aziin=rcz--�ircr-i-cncv
33 OS 26 Utility Markers/Locators
33 OS 30 Location of Existing Utilities
33 11 OS Bolts, Nuts, and Gaskets
33 11 10 Ductile Iron Pipe
33 11 i l Ductile Iron Fittings
33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe
33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type
3� � � �4 R....:oa c.00i v:..o .,�a �:+.:.,,.�
33 12 10 Water Seivices 1-inch to 2-inch
33 12 11 Large Water Meters
33 12 20 Resilient Seated Gate Valve
33 12 21 AWWA Rubber-Seated Butterfly Valves
33 12 25 Connection to Existing Water Mains
�� 1-�3n r,,,.,�.;,,.,r;,,,, n:,. ��„t„o n.,�o.,,tit:o.. c.. n„r„t,ia �z�.,,o., c..�+o.�.�
33 12 40 Fire Hydrants
33 12 50 Water Sample Stations
CITY OF FORT WORTH 4l'nler nrrd Su�tilarr Seiver Repinceme�tt Conh•ac� 20/4, 6f�S�YI-D
STANDARD CONSTRUCTION SPEC[FICATION DOCUMENTS Ci(r Projecl Na. 02385
Revised November 22, 2013
00 00 00 - �
STANDARD CONSTRUCTION SPECIFICATfON DOCUMENTS
Page 4 of 5
��-1�6E1�* a,� Ri ���� i. n t,i
c�uiraca'a-nzvw-v=r-rnTvc r-rsacmv�a'y�
3J��-� (..��iicv�-ip ��'��
��-3�� �:t,o..,,i„�� vo:.,� .•„a,� n:,.o �.. r...,,,:+., e.,.,:+.,..., c�
33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitaiy Sewer
33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe
33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe
33 ��..� �un; u�c��,�ci:..��
33 31 23 Sanitary Sewer Pipe Enlargement
33 31 50 Sanitaiy Sewer Service Connections and Service Line
�3�-� '7n r-� n• v i � c •�.,..., c�,.. � r,r •
� v—�0i��0irz t'i'i—v irr`r'�ror-ocmrmry--crcw vi�-^vic� crricai9
33 39 10 Cast-in-Place Concrete Manholes
33 39 20 Precast Concrete Manholes
33 39 30 Fiberglass Manl�oles
33 39 40 Wastewater Access Chamber (WAC)
33 39 60 Epoxy Liners for Sanitary Sewer Structures
�� 4� ��- D�, � �a�oa r a*o c+„ ,,, co .. n•..oir, i fi
lilA �V1I
�3J� i i i riigri-acirsic�ro�ca�'r�rciic�iinrD�rDz'�"�c-Lo" oirnzi nim'ri
�3 46-0� ci„�*oa c*,,,..., n,..,;,,�
' �-�4 � ���-��t^'���
3� 4°7�--�—��s� �n ��ae "����ai�E�+e��e�es
�3 49-4 .,,,,�
Division 34 - Transportation
�4 q�9 -r...,f�:,. e:,.�.,,�
3✓4 4i i i rr �r..,,��;,. e:,,.,,.t�
z--r�—r �iirpo�rbrccrio
�i '�f i't-_J D.,� � T.,fF. C' 1
" uv^� i■ig^—i iuz x-ri.�ibzii�ra
34 4� ��—��eEt-an�.,,�,,.. n,,,,;� �i.,�k�aeac�
�4 4�� -�'��,-�*�r-�.,�o,.'�oi,.�"'
34 4�- , T,,,,.�,:,,.,�;,.,, � � ti�:o�
2. 'I'IG[I"I1ITILC[LaRTTi��JG�T�CiVC[CT
34 41 30 Aluminum Signs
34 71 13 Trafiic Control
Appendix
r�" 4�-� ��ai�.,�.,•��f�s
GC-4.02 Subsurface and Physical Conditions
rE 4:84—�i��e�g-�e�rd�e�i;-:�
�3�' 4:8� �xi$iiic el�'.r-i i v i:viiriiei�t"'-a-i-cvizc'�-�it-fen--irt�-iic
GC-6.06.D Minority and Women Owned Business Enterprise Compliance
GC-6.07 Wage Rates
G.. g:�Ll Dor -.�.;�.. ...J T Tf:l:+'a�
GC-6.24 Nondiscrimination
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH t-�ater a�td Sniiilnr.v Seti��er Repincenieid Cnnh�act 2014, 1f'Sd1 D
STANDARD CONSTRUCT[ON SPECIF[CATION DOCUMENTS City Projecl Na. 02385
Revised November 22, 2013
� M&C Review
CITY COUNCIL AGENDA
Page 1 of 3
Official site of the City of Fort Worth, Texas
FoRT�oRrii
-��-
� __ - _ -
COUNCIL ACTION: Approved on 12/9/2014 - Ordinance Nos. 21577-12-2014 & 21578-12-2014
, _ - ____ _ . - -_ - - _ _ _ __
_ - - __ _ - -_ __ _ _ _ -_ _ _ _ - _ _ - _
DATE: 12/9/2014 REFERENCE NO.: **C-27117 LOG NAME: 6014WSMDP3-
WOODY
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of a Contract with Woody Contractors, Inc., in the Amount of
$738,188.06 for Water and Sanitary Sewer Replacement Contract 2014 WSM-D, Part 3
on Dahlen Street, Ewing Avenue, Dilworth Street and Gilbert Drive, Provide for Project
Costs and Contingencies for a Project Total in the Amount of $793,189.00 and Adopt
Appropriation Ordinances (COUNCIL DISTRICT 3)
� - _ _ _
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of $793,189.00 from the Water and Sewer Operating Fund in the
amount of $628,095.00 to the Water Capital Projects Fund and in the amount of
$165,094.00 to the Sewer Capital Projects Fund;
2. Adopt the attached appropriation ordinances increasing estimated receipts and
appropriations in the Water Capital Projects Fund in the amount of $628,095.00 and the
Sewer Capital Projects Fund in the amount of $165,094.00 from available funds; and
3. Authorize the execution of a contract with Woody Contractors, Inc., in the amount of
$738,188.06 for Water and Sanitary Sewer Replacement Contract 2014 WSM-D, Part 3.
� DISCUSSION:
On September 9, 2014, (M&C C-26960) the City Council authorized an Engineering Agreement with
Wade Trim, LLC, to prepare the plans and specifications for Water and Sanitary Sewer Replacemen
Contract 2014, WSM-D.
� This Mayor and Council Communication is to authorize a construction contract for the replacement o
the deteriorated water and/or sanitary sewer mains as indicated on the following streets:
�
STREET FROM TO SCOPE OF WORK
Dahlen Street Highway 377 Lyndon Drive Water
Ewing Avenue Penrose Avenue Marks Place Water
Dilworth Street Marys Creek Drive Osbun Street Water/Sewer
Gilbert Drive Aberdeen Drive Arlie Avenue Water/Sewer
I�
�
The project was advertised for bid on October 2, 2014 and October 9, 2014 in the Fort Worth Star-
Teleqram. On October 30, 2014 the following bids were received:
http://www.fortworthgov.org/council�acicet/mc_review. asp?ID=20548&councildate=l2... 12/ 11 /2014
M&C Review
Page 2 of 3
BIDDER AMOUNT TIME OF COMPLETIONI
Woody Contractors, Inc. $738,188.06 � 140 Calendar Days
Jackson Construction, �td. $788,649.45 ��
rk Contracting Services, L�C $857,649.78 �
tkins Brothers Equipment Company Inc. $842,558.89 �-
R& D Burns Brothers, Inc. $897,169.17 � �
In addition to the contract cost, $22,000.00 (water: $16,500.00; sewer: $5,500.00) is required for
' construction staking, inspection and material testing and $33,000.94 (water: $25,000.50; sewer:
$8,000.44) is provided for project contingencies.
M/WBE Office - Woody Contractors, Inc., is in compliance with the City's BDE Ordinance by
committing to three percent MBE participation and documenting good faith effort. Woody Contractor:
Inc., identified several subcontracting and supplier opportunities. However, the MBE's contacted in
the areas identified did not submit the lowest bids. The City's MBE goal on this project is 10 percent.
The project is located in COUNCIL DISTRICT 3, Mapsco 73Z. 74W, 87C and 87D.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations, and adoption of the attached appropriation ordinances, funds will be available in
the current capital budgets as appropriated, of the Water Capital Projects Fund and the Sewer
Capital Projects Fund.
TO Fund/AccountlCenters
1 &2�
P253 476045 6051702385ZZ
1 &2 �,
P258 476045 7051702385ZZ
2)P253 531200 605170238552
2)P253 531350 605170238552
2�P253 511010 605170238580
2)P253 531350 605170238580
2) P253 541200 605170238588
2)P253 531200 605170238584
2) P253 531350 605170238584
2)P253 531350 605170238585
2)P258 531200 705170238552
2� P258 531350 705170238552
2�P258 511010 705170238580
2)P258 531350 705170238580
2� P258 541200 705170238588
E.. : �• ��
$165,094.00
1 000.00
3 000.00
2 000.00
500.00
$611, 595.00
2 500.00
1 000.00
6 000.00
500.00
1 000.00
1 000.00
250.00
$159,594.00
FROM Fund/Account/Centers
1) PE45 538040 0609020 $628,095.0
1) PE45 538040 0709020 $165,094.0�
3) P258 541200 705170238588 $151,593.5�
3) P253 541200 605170238588 $586,594.5�
http://www.fortworthgov.org/council�acicet/mc review.asp?ID=20548&councildate=l2... 12/11/2014
M&C Review
2)P258 531200 705170238584
2)P258 531350 705170238584
2)P258 531350 705170238585
2)P258 533030 705170238580
21P253 533030 605170238580
1 000.00
500.00
1 000.00
250.00
500.00
Submitted for Citv Manaqer's Office bv:
Oriqinatinq Department Head:
Additional Information Contact:
ATTACHMENTS
6014WSMDP3-Woody Map 01.pdf
6014WSMDP3-Woody Map 02.pdf
6014WSMDP3-Woody Map 03.pdf
6014WSMDP3-Woody Map 04.pdf
6014WSMDP3-WOODY P253 A015.docx
6014WSMDP3-WOODY P258 A015.docx
Fernando Costa (6122)
Andy Cronberg (5020)
John Kasavich (8480)
Page 3 of 3
http://www.fortworthgov. oig/council�acicet/mc_review. asp?ID=20548&councildate=l2... 12/ 11 /2014
00 os �s - i
nDn�rrn�,
Page 1 of 2
SECTION 00 OS 15
ADDENDA
ADD�NDUM #1
s
9
10
ll
12
13
14
IS
16
17
is
19
20
21
az
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
4t
42
43
44
45
46
47
48
49
50
51
PRo�ECT tvAM�: Water and Sanitary Sewer Replacement Contract 2014. WSM-
D. Part 3
PROJECT NO: 02385
DOE N�: 7354
ISSUED; October 14, 2094
BID RATE: October 30, 2014 at 1:30 P.M..
FROM: Wade Trim, inc.
105-C North Oak Street
Roanoke, TX 76262
TO: Prospective Bidders
This Addendum forms a part of the 8idding Documents and will be incorporated into Contract
Documents, as applicabfe, Insofar as the original Coniract Documents and Specifications and
Construction Plans are inconsistent, this Addendum governs. Acknowledge receipt of this
addendum by signing and attaching it to the Co�tract Documents (inside). Note receipt of the
Addendum in the �id Proposai and on the outer envelope of your bid, FAILURE TO p0 SO MAY
SUBJECT �IDb�R TO DISQUALIFICATION.
Prosaective bidders are herebv notifled of the followina:
CLARIrICATION:
� Time is of #he essence. The Contractor shall be prepared to start construetion by the
second week of Ja�ivary 2015 due to coardination with T/PW pavement rehabilitation
projects. All time limits for Milestones, if any and Finat Acceptance within 14Q days as
stated 'an the Contract Documents are of tfac essence to this Contract.
PRO�CT MANUAL
l. REMOVE Section 00 OQ 00 Cover, �tEPLACE with attached Section 00 00 00 Cover.
a, Watet• and Sewe�� Praject No. updated
2. ItEMOVE Section 00 l 1 13 rnvitation to Bidders, ItEPLACE with attached Section 00
11 13 invitation to Bidders,
a. Bid opening date changed to October 30, 2014.
3, REMOVE Section 00 41 00 Bid Farm, RE�LACE with attached Section 00 41 00 Bid
�'orn�.
a. Contract Tirne Increased to 140 days.
4. REM�VE Section 00 42 43 Bid Proposal, R�PLAC� with attached Section 00 42 43
Bid Proposat.
a. Removed Et�rant $4 quantily.
b. Increased Traffic Control with Contract Time.
CTTY OF FORT WORTH Water end Sanitary Sewor Replecement Contract 2010., WS2vkD
STANDARD CONSTRUCTION SPECI]?iCATION DOC[1tviENTS City Projcct No. 02385
Rcviscd 7uly 1, 2011
1 5, �MOVG Section 00 52 43 Agreement, I2EPLACE wzth attached Sectxon 00 52 43
2 Agreement.
3 a. Contract Time Increased to 140 days.
4
5
6
7 All other provisions of the plans, specifications and contract documents for the project which are
8 not expressly aarended herein shall remain in fi�ll force and eff'ect.
9
10 Failure to return a signed copy of the addendum wzth the proposal shall be grounds for ren.dering
l i the bid non-responsive. A signed copy of this addendum shall be placed into the pt�oposal aC the
12 time of bid subtnittal.
13
14
is RECFII'T AC LE3i�Clila: Andrew T. Cronberg, P.E,, Interim Director
16
17 ""'"�'
18 13�t! �, � [3y: CJ /� � D ta �-'i
19 �"'� Tony �37dltsl�, P,E.
20 Engineering Manager
21
22
23
24
25 ,.�>�..�ti1�
26 �,�����"�'�'������t�
z% �+'+� r �. �
2s � �a v�d i;.,..., ,. �.,k i
29 .�, ..,. , . , �
t ��,,,R 9 3 � «.
30 � '..�,�,� `N�a� ., ,;
31
32
33
34 � � �� �� �
35
3G END OF SEC�ION
000s is-2
ADDENDA
Page 2 of 2
CITY Or PORT WORTH Water and Sanitary Sewer Replacemenf Contract 2014, WSM-D
S'I'ANllARD CON5IRUCTION SP6CIF[CATION DOCUML'NTS City Project No. 02385
Revised Juty i, 20t L
(IOtI 13-1
Tt�ViTAT10N T<J t31DDERS
Pagc I of2
2
3
4
5
6
7
8
9
10
11
12
13
1 �4
15
1 Ei
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
4l
42
43
44
4�
4fi
47
48
49
SECTION 00 11 13
INVITATION TO BIDDERS
REC�IPT OF BID5
Sealed bids f'or the construction of Water and Snnitary Sewer Replacement 2014, WSM-D,
Paet 3 City, Project No. 02385, DOE '7354, Wate►• Project No. P253-6051702385$8 and
Sewer Project No. P258-705170238588 will be received by the City of Fort Worth Purchasing
Office:
City of Fort Worth
Purchasing Division
1000 Throckmorton Street
Fort Worth, Texas 76102
until 1:30 P.M. CS'I', Thursday, October 30, 2014, and bids will be opened publicly and read
aloud at 2:00 PM CST in the Council Chambers.
GENERAL DESCRIPTION (?F WORK
The major work will consist of the (approximate) following: Water and Sanitary Sewer
Replacernent with approxirnately 3,800 LF of 8" water line by open cut, 1,200 LF of 8" sewer
pipe by open cut, and appurtenances includiug temporary asphalt paving.
PREQUALIFICATION
Thc improvcments included in this project �nust be performed by a contractor who is pre-
qualified by khe City at the time of bid apening. The procedures for qualification and pre-
qualification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS.
DOCUNIENT EXAMINATION AND PROCURCMENTS
The Bidding and Contract Documents may be examined ar obtained on-line by visiting the City
of Fort Warth's Purcliasing Division website at http://www.fortworth og v_ors�purchasin� and
clicking on the Buzzsaw link to the advertised project folders ou the City's Buzzsaw site. The
Contract Documc;nts may be dawnloaded, viewed, and printed by interested contractors and/or
suppliers.
Copies of the Bidding and Contract Documents niay be pucchased frotn Wade Tritn, Inc. at:
! 05-C North Oak Sh•eet
Roanoke, �'X 76262
The cost of Bidding and Contract Documents is:
Set of Bidding and Cc7ntract Documents with fi�ll size drawings: $SOAO
Set of Bidding and Contract Documents with half size (if available) drawings: $30.00
PR�BID COIVI+ERENCE
A prebid conference may be held as described in Section 00 21 13 - INSTRUCTIONS Tn
BIDDERS at the following location, date, and time:
DATE: October 14, 2014
TIME: 10:30 AM
PLACE: City of Fort Worth Water Department
3ll W lOth Street
Fort Worth, Texas 76102
C'ITY OF FOR'I WbRT'H 7t`nter and Snrirtaiy Seiver Repinc�r,»<+nt Cb��U•act 2�1 Q 6i�Slvf-D, f'mY .fi
ST/�NDARD ('ONSTRUCTIOiV SPECIFICr�T(ON DOCUMF'sNTS Cih� Pr��jc�c! No. 41.385
Reviscdluly 1,2011
oaii is-z
TNVPI'ATION TO F3TDDFRS
Page 2 0#'2
1 LUCATION: Conference Room
2
3 CITY'S RIGHT TO ACCEPT OR REJECT BIDS
4 City reserves the right to waive irregularities and to accept ar ceject bids.
5
6 INQUIRIES
7 All inquiries relative to this procurement shoutd be addressed to the fallowing:
8 Attn: John Kasavich, P.E., City of Fort Worth
9 Email; john.kasavich@fortworthtexas,gov
10 Phone: (817) 392-8480
ll AND/OR
12 Attn: David "I'. S�eiclier, P.E., Wade Tritn
13 Email: dspeicher@wadetrim.com
14 Phone: (682}237-7?19
15
16 ADVERTISEMENT DATES
17 October 2, 2014
18 October 9, 2014
I9
2U END OF SECTION
C[TY OF PORT WORTH li'aler nu�f Sanitnry Sesver Replacemeiit Gontract 2U19, WSd�-L7, Par•t 3
STANDARD CONSTRU(:T[ON SPECIFICATEON DOCU1viEN'1'S City Project No. 02385
Revised July l, 201 I
00 21 l3 - t
INSTRUCTIONS TO BIDDERS
Page 1 of9
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
SECTION 00 21 13
INSTRUCTION5 TO BIDDERS
Detined Terms
1.1. Terms used in these INSTRUCTIONS TO BIDDERS, which are de�ned in Section 00 72
00 - GENERAL CONDITIONS.
1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are applicable to both the singular and plural thereof.
1.2.1. Bidder: Any person, firm, paitnership, company, association, or corporation acting
directly through a duly authorized representative, submitting a bid for performing
the work contemplated under the Contract Documents.
1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or
corporation acting directly through a duly authorized representative, submitting a
bid for performing the work contemplated under the Contract Documents whose
principal place of business is not in the State of Texas.
1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City
(on the basis of City's evaluation as hereinafter provided) makes an award.
2. Copies of Bidding Documents
2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations
resulting from the Bidders use of incomplete sets of Bidding Documents.
2.2. City and Engineer in making copies of Bidding Documents available do so only for the
purpose of obtaining Bids for the Work and do not authorize or confer a license or grant
for any other use.
3. Prequali�cation of Bidders (Prime Contractors and Subcontractors)
3.1. All Bidders and their subcontractors are required to be prequali�ed for the work types
requiring prequalification at the time of bidding. Bids received from contractors who are
not prequalified (even if inadvertently opened) shall not be considered. Prequalification
requirement work types and documentation are as follows:
3.1.1. Paving — Requirements document located at;
https J/pro'lect�oint.buzzsa�v. con�/fortworthgov/Resources/02%20-
%20Construction%20Uocuments/Contractor%20Pre uq a(ificationiTPW%20Paving
%20Coneractor%20Prequali��cation%20Prograin/PREQUALIFICATION`%20REQ
UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF'?public
3.1.2. Roadway and Pedestrian Lighting — Requirements document located at;
https://praj ectpoint. buzzsaw. com/fortworthaov/Resourc es/02%20-
'%,20Construction%�20Documents/Contractar%20Prequalification/TPW%20Paving
° o20Conri�actor°%20Prec�ualification°/,20Proeran�/PREQUALIFICATION%?OREQ
UIREM�NT'S%20FOR%20PAVING%2UCON"I'RACTOItS.PDF'?public.
CITY OF PORT WORTH 6i�aler mtc( Scutilcrri� Seiver Replrtcemenl Cmttruct 2014, WSit� D
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Cih� Project No. 02335
Revised November 27, 20(2
00 21 13 - 2
INSTRUCTIONS TO BIDDERS
Page 2 of 9
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
l9
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
3.1.3. Water and Sanitary Sewer — Requirements document located at;
https://projectpoint.buzzsaw.com/fortworthgov/Resources/02°io20-
%20Construction`%20Documents/Contractor%?OPrequalitication/W ater%20and°/<,2
OSanitary%20Sewer%20Contractor%20Prequalification%20Pror►auvWSS°/,20pre
qual°%20requirements.doc?public
3.2. Each Bidder unless currently prequalified, must be prepared to submit to City within
seven (7) calendar days prior to Bid opening, the documentation identified in Section 00
45 11, BIDDERS PREQUALIFICATIONS.
3.2.1. Submission of and/or questions related to prequali�cation should be addressed to
the City contact as provided in Paragraph 6.1.
3.3. The City reserves the right to require any pre-qualified contractor who is the apparent low
bidder(s) for a project to subrnit such additional information as the City, in its sole
discretion may require, including but not limited to manpower and equipment records,
information about key personnel to be assigned to the project, and construction schedule,
to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to
deliver a quality product and successfully complete projects for the amount bid within
the stipulated time fi•ame. Based upon the City's assesstnent of the submitted
information, a recorrnnendation regarding the award of a contract will be made to the
City Council. Failure to submit the additional information, if requested, may be grounds
for rejecting the apparent low bidder as non-responsive. Affected contractors will be
notified in writing of a recommendation to the City Council.
3.4. In addition to prequalification, additional requirements for qualification may be required
within various sections of the Contract Documents.
4. Examination of Bidding and Contract Documents, Other Related Data, and Site
4.1. Before submitting a Bid, each Bidder shall:
4.1, l. Examine and carefully study the Contract Documents and other related data
identified in the Bidding Documents (including "technical data" referred to in
Paragrapl� 4.2. below). No infarmation given by City or any representative of the
City other than that contained in the Contract Documents and officially
promulgated addenda thereto, shall be binding upon the City.
4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and
site conditions that may affect cost, progress, performance or furnishing of the
Work.
4.1.3. Consider federal, state and local Laws and Regulations that may affect cost,
progress, performance or furnishing of the Work.
CITY OF FORT WORTH Ft�aler mrd Srnrilm.i� Seiver Rep]nceme�rt Cnnh•uct 20[4, i��Sd1 D
STANDARD CONSTRUCTION SPECIF[CATION DOCUMENTS Crh� Prqject Na 03385
Revised November 27, 2012
0021 13 -3
INSTRUCT[ONS TO BIDDERS
Page 3 of9
t 4.1.4. Study all: (i) reports of explorations and tests of subsurface conditions at or
2 contiguous to the Site and all drawings of physical conditions relating to existing
3 surface or subsurface structures at the Site (except Underground Facilities) that
4 have been identiiied in the Contract Documents as containing reliable "technical
5 data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any,
6 at the Site that have been identified in the Contract Documents as containing
7 reliable "technical data."
9 4. I.5. Be advised that the Contract Documents on file with the City shall constitute all of
10 the information which the City will furnish. All additional information and data
11 which the City will supply after promulgation of the formal Contract Documents
12 shall be issued in the form of written addenda and shall become part of the Contract
13 Documents just as though such addenda were actually written into the original
14 Contract Documents. No information given by the City other than that contained in
15 the Contract Documents and officially promulgated addenda thereto, shall be
16 binding upon the City.
17
18
19
20
21
22
23
24
25
4.1.6. Perform independent research, investigations, tests, borings, and such other means
as may be necessary to gain a complete knowledge of the conditions which will be
encountered during the construction of the project. On request, City may provide
each Bidder access to the site to conduct such examinations, investigations,
explorations, tests and studies as each Bidder deems necessary for submission of a
Bid. Bidder must fill all holes and clean up and restore the site to its former
conditions upon completion of such eYplorations, investigations, tests and shldies.
26 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the
27 cost of doing the Work, time required for its completion, and obtain all information
28 required to make a proposal. Bidders shall rely exclusively and solely upon their
29 own estimates, investigation, research, tests, explorations, and other data which are
30 necessary for full and complete information upon which the proposal is to be based.
31 It is understood that the submission of a proposal is prima-facie evidence that the
32 Bidder has made the investigation, examinations and tests herein required. Claims
33 for additional compensation due to variations between conditions actually
34 encountered in construction and as indicated in the Contract Documents will not be
35 allowed.
36
37 4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or
38 between the Contract Documents and such other related documents. The Contractor
39 shall not take advantage of any gross error or omission in the Contract Documents,
40 and the City shall be permitted to make such corrections or interpretations as may
41 be deemed necessary for fulfillment of the intent of the Contract Documents.
42
43
44
45
46
47
48
49
50
4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification oi
4.2, l. those reports of explorations and tests of subsurface conditions at or contiguous to
the site which have been utilized by City in preparation of the Contract Documents.
The logs of Soil Borings, if any, on the plans are for general information only.
Neither the City nor the Engineer guarantee that the data shown is representative of
conditions which actually exist.
C[TY OF FORT WORTH Di'nter nnd Sanilm.i� Se�ver Rep(nceine�rt Conh•uc! 2014, WSb1 D
STANDARD CONSTRUCTION SPEC[F[CATION DOCUMENTS Citp Projecl No. 03385
Revised November 27, 20I2
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
4'7
oozi 13-a
INSTRUCTIONS TO BIDDERS
Page 4 of 9
4.2.2, those drawings of physical conditions in or relating to existing surface and
subsurface structures (except Underground Facilities) which are at or contiguous to
the site that have been utilized by City in preparation of the Contract Documents.
4.2.3. copies of such reports and drawings will be made available by City to any Bidder
on request. Those reports and drawings may not be part of the Contract
Documents, but the "technical data" contained therein upon which Bidder is entitled
to rely as provided in Paragraph 4.02. of the General Conditions has been identified
and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is
responsible for any interpretation or conclusion drawn fi�om any "technical data" or
any other data, interpretations, opinions or information.
4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i}
that Bidder has complied with every requirement of this Paragraph 4, (ii) that without
exception the Bid is premised upon performing and furnishing the Work required by the
Contract Documents and applying the specific means, methods, techniques, sequences or
procedures of construction (if any) that may be shown or indicated or expressly required
by the Contract Documents, (iii) that Bidder has given City written notice of all
conflicts, errors, ambiguities and discrepancies in the Contract Documents and the
written resolutions thereof by City are acceptable to Bidder, and when said conflicts,
etc., have not been resolved through the interpretations by City as described in
Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate
and convey understanding of all terms and conditions for performing and furnishing the
Work.
4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated
biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by
Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract
Documents.
5. Availability of Lands for Work, Etc.
5.1. The lands upon which the Worlc is to be performed, rights-of-way and easeinents for
access thereto and other lands designated for use by Contractor in performing the Work
are identified in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment or storage of
materials and equipment to be incorporated in the Work are to be obtained and paid for
by Contractor. Easements for permanent structures or permanent changes in existing
facilities are to be obtained and paid for by City unless otherwise provided in the
Contract Documents.
5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed
in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right-
of-way, easements, and/or permits are not obtained, the City reserves the right to cancel
the award of contract at any time before the Bidder begins any construction work on the
proj ect.
CITY OF FORT WORTH I4'�rler and Smri�ar�� Seiver Replacerne�il Contrac� 2014, G{'SiYf-D
STANDARD CONSTRUCTION SPEC[FICATtON DOCUMENTS Citp Projec•1 No. 02355
Revisect November 27, 2012
0021 13-5
INSTRUCT[ONS TO BIDDERS
Page 5 of9
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
5.3. The Bidder shall be prepared to commence construction without all executed right-of-
way, easements, and/or permits, and shall submit a schedule to the City of how
constn�ction will proceed in the other areas of the project that do not require permits
and/or easements.
6. Interpretations and Addenda
6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to
City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions
received after this day may not be responded to. Interpretations or clarifications
considered necessary by City in response to such questions will be issued by Addenda
delivered to all parties recorded by City as having received the Bidding Documents.
Only questions answered by formal written Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
Address questions to:
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
Attn: John Kasavich, P.E., Water Department
Fax: (817)392-8137
Email: john.kasavich@fortworthtexas.gov
Phone: (817)392-8480
6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by
City.
6.3. Addenda or clarifcations may be posted via Buzzsaw at
https:/iprcjectpoint.l�a�,�zsar��.com/client/for•ttivorthgov/Ir�fr�astr•irctaare Projects/023$S -
b�'ater at7d Server Re�lace Ca�tract 201 � WSIYI-D/Bid Doctrme»ts Package.
6.4. A prebid conference may be held at the time and place indicated in the Advertisement or
INVITATION TO BIDDERS. Representatives of City will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. City will
transmit to all prospective Bidders of record such Addenda as City considers necessary
in response to questions arising at the conference. Oral statements inay not be relied
upon and will not be binding or legally effective.
7. Bid Security
7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five
(5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting
the requirements of Paragraphs 5.01 of the General Conditions.
C[TY OF FORT WORTH FYater a�rcl Sanitari� Seiver Rep(nceme�il Corrh•aG 201 d, GYSd� D
STANDARD CONSTRUCT[ON SPEC[FICATION DOCUMENTS Citt� Projec� No. 02385
Revised November 27. 2012
002113-6
INSTRUCT[ONS TO BIDDERS
Page 6 of9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
IS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award
have been satisfied. If the Successful Bidder fails to execute and deliver the complete
Ag�•eement within 10 days after the Notice of Award, City may consider Bidder to be in
default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited.
Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all
other Bidders whom City believes to have a reasonable chance of receiving the award
will be retained by City until �nal contract execution.
8. Contract Times
The number of days within which, or the dates by which, Milestones are to be achieved in
accordance with the General Requirements and the Work is to be completed and ready for
Final Acceptance is set forth in the Agreement or incorporated therein by reference to the
attached Bid Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement.
10. Substitute and "Or-Equal" Items
The Contract, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or-equal" items.
Whenever it is indicated or specified in the Bidding Documents that a"substitute" or "or-
equal" item of material or equipment may be furnished or used by Contractor if acceptable to
City, application for such acceptance will not be considered by City until after the Effective
Date of the Agreement. The procedure for submission of any such application by Contractor
and consideration by City is set forth in Paragraphs 6.OSA., 6.OSB. and 6.OSC. of the General
Conditions and is supplemented in Section O1 25 00 of the General Requirements.
11. Subcontractors, Suppliers and Others
I 1.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020-
12-2011 (as amended), the City has goals for the participation of minority business
and/or small business enterprises in City contracts. A copy of the Ordinance can be
obtained from the Office of the City Secretary. The Bidder shall submit the MBE and
SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor
Waiver Form and/or Good Faith Effort Form with documentation and/or Joint
Venture Form as appropriate. The Forms including documentation must be received
by the City no later than 5:00 P.M. CST, five (5) City business days after the bid
opening date. The Bidder shall obtain a receipt from the City as evidence the
documentation was received. Failure to comply shall render the bid as non-
responsive.
11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person
or organization against whom Contractor has reasonable objection.
12. Bid Form
12.1. The Bid Form is included with the Bidding Documents; additional copies may be
obtained fi•om the City.
C1TY OF FORT WORTH 1[�aler mtd Sruutnri� Se�ver Replaceme�tt Cnntruci 201 d, ��S�YI-D
STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS Ciq� Projec•1 No. 03385
Revised November 27, 2012
0021 13-7
1NSTRUCTIONS TO BIDDERS
Page 7 of9
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form
signed in ink. Erasures or alterations shall be initialed in ink by the person signing
the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit
price item listed therein. In the case of optional alternatives, the words "No Bid,"
"No Change," or "Not Applicable" may be entered. Bidder shall state the prices,
written in ink in both words and numerals, for which the Bidder pr•oposes to do the
work contemplated or furnish materials required. All prices shall be written legibly.
In case of discrepancy between price in written words and the pc•ice in written
numerals, the price in written words shall govern.
123. Bids by corporations shall be executed in the corporate name by the president or a
vice-president or other corporate officer accompanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate address and state of
incorporation shall be shown below the signature.
12.4. Bids by partnerships shall be executed in the partnership name and signed by a
partner, whose title must appear under the signature accompanied by evidence of
authority to sign. The official address of the partnership shall be shown below the
signature.
12.5. Bids by limited liability companies shall be executed in the name of the �rm by a
member and accompanied by evidence of authority to sign. The state of formation of
the firm and the official address of the firm shall be shown.
12.6.
12.7.
12.8.
12.9.
Bids by individuals shall show the Bidder's name and official address.
Bids by joint ventures shall be executed by each joint venturer in the manner
indicated on the Bid Form. The official address of the joint venture shall be shown.
All names shall be typed or printed in ink below the signature.
The Bid shall contain an acknowledgernent of receipt of all Addenda, the numbers of
which shall be filled in on the Bid Form.
12.10. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
12.11. Evidence of authority to conduct business as a Nom•esident Bidder in the state of
Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance
to State Law Non Resident Bidder.
13. Submission of Bids
Bids shall be subtnitted on the prescribed Bid Form, provided with the Bidding Documents,
at the time and place indicated in the Advertisement or INVITATION TO BIDDERS,
addressed to City Manager of the City, and shall be enclosed in an opaque sealed envelope,
marked with the City Project Number, Project title, the name and address of Bidder, and
accompanied by the Bid security and other required documents. If the Bid is sent through the
mail or other deliveiy system, the sealed envelope shall be enclosed in a separate envelope
with the notation "BID ENCLOSED" on the face of it.
CITY OF FORT WORTH fd�uler and S�milari� Se�ver Repincernent Conh•uc� 2014, WSd1 D
STANDARD CONSTRUCTION SPEC[F[CATION DOCUMEN'I'S Citv Project Nn. 03385
Revised November 27, 2012
0021 13-R
INSTRUCTIONS TO BIDDERS
Page S of9
14. Modification and Withdrawal of Bids
3 14.1. Bids addressed to the City Manager and �led with the Purchasing Office cannot be
4 withdrawn prior to the time set for bid opening. A request for withdrawal must be
5 made in writing by an appropriate document duly executed in the manner that a Bid
6 must be executed and delivered to the place where Bids are to be submitted at any
7 time prior to the opening of Bids. After all Bids not requested for withdrawal are
8 opened and publicly read aloud, the Bids for which a withdrawal request has been
9 properly filed may, at the option of the City, be returned unopened.
10
11 14.2. Bidders may modify their Bid by electronic communication at any time prior to the
12 time set for the closing of Bid receipt.
13
14 15. Opening of Bids
15 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An
16 abstract of the amounts of the base Bids and major alternates (if any) will be made available
17 to Bidders after the opening of Bids.
18
19 16. Bids to Remain Subject to Acceptance
20 All Bids will remain subject to acceptance for the time period specified for Notice of Award
21 and execution and delivery of a complete Agreement by Successful Bidder. City may, at
22 City's sole discretion, release any Bid and nullify the Bid security prior to that date.
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
17. Evaluation of Bids and Award of Contract
17.1. City reserves the right to reject any or all Bids, including without limitation the rights
to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids
and to reject the Bid of any Bidder if City believes that it would not be in the best
interest of the Project to make an award to that Bidder, whether because the Bid is
not responsive or the Bidder is unqualified or of doubtful financial ability or fails to
meet any other pertinent standard or criteria established by City. City also reserves
the right to waive informalities not involving price, contract time or changes in the
Work with the Successful Bidder. Discrepancies between the multiplication of units
of Work and unit prices will be resolved in favor of the unit prices. Discrepancies
between the indicated sum of any column of figures and the correct sum thereof will
be resolved in favor of the correct sum. Discrepancies between words and figures
will be resolved in favor of the words.
17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists
among the Bidders, Bidder is an interested party to any litigation against City,
City or Bidder may have a claim against the other or be engaged in litigation,
Bidder is in airears on any existing contract ot• has defaulted on a previous
contract, Bidder has performed a prior contract in an unsatisfactory manner, or
Bidder has uncompleted work which in the judgment of the City will prevent or
hinder the prompt completion of additional work if awarded.
CITY OF FORT WORTH I�ater aird Sanrtari� Setiver Repincemenf Ca�h•crc7 20[d, {f'S�If D
STANDARD CONST2UCTION SPEC[FICATION DOCUMENTS Cit>> Prajec� Na 0?385
Revised November 27, 2012
00 21 13 - 9
INSTRUCTIONS TO BIDDERS
Paae 9 of 9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and
other persons and organizations proposed for those portions of the Work as to which
the identity of Subcontractor•s, Suppliers, and other persons and organizations must
be submitted as provided in the Contract Documents or upon the request of the City.
City also may consider the operating costs, maintenance requirements, performance
data and guarantees of major items of materials and equiptnent proposed for
incorporation in the Work when such data is rec{uired to be submitted prior to the
Notice of Award.
173. City may conduct such investigations as City deems necessary to assist in the
evaluation of any Bid and to establish the responsibility, qualifications, and financial
ability of Bidders, proposed 5ubcontractors, Suppliers and other persons and
organizations to perform and furnish the Work in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perfarm with his own organization, work of a value not less than
35% of the value embraced on the Contract, unless otherwise approved by the City.
17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and
responsive Bidder whose evaluation by City indicates that the award will be in the
best interests of the City.
17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award
contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a
comparable contract in the state in which the nonresident's principal place of
business is located.
17.7. A contract is not awarded until formal City Council authorization. If the Contract is
to be awarded, City will award the Contract within 90 days after the day of the Bid
opening unless extended in writing. No other act of City or others will constitute
acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by
the City.
17.8. Failure or refusal to comply with the requirements may result in rejection of Bid.
18. Signing of Agreement
When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the
required number of unsigned counterparts of the Agreement. Within 14 days thereafter
Contractor shall sign and deliver the required number of counterparts of the Agreement to
City with the required Bonds, Certi�cates of Insurance, and all othec required documentation.
City shall thereafter deliver one fully signed counterpart to Contractar.
END OF SECTION
CITY OF FORT WORTH bt�irter• and Scnrilnri� Se�vei• Rep(ncement Corttrucl 2014, 4f�S�W-D
STANDARD CONSTRUC'P[ON SPEC[F[CATION DOCUMENTS Crtt� Projecl No. 0?385
Revised Noveuiber 27, 20I2
00 35 13
BID FORM
Page 1 of 1
SECTION 00 35 13
CONFLICT OF INTEREST AFFIDAVIT
Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (aiso
referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the
attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS
Fo�m) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City
Secretary the required documentation and is eligible to bid on City Work. The referenced forms may
also be downloaded from the website links provided below.
http:/lwww.ethics. state.tx. uslforms/CI Q. pdf
http�/lwww.ethics. state.tx. us/forms/CIS. pdf
�
❑
❑
❑
BIDDER:
CIQ Form is on file with City Secretary
CIQ Form is being provided to the City Secretary
CIS Form is on File with City Secretary
CIS Form is being provided to the City Secretary
WOODY CONTRACTORS INC.
650 TOWER DRIVE
KENNEDALE,TEXAS 76060
By; TROY WU Y
Signature: —
0 ��,,
Title: P�2E ENT
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION QOCUMENTS
Form Revised 20120327 00 41 00_00 43 13_00 a2 43_00 43 37 00 45 12_00 35 13 Bid Proposal Workbook 02385 Part 3
00 41 00
BID FORM
Page 1 of 3
SECTION 00 41 00
BID FORM
TO: The City Manager
c/o: The Purchasing Department
1000 Throckmorton Street
City of Fort Worth, Texas 76102
FOR: Water and Sanitary Sewer Replacement Contract 2014, WSM-D, Part 3
City Project No.: 02385; DOE No. 7354
Units/Sections: SECTION A- WATER IMPROVEMENTS
SECTION B - SEWER IMPROVEMENTS
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and
conditions of the Contract Documents.
Z. BIDDER Acknowiedgements and Certification
2.1. In submitting this Bid, Bidder accepts ali of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, including without limitation those dealing wifh the disposition of Bid Bond.
2,2. Bidder is aware of ail costs to provide the required insurance, will do so pending contract award, and wiil
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed
individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,
association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.
For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a public o�cial in the bidding process.
b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the
bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive
levels, or (c) to deprive City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or rnore Bidders, with or
without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-
competitive levels.
CITY OF FORT WORTH
STANDARD CONSTRUGTION SPECIFICATION DOCUMENTS
Form Revised 2o120327 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_6id Proposal Workbook 02385 Part 3
00 41 00
BID FQRM
Page 2 of 3
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequalified contractors and
subcontractors:
�. Water Distribution, Urban and Renewal, 8-inch diameter and smaller
b. Sewer Collection System, Urban and Renewat, 8-inches and smaller
C,
Q
4. Time of Comptetion
4.1. The Work will be complete for Final Acceptance within 140 days after the date when the
the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditians.
4.2. Biddar accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete
the Work {andlor achievement of Milestones} within the times specified in the Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
� a. This Bid Form, Section QO 41 00
� b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
✓ c. Proposal Form, Section 00 42 43
� d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. MWBE Forms (optional at time of bid}
� f. Prequaiification Statement, Section 00 45 12
, / g. Conflict of {nterest Affidavit, Section 00 35 13
� "`If necessary, CIQ or CIS forms are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In
the space provided below, please enter the total bid amount for this project. Only this figure will be read
publicly by the City at the bid opening.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327 00 41 00 00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_8id Proposal Workbook 02385 Part 3
00 41 00
BID FORM
Page 3 of 3
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
subject to veri�cation andlor modification by multiplying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then totaling all of the extended amounts.
6.3. Total Bid
7. Bid Submittal
This Bid is submitted on
$738,188.06
OCTOBER 30,2014 by the entity named below.
Respectfully sub ' ed,
����,,,,�.r-w-
By:
(Signature) :�'
7ROY WOODY
(Printed Name)
Title: PRESIDENT
Company: WOODY CONTRACTORS,INC.
Address: 650 TOWER DRIVE
KENNEDALE,TEXAS 76060
State oi Incorporation: TEXAS
Email: twoody2020Ca�.aol.com
Phone: 817-�83-4787
ENb OF SECTION
Corporate Seal;
CITY OF FORT WOR7H
S7ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook 02385 Part 3
on az n_
�i�� r�zovos:�i.
Yaqc i nl '
SECTION 00 42 43
PROPOSALfORM
UNIT PRICE BID
Project ttem Infonnution
�Sidlist Ilein No:. Desr.ription
SEC710N A -'
i�311 A261 8" PVC Water Pipe
� 3311.0161 6" PVC Water Pipe
> 3312 3003 d" Gate Valve
�t 3312,3002 6" Gate Valve
5 3311.0001 Ductile Iron Waker Fittings
r, 3312.0001 Fire Hydrant
��t 3312,2001 1" Water Service, Meter Reconnection
s 3312,2003 1" Water Service
�a 33122004 1" Private Water Service Relocation
�0 3304.0102 2°' Tempo��ry Water Services
i i 0241.1302 Remove 6" Water Valve and Vatve Box
i2 0241;1303 Remove S" Water Valve and Valve Box ^
�s 3312,0102 Connection to Existing 6" & 8" Water Main
f� 0241.1511 5�ivage 3/4" Water Meter
Is 021d,1510 S�Ivac�e Fire Hydrant
iG 31_01,0111 Permanent Asphait Pavement Repair
i7 3201,0400 Temp4rary Asphalt Pevi�)q Repair
i x 99 59 a0 Tempntary f(s{��aiE �ur[� � Gutter
�<� 99 99 00 Tempor�iry Aspi7alt DriVew�iy
�t� 3305.0109 Trer�ch S�fety
1 i 3292.O1d0 Biock Sod Placement
?Z 3305.0103 Gxploralory Excavation of Existing Utilities
z? 3471.0001 TraffiC Controi
SECTION B -
; 3331.4115 8" Sewer Pipe
--
2 "�331.310 f 4" $�war Service
� 3339,1001 4' Manhofe
4 33q�.0112 Concreke Collar
5 33(31.0002 Post-CCN itts�tc�Gfic�r�
!, 3301.0101 Manhole Vacuurn Testing
'1 024L2201 Remove 4' Sewer Manhole
S 3201A400 ��'�s��{�arary Aspllalt Pavi�t�J Repair
�a 99 99 00 Temporary �sph<iIt Curb � Gutter
�� 33D05.0109 Troneh �afsty�
I 1 3292.0100 Black Sod Piacement
iz 3305,0103 Ex�Ioratory Excavation of Existing Utilities
ra 3471.0001 Tra�c Control
Bidder's Application
Bidder's C'ropas,al
peciiicntion �iuetiin� Unit oS ��� L!oii Yrice Bid °Jaluu
id��Mtea�ur� Q❑antity ..
;IMPROVEMENTS
33 11 1d, 33 11
12 LF 3;79b �,�S,dU �170,5Nt}<OD
33 11 10, 33 11 .,
12 LF b5 �41.00 $2,66�.04
33 12 20 EA 11 �1,3�Q.p0 $14,�Ctt3.t��i
33 12 20 EA 6 `�SOO,OU ��i,800.OQ
331111 TON 1,79 S�,OQQ.90 y^i7.,530,QU
331240 EA 6 �3,6Q4.QQ �21,600.96
331210 EA 13A �u"340.�0 $�ttl,200.00
331210 EA 13A �1,100.€9b �'147,Q�Q.00
331210 LF $tl _ �a12.00 _ $960.qt�
33 04 30 LS 1 �99.04'Q.dU 539,040.00
02 41 1<t EA 2 515Q,04 _ �30t�.00
02 41 14 EA 4 $150.00 ^�$60ft.00
33 12 25 EA 9 $1,700.Q0 �15,30Q.00
024114 EA 134 $1Q0.0� �13,400A0
02 41 14 EA 3 �3UO.d0 �w9Qd.00
32 01 17 LF 100 �$p:00 S8,OQD.00
32 01 18 LF �a,4t?p $11,Op �7Q,d00.00
99 99 00 LF � 754' $1.00 �750.�0
49 99 00 SF 13,000 $0,�0 56,60�,00
33 05 10 LF 3,7�J0 $0.05 y189.50
32 92 13 SY 950 $10,q0 ��J,SQA,t}{7
33 05 30 EA $756.Oq 5750,Q0
3A 71 13 MO 3 �2,ODOAO ��,p40.(7q
Tutnl I3iJ Sectio� A �5$�i.594.50
33 11 10, 33 31
12. 33 31 20 �F 1,1$4 �h�3.Q� S5G
33 31 50 EA �i`l _ �a930.tJ0 _ �39
33 39 10, 33 39
20 � G S��C}4Q,QQ $18
33 05 17 EA � 6 �a10[l p0
33 01 31 LF 1,184 �w3.{l0 $�
33 01 30 EA 6 $15D.Ot�
02 41 14 EA 1 SAOb,t?(i
320118 LF 1,7ap �1�1.00 $2r1
99 99 00 LF 210 �1.4b
330510 LF 1,1£34 $1.00 51
32 92 13 SY 155,55fi ^�t4.Gp �u1
33 05 30 EA 1 �6D0,00
34 71 13 MO 2 $2,000.00 ��
Total 13id Sec�inn 13 $151
Totalllid $73p,188.06
P.ND OF SF,CTfC)N
rITY �;� e01t�1' R'ott7H
iTANb.A;i;7 CONSTftUCTIOtJ SPECii'ICh'CION Rftf'li;A"��TS
l�om� Karisc�d 2ll i?�120
UIf d 1 OU_;1(! d's 13_Ub d2 43_ UU A? ?7_OP 4: 12_u4) ?5 13, fiid ProposnllVod.hnok i12 tg; i'art ;
00 43 13
BID BONO
Page 1 of 1
SECTION 00 43 73
BID BOND
KNOW ALL BY THESE PRESENTS:
That we, (Bidder Name) Company Name Here hereinafter
called the Principal, and (Surety Name) ���f-�iy �1�rr2� �i���e
a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety,
are held and firmly bound unto the City, hereinafter called the Obligee, in the
sum of ��eEi flut' �urrs��r� �i�re' and No/100 Dollars
($ �u€'�se�a[s �i�r� .00), the payment of which sum will be well and truly made and the
said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firm by these presents.
WHEREAS, the Principal has submitted a proposal to perform work for the following project of the Obligee,
identified as Water and Sanitary Sewer Replacement Contract 2014, WSM-D, Part 3
0
NOW, THEREFORE, if the Obligee shall award the Contract for the foregoing project to
the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the
Contract and shall enter into the Contract in writing with the Obligee in accordance with the terms of such proposal,
then this bond shall be null and void. if the Principal fails to execute such Contract in accordance with the terms of
such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in
accordance with the proposal or fails to satisfy all requirements and conditions required for the execution of the
Contract in accordance with the proposal, this bond shall become the property of the Obligee, without recourse of the
Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference
between Principal's Total Bid Amount and the next selected Bidder's Total Bid Amount.
SIGNED this day of , 2014.
By: Company Name Here
(Signature and Title of Principal)
*By: Surety Name Here'
(Signature of Attorney-of-Fact)
*Attach Power of Attorney (Surety) for Attorney-in-Fact Impressed
Surety Seal
Only
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20110627 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook 02385 Part 3.xls
00 43 37
VENDOR COMPLIANGE TO STATE LAW
Page 1 of 1
SECTION OQ 43 37
VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This
law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors
whose corporate offices or principal place of business are outside the State of Texas) bid projects for
construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in
order to obtain a comparable contract in the State which the nonresident's principal place of business is located.
The appropriate blanks in Section A must be fiiled out by all nonresident bidders in order for your bid to meet
specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident
bidders must check the box in Section B.
A. Nonresident bidders in the State of State' Here or Bfank , our principal place of business,
are required to be %o Here'' percent lower than resident bidders by State Law. A copy of the
statute is attached.
Nonresident bidders in the State of State Here or Blank , our principai place of business,
are not required to underbid resident bidders.
B. The principal place of business of our company or our parent campany or majority owner is
in the State of Texas. �
- �� -
WOODY CONTRACTORS INC.
650 TOWER DRIVE
0
KENNEDALE,TEXAS 76060
By: TROY
PRESIDENT
END OF SGCTION
Date: �� � � (� "" � �,
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICA710N DOCUMEN7S
Form Revised 20110627 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook 02385 Part 3
004511-I
BIDDERS PREQUALIFICATIONS
Page 1 oti 3
1 SECTION 00 45 ll
2 BIDDERS PREQUALIFICATIONS
4 1. Summary. All contractors are requu•ed to be prequalified by the City prior to subinitting
5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification
6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is
7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder
8 Prequaliiication Application in accordance with the requirements below.
9
10 The prequalification process will establish a bid limit based on a technical evaluation and
11 financial analysis of the contractor. The information must be submitted seven (7) days prior
12 to the date of the opening of bids. For example, a contractor wishing to submit bids on
13 projects to be opened on the 7th of April must file the information by the 31st day of March
14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's
� 15 Prequali�cation Application, the following mList accompany the submission.
16 a. A complete set of audited or reviewed financial statements.
17 (1) Classified Balance Sheet
' 18 (2) Income Statement
19 (3) Statement of Cash Flows
20 (4) Statement of Retained Earnings
21 (5) Notes to the Financial Statements, if any
22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles
23 of Incorporation, Articles of Organization, Certificate of Formation, LLC
24 Regulations, Certificate of Limited Partnership Agreement).
25 c. A completed Bidder Prequalification Application.
26 (1) The �rm's Texas Taxpayer ldentification Number as issued by the Texas
27 Comptroller of Public Accounts. To obtain a Texas Taxpayer ldentification
� 28 number visit the Texas Comptroller of Public Accounts online at the
29 following web address www.window.state.tx.us/taxpermit/ and iill out the
30 application to apply for your Texas tax ID.
31 (2) The firm's e-mail address and fax number.
32 (3) The �rm's DUNS number as issued by Dun & Bradstreet. This number
33 is used by the City for required reporting on Federal Aid projects. The DLJNS
34 number may be obtained at www.dnb.com.
35 d. Resumes reflecting the construction experience of the principles of the firm for firms
36 submitting their initial prequalification. These resumes should include the size and
37 scope of the work performed.
' 38 e. Other information as requested by the City.
39
40 2. Prequalification Requirements
41 a. Fina»cial Statements. Financial statement submission must be provided in
42 accordance with the following:
43 (1) The City requires that the original Financial Statement or a certified copy
44 be subulitted for consideration.
CITY OF FORT WORTH i�nter nnd Scrnilcn.i� Sewer 2epincenieitl Conirac120[4, Ff�SM-D
STANDARD CONST2UCT[ON SPEC[FICAT[ON DOCUMENTS Citt� Projec� No. 0?385
2evised July l, 201 l
00 45 I I- 2
BIDDERS PREQUAL[FICATIONS
Page 2 of 3
1 (2) To be satisfactory, the financial statements must be audited or reviewed
2 by an independent, certified public accounting �rm registered and in
3 good standing in any state. Current Texas statues also require that
4 accounting firms performing audits or reviews on business entities within
5 the State of Texas be properly licensed or registered with the Texas State
6 Board of Public Accountancy.
7 (3) The accounting �rm shouid state in the audit report or review whether
8 the contractor is an individual, corporation, or limited liability company.
9 (4) Financial Statements must be presented in U.S. dollars at the current rate
10 of exchange of the Balance Sheet date.
11 (5) The City will not recognize any certified public accountant as
12 independent who is not, in fact, independent.
13 (6) The accountant's opinion on the financial statements of the contracting
l4 company should state that the audit or review has been conducted in
15 accordance with auditing standards generally accepted in the United
16 States of America. This must be stated in the accounting iirm's opinion.
17 It should: (1) express an unqualified opinion, or (2) express a qualified
18 opinion on the statements taken as a whole.
19 (7) The City reserves the right to require a new statement at any time.
20 (8) The financial statement must be prepared as of the last day of any month,
2l not more than one year old and must be on file with the City 16 months
22 thereafter, in accordance with Paragraph 1.
23 (9) The City will determine a contractor's bidding capacity for the purposes
24 of awarding contracts. Bidding capacity is determined by multiplying the
25 positive net working capital (working capital= current assets — current
26 liabilities) by a factor of 10. Only those statements reflecting a positive
27 net working capital position will be considered satisfactory for
28 prequalification purposes.
29 (10) In the case that a bidding date falls within the time a new financial
30 statement is being prepared, the previous statement shall be updated with
31 proper veriiication.
32 b. Bidder Preqaralificatior� Application. A Bidder Prequalification Application inust be
33 submitted along with audited or reviewed financial statements by firms wishing to be
34 eligible to bid on all classes of construction and maintenance projects. Incomplete
35 Applications will be rejected.
36 (1) In those schedules where there is nothing to report, the notation of
37 "None" or "N/A" should be inserted.
38 (2) A minimum of five (5) references of related work must be provided.
39 (3) Submission of an equipment schedule which indicates equipment under
40 the control of the Contractor and which is related to the type of work for
41 which the Contactor is seeking prequalification. The schedule must
42 include the manufacturer, model and general common description of
43 each piece of equipment. Abbreviations or means of describing
44 equipment other than provided above will not be accepted.
45
46 3. Eligibility to Bid
47 a. The City shall be the sole judge as to a contractoc's prequali�cation.
48 b. The City may reject, suspend, or modify any prequalification for failure by the
49 contractar to demonstrate acceptable financial ability or performance.
50 c. The City will issue a letter as to the status of the prequalification approval.
C1TY OF FORT WORTH FYnler mtd Sn�ti�ary Sewer 2epincernenl Contract 20[d, 6YSM-D
STANDARD CONSTRUCTION SPEC[FICATION DOCUMEN'i'S Cih� Pi•oject No. 02385
Revised Jttiy 1, 20t l
0045 11 -3
B[DDERS PREQUAL[FICATIONS
Page 3 of 3
1
2
3
4
5
6
7
8
L•:
d. If a contractor has a valid prequali�cation letter, the contractor will be eligible to bid
the prequalified work types until the expiration date stated in the letter.
END OF SECTION
CITY OF FORT WORTH G�nter and Sanil�ry Seww� Repincentenl Contruct 20l4, FYSM-D
STANDARD CONSTRUCT[ON SPEC[FICAT[ON DOCUMENTS Cit�� Projecl No. 02355
Revised July l, 20l (
00 45 12
BID FORM
Page 1 of 1
SECTION 00 45 12
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by identifying the prequalified
contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed.
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are
currently prequalified for the work types listed.
BIDDER:
WOODY CONTRACT�RS INC.
650 T�WER DRIVE
0
KENNEDALE,TEXAS 76060
Date: ��% � ,J ji � ��'%
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECSFICATION DOCUMENTS
Form Revised 20120120 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook 02385 Part 3
���� �����
SECTION 00 45 13
BIDDER PREQUALIFICATION APPLICATION
Date of Balance Sheet
Name under which you wish to qualify
Post Of�ce Box
Sneet Address (required)
Telephone
City
City
Fax
Mark only one:
Individual
Limited Partnership
General Partnership
Corporation
Limited Liability Company
State
State
Email
Zip Code
Zip Code
Texas Taxpayer ldentification No.
Federal Employers Identification No.
' DLJNS No. (if applicable)
MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO:
CITY OF FORT WORTH TEXAS
1000 THROCKMORTON STREET
FORT WORTH, TEXAS 76102-6311
AND MARK THE ENVELOPE: `BIDDER PREQUALIFICATION APPLICATION"
ooas �3-2
BIDDER PREQUALIFICATION APPLICATION
Page 2 of 8
BUSINESS CLASSIFICATION
The following should be completed in order that we may properly classify your firm:
(Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is
checked)
� Has fewer than 100 employees
and/or
� Has less than $6,000,000.00 in annual gross receipts
OR
� Does not meet the criteria for being designated a small business as provided in Section
2006.001 of the Texas Government Code.
The classi�cation of your firm as a small or large business is not a factor in determining eligibility to
become prequalified.
MAJOR WORK CATEGORIES
Water Department
Augur Boring - 24-inch diameter casing and less
Augur Boring - Greater than 24-inch diameter casing and greater
Tunneling — 36-Inches — 60 —inches, and 350 LF or less
Tunneling - 36-Inches — 60 —inches, and greater than 350 LF
Tunneling — 66" and greater, 350 LF and greater
Tunneling — 66" and greater, 350 LF or Less
Cathodic Protection
Water Distribution, Development, 8-inch diameter and smaller
Water Distribution, Urban and Renewal, 8-inch diameter and smaller
Water Distribution, Development, 12-inch diameter and smaller
Water Distribution, Urban and Renewal, 12-inch diameter and smaller
Water Transmission, Development, 24-inches and smaller
Water Transmission, Urban/Renewal, 24-inches and smaller
Water Transmission, Development, 42-inches and smaller
Water Transmission, UrbanlRenewal, 42-inches and smaller
Water Transmission, Development, All Sizes
Water Transmission, Urban/Reuewal, All Sizes
Sewer Bypass Pumping, 18-inches and smaller
Sewer Bypass Pumping, 18-inches — 36-inches
Sewer Bypass Pumping 42-inches and larger
CCTV, 8-inches and smaller
CCTV, 12-inches and smaller
CCTV, 18-inches and smaller
CCTV, 24-inches and smaller
CCTV, 42-inches and smaller
CCTV, 48-inches and smaller
C[TY OF FORT WORTH 6f�nter and Saniln�y Se�ver Replacemen� Contract 2014, WSM-D
STANDARD CONSTRUCTION SPEC[FICATION DOCUMENTS Ciq� Projec! No. 0?j85
Revised December 20, 2012
00 45 I 3- 3
BIDDER PREQUALIF[CATtON APPLICAT[ON
Page 3 of 8
MAJOR WORK CATEGORIES, CONTINUED
Sewer CIPP, 12-inches and smaller
Sewer CIPP, 24-inches and smaller
Sewer CIPP, 42-inches and smaller
Sewer CIPP, Ail Sizes
Sewer Collection System, Development, S-inches and smaller
Sewer Collection System, Urban/Renewal, 8-inches and smaller
Sewer Collection System, Development, 12-inches and smaller
Sewer Collection System, Urban/Renewal, 12-inches and smaller
Sewer Interceptors, Development, 24-inches and smaller
Sewer Interceptors, Urban/Renewal, 24-inches and smaller
Sewer Interceptors, Development, 42-inches and smaller
Sewer Interceptors, Urban/Renewal, 42-inches and smaller
Sewer Interceptors, Development, 48-inches and smaller
Sewer Interceptors, Urban/Renewal, 48-inches and smaller
Sewer Pipe Enlargement 12-inches and smaller
Sewer Pipe Enlargement 24-inches and smaller
Sewer Pipe Enlargement, All Sizes
Sewer Cleaning , 24-inches and smaller
Sewer Cleaning , 42-inches and smaller
Sewer Cleaning , All Sizes
Sewer Cleaning, 8-inches and smaller
Sewer Cleaning, 12-inches and smaller
Sewer Siphons 12-inches or less
Sewer Siphons 24-inches or less
Sewer Siphons 42-inches or less
Sewer Siphons All Sizes
Transportation Public Works
Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards)
Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER)
Asphalt Paving Heavy Maintenance (UNDER $1,000,000)
Asphalt Paving Heavy Maintenance ($1,000,000 and OVER)
Concrete Paving Construction/Reconstruction (LESS THAN 15,000 square yards)
Concrete Paving Construction/Reconstruction (15,000 square yards and GREATER)
Roadway and Pedestrian Lighting
C'ITY OF FORT WORTH Gf�aler• nird Sarritart� Sewer Repincemen� Conh•acl 2014, �7'SM-D
STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS Cit�� Pr�ojecl No. 02385
Revised December 20, 2012
00 45 13 - 4
BIDDER PREQUAL[F[CAT[ON APPLICATION
Page 4 of 8
1. List eauioment vou do not own but which is available bv rentin�
DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER
2. How many years has your organization been in business as a general contractor under your present
name?
List previous business names:
3. How many years of experience in
had:
construction work has your organization
(a) As a General Contractor: (b) As a Sub-Contractor:
d �What nrniertc hae vniir nraani�atinn rnmrilatarl 1T1 TPYAC Atlf� PICPIEI}1PYP%
CLASS LOCATION NAME AND DETAILED
CONTRACT OF DATE CITY-COUNTY- ADDRESS OF OFFICIAL TO
AMOUNT WORK COMPLETED STATE WHOM YOU REFER
*If requalifying only show work performed since last statement.
5. Have you ever failed to complete any work awarded to you?_
If so, where and why?
6. Has any officer or owner of your organization ever been an offcer of another organization that failed to
complete a contract?
If so, state the name of the individual, other organization and reason.
7. Has any officer or owner of your arganization ever failed to complete a contract executed in his/her
name?
If so, state the name of the individual, name of owner and reason.
C[TY OF FORT WORTH Ft�nler nnclSairitari� Se�ver Replacenrent Co�rh•ncl 201�1, iUS�i1 D
STANDARD CONSTi2UCT10N SPEC[FICAT[ON DOCUMENTS Cih� Projec� No. 02385
Revised December 20, 2012
00 45 l3 - 5
BIDDER PREQUALIFICAT[ON APPL[CATION
P3ge 5 of R
8. In what other lines of business are you financially interested?
9. Have you ever performed any work for the City?
If so, when and to whom do you refer?
10. State names and detailed addresses of all producers from whom you have purchased principal
materials during the last three years.
NAME OF FIRM OR COMPANY DETAILED ADDRESS
11. Give the names of any af�liates or relatives currently debarred by the City. Indicate your relationship
to this person or �rm.
12. What is the construction experience of the principal individuals in your ot•ganization?
PRESENT MAGNITUDE
POSITION OR YEARS OF AND TYPE OF IN WHAT
NAME OFFICE EXPERIENCE WORK CAPACITY
13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the
same household with a City employee, please list the name of the City employee and the relationship. In
addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or
director who does not live in the same household but who receives care and assistance fi-om that person as
a direct result of a documented medical condition. This includes foster children or those related by
adoption or marriage.
CITY OF FORT WORTH G�n�er nrid S�milary Seiver Repincemem Contrnc( 20l4, l�S�t1 D
STANDARD CONSTRUCTtON SPEC[EtC'AT[ON DOCUMENTS City Project No. 02385
2evised December 20, 2012
ooas is-6
BIDDER PREQUALIFICATION APPLICATION
Page f> of R
CORPORATION BLOCK PARTNER5HIP BLOCK
If a corporation: If a partnership:
Date of Incorporation State of Organization
Charter/File No. Date of organization
President Is partnership general, limited, or registered limited
liability partnership?
Vice Presidents
File No. (if Limited
Partnership)
General Partners/Officers
Secretary Limited Partners (if applicable)
Treasurer
LIMITED LIABILITY COMPANY BLOCK
If a corporation:
State of Incorporation
Date of organization
File No. Individuals authorized to sign for Partnership
Officers or Managers (with titles, if any)
�;xcept for limited partners, the individuals listed in the blocks above are presumed to have full
signature authority for your firm unless otherwise advised. Should you wish to grant signature
authority for additional individuals, please attach a certified copy of the corporate resolution,
corporate minutes, partnership agreement, power of attorney or other legal documentation which
grants this authority.
CITY OF FORT WORTH 6�aler and Sai�i�ary Sewer Repincenten! Conh•nct 2014, II�SM-D
STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS Ci1�� Projecl No. 0?385
Revised December 20, 2012
00 45 13 - 7
BIDDER PREQUAL[FICATION APPLICATION
Nage 7 of R
14. Equipment
$
TOTAL
BALANCESHEET
ITEM QUANTITY ITEM DESCRIPTION VALUE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Various-
TOTAL
�im�lar types ot equipment may be lumped together. if your tlrm has more than 3U types of equipment,
you may show these 30 types and show the remainder as "various". The City, by allowing you to show
only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment.
The equipment list is a representation of equipment under the control of the firm and which is related to
the type of work for which the firm is seeking qualification. In the description include, the manufacturer,
model, and general common description of each.
CITY OF FORT WORTH Fl�nler n�ad Sairita�y Se�ver Repince�nen� Cath•ac12014, WSd� D
STANDARD CONSTRUCTION SPEC[FtCAT[ON DOCUMENTS Ci1�� Project No. 0?385
Revised December 20, 2012
ooas i3-g
BIDDER PREQUALIFICATION APPLICATtON
Page 8 of 8
BIDDER PREQUALIFICATION AFFIDAVIT
STATE OF
COUNTY OF
The undersigned hereby declares that the foregoing is a true statement of the financial condition of the
entity herein first named, as of the date herein first given; that this statement is for the express purpose of
inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who
prepared the balance sheet accompanying this report as well as any depository, vendor or any other
agency herein named is hereby authorized to supply each party with any information, while this stateinent
is in force, necessary to verify said statement.
, being duly sworn, deposes and says that
' he/she is the of , the entity
described in and which executed the foregoing statement that he/she is familiar with the books of the said
entity showing its iinancial condition; that the foregoing financial statement taken from the books of the
said entity as of the date thereof and that the answers to the questions of the foregoing Bidder
Prequalification Application are correct and true as of the date of this affidavit.
Firm Name:
Signature:
Sworn to before me this
day of _
Nota�y Public
Notary Public must not be an officer, director, or stockholder or retative thereof.
C[TY OF FORT WORTH 6i'ater nnJSunitary Seiver lteplucemenl Coith•ne12014, WSiYI-D
STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS Crt�� Project Na. 02385
Revised December 20, 2012
9,
004526-I
CONT[tACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of I
2
3
4
5
6
7
8
9
10
11
12
l3
14
15
16
17
�g
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WOR.KER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on City
Project No. 02385. Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worker's compensation coverage.
CONTRACTOR:
� 7iz� G'�o� `7 —��'!C •
Company
�y�� �
/�� � �
Address
X���IA �, i k 76C6�
City/State/Zip
�� � �.
By: I/�4�1 !�/QOG� Gl
(Please Print)
Signature:
Title: �� Lj� � iZ �
(Please Print)
THE STATE OF TEXAS §
COUNTY OFTARRANT §
BEFORE ME, the undersigned authority, on this day personally appeared
`T ,� %(/o oa�i,, , known to me to be the person whose name is
subscribed o the foreg ' g instrument, and acknowledged to me that he/she executed the same as
the act and deed of ��oo/h C�n�� 4�� S.L.� c for the puiposes and
consideration therein expressed and in the capacity therein stated.
GNE DER Y HAND AND EAL OF OFFICE this �'+��� day of
, 20 ��
���py�YPU@� SHARON RIDOL� �k '���
Notary Public Notary Pub ic in and for the State of Texas
38 *O* STATE OF TEXAS
�1��F�Py My Comm. Exp, 0212812016
39 TION
40
CITY OF FORT WORTH 6�niei• nnd Sanilnri� Sewer 2epincernent Conlr�rct 20/d, II�Sd�!-D
STANDARD CONSTRUCT[ON SPECIFICAT[ON DOCUMENTS Citr Projecl No. 02385
Revised July l. 201 l
i �
00 45 40 - 1
MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL
Page 1 of 1
1 SECTION 00 45 40
♦ �[�7:�I11►•/:ill.Yl►1�.Y.���f1�1�'7' '� �K�Z�\IJ
4 APPLICATION OF POLICY
5 If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal
6 may be applicable. If the total dollar value of the contract is $50,000 or less, the MBE
7 subcontracting goal is not applicable.
8
9 POLICY STATEMENT
10 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority
11 Business Enteiprises (MBE) in the procurement of all goods and services. All requirements and
12 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid.
13
14 MBE PROJECT GOAL
15 The City's MBE goal on this project is 10% of the total bid (Base bid applies to Parlts arzd
16 Con2n�u»ity Sei-vices). Note: If both MBE and SBE subcontracting goals are established for this
17 project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be
18 deemed responsive.
19
20
21
22
23
24
25
26
27
28
29
30
COMPLIANCE TO BID SPECIFICATIONS
On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are
required to comply with the intent of the City's Business Diversity Ordinance by one of the
following:
1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or
2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or
3. Good Faith Effort documentation, or;
4. Waiver documentation.
Failure to comply with the City's M/WBE Ordinance, shall result in the Bid being considered non-
responsive. Any questions, please contact the M/WBE Office at (817) 392-6104.
31 SUBMITTAL OF REQUIRED DOCUMENTATION
32 The applicable documents must be received by the Managing Department, within the following
33 times allocated, in order for the entire bid to be considered responsive to the specifcations. The
34 Offeror shall deliver the MBE documentation in person to the appropriate employee of the Managing
35 Department and obtain a date/time receipt. Such receipt shall be evidence that the City received the
36
37
documentation in the time allocated. A faxed copy will not be accepted.
1. Subcontractor Utilization Form, if goal is met received by 5:00 p.m., five (5) City business days after
or exceeded: the bid opening date, exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after
Utilization Form, if participation is less than the bid opening date, exclusive of the bid opening date.
stated goal:
3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after
Utilization Form, if no MBE participation: the bid opening date, exclusive of the bid opening date.
4. Prime Contractor Waiver Form, if �rm will received by 5:00 p.m., five (5) City business days after
perform all subcontracting/supplier work: the bid opening date, exclusive of the bid opening date.
5. Joint Venture Form, if utilizing a joint venture received by 5:00 p.m., five (5) City business days after
to meet or exceed goal. the bid opening date, exclusive of the bid opening date.
END OT SECTION
CITY OF FORT WORTH �f'ater and Sanitary Seiver Replacement Contract 2014, 6VSM-D
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Cih� Project No. 02385
Revised December 20, 2012
�'
0o sz a3 - �
Agreement
Page l ofd
I
1
2
3
4
5
6
7
8
9
SECTION 00 52 43
AGREEMENT
rr
THIS AGREEMENT, authorized on ���- '�� ���' �� �`� is made by and between the City of Forth
Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
("City"), and WOODY CONTRACTORS, INC. , authorized to do
business in Texas, acting by and through its duly authorized representative, ("Contractor").
City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
follows:
10 Article 1. WORK
11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
l2 Project identified herein.
13 Article 2. PROJECT
14
15
16
17
18
19
20
21
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
Water and Sanitary Sewer Replacement Contract 2014, WSM-D, Part 3
Citv Proiect No. 02385
Article 3. CONTRACT TIME
3.1 Time is of the essence.
All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
Documents are of the essence to this Conri•act.
22 3.2 Final Acceptance.
23 The Work will be complete for Final Acceptance within 140 days after the date when the
24 Contract Time cominences to run as provided in Paragraph 2.03 of the General Conditions.
25 3.3 Liquidated damages
26
27
28
29
30
31
32
33
34
35
Contractor recognizes that time is of the essence of this Agreement and that City will
suffer financial loss if the Work is not completed within the times specified in Paragraph
3.2 above, plus any extension thereof allowed in accordance with Article 12 of the
General Conditions. The Contractor also recognizes the delays, expense and difficulties
involved in proving in a legal proceeding the actual loss suffered by the City if the Worl<
is not completed on time. Accordingly, instead of requiring any such proof , Contractor
agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay
City Six Hundred Fiftv Dollars ($650.00) for each day that expires after the time
specified in Paragraph 3.2 fot• Final Acceptance until the City issues the Final Letter of
Acceptance.
C►TY OF FORT WORTH IVulcr rmd Snnrtnry Seiver Replacenrenl Con�nrc( 201d. N'Si19-D
STANDARD CONSTRUCTION SPGC(FICAT[ON DOCUMGNTS Cit�� Prqject Na. 02385
Revised August l7, 2012
i �
oos2as-a
Agreement
Page 2 of 4
36 Article 4. CONTRACT PRICE
37 City agrees to pay Contractor for performance of the Work in accordance with the Contract
38 Documents an amount in current funds of Seven-Hundred Thirty-Ei�ht Thousand, One-Hundred
39 Eighty-Eight Dollars and Six Cents ($738,188.0�.
40 Article 5. CONTRACT DOCUMENTS
41 5.1 CONTENTS:
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
A. The Contract Docuinents which comprise the entire agreement between City and
Contractor concerning the Work consist of the following:
1. This Agreement.
2. Attachments to this Agreement:
a. Bid Form
1) Proposal Form
2) Vendor Compliance to State Law Non-Resident Bidder
3) Prequalification Statement
b. Current Prevailing Wage Rate Table
c. Insurance ACORD Form(s)
d. Payment Bond
e. Performance Bond
£ Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's Compensation Affidavit
i. MBE and/or SBE Commitment Form
3. General Conditions.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment
or, if not attached, as incoiporated by reference and described in the Table of
Contents of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
9. The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
CITY OF FORT WORTH 6t'n�er nnd Snnitary Sewer Replacenre�il Conn•nc! 2014, II�SM-D
STANDARD CONSTRUCTION SPECfFICAT[ON DOCUMENTS Cilp Project No. 023R5
Revised August l7, 2012
oosza3-3
Agreement
Page 3 of4
74 Article 6. INDEMNIFICATION
'75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
6.1 Contractor covenants and agrees to indemnify, hotd harmless and defend, at its own
expense, the city, its of�cers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification provision is speci�callv intended to operate
and be effective even if it is alleged or proven that all or some of the damages beins
sou�ht were caused, in whole or in part, bv anv act, omission or ne�li�ence of the city.
This indemnity provision is intended to include, without limitation, indemnity for
costs, expenses and legal fees incurred by the city in defending against such claims and
causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
the city, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemni�cation
provision is specificallv intended to oqerate and be effective even if it is alle�ed or
proven that all or some of the damages bein� sought were caused, in whole or in part,
by any act, omission or negli�ence of the citv.
Article 7. MISCELLANEOUS
96 7.1 Terms.
97 Tertns used in this Agreement which are de�ned in Article 1 of the General Conditions will
98 have the meanings indicated in the General Conditions.
99 7.2 Assignment of Contract.
100 This Agreement, including all of the Contract Documents may not be assigned by the
101 Contractor without the advanced express written consent of the City.
102 7,3 Successors and Assigns.
103 City and Contractor each binds itself, its partneis, successors, assigns and legal
104 representatives to the other party hereto, in respect to all covenants, agreements and
105 obligations contained in the Contract Documents.
106 7.4 Severability.
l07 Any provision or part of the Contract Documents held to be unconstitutional, void or
108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
109 remaining provisions shall continue to be valid and binding upon CITY and
110 CONTRACTOR.
1 l I 7.5 Governing Law and Venue.
ll2 This Agreement, including all of the Contract Documents is per%rmable in the State of
1 l3 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
114 Northern District of Texas, Fort Worth Division.
CiTY OF FORT WORTH 4Vuler und Srntitary Seiver Replaceme�tt Conh�acl 2014, Ft�Sd� D
STANDARD CONSTRUCT[ON SPECIFICAT[ON DOCUMENTS Citp Prqjecl No. 02385
Revised August l7, 2012
�,
00 52 43 - 4
Agreement
Page 4 of 4
1 l5 7.6 Other Provisions.
116 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is
117 classified, promulgated and set out by the City, a copy of which is attached hereto and
118 made a part hereof the same as if it were copied verbatim herein.
I 19 7.7 Authority to Sign.
120
121
122
123
124
125
126
127
Contractor shall attach evidence of authority to sign Agreement, if other than duly
authorized signatory of the Contractor.
IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple
counterparts.
This Agreement is effective as of the last date signed by the Parties ("Effective Date").
Contractor: City of Fort Worth
WOODY CONTR�1 CTORS, INC. /
BY� , (..��
Fernando Costa
B : Assistant City Manager
(Signatur
Date /2�2�/�► 1 ' !
Q o Attest: � �
rinted Name) Ciry Se ret iy ;��
(Seal) '�
Title: Pr��� � ��
Address: (�SO lOwe✓' �r.
�ennemld l.vT�� l�D60 M&c �- - Z� I f�'
Date: 12 -- 9' I y
128
129
130
131
132
133
l34
135
136
137
r,�_�—
f
� � �� ,
�� �oa000a
�S °�oo �°`�B�
� o�
�� Q�
0
�$oo/ o���
.������� °`��
�� � �
_City/State/Zip: Approv as to Form and Legality: �����
Date Douglas W. Black
Assistant City Attorney
� — - -- -- ---_-
��� c����r�m�� ���o���
� �d�°�� �����E'fAR�
�'�� �"�', �k�.����q ��
i
� � _ � ------
APPROVAL RECOMMENDED:
�� •
Andrew T. Cronberg, P.E.
INTERIM DIRECTOR,
Water Department
C[TY OF FORT WORTH IVnie�• u��d Srntila�;v Setver Rep/nceme�tl Conlracl 2014, 1�'Sil/ D
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS Crrp P�•qject No. 02385
Revised Augiist l7, 2012
�\
� 006113-1
PERFORMANCE BOND
Page I of 2
Bond No. 823 8-20-19
1
2
3
4
5
6
fll
8
9
10
11
12
13
14
15
16
17
I8
19
20
21
22
SECTION 00 61 13
PERFORMANCE BOND
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§ KNOW ALL BY THESE PRESENTS:
§
That we, WoodXContractors, Inc. , known as "Principal" herein and
Vigilant Insurance Company , a corporate surety(sureties, if more than one)
duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or
more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created
pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Seven Hundred
Thirty-Eight Thousand One Hundred Ei h�tv-Ei�ht Dollars & Six Cents ($738 188.06) lawful
money of the United States, to be paid in Fort Worth, Tarrant County, TeYas for the payment of
which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators,
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City
�;
awarded the day of �� � r`'Y �����, 20_, which Contract is hereby referred to and
made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment
labor and other accessories defined by law, in the prosecution of the Work, including any Change
Orders, as provided for in said Contract designated as Water and Sanitar�Sewer Replacement
Contract 2014 WSM-D Part 3, City Project No. 02385.
23 NOW, TH�REFORE, the condition of this obligation is such that if the said Principal
24 shall faithfully perform it obligations under the Contract and shall in all respects duly and
25 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
26 specifications, and contract documents therein referred to, and as well during any period of
27 extension of the Contract that may be granted on the part of the City, then this obligation shall be
28 and become null and void, otherwise to remain in full force and effect.
29
30
31
PROVID�D FURTH�R, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS City Projec[ No. 02385
Revised July l, 201 l
00 61 13 - 2
PERFORMANCE BOND
Page 2 of 2
Bond No. 823 8-20-19
1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statue.
4 IN WITN�SS WHEI2EOF, the Principal and the Surety have SIGNED and SEALED
5 this instrument by duly authorized agents and officers on this the day d$� �;��9 ��� `l(I I%�, 20_.
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
�
,. . - - ' �
Witness �a o Surety Elizabeth Gray V'
38
39
40 *Note:
41
42
43
PRINCIPAL:
WOODY CONTRACTORS, INC.
�
BY:
Sig re
1 l'O N W D O d h � �!"C S 1�D� ✓� �
Name and T' e
Address: 650 Tower Drive
Kennedale, Texas 76060
SURETY:
VIGILANT INSURANCE COMPANY
�,
� 6
%
.
BY: /
ignature
Kvle W Sweenev Attorney-in-Fact
^ Name and Title
Address: 2001 Brvan Street Suite 3400
Dallas Texas 75201
Telephone Number: 214-754-0777
If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIFICATION DOCUMGNTS City Project No. 02385
Revised July 1, 2011
��� � �
Witness as to Principal
�
�
1
2
3
4
5
6
THE STAT� OF T�XAS
00 61 14 - 1
PAYMENT BOND
Page 1 of 2
Bond No. 8238-20-19
SECTION 00 61 14
PAYMENT BOND
`
��
d
9
I
7
8
9
10
11
12
13
14
15
16
COUNTY OF TARRANT
.
KNOW ALL BY TH�SE PRES�NTS:
That we, Wood,y Contractoi•s, Inc. , known as "Principal"
herein, and Vi�ilant Insurance Company , a corporate surety (sureties),
duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or
more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created
pursuant to the laws of the State of Texas, known as "City" herein, in the penal sum of Seven
Hundred Thii•t�Ei�ht Thousand One Hundred Ei�hty-Eight Dollars & Six Cents ($738 188.06),
lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the
payment of which sum well and truly be made, we bind ourselves, our heirs, executors,
administrators, successors and assigns, jointly and severally, firmly by these presents:
17 WHEREAS, Principal has entered into a certain written Contract with City, awarded
18 the dayof �)�_I�� �i; �:- %�����0_, which Contract is hereby referred to and made a part
19 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and
20 other accessories as defined by law, in the prosecution of the Work as provided for in said
21 Contract and designated as Water and Sanitary Sewer Replacement Contract 2014, WSM-D, Part
22 3, Citv Project No. 02385.
23 NOW, THEI2�FOR�, THE CONDITION OF THIS OBLIGATION is such that if
24 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defned in
25 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
26 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
27 force and effect,
� 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
29 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
30 accordance with the provisions of said statute.
31
C[TY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIF[CATION DOCUMENTS City Project No. 02385
Revised July l, 2011
i �
00 61 14 - 2
PAYMENT BOND
Page 2 of 2
Bond No. 8238-20-19
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
2
3
4
5
6
7
8
9
10
11
this instrument by duly authorized agents and ofiicers on this the _ day o�� T �, 20_.
ATTEST:
(Principal) Secretary
.t.�a�.Qc.J
Witness as to Principal
ATTEST:
(Surety) Secretary
� , , ,
Witness as Surety Elizabeth y
PRINCIPAL:
WOODY CONTRACTORS,INC.
BY: �
ign e
/'o N �%Od v1 �' 1 /�5l ��{ ✓t- i
Name and Title
Address: 650 Tower Drive
Kennedale, Texas 76060
SURETY:
Address: 2001 Bryan Street, Suite 3400
Dallas, Texas 75201
Telephone Number: 214-754-0777
Note: If signed by an officer of the Surety, there must be on file a certifed extract from the
bylaws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF S�CTION
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDAItD CONSTRUCTION SPEC[F[CATION DOCUMENTS City Project No. 02385
Revised July 1, 2011
Name and Title
�
d
1
1
�
00 61 l9 - 1
MAINTENANCE BOND
Page 1 of 3
Bond No. 8238-20-19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
S�CTION 00 61 19
MAINTENANCE BOND
THE STATE OF T�XAS
COUNTY OF TARRANT
.
K1VOW ALL BY THESE PRESENTS:
That we Wood,y Contractors, Inc. , known as "Principal"
herein and V�ilant Insurance Company , a corporate surety
(sureties, if more than one) duly authorized to do business in the State of Texas, known as
"Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a
municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein,
in the sum of Seven Hundred Thirty-Eight Thousand, One Hundred Ei�ty-Eight Dollats & Six
Cents ($738,188.06), lawful money of the United States, to be paid in Foi�t Worth, Tarrant
County, Texas, for payment of which sum well and truly be made unto the City and its
successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
19 WHEREAS, the Principal has entered into a certain written contract with the City awarded
20 the day of ���''� ���� ��� �;��20_, which Cont�•act is hereby referred to and a made part
21 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and
22 other accessories as defined by law, in the prosecution of the Work, including any Work resulting
23 from a duly authorized Change Order (collectively herein, the "Work") as provided for in said
24 contract and designated as Water and Sanitar�Sewex Replacement Contract 2014, WSM-D, Part
25 3, City Project No. 02385; and
26
27 WH�R�AS, Principal binds itself to use such materials and to so construct the Work in
28 accordance with the plans, specifications and Contract Documents that the Work is and will
29 remain free from defects in materials or workmanship for and during the period of nvo (2) years
30 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
31
32 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
33 upon receiving notice fi•om the City of the need thereof at any time within the Maintenance
34 Period.
;
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCT[ON SPECIF[CATION DOCUMENTS Ciry Project No. 02385
Revised July 1, 2011
�
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
00 61 19 - 2
MA[NTENANCE BOND
Page 2 of 3
Bond No. 8238-20-19
NOW THEREFORE, the condition of this obligation is such that if Principal shall
remedy any defective Work, for which timely notice was provided by City, to a completion
satisfactory to the City, then this obligation shall become null and void; otherwise to remain in
full force and effect.
PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
noticed defective Work, it is agt•eed that the City may cause any and all such defective Work to
be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and
the Surety under this Maintenance bond; and
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division; and
PROVIDED FURTHER, that this obligation shall be continuous in nature and
successive recoveries may be had hereon for successive breaches.
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02385
Revised July 1, 2011
00 61 19 - 3
MAINTENANCE BOND
Page 3 of 3
Bond No. 8238-20-19
fi]
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
IN WITNESS WHEItEOF, the Principal and the Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the _ day o�(�I�' �;� ��;)��'��., 20_.
ATTES •
(Principal) Secretary
�k.,� .t.�lc�
Witness as to Principal
ATTEST:
(Surety) Secretary
� ' , ' -- � ��
Witness � o Surety Elizabeth Gray
PRINCIPAL:
WOODY CONTRACTORS, INC.
I: `i//;� i
= ' � .�
"'�� � l
% � � 1
ame and Ti e
Address: 650 Tower Drive
Kennedale, Texas 76060
SURETY:
VIGILANT INSURANCE COMPANY
�
BY:
ignature
Kvle W. Sweeney, Attorney-in-F�ct
Name and Title
Address: 2001 Bryan Street, Suite 3400
Dallas, Texas 75201
Telephone Number: 214-754-0777
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
C[TY OF FORT WORTH Water and Sa��itary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS City Project No. 02385
Revised July 1, 20l I
Policyholder Information Notice
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call Chubb's toll-free telephone number
for information or to make a complaint at
1-800-36-CHUBB
You may contact the Texas Department of
Insurance to obtain information on companies,
coverages, rights or complaints at
1-800-252-3439
You may write the Texas Department of Insurance
P.O. Box 149104
Austin, TX 78714-9104
FAX # (512) 475-1771
Web: http://www.tdi.state.tx.us
E-mail: ConsumerProtection@tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium
or about a claim you should contact the agent first.
If the dispute is not resolved, you may contact the
Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not
become a part or condition of the attached
document.
AVISO IMPORTANTE
Para obtener informacion o para someter una
quej a:
Usted puede llamar al numero de telefono gratis
de Chubb's para informacion o para someter una
queja al
1-800-36-CHUBB
Puede comunicarse con el Departamento de
Seguros de Texas para obtener informacion acerca
de companias, coberturas, derechos o quejas al
1-800 252-3439
Puede escribir al Departamento de Seguros de
Texas
P.O. Box 149104
Austin, TX 78714-9104
FAX # (512) 475-1771
Web: http://www.tdi.state.tx.us
E-mail: ConsumerProtection@tdi.state.tx.us
DISPUTAS SOBRE PRIMAS O RECLAMOS:
Si tiene una disputa concerniente a su prima o a un
reclamo, debe comunicarse con el agente primero.
Si no se resueve la disputa, puede entonces
comunicarse con el depart�inento (TDI).
UNA ESTE AVISO A SU POLIZA:
Este aviso es solo para proposito de informacion y
no se convierte en parte o condicion del documento
adjunto.
Form 99-10-0299 (Rev. 1-08)
Chubb
Surety
CHCJBe
POWER Federal Insurance Company Attn: Surety Department
OF Vigilant Insurance Company 15 Mountain View Road
ATTORNEY pacific Indemnity Company Warren, NJ 07059
Know All by These Presents, That FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE
COMPANY, a New York corparation, and PACIFIC INDEMNlTY COMPANY, a Wisconsin corporation, do each hereby constitute and
appoint Elizabeth Gray, Charles D. Sweeney, Kyle W. Sweeney and Michael A. Sweeney of Fort Worth, Texas -----------------
each as their true and iawful Attorney- in- Fact to execute under such designaUon in their names and to aKx their corporate seals to and deliver tor and on their behalf as surety
thereon or olherwise, bonds and undertakings and other writings obiigatory in ihe nature thereof (olher than bail bonds) given or executed in the course of business, and any
instruments amending or ailering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations.
in Wifness Whereof, said FEOERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY have each executed and attested
these presents and aifixed their corporate seals on this 26th day of Aprll, 201
/ � .r
--...__
ennet . i, A istant ecre ry Da ' . NorBs, Jr., Vice President
STATE OF NEW JERSEY
ss.
' County of Somersel
On this 261h day of April, 2011 before me, a Notary Public of New Jersey, personally came Kenneth C. Wendei, to me
k�own to be Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY, the companies which
executed the foregoing Power af Attorney, and fhe said Kenneth C. Wendel, being by me duly sworn, did depose and say that he is Assistant Seaetary o( FEDERAL
INSURANCE COMPANY, VIGIIANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and knows the corporate seais thereof, that the seals affixed to the
foregoing Power of Attorney are such corporate seals and were thereta aKxed by aulhoriry of the By- Laws of said Companies; and thaf he signed said Power of Attomey as
Assistant Secretary of said Companies by like authorily; and that he is acquainted with David B. Norris, Jr., and knows him to be Vice President of said Companies; and that the
signature of David 8. Norris, Jr., subscribed to said Power of Attorney is io the genuine handwriting of David 8. NoRis, Jr., and was iherefo subscribed by authority of said By-
Laws and in deponenYs presence.
Notarial Seal
KATHERiNE J. ADEUAR
�� � � NOTi�RY PU9LIC OF NEW JFkSFI ���G�v�"
�Q �PRY �� N�.2�1G685
��P����G� Comm'�i�n 6cpir� July 16, 241�
Notary Public
N�� . GERTIFICATION
Extract from the By- Laws of FEDERAL INSURANCE COMFANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY:
'AIf powers of attorney for and on behaif of the Company may and shall be executed in the name and on behalf of the Company, either by the Chairman or ihe
President or a Vice President or an Assistant �ce President, Jointly with the Secretary or an Assistant Secretary, under their respective des(gnations. The
signature of such officers may be e�graved, prinfed or liihographed. The signature of each of the following officers: Chairman, President, any Vice President, any
Assistant Vice President, any Secretary, any Assistant Secretary and the seal of the Company may be a(fixed by facsimile to any power of attorney or to any
certificate relating thereto appointing Assistant Secretaries or Attomeys- in- Fact for purposes only of executing and attesting bonds and undertakfngs and other
ti+nitings ohiigatory in the nature lhereof, and any such power of attorney or certificate 6earing such facsimile signature or facsimile seal shall he valid and bfnding
upon the Company and any such_power so executed and certified by such facsimile signature and facsimile seal shall be vai(d and binding upon the Company
wilh respect to any bond or undertaking to which it is attached'
I, Kenneth C. Wendel, Assistant Seuetary ot FEOERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPAhlY, and PACIFIC INOEMNITY COMPANY
(the'Compa�les') do hereby certiry that
(i) the foregoing extract of the By- Laws of the Companies is true and corcect,
(ii) the Companies are duly licensed and authorized to transact surety business in all 50 of the United States of America and the District of Columbia and are
authorized by the U.S. Treasury Department; further, Federal and Vigilant are licensed in Puerto Rico and the U.S. Virgin Islands, and Federaf is licensed in
Amedcan Samoa,.Guam, and each of the Provinces of Canada except Prince Edward Island; and
(iii) lhe foregoing Power of Attorney is true, correct and in full force and e(fect.
Given under my hand and seais of said Companies et Warren, NJ this
' �yut�N� ,�,vunr � `,�yuaak��,
f��Y` c� 3.�'�tF'otrrf�,i� � `'of
"' c � i
—�— i�
R
{11W �'� � I� t� `{� � 4
�OIANP '�! MS�� N6W YOR�f-
' e ne . en ei, . istant Secretary
IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM, VERIFY THE AUTHENTICITY OF THiS BOND OR NOTIFY US OF ANY OTHER
MATTER, PLEASE CONTACT US AT ADDRESS LISTED ABOVE, OR BY 7elephone (908) 903- 3493 Fax (908) 903- 3656
Form 15-10- 02256- U(Ed. 5- 03) CONSENT
,�
AGENCY CUSTOMER ID: WOODYS
LOC #:
AC O� ADDITIONAL REMARKS SCHEDULE Page � of �
��
. AGENCY NAMEDINSURED
' Higginbotham Insurance Agency, Inc. Woody Contractors, Inc.
Po�icv NUMeea 650 Tower Dr.
Kennedale TX 76060-3012
��� CARRIER NAIC CODE
'�. EFFECTIVE DATE:
ADDITIONAL REMARKS
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE
where there is a written contract between the Named Insured and the certificate holder that requires such status.
' The Automobile Liability policy includes a blanket notice of canceliation to certificate holders endorsement, providing for 30 days' advance
' notice if the policy is canceled by the company other than for nonpayment of premium, 10 days' notice after the policy is canceled for
nonpayment of premium. Notice is sent to certificate holders with mailing addresses on file with the agent or the company. The endorsement
does not provide for notice of cancellation if the named insured requests cancellation.
Umbrella is foilow form.
RE: WATER AND SANITARY SEWER REPLACEMNT CONTRACT 2014, WSM-D, PART 3, CITY PROJECT NO. 02385
= PO�ICIES INCLUDE AN ENDORSEMENT PROVIDING 30 DAYS NOTICE OF CANCELLATION (10 FOR NON-PAY OF PREMIUM)
THE CERTIFICATE HO�DER.
ACORD 101 (2008/01) O 2008 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
oo6izs-i
CERTIFICATE OF INSURrWCE
Page 1 of I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
SECTION 00 61 25
CERTIFICATE OF INSURt1NCE
END OI+ SECTION
CITY OF FORT WORTH 6{�nler nnd Snnilnry Seiver Replacentent Corth•nct 2014, [{�SA/ D
STANDARD CONSTRUCT[ON SPEC[F[CAT[ON DOCUMENTS Cr�j� Projec7 No. 02385
Revised July I, 20l 1
STANDARD GENERAL CONDITIONS
OF THE CC?NSTRUCTION CONTRACT
CITY OP FORT WORTH
S"CANDAI2U CONS'i'RUC'['[O'� SPECI[�Ct�"1'[04 DOCUi�1FNT5
Revisi��n: C7ecemt�,v23, 20t2
STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
A►�ticle (— Definitions and Termino(ogy .......................................................................................................... I
I.O1 Detined Terms ....................................................................�.......,....,...,.......,......,...,,......,..,,....,,,,., l
L02Terminology ......................................................................................................„..,......,,..,....,,.......6
Article2 — Preliminary Matters .........................................................................................................................7
2.01 Copies of Documents ........ ........................................................................................................7
2.02 Commencement of Contract Time; Notice to Proceed ................................................................ 7
2.03 Startin� the Work ..........................................................................................................................8
2.04 Before Starting Construction ........................................................................................................ 8
2,05 Preconstruction Conferenee ..........................................................................................................8
2.06 Public Meeting .............................................................................................................................. 8
2.07 Initial Acceptance of Schedufes ....................................................................................................8
Article 3— Contract Documents: Intent, Amending, Reuse ............................................................................8
3.0 I Intent .............................................................................................................................................. 8
3.02 Reference Standards ......................... .....................................................�............,......,...............9
3.03 Reporting and Resolving Discrepancies .......................................................................................9
3.04 Amending and Supplementing Contract Documents ................................................................. l0
3.05 Reuse of Documents ...................................................................................................................10
3.06 Electronic Data ................................................................................�.,........,....,....,........,.......,.....1 l
A►�ticle 4— Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmentat
Conditions; Reference Points ........................................................................................................... l I
4.01 Availability of Lands .................................................................................................................. i I
4.02 Subsui•face and Physical Conditions .......................................................................................... 12
4.03 Differing Subsurface or Physicai Conditions ............................................................................. 1?
4.04 Underground Facilities ............................................................................................................... I 3
4.05 Reference Points ...............�...........,.................�.........,...,.....,....,.........,.....................,�.,.........,...,. (�
4.06 Hazardous Environmenta! Condition at Site ..............................................................�............... (�E
Article5— Bonds and Insurance ................................................... .............................................................. 16
SAl Licensed Sureties and Insurers ................................................................................................... I6
5.02 Perf'ormance, Payment, and Maintenance Bonds ............ .................. .. ...........................16
5.03 Certificates of Insurance .............................................................................................................16
5.04 Contractor's Insurance ................................................................................................................18
5.05 Acceptance of Bonds and [nsurance; Option to Replace ........................................................... 19
Article 6 — Contractor's Responsibilities ....................... .............................................................................19
6.01 Supervision and Superintendence ............................................................................................... 19
ci-ry or rok r w�rTF�
S'fANDARG CONS'TRUC'11QN SNFC[FCA'iION DC)CUMENTS
Revision: Ckcember2l,'20t2
6.02 Labor; Working Hours ............................:...................................................................................2Q
6.03 Services, Materials, and Equipment ...........................................................................................2C!
6.04 Project Schedule ..........................................................................................................................21
6.05 Substitutes and "Or-Equals" ................................................................................... ...............2)
6.06 Conceening Subcontractors, Suppliers, and Others ....................................................................24
6.0'7 Wage Rates ............................................................................................ .....................................25
6.08 Patent Fees and Royalties ...........................................................................................................2Ci
b.09 Permits and Utilities ................................................ .......................<........�,.....�....,.....,.............27
6.10 Laws and Regulations .................................................................................................................27
6.l 1 Taxes ..................... ....................................................�............................................................,2K
6.12 Use of Site and Other Areas .................................... ........................................... ...............2�3
6.13 Reeord Docutnents ........................................................ ......................................�.......,,..,,,.....2�)
6.14 Safety and Protection ......................................................�.....................,,.,...,....:.,....................... 2�)
6.15 Safety Representative ..................................................................................................................3�
6.16 Hazard Communication Programs ...........................................................<.........,....,.........,........30
6. ( 7 Emergencies and/or Rectification ............................:.................................................................. 3C}
6.1 S Su6mittals ............. . . ..... ...........,.......,.......................... ......................,......................31
6.19 Continuing the Work ...................................................................................................................32
6.20 Contractor's General Warranty and Guarantee ..........................................................................:�2
b.21 Indemnification ................................................................................................................:........33
6.22 Delegation of Professional Design Services ..............................................................................3�I
6.23 Right to Audit ...............................................................................................................................3=�
6.2� Nondiscrimination ......................... .,............,..........,.................................,...........,.......,.......,.3�
Article7- Other Work at the Site ................................................................................................................... �5
7A1 Related Work at Site ............................................................................................. �5
7.02 Coordination .............................................................................................................. ......,......3C�
Article 8 - City's Responsibilities ......................................................�....................,.,..,..........................,.......36
8.01 Communications to Contractor .............................�...,.......,,...,...........,...,,.....,..........,...a..............36
8.02 Furnish Data ...............................................................................................>........,.......................36
8.03 Pay When Due ............................................................................................................................36
8.04 Lands and Easements; Reports and Tests ...................................................................................36
8.05 Change Orders .............................................................................................................................36
8.06 Inspections, Tests, and Approvals ..............................................................................................36
8.07 Limitations on City's Responsibilities ....................................................................................... 37
8.08 Undisclased Hazardaus Environmcntal Condition .............................................:......................37
8.09 Compliance with Safety Program ....... ................................. ... ............. ....................... ..37
tlrticle 9- City's Observation Status Uuring Construction ...........................................................................37
9.01 City's Project Representative ......................................................... ........................................37
9.02 Visits to Site ................................................................................................................................ 37
9.03 Authorized Variations in Work ..................................................................................................38
9.04 Rejecting Defective Work ........................................................ ................................................. 38
9.05 Determinations f'or Work Performed .........................................................................:................38
9,06 Decisions on Requirements of Contract Documents and Acceptabi(ity of Work .....................38
CI'['Y OE FORT WOCtTEt
S'I'ANDARUC'ONS'fRt'C:TIONSPECIFCAI'lON DOC'UMEN'I;S
Rev�sion: lk�e�nlier2l, 2012
Article l0 - Changes in the Work; Claims; Extra Work .................,.,..,....,,:,.,.,,.....,....,................................. 38
10.01 Authorized Changes in the Work ............................................................................................... ��
10.02 Unauthorized Changes in the Work ................................:.........................................................� 3�)
10.03 Execution of Change Orders ............................................�...........,.......,....�...,....,,.,.,...,,,....,.,.,.„,.:�tl
I0.04 Extra Work �
..................................................................................................................................3 )
10.05 Noti6cation to Surety ..................................................................................................................:3�)
10.06 ContractClaimsProcess .................................................................:...........................................�40
Article 11 -Cost ofthe Work; Allowances; Unit Price Work; Plans Quantity Measurement ......................41
11,01 Costofthe Work .........................................................................................................................41
11.02 Allowances .....................................................................<.....,....,................,.........,.,.,..,,...,.,.,,..,.,43
I 1.03 Unit Price Work .....................................................................................................................
.....44
11.04 Plans Quantity Measurement .........................�..,..,..............,...........,.....,...........,...,.,......,.,.......,..45
Article 12 - Change oFContract Price; Change of Contraet Time ...............................................................�.46
12.01 Change ofContract Price ............................................................................................................46
12.02 Change of Contract Time ............................................................................................................47
12.03 Delays ..........................................................................................................................................47
Article I 3- Tests and Inspections; Correction, Removal or Acceptance of Defective Work ......................48
I3.01 Notice of Defects ........................................................................................................................48
13.02 Access to Work ........................................................�..........................,...............,......................,48
13.03 Tests and Inspections ..................................................................................................................48
13.04 Uncovering Work ........................................................................................................................49
13.05 City May Stop the Work ...................................................................................t,....,.,.................49
13.06 Correction or Removal of Defective Work ................................................................................50
13.07 Correction Peeiod ........................................................................................................................54
13.08 Acceptance of Defective Work ................................................................................................... 51
I3.09 City May Correct Uefective Work ......................................................................�....,....,............51
Article 14 - Payments to Contraetor and Completion ...............................�....�........,,...,.........,.......,,.,,...,,.,,.,, 52
14.O1 Schedule of Values ......................................................................................................................52
14.02 Progress Paytnents ................................................................... ............................................... 52
14.03 Contractor's Warranty of Title .................................. ............................................................. 54
14.04 Partial Utilization .................................�,.......,....�......,.�..............................�......,.......,.............,...55
14.05 Finai Inspection ...........................................................................................................................55
14.06 Final Acceptance .........................................................................................................................55
14.07 Final Payment ..............................................................................................................................56
14.08 Final Completion Delayed and Partial Retainage Release ........................................................56
14.09 Waiver of Claims ........................................................................................................................ 57
Article 15 - Suspension of Work and Termination ................. ............57
I5.01 City May Suspend Work .............................................................................................................57
15.02 City May Terminate Por Cause ...................................................................................................58
15.03 City May Terminate For Convenience .......................................................................................60
Article l6 - Dispute Resolution ......................................................................................................................61
16.01 Methods and Procedures .............................................................................................................61
CITY OF t�ORT WORTk{
STANDAIZD CONS'I"RUC'1'I(>N SPI:C;N�(:'A'IION I:)OClJ�41LiN'I'S
Itevision: Lk�cantxr2l, 2012
Article17—Miscellaneous ..............................................................................................................................62
17.01 Giving Notice ..............................................................................................................................62
17.02 Computation of Times ................................................................................................................ 62
17.03 Cumulative Remedies .................................................................................................................62
17.04 Survival of Obligations ...............................................................................................................63
1'7.05 Headings ......................................................................................................................................63
CITY OF P'OR'I' WOR'I'FI
STAND�IRD CONSTRUC'I'ION SPF.CIFCA'PION DOCUMENTS
2evision: I�+c;ember2t, 2012
UO7200-i
General Cundidons
Pagc I oF63
ARTICLE 1— D�FINITIONS AND T�RMINnLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural ther�eof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed-defined term, the te��rn shall have a meaning as defined below whether
capitali-r.ed or italicized or otherwise. In addition to terms specitically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
l. Addendu—Written or �•aphic instruments issued prior to the opening of Bids which clarify,
correct, or chatz�e the Bidding Requirements or the proposed Contract Documents.
2. Agreement—The written instrument which is evidence of the agreement between City and
Cantractor coverin�; the Work.
3. Application f'or Payment—The form acceptable to City which is to be used by Contractor
during the course of the Work in requesting progress or final payments and which is to be
accompanied by such supporting documentation as is required by the Contract Documents.
4. Asbestos—Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
S. Award— Authorization by the City Council for the City to enter into an Agreement.
6. Bid—The offer or pi�oposa( of a Bidder submitted on the prescribed fortn setting forth the
prices t��r the Work to be performed.
7. Bidder--The individual or entity who submits a Bid directly to City.
$. Bidding I�ocasments—The Bidding Requirements and the proposed Contract Documents
(including all Adtienda).
9. Bidding Reyuiremerrls—The advertisement or Invitation to Bid, [nstructions to Bidders, Bid
security of acceptable form, if any, and the Bid Form with any supplements.
10. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
t l. Baczzsmv — City's on-(ine, electronic document management and co(laboratian system.
I2. C'alendar Dcry — A day consisting of 24 hours measured fi�om midnight to the next midnight.
C:f'CY QF F(11tT 4V17R"f[I
5"t'ANt�ARD CONS'CRUCTfON SPFCIFCA'I'IC?N DOCU 41EN'tS
Revision: Ck�ernlxr2L 2012
OQ7200-I
Gcncral Condikions
Page 2 af 63
13. Change Order—A document, which is prepared and approved by the City, which is signed
by Contractor and City and authorizes an addition, deletion, or revision in the Work or an
adjustment in the Contract Price or the Contract Time, issued on o►• after the Effeetive Date
of the Agreement.
14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and
chartered under the Texas State Statutes, acting by its governing body through its City
Manager, his designee, or agents authorized under his behalt; each of which is required by
Charter to perform specific duties with responsibility for final enforcement of the contracts
involving the City of Fort Worth is by Charter vested in the City Manager and is the entity
with whotn Contractor has entered into the Agreement and for whom the Work is to be
performed.
15. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or
his duly authorized representative.
16. Ciry Council - The duty elected and qualified governing body of the City of �ort Worth,
Texas.
1?. C'ity Manager� — The officially appointed and authorized City Manager of the City of Fort
Worth, Texas, or his duly authorized representative.
18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of
Contract Price or Contract Time, or both, or other relief with respect to the tenns of the
Contract. A demand for money or services by a third party is not a Contract Clairr►.
19. Cantract—The entire and integrated written document between the City and Contractor
concerning the Work. The Contract contains the Agreennent and all Contract Documents and
supersedes prior negotiations, representations, or agreements, whether written or oral.
20. Cantract D�cuments—Those items so designated in the Agreement. All items listed in the
Agreement are Cantract Documents. Approved Submittals, other Contractor submittals, and
the reports and drawings of subsurface and physical conditions are not Contract Documents.
Z1. Contrcrct Pf•ice—The moneys payable by City to Contractor for completion of the Work in
accordance with the Contract Documents as stated in the Agreennent (subject to the
provisions af Paragraph 11.03 in the case of Unit Price Work).
22. Cantract Time—The number of days oj• the dates stated in the Agreement to: (i) achieve
Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance.
23. Contr•actor—The individual or entity with whom City has entered into the Agreement.
24. Cost af the Work—See Paragraph l 1.01 of these General Conditions fc�r definition.
crry or t�oiz�r woa rt �
STANDARD CONSTRUC`"I'ION SPECIfCATfON �OCL�Rif=.N"TS
ficvision: Ck�:emt�21, 2!)12
00 72 CO - 1
Genc�ui Condivans
Page 3 oP63
25, Damcage Claims — A demand For money or services arising from the Project or Site from a
third party, City or Contractor exclusive of a Contract Claim.
26. Day or day — A day, unless otherwise defined, shall mean a Calendar Day.
27. Director of.4viatinn — The c�ffiicially a�pointed f.)irector of the Aviation Department ofi the
City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents.
28. Directnr• of Park,s and Commzinity Services — The officially appointed Di��ector of the Parks
and Community Services Department of the City of Fort Worth, Texas, or his duly appointed
representative, assistant, or agents.
29. Director• nf Planning crnd Development — The ofticially appointed Director of the Planning
and DeveCopment Deparkment of the City of Fort Worth, Texas, or his duly appointed
rep►•esentative, assistant, ar agents.
30. Director of 7ransportation Public Works — The officially appointed Director of the
Transportatian P��blic Works Department of the City of' Fort Worth, Texas, oc• his duly
appointed representative, assistant, or agents.
3l. I�irector of Water Department -- The officially appointed Director of the Water Department
of the City of Fort Worth, Texas, or his duly appainted representative, assistant, or agents,
32. Drawin�s--That part of the Contract Documents prepared or approved by Engineer which
graphica(ly shows the scope, extent, and character of the Work to be perf�rmed by
Contractor. Submittals are not Drawings as so defined.
33. Eff'eclive Dnte of the A�f-eement—The date indicated in the Agreement on which it becomes
effective, but if no such date is indicated, it means the date on which the Agreetnent is signed
and delivered by the (ast of the two parties to sign and deliver.
34. En�rneer—The licensed professional engineer or engineering fit-m registered in the State of
Texas performing professional seiwices for the City.
35. Extrcz Wark — Additional work made necessary by changes or a(terations of the Contract
Doc�iments or of c�uantities or for other reasons for which no prices are provided in the
Contract Uoeuments. Extra work shall be part ofthe Work.
36. Field Ordei, — A written order issued by City which requires changes in the Work but which
does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer.
Field Orders are paid from Field Order Allowances iz�coiporated into the Contract by funded
work type at the tittte of award.
3'7. Fincal Acceptcrnce — The written notice given by the City to the Contractor that the Work
specifted in the Contract Documents has been campleted to the satisfaction of the City.
C:I'I'Y<)F FO�T WC)R'CH
STANUAItD CONS'fKLIC'fll)N SE'i;CIPCA"PION L70CUh1EN't'S
Rcvision: Dtamf�uZf, 2012
00 �z oa - �
General Conditions
I'age 4 oC63
3$. Final Inspection — Inspection carried out by the City to verify that the Contractor has
cotnpleted the Work, and each and every part or appurtenance thereof, Fully, entirely, and in
conformance with the Contract Documents.
39. GeneraC Requirements—Sections of Division 1 of the Contract Documents.
40. Hcrzardous Environmentnl Cnndition—The presence at the Site of Asbestos, PCBs,
Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or
circumstances that may present a substantial danger to persons or property exposed thereto.
41. HUzardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or
possesses one ar more hazardous characteristics as defined in the federal waste regulations,
as amended from time to time.
42. L,ativ,s and Re�nrlations—Any and all appIicable iaws, rules, regutations, ordinances, codes,
and orders of any and all gove►mmental bodies, ageneies, authorities, and courts having
jurisdiction.
43. Liens—Charges, security interests, or encumbrances upan Project Funds, real pr�operty, or
personal property.
44. Major Item — An Item of work included in the Contract Documents that has a total cost equal
to or greater than S°/fl of the original Contract Price or $25,000 whichever is less.
45. Milestone—A principal event specified in the Contract Documents relating to an intennediate
Contract Time prior to Final Acceptance of the Work.
46. Notice �f' Awurcl—The written notice by City to the Successful Bidder stating that upon
lime(y compliance by the Successful Bidder with the conditions precedent listed therein, City
will sign and deliver the Agreement.
47. Notice to Proceed—A written notice given by City to Contractor fixing the date on which the
Contraet Time will commence to run and on which Contractor shall start to perform the
Work specified in Contract Documents.
48. PCBs—Po(ychlorinated biphenyls.
49. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard
conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square
' inch absolute), such as oil, petroleum, fi�el oil, oil sludge, oi( refuse, gasoline, kerosene, and
oil mixed with other non-Hazardous Waste and crude oils.
50. PCarrs — See definition of Drawings.
C'ITYOf EORTLVORTFI
STANDAf2D CONS"I'RUC"f'[ON SPFCIFCATION DOCUMLN'CS
Kevision: Ck�ember2l, 2012
uonoo-i
General Conditions
Pa�c 5 uf 63
51. Project Schedule—A schedule, prepared and ►naintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time,
52, Prnject—The Work to be performed under the Contract Documents.
53. Project Representative—The authorized representative of the City who will be assigned to
the Site.
54. Public Meeting — An announced meeting conducted by the City to facilitate public
participation and to assist the public in gainin�; an informed view of the Project.
55. Rac�ioactive Material--Source, special nuclear, or byproduct material as defined by the
Atomic Energy Act of 195� (42 USC Section 2011 et seq.) as amended from time to time.
56. Regzrlar Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding lega) halidays).
57..4amples—Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which estabtish the standards by which such
portion ofthe Work will be judged.
58. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required
submittals and the time requirerrtents to support scheduled performance of related
construction activities.
59. Schedule qf' Vcrlues—A schedule, prepa►•ed and maintained by Contractor, allocating portions
of the Contract Price to various portions of the Work and used as the basis for reviewing
Contractor's Applications for Payment.
60. Site—Lands or areas indicated in the Contract Documents as being furnished 6y City upon
which the Work is to be performed, including rights-ot=way, permits, and easements for
access thereto, and such other lands furnishect by City which are designated for the use of
Contractor.
61. 5pecificatior�s --That part of the Contract Documents consisting of written requirements tor
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto. Specifications
may be specitically made a part of the Contract Documents by attachment or, if not attached,
may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00)
ofeach Project.
62, Suhcontractor—An individual ar entity having a direct contract with Contractor or with any
other Subconh•actor for the performance of a part of the Work at the Site.
CITY (1F' FQR'1' 4VOft'Cf I
S'CANDARDCONSTT:UCT(OM SPECIPCaI'tON D(')CUNt[iN'PS
Revisiun: [k�emlx� 2L 2tl l2
Op 72 O() - I
Generai Conditions
Page 6 oi'61
63. Submittals—All drawings, diagrams, illustcations, sehedules, and other data or information
which are specifically p►•epared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
64, Succe,ssfsl Bidder—The Bidder submitting the lowest and most responsive Bid to whom City
makes an Award.
b5. Superintendent — The representative of the Contractor who is available at all times and ablc
to receive instructions frvm the City and to act for the Contractor.
66. Supplementary Conciitivns—That part of the Contract Documents which amends or
supplements these General Conditions.
67. Supplzer—A tnanufacturer, fabricator, supplier, distributor, materialman, or vendor having a
direct contract with Contractor or with any Subcontractor to furnish materials or equipment
to be incorporated in the Work by Contractor or Subcontractor.
68. Underground Fczcilities—All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements
containing such facilities, ineluding but not limited to, those that convey electricity, gases,
steam, liquid petroleum products, telephone or othcr communieations, cable television,
water, wastewater, storm water, other (iquids a� cherrticals, or traffzc or other control systems.
69. Unit Prace Work—See Paragraph 11.03 of these General Conditions for definition.
70. Weekend Y['orking Hoae�s — Hours 6eginning at 9:00 a.m. and ending at 5:00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
71. Work—The entire construction Ur the various separately identifiable parts thereof required to
be provided under the Contract Documents. Work includes and is the resutt of perfortning or
providing afl labor, services, and documentation necessary to produce such construction
including any Change Ordcr or Field Order, and furnishing, insta(ling, and incorporating all
materials and equipment into such construction, all as required by the; Contract Documents.
72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legai
holidays authorized by the City for contract purposes, in which weather ar other conditions
not under the control of the Contractor will permit the performance of the principal unit of
work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m.
I..02 Terminvlogy
A. The words and terms discussed in Paragraph 1.02.B throu�;h E are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Intent of Certain Terms ot- Adjectives:
cr-r�r oF Faa r w�iz rt �
S'PAtiD,4E2D CONS"1'RUC'['iON SPECIi'CA'CION DC}CUMEYI;S
Kevision: I.k�cmher2l, 201'
t)0 72 00 - I
C;eneral Conditions
Page 7 oC63
The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as
directed" or terms of like effect or import to authorize an exercise of judgrrient by City. �n
additian, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or
adjectives of like effect or import are used ta describe an action or detennination of City as to
the Work. It is intended that such exercise of professional judgment, action, or determination
will be solely to evaluate, in general, the Work f'or compliance with the information in the
Contract Documents and with the design concept of the Project as a fimctioning whole as
shown or indicated in the Contract Documents (unless there is a specific statement indicating
otherwise).
C. Defective.�
I. The word "defective," when modif'ying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicab(e inspection, reference standard, test, o►•
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
D. Furnrsh, Install, Perform, Provicte.•
L The word "Fumish" or the word "Install" c�r the word "Perform" or the word "Provide" or
the word "Supply," oc• any combination or similar directive or usage thereof, shall mean
Fi�rnishing and incorporating in the Work including all necessa�y labor, materials, equipment,
and everything necessa�y to perform the Work indicated, unless specifically limited in the
context used.
E. Unless stated otherwise in the Contract Documents, words or phrases that have a weli-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recagnized meaning.
ARTICLE 2 — PRELIMINARY MATTERS
2.O l Copies of'Docun�ents
City shall furnish to Contractor one (() original executed copy and one (1) electronic copy of the
Contract Documents, and four (4) additional copies of the Da�awings. Additional copies will be
furnished upon request at the cost ofreproduction.
2.02 Commencetnent �f Contract Time; Notice to Proceed
The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to
Pruceed may be given at any time within l4 days aftei• the F,fFective Uate of the Agreement.
ciTY t�r [���ra�c wo2Tt�
S"i'ANU�ItGCUN�S"l'RI�C'7'lON SPL-'C[FCA"CfON I]OCUMF.N'CS
12cvision: [kxemlzr21.21)12
007200- I
General Conditions
Pt�ge 8 of63
2.03 Starting the Work
Contractor shall start to perform the Work on the date when the Contract Time commences ta run.
No Work shall be done at the Site prior to the date on which the Contract Time commences to run.
2.04 Bcfore Starting Cvnslruction
Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the
Work.
2.OS Precvnstrttetion Conference
Before any VUork at the Site is started, the Contrackor shall attend a Preconstruction Conference a�
specified in the Contract Documents.
2.06 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
2.07 Initial Acceptance of �Schedules
No progress payment sha(1 be made to Contractor until acceptable scheduies are submitted to City in
accordance with the Schedule Specification as provided in the Contract Doeuments.
ARTICLE 3— CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE
3.0 ( Intent
A. The Contract Documents are complementary; what is required by one is as binding as if required
by all.
B. It is the intent of the Contract Documents to describe a functionally complete project (or part
thereofl to be constructed in accordance with the Contract Doci�ments. Any labor,
documentation, services, materials, or equipment that reasonably may be inferred from the
Contract Documents or from prevaiting custom or trade usage as being required to produce the
indicated result will be provided whether or not specifically called for, at n� additional cost to
City.
C. Clarifications and interpretations of the Contract Documents shall be issued by City.
D. The Specitications may vary in form, format and style. Some Specification sections may be
written in varying degrees of streamlined or declarative style and some sections may be
relatively narrative by comparison. Omission of such words and phrases as "the Contractor
shall," "in conformity with," "as shown," or "as specified" are intentional in st��camlined
sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions
may appear in various parts of a section or articles within a part depending on the format of the
CIT�` (�F FO(t l WOK"1'ht
S'C��;DARll CONSTRU("I'lOR SPt�:CIPCA'['fON D(lC'UM[iN"t�S
Revision: [kumfxr2l, 2012
40 72 00 - t
Genero: Conditions
Pa�e 9 oE'63
section. The Contractor shall not take advantage of any variation of form, format or style in
making Contract Claims.
E. 'The cross referencing of specification sections under the subparagraph heading "Related
Sections include but are not necessarily limited to:" and elsewhere within each Specification
s�ction is provided as an aid and convenience to the Contractor. The Contractor shall not rely on
the cross referencing provided and shall be responsible to coordinate the entire Work under the
Contract Documents and provide a complete Project whether or not the cross referencing is
provided in each section or whether or not the cross referencing is complete.
3.02 Referevtce Standards
A. Standards, Specitications, Codes, Laws, and Regulations
Refecence to standards, specifcations, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manua(, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as rnay be otherwise specificaily stated in the Contract Documents.
No provision of any such standard, specification, manua(, or code, or any instruction of a
Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any
of their subcontractors, consultants, agents, or employees, from those set forth in the Contract
Documznts. No such provision or instruction sha(1 be ef'fective to assign to City, or any of its
officers, directors, members, partners, employees, agents, consultants, or subcontractors, any
duty oc authority to supervise or direct the performance of the Work or any duty or authority
to undertake responsibility inconsistent with the provisions of the Contract Docurnents.
3.(?3 Reporting and Resolving Diserepaneies
A. Repor•ling Urscrepancie.s:
I. Conh•actor•'s IZeview qf Contract Docurnents Befor•e Starfing Work: Before undertaking each
part of the Wark, Contractor shall carefully study and compare the Contract Documents and
check and verif� pertinent figures therein against all applicable field measurernents and
conditions. Contractor shall promptly repo�t in writing to City any conflict, error, ambiguity,
or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a
wt•itten interpretation or clarification from City before proceeding with any Work affected
thereby.
2. Contructor's Review of C'ontract Document.s During Perfarmance of Work: [f, during the
performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy
within the Contract Documents, or between the Contract Docurnents and (a) any applicable
Law or Regulation ,(b) any standard, specifieation, rnanual, or code, or (c) any instruction of
any Supplier, then Contractor shall pi•omptly report it to City in writing. Contractor shall not
proceed with the Work affeeted thereby (except in an emergency as required by Paragraph
Ct"I'Y OF FC1R'f 4VOR"I'H
S'I'AN[7ARD t;ONSTRUC7'IUN SPEiCIPC;ITIC)�t C.IOCUivfENTS
Revision: [kccmber2l. 2012
o�noa- i
Generai Conditions
Page 10 of 63
6.17.A) until an amendment or supplement to the Contract Documents has been issued by
one of the methods indicated in Paragraph 3.04.
3. Contractor shall not be liable to City for failure to report any cont7ict, error, ambiguity, or
discrepancy in the Contract Documents unless Contractor had actual knowledge thereof.
B. Resolving Drscrepancie.s:
1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of
the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, oi•
discrepancy between the provisions of the Contract D�cuments and the provisions of any
standard, specification, manual, or the instruction of any Sup�lier (whether or not specifea(ly
incorporated by reference in the Contract Documents).
2. In ease of discrepancies, figured ditnensions shall gove�n over scaled dimensions, Plans shall
govern over Specifications, Supplementary Conditions shatl govern aver General Conditions
and Specifications, and quantities shown on the Plans shall govern over those shown in the
proposal.
3.04 Amending arrd Supplementing Contract Documents
A. The Contract Documents may be amended to provide f�r additions, deletions, and revisions in
the Work or to modify the terms and conditions thereoFby a Change Orde�•.
B. The requirements of the Contract Docurnents rnay be supplemented, and minor variations and
deviations in the Work not involving a chan�e in Gontract Price or Contract Time, may be
authorized, by one or tnore of the foltawin� ways:
1. A Field Order;
2. City's review of a Submittal {subject to the provisions of Parag��aph b.18.C); or
3, City's written interpretation or ctarifieation.
3.05 Reuse of Documents
A. Contractor and any Subcontractor or Supplier shall not:
1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or
other documents (or copies of any thereofl prepared by or bearing the seal of Engineer,
including electronic media editians; or
2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of
the Project or any other project without written consent of City and specific written
verification or adaptation by Engineer.
ci�-�r aF �a�zT woRTl i
S'1'.4NDAKUCONS'I'I2UC`fldN SPFCiFG\T[ON DOCI)MFN"T:S
Revision: [krzmtxr2(.2Q12
OU7200• I
Genenil Conditions
Pagc ( I of 63
B. The prohibitions of this Paragraph 3.05 witl survive final payment, or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract
Documents for record purposes.
3.06 Electronic Data
A, Unless othettivise stated in the Supplementary Conditions, the data furnished by City or Engineer
to Contractor, or by Contractor to City or• Engineer, that tnay be relied upon are limited to the
printed copies included in the Contract Documents (also known as hard copies) and other
Specifications referenced and located on the City's Buzzsaw site. Files in electronic media
fortnat of text, data, graphics, or other types are furnished only for the convenience of the
receiving party. Any conclusion or information obtained or derived from such electronic files
will be at the user's sole risl.. [f there is a discrepancy between the electronic files and the hard
copies, the hard copies govern.
B. When transferring documents in electronic media format, the transferring pa��ty makes no
representations as to long term cotnpatibility, usability, or readabi(ity of documents resulting
from the use of software application packages, operating systems, ar computer hardware
differing from those used by the data's creator.
ARTICLE 4— AVAILABILITY OF LANDS; SUBSUltFACE AND PHYSICAL CONDITIONS;
HAZARDOUS ENViRONMENTAL CONDITIONS; REFERENCE POINTS
4.01 Availafiility of Lanr�s
A. City shall fumish the Site. City shall notify Contractor of any encumbrances or restrictions not of
general appfication 6ut specifically re(ated to use of the Site with which Contractor must comply
in performing the Wock. City will obtain in a timely manner and pay for easements for
permanent structures or permanent changes in existing facilities.
The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or
easements. Any outstanding right-of=way and/or easements are anticipated to be acquired in
accordance with the schedule set forth in the Supplementary Conditions. The Project
Schedule submitted by the Contractor in accordance with the Contract Dacuments must
consider any outstanding right-of-way, and/or easements.
2. The City has or anticipates removing and/or reloc�ting utilities, and obstructions to the Site.
Any outstanding removaf or relocation of utilities or obstructions is anticipated in accordance
with the schedule set forlh in the Supplementary Canditions. The Project Schedule submitted
by the Contractor in accordance with the Contract Documents must consider any outstanding
utiiities or obstructions to be removed, adjusted, and/or relocated by others.
B. Upon reasonable written request, City shall furnish Contractor with a current statement of record
legal title and legal description of the lands upon which the Work is to be performed.
crrY or� ro�r r worz� F i
STANDARD CONS�IRUC'1'iQN SPECII�C'Al'tON Ut')CUMENTS
Revision: Ck°ccmLYr2l, 2012
O(172 QO - I
Gcncral Conditions
P3gc 12 oP63
C. Contractor shall pravide for alt additional lands and access thereto that may be requic•ed for
construction facilities or storage of materials and equipment.
4.02 Subsurface and Physical Conditions
A. Repor•t,s and Drawings: The Supplementacy Conditions identify:
1. those reports known to City of explorations and tests of subsurface conditions at or
contiguous to the Site; and
2. those drawings known to City of physical conditions relating to existing surface or
subsurface structures at the Site (except Underground Facilities).
B. Linrited Reliance by Cnntractor an Technical Data Authoriz�,�d: Contractor may re(y upon the
aeeuracy of the "technical data" cantained in such reports and drawings, but such reports and
drawings are not Contract Documents. Such "technical data" is identified in the Supptementary
Conditions. Contractor may n�t make any Contract Claim against City, or any of their officers,
directors, members, partners, employees, agents, consultants, or subcontractors with respect to:
1. the completeness of such reports and drawings for Contractor's purposes, inc(uding, but not
(imited to, any aspects of the means, methods, techniques, sequences, and procedures of
construction to be employed by Contractor, and safety precautions and programs incident
thereto; or
2. other data, interpretations, opinions, and information contained in such reports or shown ar
indicated in such drawings; ar
3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such
other data, interpretations, opinions, or infiormation.
4.03 D ffering Subsurfcrce o� Physical Canditions
A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or
revealed either:
1. is of such a nature as to establish that any "technica( data" on which Contractor is entitled to
rely as provided in Paragraph 4.02 is materially inaccurate; or
2. is of such a nature as to require a change in the Conh•act Documents; or
3. differs materially from that shown or indicated in the Cantract Documents; or
4. is of an un«sua( nature, and diFfers materially from conditions ordinarily encountered and
generally recognized as inherent in work of the character provided for in the Contract
Documents;
CI'I'Y OF PORT WOR'I'[{
S'T'ANPARD CONS`t'R[IC"t'ION SPECIFCAT(ON f)OCUMtiF.'V'1S
Revisian: L7c�i�rnbc�ril, 2012
0�72�0-I
Genera, Conditions
Pagc 13 0l'63
then Contractor shall, peomptly after becorning aware thereof and before further disturbing the
s«bsurface or physical conditians or performing any Work in connection therewith (except in an
emergency as required by Paragraph 6.17.A), notify City in writing about such condition.
B. Pos.sible Price and Time Adjustmenls
Contractor shall not be entitled to any adjustrnent in the Contract Price or Contract Time if:
(. Contractor knew oP the existence oF such conditions at the time Contractor made a final
commitment to City with respect to Contract Price and Cantract Time by the submissian of a
Bid or becoming baund under a negotiated contract; or
2. the existenee of such condition could reasonably have been discovered or revealed as a result
of the examination of the Contract Documents ox the Site; or
3. Contcactor failed to give the written notice as required by Paragraph 4.03.A.
4.04 Undergr�ound Facililies
A. Shown or Indacated: Tiie information and data shown or indicated in the Contract Documents
with respect to existin�; Underground Facilities at or contiguous to the Site is based on
information and data furnished to City or Engineer by t1�e owners of such Undergound
Facilities, including City, or by others. Un(ess it is otherwise expressly provided in the
Supplementary Conditions:
l. City and Engineer shall not be responsible for the accuracy or completeness af any such
infot7nation or data provided by others; and
2. the cost of all of the folfowing �vil( be included in the Contract Price, and Contraetor shall
have full responsibility f'or:
a. revicwing and checking all such inforrnation and data;
b. locating al! Underground Facilities shown or indicated in the Contract Documents;
coordination and adjustment of the Work with the owners of such Under�round
Facilities, inc(uding City, during construction; and
d. the safety and protection of all such Undergraund Facilities and repairing any damage
thereto resulting ti•om the Work.
B. Not Shown or Indicatecl.•
l. IF an Underground Facility whieh conflicts with the Wark is uncovered or revealed at or
contiguous to the Site which was not shown or indicated, or not shown or indicated with
reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming
aware thereof and before fui�ther disturbing conditions affected theeeby or performing any
Cl`I'Y OF ('ORT WORTH
STANL);IRD CONS"CRUC"PfON SPFGFCA t'ION DOCUNtEN'l�
Revision: Ik�;ember2l, 2012
0072UO-�
C;encral Conditions
Page 14 of 6.3
Work in connection therewith (except in an emergency as required by Paragraph 6.17.A),
identify the owner of such Undergraund Faci(ity and give notice to that owner and to City.
City will ►•eview the discovered Underground Facility and determine the extent, if any, to
which a change may be required in the Contract Docutnents to reflect and document the
consequences of the existence or location of the Underground Facility, Contiactor shall be
. r•esponsible for the safety and protection of such discovered Underground Faciiity.
2. If City concludes that a change in the Contract Documents is required, a Change Order may
be issued to retlect and document such consequences.
ti/erification of existing utilities, structures, and service lines shall include notification of a(1
utility companies a minimum of 48 hours in advance of construction including exploratory
excavation if necessary.
4.05 Reference Points
A. City shall provide en�;ineering surveys to establish reference points For construction, which in
City's judgment are necessary to enab(e Contractor to proceed with the Work. City will provide
construction stakes or other customary method of marking to establish line and grades for
roadway and utility construction, centerlines and benchtnarks for bridgework. Contractor shall
protect and preserve the established reference points and property monuments, and shall make no
changes or relocations. Contractor shall report to City whenever any reference point or property
monument is lost or destroyed or requires relocation because of necessary changes in �rades or
(ocations. The City shall be responsible for the replacement or relocation of reFerence points or
property monuments not carelessly or willfully destroyed by the Contractor. 'I'he Contractor shall
notify City in advance and with sufficient time ta avoid delays.
B. Whenever, in the opinion of the City, any reference point or monument has been care(essly or
willfi�lly destroyed, disturbed, or removed by the Contractor or any of his emp(oyees, the full
cost for rep(acing such points plus 25% will be charged against the Contraetor, and the full
amount wilt be deducted it�om payment due the Contractor.
4.06 Hazard�us Fnvif•onmental Condition at Site
A. Reports and Drurvings: The Supplementary Conditions identify those reports and drawings
known to City relating to Hazardous Environmental Conditions that have been identified at the
Site.
B. Limited Reliance by Contr•actcrr on Technical Dcrta Authorizecl: Contractor may rely upon the
accuracy of the "technicai data" contained in such reports and drawings, but such reports and
drawings are not Contract Documents. Such "technical data" is identified in the Supplementary
Conditions. Contractor may not make any Contract Claim against City, or any of their officers,
directors, membet•s, partners, employees, agents, consultants, or subcontractors �vith respect to:
I. the complekeness of such reports and drawings for Contractor's purposes, including, but not
fimited to, any aspects of the means, ►nethods, techniques, sequences and procedures of
crl�r or rc�x�r woK r� �
s-r�lr�anr�o c��NSTaucT•�oN s1�ec�rc�Ttor� �ocumF.N i�
Revision: Ck�u,fir�Lt�r21, 2012
00 �z oo - i
General (bnditions
Fagc I S oi 63
construction to be employed by Contractor and safety precautions and programs incident
thereto; or
2. other data, interpretations, opinions and information contained in such reports or shown or
indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any "technieal data" or any such
other data, interpretations, opinions or information.
C. Contractor shall not be responsible for any Ha�ardous Environmenta! Condition uncovered or
revealed at the Site which was not shown or indicated in Drawings or Specifications or identified
in the Contract Documents to be within the scope of the Work. Contractor shall be responsible
far a Hazardous Environmental Condition created with any materials brought to the Site by
Contractor, Subcontractors, Suppiiers, or anyone else for whom Contraetor is responsible.
D. If Contractor encounters a Hazardous Environmental Condition ar if Contractor or anyone for
whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall
immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with
such conditron and in any area affected thereby (except in an emergency as required by
Para�;raph 6.17.A); and (iii} notify City (and promptly thereafter confirm such notice in writing).
City may consider the necessity to retain a qualifted expert to evaluate such condition or take
corrective action, if any.
E. Contractor shall not be required to resume Work in cannection with such condition or in any
affected area until after City has obtained any required permits related thereto and delivered
written notice to Contractor: (i) specifying that such condition and any affected area is or has
been rendered suitable for the resumption of Work; or (ii) specifying any specia) conditions
under which such Work may be resumed.
E. If after receipt of such written natice Contracior does not agree to resume such Work based on a
reasonable belief it is unsafe, or does not agree to resume such Work under such special
conditions, then City may o��der the portion of the Work that is in the area affected by such
condition to be deleted from the Work. City may have such deleted poi�tion of the Work
performed by City's own forces or others.
G. To the f'ullest extent permitted by Lcrws and Regulations, Condractor shall indemn� and hold
harmless City, from and against ull clairns, costs, losses, and damages (includirtg but not limited
to al! fees and charges of engineers, af�chitects�, attorneys, and other professionuls and all eourt
or arbitration or c�ther drspute resolzrtion costs) arising out qf or relating to a flazardous
Environmental Conditron createcl by Cantructor or by anyone for whom Contractor is
respon,sible. Nolhing in lhis Pceragr•aph 4.06.0 shall oblfgate Cnntr�act��r to indemnif'y any
i�dividuul or� entiry ,f'r�vnz crncl agarnst the consega�ences of that individual's vr entity's own
negligenee.
H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Haza►•dous Envil•onmental
Condition uncovered or revealed at the Site.
crr�r or• ro�r w�oxT��l
S'1�ANU�IRDCONSTRUC'i'fON tiPH;CIf�CA'flnN f�C,)Cll;NL:NTS
Revision: Lk�:etn��r 21, 2C) ( 2
QO"12O0- I
General <'onditions
Pagc 16 of 63
ARTICLE 5— BONDS AND INSURAI�iCE
S.O l Licensed Sureties and Insarrens
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly ticensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverages so required.
Such surety and insurance companies shall also meet such additional requirements and qua(ifications
as may be provided in the Supplementary Conditions.
5.02 Perf'ormance, Payment, and Maintenance 13ond.s
A. Contractor shall furnish performance and payment bonds, in aceordance with Texas Government
Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as
security for the faithful performance and paymcnt of all of Contractor's obligations under the
Contract Documents.
B. Contractor shall furnish maintenance bonds in an amount equai to the Contract Price as security
to protect the City a�ainst any defects in any portion of the Work described in the Contract
Documents. Maintenance bonds shatl remain in effect for t�vo (2) years after the date of Final
Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Hotding Certificates of Authority as Aceeptable Sureties on Federal Bonds and
as Acceptable Reinsut7ng Companies" as published in Circular 570 (atnended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attotmey
rvhich shall show that it is effective on the date the agent or atto��n.ey-in-fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankc•upt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the reyuirements of
Paragraph S.Q2.C, Contractor shall prornptly notify City and sha(1, within 30 days after the event
giving cise to such notification, provide another .bond and surety, both of which shall comply
with the requirements of Paragraphs 5.0 l and 5.02.C.
5.03 Certificates �f'Insurance
Contractor shall deliver• to City, with copies to each additional insured and loss payee identified in
the Supplementary Conditions, certiticates of insurance (and other evidence of insurance requested
by City or any other additional insured) which Contc•actor is required to purchase and maintain.
l. The certificate of insurance shal( document the City, and all identified entities named in the
Supptementary Conditions as "�dditional Insured" on al( liability policies.
CITY OF �ORT WORTF(
S'CAND��RDCUNS"C�[ZUC"CION SPECIECA"PION DOC:I�MF.NTS
Revision: [k�ernt�,r21�'1012
UO 72 Ot) - I
Gcncral Conditions
Page f 7 of G3
2. The Contractor's general liability insurance sh111 include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certiticate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show camplete insurance carrier names as listed in
the curcent A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State oP
Texas. Except for workers' compensation, all ins�u�ers must have a minimum rating of A-:
V[I in the current A. M. Best I{ey Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval ofCity is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in tiavor
of the City. In addition, the Contractor agrees to waive a(i rights of subro;ation against the
Engineer (if applicable), and each additional insured identified in the Supplementary
Conditions
6. Failure of the City ta demand such certificates oc other evidence of full compliance with the
insurance requirements oi• failure of the City ta identify a deficiency from evidence that is
provided shall not be construed as a waiver of Contractor's obligation to maintain such lines
of insurance eoverage.
7. I� insurance policies are not written for specified coverage lirnits, an Umbrella or F,xcess
Lia6ility insurance for any differences is requirecf. Excess Liability shall fol[ow form of the
primary coverage.
8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with
or prior to the date of the eff'ective date of the agreement and the certificate of insurance shall
state that the coverage is ciaims-made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years foliowing Final
Acceptance pr�vided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
Policies shall have no exclusions by endorsements, which, neither nullify ar amend, the
required lines of coverage, nor decrease the limits of said cove�•age unless st�ch endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insttrance
coverage, and the City desires the contractar/en�;ineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage pfus 10%.
10. Any self-insured retention (S[R), in excess of $25,000.00, affecting required insurance
coverage shal( be appc•oved by the City in regards to asset value and stockholders' equity. In
Cl'7'YOF 1�ORT WORTI�I
STANDARI7 CONS'1'RIJCTl01� SPEC[PCA'fION n(�CUMF.NTS
Rcvision; Ikcember2l, 2U12
oonoo-i
General Conditions
Pagc I 8 of 63
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
( l. Any deductible in excess of $S,OQ0.00, for any policy that does not provide coverage on a
first-dollar basis, must be acceptable to and approved by the City.
12. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change �rder.
13. City shall be entitled, upon written request and �vithout expense, to receive copies of policies
and endorsements thereta and tnay make any reasonabte r•equests for deletion or revision or
modi6cations of particular policy terms, conditions, limitations, or exclusions necessary to
confonn the poliey and endorsements to the requirements of the Contract. De(etions,
revisions, or modifications shall not be required where poticy provisions are established by
law or regulations binding upon either party or the underwriter on any such policies.
14. City shal! not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
5.04 Contractor's In.surance
A. W�rkers Compensatron and Employer�s' Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits out(ined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Ernployers' Liability as is appropriate for the Work being performed and as wi(I provide
protection from claims set forth beiow which may arise out of or result from Contractor's
performance of the Work and Contractor's other abligations under the Contract llocuments,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any oi'them to perfornn any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims undet• workers' connpensation, disability benetits, and other similar employee benetit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
B. Cammercial GeneraC Liability. Covera�;e shall include but not be limited to covering liabi(ity
(bodily injury or property damage) arising from: premises/operations, independent contractoi•s,
products/completed aperations, personal injury, and liability under an insurecl contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services
Office (ISO) policy, This insurance shatl apply as prima►y insurance with respect to any other
crry ar roirr wol��rr�
STANDARD CONS"('RUCTfpN SPF.C`[FCATipN Dt)CtitvlENfS
Rcvision: f)cxembcr2l,?.rll2
ooroo-i
C;ener�i Conditions
Page 19 uP63
insurance or self-insurance programs affocded to the City, The Commercial General Liability
policy, shall have no exclusions by endorsements that would alter of nullify premises/opei�ations,
products/completed operations, contcactual, personal injury, or advertising injury, which are
normally contained with the policy, unless the City approves sueh exclusions in writing.
Foe construction projects that present a substantial completed operation exposure, the City may
require the contractor to maintain completed operations coverage for a minimum of no Iess than
three (3) years following the completion of the project (if identified in the Supplementary
Conditions).
C. Aastomohile Liabillry. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hic•ed and non-awned and provide indemnity t��r claims for damages
because badily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Si�bcontractor or Supplier, or by
anyone di►�ectly or indirectly employed by any of thern to perform any of the Work, or by anyone
for whose acts any of them may be liable.
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-oF way, the Contractor shall comply with the requirements identified in the
Supplementary Conditions.
E. Nolificatian of'Palicy Cancellation: Contractor shall immediately notify City upon cancel(ation
or other loss of insura►lce coverage. Contractor shali stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
5.05 Accepdance of Bonc�s und Insatr•ance; Option to Repince
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Ai�ticle 5 on the basis
of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing
within 10 Business Days after receipt of the certiticates (or other evidence requested). Contractor
shall provide to the City such additional information in respect of insurance �rovided as the City may
reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance
required by the Contract Documents, the City shall natify the Contractor in writing of such faiture
prior to the start of the Work, ar oF such failure to maintain prior to any change in the required
coverage.
ARTICLE 6 — CONTI2AC'TOR'S 12ESPONSIBILITIES
6.01 Supervision and Super•intendence
A. Contractor shall supervise, inspect, and direct the Work competently and efticiently, devoting
such attention thereto and applying such skilts and expertise as may be necessary to perform the
Work in accordance with the Contract Documents. Conti�actor shall be sofely responsible for the
means, methods, techniques, sequences, and pi•ocedu�•es of canstruction.
c��ry or roR-r woRT�t
S"I'ANDARD CONS'1'ItUC'1`lON SPGCIFC,AT[ON DOCUMF.NTS
t2evision: [kxemher2l, 2012
00 �z tx� - i
Gcneral Cunditions
Yage 20 of 53
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
G Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
6.02 Labor; GVorkrng Hours
A. Contractor shall provide cornpetent, suitably qualified personne{ to perform construction as
required by the Contract Documents. Contractor shall at atl times maintain good discipline and
order at the Site.
B. Except as otherwise required For the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be perfoi�ned during Kegular Working Hours. Contractor witl not per�nit the
performance of Work beyond Regutar Working Hours or for Weekend Working Nours without
City's written consent (which will nat be unreasonabfy withheld). Written request (by letter or
electronic communication) to perfolTn Work:
l. for beyond Regular Working Hours request must be made by noon at least two (2} Business
Days prior
2. fot• Weekend Working Hours request must be made by noon ofthe preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior ta the legal
holiday.
6.03 Services, Mater�rals, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for aEl services, materials, equipment, Iabor, transportation, construction equipment
and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facitities,
temparary facilities, and all other facilities and incidentals necessary far the performance,
Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incarporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and �uarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shal( fi►rnish satisfactary evidence (including reports of
required tests) as to the source, kind, and qual'rty of materials and ec�uipment.
t:i"I Y OF FOR"I' WOR"('l f
S'TANDA[tD CONSTRUCCION SPEC[FCA"(1C�ti pOCUMEN't'S
Revision: Ikcemk�er21, 2f) l2
O0 72 OO - I
Gcncral C:onditions
Page 2 ( uf fi3
C. All materials and equipment to be incorporated into the Wark shall be stored, app(ied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions vf
the applicable Supp(ier, except as otherwise may be provided in the Contract Documents.
D. All items of standard equipment to be incorporated into the Work shall be the latest model at the
tirne of bid, unless otherwise specified.
6.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in aec�i•dance with Paragraph 2.07
and the General Requirements as it may be adjusted from time to time as provided below.
I, Conh•actor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and
the General Requirements) proposed adjustments in the Project Schedule that will not result
in changing the Contract Time. Such adjustments will comply with any provisions of the
General Requirements applicable thereto.
2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment
for the duration of the Contract in accordance with the schedule specitication Ol 32 lb.
Proposed adjustments in the Project Schedule that will change the Contract Time shal( be
submitted in accordance with the requirements of Article 12. Adjustments in Contract Time
may anly be made by a Change Order.
b.05 Substitutes and "Or-Equals "
A. Whenever an item of material or equipment is specified o�• descri6ed in the Cont►•act Documents
by using the name of a proprietary item or the name of a parkicular Supplier, the specification or
descx�iption is intended to establish the type, function, appearance, and quality requii•ed. Unless
the specification or description contains or is fo(lowed by words reading that no like, equivalent,
or "or-equal" item or no substitution is permitted, other items of material or ec�uipment of other
Suppliers may be submitted to City far review under the circumstances described below.
"Or-Equal" Item,s: If in City's snle discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficientfy similar so that no change in
re(ated Work will be required, it may be considered by City as an "or-equal" item, in which
case review and approval af the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 6.OS.A.I, a proposed item of
material or equipment will be considered functionally equal to an item so named if
a. the City determines that:
i} it is at least equal in materials of construction, quality, durability, appearance,
stren�th, and clesign characteristics;
clTv ar roKT woRTH
S'1'ANIa:1RD COiVSTKUC'I'!ON SP6CiI�CATION f}OC'UtiTENTS
ftevisiun: [henntxr2l, 2012
0�720U-i
General C:onditions
Page ?2 of b3
2) it will reliably perform at least equally wel( the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availahility of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
t) there will be n� increase in cosk to the City or increase in Contract Time; and
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitz�te Items:
a. If in City's sole discretion an item of material or eyuipment proposed by Contractor does
not qualify as an "or-equal" item under Paragraph 6.OS.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to aliow City to
determine if the item of material or equiprnent proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed s�ibstitute
items of material or equipment will not be accepted by City from any�ne other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contt•actor seeks to furnish ar use. The application shall
comply with Section Ol 25 00 and:
l) shall certify that the proposed substitute item will:
a) perform adequately th�; functions and achieve the results called for by the general
design;
b) be similar in substance to that specitied;
c) be suited to the same use as that specified; and
2) will state:
a) the extent, if any, to which the use ol'the proposed su6stitute itern will prejudice
Contractor's achievement af final completion on time;
b) whether use oPthe proposed substituke item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City For other work an the Project) tc� adapt the clesign to the proposed
substitute item;
C1TY OF FORT WOR7'I I
S"I'A�1DNZllCONS`CRUCl'fON SP6CIFCA"P[ON DOCUME�JTS
Rev is ion: I k�:emher 21. 2012
00 �2 00 - i
(7eneral Cnndiiions
Pagc 23 oP53
c) whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fe� or royalty; and
3) will identify:
a) all variations of the proposed substitute item from that specitied;
6) available engineering, sales, maintenance, repair, and rep(acement services; and
4) shall contain an itemized estimate of all costs or credits that will result directly or
rndirectly from use of sttch substitute item, including costs of redesign and Dannage
Claims of other contractors affected by any resu(ting change.
B. Substitute Constra�ction Methods �r Procedures.� If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to al(ow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written app(ication to City for
review in the same manner as those provided in Paragt•aph 6.OS.A.2.
C. Ciry's EvaCuation: City will be a(Iowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 6.OS.A and 6.OS.B. City may require
Contractor to furnish additional data about the proposed substitute. City witl be the sole judge of
acceptability. No "o►•-equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or-equal." City wil( advise Contractor in writing of its determination.
D. .Special Guarantee: City may require Contractor to furnish at Contractar's expense a special
pe�•formance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemn� ancl hold harntless City nnd' anyone clirectly or indirectly empl��yed by them fi�o»� and
against pny anc� all clnirns, clumages, losses an�l expenses (including attor�neys fees) arising out
qf the use vf'substituled materials or equipment.
E. Cily's Cost Reimbursement. City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs E.OS.A.2 and 6.OS.B. Whether or not City
approves a substitute so proposed or submitted by Contractoi•, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the eharges for making changes in the Contract Documents (or in the
provisions of any other direct contract with City) resulting from the acceptance of each proposed
substitute.
F. Contructor•'s �xpense: Contractor shall provide all data in support of any proposed substitute or
"or-equal" at Contractor's expense.
CITY OF FOR"i' WOR"TH
Sl"ANDARU CONSTRU(:"T'ION SPG('I�CAT[ON DOCUMEN'f5
Revision: Ckr,emt�r2l.2D12
ooncu-i
General Conditions
Pagc 2d of'63
G. C,'rty Sarbstitute Reimbairsement: Costs (savings or charges) attributabte to acceptance of a
substitute shall be incorporated to the Contract by Change Order.
H, Time Exten.sions: No additional time will be granted for substitutions.
6.06 Concerning Suhcontractnrs, Suppliers, and Others
A. Contracto►• shall perform with his own organization, work of a value not less than 35% of the
value embraced on the Contract, unless otherwise approved by the City.
B. Contractor sha(1 not employ any Subcontractor, Supplier, or other individual or entity, whether
initially or as a replaeement, against whotn City may have reasonable objection. Contractor shall
not be reRuired to e.mploy any 5ubcontt•actor, Supplier, or other individual or entity to furnish or
perform any of the Work against whom Contractor has reasonable objection (excluding those
acceptable to City as indicated in Paragraph 6.06.C).
C. The City may from time to titne require the use of certain Subcontractors, Suppliers, or othe��
individuats or entities on the project, and will provide such requirements in the Supplementary
Conditions.
D. Btrszness Diver�sity Entetprise (�rdinance Compliance: It is City policy to ensure the full and
equitable pat�ticipation by Nlinority and Small Business Enterprises (MBE)(SBE) in the
proeurement of goods and services on a contractual basis. If the Contract Documents provide for
a MBE andlor SE3E �oal, Contractor is required to comply with the intent of the City's Business
Diversity t�rdinance (as amended) by the following:
1. Contractar shall, upon request by the City, pravicie complete and accurate information
regarding actual work perfor�ned by a MBF.; and/or SBE on the Contract and payment
therefor.
2. Contractor will ttot make additions, deleiions, or substitutions of accepted MBE without
written consent of the City. Any unjustificd change or deletion shal( be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
Contractor shall, upon request by City, allow an audit and/or examination of any books,
rec�rds, or files in the possession of the Contractor that will substantiate the actual work
performed by an MBE and/or SBE. Materia( misrepresentatian of any nature may be grounds
for termination of the Contract in accordance with Paragraph 15.02.A. Any such
misrepresentation may be grounds for disqualification of Contractor to bid on future
contracts with the City f'or a period of not less than three years.
E. Contraetor shali be fully responsible to City for all acts and omissions of the Subeontractors,
Suppliers, and other individuals �r entities performing or furnishing any vf the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents;
crrYor rt�tz�r wt7[z'rti
S"fAiVDARf) CC}NS�CRUCT(C)N SPF.CIFCA'fIC)N DtJCUM[:N"I'S
Rcvisiun. Ik�emt-er?.I, 2U 12
00 7z oo - i
Oenerai Conditions
Pa�;e 25 of 63
1. shall create f'or the benefit of any such Subcontractor, Supplier, or other individua[ or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any ob(igation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supp(ier, or other individual or entity except as may otherwise
be required by Gaws and Regtilations.
F. Contractor sha(I be solely responsible for schedu(ing and coordinating the Work of
Subconti•actors, Supp(iers, and other individuals oi• entities performing or furnishing any of the
Wo�•k under a direct or indirect cont►•act with Cantractor.
G. All Subcontractors, Suppliers, and such other individuals or entities performing or fitrnishing any
of the Work shall communicate with City thraugh Contractor.
H. All Work performed for Contractor by a Subcontrletor or Supplier will be pursuant to an
appropriate agreement between Contractor �nd the Subcontractor or Supplier which specit7cally
binds the Subcontractor or Supplier to the applicabte terms and conditions of the Contract
Documents for the benefit of C ity.
6.07 Wage Rates
A. Dr�ty to puy Pr�evailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), inc(uding the payment of not less than the
rates determinec! by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chaptei• 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penally for Vivlatios7. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to thc City $60 for each warker employed for each
ca(endar day or part af the day khat the worker is paid (ess than the prevai(ing wage rates
stipu[ated in these contract documents. This penalty shall be retained by the City to otrset its
administ��ative costs, put•suant to Texas Government Code 2258.023.
C. Complainls �f Uralatrons nnd City Determinution qf Good Caz�se. On receipt of information,
including a complaint by a worker, concer��ing an atleged violation of 2258.023, Texas
Government Code, 6y a Contractor ar Subcontractor, the City shall make an initial
detennination, before the 31st day after the date the City receives the information, as to whether
good cause exists to believe that tt�e violation occurred. The City shall notify in writing the
Contractor or Subcontractor attd any affected worker of its initial determination. Upon the City's
determination that theee is good cause to believe the Contractor or Subeontractor has violated
Chapter 2258, the City sha(l retain the full amounts claimed by the claimant or claimants as the
difPerence between wages paid and wages due under the prevailing wage rates, such amouttts
being subtracted fi•om successive progress payments pending a f►nal determination of the
violation.
C:1'IY OP FORT WO[t"t'ki
5TANDAKD CC�Nb'CRL;CCf(7N SPI:C1f�Ct1'I9<7N UOCUR46N`['S
[��visioir ChrcmL�r2f, 2012
oonno-i
General C;onditions
Page ?6 oFb3
D. ,4rbitration Reyurred if Violution Not Resolvecf An issue relating to an alleged vio(ation of
Section 2258.023, Texas Gove►nment Code, including a penalty owed to the City or an affected
worker, shal( be submitted to binding arbitration in accordance with the Texas General
Arbitratian Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Pa►•agraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on al[ parties and may be enforced in any court of competent jurisdiction.
E. Rec�rds to be Maintainecl. The Contractor and each Subcontractor shall, for a period �f three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii} the actual per diem wages paid to each worker. The records shall be
open at alt reasonable hours far inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspectian.
, F. Progress Payments. With each progress payment or payroli period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has comp(ied with the
requirements of Chapter 2258, Texas Government Code.
G. Pvsting af Wage Rutes. The Contractor shalt post prevailing wage rates in a conspicuous place at
all times.
H. Subc�ntractor Compliance. The Contractor shall include in its subc�mtracts and/or shall
othettivise require all of its Subcontractors to comply with Paragraphs A through G above,
6.08 Patent Fees and Royalties
A. Contractor shali pay a(1 license fees and royalties and assume all costs incident to the use in the
performance oP the Work or the incorporation in the Work of any invention, design, process,
product, or device which is the subject of patent rights or capyrights held by others. If a
particular invention, design, process, product, or device is specified in the Contract Docurnents
for use in the perfonnance of the Work and if, to the actual knowledge of City, its use is subject
to patent ribhts or copyrights cal(ing for the payment of any license fee or royalty to others, the
eYistence of such ri�hts shall be disclosed by City in the Contract Documents. Failure of the City
to disclose such information does not relieve the Contractor from its obfigations to pay for the
use of said fees or royalties to others.
B. To the fulCest extent permitted by Lmvs urtd Re�ulations, Cantrtzctor shall indemn� and hold
harmless City, frorn and against all claims, co.sts, Zasses, and damages (including b�ct not limited
tc� all fees ernd charges of engineers, architects, attorneys, crnd other pr�fessionals and all cotrrt
or ar�bitrution or other d'ispute resolution costs) arising out of or relating to any infringement �f'
patent rrghts or copyrights incident to lhe aise in the performance of'the Work or resa�lting from
crr��r tst� F�o� [� W�r��rH
SZ'ANDARD CON5"I"RlJC3'It)N SPECtI�CA'fION UOCUIVIENTS
Rev)sion: [7et emher2l. �012
00 72 UO - i
C;eneral Ccmditiuns
Pa�;c 27 of 63
the incorporalion in lhe Wurk of'any invention, desi�n, prncess, prnduct, or device nvt specified
in the Contruct Dvcuments.
6.09 Permits and Utilities
A. Contrcrctor obtained permits and licenses. Contractor shall obtain and pay for all construction
permits and licenses except those provided for in the Supplementaty Conditions or Contract
Documents. City shall assist Contractor, when necessary, in abtaining such pe�7nits and licenses.
Contractor shall pay all governmenta) charges and inspection fees necessary for the prosecution
of the Work which are app(icable at the time of opening of Bids, or, if there are no Bids, on the
Effective Date oFthe Agrcement, except for permits provided by the City as specifed in 6.09.B.
City shali pay aIl charges of utility owners for connections for providing permanent service ta the
Work.
B. Ciry obtained permits and licenses. City witl obtain and pay for all permits and licenses as
provided for in the Supplementary Conditions or Contract Docunnetits. It will be the Contractor's
responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the
Contract and the C.ity approves the changes, the Contractor is responsible for obtaining
clear•anees and coordinating with the appropriate regulatory agency. rI'he City wiii not reimburse
the Contractor for any cost associated with these requirements of any City acquired permit. The
fol(owing are permits the City will obtain if required:
1. Texas Department of Transportation Permits
2. U.S. Army Corps of Engineers Permits
3. Texas Commission on Environmental Quality Permits
4. Railroad Company Permits
C. Outstanding permits nnd licenses. The City anticipates acquisition of and/or lecess to permits
and (icenses. Any outstanding permits and licenses are anticipated to be acquired in accordance
with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by
th� Contractor in accordance with the Contract Documents must consider any outstanding
perm'rts and licenses.
6.1 Q Lcrws and Regu[atlons
A. Contractor shall give all notices required by and shall co�nply with all Laws and Regulations
applicable to the performance of the Work. Except where otheitivise expressly required by
applicable Laws and Regulations, the City sha(L not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B, If Contractor perfonns any Work knowing or having reason to know that it is contrary to Laws or
Regulations, Contracto�, shall bear all clau��s, costs, losses, and damages (includiug but nut
limited to all fees and charges of engineers, a��chitects, attorne;ys, and other professionals and all
crr�� ak� E�o� r woR rE �
S"1'ANDARQ CC7NS"CRUCTION SPLCIP'CA"rION UOCUMEN'fS
Revision: [�a:ember'? I, 20 I 2
oonco-i
(;zneral C'onditions
Pa�,c 28 of 43
coui�t or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Speciftcations and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.02.
C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on
the cost or time of performance of the Work may be the subject of an adjustment in Contract
Price or Contract Time.
6.11 Tcrxes
A. On a contract awarded by the City, an organization �vhich qualifres for exemption pursuant to
Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may
purchase, rent or lease all materials, supplies and equipment used ar consumed in the
performance of this cantract by issuin� to his supplier an exemption certificate in lieu of the tax,
said exemption certificate to comply with State Cotnptroller's Ruling .OQ7. Any such exemption
certificate issued to the Contractor in lieu of the tax shall be subject to and shall connply with the
provision of State Comptroller's Rulin� .Ol (, and any other applicab(e rulings pertaining to the
Texas Tax Code, Subchapter H.
B. Texas Tax pe►mits and information may be obtained from:
1. Comptroller of Public Accounts
Sales Tax Division
Capitol Station
Austin, TX 7$7I l; or
2, htt�://www.window.state.t�c.us/taxinfo/taxFormsJ93-forms.html
6. l 2 Use of Site and Qther• Areas
A. Limitatzon an Use of �Site and Other Ar•eus:
Contractor shall confine construction equipment, the st�rage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
other materials or equipment. Contractor shall assume fu(t respunsibility far any damage to
any such land or area, or to the owner or occupant thereof; or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of=way, or easement greater than is
necessary for proper execution of the Work, the City may requit•e the Contractor to finish the
section on which operations are in progress before work is commenced on any additianal
area of the Site.
cri�v or ror�T woa�rEi
S"I�t1\DA[2D CONS'1'RUC'i�[ON SPEC'(t�t;A"ClON i)OCIJMF.NTS
Revision: f�embf,�r21,2()12
0072U0-1
Gcncral Condifions
P��gc 29 of 63
Should any Damage Claim be made by any such owner or occupant because of the
perfo�•mance of the Work, Contractor shall promptly attempt to resolve the Damage C(aim.
4. Pursuant to Parngraph 6.21, C:ontractor shall indenznify and hold hurmless Crty, fron7 und
ugainst all cCaims, cost,s, losses, and dama�,Jes C7i"IS1Y1� OLl1 Of OY i�elating to any cluim or
action, legal or equitcrble, broughi by uny such owner or occupant against City.
B. Remo��al qf' Dehris During Perfc�rmance af lhe Wof•k.� During the progress of the Work
Contractor shali keep the Site and other areas free from accumu(ations of waste materials,
rubbish, and other debris. Removal and disposal ofi such waste materials, rubbish, and other
debris shafl conform to applicable Laws ancl Regulations.
C. Sile A�faintenunce Cleaning.• 24 hours after written notice is �iven to the Contractor that the
cfean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor
fails to correct the unsatisfactory procedure, the City may take such direct action as the City
deems approprilte to correct the clean-up deficiencies cited to the Contractor in the written
notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of
such costs, shall be deducted from the monies due or ta become due to the Contractor.
D. Final Srte Clecrning: Prior to Finai Acceptance of the Work Contract�r sha(I clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all toofs, appliances, construction equipment
and machinezy, and surplus materials and shall restore to original condition or better a(I property
disturbed by the Work.
E. I,ouding Structures: Contractor shall not (oad nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor su6ject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
6.13 Record Docurnents
A. Contractor shall maintain in a sate place at the Site or in a p(ace designated by the Contractor and
approved by the City, one (() record copy of a!1 Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated to
show changes tnade during construction. These record documents to�ether with all approved
Samp(es and a counterpart of a(1 accepted Submittals will be available to City for reference.
Upon completion of the Work, these recocd documents, any operation and maintenance manuais,
and Submittals wil( be delivzred to City prior to Final Inspectivn. Contractor shall include
accurate locations for buried and imbedded items.
6. ( � Saf'ety and Pr•vlection
A. Contractor sha11 be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of the'rr responsibility tor the safety of persons or propet�ty in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
C'I7'Y Ot� POK'C WORTH
STANDA2D CUtiS'CRUC'f10N 5F't�,C'.IFCA"ClON DOCUivt[:NTS
Rci�ision Ducmtrr21,2U12
00 72 (}0 - I
Gener.il C;ondizions
PaRc 3U c�f63
take all necessary precautions for the safety of, and shall provide the necessary protectian to
prevent damage, injury or loss to:
I. all persons on the Site or who may be aff'ected by the Work;
2. all the Wvrk and materials and equipment to be incorpo�•ated therein, whether in storage on
or off the Site; and
ather property at the Site or adjacent thereto, including t��ees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall eomp(y with all applicable Laws and Regulations relating to the safety af
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain aIl necessary safeguards for such saPety and protection. Contractor shalt
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, re(ocation, and rep(acement of their praperty.
C. Contractor shaEl camply with the applicable requirements of City's saPety prograrns, if any.
D. Contractor shal! inform City of the specitic requirements of Contractor's safety program, if any,
with which City's employees and representatives must compty while at the Site.
E. All dama;e, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Su6contractor, Supplier, or any
other individual or entity directly or indirectty employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be (iable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall eontinue
unti( such time as alt the Work is completed and City has accepted the Work.
6.15 Safety Representative
Contractor sha({ inform City in writing of Contractor's designated safety representative at the Site.
6.16 Hcrzcird Communication Pt•ograms
Contractor shall be responsible for coordinating any cxchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or among
emp(oyers in aceordance with Laws or Regulations.
6.17 �mergencies and/�r Rectificatinn
A. [n emergencies affecting the safety ar protection of persons or the Work or property at the Site or
adjacent thereto, Contcactor is obligated to act to prevent threatened damagc, injuiy, or loss.
Contractor shall give City prompt written notice if' Contractor believes that any significant
crry ar• roR�r �voaTr�i
S"I'ANDARD CC�NS`t�ItUCTION SPECIFCA"C[��N DOCU(v1EN"fS
Kevision: L7�cemt?er21.201?
00 72 00 - i
Ceneral Conditions
Page 3 i of b3
changes in the Work or variations from the Contract Documents have been caused thereby or are
requieed as a result thereof. If City determines that a change in the Contract Documents is
required because of the action taken by Contractor in response ta such an emergency, a Change
Order may be issued.
B. Shou(d the Contractor fail to respond to a request from the City to rectify any disccepancies,
omissions, ar correction necessary ta conform with the requirements of the Contract Documents,
the City shall give the Contractor written notice that such work or changes are to be performed.
The written notice shall direct attention to the discrepant condition and request the Contractor to
take remedial action to correct the condition. In the event the Contractor does not talce positive
steps to fiilfilE this written ��equest, or does not shaw just cause for not taking the proper action,
within 24 hours, the City may take such remedial action with City forces or by contract. The City
shall deduct an amount equal to the entire costs for such remedial action, ptus 25%, from any
funds due or become due the Contractor on the Project.
6.18 Submittals
A. Contractor sha(1 submit required Submittals to City for review and acceptance in accordance
with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be
identified as City may require.
i. S��bmit nurnber of copies specitied in the General Requirements.
2. Data shown on the Submittals witl be comp(ete with respect to quantities, dimensions,
specified performance and design criteria, materials, and sim'rlar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 6.18.C.
Submittals submitted as herein provided
conformanee with the design concept shall
Documents unless alherwise required by City.
by Contractor and reviewed by City for
be executed in conformity with the Contract
4. When Sui�mittals are submitted for the purpose of showing the installation in �;reater detail,
theiz• review shall not exc«se Contrac;tor fr�m requirements shown on the Drawings and
Specifications.
5. For-Information-Only submittals upon which the City is not expected to canduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number oF Samples specitied in the Specifications.
7. C(early identify each Sample as to material, Supplier, pertinent data such as catalo� numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 6.18.C.
cirYor• ro�T woRT�i
s�r,a�onrt� corrsl�rtucTio� sPeciFca�noN Ut�cu�i�.rv�rs
Iievision: L�rt�rnber 2l. 2U I 2
aonuo-i
Gencral Conditions
t'agc 32 of 63
B. Where a Submittal is required by the Contract Documents or the Scheduie of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide time(y reviery of requit�ed Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
iterns covered by the submittals will, after instal(ation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatib(e with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
2. City's review and acceptance wit( not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
ar procedure of construction is specificatly and expressly called for by the Contract
Doc«mettts) or to safety precautions or programs incident thereto. The review and acceptance
of a separate item as such will not indicate approva! of the assembly in which the item
f'unctions.
3. City's review and acceptance shatl not re[ieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has comp(ied
with the requirements of Section O1 33 00 and City has given written acceptance oF each
such variation by specific written notation thereof incorporated in or accompanying the
Su6mittal. City s review and acceptance shall not relieve Contractor from responsibility for
eomplying with the requirements of the Contract Documents.
6.19 Continu�nK the Wor•k
Except as otherwise provided, Contracto►• shall carry on the Work and adhere to the Project Schedule
during atl disputes or disagreements with City. No Work shal( be delayed or postponed pending
resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in
writing.
6.20 Contractor ;s General Warranty and Uuarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its ofticers, directors, members, partners,
emp(oyees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Conkractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or dama�;e caused by:
abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subconti•actors, Suppliers, or any other individual or entity for whorn eontractor is
responsible; or
crrY or rc�� r tuoa�rE i
5TA�iC)ARD CONS'PRUt"PiON SPECIFCA"fI�N f)(')CItMF.hlTS
Revision�. [7ccc�n��21_2Ulv
���.� �z on - �
Gunera( Conditions
Pai�;e 3.i of h:l
2. normal wear and tear under normal usage.
C, Contractor's obligation to perform and complete the Worlc in accordance with the Contract
Documents sha(l be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to perform
th� Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City of any progress or tinal payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Su6mittai by City;
6. any inspection, test, or approva( by others; or
7. any co�rection ofdefective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefi•om which shall appear within a period of two (2) years
From the date of Final Acceptance of the Work un(ess a longer period is specitied and shall
fumish a�;ood and sufficient mainkenance bond, compiying with the requirements of Article
5.02.8. The City will give notice ofobserved defects with reasonable promptness.
6.21 Indemnification
A. Contractoi• covenants and agrees to indem�iify, hotd harmless and defend, at its own
expense, the City, its of�cers, servants and employees, from and against any and all claims
arising out of, or alleged to arise out of, the work and services to be performed by the
Contractor, its officers, agents, employees, subcontractars, lieenses or invitees under this
Contract. THIS INDEMNIFI�ATION PROVISION IS 5PE�IFICALLY INTENDED TO
QPERATE AND BE EFFECTIV� EVEN IF IT 1 ALLE��OR PROVEN THAT AL
OR SOM� OF THE DAMAGES BEING SOU �HT WFRE A ll IN WHOLE OR IN
PART. BY ANY ACT. OMIS�ION OR NE .LI �EN E OF THE ITY. This indemnity
provision is intended to include, without limitation, indemnity for costs, expenses and legat
fees incurred by the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmtess, at its own expense, the
City, its officers, servants and employees, from and against any and all7oss, damage or
destruction of property of the City, arising out of, or alleged to arise out of, the work and
services to be perfar�ned by tl►e Contractor, its ofticers, agents, e�x�ptoyees, subcontractors,
licensees or invitees under this Contract. TH1S INDEMNIFI�ATIOIv PROVI ION 1�
crry or ror:�r woRrH
Sl"AN(JARD CONS'1'RUC'I`IQN tiPF•.(,:IFG�TtON DOCUMENTS
Revision: Cktember2l. 2(112
00 72 00 - I
General Condilions
Paee 3� of 63
' \ \1 1 � 1' '' - .\1 �.. �_ L \
1 �► ':� / \ .: �► !1 � . I:U: : ► � .
� .. L, 1 t' ',�: _ • :. ►L. 1 ! �
► \ � .
6.22 Delegation of Professional Design Services
A. Contractor will not be required to provide pratessional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry o�Gt Contractor's responsibilities for construckion means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professiona[ related to systems,
materials or equipment are specifical(y required of Contractor by the Contract Documents, City
will specify ali performance and design criteria that such services tnust satisfy. Contractor sha(I
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on al) drawings, calcu(ations, speciftcations, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified by
such professional, if prepared by others, shalt bear such professional's written approval when
submitted to City.
C. City shall be entitled to reiy upon the adequacy, accuracy and comp(eteness of the services,
certifieations or approvals pet•Pormed by such design professionals, prvvided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance and
design criteria given and the design concept expressed in the Contract Documenks. City's review
and acceptance of Submittals (except design calculations and design drawings) will be only for
the purpose stated in Paragraph 6.18.C.
6=23 Right to Aa�dit
A. `I'he Contractar agrees that the City shall, until the expiration of three (3) years after tinal
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent E�ooks, documents, papers, and records of the Contractor involving transactions re(ating
to this Contract. Contractor agrees that the City shall have access during Regu(ar Warking Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduet audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
B. Contractor further agrees to inciude in all its subcontracts hereunder a provision to the etfect that
the subcontractor agrees that the City shall, until the expiration oF three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions ta
the subcontract, and further, that City shall have access during Regular Working Hours to all
crrY or• roRi woriTti
s�-n�uar�t�cor�s���Ruc�r�o�v si�Fc�rcn-erc��v «f}ctrr�i;�v�rs
Revision: I'A°u,�rnix�21, 2012
O0 72 0U - I
(.�cncrnl Conditiuns
Page 3S of 63
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in comp(iance with the provisions of this Paragraph, The City shall give
Subcontractor reasonable advanee notice of intended audits.
C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as fo(lows at the rate
published in the Texas AdministraCive Code in effect as of the time copying is perfortned.
6.24 Nondiscrimination
A. The City is responsible for operating Public Transpo��tation Programs and implementing transit-
related projects, which are funded in pa►�t with Federal tinancial assistance awarded by the U.S.
Department of Transportation and the Federa! Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, calor, or national
o►•igin.
B. Title VI, Civil Ri�hts Act of 1964 as arnended:
the Act and the Regu(ations as further defined
receiving Federal assistance.
Contractor shall comply with the requirements of
in the Supplementary Conditions for any project
ARTICLE 7— OTHER WORK AT THE SI'CE
7.01 Related Wnrk at Site
A. City may perform other work re(ated to the E'roject at the Site with City's emp(oyees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. IF such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other wot�k with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
intr•oduction and storage of materiats and equipment and the e:�ecution of such other work, and
proper(y coordinate the Work �vith theirs. Contractor shall do al( cutting, fitting, and patching of
the Work that may be required to prop�rly connect or otherwise make its several parts come
tagether and properly integrate with such other work. Contractor shali not endanger any work of
othei•s by cutting, excavating, or otherwise altering such wo►�k; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work wil( be affected.
C. [f the proper execution or results of any pat�t oFContractor's Work depends upon work perFormed
by others under this Artiele 7, Contractor shall inspect such other work and promptly report to
City in writing any delays, defects, or deficiencies in such other work that render it unavailable
or unsuitab(e for the proper execution and results of Contractor's Work. Contractor's failure to so
report wifl constitute an acceptance of such other work as tit and proper for integration with
Contractor's Work exeept for latent defects in the work provided by others.
riTrr or rox�� woftrtt
5'P.4NDARD CONS'1RUC'CION SPii(;IFCATfO:�J DUCU�4tEN'CS
ReviSii�n: CA�:emF�r21, 2(}12
nn �z or� - i
(ieneral Candition,
Page 36 of'61
7.02 Coordination
A. If City intends to cont►•act with others for the performance of othet• work on the Project at the
Site, the fol(owing will be set forth in Supplementary Conditions:
1. the individual or entity who will have authority and responsibility for coordination of the
activities among the various contractors will be identified;
2. the specific matters to be covered by such authority and responsibility will be itemized; and
3. the extent of such authority and responsibilities will be provided.
B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such
coordination.
ARTICLC 8 — CITY'S RESPONSIBILITIES
8.01 Communzcations ta Cantraclor
Except as otherwise provided in the Supplementary Conditions, City shall issue all communieations
to Contractor.
$.02 Furnish Data
City shall titnely furnish the data required under the Contract Documents.
&.03 Pcry ti�hen Due
City shall make payments to Contractor in accordance with Artiele 14.
8.04 £.ands and Easements; Reports and Tests
City's duties with respect to pr�viding lands and easements and providing engineering surveys to
establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's
identifying and making available ta Cantractor copies of reports of exptorations and tests of
subsurfaee conditions and drawings of physical conditions relating to existing surface or subsw•face
structures at or contiguous to the Site that have been utilized by City in pi•epai•ing the Contract
Documents.
8.05 C,�hange Orders
City shall execute Change Orders in accordance with Paragraph 10.03.
8.06 Inspections, Tests, and Approval.s
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
13.03.
crry or r�a�i• wo�Tt t
S'1'ANDARD CONS"1'RUC"tION SPEC[F'G\"flUiv DOCUML3N'CS
Itcvision:I7cxc,lntx:r21. �'.()12
00 72 00 - I
Gencral Conditions
Page 37 ot 63
$.07 Limitc�tions on Ciry :s Responsibilities
A. The City shall not supervise, direct, or have contro( or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of eonstcuction, or the safety
precautions and programs incident the�•eto, or for any failu►•e of Contractor to comply with Laws
and Regulations app(icable to the performattce of the Wark. City will not be responsible for
Conta�actor's failure to perfoi�m the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable saf'ety plans pursuant to Paragraph 6.14.
8,08 Undi,sclosed Hazurctous Environmental Conditivn
City's responsibility with respect to an undisclased Hazardous Environmental Condition is set fai�th
in Paragraph 4.06.
8.{)9 Compliance with Scrfety Program
Whi(e at the Sitc:, City's ernployees and representatives shall comply with the specif[c applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 6.14.
ARTICLE 9— CITY'S OBSERVATION STATUS DURING CONSTRUCTiOIY
9.01 City's Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents. The Project I2_epresentative(s) will be as provided in the
Suppiementary Conditions.
9.02 I�i,sits !o Site
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
sta�es of construction as City deems necessary in order to observe the progress that has been
made and the Quality of the various aspects of Contractoi's executed Work. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in generat, if the Work is proceeding in aecordance with the Contract Documents.
City's Project Representative will not be reauired to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Woc(c. City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Wark
will confocm generally to the Contract Dacuments.
B. City's Project Representative's visits and observations are subject to all the limitatians on
authority and responsibility in the Contract Documents including those set forth in Paragraph
8.07.
cr��v oF raaT wo� rH
STAR�DA{tD CONS'Cl2U<' ['IbN SP[:C[FCATI(�N UUCUMfF".M'CS
Rcvision: [Xt;emher2L 2012
QO 72 f?0 - I
General Conditions
Page 34 of63
9.03 Atrthurized I�ariations in Work
City's Project Representative may authorize minor variatians in the Work from the requii•ements of
the Contract Documents which do not involve an adjustnnent in the Contract Price or the Contract
Time and are compatible with the design cancept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City and also on Contractor, who shall perform the Work involved promptly.
9.04 Rejecting Defective Work
City will have authority to reject Wc>rk which City's Project Repcesentative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a ti�nctioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Artic(e 13, whether or not the Work is fabricated, installed, or
completed.
9.05 Determinations, f'or Work Perf'vrmed
Contractor will determine the actual quantities and classifications of Work performed. City's Praject
Representative will review with Contractor the pre(iminary determinatians on such matters before
rend�.ring a written recommendation. City's written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
9.06 Decisions an Reyuirements vf Canlract Doci�ments and Acceptability qf Work
A. City will be the initial interpreter of the requirements of the Contract Documents and jud�e of the
acceptab+lity of the Work thereunder.
B. City will render a written decision on any issue referred.
C. City's written decisian on the issue referred will be final and binding on the Contractor, subject
to the provisions of Paragraph 10.06.
ARTICLE l0 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK
10.0 ( Aulhorized Changes in the Work
A. Without invalidating the Contract and without noticc to any surety, City may, at any time or from
time to time, oi•der Extra Work. Upon notice of such Extra Work, Contractor sha(I promptly
proceed with the Work involved which will be performed under the applicable conditions of the
Contract Documents (except as otherwise specifically provided). Extra Work shall be
memorialized by a Change Order which may or may not precede an order of Extra work.
B. For minor changes of Work not requirin� changes to Contract Time or Contract Price, a Field
Order may be issued by the City.
crr� oF rox�r woa��t i
S"CAN[��IRUCONSTRUC"CION SPECIFCA"�(QN DOC[JMt:N'I�S
2evision: IAumhec"l l, 201'_
00 72 (�l - i
General Cbnditions
Pa�e 39 of63
l 0.02 Unuuthorized Changes in the Work
Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract
Time with respect to any work performed that is not required by the Contract Documents as
amended, moditied, or supplemented as provided in Paragraph 3.04, except in the case of an
emergency as provided in Paragraph 6.17.
10.03 E'xecution qf Chunge Orders
A. City and Contractor shall execute appropriate Change Orders covering:
l. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii)
required because of acceptance of defective Work under Paragraph 13.08 or City's correction
ofdefective Work under Paragraph 13.09, or (iii) agreed to by the parties;
2. changes in the Contract Price or Contract Time which are agreed to by the parties, including
any undisputed sum or amount of time for Work actuaZly perforined.
I 0.04 Extra Work
A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment
thereof, and the City insists upon its performance, the Contl•actor sha!} proceed with the work
af�er making written request for written orders and shall keep accurate account of the actual
reasonable cast thereof. Contract Claims regarding Extra Work shall be made pursuant to
Paragraph 10.06.
B. The Contractor shall furnish the City such installation recot�ds of all deviations from the original
Contract Documents as may be necessary to enable the City to prepare for permattent record a
corrected set of plans showing the actual installation.
C. The cotnpensation agreed upon for F,xtra Work whether o►• not initiated by a Change Qrder shall
be a full, complete and final payment f'or all costs Contractor incurs as a result or relating to the
change or Extra Worl<, whether said costs are known, unknown, foreseen or unforeseen at that
time, including without limitation, any costs For delay, extended overhead, ripple or impact cost,
or any other effect on changed or unchanged work as a resu(t of the change or Extra Work.
10.05 Notification tn Sa�rery
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notic�. will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effeet of any such change.
crry c�r ro�T woRT� i
S"1'ANDARD CON5"I'RUC'I'[O;V SPF.GIFC'AT(ON DOCL'MENTS
Revisiorr. [kx�emtxr2l, 2012
0012 co � i
Genernl Conditians
Page 40 of�63
10.06 Contract Claims Process
A. Ciry .s Decision Reyuir•ed: All Contract Claims, except those waived pursuant to Paragraph
14.09, shall be referred to the City fo►• decision. A decision by City sha(1 be requiced as a
condition precedent to any exercise by Contractor of any rights or remedies he may otherwise
have under the Contract Documents or by Laws and Regulations in respect of such Contract
Claims.
B. Notice:
l. Written notice stating the �eneral nature of each Contract Claim shall be de(ivered by the
Contractor to City no tater than IS days after the start of the event giving rise thereto. The
responsibility to substantiate a Contract Claim shall rest with the party making the Contract
C(aim.
2. Notice of the amo�mt or extent of the Contract Clairrt, with supporting daka shall be delivered
to the City on or before 45 days from the start of the event giving rise thereto (unless the City
allows additional time for Contractor to submit additional or more accurate data in support of
such Contract Claim).
3. A Cantract Claim for an adjustment in Contract Price shafl be prepared in accordance �vith
the provisions of Paragraph �12.01.
�. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with
the provisions of Paragraph 12.02.
5. Each Contract Claim shall be accompanied by Contractor's written statement that the
adjustment claimed is the entire adjustnnent to which the Cantractor believes it is entitled as a
result of said event.
6. The City shall submit any response to the Contractor within 30 days after receipt of the
claimanYs (ast submittal (unless Conh�act allows additional time).
C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last
submittal of the Contractor, if any, take one of the following actions in writing:
1. deny the Contract Claim in whole or in part;
2. approve the Contract Claim; or
3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's
sole discretion, it would be inappropriate for the City to do so. For purposes of further
resolution of the Contract Ciaitn, such notice shall be deemed a denial.
crry ar r•ok r woa�r� i
STANDAR[) CONSTR�K'TI(>N SPECIf�CA"IlON I�OCItMGN"I'S
Revision: Ck�;ersi�r21,21)Yl
00 72 00 - i
Genaral Conditicros
Page 41 oC63
D. City's written action under Para�raph 10.06.0 will be final and binding, unless City or
Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such
action or denial.
E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not
submitted in accordance with this Paragraph 10.06.
ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICI; WOItK; PLANS
QUANTITY MEASUREMFNT
1 1.01 Casl of the Work
A. Costs Inclucled: The term Cost of the Work means the si�m of all costs, except those excluded in
Paragraph I l.O l.B, necessari(y incurred and paid by Contractor in the proper performance of the
Work. When the va(ue of any Work covered by a Change Order, the costs to be reimbursed to
Conh•actor will be only those additional or incremental casts required because of the change in
the Work. Such costs shall not inc(ude any of the costs itemized in Paragraph 11 A1.B, and shall
inc(ude but not be limited to the foflowing items:
t. Payroll costs for employees in the direct employ of Contractor in the performance of the
Work under schedules oF job classifications agt�eed upon by City and Contractor. Such
emp(oyees shall inciude, without limitation, superintendents, foremen, and other personnel
empfoyed Full time on the Work. Payroll costs for employees not employed f'u(1 time an the
Work shafl be apportioned on the basis of their time spent on the Work. Payroll costs shall
include;
a. salaries with a 55% markup, or
salaries and wages plus the cost of fringe benefits, which shall include social security
contributions, unemployment, excise, and payroll taxes, workers' compensation, health
and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto.
The expenses of performing Work outside of Regular Working Hours, Weekend
Working EIours, or legal holidays, sha(1 be included in the above to the extent authoi7zed
by City.
2. Cost of all materia(s and equipment furnished and incoiporated in the Work, includin� costs
of transportation and storage thereof, and Suppliers' field services required in connection
therewith.
Rentals of all construction equipment and machinery, and the parts thereof whether ►•ented
from Contractor or others in accoi•dance with rental agreements approved by City, and the
costs of transportation, (oading, unloadi►�g, assembly, dismantlin�;, and removal thereof. All
such costs shall be in accoi•dance with the terms of said rental agreements. The rental of any
sueh equipment, machinecy, or parts shall cease when the use thereoti is no (onger necessary
for the Work.
Cl"t`Y Of•' f�0it'I' WOI".'I'H
S'1'ANDARt� CONSTRUCTION SPGCIFCAT(ON C)UCLI'�iF.N'1'S
Revision: l:kcrmh�.r21, 2(? I 2
00 72 G� - I
General Conditions
Page �I2 of 63
4. Payments made by Contractor to Subc�ntractors for Work perfoi�ned by Subcontractors. If
required by City, Contractor shall obtain competitive bids from subcontractors acceptable to
City and Contcactor and shall delive►• such bids to City, who will then determine, which bids,
if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on
the basis of Cost of the Work plus a fee, the Subcontractor's Gost of the Work and fee shall
be determined in the same manner as Contractor's Cost of the Work and fee as provided in
this Paragraph 11.01.
5. Costs of specia( consultants (including but not limited to engineers, architects, testing
laboratories, surveyors, attorneys, and accountants) empioyed for services specifically retated
to the Wark.
6. Supplemental costs including the tollowing:
a. The proportion of necessary tr-ansportation, travel, and subsistence expenses of
Contractor's employees incurred in discharge ofduties connected with the Work.
b. Cost, including transportation and maintenance, of a!I materials, supplies, equipment,
' machinery, appliances, ot�ce, and temporary facilities at the Site, and hand tools not
owned by the workers, which are consumed in the performance of the Work, and cast,
less market value, of such items used but not consumed which remain the peoperty of
Contractor.
c, Sales, consumer, use, and ather similar taxes related to the Work, and for which
Contractor is liable not covered under Paragraph 6.1 t, as impased by Laws and
Regulations.
d. Deposits (ost for causes other than negligence of Contractor, any Subcontractor, or
anyone directly or indirect(y emplayed by any of them or fo►• whose acts any of them may
be liable, and roya(ty payments and fees for permits and licenses.
e. Losses and damages (and related e:cpenses} caused by damage to the Work, not
compensated by insurance or otherwise, sustainecl by Cantractor in connection with the
perfonnance of the Work, provided such losses and damages have resulted frorn causes
other than the negligence of Contractor, any Subeotttractor, or anyone directly or
indirectly etnployed by any of them or for whose acts any of them may be liab(e. Such
losses shall include settlements made with the written consent and approval of City. No
such losses, dama�es, and expenses sha(l be included in the Cost of the Work for the
purpose of determining Contractar's fee.
f. The cost of utilities, fuel, and sanitary facilities at the Site.
g. Minor expenses such as telegrams, long distance telephone calls, telephone and
communication services at the Site, express and couricr services, and similar petty cash
items in connectic>n with the Work.
C'1'I`Y OP POR'C WOItTH
S"fANDARD C'C7;�15'IRUC"PInN SPfCIPC'A'Cit)N D(?C'UMEN"i'S
Revision: Ck�mlxr21.201?
00720U- i
Generu( Conditions
Yage 43 0('63
h. The costs of premiums for a(I bonds and insurance Contractor is required by the Contz�act
Documents to purchase and maintain.
B. Cost,s Exclude�l.• The te►m Cost af the Work shall not include any of the fo(lowing items:
Payroll costs and other compensation of Contractor's officers, executives, principals (of
partnerships and sole proprietorships), general managers, safety managers, engineers,
architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents,
expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the
Site or in Contractoe's principal or branch ot�ice far general administration of the Work and
not specitically included in the agreed upon schedule of job classitications referred to in
Paragraph i 1.0 ].A.1 or specifically covered by Paragraph 11,01.A.4, al l of which are to be
considered administrative cosks covered by the Contractoc's fee.
2. Expenses of Contractor's principa( and branch offices other than Contractor's office at the
Site.
Any part of Contractor's capital expenses, including interest on Contractor's capital
emp(oyed for the Work and charges against Contractor for delinquent payments.
4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly
employed by any of them or for whose acls any of them may be fiable, including but not
limited to, the correction of defective Work, disposal of materials or equipment wrongly
supplied, and making good any damage to propet�ty.
5. Other overhead or general expense costs of any Icind.
C. C'ontractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee
sl�all be determined as set E'orth in the Agreement. When the value of any Work covered by a
Change Order for an adjustment in Contract Price is deternnined on the basis of Cost of the
Work, Contractor's fee shall be determined as set fo��th in Faragraph 12.01.C.
D. Docirmerrtatiavr: Whenever the Cost of the Work for any purpose is to be determined pursuant to
Faragraphs 1 t.Ot.A and I 1.01.Q, Contractor will establish and maintain records thereof in
accordance with generally accepted accounling practiees and submit in a form acceptable to City
an itemized cost breakdown together with supparting data.
11.02 Allowance.s
A. Specifted Allotivance: [t is understood that Contractor has included in the Contract Price all
al(owances so named in the Contract Uocuments and sha(I cause the Work so eovered to be
performed for such sutns and by such persons or entities as may be acceptable to City.
B. Pre-bid Allo��ances:
1. Contractor agrees that:
cr�� or r�oa�r wo1zT�{
ST;\N�ARDCONS`IRUCT[ON SPECiFC1"i'ION L}C�Ct1MEN7:S
Revieior.: fhzti�rnber2l, 2012
OU7200- I
General Cond;tions
Puge 44 0:'63
a. the pre-bid allowances include the cost to Contractor of materials and equipment required
by the allowances to be delivered at the Site, and all applicable taxes; and
b. Contractor's costs for unloading and handling on the Site, labor, instaliation, overhead,
profit, and other expenses contemplated for the pre-bid allowances have been included in
the allowances, and no demand for additional payment an account of any oF the
foregoing will be vafid.
C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is f�r the sole
use of City.
D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due
Contractor on account of Work covered by allowances, and the Contract Frice shall be
correspondingly adjusted.
11.03 tlnit Price Work
A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work,
initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to
the sum of the unit price for each separately identified item of Unit Price Work times the
estimated quantity af each item as indicated in the Agreement.
B. The estimated quantities of iterns of Unit Price Work are not guaranteed and are so(ely for the
purpose of comparison of Bids and determining an initial Contract Price. Determinations of the
actual quantities and classi fications of Unit Price Work performed by Contractor will be made by
City subject ta the provisions of Paragraph 9.05.
C. Each unit price will be deemed to include an am�unt considered by Contractor to be adequate to
cover Contractor's overhead and protit For each separately identified item. Work described in the
Contract Documents, or reasonably inferred as required for a fiinctionally comp(ete installation,
but nat identified in the (istin�; of unit price items shall be considered incidental to unit price
work listed and the cost of incidental work included as part of the unit price.
D. City may make an adjustment in the Contract Price in accardance with Paragraph 12A l if:
1. the quantity of any item of Unit Price Work performed by Contz•actor differs materiatly and
significantly trom the estimated quantity of such item indicated in the Agreement; and
Z. there is no corresponding adjustment with respect to any other ite;m of Work.
F.. Increasec� or Decreased Quantities: The City ►•esec•ves the right to order Extra Work in
accordance with Paragraph 10.01.
lf the changes in quantities or the alterations do not significantly change the character of
tivork under the Contract Documents, the altered work will be paid for at the Contract unit
price.
crry ue �or.�r wr�ltr�� �
S'I'ANDARD CONS"I'RUGT[ON SPECII'CATtON DOCUh1RN'i:ti
Revision: [kcember2L 2U1?.
(10 72 DO - i
Gencral Conditions
Pu�;e 4j uf 63
If the changes in quantities or alterations significantly change the character of work, the
Contract will be amended by a Change Order.
3. [f no unit prices exist, this will be considered Extra Woi•k and the Contract wi(l be amended
by a Change Order in accordance with Artic(e l2.
4. A significant change in the character of work occurs when;
a. the character of work for any Item as altered differs materially in kind or nature from that
in the Contract or
b. a Major Item of work varies by more than 25% from the origina( Contract quantity.
5. When the quantity of work to be done under any Major Item of the Contract is more than
125% of the o�•iginal quantity stated in the Contract, then either party to the Contract may
request an adjustment to the unit price on the portion of the work that is above 125%.
6. When the quantity of work to be done under any Majo�r [tem of the Contc•act is less than 75%
of the original quantity stated in the Contract, then either party to the Contract may request
an adjustment to the unit price.
1 l.04 Plans Qunntity Measur•en�ent
A. Plans quantities may or may not represent the exact quantity of work performed or material
moved, handled, or piaced during the execution of the Contract. The estimated bid quantities are
designated as final payment quantities, unless revised by the governing Section or this Article.
B. If the guantity measured as outlined under "Price and Payment Procedures" varies by more than
25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total
estimated quantity for an individual Item originally shown in the Contract Documents, an
adjustment may be made to the quantity of authorized work done for payment purposes. The
party to the Contract requesting the adjustment will provide field measurements and calculations
showing the tina( quantity for which payment will be made. Payment for revised quantity wi11 be
made at the unit price bid for that Item, except as provided for in Article i 0.
C. When quantities are revised by a change in design approved by the City, by Change Order, or to
correct an error, or to correct an error on the pians, the plans quantity will be increased or
decreased by the amount involved in the change, and the 25% variance will apply to the new
plans quantity,
D. If tt�e total Contract quantity multiplied by the unit price bid for an individual Itertt is less than
$250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans
quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans
quantity.
C:iTY O� FQRT Wc�RTH
S"17\NBARD CONS'IRUC'C10N SPECIPCr1TlQN UOCUMtLN'CS
Revision: [7fs:emt�r21, 2(112
�� 72 GO - i
Generu? Conditions
Pilgc �16 of'63
E. For cal(out work or non-site specific Contracts, the plans quantity measurement requirements are
not applicab(e.
ARTICLE 12 — CHANGE OF COYTRACT PRICE; CHANGE OF CONTRACT TIME
12.01 Chnnge af Contract Price
A. The Contract Price may only be changed by a Change Order,
B. The value of any Work covered by a Change Order will be determined as follows:
l. where the Work involved is covered by unit prices contained in the Contract Documents, by
application of such unit prices ta the quantities oP the items involved (subject to the
provisions of Paragraph 1(.03); or
2, where the Work involved is not covered by unit prices contained in the Contract Documents,
by a mutua(ly agreed lump sum or unit price (which may include an allowance for overhead
and protit not necessarily in accordanee with Paragraph 12.O1.C.2), and sha(l include the cost
of any secondary impacts that are fo►•eseeable at the time of pricing the cost of Extra Work;
�r
3. �vhere the Work involved is not covered by unit prices contained in the Contract Documents
and agreement to a lump sum or unit price is not reached under Paragraph 12.O1.B.2, on the
basis of the Cost of the Work (determined as provided in Paragraph 1 1.01) plus a
Contractor's fee for overhead and protit (determined as provided in Paragraph 12.Ot.C).
C. Contractor's Fee: The Contractor's additional fee fot• overhead and profit shal( 6e determined as
follows:
1. a mutually acceptable fiYed Cee; or
2. if a fixed fee is not agreed upon, then a fee based on the fo(lowing percentages of the various
portions of the Cost of the Work:
a. for costs incurred under Paragraphs 11.OI.A.1, ll.Ol.A.2. and 11.OI.A.3, thc
Contractor's additional fee sha11 be 15 percent except far;
i) rental fees for Contractor's o�vn equipment using standard rental rates;
2) bonds and insurance;
b. for costs incurred under Paragraph 1 1.Q 1.A.4 and t 1.O I.A.S, the Contractor's fee shal I be
five percent (5%);
1) �vhere one or more tiers of subcontracts are on the basis of Cost of the Work plus a
fee and no fixed fee is agreed upon, the intent of Paragraphs 12A I.C.2.a and
(2.O1.C.2.b is that the Subcontractor who actuaily performs the Work, at whatever
CCCY ( )F EOR'C �h�Olt'I�H
S'CAN[7ARD CONS"1'RIJC'1'IQN SI'F:Cii�CA�i7C)N [X)CUMENTS
Revisirni: [kccit7kti�r2?, 2012
�o7aoo-i
General Conditions
Pagc 47 ofti3
tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under
Paragraphs II.OI.A.I and 11.O1.A,2 and that any higher tier Subcontractor and
Cont►•aetor will each be paid a fee of five percent (S%) of the amount paid to the next
lower tier Subcantractor, however in no case shall the cumu(ative total of fees paid be
in excess of 25%;
c. no tee shall be payable on the basis of casts itemized under Paragraphs 11.OI.A.6, and
1 l.0(.B;
the amount of credit to be allowed by Contractor to City for any change which results in
a net decrease in cost will be the amount oF the actua( net decrease in cost plus a
deduction in Contractor's Fee by an amount equal to five percent (5%) of such net
decrease.
I 2.02 C�lGYl�E' of C��ntr�act Time
A. The Contract Time may on(y be changed by a Change Order.
B. No extension of the Contract Time will be ailowed for Extra Wark or for claimed delay unless
the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project
Schedu(e or Contractor can show by Critical Path Method analysis how the Extra Work or
claimed de(ay adversely affects the critical path.
12.03 Delcrys
A. Where Contractor is reasonably delayed in the performance or completion of any part of the
Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time
may be extended in an amount equal to the tiene (ost due to such delay if a Contract Claitn is
made therefor. Delays beyond the control of Contractor shall inc(ude, but not be limited to, acts
or neglect by City, acts or neglect of utility owners or other contractors performing other work as
contemplated by Articie 7, tires, tloods, epidemics, abnormal weather conditions, or acts of God.
Such an adjustment shall be Cantractor's sole and exc(�tsive remedy for the de(ays described in
this Paragraph.
B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not timited t� all fees and char�;es of engineers, architects, attomeys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays
within the control of Contcactor. Delays attributable to and within the control of a Subcontractor
or Supplier shall be cleemed to be delays within the contro( of Contractor.
D. Thc Contractor shall receive no compensation for deiays or hindrances to the Work, except when
direct and tulavoidable extra cost to the Contractor is caused 6y the failure of the City to provide
info�mation or materia(, if any, which is to be furnished by the City.
c:rrvoH Fox���w�cna�n�
S'1'AN[)AKD CONSTRUC't'I(�N SPECIFCATIC�N DOCUN1�N'CS
Kavision: [7eceml�er21, 2J 12
00 �z oo - i
(';eneral Conditions
Pagc 43 of b1
ARTICLE 13 — TESTS AIYD INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OI'
llEF�CI'IVE WORK
13.01 Nvtice of D�fects
Notice of all defective Work of which City has actual knowledge will be given ta Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Artic(e 13.
13.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor sha(( provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
13.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shatl cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Docutnents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereo� to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specificalIy identified in the
Supplementary Conditions or any Texas Department of Licensut•e and Regulation (TULR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsibie for arranging and obtaining and shalt pay all costs in connection
with any inspections, tests, re-tests, or appi•ovals required for City's acceptance of materials or
equipment ta be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to
C; ity.
D. City may arrange for the services of an independent testing (aboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Work, as determined solely by
City.
City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 13.03 D resu(t in a"fail", "did not pass" or other
simitar negative result, the Contractor shall be responsible for paying for any and al( retests.
Contractor's cancellation without cause of City initiated Testing shal! be deemed a negative
result and require a retest.
crr�r or rolzr wo��k i
STANDARO CONSTRUCI'tC)N SPECIFCA�'IUN DOCUMF,;<ITS
Re��ision: C7c�c�rntz�rLi.'1012
00 72 00 - I
Genera( Conditions
Page 49 of 63
Any amounts owed for any retest under this Section I3.03 D shall be paid direct(y to the
"['esting Lab by Contractor. City will forward all invoices for retests to Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue Fina( Payment until the Testing
Lab is paid.
E. [f any Work (or the wock of others) that is to be inspected, tested, ar approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
F. Uncovering Wot•k as provided in Paragraph 13.03.E shal( be at Contractor's expense.
G. Contractor shali have the right to make a Contract C'laim regarding any retest or invoice issued
under Section 13.03 D.
13.04 Uncavering Work
A, if any Wo►•ic is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's obseiroation and replaced at Contractor's
expense.
B. lf City considers it taecessary or advisabie that covered Work be observed by City or inspected or
tested by others, Contractor, at City's request, shall �mcover, expase, or otherwise make available
for observation, inspection, or testing as City may require, that portion of the Work in question,
furnishing all necessary labor, material, and ec�uipment.
I. If it is found that the uncovered Work is defeetive, Contractor shall pay all e(aims, costs,
losses, and damages (including but not limited to al! fees and charges of engineers, architects,
attorneys, and other professiona(s anci all co�u�t or othei• dispute resolution costs) arising out
of or relatin�; to such uncovering, e:cposure, observation, inspection, and testing, and of
satisfactory replacement or reconstruction (including but not limited to all costs of repair or
replacement of work of other•s); or City shall be entit[ed to accept defeetive Wark in
accordance with Paragraph 13.08 in which case Contractor shall still be responsible for alt
costs associated with exposing, observing, and testing the defective Work.
2. 1f the uncover�d Wot•k is not f'ound to be defective, Contractor shall be allowed an inerease
in the Contract Price or an extension of the Contract Time, or both, directly attributable to
such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction.
( 3.05 City May ,5top the Work
If the Worlc is defective, or Contractor fails to supp(y sufficient skilled workers or suitable materials
or equipment, or faiis to perform the Work in such a way that the compieted Work will conform to
the Contract Documents, City may order Contractor to stop the Work, ot• any portion thereof, until
the cause for such orcier has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this ��ight for the benefit of Contractor, any
cny cm roaT woRTi 1
STANDARD COI�15t'RUC"['[ON SPL?CIPCAT(QN DOCUivfEV'I'S
Revision: Lkxemt�er�l, 2012
Ut) 72 00 - I
Cieneral Conditions
Page 5(? oi'bi
Subcontractor, any Supp(ier, any other individual or entity, or any surety for, or employee or agent of
any of them.
13.06 C'orrection or Remova! of'Defective Work
A. Promptly after receipt of written notice, Contractor shall carrect all defeetive Work pursuant to
an acceptable schedu(e, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testin�, losses, and damages (including but nat
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating ko such correction
or removal (including but not iimited to all costs of repair or replacement of work of others).
Failure to require the removal of any defeetive Work shall not constitute aeceptanee of such
Work.
B. When correcting defective Work under the terms of this Paragraph 13.Ob or Paragraph ( 3.07,
Contractor shall take no action that would void or otherwise impair �ity's special warranty and
guarantee, if any, on said Work.
13.07 Correction Perfod
A, If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee req�iired by the Contract
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available far Contractor's use by City or pertnitted by Laws and Regulations as
contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
l. repair such defective land or areas; or
2. correct such defective Work; or
3, if the defective Work has been rejected by City, remove it From the Project and replace it
with Work that is not defective, and
4, satisfactorily correct or repair or remove and replace any damage to other Wark, to the work
oFothers or other land or areas resulting therefrom.
B. If Contractar does not protn�tly comply with the terms of City's written instructions, or in an
emergency where detay wou(d cause serious risk of l�ss or damage, City may have the defective
Work corrected or repaired ot• may have the rejected Work removed and replaced. Alf claims,
costs, losses, and dama�es (including but not lirrzited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other clispute resolution costs)
arising out oF oi• relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or reptacement of work of others} will be paid by Contractor.
c��cv or roR�r wc�rrTt i
STAIVD�\RD CONSTRUC:"['10N SPEC[FCA�ION DOCl1Mk;N'I'S
Revision: LJc�ember 21, 2p I 2
U6 72 00 - I
General Conditions
Pagc S I ol'63
C. In special circumstances where a particu(ar item of equipment is placed in continuous service
before Final Acceptance of aIl thc Work, the correction period for that item may start to run from
an earlier date if so provided in the Contract Documents.
D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 13.07, the correction peciod hereunder with respect
to such Work may be required to be �xtended for an additional period of one ycar after the end of
the initial correction period. City shall provide 30 days written notiee t� Contractor should sueh
additional warranty coverage be required. Contractor may dispute this requicement by filing a
Contract Claim, pursuant to Paragraph 10.06.
E. Contracto�'s obligations under this Paragraph 13.07 are in addition to any other obligation or
warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a
waiver of, the provisions of any appficable statute of limitatian or repose.
13,08 .4cceptance �fDefective Work
If, instead of requiring correction or removal and replacement of defective Work, Gity prefet�s to
accept it, City tnay do so. Contractor shall pay all claims, costs, (osses, and damages (including but
not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or other dispute resolution costs) attributablc to City's evaluation af and determination to
accept such defiective Work and for the diminished value of the Wark to the extent not otherwise
paid by Contractor. If any such �cceptance occurs prior to Final Acceptance, a Change O��der will be
issued incorporating the necessary revisions in the Contract Documents with respect to khe Work,
and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished
va(ue of Work so accepted.
13.09 C:ity tLlay Correct Defective Work
A. [f Contractor fails within a reasonable time at�er written notice from City to correct defective
Work, o�• to cernove and replace rejected Work as required by City in accordance with Paragraph
13.OG.A, or if Contractor fai(s to perfi�rm the Work in accordance with thc Contract Documents,
or if Contractor fails to comply with any other provision af the Contract Documents, City may,
after seven (7) days �vritten notice to Contractor, correct, or remedy any such deticiency.
B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed
expeditiously, In connection with such corrective or remedial action, City may excl��de
Contz•actor from ali or part of the Site, take possession of all or part of the Work and suspe:nd
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other conkractors, access to the Site to enable City to eYercise the rights
and remedies under this Paragraph.
C. A(I claims, costs, losses, and damages (including but not limited to all fees and charg�s of
en�;ineers, architects, attorneys, and other professionals and all court or othe�� dispute resolution
crry ot� t oaT worrr�t
STANDARD COfvS"['RUC'T'It:)h SPECI} �ATION f70CtiMGNTS
Revision LAcemt�r21, 2012
tu� �z ao - i
General Conditions
f'age J2 af 61
costs) incun•ed or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respeet to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
- performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 13.09.
ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION
14.01 Scheclule Uf Valztes
The Scheduie of Values for lump sum contracts established as provided in Paragraph 2.07 will serve
as the basis for pro�;ress payments and will be inco�porated into a form of App(ication for Payment
acceptab(e to City. Progress payments on account of Unit Price Work will be based on the number of
units completed.
14.02 Progres,s Paynrents
A. Applicattans f��r Payments:
1. Contracior is responsible for providing all information as required to become a vendor of the
City.
2. At least 20 days before the date established in the General Requirements for each progress
payment, Contractor shall submit to City for review an Applica#ion for Payment filled out
and signed by Contractor covering the Work eomp(eted as of the date af the Application and
accompanied by such supporting documentation as is required by the Contract Documents.
3. If payment is requested on the basis of materials and equipment not incorporated in the Wark
but delivered and suitab(y stored at the Site or at another location agreed to in writing, the
�pplication for Payment sha(1 also be accompanied by a bill of sale, invoice, or other
documentation warranting that City has received the materials and equipment free and clear
of all Liens and evidence that the materials and equipment are covered by appropriate
insurance or other arrangements to proteet City's interest therein, aEt of whieh must be
satisfactory to City.
4. Beginning with the second Application fot• Pay►nent, each Application shall inelude an
af�idavit of Contractor stating that previous progress paytnents received on account of the
Work have been applied on account to dischar�;e Cantractor's legitimate obligations
associated with prior Applications for Payment.
5. The amount of retainage with respect to progress payments will be as stipulated in the
Contract Documents.
CITY UP' PORT W(�C(Tf�i
S"1'AivD.aRDCONS"('RUCZ'!ON SPECiFCAT1C)N I�OCUMliN�l'S
ftevision: L7ei:r.firtt�,� 2l, 2012
00 72 0{} _ �
Gencral Condiuons
Page 53 of G3
B. Review of Applications:
l. City will, after receipt of each Application for Payment, either indicate in writing a
recommendation of payment or return the Application to Contractor indicating reasons For
refusing payment. In the latter case, Contract�r may make the necessary corrections and
resubmit the Applieation.
2. City's proeessin�; of any payment requested in an Application for Payment will be based on
City's observations of the executed Work, and on City's r•evie�v of the Application for
Payment and the accompanying data and sehedules, that to the best of City's knowledge;
a. the Work has progressed to the point indicated;
b. the quality of the Work is generally in acco►•dance with the Contract Documents (subject
to an evaluation of the Work as a fiinctioning whole prior to or upon Final Acceptance,
the results of any subsequent tests called for in the Contract Documents, a fina(
determination of quantities and classifications for Work performed under Paragraph 9.05,
and any other qualiticati�ns stated in the recommendation).
3. Processing any such payment will not thereby be deemed to have represented that:
a. inspections made to check the quality or the quantity of the Work as it has been
perfonned have been exhaustive, extended to every aspect of the Worlc in peogr�ss, or
involved detailed inspections of the Work beyond the responsibilities speciFcally
assigned to City in the Contract Documents; or
b. thet•e may not be other mattei•s or issues between the pa►�ties that might entitle Contractor
to be paid additionally by City or entit{e City to withhold payment to Contractor, or
Contractor has complied with Laws and Regulations applicabfe to Contractor's
performance of the Work.
4. City may refuse to process the whote or any part of any payment because of subsequently
discovered evidence or the results of subsequent inspections or tests, and revise or revoke
any such payment previously made, to such extent as may be necessary ko pratect City from
loss because:
a. the Work is def`ective, or the completed Work has been damaged by the Contractor or his
subcontractars, requiring correction or replacement;
b. discrepancies in quantities contained in previous applications for payment;
c. the Contract Price has been reduced by Change Orders;
d. City has been required ta correct def�ctive Work or complete Work in accordance with
Paragraph 13.09;or
crry or E�oa�� wof. rE �
S'CANL�AR[] t:{:)NS�I'RllC'1'(ON tiPECtFCATIO�' �OCUYtEN"1'S
Revision: fkc;eintx�21.21?12
flf)7200- i
General Canditions
Page 5d of 63
e. City has actual knowledge of the occurrence of any af the events enumerated in
Paragraph 15.02.A.
C. Retainage:
I. For contracts less than $400,000 at the time of execution, retainage shail be ten percent
(10%).
2. For contracts greater than $400,000 at the time of exect�tion, retainage shall be five percent
(5%).
D. Liquiclated Damages. For each calendat� day that any work shall remain uncompleted after the
time specified in the Contract Documents, the sum per day specified in the Agreement, wiil be
deducted from the monies due the Gontractor, not as a penalty, but as liquidated damages
suffered by the City.
E. Paynzent: Contractor will be paid pursuant to the requirements of this Artiele 14 and payment
will become due in accordanee with the Contract Documents.
F. Redzsction in Payment;
l. City may refuse to make payment of the artiount requested because:
a. Liens have been filed in connection with the Work, except where Contractor has
delivered a specific bond satisfactory to City to secure the satisfaction and diseharge of
such Liens;
b. there are other items entitling City to a set-oFf against the amount recommended; or
c. City has actual knawledge of the occurrence of any of the events enumerated in
Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A.
2. If City refuses to make payment of the amount requested, City will give Cantractor written
notice stating the reasons for such action and pay Contractor any amount remaining after
deduction of the amaunt so �vithheld. City shall pay Contractor the amount so withheld, or
any adjustment thereto agreed to by City and Contractor, when Contractor remedies the
reasons for such action.
14.03 Contractor's Warr•unty of 7'itle
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment, whether incorporated in the Project �r not, wiil pass to City no later than
the time of payment free and clear of all Liens.
Ctl'Y O1�� FOIL"C WC)K"t'f I
S"I'�tiDARD CONSTRUCT[<)v SP(�:C'I1�CA'l1c�N uOCUMENTS
Rovision: Dcrocm�cr21, 2Q 12
��� �2 ao - I
General Condilions
P��gu �5 nf63
14,04 Partial Utilrzation
A. Prior to Final Acceptance of al( the Work, City may use or occupy any substantially completed
part of the Woc•k which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part af the Work that can be
used by City for its intended purpose without significant intecference with Contractor's
perfortnance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following eonditions:
L. Contractor at any time may notify City in writing that Contractoc considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notiftcation as enumerated in Paragraph 14.Q5.A.l, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completi�n. [f City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partiai Utilization will not constitute Final Acceptance by City,
14.05 Finullnspection
A. Upon written notice from Contractor that the entire Work is complete in acco►•dance with the
Contract Documents:
l. within 10 days, City will schedule a Final Inspection with Contractor.
2. City wili natify Contractor in writing of all particulars in which this inspectioa reveats that
the Work is incotnplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work oz• a�emedy sueh deficiencies.
B. No time charge will be made a�ainst the Contractor between said date of notification of the City
and the date of Fina( [nspection. Should the City determine that the Work is not ready for Final
Inspectian, City will notify the Contractor in writing of the reasons and Contract Time will
resume.
14.06 Final Acceptance
Upon comptetion by Contractor to City's satistaction, of any additianal Work identitied in the Final
inspection, City wi(l issue to Contractor a(etter oFFinal Acceptance.
crry c�r rox r wr�a�rl �
sTnrrr�nKn caus r�ucrio�; sr�Eci� c�a riori Uc�cu�nrNTs
Rcvi,ion� f}acmtw�r2l, 2012
U0720Q- I
Genert�l Conditions
Page 56 of 63
t 4.07 Final Paynrent
A. Application for P�yment:
I. Upon Final Acceptance, and in the opinion of City, Contractor may make an application Por
tinal payment following the proeedure for progress payments in aceordance with the
Contract Documents.
2. The Final Application for Payment shall be accompanied (except as previously delivered) by:
a. all documentation called for in the Contract Documents, ine(uding but not limited to the
evidence of insurance required by Paragraph 5.03;
b. cansent of the surety, if any, to final payment;
c. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
d. affidavits of payments and complete and lega(ly effective releases or waivers
(satisfactory to City) of all E,ien rights arising out oFor Liens filed in connection with the
Work.
B, Puyment 13ecomes Due,•
1. After City's acceptattce of the Application for Payment and accompanying documentation,
requested by Contractor, less previous payments made and any sutn City is entitled,
including 6ut not limited to lic�uidated damages, will become due and payable.
2. After ail Damage Claims have been resolved:
a. directly by the Contractor or;
b. Cont►•actor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
3. The making of the final payment by the City shatl not relieve the Contractor of any
guarantees or other requirements of the Contract Docutnents which specifically continue
thereafter.
14.08 Fincrl Completion Delayecl and Partial Retainuge Release
A. If fina[ eompletion of the Wark is significantly delayed, and if City so confirtns, City may, upon
reeeipt of Contractor's final Application for Payment, and withaut terminating the Contract,
make payment of the balance dtte for that portion of the Work fuily cornpleted and accepted. If
the remaining balance to be held by City for Work not fully completed or corrected is less than
the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as r�Quired in
Paragraph 5.02, the written consent of �the surety to the payment of the balance due for that
CI"1"Y Or [�OI2T WORTFI
STANDARt� C'ONS CRUC'Pff1N SPF.CIPCA']'ION DOCt (MGN'CS
Revision: fkcemtxr2l, 2012
00 72 Ot) - I
General Conditions
Page �7 oi'63
portion of the Work fu(ly completed and accepted shall 6e submitted by Contractar to City with
the Application for such payment. Such payment shal( be made under the terms and conditions
governing final payment, except that it shall not constitute a waiver of Contract Claims.
B. Partral Retainuge Release. For a Contract that provides for a separate vegetative establishment
and maintenance, and test and perfonnance periods f'ollowing the completion of all other
construction in the Contract Documents for all Wo��k (ocations, the City may release a portion of
the amount retained provided that all other work is comp(eted as determined by the City. Bef�re
the release, all submittals and final quantities must be completed and accepted far all other work.
An amount sufficient to ensure Contiact campliance will be retained.
14.09 Waivef• of Claims
The acceptance of final payment will canstitute a release of the City from alI claims or liabilities
under the Contract for anything done or furnished or relating to the work under the Contract
Documents or any act or neg(ect of City related to or connected with the Contract.
ARTICLE 15 — SUSPENSION OF WORK AND TCRMINATION
15.0 i City 1t�Icry Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work wil( be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City wili make no extra payment for stand-by
time of construction equipment and/or construction crews.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
contro( of and without the fault or negiigence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
available within a reasonable period of time, Contractor may request an extension in Contcact
Time, directly attributable to any se�ch suspension.
C. if it should become necessary to suspend the Work for an indeftnite peciod, the Contractor shall
store al( materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent darnage or
deterioration of the work performed; he shall provide suitable drainage abot►t the work, and erect
temporary structures where necessary.
D. Contractor may be reimbursed for the cost of maving his equipment off the job and returning the
necessary equipment to the job when it is determined by the City that construction may be
resumed. Such reimbursernent shall be based on actual cost to the Contractor of moving the
equipment and no profit will be allowed. L2eicnbursement may not be allowed if the ec�uipment is
tnoved to another construction project for the City.
C['R' OF FORT WOR'Cli
S'f'ANDARll C;ONS'CRIiCTtON tiPrC1FCAT[ON DC}CU(vtENTS
Revisioir. [k�cemt�r21_'?{I12
ao �z oo - i
General C�ndition5
Pa�e 53 oF63
15.02 City May Tern�inate, for Cause
A. The occurrence of any one or more of the following events by way of example, but not of
limitation, rnay justif'y termination for cause:
l. Contractor's persistent failure to perform the Work in accordanee with the Contract
Documents (including, but not limited to, Failure to supply sufficient skilled workers or
suitable materials or equipment, failu�•e to adhere to the Project Schedule established under
Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere
to the City's Business Diversity Ente�prise Ordinance #20020-1 2-20 1 1established under
Paragraph 6.06.D);
2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction;
3. Contractor's repeated disregard of the authority of City; or
4. Contractor's violation in any substantial way of any provisions of the Contract Documents;
or
5. Contractar's failure to promptly make good any defect in materials or workmanship, or
defects of any nature, the correction of which has been directed in writing by the City; or
6. Substantial indication that the Contractor has made an unauthorized assignment of the
Contract or any funds due therefrom for the beneitt of any creditor or far any other purpose;
or
7. Substantial evidence that the Contractor has become insalvent or ba�nkru�t, or otherwise
financially unable to carry on the Work satisfactorily; or
8. Contractor commences legal action in a court of competent jurisdiction against the City.
B. If one or more of the events identified in Paragraph 15.02A. occur, City �vill provide written
notice to Contractor and Sureky to arrange a conference with Contractoc• and Surety to address
Contractor's failure to perform the Wo►•k. Conference shall be held not later than IS days, after
receipt of natice.
1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to
perform the construction Contract, the City may, to the extent permitted by Laws and
Regulations, decfare a Contractor default and formally terminate the Contractar's right to
complete the Contract. Contractor default shall not be declared earlier than 20 days after the
Contraetor and Surety have received notice of conferenee to address Contraetor's failure to
perform the Work.
2. If Contractor's services are terminated, Surety shail be obligated to take over and perform the
Work. If Surety does not commence performance thereof within 15 cansecutive calendar
days after date of an additional written notice demanding Surety's performance of its
CITY OF FQRT WC)RTfI
5'I'rlND/�RU CONSTRUCTtOiti Sf'GCiFCATION CJOCUMF:NI;S
Kevision: (k+c;en:Fer21, 2612
00 �z rx� . i
Cencru! Conditiuns
I'age ,59 of 63
o6ligations, then City, without process or action at law, rrtay take over any portion of the
Work and complete it as described below,
a. If City comp(etes the Work, City may exclude Contractor and Surety from the site and
take possession of the Work, and all materials and equipment incorporated into the Work
stored at the Site or for which City has paid Contractor or Surety but which are stored
elsewhere, and finish the Work as City may deem expedient.
Whethei• City or Surety completes the Work, Contractor shall not be entitled to receive any
fiirthei• payment until the Work is tinished. If the unpaid balance of the C�ntract Price
exceeds all claims, costs, (osses and damages sustained by City arising out of or resultin�
from completing the Work, such excess will be paid to Contractor. If such claims, costs,
losses and damages exceed such unpaid balance, Contractor shal! pay the difference to City.
Such claims, costs, losses and damages incurred by City will be incoipocated in a Change
Order, provided that when exercising any rights or remedies under this Paragraph, City shall
not be required to obtain the lowest price for the Work performed.
4. Neither City, nor any of its respective consultants, agents, officers, directors or employees
shall 6e in any way liable or accountable to Contractor or Surety for the method by which the
completion oF the said Work, or any portion thereof, may be accomplished or for the price
paid therefor.
5. City, notwithstanding the method «sed in completing the Contract, shall not forteit the right
to recover damages from Contractor or Surety for Contractor's failure to timely complete the
entire Contract. Contractor shall not be entitled to any claim on account oF the method used
by City in completing the Contract.
6. Maintenaiice of the Work shall continue to be Contractor's and Surety's responsibilities as
provided for in the bond requirements of the Contract Documents or any speciai guarantees
provided foc under the Contract Documents or any other obligations otherwise prescribed by
law.
C. Notwithstanding Paragraphs 15,02.B, Contiactor's services will not be tettninated if Contractor
begins within seven days of receipt of notice of int�nt to terminate to cocrect its failure to
perform and proceeds diligently to cure setch failure within r�o more than 30 days of receipt of
said notice.
D. Where Contractor's serviees have been so terminated by City, the termination will not affect any
rights or remedies of City against Contractor then existing or which may thereafter accrue. Any
retention or payment of moneys due Contractor by City will not release Contractor from liability.
E. If and to the extent that Contractor has provided a performanee bond under the provisions of
Paragraph 5.02, the tet•mination procedures of that bond shall not supersede the provisions of this
Article.
C(TY t�[' PORT tiVOR1'H
.STANDARL> C'Oti5�1"RUCTION SPECIFCATfON DOCUMF,NT5
Revision: Dec emt�r21, 2D 12
�o�zoo-i
Generai Conditions
Page fit) of fi3
15.03 Ciry �Liay 7'ef�minate For Cojzvenience
A. City may, without cause and without prejudice to any other right or remedy of City, terminate the
Contract. Any termination shall be effected by mailing a notice af the tertnination to the
Contractor specifying the extent to which performance of Work under the contract is terminated,
and the date upon which such termination becomes effective. Receipt of the notice shall be
deemed conclusively presumed and established when the (etter is placed in the United 5tates
Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and
established that such termination is made with just cause as therein stated; and no proof in any
claim, demand or suit shal! be rec{uired of the City regarding such discretionary action.
B. Ai�er receipt of a notice of termination, and except as otherwise directed by the City, the
Contractor shall:
L Stop �vork under the Contract on the date and to the extent specified in the notice of
termination;
2. place no fu��ther orders or subcontracts for materials, services or facilities except as may be
necessary for comp(etion of such portion of the Work under the Contract as is not terminated;
3. terminate all orders and subcontracts to the extent that they relate to the performance of the
Work terminated by notice of termination;
4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any,
directed by the City:
a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and
other material produced as a part of, or acquired in cannection with the performance of,
the Work terminated by the notice of the termination; and
b. the comp(eted, or partial(y compteted plans, drawings, information and other property
which, if khe Contract had been completed, would have been required to be furnished to
the City.
�. complete performance of such Work as shall not have been terminated by the notice of
termination; and
6. take such action as may be necessary, or as the City may direct, for the protection and
preservation of the property related to its contract whieh is in the possession of the
Contractor and in which the owner has or may acquire the rest.
C. At a time not later than 30 days after the tennination date specified in the notice of termination,
the Contractor may submit to the City a list, certified as to quantity and quality, of any or all
items of termination inventory not previously disposed of, exclusive of items the disposition of
which has been directed or authorized by City.
crT� of. h�ok�r woK�rt�
S"I�ANDARIaCON;;'1'RUC;TCt}N SYEC[I�CA"PION DpCUMEN'TS
Revision: fk?ccrnhcr21,20�2
00 7z ou - i
(ieneral Conditions
Ya�e 61 oC63
D. Not (ater than 15 days thereafter, the City sha(1 accept title to such items �rovided, that the list
submitted shal( be subject to veeification by the City upon removal of the items or, if the items
are stored, within 45 days ti�om the date of submission of the list, and any necessary adjustments
to correct the list as submitted, shall be made prior to tinal settlement.
E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination
claim to the City in the form and with the certification prescribed by the City. Unless an
extension is made in writing within such 60 day period by the Contractor, and granted by the
City, any and all such claims shall be conclusively deemed waived.
F. In such case, Contractor shall be paid for (�vithout duplication of any items):
l. completed and acceptable Work executed in accordance with the Contract Documents prior
to the effective date of termination, including fair and reasonable sums for overhead and profit on
such Work;
2. expenses sustained prior to the etfective date of termination in perForming services and
furnishin; labor, materials, or equipnnent as required by the Contract Documents in connection
with uncompleted Work, plus fair and reasonable sums for overhead and profit an such expenses;
and
3. reasonable expenses directly attributable to termination.
G. In the event of the fai(ure of the Contractor and City to agree upon the whole amount to be paid
to the Contractor by reason of the termination of the Work, the City shall determine, on the basis
of infonnation available to it, the amount, if any, due to the Contractor by reason of the
termination and shall pay to the Contractor the amounts detcrmined. Contractor shall not be paid
on account of loss of anticipated profits or revenue or other econamic loss arising aut of or
resulting from such termination.
ARTICLF 16 — DISPUTC RESOLUTION
l 6.01 Nlethods and Procedzrres
A, Either City or Contractor may request mediation of any Contract Ctaim submitted for a decision
under Paragraph 10.06 before such decis'ron becomes final and binding. The request for
mediation shall be su6mitted to the other party to the Contract. Timely submissian oFthe reyuest
shall stay the effect of Paragi•aph 10.06.E.
B. City and Contractor shal( participate in the mediation process in good faith. The p►•ocess shall be
commenced within 60 days of filing of the reauest.
C. If the Contract Claim is not resolved by mediation, City's action under Paragraph I0.06.0 or a
denial pursuant to Paragraphs 10.06.C.3 or 10.06.D shall become final and binding 30 days after
termination of the mediation unless, within that time period, City or Contractor:
CIT'Y QE F02T bVOI�II l
S'I'ANDARC7 C'ONS"('(iUCTIUN SP6CtFCAT[ON UOCl1MGN'CS
Revision: E)ax°ml�er21, 2012
na �2 ca�� - i
General Conditions
Page 52 of 6 i
l. e(ects in writing to invoke any other dispute resolution process provided for in the
Supplementary Conditions; or
2. agr•ees with the other party to submit the Contract Claim to another dispute reso(ution
process; or
3. gives written notice to the other party of the intent to submit the Contract Claim to a court of
competent jurisdiction.
ARTICLE 17 — MISCELLANEOUS
17.01 Uivin,� Nottce
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
l. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known ta the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Cantract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufticient upon confirmation ofreceipt by the receiving party.
17A2 Computation of Timea
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the Iast day of any such peri�d falls on a
Saturday or Sunday or on a day made a Iegal holiday the next Warking Day shall become the last
day of the period.
17.03 C'umulative Rerrtedies
The duties and obligations imposed by these Generat Conditions and the rights and remedies
availab(e hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy ta
which they apply.
ci�� oF For�T woR�rf f
S'I'.4NDARll CONS'I RUCTII�N SPEt:1f�Ct1"t'[ON UOCUivfE,NTS
Ravision: Lkcemtxr2l, 2012
00 �z oo - i
General Conditions
Page 63 of ti3
17.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all eontinuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
17.05 Headrngs
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
Generat Conditions.
CITY UP fOR'I' WORTH
S'PANDARD CONS"fRUCi'ION SPECll'CATION DOCliMENT'S
Revisinn: Ckcerribcr2l, 2012
00 73 00 - 1
SLPPLBIvtGNTARY COND[TIONS
Page I oC5
1
2
3
4
5
6
7
8
9
10
(1
12
t3
14
i5
16
17
18
19
20
��
22
23
24
25
26
2?
2A
29
30
31
32
33
34
35
36
37
38
39
40
4t
42
43
44
45
46
47
SECTION 00 73 00
SUPPLEMENTARY CONDITIONS
TO
GENERAL CONDITIONS
Supplementary Conditions
These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other
provisions ofthe Contract Documents as indicated below. All provisions of the General Conditions that are
modi6ed or supplemented remain in ti�lt f'orce and effect as so modified or supplemented. All provisions
of the General Condikions which are not so modified or st�pplemented remain in full force and effect.
Defined Terms
'T'he terms used in these Supplementary Conditions which are defined in the General Conditions have the
meaning assigned to them in the General Conditions, unless specifically noted herein.
Nlodifications and Supplements
The following are instructions that modiFy or supplement specific paragraphs in the General Conditions and
�ther Contract Documents.
SC-3.03B.2, "Kesolving Discrepancies"
Plans govern over Specifications.
SC-4.01 A
Easement limits shown on the Drawing are approximate and were provided ko estab(ish a basis for bidding.
Upon receiving the final easements descriptions, Contractor shall eompare them to the lines shown on the
Contract Drawings.
SC-4.OlA.t., "Availability of Lands"
'I1�e following is a(ist of known outstanding right-of-way, ancilar easements k� b$ acquired, if any as of
October 8, 2014:
Outstanding Right-Of-Way, ancl(or Easements to Be Acquireci
PARCEL OWNER TARGET [�ATE
NUMBER OF POSS�SSION
None
The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed,
and do nat bind the City.
(f Contractor considers the final easements provided to differ materially irom the representations on the
Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work,
notify City in writing associated with the differing easement line locations.
CCTY OP �ORT WORTH {3T�rter and Sitrzirary Se�v�r Replua�emerrt Coirh•ac� Z0l d, Gl<S�LJ-D
STAiVDAR[7 CORtiTRUC"I'ION SI'EC[F'ICA"PION DOCU�IENTS Ciry ProJect Nn. 02385
Revised April I, �t71 3
Ot) 73 UO - 2
SUPPLfMGN"CARY CONOfI'IONS
I'age? of�
5C-4.01 A.2, `�Availability of Lands"
Utilities or obstructions to be removed, adjusted, and/or relocated
The following is list of utilities and/or obstructions thak have not been removed, adjusted, azidlor relocated
as of October 8, 2014:
EXPECTED UT[LITY AND LOCATION TARGET DATE OF
OVJNER ADJLISTMEN'T
None
7
8
9
(0
ll
(2
(3
14
(5
(6
17
18
19
20
21
�2
23
24
25
26
27
�g
�g
30
31
32
33
34
35
3b
37
38
39
40
41
42
43
44
45
46
47
48
The Contractor understands and agrees thlt the dates listed above are estimates only, are not guaranteed,
and do not bind the City.
SC-4.02A., "Subsurface and Physical Conditions"
The following are repoi�ts ofexplorations and tests ofsubsurface conditions at the site of the Work:
?�'one
T'he following are drawings of physical conditions in or relating to existing surface and subsurface
structures (except Underground Facilities) whieh are at or contiguous to the site of the Work:
None.
SG4.06A., "HazArdous E:nvironntental Conditions at Site"
The following are reports and drawings of esisting hazardous environmental conditions knawn ta the City:
None.
SC-5.03A., "Certificates of [nsurance"
T'he entities listed below are "additional insureds as their interest may appear" inchiding their respecdve
of'ficers, directors, agents and employees.
(l) City
(2) Consultant: None
{3} Other: None
SG5.04A., ��Contractor's Insur�nce"
The limits of liability for the insurance required by Paragrapt� GG5.04 shall provide the following
coverages f'or not less than the following amounts or greTter where required by laws and regulations:
S.O�tA. Workers' Compensation, under Paragraph GC-5.04A.
S�ati�toyy limits
Errrpinyer;c liability
$100, 000 ecrch uacider7t/acczu�rence
$l (J0, tJ00 Disease - each ernployee
$500, �00 Disease - policy limit
SC-5.04B., °°Contractor's [nsur»nce"
CCl'Y OF' FOIL"f WOR"C'H 6Yatm crnd Sairrtary.Sewer Repincxmeri! C'oitlrcut 2O!4, l4:S��1-tJ
S"fANDnIZD (:<7NS"IRl1C"P[t)N SI'TiC'IF[l:A'PION f70CUMENTS City Prqjecf,No. 02385
('ie4�ised April I, 20 i 3
007300-3
SUPPLGM�NTARY CC�NDITIONS
Page 3 oi'S
1
2
3
4
5
6
7
8
9
l0
Il
12
l3
14
15
l6
l7
18
19
20
��
?2
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
4S
46
47
48
49
50
5l
52
53
54
55
5.046. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance
under Paragraph GC-5.04B., wh ich shall be on a per project basis covering the Contractor with
minimum fimits of:
$l,0�0,�00 each occurrence
�2, 000, �00 aggregate Irmit
The policy must have an endorsement (Amendment — Aggregate Limits of Inslirancej making the
General Aggregate C,imits apply separately to each job site.
The Commercial Ueneral Liability [nsurance policies shall provide "X", "C", and "U" coverage's.
Verification of such coverage must be shown in the Remarks firtiele of the Certificate of Insurance.
SC S.04C., "ConU•actor's [nsuraoce"
5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under
Paragraph GG5.04C., which shall be in an amount not less than the fol(owing amounts:
( i) Automobile �iability - a commercial business pol icy shall provide coverage on "Any Auto",
defined as autos owned, hired and ►�on-owned.
��t,�00,000 eacii accident on a combined single limit basis. Split limits are acceptable if limits are at
(east:
�'25Q, 000 Bodidy lnji+�y per person /
�SDO, 000 Bodily Injury per accic�nt /
$/00,O00 Property Damage
SC-5.04D., "Contractor's Insurance"
The Contractor's construetion activities will require its employees, agents, subcontraetors, eQuipmenk, and
►naterial deliveries to cross railroad properties and h-acks. Noae.
'The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with,
hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their tcains
or other property. Such operations on railroad properties may require that Contractor to execute a"Right of
Entry Agreement" with the particular rai[road company or companies invo(ved, and to this end the
Contractor should satisfy itself as to the requirements of each railroad eompany and be prepared to execute
the right-of-entry (if any) required by a railroad company. The requirements specifie�i herein (ikewise retate
to the Contractor's use of private andlor construction access roads crossing said railroad company's
properties.
The Cantractua( Liability coverage required by Paragraph 5.04D ofthe Genera( Conditions shail provide
coverage For not less than khe following amounts, issued by companies satisfactory to the City and to the
Railroad Company for a term that continues for so long as the Contractor's operations and work cross,
occiipy, or touch railroad property:
Required for this Contract
X Not required for this Contract
With respect to the above out(ined insul•ance requirements, the follawing shall govern:
I. Where a single railroad company is involved, the Contractor shall provide one insurance palicy in
� tl3e �iame of the railroad company. However, if more than one grade separation or at-grade
crossing is affected by the Project at entire(y separate locations on the line or lines of the same
railroad compatty, separate coverage may be required, each in the amount stated above.
t[TY C)f� FOR'C WC)RTi{ GYirter arsrlSuirrterry Sesver Replace»iex! Cor�trnct �t7ld, GRS�bf-I?
STANDARD Ct�NSTRUCT�C)N SPECITiCAT[ON DOCUMEN"CS City Prnject Nn. 0:�31?.5
Revise�i April i, 2�)I:�
on �� oo - �
SUPPLEh4�NTAKY CONUI'flONS
Page�l of5
I
2
3
4
5
6
7
8
9
l0
il
12
13
14
IS
16
17
ix
19
20
21
22
23
aa
25
26
�7
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
4&
49
50
5]
2, Where mora than one railr�ad company is oper�ting on the same right-of-way or where several
railroad companies are involved and operated on their own separate rights-of-way, the Contractor
may be required to provide separate insurance policies in the name of each railroad company.
3. lf, in addition to a��ade separation or an at-grade crossing, other work or activity is proposed on a
railroad company's right-of-way at a location entirely separate from the grade separation or at-
�rade crossing, insurance coverage for this work must be inc(uded in the policy covering the grade
separation.
4. If no gr�de separation is involved but other work is proposed on a railroad company's right-of-
way, aU such other work may be covered in a single policy for that r�ilroad, even though the work
may be at two or more separate locations.
No work ar activities �n a railroad company's property to be performed by the Contractor shal) be
c�nunenced until tha Contractor has fuimished the City with an originaf poliey or policies of the insurance
for each railroad company named, as required above. All such insurance must be approved by the City and
each affected Railroad Company prior to the Contractor's beginning work.
'T1�e insurance specified above niust be carried until all Work to be perfonned on the railroad right-of-way
has been completed and the ��1de crossing, if any, is no longer used by the Contractor. In addition,
insurance must be carried during all maintena�ice and/or repair work performed in the railroad right-oF way.
Such insurance must name the railroad company as the insured, together with any tenant or lessee of the
railroad eompany operating over tracks involved in the Project.
SC-fiA�t., "Project Schedule"
Project schedule shall be tier 3 for the project.
SC-6.07., "Wage Rates"
The follawing is the prevailing wage rate table(s) applicabte to tfiis project and is provided in the
Appendixes:
��13uzzsmv localion, Resources/02-Corislruction Documenl,s/Specificalions/l�iv 00-Uenerul
Cunditions/CFW Wnge Rate Table 20(ISO708.pdf`>
5C-6.09., `°Permits and Utilities"
SC-6.09A,, °fContractor obtained permits and licenses"
The following are known permits anci/or licenses required by the Contract to be acquired by the Contractor:
None.
SC-6.09B. i°City obtained permits and licenses"
The following are known permits and/or licenses required by the Contract to be acquired by the City: None
SC-6.09C.'°Outst�nding permits and licenses"
'T1�e following is a list of known outstanding permits and/or licenses to be acquired, if any as of petober 8,
2014:
Outstanding Permits and/or Licenses to Be Acquired
OWNER PE�tMi'C OR LICENSE AND 1..(�CATION
NONE
"t'ARGET DATE
OF POSSESSION
CCt'Y OP FORT LVQRTH bi'ater artd Saruta�y J'e�ver Replarenter�i Co�rtr�ct �Ol �t, GYSrt� fJ
S"I'ANDARD CONSThUC"I'[(>N SPEC[FICA'f{ON DOCUMEN'PS (;ity Prqject Nn, 02?45
Revised April I, 2013
OWNER
OU730U-5
StJPPi.,F..��iF.N'i'ARY CC)NUI'ftC)Nti
Page 5 af 5
PERMtT OR LICENSE AND LOCAT[�N TARGET DATE
OF POSSESSION
t
2
3 SC-7,02., "Coordination"
4
5 The individuals or entities listed below have contracts with the City for the performance of other work at
6 the Site:
7 None.
_--------_.------- ---.._..�--_._.�_w._..__...,.....,...._,_______...�.� _._v ,.�.M__......__��..,__.w_____.___._---
Vendor _�� �� Scope of Work � Coordination Authority
None.
� _ .._ �.__ ____�-- _._ �-- _ _--- -- --- _-_� _ _ , ._- __— _ _ u-- __ _ __ ___�� ..
8
9
10
ll
12
(3
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SC-8.01, "Communications to Contractor"
SC-9.01., "City's Pro,ject Representative"
The following firm is a consultant to the City responsible for construction management of this Project:
None
SG13.03C., "Tests and [nspections"
None.
SC-16.O1C.1, °°Methods and Procedures"
None.
END OF SECTION
CI'I'Y OP FOftT W��A CI1 N'ater and 3unitary Seiver Re�laceme�u C'ontr��ct 20t 4, WSe611J
STANDARD CONS'I'ItUC'fiGN Sl'�G[FICA"1'ION pOCUMF.I'�!"CS City Pr•oject No. 02385
Revised Apri� !.2013
oi iioo-i
sum�mn�zY ot� wo«x
Page 1 of3
1
2
3 PART1- GENERAL
SECTI01�101 11 00
SUMMARY OF WORK
4 1.1 SUYItYIARY
5 A. Section Includes:
6 l. Summary of Work to be performed in accordance with the Gontract Documents
7 B. Deviations from this City of Fort W�rth 5tandard Specification
8 1. None.
9
l0
ti
12 1.2
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0- Bidding Requirements, Contract Forms, and Conditions of the Contract
2. Division 1- General Requirements
PRICE AND PAl'MENT PROCEDURES
13 A. Measurement and Paytnent
14 I. Work associated with this Item is considered subsidiary to the various items bid.
I S No separate payment will be allowed for this Item.
16 I.3 REFERENCES [NOT USEDj
17 1.4 ADMINISTRATNE REQUIREMENTS
18 A. Work Covered by Contract Documents
19 1. Work is to include furnishing all labor, materials, and equipment, and performing
20 all Work necessary for this construction project as detailed in the Drawings and
21 Specifications.
22 B. Subsidiary Work
23 1. Any and all Work specificaily gaverned by documentary requirements for the
24 project, such as canditions imposed by the Drawings or Contract Documents in
25 which no specific item for bid has been provided for in the Proposal and the item is
26 not a typical unit bid item included on the standard bid item list, then the item shall
27 be cansidered as a subsidiary item of Work, the cost of which shall be included in
28 the price bid in the Proposa( for various bid items.
29 C. Use of Premises
30 1. Coordinate uses of premises under direction of the City.
3l 2. Assume fu►l responsibility for protection and safekeeping of materiafs and
32 equipment stored on the Site.
33 3. Use and occupy only portions of the public streets and alleys, or other pubfic places
34 or other rights-of-way as provided fo►• in the ordinances of the City, as shown in the
35 Contract Documents, or as may be specitically authorized in writing by the City.
36 a. A reasonable amount af tools, materials, and equipment for construction
37 purposes may be stored in such space, but no more than is necessary to avoid
38 delay in the construction operations,
CCfY OF YOR'1' WOI�'1't{ {Vater and SarritarySefver Replacemen! Cnrrh�ac[ 2f)14, W.S:L1-L�
STANDARD CC7NS't'Itt;CT{ON SPGCIF[CA"I'ION DOCUbtEtv"CS f:iry Psq�ect h''o. �2355
Revised December 20, 2012
oi i i na-z
SUMMARY OP WORK
Pagc 2 of 3
b. Excavated and waste materials shall be stored in such a way as not to interfere
with the use of spaces that may be designated to be lef't free and unobstructed
and so as not to inconvenience occupants of adjacent propei�ty.
c, If the street is occupied by railroad tracks, the WQrk shall be carried on in such
manner as not to interfere with the operation of the railroad.
1) All Work shall be in accordance with railroad requirements set forth in
Division 0 as well as the railroad permit.
D. Worlc within �asements
9
t0
11
12
13
l4
l5
16
1. Do not enter upon private property for any purpose without having previously
obtained permission from the owner of such praperty.
2. Do nat store equipment or materiat on private property unless and until the
specified approval of the property owner has been secured in writing by the
Contractor and a copy furnished to the City.
3. Unless specificaily provided otherwise, clear all rights-of-way or easements of
obstructions which must be removed to make possible proper prosecution of the
Work as a part of the project construction operations.
17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,
18 Iawns, fences, ctilverts, curbing, and all other types of st►•uctures or improvements,
19 to all water, sewer, and gas tines, to all conduits, overhead pole lines, or
20 appurtenances thereof, including the construction of tempnrary fences and to all
2t other pijblic or private property adjacent to the Work.
22 5. Notify the proper representatives of the owners or occupants c>F the public or private
23 lands of interest in lands which might be affected by the Work.
24 a. Such notice shall be made at least 48 hours in advance of the be�inning of the
25 Work.
26 b, Notices shall be applicable to both public and private utility companies and any
27 corporation, company, individual, or other, either as owners or occ�ipants,
28 wl�ose land or interest in land might be affected by the Work.
29 c. Be responsible for all damage or injury to property of any character resutting
30 from any act, amission, neglect, or miscanduct in the manner or method or
3l e;cecution oFthe Wo►�k, or at any time due to defective work, material, or
32 equipmettt.
33
34
35
36
37
38
39
4Q
41
6. Fence
a. Restore all fences encountered and removed du�'in� constrtiction of the Project
to the original or a better than original condition.
b. Erect temporary fencing in place of the fencing removed whenever the Work is
not in progress and when the site is vacated overnight, and/or at all times to
provide site security.
c. The cost for all fence work within easements, including removal, temporary
closures and replacement, shall be subsidiary to the various items bid in the
project proposal, unless a bid item is specifically provided in the proposal.
CI'1'Y OF fORT WOR"PN DYcver nuu'Satritnr;v Sewer Re�lace�rrenl Couu�uct 30/d, GYS;t4-L7
STAAIDiARD CUNSTRUCTIO%! SPECIFICA�P[ON DOCtiMENTS Cily Prnjec! Nn. O2385
Revised lJcccmher 20, 2i> 12
Ol1It)0-3
SUMMARY Ol-' 1i�ORK
Pagc 3 of 3
t
2
3
4
5
G
7
8
9
t0
ll
12
1.5 SUBMITTALS [NOT USED]
1.6 ACTIOIY SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.$ MAINTENANCE MATERIAL SUBMITTALS [NOT USEDj
1.9 QUALITY ASS[1RA1�10E [NOT USED]
1.10 DELiV�RY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USEDj
1.12 WARRAtVTY [NOT USEDj
PART 2 - PRODUCTS [NOT USED)
PART 3 - EXECUTION [NUT USED]
END OF SECTION
- Revision Log
__ _—,
DA"CE NAIvSE SUMMARY OF CHANGE
13
CI'I'Y OE E�OEt"I' WOK"PH 6t�aler and Sanrinry Se4ver ReplacenJenr t'oritruct Z(114, WSM•t7
S`I'ANDARD �i1NS'I'ItUC'CfUN SYEC(FICAT[ON DOCL7M�NTS Crry Proj�cf A'a. 023N5
RE:vised Dc:ccmbcr 20, ZU 12
oi z;oo-i
S[,BSI'[TU1'ION PKOCF,Ial1RES
Page I of4
t
2
3 PART 1 - GENERAL
4 1.1 SUMMARY
SECTION O1 25 00
SUBSTITUTION PIZOCEDURES
5 A. Section Includes:
6 I. 'Che procedure for requesting the approval of substitution of a product that is not
7 equivalent to a product which is specified by descriptive or performance criteria ar
8 defined by reference to 1 or more of the following:
9 a. Name of manufacturer
l0 b. Name of vendor
t 1 c. Trade name
t2 d. Catalog number
l3 2. Substitutions are not "or-equals".
14 B. Deviations from this City of Fort Worth Standard Specification
15 1. None.
t6 C. Related Speci�cation Sections include, but at•e not necessarily (imited to:
i 7 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
18 2. Division 1— General Requirements
t9 1.2 PRICE AND PAYMENT PROCEDURES
20 A. Measurement and Payment
2 t I. Work associated with this Item is considered subsidiary to the variaus items bid.
22 No separate payment will be allowed for this Item,
23 1.3 REFF.RENCES [N�T USED]
24 1.4 ADMINISTRATIVE REQUIREMF,NTS
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A. Request for Substitution - General
1. Within 30 days after award of Contract (unless noted otherwise), the City will
consider formal requests from Contractor for substitution of products in place of
those specitied.
2. Certain types of equipment and kinds o#' material are described in Specifications by
means of references to names of manufacturers and vendors, trade names, or
catalog numbers.
a. When this method of specifying is used, it is not intended to eYclude fi•om
consideration other products bearing other manufacturer's or vendo�•'s names,
trade names, or catalog numbers, provided said products are "or-equals," as
determined by City.
3. Other types of equipment and kinds of material may be acceptable substitutions
under the f�llowing conditions:
a. Or-equals are unavailable due to strike, discontinued production of products
meeting specified requirements, or other factors beyond control of Contractor;
or,
CCI'YOFFOft"!' WOR'i'H 66crteran�iSareirurySetirerReplacsrnentContrnet2Ul4, N<Sbi-U
SCAN[�tUZD CONS'fRUCCItlN SPLiCiP[CA"PIUIti D(�CIJ'vtENTS Clty� Prnjecr tV'a. OZ.iB.i
Revised July I, 24! (
U12500-2
SIJBSTITtJT[ON PROCF,DURLS
Puge 2 of4
1 b. Contractor proposes a cost and/or time reduction incentive to the City.
2 1.5 SUBMITTALS
3 A. See Request for Substitution Form (attached)
4 B. Procedure for Requesting Substitution
5 l. Substitution shall be considered only;
6 a. After award of Contract
7 b. Under the conditions stated herein
8
9
10
11
12
13
14
l5
l6
17
18
l9
20
2l
22
23
2�
2S
26
27
28
29
30
3l
32
33
34
35
36
37
38
39
40
41
42
2. Submit 3 copies of each written request for substitution, including:
a. Documentation
1) Camplete data substantiating compliance of proposed substitution with
Contract Documents
2) Data relating to changes in constructian schedule, when a �•eduction is
proposed
3) Data relating to changes in cost
b. For products
1) Product identification
a) Manufacturer's name
b) Telephone number �ind representative contact name
c) Specification Section or Drawing reference of originally specified
product, including discrete name or tag number assigned to ori�inal
product in the Contract Documents
2) ManuFacturer's literature clearly marl<ed to show compliance of proposed
product with Contract Documents
3) ftemized camparison of original and proposed product addressing product
characteristics irlcluding, but not necessarily limited to:
a} Size
b) Composition or materials of constructian
c) Weight
d) Electrical ar mechanical requirements
4) Product e;cperience
a) Lacation of past projects utilizing product
b) Name and telephone number of persons associated with referenced
pi•ojects knowledgeable concerning proposed product
c) Available field data and reports associated with proposed product
5} Samples
a) Provide at request of City.
b) Samples become the property of the City.
c. For construction methods:
1) Detailed description of proposed method
2) Illustration drawings
C. Approval or Rejection
Written approval or rejection of substitution given by the City
43 2. City reserves the right to reauire proposed product to comply with color and pattern
44 of spacified product iF necessary to secure design intent.
45 3. In the event the substitution is approved, the ��esulting cost and/or time reduction
46 will be documented by Change Order in aceordance with khe General Conditions.
Ct't'Y f)E FOR'C W(7R'1'H 4Yuter• nnd,Sarritar>> Se�var Replacemenl Corrrrnc/ IfJl�t, GYS,1�1-D
5"Pr1NUARD COAJST2UCTEON tiPCC(FICATION D(1CUMF.NTS Crry Project No. 02385
Reviscd July I, 2fl I 1
01 25 1){� - 3
SUBS'CI"1'U'P10N YA��CEDUE2f:S
Page 3 oE'4
I 4. No additional contract time will be given for substitution.
2 5. Substitution will be rejected if:
3 a. Submittal is not through the Conti•acto�• with his stamp of approval
4 b. Request is not made in accordance with this Specification Section
5 c. [n the City's apinion, acceptance will require substantial revision of the original
6 design
7 d. tn the City's opinion, substitution will not perform adequately the function
8 consistent with the design intent
9 1.(� ACTION SUBMITTALS/TNFORMATIONAL SUBMITTALS [NOT USED]
l0 1.7 CLOSEOUT SUBMITTALS [NOT USED]
11 1.8 MAINTEi�TANCE MATERIAL SUBMITTALS [NOT USLD1
12 1.9 QUALITY ASSURANCE
13 A. ln making request for substitution or in using an approved product, the Contractor
14 represents that the Contractor:
IS i. Has investigated proposed product, and has determined that it is adequate or
t6 superior in all respects to that specified, and that it will perform funetion for which
l7 it is intenc�ed
18 2. Will provide same guarantee for substitute item as for product specified
19 3. Will coordinate instaUation of accepted substitution into Work, to include building
20 modifications if necessary, making such changes as may be required for Work to be
21 complete in all respects
22 4. Waives ali claims for additional costs related to substitution which subsequently
23 arise
24 1.10 DELIVERY, S'TORAGE, AND HANDLING [NOT USED]
25 1.11 FTELD (SITE] CONDITIONS [NOT USED]
26 1.12 WARRAN`TY [NOT USED]
27 PART 2- PRODUCTS [NOT US�D]
28 PART 3- EXECUTION [NOT USED]
29
30
END OF SECTIUN
Revisioti Log
' DATB NAME SLJ':VLv[ARI�' OF CEiANGE
3!
C7'CY OF FOIZ'C W O1Z`l'H Gf`nter and Sar:itat�� Sex�er Replacemen! Contract 2414, FVSM-U
S"I'.4NDA[tI) COiVS"I'RUC"CIQN SI'GC[I'iCA'1'[ON DQCU6IEN"["S City Prnject Nn. 023<i5
Rati�ise�i July 1, 201 1
o� 2soo-�
SUF3STITlJTtON PROCL•;DUI�:S
Paga4 of4
�
2
3
4
.5
6
7
8
9
10
m
EXHIBIT A
REQUEST FOR SUBSTITUTION FORM:
TO.
t'RCy,(I:G'1": DATE: _
We hereby st►bmit for your consideration the following pt•oduct instead of the specitied item fo►•
the above project:
SECTION PARAGRAPH SPECIFIED CTEM
Proposed Substitution:
12 Reason for Substitution:
l3
l4
15
16
t7
t8
l9
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
�t0
41
42
43
44
45
46
47
48
49
[nclude complete information on changes to Drawings and/or Specifications which proposed
substitution wili require for its proper installation.
Fi[1 in Btanks Below:
A. Will khe undersigned contractor pay for changes.to the building design, including engineering
and detaiting costs caused by the rec7uested substitution?
B. What e#fect does substitution have an other trades7 rn
C. DiFfe►•ences between proposed substitution and specified item
D. Differences in product cost or product delivery time?
E. Manufacturer's guarantees of the proposed azld specified items are:
Equal Better (explain on attachment)
The undersigned states that tl�e function, appearance and quality are equivalent or superior to the
specified item.
Submitted By: F'or Use by City
Signature
as noted
Firm
�. _� �_.
Address ____
Date
Telephone
For Use by City:
Approved
City
�_ Recommended _ Recomrnended
Not recommended Received late
�y � �.
Date
Remarks
Date
Rejected
CITYt�F FpRT WORTH di4�rtrarulSanrtarySesrerfteplacemreruContrnce20/4, 4i�S;LI-D
ST�1NDrlRD CONSTRUCTtt)M1I SPEC[F1CA"F!ON DOCClMENTS Clry PrnJect Ntr, 033Ff5
[ievised �uly 1,2011
Ol"3i 19-I
P[t6CONS'CRUCI'tON MEE"1'ING
Pnge 1 uf3
1
2
3 PART 1 - G�NERAL
4 1.1 SUMMARY
5
6
7
8
9
10
11
12
t3 1.2
S�CTION 01 31 19
PRECONSTRUCTION MEETING
A. Section [ncludes:
1. Pravisions for the preconstruction meeting to be held prior to the start of Work to
clarify construction contract administration procedures
B. Deviations from this City of Fort Worth Standard Specification
I. None.
C. Related Specification Sections ine[ude, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the C.ontract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES
t4 A. Measurement and Payment
I S i. Work associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT USEDj
t8 lA ADNIINISTRATIVE KEQUIREMENTS
t9 A. Coordination
20 1. Attend preconstruction meeting.
21 2. Representatives of Contractor, subcontractors and suppliers attending meetings
22 shal[ be qualified and authorized to act on behalf of the entity each represents.
23 3. Meeting administered by City may be tape recorded.
24 a. [f recorded, tapes will be used to prepare minutes and retained by City for
2S future reference.
26 B. Preconstruction Meeting .
27 1. A preconstruction meeting will be held within 14 days after the execution of the
28 Agreement and before Work is started.
29 a. The meeting will be scheduled and administered by the City.
30 2. The Project Representative will preside at the meeting, prepare the notes of the
3 t meeting and distribute copies of sarne to all participants who so request by fully
32 comp(eting the attendance form to be circulated at the beginning of the meeting.
33 3. Attendance shall include:
34 a. Project Representative
3S b. Contractor's project manager
36 c. Contractor's superintender�t
37 d, Any subcontractor or supplier representatives whom the Contractor may desire
38 to invite or the City may request
C:iTY OF POR1� WC)R'C( ( Wuter and Sunitury SeEver Replacement C:o�rtract 20l4, GYSrLI-U
STANUAIZD CONSTRUC"CION SPF.CIFICriTION DOCUMEN'i"S Crty Pr•oject Nu. 02385
Re�-ised August 17, 2012
Ol 31 19-2
PRGCONS't'RUCC(UN MEGTING
Page 2 of 3
1
2
3
a
5
6
7
8
9
10
It
(2
13
l4
IS
l6
r�
18
l9
20
21
22
23
24
25
��
27
28
29
30
3l
32
33
34
35
36
37
3$
39
40
41
42
43
44
45
e. Other City representatives
f. Others as appropriate
4. Construction Schedule
a. Prepare baseline construction schedule in accordance with Section Ol 32 16 and
provide at Preconstruction Meeting.
b. City witl notify Contractor of any schedule changes upon Notice of
Preconstruction Meeting.
5. Pre(iminary Agenda may include:
a. [ntroduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easetnents or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
f. Notice to Proceed
g. Construction Staking
h. Pro��ress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
I. Insurance Renewals
m, Payrol) Certification
n. Material Certifications and Quality Control "I'esting
o. Public Safety and Convenience
p. Documentation af Pre-Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Et�try Standards
u. Coordinakion with the City's representative fbr operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Eariy Warning System
y. C.ontractc�r Evaluation
z. Special Conditions app{icable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff, Temporary construction facilities
gg. M/WBE or MBE/SBE procedures
hh. Finat Acceptance
ii. Final Payment
jj. Questions or Comments
C(TY(7FFORT WORTH Yl�crlern���Sanrtnry5e�verRe��/ncei�rer�tConrruct20/d, IVS�bf-D
STANi�AK[) CC�NS'I'RiJCTION SPh'CIPICA't'ION DOCU'vI�N'I'S City Prr�jectLVo. 02385
Revised August i7, 2012
01 3( Iy-3
PRF..CONSTRUC"C[ON'viTiETING
Page3 of3
1 1.5 SUBMITTALS [NOT USED]
2 1.6 ACTION SUBMITTALS/INFORMATIQNAL SUBMITTALS [NOT USED]
3 1.7 CLOSEOUT SUBMITTALS [NOT USED]
4 1.8 MAIIYTENANCE MATERIAL SUBMITTALS [NOT US�D]
5 1.9 QUALITY ASSURANCE [NOT USED]
6 1.10 DELIVERY, STORAGE, AND HAI�tDLING [NOT USED]
7 1.11 FIELD [5ITE] CONDITIONS [NOT USED]
8 1.12 WAR[2ANTY (NOT USED�
9 PART 2- PRODUCTS [NOT USED]
10 PART 3- EXECUTION [NOT USED]
11 END OF SECTION
�
l3
Revision Log
DATE NAME SUMMARY OF CHANGE
C(TYt)� FOR"1' WOR't'!i 6G'rrterand,SanilarySewvrRepfacemer�tCarlract20/d, GY,S,bl-D
STANPA2D CONS'1'RtJCTfOT'J SPEC(P1CA'PION DOCUMENTS Ciry f`rqject No. Ou385
Revised August l7, 2012
t11312b-I
PFLOJEC"C ME,GT[NGS
Pa�e I ot'3
t
2
3 PART 1 - GE1�i�RAL
4 1.1 SUMMARY
SECTION 013120
PROJECT MEETINGS
5 A. Section tncludes:
6 l. Provisions for project meetings throughout khe construction period to enable orderly
7 review of the progress of the Work and to provide for systematic discussion of
8 potential problems
9 B. Deviati�ns this City of Fort Worth Standard Specification
10 1. None.
li
l2
13
14 1.2
C. Related Specification Sections include, but are not necessarily timited to:
t. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division t— General Requirements
PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
l6 1. Work associated with this Item is considered subsidiary to the various items bid.
l7 No separate payment will be allowed for this [tem.
I8 1.3 RGFERENCES [NOT USEDJ
i9 1.4 ADMINISTRATIVE R�QUIREMENTS
20 A. Coordination
21 l. Schedule, attend and administer as specified, periodic progress meetings, and
22 specially called meetings throughout progT•ess of the Work.
23 2. Representatives of Contractor, subcontractors and suppliers attending meetings
24 shall be qualitied and authorized to act on behalf of the entity each represents.
25 3. Meetings administered by City may be tape recorded.
26 a. [f recorded, tapes will be used to prepare minutes and retained by City for
27 future reference.
28 4. Meetings, in addition to those speci�ed in this Section, may be held when requested
29 by the City, Engineer or Contractor.
30 B. Pre-Construction Neighborhood Meetiiig
31 l. After the execution of the Agreement, but before constructivn is al(awed to begin,
32 attend l Pubiic Meeting with affected residents to:
33 a. Present projected schedule, ineluding construction start date
34 b. Answer any construction related questions
35 2. Meeting Location
3G a. Location of ineeCing to be determined by tt�e City.
37 3. Attendees
38 a. Contractor
CI"I'Y Uf�� E�Oft'i' WOR`i'H Walernnd SrmitnrySeiuer Replace.rnentCo:rtrar.t 7.0l�l, �YSti!-1)
S"I�ANllARD CON5'fl2UC'CION S!'GCiFICATfON DOCClMF:NTS Ciry Yroject N�. 02355
Revised July l, ?01 I
Ot 31 20-2
PROJEC`C MEE'I'INGS
Pagc 2 of 3
I
2
3
4
5
6
7
8
9
t0
ll
t2
(3
14
15
16
l7
18
t9
20
21
22
23
24
2$
26
��
28
29
3a
31
32
33
34
35
36
37
38
34
40
41
42
�3
44
45
46
47
48
b. Project Representative
c. C?ther City representatives
4, Meeting Schedule
a. In general, the neighborhood meeting will occur within the 2 weeks following
the pre-construction conference.
b. In no case will construction be allowed to begin until this meeting is held.
C. Progress Meetings
l, Formal project coordination meetings witl be held periodically. Meetin�;s will be
scheduled and administered by Project Representative.
2. Additional progress meetings to discuss specific topics will be conducted on an as-
needed basis. Such additional meetings shall include, but not be limited to:
a. Coordinating shutdowns
b. Installation of piping and equipment
c. Coordination between ather construction projects
d. Resolution of construction issues
e. Equipment approval
3. The Project Representative will preside at pro�ress meetings, prepare the notes of
the meeting and distribute copies of the same to all participants who so request by
fully completing the attendance form to be circulated at the beginning of each
ineeting.
4. Attendance shall include:
a. Contractoc's praject managec
b. Contractor`s superintendent
c. Any subcontractor or supplier representatives whom the Contractor may desire
to invite or the City may request
d. Engineer's representatives
e. City's representatives
f. Others, as requested by the Project Representative
5. Preliminary Agenda may include:
a. Review of Work progress since previous meeting
b. Fiefd observations, problems, conflicts
c. Items which impede construction schedule
d. Revie�v of off-site fabrication, delivery schedu(es
e. Review of construction interfacing and sequencing requirements with other
construction contracts
f. Correc;tive measures and procedures to regain projected schedule
g. Revisions to construction schedule
h. Progress, schedule, during succeeding Work period
i. Coordination of schedules
j. Review submitta! schedules
k. Maintenance of quality standards
I. Pending changes and substitutions
m. Review proposed changes foi•:
1) Effect on construction schedule and on completion date
2) Effect on other contracts of the Project
n. Review Record Documents
a. Review monthly pay request
p. Review status of 12equests for Information
CCPY OP PC)RT WOIZTH Wcrter und Sairitnry Sewer RepJacenten( Con(rac[ 20/4, W,SNf-D
S"I'Ari�I)ARD C'ONS"PRUC'I'[ON SPL:C:iEtCA'CtON DOCUMEN'I:5 City Project Nrz. 02385
Reviaed July I, 2i)( I
Ol 31 2O-3
PROJGCT MGFTINGS
Page 3 uf 3
1 6. Meeting Schedule
2 a. Progress meetings wi(1 be held periodical(y as determined by the Project
3 Representative.
4 1) Additional meetings may be held at the request of the:
5 a) City
6 b) Engineer
7 c) Contractor
8 '7. Meeting Location
9 a. The City will establish a meeting location.
IO 1) To the extent practicable, meetings will be held at the Site.
t l 1.5 SUS[Y[[TTALS tNOT USED)
t 2 1.6 ACTION SUBMITTALS/INFORMATI4NAL SUBMITTALS [NOT iJSED]
l3 1.7 CLOSEOUT SUBMITTALS [NOT USEDj
14 1.8 MAINI'ENANCE MATERIAL SUBMTTTALS [NOT USED�
15 1.9 QUALITY ASSURANCE [NOT USEDj
l6 110 DELIVERY, STOI2AGE, AND HANllLING (NOT USED]
l7 1.11 FIELD [S1TEJ CONDITIaNS [NOT USED]
l8 1.12 WARI2ANTY [NOT USED]
19 PART 2- PRODUCTS [NOT USED]
20 PART 3- EXECUTION [NOT USEDJ
21
22
END OF SECTION
Revision [,og
DATE I`��NtE SUMMARY OF CHANGE
23
CI'I'Y QF FOEt"f WOR"T'H tYater a�rd Sn�»tnry Sewer I�aplaceme�tt Cntttract 20/4, WSiY1-I�
S'I'ANllARL) CONS'I'RUC�f'ION SPEC�1fICAT1UN DOCUMENTS Citv Prnjact No, t�23tJS
Revised !uiy 1, 201 1
O1321b-t
Ct)NS1�Rl;C'I'fON PftOC'iRESS SCHEDI;LE
Pag+: I of'S
SECTION U132 16
CONSTRUCTION PROGRESS SCHEDULE
3 PART 1 - GENERAL
4 1.1 SUMMARY
S �. Sectian lncludes:
6 1. General requirements for the preparatian, submittal, updating, status reporting and
7 management of the Construction Progress Schedule
8 2. Specific requirements are presented in the City of Fo��t Worth Scheduie Guidance
9 Doctament
10 E3. Deviations from this City of Fort Worth Standard Specification
11 1. None.
t2
13
(4
l5 1.2
16
t7
l8
19 1.3
20
21
22
23
24
2$
26
?7
28
�9
30
31
32
33
34
35
3G
37
38
39
40
C. Related Specification Sections inc(ude, but are not necessari}y timited to:
t. Div'tsion 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division t— General Requirements
PRIC� AND PAYMENT PROCEDURE5
A. Measurement and Payment
l. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this [tem.
REI�`ERENCES
A. Definitions
1. Schedule Tiers
a. Tier 1- No schedute submittal required by contract. Small, brief duration
projects
b. Tier 2- No schedule submittal required by contract, but will require some
milestone dates. Small, brief duration projects
c. Tier 3- Sehedule submittal required by contract as described in the
Specification and herein. Majority of City projects, includin� all bond program
projects
d. Tier 4- Schedule submittal required by contract as described in the
Specification and herein. C,arge ancU�r complex projects with long durations
l) Examples: large water pump station project and associated pipeline with
interconnection to another governmentaf entity
e. Tier 5- Schedule submitta( required by contract as described in the
Specification and herein. Large and/or very complex projects with long
durations, high pubiic visibility
t) Examples might incfude a water or wastewater treatment plant
2. Baseline Schedule - Initial schedule submitted before work begins that will serve
as the baseline for measuring progress and departures from the schedule,
3. Progress Schedule - Monthly submittal of a pro�►•ess schedule dacumenting
progress on the project and any changes anticipated.
CI'CY OF i�OR"C 1W(1R'I�H bvnter a�rd Sanrtrny Sewer Rep/ncen:eru Cnnn�ar,t 201 �f, lV,Sh� D
STAVDARD COt>t5"I'Rl.:`Cl'ION SPEGI�[CA'flON DOCUivtL',NTS C.'iry Project No (i23b5
ttevisod,luly l, 201 i
01 32 16-2
CONSTRUCTION PROGRESS SCHEllULG
Page 2 uf5
1 4. Schedule Narrative - Concise narrative oi'the schedule including schedule
2 changes, expected delays, key schedule issues, critica) path items, etc
3 B. Reference Skandards
4 1. City of Fort Worth Schedule Guidance Document
5 1.4 AUMINISTRATIV� REQUIREMENTS
6 A. Baseline Schedule
7 l. Ceneral
8 a. Prepare a cost-loaded baseline Schedule using approved software and the
9 Critical Path Method (CPM) as required in the City of Fort Worth Schedule
( 0 Guidance Documenk.
l 1 b. Revicw the draft cosk-loaded baseline Schedule with the City to demonstrate
12 understanding of the work to be performed and known issues and constraints
13 related to the schedule.
14 c. Designate an authorized representative {Project 5cheduler) responsibie for
I S developin�; and updatin}; the schedule and preparing reports.
l6 B. Pro�ess Schedule
l7 l. Update the progress Schedule monthfy as required in the City of Fort Worth
l8 Schedu(e Guidance Document.
�v
Prepare the Schedule Nar��ative to accompany the monthty pro�ess Schedule.
2U 3. Change Orders
2l a. Incorporate approved change orders, resulting in a change of conkract time, in
22 the baseline Schedule in accordance with City of Fort Worth Schedule
23 Guidance Document.
24
25
26
27
28
29
30
3t
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
C. Responsibility for Schedule Compliance
1. Whenever it becomes apparent from the current progress Schedule and CPM Status
Report that delays to the critical path have resu(ted and the Contract completion
date will not be met, or when so directed by the City, make some or all oFthe
following actions at no additional cost to the City
a. Submit a Recavery Plan ta the City for approval revised baseline Schedule
outlining;
1) A written statement of the steps intended to take to remove or arrest the
delay to the critical path in the approved schedule
2) [ncrease construction manpower in such quantities and cra#�s as will
substantially eliminate the back(og of work and return current Schedule to
meet projected baseline cotnpletion dates
3) Increase the number oF working hours per shift, shifts per day, working
days per week, the amount of construction equipment, or any combination
of the foregoing, sufficiently to substantially eliminate the backlag of work
4) Reschedule activities to achieve maxitnum practical concurrency of
accomplishment of activities, and comply with the revised schedule
2. If no written statement of the steps intended to take is submitted when so requested
by the City, the City may direct the Conkractor to increase the level of effort in
manpower (trades), equipment and work schedule (overtime, weekend and holiday
wark, etc.} to be employed by the Contractor in order to retnove or arrest the detay
to the critical path in the approved schedule.
a. No additional cost for such work will be considered.
CI"CY OP FOR"1 WOR'I'H Li�nter arrzf Sanrtary,5`eu�er Reptncemenr Cw�lract �O14, GVShf-D
�'TANT)ARD CU[YSIRUC.'17ON SPI3C11�[CATtUN DOCUMENTS C�ity Profeo�t No. 02385
Reviscd.tulY 1,2011
01321G-3
f;ONS'I`RUC"PION NROG[tF`.SS SCHEB�iLE
Pagc �� of" 5
10
ll
12
13
l4
15
16
17
18
t9
2Q
21
22
23
24
25
26
27
?g
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
D. The Contract completion time will be adjusted only for causes spec;ified in this
Contract.
a. Requests for an extension of any Contract completion date must be
supplemented with the following:
1) Furnish justification and supporting evidence as the City may deem
necessary to determine whether the requested extensian of time is enkitled
undei• the provisions of this Contract.
a) The City will, after receipt of such justification and supporting
evidence, make findings of fact and will advise the Contractor, in
writing thereof.
2) If the City finds that the requested extension of time is entitled, the City's
determination as to the total ❑umber of days allowed for the extensions
shatl be based upon the approved totat baseline schedule and on all data
relevant to the extension.
a) Such data shall be included in the next updating ofi the Progress
schedule.
b) Actual deiays in activities which, according to the Baseline schedule,
do not affect any Contract completion date shown by the critical path in
the network will not be the basis for a change therein.
2. Sul�mit each request for change in Contract completion clate ta the City within 30
days after the bebinning of the delay E'or which a time extension is requested but
before the date of final payment under this Contract.
a. No time extension wil( be ��anted for requests which are not submitted within
the foregoing time limit.
b. From time to time, it may be necessary for the Contract schedule �r comp(etion
time to be adjusted by the City to reflect the effects of job conditions, weather,
technical difficulties, strikes, unavoidable de(ays on the part af the City or its
representatives, and other unforeseeable conditions which may indicate
schedule adjustments or completion time extensions.
1) Undei• such conditions, the City tivill direct the Contractor to reschedule the
work or Contraet completion time to reflect the changed conditions and the
Contractor shall revise his schedule accordiagly.
a) No additional compensation will be made to the Cantractor for such
schedule changes except for unavoidable overall contract time
extensions beyond khe actual completion of unaffecked wortc, in which
case the Contractor shall take all possible action to minimize any time
extension and any additional cost to the City.
b) Available float time in the BaselSne schedule may be used by the City
as well as by the Contractor.
3. Float oi• slack time is defined as the amount of time between the earliest stai-t date
and the latest start date or bet�veen the earliest finish date and the latest finish date
of a chain of activities on the Baseline Schedule.
a. Float or slack time is not for the exclusive use or benetit of eitI�er the
Contractor or the City.
b. Proceed with work according to early start dates, and the City shall have the
right to reserve and apportion float ti�ne according to the n�eds of the project.
CI"I'Y OP FC)R'I' WO(t't't{ Gvater c�nct ,Saniln�y Se�ver Re�lace»ierrtCa��rracl ZOl�I, WS�Lf-l�
STANDARD CONST'R[JCCION SPECIFICA'tION UOCUMEN'fS Cin' 1'rof�ct Nr�. U2385
Revised July I, 201 I
�i 32 Ib-4
CONSTRUCTIONPROGRESSSCHEllULE
Page 4 of 5
I
2
3
4
5
b
7
8
9
10
11
12
13
l4
15
16
l7
c. Acknowledge and agree that actual delays, affecting paths of activities
containing float time, will not have any effect upon contract completion times,
providing that the actual defay does not exceed the float time associated with
those activities.
E. Coordinating Schedule with Other Contract Schedules
1. Where work is to be performed under this Contract concurrently with or contingent
upon work performed on the same facilities or area �mder other contracts, the
BaseJine Schedule shall be coordinated with the schedules of the other contracts,
a. Obtain the schedules of the other appropriate contracts from the City for the
preparation and updating of Baseline schedule and make the required changes
in his schedule when indicated by ehanges in corresponding schedules.
2. In case of interference between the operations of different cont��actors, the City will
determine the work priority of eaeh contractor and the sequence of work necessary
to expedite the completion of the entire Project,
a. In such cases, the decision of the City shalt be accepted as finat.
b. The temporary delay of arty work due to such circumstances shall not be
considered as justification for claims for additional compensation.
l8 1.5 SUBMITTALS
t9
2t)
21
?Z
23
?4
25
A. Baseline Schedule
I. Submit Schedule in native file format and pdf format as rec�uired in the City of Fort
Worth Schedule Guidance Document.
a. Native file format inctudes:
1) Primavera (P6 or Primavera Contractor)
2. Submit draft base(ine Schedu(e to City prior to the pre-construction meeting and
bring in hard copy to the meeting for review and discussion.
26 B. Progess Schedule
27 I. Subtnit progress Schedule in native file format and pdf format as required in the
28 City of Fort Worth Schedule Guidance Document.
29 2. Submit progress Schedule monthly no later than the tast day of the month.
30
31
32
33
34
35
3G
37
38
39
C. Schedule Narrative
1. Submit the schedule narrative in pdf format as required in the City of Port Worth
Schedule Guidance Document.
2. Submit schedule narrative monthly no later than the last day of the month.
D. Submittal Process
1. The City ad►ninisters and manages schedules through Buzzsaw.
2. Contractor shall submit documetlts as required in the City of Fort Worth Schedule
Guidance Document.
3. Once the project has been completed and Final Acceptance has been issued by the
City, no fiu-ther progress schedules are required.
CITY OF' FC1R9' WOR'PFt 11�ut�r crnd,Saititary Sefver Replace�t�e�rt Cni�traed 20/4, 6YSA�/-C)
S"1'ANDAI�U Ct7NS'CRUCTIf)N tiPF,C[FICATtON DOCUMJ�.NTS Cit}� Prnject .No. 0?3N5
lieviscd July i, 201 l
OI32I6-5
CONSTRUCT[ON PROGRGSS SCHEDULE
Page � of 5
1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [N(?T USEDj
2 1.7 CLOSGOUT SUBMITTALS [NOT USEDj
3 1.8 MAINTEIVANC� MATERIAL SUBMITTALS (NOT USED]
4 1.9 QUALITY ASSURANCE
5 A. The person preparing and revising the construction Progress Schedule shall be
6 experienced in the preparation of schedules of similar complexity.
7 k3. Schedule and supporting documents addressed in this Specification shall be prepared,
8 updated and revised to accurately reflect the performance of the conskruction.
9 C. Contractar is responsible for the quality of all submittals in this section meeting the
10 standard of care for the construction indust��y for similar projects.
i l 1.t0 DELIVERY, STORAGE, AND HANDLING [NOT USED]
12 1.11 F[ELD [SITE] CONDITIONS [NOT USED]
13 1.12 WARRANTY [NOT USEDj
t4 PART 2- PRODUCTS (NOT USED]
15 PART 3- EXECUTION [NOT USED]
l6 END OF SECTION
l7
18
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY O� E�t)R"C Wdti'I'F[ lt�nter and S'ariituiy Sewer Replac,�eme�at Corrtrucr 20/4, G3;SM-L)
S'I'AND,4ttC) CONS'1'I{L1C'1'ION SPGCIPfCAT[ON DCJCLI�viI:NTS Ct,ry l'roject No. 0?i85
ELevised July l, 2(7I I
Oi 32 33 • I
PRGCdNSTRUCTION VIDGO
Page i oF2
1
7
3 PART1- GENERAL
SECTION O1 32 33
PRECONSTRUCTION VIDEO
4 1.1 SUMMARY
�
5 A. Section Includes:
6 1. Administrative and procedural requirements for:
� a. Preconstruction Videos
8 B. Deviations fi•om this City of Fort Worth Standard Specification
9 l. None.
10 C. Re(ated Specification Sections inctude, but are not necessa��ily limited to:
i l 1. Qivision 0— Biddin� Requirements, Contract Forms and Conditions of the Contract
12 2. Division 1— General Requirements
13 1.2 PRICE AND PAYNIENT PROCEDURES
l4 A. Measurement and Payment
l5 l, Work associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
l7 1.3 REFF.RENCES (N(?T USED]
t 8 1.4 ADMINISTRATIVE REQUIKEMENTS
19 A. Preconstructian Video
20 l. Produce a preconstruction video of the site/alignment, including atl areas in the
2I vicinity of and to be affected by construction.
22 a. Provide �iigital co�y of video upon request by the City.
23 2. Retain a copy of the preconstruction video unti( the end of the maintenance surety
24 period.
25 L5 SUBMITTALS [NOT USEDj
2b 1.6 ACTION SUBMITTALS/INFORNIATIONAL SUBI�IITTALS [NOT USED]
27 1,7 CLOS�OUT SUBMITTALS (NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCE [NOT USED]
30 l.lU DELNERY, STORAGE, AND HANDL[NG [I�10T USEDj
3l 111 FIELD (SITE] CUNDITIONS [NOT IJSED]
32 1.12 WARRANTY [NOT USF.D]
33 PART 2- PRODUCTS [NOT USED]
Ci1'Y <)1� t��K"C WOR'I'N i3'ater and Sanita�y 5'etivc�r Replaeenient Con[r•act 2111�1, G�SAf D
S'I'ANL?AI�[) CONSfRUC'('(O[�I SPEC(FtCA'I'ION DOClfh-IL'NTS Cily Prqject ;Vn. 023<45
(ZevisedJuly 1,2�11
01 32 33 - 2
k'[tECONS'I'2UC'i'lON V[DEO
Pagc2 oC2
PAR'I' 3 - EXECUTIOPt [NOT USED]
END OF SECTION
Revision Log
DATE NAME SiJMMARY OF CHANGE
C('fY {)� FORT W()I2"S'H y�a�er a�id Snfirrary Sesver Ret�/ucwuent Con�r�xc�� 1014, dt�S,t! !)
51'�AN17ARU CON iTRIlCTfON SPf:C[PICA'CION DOCUNIP,NTS Clty Prnject rYa 02385
Revised July i, Zt)1 t
� I 33 QU - I
SIJBMI"CTALS
Page i of8
t
2
3 PAR1' 1 - GF.NERAL
4 1.1 SUMMARY
SECTION 0133 00
SUBM[TTALS
5 A. Section [ncludes;
6 l. General methods and requirements af submissions applicable to the following
7 Work-related submittals:
8 a. Shop Drawings
9 b. Product Data (including Standard Pi•oduct List sub►nittals)
iti c. Sampfes
I 1 d, Mock Ups
12 B. Deviations fram this City of Fort Worth Standard Specification
13 l. None.
14 C. Related Specification Sections include, but are not necessarily iimited to:
15 l. Division 0— Bidding l2equirements, Contt•act Forms and Conditions of the Contract
16 2. Division 1— General Requirements
17 1.2 PRIC,F. AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this [tam is considered subsidiary to the various items bid.
20 No separate payment will be allowed for this Item.
21 1.3 RF,FERENCES [NOT USEDj
22 1.4 ADIYIINISTRATIVE REQUIREMENTS
23
24
25
2b
27
28
29
3a
31
32
33
34
35
36
37
38
39
40
A. t;oordination
l. Notify the City in writing, at the time of submittal, of any deviations in the
submittals From the requirements of the Contract Documents.
2. Coordination of Submittal 'I'imes
a. Prepare, prioritize and transmit each submittal sufficiently in advance of
performing the related Work or other applicable activities, or within the time
specified in the individual Work Sections, of the Specifications.
b. Contractor is responsible such that the installation wil( not be delayed by
processing times including, but not limited to:
a) Disapproval and resubmittal (if required)
b) Coordination with other submittals
c) Testing
d) Purchasing
e) Fabrication
fl Delivery
g) Similar sequenced activities
c. No extension of time will be authorized because of the Contractor's failure to
transmit submittals sufficiently in advance af the Work.
CI'1'Y OE F��tt"C VJO[t"CH lYnter arrd ,4a�uk�iy S�wer ilepince�nent l:;w�traca 201 �t, WS�1-D
ti'CANDARU CONS"C[tUCt'I(1N SPECf EICA"I'ION DOCUMENTS Citv Pruject Nu. �'J85
Rcviscd Dccembcr 20, 2t)12
U13300-2
SUAMITTALS
Page 2 of S
d, Make submittals promptly in accordance with approved schedule, and in such
sequence as to cause no de(ay in the Work or in the work of any other
contractor.
B. Submittal Numbering
5
6
7
8
9
10
tl
12
I3
14
15
16
17
l8
19
20
When submitting shop drawings or samples, utilize a 9-charaeter submittal cross-
reference identification numbering system in the following manner:
a. Use the first 6 digits of the applicable Specification Section Number.
b. For the next 2 digits nu►nber use numbers 01-99 to sequentially number each
initial separate item or drawing submitted under each specific Section number.
a Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e.
A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical
submittal number would be as follows:
03 30 00-08-B
1) 03 30 00 is the Specification Section for Concrete
2) OS is the eighth initial subtnittal under this Specification Section
3) B is the third submission {second resubmission) of that particular shop
drawing
C. Contractor Certification
21 L Review shop drawings, product data and samp(es, inciuding those by
22 subcontractors, prior to submissio�7 to determine and verify the following:
23 a. Field measurements
24 b. Fie(d construction criteria
25 c. Catalog numbers and similar data
26 d. ConFormance with the Contract Documents
27 2. Pravide each shop drawing, sample and product data submitted by the Contractor
28 with a Certification 5tatement aftixed inctuding:
24 a. The Contractor's Company name
30 b, Signature of submittal reviewer
31 c. Certification Statement
32 1) "By this submittal, I hereby represent that [ have determined and verified
33 field measurements, fie(d construction criteria, materials, dimensions,
34 catalog numbers and similar data and I have checked and coordinated each
35 itzm with other applicable approved shop drawings."
36
37
38
D. Submittal Format
1. Fold shop drawings larger khan 8% inches x 1 1 inches to 8%z inches x 11 inches.
2. Bind shop drawings and product data sheets together.
39 3. Order
40 a. Cover Sheet
4( t} Description of Packet
42 2) Contractor Certification
43 b. List of items / Tabie of Contents
44 c. Prodttct Data /Shop Drawings/Samples /Calculations
45
46
E. Submittal Content
1. The date of submission and the dates of any previous submissions
C{TY O[^ POR'T' WO[2Tl [ N�aler imd Smat[my S�iver Ita�/acen�e�r1 Corrtract l0l �'l, Gt'S�il-IJ
STANDARD CONSTRUCTtON SPGLI['ICr�TiUN DOCUh'tEN'I'S Gp� Pr�o�ec� Na. (12385
Etevised December 2t), 2012
J13300-3
StJ[3ti11T"t'A[.S
Page 3 of8
I
2
3
4
5
6
7
8
9
t0
Il
12
l3
14
15
16
i7
18
19
20
21
22
23
24
25
26
27
28
29
30
3l
32
33
34
3S
36
37
38
39
40
41
42
43
44
45
46
2. The Project title and number
3. Contractor identification
4. 'I'he names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section number, page and
paragraph(s)
6. Field dimensions, clearly identified as such
7. Retatian to adjacent or critical features of the Work ar materials
8. Applicable standards, such as ASTM or Federal Specification numbers
9. Identification by highlighting of deviations from Contract Documents
10. Identification by highlighting of revisions on resubmittals
1 l. An 8-inch x 3-inch blank space for Contractor and City stamps
F. Shop Drawings
1. As speci�ed in individuai Work 5ections inc(udes, but 'ss nai necessarily limited to:
a: Custom-prepared data such as fabrication and erection/installation (working)
drawings
b. Schedu(ed information
c. Setting diagrams
d. Actual shopwork manufacturing instructions
e. Custom templates
f. Speciat wiring diagrams
g, Coordination drawings
h. [ndividual system or equipment inspection and test reports including:
1) Performance curves and certifications
i. As applicable to the Work
2. Details
a. Relation of the various parts ta the main members and lines of the structure
U. Where coa•rect fabrication of the Work depends upon field measurements
1) Provide such measurements and note an the drativings prior to submitting
for approval.
G. Product Data
I. For submittals of product data for producEs inctuded on the City's Standard Product
List, clearly identify each item selected for use on the Project.
2. For subrnittals of product data for products not included on the City's Standard
Product List, submittal data may include, but is not necessarily limited to:
a. Standard prepared data for manufactured products (sometimes referred to as
catalog data}
1) Such as the manuiacturer's product speci#ication and installation
instructions
2) Availability af colors and patterns
3) Manufactui•er's printed statements of cotnpliances and applicability
4) Roughing-in diagrams and kemplates
5) Catalog cuts
6) Product photog,raphs
C[TY OF FORT WOK"I'H Yt�ater nrrct 5uni�ar}� Servc+r Replacetnerrt Coi�U�aci 10l�1, Gf�S:bf-D
S'PANDARD CONS'CRUCTIOtJ SPEC[FICAT[ON DOCUMLN"CS City Project No. U23S5
Rcviscd Ucccmbt�r 20, 2012
oi33oc�-a
S1II3MITTALS
P�ge 4 of 8
1 '7) Standard wiring dia�•ams
2 8) Printed perfbrmance curves and operational-range diagrams
3 9) Production or quality control inspection and test reports and certifications
4 ] 0) Mill reports
5 1 1) Product operating and maintenance instructions and recotnmended
6 spare-parts listing and printed product warranties
7 12} As applicable to the Work
8 H, Samples
9 I. As specified in individual Sections, include, but are not necessarily limited to:
l0 a. Physical examples of the Work such as:
11 l) Sections of manufactured or fabricated Work
12 2) Small cuts o�• containers of materials
(3 3} Complete units oFrepetitively used products color/texture/pattern swatches
14 and range sets
(5 4) Specimens for coordination of visual effect
16 5) Graphic symbols and units af Work ta be used by the City for independent
l7 inspection and testing, as applicabie to the Work
t8 I. Do not start Work requiring a shop drawing, sample or product data nar any material to
19 be fabricated or installed peior to the approvai or qualified approval of such item.
20 1. Fabrication performed, materials purchased or on-site construction accomplished
21 which does not conf'orm to approved shop drawings and data is at the Contractor's
22 risk.
23 2. The City wiil not be liable for any expense or delay due to corrections or remedies
24 required ko accomplish conformity.
ZS 3. Complete project Work, materials, fabrication, and instatlations in conformance
26 with approved shop drawings, applicable samples, and product data.
27
�g
29
30
31
32
33
34
35
36
37
38
39
40
4l
42
43
44
45
46
47
J. Submitta( Distribution
l. Electronic Diskribution
a. Confirm development of Project directory for electronic submitta(s to be
uploaded to City's Buzzsaw site, or another external FTP site approved by the
C ity.
b. Shop Drawings
1) Upload submittal to designated project directory and notify appropriate
City repeesentatives via email of submittal posting.
2) Hard Copies
a) 3 copies foi• all submittals
b) If Contractor requires more tt�a►1 l hard copy of Shop Drawings
returned, Contractar shall submit more than the number of copies listed
above.
c. Product Data
1} Up(oad submittal to designated project directory and notify appropriate
C;ity representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Satnp(es
1) Distributed to the Project Representative
2. Hard Copy Disti•ibution (if ce�uired in lieu of electronic distribution)
CI'I'Y OF P'OI2T WORTI�1 )YaPer-arul Sanrlary Sewer /leplcrcenrent Carrtrac7 201d, !4'S�til-D
STANDARD CUNSTRUCTIC�N SPECiF1CA"1'ION f)OCI1(vIENTS City Projec! No, 0?3iJS
Kevised C)ecember?0, 2012
01 3:S Otl - 5
Sltf3Ml"LTALS
Pagc � or 8
l
2
3
4
S
6
7
s
9
t0
11
12
13
14
l5
16
17
t8
19
20
a
l�
c.
Shop Drawings
l) Distributed to the City
2) Copies
a) 8 copies for mechanical submittals
b) 7 copies for all ather submittals
c) If Contractor requires more tllan 3 copies af Shop Drawings retut•ned,
Contractor shall submit more than the number of copies listed above.
Product Data
1) Distributed to the City
2) Copies
a) 4 copies
Samples
i) Distributed to the Project Representative
2) Copies
a) Submit the number stated in the respective Speciftcation Sections.
21
22
23
?4
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
3. Distribute reproductions of approved shop drawings and copies of approved
product data and samples, where required, to the job site ti le and elsewhere as
directed by the City.
a. Provide number of copies as directed by the City but not exceeding the number
previously specified.
K. Submittal fteview
1. The review of shop drawings, data and samples will be for general conformance
with the design concept and Contract Documents. This is not to be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility f'or any errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, e:ccept as otherwise
provided herein
2. The review and approval of shop drawings, samples or product data by the City
does not relieve the Contractor from his/her responsibility with regard to the
fulfitlment of the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City will
have no responsibility therefore.
3. The Contractor remains responsible for details and accuracy, for coordinating the
Work with all ather assc�ciated w�rk and trades, tor selecting fabrication processes,
for techniques of assembly and for pei•forming Work in a safe manner.
4. If the shop drawings, data o►• samples as submitted describe variations and shaw a
departure fram the Contract requirements which City finds to be in the interest of
the City and to be so minor as not to involve a change in Contract Price or time for
perfarmance, the City may return the reviewed drawings without noting an
exception.
5. Sub�nittals will be returned to the Contractor �mder 1 of the following codes:
a. Code 1
I) "NO FXCEPTIONS TAKEN" is assigned when there are no notations or
comments on the submittal.
a) When returned under this code the Contractor may release the
ec�uipment antilor material for manufacture.
b. Cocie 2
CITY OP FOR"C WOI2Tli Watzr nnci S'anr�ary Seiver� R�placetnetit Coturcrci ?0I d, DG:S;Lf-D
STAiJDARD CONS"TP,UCPI�JN SPf'iCIf�IC.4'CION U(.)CUMrNTS Crly Yrqject No. 9?38S
Revised December 20, 2012
O13300-6
SUE3MI'I"PAI,S
Page 6 of S
8
9
10
Il
12
13
14
15
t6
l7
18
19
20
21
22
23
�4
25
26
27
28
29
30
31
3�
33
34
35
3G
37
38
39
40
41
42
43
44
45
46
47
48
49
1) "EXCEPTIC}NS NO"I'EU". T'his code is assigned when a confirmatian of
the notations and comments IS NOT required by the Contractor.
a) The Contractor may relc;ase the equipment or material for manufacture;
however, all notations and comments must be incorporated into the
final product.
c, Code 3
1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is
assigned when notations and comments are extensive enough to require a
resubmittal oF the package.
a) 'I'he Contrlctor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated inta the
final product.
b) This resubmittal is to address all comments, omissions and
non-conforming items that were noted.
c) Resub�nittal is to be received by the City within l5 Calendar Days of
the date of the City's transmittal requiring the resubmittal.
d. Code 4
1) "NOT APPROVED" is assigned when the submittal does not meet the
intent of the Contract Documents.
a) T'he Contractor must resuhmit the entire package i•evised to bring the
submittal into conformance.
b) It may be necessary to resubmit using a different manufacturerJvendor•
to meet the Contract Documents.
6. itesubmittals
a. Handled in the same manner as first submittals
1) Corrections other than requested by the City
2) Marked with revision trian�le or other similar method
a) At Contractor's risk if not marked
b. Submittals for each item will be reviewed no more than twice at the City's
expense.
t) All subsequent reviews will be perf��rmed at times convenient to the City
and at the Contractor's expense, based on the City's or City
Representative's then prevailing rates.
2) Provide Contractor reitnbursement to the City within 30 Calendar L�ays for
all such fees invoiced by the City.
c. The need for more than 1 reslibrnission or any other delay in obtaining City's
review of submittals, will not entitle the Conti•actor to an extension of Contract
Time.
i. Partial Submittals
a. City reserves the right to not review submittals deemed p�rtial, at the City's
discretion.
b. Submittals deemed by tl�e City to be not cornplete will be returned to the
Contractor, and will be considered "Not Approved" until resttbmitted.
c. The City may at its option provide a(ist or mark the submittal directing the
Contractor to the areas that are incomplete.
8. If the Contractor considers any correction indicated on the shap drawiiigs to
constitute a change to the Contt•act Documents, then w1•itten notice must be
provided thereof to the City at (east 7 Calendar Days prior to release for
mat�ufacture.
CY!'Y OF POIt"1' bVORTF1 N�arer a�rd Sarrl�ary �Sc-iver llepluce�rrunt C'ontrctci <Ol d, 6tCStit-1.)
S'I�ANL)ARD CONS'1'RUCTION SPHC[I�[CAT[ON PO(;tJMEsNTS Cit}� Prr,�jec:! No. 023�R5
Rcvise�i Daeember 20, 2012
01 3300-7
SUAMIT"CALS
Fage7 oi8
I 9. When the shop drawings have been completed to the satisfaction of the City, the
2 Contractor may carry out the construction in accordance therewith and no fiirther
3 changes therein except upon written instructions from the City.
4 l0. Each submittal, appropriately coded, wi(I be returned within 3U Catendar Days
5 following receipt of submittal by the City.
6 L. Mock ups
7 l. Mock Up units as specified in individua( Sections, incfude, but are not necessarily
8 limited to, complete units of the standard of' acceptance for that type of Work to be
9 used on the Project. Remove at the completion of the Work or when directed.
10 Ni. Qualitications
1 t 1. If specifically required in other Sections of these Specifications, submit a P.E.
12 Certification for each item required.
13
t4
15
lb
17
18
l9
20
2t
22
23
24
25
26
27
28
29
30 1.5
N. Request for Information (RF[)
i. Contractor Request for additional information
d. ClariGcatiun oc inter�reEalion o� the contract aucunients
b. When the Cantractor believes there is a contlict between Contract Documents
c. When the Contractor believes there is a contlict between the Drawings and
Specifications
l) Identify the conflict and request clarification
2. Use the Reguest for I►aformation (RFI) form provided by the City.
3. Numbering of RFI
a. Prefix with "RFI" followed by series number, "-acxx", beginning with "O 1" and
increasing sequentially with each additional transaiittal.
4. Sufficient information shall be attached to percnit a wcitten response without further
information.
5. The City will log each request and will review the rec�uest.
a, If review of the project information request indicates that a change to the
Contract Documents is required, the City will issue a Field Order or Change
Order, as appropriate.
SUBMITTALS [NOT US�:D�
_31 1.6 ACTION SUBMITTALS/IIVFORMATIONAL SUBMITTALS (NOT USED]
32 1.7 CLOSF.OUT SUBMITTALS [NOT USED]
33 1.8 MAINTENANCE MATERIAL SUBiVIITTALS [NOT USED]
34 1.9 QUALITY ASSURANC� [IYOT USED]
35 1.10 DELIVERY, STORAGE, AND HANULING [NOT USF.11]
36
37
1.11 FIELD [SITE� CONDITIONS [NOT USEDJ
1.12 WARI2ANTY [NO'I' USED]
C("1'Y OF Ft7C�T WQR'1�(1 if nter unc( Sanrlary Seiuer 2eplt�cente�rr t�ontruc7 2f?/4, WS�bI-U
�TAiVDAtt() CONS`CRUCT[()1V .iPF,CI�ICATtt:)N dOCUh1BN'PS City !'rcrject iVn. tJ?385
Revised December 20, 2U 1?
01 330U-8
StIBM[T'T'AI.S
Page 8 uC8
i PART 2- PRODUCTS (NOT USED]
2 PART 3- EXECUTION [NOT US�D)
3 END OF SECTION
Revision Log
DATE NAM� StJMMARY OF CHANGE
t2/20/201� U. Johnson 1.4.K.8. Warking Uays modi(ied to Calendar Days
Cl']'Y OE COR'T' WORTH Gi�alvr ancl Scrnitetry Sewer Rep/aceirret:t Cvralrac! 2014, WS�UI-D
S'PANUARD CONSTRUCTION SPF.(::[FLCnTIC)N DOCUMF.NTS Ciry Project,Vo, 023d5
Revised Decemher 20, 2012
01 35 13 - I
3PEC:fAL PROJFCT PROC[;DURES
P�igc I oP8
SECTION 0135 13
SPECIAL PROJECT PROCEDURES
3 PART 1 - G�NERA,L
4 1.1 SUMMARY
5
6
7
8
9
�a
I1
12
13
l4
15
16
l7
18
l9
20
21
22
23
A. Section Includes:
1. The procedures for special project circumstances that includes, but is not Hmited to:
a. Coordination with the Texas Department of Transportation
b. Work near High Voltage Lines
c. Contined Space Entry Program
d. Air Pollution Watch Days
e. Use of Explosives, Drop Weight, Etc.
f. Water Department Notitication
g. Pubtic Notification Prior to Beginning Construction
h. Coordination with United States Army Corps of Engineers
i. Coordination within Railroad permits areas
j. Dust Controi
k. Employee Parking
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections inctude, but are not necessarily limited to:
1. Division 0— Bidding Reguirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
3. Section 33 12 25 — Connection to Existing Water Mains
24 1.2 PRICE AND PAYMENT PROCFnI1RF,S
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
4Q
41
42
A. Measurement and Payment
l. Coordinatian within Railroad permit areas
a. Measurement
1) Measurement for this Item will be by lump sum.
b. Payment
1) The work performed and materia(s furnished in accordance with this Item
will be paid for at the lump sum price bid for Railroad Coordination.
c. 'I'he price bid shall include:
1) Mobilization
2) [nspection
3) Safety training
4) Additional insurance
5) Insurance Certificates
6) Other requirements associated with general coordination with Railroad,
inc(uding additional employees required to proteet the ri�ht-of-way artd
property of the Railraad from damage arising out of and/or from the
construction of the Project.
2. Railroad F(agmen
CCI'Y GF E�OA't' W 02'f l l tPa[er artd Snt�itary Se+ver Rep(ncemenl C'aiuract 30l4, li;SM-IJ
S`I'ANDARD CC3NSTRUCt�tON SPGC(FICAl'ION DOCUMEN'('S Crty Prnject No. (12385
Revised Decamber 20, 2012
01 35 I 3- 2
SPL'C1AL P[tOJEC'I' PROCF,DURFS
Page 2 aF3
1
2
3
4
S
6
7
8
9
10
It
12
l3
a. Measurement
1) Measurement for this Item will be per working day.
b. PaymenC
1) The work performed and matei•ials fiiz�nished in accordance with this [tem
will be paid for each working day that Railroad F(agmen are present at the
S ite.
c. The price bid shall include:
1) Coordination for scheduling tlagmen
2) Flagmen
3) Othee requirements associated with Railroad
3. All other items
a. Work associated with these Items is considered subsidiary to the various Items
bid, No separate payment will be allowed for this Item.
14 1.3 R� + + RENCES
( 5 A. Reference Standards
16
17
t8
19
20
21
22
2
3
Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specificatior�, w�less a date is specifically cited.
Health and Safety Code, Tit1e 9. Safety, Subtitle A. Public Safety, Chapter 752.
High Voltage Over�iiead Lines.
North Central Texas Council of Governments (NCTCOG) — Clean Construction
Specification
23 1.4 ADMINISTRATIVE REQUIREMENTS
24
25
26
��
28
29
30
31
A. Coordination with the Texas Department of Transportation
l. When work in the right-of-way which is under the jurisdiction of the Texas
Department of Transportatian (TxDOT):
a. Notify the Texas Department of "Transportation prior to comtnencing any work
therein in accordance with the provisions of the permit
b. A(1 work performed in the TxDOT right-of way shall be performed in
compliance witll and subject to approval fi•om the 'I'exas Department of
Transportation
32 B. Work near High Voltage Lines
33 1. Regu(atory Requirements
34 a. All Work near High Voltage Lines (more than fi00 volts measured between
35 conductors or between a conductor and the �,mound) shall be in accordance with
36 Eic;alth and Safety Code, Title 9, Subtitle A, Chapter 752.
37
38
39
40
4l
42
43
a�
45
2. Warning sign
a. Provide sign of suFficient size meeiing ali OSHA requirements.
3. Equipment operating within 10 feet of high voltage lines will require the following
safety features
a. Insulating cage-type of guard about the boom or arm
b. [nsulator links on the lift hook connections for back hoes or dippers
c. Equiprnent must meet the safety t•equirements as set forth by OSHA and the
safety requii•ements of the owner of the high voltage lines
4. Work within 6 feet of high voltage electric lines
CCI'YOFFOR"P WO['�i�K 4i'ut�raudSGnritrrrvSeiverRep(acemeiitC'aihac�.?U14, GKS�1d-D
S"1'ANDARD CQNSTRtICT(ON SpLCIF(CA'1'lON DOCIINIENTS Cih� Prnject rVo, Q23�Y5
Revised L)�cember20, 2012
013513-3
SPECIAL PILOJF;C'7' P20CEDURES
Page 3 of 8
t
2
3
4
5
6
7
8
9
l0
�
a. Notification shall be given to:
1) The power company (e:cample: ONCOR)
a) Maintain an accurate log of all such calls to power company and record
action taken in each case.
b. Coordination with power company
1} After notification coordinate with the power company to:
a) Erect temporary mechanical barriers, de-energize the lines, or raise or
lower the (ines
c. No personne! may work within 6 feet of a high volta�;e line before the above
requirements have been met.
C. Cantined Space Entry Pro�;ram
12 l. Provide and follow approved Confined Space Entry Program in accordance with
13 OSHA requirements.
14 2. Confined Spaces include:
i 5 a. Manholes
t6 b. All other confined spaces in accordance with OSHA's Permit Required f�r
17 Contined Spaces
18
19
20
21
22
23
24
25
26
27
28
24
30
31
32
33
34
35
36
37
D. Air Poitukion Watch Days
1. General
a. Observe the fottowing guidelines relating to working on City construction sites
on days designated as "AIR POLLUTION WATCH DAYS".
b. Typical �zone Season
1) May 1 through October 31.
c. Critical Emission Time
1) 6:00 a.m, to 10:00 a.m.
2. Watch Days
a. The Texas Commission on Environmental Quality (TCEQ), in coordination
with the National Weather Service, will issue the Air Pollution Watch by 3:04
p.m, on the afternoon prior ta the WATCH day.
b. Requirements
1) Begin work after 1Q:00 a.m. whenever construction phasing rec�uires the
use of motorized equipment for periods in excess of 1 hour.
2) However, the Contractor may begin work prior to 10:00 a.m. if:
a) Use of motorized equipment is less than t hour, or
b) lf equipment is new and certified by EPA as "C.,ow Emitting", or
equipment burns Ultra Low Su(fur Uiesel {ULSU), diese( emulsions, or
alternative fuels such as CNC,.
38 E. TCEQ Air Permit
39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ.
40 F. Use of Explosives, Drop Weight, Etc.
41 [. When Contract Documents permit on the project the following will apply:
42 a. Public Notification
43 1) Submit notice to City and proof of adequate insurance coverage, 24 hours
44 prior to commencing.
45 2) Minimum 2� hour public notification in accoc�dance with Section Ol 31 I3
4G G. Water Department Coordination
CITY C}F PQRT W02TE�1 tinter and Sunrtaty� Setiver Replaceme�tt Contract 2fil4, {3;S,LI-i�
ST'AiVD;1RD CONSTRtJC'T'ION SPI:CIFICAT[Oty' DOCUMLNTS Cltv Projecr No. 0�385
Revised December 20, 20 (?
oi 3s i3-a
SPGG[AL PROJFsC'1' PROCGDURRS
P�ge 4 of 8
1. U�reing the construction of this project, it will be necessary to deactivate, for a
period of time, existing lines. The Contractor shall be required to coordinate with
the Water Department to determine the best times for deactivating and activating
those lines.
5 2. Coordinate any event that wifl require connecting to or the operation of an existing
6 City water lit�e system with the City's representative.
7 a. Coordination shall be in accordance with Section 33 12 25.
8 b. If needed, obtain a hydrant watei• meter from the Water Department for use
9 during the life of named project.
10 c, In the Evcnk that a water valve on an existing live system be turned off and on
11 to accommodate the construction of the project is required, coordinate this
12 activity through the appropriate City representative.
13 l) Do not operake waker line valves of existin� water system.
14 a) Failure to comply will render the Contractor in vio(ation of Texas Penal
I 5 Code Title 7, Chapter 28,03 (Criminal Mischie�} and the Contractor
16 will be prosecuted to the full extenl of the law.
t7 b) In addition, the Contracror will assume alt liabilities and
t8 responsibilities as a result of these actions.
19 H. Public Notification Prior to Beginning Construction
20 1. Prior to beginnin� construction on any block in the project, on a block by block
21 basis, prepare and deliver a notice or flyer of the pending construction to the fi•ont
22 door ofeach residence or business that will be impacted by construction. The notice
23 shall be prepared as fol(ows:
24 a. Post notice or tlyer 7 days prior to beginning any construction aetivity on each
25 block in the pr�ject area.
26 1) Prepare flyer on the Contractor's (etterhead and include the following
27 inforrnation:
28 a) Name of Project
29 b) City Project No (CPN)
30 c) Scope of Project (i.e. type of constructian activity)
31 d) Actual construction c�uration within the block
32 e) Name of the contractor's foreman and phone number
33 f) Name of the City's inspector and phone nurnber
34 g) City's after-hours phone number
35 2) A sample of the `pre-construction not'rEication' tlyer is attached as Exhibit
36 A.
37 3) Submit schedule showing the construction start and tinish time for each
38 block of khe project to the inspector.
39 4) Deliver tlyer to the City Inspector for review prior to distribution.
4(i b. No construction will be allowed to begin on any btock until the flyer is
4( delivered to all resid�nts of the block.
42 i, Public Notification of "I'emporary Water Service [nterruption duc•ing Construction
43 I. [n the event it becomes necessary to temporarily shut down water service to
44 residents or businesses during constructron, prepare and deliver a notice or flyer of
45 the pending interr�iption to the frotit door of each affected resident.
46 2. Prepared notice as follows:
47 a. "I'he notification or flyer sftall be posted ?4 hours prior to the temporary
48 interruption.
Cl'1'Y Of: FOR"C WORTII Wc�rer cu�d Smritcn.a� Setirer Rep(uce»�ertt Co�Urerct 20l �J, dYS:t�-D
S'{'r\NDAR(J ('ONS'CRl�C1lON SPf•:CIFICA'fION DUC[iNtP,N"1"5 �'i!}� Projer.! No. 01335
Revised Uecemher 2U, 2012
013i 13-5
SPEC(AL PRO.IECT PROCIiDURBS
Pagc 5 oF8
I
2
3
�
5
6
7
8
9
10
I1
12
l3
i4
15
l6
K. Coordination within Railroad Permit Areas
1. At locations in the project where construction activiti�s accur in areas where
Prepare flyer on the contractor's letterhead and include the following
information:
i) Name of the project
2) City Project Number
3) date of the interruption of service
4) Period the interruption will take place
5) Name of the contractor's foreman and phone number
6) Name of the City's inspector and phone number
A sample of the temporary water service intei�ruption notification is attached as
Exhibit B.
Deliver a copy of the temporary interruption notification to the City inspector
for review prior to being distributed.
N� interruption of water service can occur until the flyer has been delivered to
all affected residents and businesses.
Electronic versions �f the sample flyers can be obtained frorrt the Praject
Construction Inspector.
l7 J. Coordination with United States Army Corps of Engineers (USACE)
18 i. At locations in the Project where construction activities occur in areas where
l9 USACF, permits are required, meet all requirements set forth in each designated
20 permit.
21
22
23
24
25
26
27
28
?9
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
2
3
L^
c.
d.
e.
f.
raitroad permits are required, meet all requirements set forth in each designated
railroad permit. This includes, but is not limited to, provisions for.
a. Flagmen
b. Inspectors
c. Saf'ety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of-way and property of the
Railroad Company from damage arising out of and/or firom the construction of
the project. Proper utility ctearance procedures shall be used in accordance
with the permit guidelines.
Obtain any supplemental information needed to comply �vith the railroad's
requirements.
Railroad Flagmen
a. Submit receipts ta City for verification of working days that railroad flagmen
were present an Site.
L. Dust Control
l. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose af waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
M. Employee Parking
1. Provide parking for employees at locations approved by the City.
CITY UP FORT WOftTH 4Yc�ter aird Smritnry Sewer Replace»ie�tt C,'artrc�ct ?Ot !, 6YSb4-CJ
STANDARU Cf)NSTRIJC;TION SPGC[�[<'��TION [�OCUWE.NT5 Crty Prr�ject rVv. 02385
Revised [7�embcr 20, 2U I 2
6( 35 13-6
SPECIAL PKOJEC'1' PROCEDlJRG5
Pagc 6 oi' 8
1 1.5 SUBMITTALS [NOT USED]
2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
3 1.7 CLOSEOUT SUBMITTALS [NOT USED]
4 1.$ MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
S 19 QUALITY ASSURANCE [NOT USED�
6 1.10 DELIV�RY, STORAGE, AND HANDLING [i�TOT USED]
7 1.12 FIELD [SITE] CONDITIONS [NOT US�D]
8 1.12 WARRANTY [NOT USED�
9 PART 2- PRODUCTS (NOT USEDj
10 PART 3- EXECUTION [IYOT USED)
t 1 END OF SECTION
12
Revision Log
DATE � NAME SUI�iMARY OF CHANGE
1.4.[3 — Added requirement of compliance with tiea(th and Safety Codc, "t'itle 9.
8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
I.4.E — Added Contractor responsibility for obtaining a TCGQ Air Permit
13
Cll'Y OP FOEt'F WORTFI H'ater arrd Sa��rtmy Sewer 2epincement Conh�ucl ZOl�l, Y�S,Lf-D
S'1'ANllAR[7 CONS'fRUCTION SPL'CIf1CAT{ON I70CUMEN"I'S CityYr-nj�t<.�t Nn. 02�N5
Rcvised Gecember 20, 2012
JI3513-7
SFGCIAL PRO.IEC'f PROCEDURES
Page7 of8
1
2
3
4
5
6
7
8
9
l0
tt
l2
13
14
IS
16
17
ts
19
20
21
22
23
24
25
26
27
2s
29
30
31
32
33
34
35
3t
37
Date:
CPN No.:
Project Name;
Mapsco Location:
Limits of Construction:
EXHIBIT A
(To be printed on Contractor's Letterhead)
, �
TNlS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE
OF THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
tSSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT < TE�EPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CA�L (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
Cl'('Y C)I' C�OR"C' WOR'1'H )9citer aiid Snnr�nry Seu�er ltepface�meru C'atrtract �D/�J, i�YS,tT D
5'1't1tiDAKD C:C)NS'1'RUCT[ON SPGCIPICATION DOCLM�N"CS Ciry Project No. QZ3S5
Reviseci Decimhcr 2t). 2412
Ol 35 13 - 8
SVECCAL PRv.IEC'P PROCEDURCS
Pa�;c 8 of 8
�
EXHIBIT B
�'C�RT V�ORTH
�„��--
p.,.:
.�
i�iOTlCE OF TBMPORARY WATER SEItVICE
IN?ERRt1PTI01�
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR
WATGR SERVICE WiLL BE INTERRUP'T�D ON
BE'TWEEN THE HOURS dC AND
1F'YOU iiAVE Q[TESTIONS ABOUT THIS SHOTAIJT, PLEAS� CALL:
MR. AT
(CON7'RACTORS SUPEitINTENDEN'I) (TELEPPONE NUMBER)
OR
MR. AT
(C1TY 1NSPECTdR) (TELEPHONE NUMBER)
TIiIS INCONYGNIENCE WTLL BE AS SHORT AS POSSIBLG.
THANK YOU,
CONTRACTOR
3
4
C['I'Y OF FURT WOR'I'I�{ Gl�ater and Smdt<ary Stwer Re�lacerne�u Contract 20/4, tYSd=1-U
S'CANDARb CONSTRUCT[t)N SPGCiPICAT[t�N D(7CUMEN'I'b Crry I'i'njecl Nn, 02 �RS
Revised D��c;ernher 2l1, 2� 12
Q14523-f
TESTfNG AND [NSPF,CTION S�RV[CrS
Yagc I of2
l
2
3 PART 1 - GEIYERAL
4 1.1 SUMMARY
5
6
7
8
9
t0
I(
l2
13
14
15
16
17
18
19
20
Zi
22
23
24
SECTION Ol 45 23
TEST[NG AND INSPECTION SERVICES
A. Section Includes:
I. Testing and inspection services procedures and coordinatian
B. Deviations from this City af Fort Wo��th Standard Specification
l. None.
C. Related Specitication Sections include, but are not necessari(y limited to:
1. Division 0— Bidding Reqizirements, Contract Forms and Conditions of the Contract
2, Division I— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
25 1.3
A. Measurement and Payment
l. Work assaciated rvith this [tem is cansidered su6sidiary to the various Items bid.
No separate payment will be allowed for this Item.
a. Contractor is responsible fOr performing, coordinating, and payment of all
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the first Quali[y Assurance test performed by the City fails, the
Contractor is responsib(e for payment oFsubsequent Quality Assurance
testing until a passing test occurs.
a) Final acceptance will not be issued by City until all req�iired payments
for testing by Contractor have been paid in full.
REFERENCES [NOT USF,Dj
26 1.4 ADMINISTRATIVE REQUIREMF.NTS
27
28
29
30
31
32
33
34
35
36
37
38
A. "C'estin�
1. Camp(ete tesking in accoi•dance with the Contract Do�uments.
2. Caordination
a. When testing is required to be perf'ormed by the City, notity City, sufficiently
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, natify City,
sufficiently in advance, that testing will be performed.
3. Distribution of Testing Reports
a. Electronic Distribution
1) Confirm development of Project directory for electronic submittals to be
uploaded to City's 6uzzsaw site, or another external FTP site approved by
the City.
Cl`CY OF FOR'f WC?R"CH 6Ynter and Sanitary 8e�rer Replacemc�rt Contrar( 20(4, Gi:Sh!-L>
STANDA32D CONS"CRUCTCON SPECIf�CCA'I'[Uti llO�UMEN'f5 City PrqjectNo. 02385
ftevised Juiy i, 201 I
1
2
3
4
S
6
7
8
9
(0
ll
12
13
t4
(S
l6
1 '7
l8
l9
ao
21
01 45 23 - 2
CES'l'ING AND INSPEC'1'ION SERVICES
Yage 2 of'2
2) Uplaad test reports to designated project directo�y and notify appropriate
City representatives via email of submittal posting.
3) Hard Copies
a) 1 copy for all submittats submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Project Representative with trip tickets For each defivered load of
Concrete or Lime materia! including the following information:
a. Natne of pit
b. Date of delivery
c. Material delivered
B. Inspection
l. Inspection or [ack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Documents.
1.5 SIJRMITTALS [NOT USGD]
l.b ACTIOIY SUBMIT'TALS/INI+ORMATIONAL SUBMITTALS [NUT USED�
i.� cLos�ouT svBMuz�•r��s ��vo7� us�;v�
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
22 1.9 QUALITY ASSUItANCE [NOT USED]
23 L10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
24 1.11 FIGLD [SITEj CONDITIONS [NOT USED]
25
�
2.12 WAItItANTY (NOT USGD]
PART 2 - PRODUCTS [NOT [ISF.D]
?7 PART 3 - EXFCUTION [NOT USED]
28
29
END OF SECTION
Revision Log
DATE N�lIvIE SUMMARY OF CHANGF.,
30
CITY OF PORi' WOR Cf ( F{�nternJeclScrnrra�y Seiver Replacenteiu Cauract l�l4, tVSd4-L1
S'1'fl(�IDARD CONS'l`RUt"C(C1N S!'FCIFICA'I'ION DOCIJ'v1�N"!;S Ciry Prnjecl No. �238.5
Revised July I, 20t I
0! �0 Di) • I
1'FMP(�RARY T'ACILI'1'[ES ANI7 CONTROLS
Page I of4
�
SECTION Ol SO 00
TEMPORARY FACIL[TIES AND CONTROLS
3 PART1- GENERAL
4 1.1 SUMMARY
S
fi
7
8
4
t0
ll
iz
(3
14
l5
16
17
18
�. Sectian [ncludes:
1. Provide temporary facilities and controls needed for the Work including, but not
necessarily limited to:
a. Temporary utilities
b. Sanitary facilities
c. Storage Sheds and Buildings
d. Dust contro(
e. Temporary fencing of the construction site
B. �eviations from this City of Fort Worth Standard Specificatior�
1. None.
C. Retated Specification Sections inc(ude, but are not necessarily limited to:
l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division l— General Requiremants
1.2 PRICE A1�1D PAYMENT PROCEDURES
19 A. Measurement and Payment
20 1. Work associated with this Item is considered subsidiary to the various Items bid.
21 No separate payment will be allowed for this Item.
22 1.3 REFEKENCES [NOT USEDj
23 1.4 AUMINIS'TRA'I'1VE REQU[RENiEIVTS
24
25
26
27
28
29
30
3l
32
33
34
35
36
37
38
39
40
A. Temporary Utilities
1. Ubtaining'I'emporary Service
a. Make arrangements with utility service companies for temporary services.
b. Abide by rules and regulations of z�tility service companies or authorities
having jurisdictioi�.
c. Be responsible for utility se;rvice costs until Work is approved for F'inal
Acceptance.
i) Inc(uded are fuel, power, light, heat and other utility services necessary for
execution, comp(etion, testing and initial operation of Work.
2. Water
a, Contractor ko provide water required for and in connection with Work to be
perforrr�ed and for specified tests of piping, equipment, devices ar other use as
required for the completion of the Work.
b. Provide and maintain adequate supply of potable water for domestic
consumption by Contractor personnel and City's Project Representatives.
c. Coordination
1) Contact City 1 week before water for construction is desired
C'I9'X O[ �ORT WOCLTH Water and Sairi�ary 5e+ver Repincerne�u Cou�rac12014, t4,S:L1-D
STANDARD ('ONSTR()CTfON SPGCitICA'1'IOi1' DqC'UMP,NTS Citv Prnf�at;Vn. OZ385
Revised July t, 20 ( 1
o� s000-a
1'EN(YC)RARY FAG ILCI'16'S AND Cf.)N'CROLS
Pa�e � of4
1
2
3
4
5
6
7
S
9
10
II
l2
13
14
IS
1G
17
18
l9
20
21
?�
23
24
2S
26
27
28
29
30
3l
32
33
34
35
36
37
38
39
40
41
42
43
44
45
3
4.
5.
d. Contractor Payment for Construction Water
() Obtain construction water meter from City for payment as billed by City's
estabiished rates.
Electricity and Lighting
a. Pcovide and pay for electric powered service as required for Work, including
testing of Work.
1) Provide power for lighting, operation of equipment, or ather usa.
b. Electric power service incltides temporary power service or generator to
maintain operations during schediiled shutdown.
Telephone
a. Provide emergency telephone service at Site for use by Contractor personnel
and othcrs performing work or furnishing services at Site.
Temporary Heat and Ventilation
a. Provide tempoyary heat as necessary for protection or completion of Work.
b. Provide temporary heat and ventilation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persoas on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclose and anchor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and waste so as nat to cause nuisance or health
problem.
d. Haul sewage and waste off-site at no less than weekly intervals and properly
dispose in accordance with applicabie regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at co►npletion of Yroject
C. Storage Sheds and Buildings
1. Provide adequate(y venti(ated, watertight, weatherproof storage facilities with floor
above ground (evel for tnaterials and equipment susceptible to weather damage.
2. Storage of materials not susceptible to weather damage may be on blocks off
ground.
3. Store materiafs in a neat and order(y manne�•.
a. Place materials and eguipment to permit easy access for identification,
inspection and inventory.
4. Equip building with lockable doars and lighting, and provide electrical service for
equipment space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
5. Fill and �ade site for tempol•a��y structures to provide draina�e away from
temporary and existing buildings.
6. Remove building from site priar tc� Final Acceptance.
D. "I'emporary Fencing
l. Provide and maintain for tlle duration or construction when required in contract
docutnents
E. Dust Contro(
CCI'Y UF PORT W02TI I {1'ater atiri Sa�rita�y Setiver Rep(acement Cnnh•act lUt �l, 61;SiL/-D
S'I'ANDARD CONSTRUCTION SPF.CIFICATION DOCIJMF,NTS CrtY Proje�t iVo. 02385
RevisedJuly 1,2011
I
2
3
4
5
6
7
8
9
10
ll
t2
13
i4
15
t6
Ol 5000-3
'1'EMPURARY FACIUT[ES AND CONTROLS
Page 3 oP4
I. Cont►•actor is responsible for maintaining dust control tFu•ough the duration of the
proj ect.
a. Contractor remains on-call at all times
b. Must respond in a timely manner
F. Tempora�y Protection of Construction
1. Contractor or subcontractors are responsible for protecting Work frotn damage due
to weather.
1.5 SUBMITTALS [NOT USED]
1.6 AGTION SUBMITTALS/INFORMATIONAL SUSMITTALS [NOT USED]
1.'7 CLOSEOUT SUBMITTALS [NOT USEDj
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALI'TY ASSURANCE [NOT USED]
1.10 UELIVERY, STORAGE, AND HANDLING [NOT USEDj
l.11 FIELD [SITE] CONDITIONS [NOT USEDj
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS (NOT USEDj
17 PART 3- EXECUTION [NOT USED]
t 8 3.1 INSTALLERS [NOT USED]
l9 3.2 EXAMINATION [NOT USED]
20 3.3 PREPARATION [NOT USEDJ
2 ( 3A INSTALLATION
22 A. Temporary Facilities
23 1. Maintain all temporary facilities for duration of construction activities as needed.
24 3.5 [REPAIR� / [RESTORATION]
25 3.6 RE-INSTALLATION
26 3.7 FIELU �oe] SITE QUALITY CONTROL [NOT USED]
27 3.8 SYSTEM STARTUP [NOT USEDj
28 3.9 ADJUSTINC (NOT USED]
29 3.10 CLF.AIVING [NOT USED)
30 3.11 CLOSEOUT ACTNITIES
3t A. Temporary Facilities
CI"I'X QF FOli'I' 1NOR"1'H Gt�ute� and;7af�itary Se�ver Replacemerrt C.a�trac! 2(�l d, {V:SM-t�
S'I`ANUr�KD CONS1'IZU�T[ON SPGC[�[C�#T"tON DOC1JNtF.-NTS Ct[y Project ho. 02385
Revised July I, 201 I
oi s000-a
TEMPORARY FACILITIES AND CONTROLS
Puge 4 o f 4
1, Remove all temporary facilities and restore area after completion of the Work, to a
condition equal to or better than prior to start of Work.
3 3.12 PROTECTION [NOT USED]
4 3.13 MAINTENANCE [NOT LISEDj
5 3.14 AT'i'ACHMENTS [NOT USEllJ
6 END OF SECTION
Revision Log
DATE NAME SUMNTARY OF CFiANGE
CI'l'Y O� E(1R"I' W(7RT'H 6Vuter urid Su�titut;v Sei✓er Replac�ernent Contract 2014, 4G;Sd�1-D
S'I'ANDAR(7 <'ONtiTR[ fCf[Q�,` SPFCIFtCATiON f70C11;�-1F',NTS Ciry f'roject rti�. 02?SS
Revised July l, 201 I
01 i526-I
S'T'REF,"I' USF. PERM[T.4ND M011iF[CAT[ONSTO TRAFFfC CONTROL
Page I of'3
1
2
SECTION Ol 55 26
STREET USE PERMIT AND MODIFICATIONS TO TRAFF[C CONTROL
3 PART l - GFNFRAI,
4 1.1 SUMMARY
S
b
7
8
9
10
tt
t2
l3
14
IS
(6
A. Section Includes:
l. Administrative procedures for:
a. Street tJse Permit
b. Modificatian of approved traffic control
c. Removal of Street Signs
B. Deviations from this City of Fort Worth Standard Specification
l. None.
C. Related Specification Sections include, but are not necessa�•ily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Cantract
Z. Division 1— General Requirements
3. Section 34 71 I 3— Traffic Contral
1.2 PRICE AND PAYM�NT PROCEllU12ES
17 A. Measurement and Payment
18 l. Work associated with this Item is considered subsidiary to the various Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 RFFFRENCES
2t
22
23
24
25
26
A. Reference Standards
1. Reference standards cited in this specification refer ta the current reference standard
published at the time of the latest revision date (ogged at the end of this
specification, unless a date is specifically cited.
2. Texas Manual on Uniform Traffic Control Devices (TiviUTCD),
1.4 ADMINISTI2ATiVE REQUIREMENTS
27 A. T'raf�c Control
2% 1. General
29 a. When traffic control plans are included in the Drawings, provide Traffic
30 Cantroi in accordance with Drawings and Section 34 71 13.
31 b. When traffic control plans are not included in the Drawings, prepare traffic
32 control pians in accordance with Section 34 71 13 and submit to City for
33 review.
34 1) Altow minimum 10 working days for review of proposed Traf'fc Control.
35 B. Street Use Permit
36 1. Prior to installation of Traftic Control, a City Street Use Permit is required.
37 a. 'To obtain Street Use Per►nit, submit �I'raffic Control Plans to City
3& Transportation and Public Works Department.
CCCY CiP I�OR"i' WOft'1"H {�atr:ranrfSanitarySewerRepincenieiuC=nn[ract?(11=1, .GYSd1 D
STr1NDAKr� CUNS'['KUC'T(OR SPL`•.CIF(CA'I'I(')N UOC'1.;(VITNTS City Project A'o. IJ238S
RevisedJuly 1,'2011
01 5526-2
S"CREE'C USE PEtt�(i'P AND NtOD1P[CATIONS TO TRA�FIC CON"i'ROL
Page2 of3
t
2
3
1) Allow a minimum of 5 working days for permit review.
2) Contractar's responsibility to coordinate review of Traffic Contral plans for
Street Use Permit, such that construction is not delayed.
4 C. Modification to Approved "i'raFfic Control
5 l. Prior to installation traffic control:
6 a. Submit revised traffic control plans to City Department Transportation and
7 Public Works Department.
8 I) Revise TraFfic Control plans in accoc•dance with Section 34 71 13.
9 2) Allow minimum 5 working days for review af revised Traffic Control.
10 3) [t is the Contractor's responsibility to coordinate review of T�•aftic Control
11 p(ans for Street Use Permit, such that construction is not delayed.
(2 D. Removal of Street Sign
l3 i. If it is determined that a street sign must be removed for constructian, then contact
14 City Ti•ansportation and Public Works Department, Signs and Markings Division to
15 remove the sign.
1G
17
18
(9
20
21
22
23
24
25
E. Temporary Signage
I. [n the case of regulatory signs, replace permanent si�;n with temporary sign meeting
cequirements of the Eatest edition of the Texas Manual on Uniform Traffic Control
Devices (MUTC,D).
2. Install temporary sign before the remova( of permanent sign.
3. When construction is complete, to the extent that the permanent sign can be
reinstalled, contact the City `['ransportation and Public Works Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Tra�c Control Standards
l. 1'raffic Control Standards can be found on the City's Buzzsaw website.
26 1.5 SCIBMITTALS [NOT USED]
27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
28 1.7 CLOSLOU'I' SUBMITTALS [Nt1T USED]
29 1.8 MAIN'1'LNANCE MATERIAL SUBMITTALS [NC?T USED]
30 1.9 QUALI'I'Y ASSURANCE [NOT USED]
31 1.1Q DFLIVEI2Y, STORAGE, AND HANDLI1�tG (NO'T USED�
32
33
1.11 FIELD [SITEJ CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
34 PART 2- PRODUCTS [NOT USED]
35 PART 3- EXECUTION (NOT USEDJ
36
ENll OF SECTION
C:1'i'Y C7F FOIt'1' WOR�C}( GYnter rnrd Sntartary SFtiver Renlacemerzt Coi�lruc! 2014, {ti'SrL!-I�
S"C;�NDARD CQN5T'RUC"itON SPEC[FICr1l'IO� QOCUMENTS Crty Prqjecl No. 0?385
Revised July I, 201 I
01 5526-3
4'I'RF;E'I' tJSE PERM[T AND MnDiFICA'I'IONS TO'CRAFF[C COMl'ROL
Page 3 ot 3
Revision Lob
DATE NALtE SUIVt�UtARY UF CHANGE
2
CfPY Ok' f�OR'f WU[{"1'H Water ur�d Snrfitnry Server Itepinceir�ent Coritract 2ti14, {YSh� l7
SCANI�ARU CUNS'CRUCTION SPEC(FtCATION DOCUMGNTS City!'roject No. t12385
Reviscd hdy L 201 t
01 57 13 - I
S'I'ORM �VA'ft;R PqLC.I,:'I't(�N PIZEVEN"I'IC)N
Pagc I of3
1
�
SEC'TION 01 S'7 13
STORM WATER POLLUT[ON PREVENTION
3 PART1- GENERAL
4 1.1 SUMMARY
5
G
7
8
9
10
II
12
13
14
IS
lb
17
18
19
20
A. Section Includes:
1. Procedures for Storm Water Pollution Prevention Plans
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
3. Division 0-- Bidding Requirements, Contract Forms and Conditions of the
Contract
2. Division 1— General Requirements
3. Section 31 25 00 — Erosion and Sediment Control
1.2 PRICE AND PAYMENT PROCEDURES
21 1.3
22
23
24
25
26
27
28
29
30
31
32
33
34 l.4
3S
36
37
A. Measurement and Payment
1. Construction Activities resultin�? in (ess than 1 acre of disturbance
a. Work associated with this Itern is conside�•ed subsidiary to the various Items
bid. No separate payment wil( be allowed for this Item.
2, Construction Activities resulting in greater than 1 acre of disturbance
a. Measurement and Payment shall be in accordance with Section 3 I 25 OQ.
REFERENCES
A. Abbreviations and Acronyms
l. Notice af Intent: NOI
2. Notice of'I'ermination: NOT
3. Storm Water Pollution Prevention Plan: SWPPP
4. Texas Commission on Enviranmental Quality: TCEQ
5. Notice of Change: NOC
A. Reference 5tandards
t. Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specification, unless a date is speeifically cited.
2. Integrated Storm Management (iSWM) Technical Manual for Canstruction
Controls
ADM[N[STRATIVE REQUIRF.MENTS
A. Gencral
l. Contractor is responsible for resolution and payment of any fines issued associated
with compliance to Stormwater Polhition Prevention Plan.
CI'l'\' QF FOE21' WOR'1'H lf�ater arrd Su�iirary 3'e�ver Rep(ace�nent L:nntract 20l�J, If:S�LI-C�
S'('ANDARC� CONS'fRUC'1"ION SYECII�LCATION DOGCiNi[:N"CS �;iry Project Na. 0�38i
ftevised Julv t, 201 (
Ot 5713-2
S'1'ORM WATGRPOLLUI'ION Plit�;VEN'1'fON
P�ge 2 oF7
B. Construction Activities resufting in:
]0
i(
12
13
14
15
16
t7
18
19
20
1. Less than 1 acre of disturbance
a. I'rovide erosion and sediment control in accordance with Section 31 25 00 and
Drawings.
2. 1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Smal) Construction Site Notice Required under general pe�mit
TXR 150000
a) Sign and post at job site
b} Priar to ��econstruction Meeting, send 1 copy to City Department of
Transpo��tation and Public Works, Environmental Division, (8 i 7) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 31 25 00
b) The Drawings
c) TXR150000 Genera[ Pzrmit
d) SWPPP
e) TCEQ requirements
21 3. 5 acres or more of Disturbance
22 a, Texas Poflutant Discharge Elimination System (TPDES) General Construction
23 Permit is required
24 b. Complete SWPPP in accordance with TCEQ requirements
25 1) Prepare a TCEQ NOI form and submit to TCEQ along witt� required fee
26 a) Sign and post atjob site
27 b) Send copy to Cify Department of Transportation and Public Works,
28 Enviranmental Division, (817) 392-6Q88.
29 2) TCEQ Notice of Change required if making changes or updates to N�I
30 3) Provide erosion and sediment control in accordance with:
3 t a) 5ection 31 25 40
32 b) The Drawings
33 c) TXR150000 General Permit
34 d) SWPPP
35 e) TCEQ requirements
36 4) Once the project has been completed and all the closeout requirements of
37 TCGQ have been met a TCEQ Notice of Termination can be s�Gbmitted.
38 a) Senci copy to City Department of Trai7sportation and Public Works,
39 Environmental Division, (817) 392-6088.
40 1.5 SUBMITTALS
41
42
43
44
45
46
47
A. S WPPP
Submit in accordance with Section 01 33 00, except as stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as foilows:
1) 1 copy to the City Project Manager
a) City Project Manager will forward to the City Department of'
Transportation and Pubiic Works, Environmental Division f�r review
CI"I'Y Of� PORT WURTH {i�cuer und 5unitary Sex�et� Replace�ner�t Cn�itract 2�14, WS�ti/-D
STANI?ARf� CONS"CRLCTION St'EC:IFLCA'I'ION OOCUMEN'CS Crry f'r•qjecl Nn. 02JN5
Revised July I, 201 I
0( �713�3
STOR�I WATER POLL[,'T[(7N PREVENT[ON
Page3 nP3
t B. Modified SWPPP
2 I. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
3 in accordance with Section O1 33 00.
4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
5 1.7 CLOSEOU'C SUBMITTALS [NOT USED]
6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
7 1.9 QUALITY ASSURANCE [NOT USED]
S 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
�� 9 1.11 FIELD [SITEJ CONDITIOI�TS [NOT USED]
] 0 1.12 WARRANTY [NOT USED]
l I PART 2- PRODUCTS [NOT USEDJ
12 PART 3- EXECUTION [NOT US�D]
t 3 �ND OF SECTION
14
15
Revision Log
DATE NAMF.. SUM1ViARY OF CHANGE
Cl"I'Y OF FO[Z`f WC7K'C'F! IHbterand,Smti(nrvSPwer Rer�lncem�nt C'on(ract ?DJ4, lF'Sibt-!7
S'I'ANDARD (,ONS"PRUC'1'COtv SPECIP[CA"C10N Dt�CUMLN'CS Crry 1'r�%er.t ;Vo. 02385
Rcviscd Jtdy 1, 20[ i
01 >3 l3 - f
i'EhrlPOfiAIZY PRO.fN;C'1' S[GNt1GF:
Pagc i of 3
t
2
3 PART1- GENGRAL
4
5
b
7
8
9
LO
11
l2
13
14
15
16
l7
18
14
20
2(
22
23
24
25
26
27
28
29
30
31
SECT[ON O1 58 13
TEMPORARY PROdECT SIGNAGE
1.1 SUMMARY
A. Section Includes:
1. Temporary Project Signage Requirements
B. Deviations from this City of Fort Worth Standard Specification
l. None.
C. Related Specificatian Sections include, but are not necessarily limited to:
!. Division 0— Bidding Requirements, Contract Fortns and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
l. Work associated with this Item is considered subsidiary to the variaus Items bid.
No separate payment will be allowed for this Item.
1.3 REFF.RENCES [NOT USEDj
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USEDJ
1.5 SUBMITTALS [NUT USED]
1.6 ACTION SUBMITTALS/INFOI2MATIONAL SUBMITTALS [NOT USEDj
2.7 CLOSEOUT SUBMTTTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.1Q DELIVERY, STORAGE, ANll HANDLING [NOT USEDj
1.11 FIELD [SITE] CONDITIONS [NOT USED]
112 WARRANTY [NOT USED]
PART 2 - PRODUCTS
2.1 OWNER-F'IJRNISHED �ox] OWNER-SUPPL[EDPRODUCTS [NOT USEDJ
2.2 EQUIPMENI', PRODUCT TYPES, AND MATERIALS
A. Desi�n Criteria
(, Provide free standing Projcct Designation Sign in accordance with City's Standard
Details for project signs.
CITY OP FO R"C WC3R'CE[ {G'nter ar��� Sanitnll- Seiver IZepJace�r�er�t Conrrnct 20(4, IV.S,S1 D
STANDARD t:ONS'CRUC;7'[ON SPECTF�CAT[ON T)OClIN16N`PS Ciry Project :Vo_ O23'�S
2evised 1uly 1, 201 1
01 SR 13-2
I'EMYORi1RY PROJEC7' S[GNACiE
Pagc. 2 of 3
1 B. Materials
2 1. Sign
3 a. Constructed of'/a-inch fir plywood, grade A-C (exterior) or better
4 2.3 ACCESSORIES �NOT USED]
5 2.4 SOURCF, QUALITY CONTROL [NOT USEDj
6 PART 3 - EXECUTION
7
S
9
t0
II
12
l3
14
15
l6
17
18
l9
20
21
22
23
24
25
26
27
28
29
30
31
3.1 INSTAI,LERS [NOT USEDJ
3.2 EXAMII�iATION (NOT USGD]
3.3 PREPARATION [NOT USEDj
3.4 INSTALLATION
A. General
I. Provide vertical installation at extents of project.
2. Relocate si�n as needed, upon request of the City.
B. Mounting options
a. Skids
b. Posts
c. Barricade
3.S REPAIR / RESTORATI0I�T [NOT USED]
3.6 RE-INSTALLATION [NOT USEDj
3.7 FIELD (oH] SITE QUALITY CONTROL [1�iOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.1U CLEANING [NOT USEDJ
3.11 CLOSEOUT ACTMTIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINT�NANCE
A. General
1. Maintenance will include painting and repairs as needed or directed by the City.
3.14 ATTACHMENTS [NOT USED)
END OF SECTION
Cl'CY UF FQ2l' WqR"(`I t {�nler cmd S«nit�ry Server RepTacentent Contract 201d, l3'S�1�1-C)
S"f'ANDARU CONS'CftUCT10N SAGC[f[CATION DOCUMBNTS Crty Prujec't Nu. �1.i8±
Re,vised Jidy 1, 201 1
t71 >8 13 -3
TFMPORARY PROJF.C"i' StGNAGF..
Page 3 of 3
Revision Log
DATE NAME SUNIMARY OF CHANGE
CITY OP PORT WORTH GY'ater �nd Sor+itary Sewer Ruplaaenrent CarTtraca 20/d, WS�Lf-l�
STANI7ARI7 CONSTRUCTtON SVtiC:IF(CA1'TON DOCCJMEt�lTS (`rry Prqject Nr�. 02385
RevisedJuly l,?011
oi ���00-1
NROI)UCC REQUIRG(vIENTti
Pagc I of2
1
2
3 PAI2T l - GENERAL
4 1.1 SUMMARY
5
6
7
8
9
10
It
12 1.2
13
t4
(5
16
17
18
19
20
21
22
23
24
25
26
27
2$
29
3�
31
32
33
34
SECTION Ol 60 00
PRODUCT REQUIREMENTS
A. Section Includes:
1. References for Product Requirements and City Standard Products C.ist
8. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related 5peci�cation Sections include, but are not necessarily limited to:
l. Division 0— Bidding Requirements, Contract Forms and Conditions ofthe Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES [NOT USEDj
1,3 REFF.RENCES [NOT USED]
1.4 ADMINISTKA'TIVE REQUIREMENTS
A. A list of City approved products for use is located on Buzzsaw as follotivs:
1. Resources102 - Construction Doeuments\Standard Products List
B. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved products will �nly be allowed for use upon specific
app►•oval by the City.
C. Any speci�c product requirements in the Cantract Documents supersede similar
products included on the City's 5tandard Product List.
1. 'The City reserves the right to not allow products to be used for certain prajects even
though the product is listed on the City's Standard Product List.
D. A{though a specific praduct is included on City's Standard Product List, not all
products from that manufacturer are approved far use, ineluding but not limited to, that
manufacturer's standard product.
E. See Section O 1 33 00 for submittaf requirements of Product Data included on City's
Standard Product List.
l.S SUBMITTALS [ivOT USF,D]
1.6 ACTION SUBMITTALS/INFORMATIC}NAL SUBMITTALS [tYOT USED]
1.� CLOSGOUT SUBMITTALS [NOT USEDJ
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED)
1.9 QUALITY ASSURANCE [NOT USEDj
CI'f Y OF FOR7' WC)R"T'H �Yater �nd Sanrtary Sewer R<.p[ncvutetrt t,orrtract 2�1d, Y#;SM-U
S'I'AA�UARD Ct)NSTRt;C"PIC)N SPEC(F[C�l"CCQN DOCUI�ILN'1'S City PrrJ�ect iVa. 0.3H5
Rc;viscd Dccercaber 2�. 2�12
01 60 OQ - 2
PItODUC'1' Rf:QU1RLbtCNTS
Page � of2
1 1.10 DELIV�RY, STORAG�, AND HANDLING (NOT USEDj
2 1.11 FIELD [SITF,] CONDITION5 [NOT USEDj
3 1.12 WARRANTY [NOT USED)
4 PART 2- PRODUCTS [NOT USED]
5 PART 3- EXECUTION [NOT USED]
6 END C1F SECTION
Revision Log
DAT'E NAME SUMMARY OF CHANGE
l Ol l2/ 12 D. Johnson Modified Location of City's Standard Product List
CTTY C)P fORT WI�RTH K�ulei� nnd S'unilary Se�vrsr Repinoement G'a�urae[ 2�14, W,S,if-C>
S"l'ANDARD CC)NSTftt1CTI4N SPECIFIGIT[OPI DOCUMENCS Crly Yr•qjec! No. 02385
Revised I)acernher 20, 2012
01 6h OU - I
PRODUCT STOR:1GE AND HANUL[NG RECIUIREMEN"CS
Page l ofv
l
2
SECTION 01 66 00
PRODUCT STORAGE AND F-IANDLING REQUIREMENTS
3 PART 1 - GENERAL
4
S
6
7
8
9
10
Il
12
13
14
IS
16
1 '7
l8
14
20
21
22
23
24
25
��
�7
28
29
30
31
32
33
1.1 SUMMARY
A. Section Includes:
i. Scheduling of product delivery
2. F'ackaging of products for delivery
3. Protection of products against damage trom:
a. Handling
b. Exposure to elements or harsh environments
B. Deviations Prom this City of Fort Worth Standard SpeciEication
1. None.
C. Related Specification Sectians include, but are not necessarily limited to:
l. Division 0-- Bidding Requirements, Contract Forms and Conditions of the Contraet
2, Division I— General Requirements
1Z PRICE AND PAYMENT PROCEDURES
A. Nleasurement and Payment
l. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be altowed for this Item.
1.3 REFERENCES [1�10T USEDJ
1.� ADMIN[STRATIVE KEQUIREMF.NTS (NOT USED]
I.5 SUBMITTALS [NOT USED}
1.6 r�CT'ION SUBMIT'CALSlINFORMATIONAL SUBMITTALS [NOT USED)
l.'7 CLOSEOUT SUBMITTALS (IYOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED�
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY AIYD HANDLING
A. Delivery Requirements
l. Schedule delivery of products or equipmc;nt as required to allow timely installation
and to avoid proionged storage.
2. Provide appropi•iate personncl and equipment to rec�ive deliveries.
3. Delivery trucks wiil not be permitted to wait extended periods of time on the Site
for personnel or equipment to receive the delivery.
CI"�'Y OF f'i�R"f WOlZ"t'H it�ater mu(Snni�nry Selver Replaceuient CnnU•crct 2(11�J, 6V$A� D
S'f'nND�lI2D CONS"1'I2UC7'ION St'ECI F[CA I'10N UOCUNtGivTS Citv Yrqject No, (J2345
Revised Juiy l, 201 I
01 6G 00 - 2
PROD[1CT S'1'OItAGE rW D HAND[_INci REQCIIREMEN'('S
Page2 oFd
I 4. Deliver products or equipment in manufacturer's originai unbroken cartons ot� other
2 containers designed and constructed to protect the contents from physical or
3 environmental damage.
4 5. Clearly and ful(y mark and identify as to manufacturer, item and installation
5 location.
G 6. Provide manufacturer's instructions for storage and handling.
7 B. Handling Requirements
8 l. Handle products or equipment in accardance with tliese Gontract Documents and
9 manufacturer's recommendations and instructions.
t0 C. Storage Requirements
l l t. Store materials in accordance with manufacturer's recommendations and
12 requirements of these Specifications.
t3 2. Make necessary provisions for safe storage of rnaterials and equipment.
t4 a. Place loose soil materials and materials to be incorporated into Work to prevent
15 damage to any part of Work or existing facitities and to maintain free access at
I G all times to afl parts of Work and to utility service company insta(lations in
17 vicinity of Work.
18 3. Keep materials and equipment neatly and compactly stored in locations that will
l9 cause minimum inconvenience to other contractors, public travel, adjoining owners,
20 tenants and occupants.
21 a. Arrange storage to provide easy access for inspection.
22 4. Restrict storage to areas available on construction s'rte for storage of materia( and
?3 equipment as shown on Drawings, or approved by City's Project Representative.
24 5. P�•ovide offi=site stora�e and protection when on-site storage is not adequate.
25 a. Provide addresses of and access to aff-site storage locat'rons for inspection by
26 City's Project Representative.
27 6. Do not use lawns, �•ass plots or othee private property For storage purposes without
28 written permission of owner or other person in possession or contro( of pcemises.
29 7. Store in manufacturers' unopened containers.
30 8. Neatly, safely and compactly stack materials delivered and stored along line of
3( Work to avaid inconvenience and damage to property owners and general public
32 and maintain at least 3 feet fi•om fire hydrant.
33 9. Keep public and private driveways and street crossings open.
34 1Q. Repair or replace damaged lawns, sidewalks, streets or other improvements to
3.5 satisfaction of City's Project Representative.
36 a. Total length which materials may be distribuked alon�; rouke of construction at
37 one time is 1,000 linear• feet, unless otherwise approved in writin�; by City's
38 Project Representative.
CITY OP FOR'C WOR'fl I 4�uler and Srmitury Sewer Rep/cicen�ent Contrac! 20/4, WSM-D
STANDARDCONS'fftUC'1'lON SPECIF[CA'fION DOCUNtEN'I'S Cih+Projec�;Vn. 02385
{�evised July l, 201 t
Ot 5600-3
PRODUCT ST"URAGE AN[? HANDLfNG REQUfREMENTS
Puge 3 oF4
I L11 FIELD [S[TEj CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART 2- PRODUCTS [NOT USED]
4 PART 3 - EXECUTION
5
6
7
8
9
10
tl
12
13
l4
15
l6
t7
18
19
20
21
22
23
24
25
26
27
28
29
30
3.1 INSTALLERS [IYOT' LtSEDJ
3,2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USEDj
3.4 ERECTION [NOT USED]
3.5 REPAIR / RESTORATION [Nt3T USED]
3.6 RE-INSTALLATI�I�t [NOT USED)
3.7 FI�LD [oH] SITE QUALITY CONTROL,
A. Tests and Inspections
1. Inspect ali products or equipment delivered to the site prior to unloadin�.
B. Non-Conforming Work
I. Reject al) products or equipment that are damaged, used or in any other way
unsatisfactory for use on the project.
3.8 SYSTEM S'TAR1'UI' [IYOT USED}
3.9 ADJUSTING [NOT USED]
3.10 CLEAIVING (NOT USED]
3.11 CLOSEOUT ACTIVITIES [iVOT USEU]
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Protect equipment from exposuc•e to elements and keep thoroughly dry if required by
the manufacturer.
3.13 MA.INTEPIANCE [NOT USED�
3.14 ATTACHMENTS [NOT USED]
END OF SECTIOIY
Ct'I'7' OH 1-'OK'I' Wt�lZTH tY'ute�• arrct Sanilury 5`eiver Replacemei7t C<�irtrac•t 201 �f, Gi;S,bt-I_1
STi�NDARll CONS"I'RUCTIfJN SPEC:[FTC:1"CION DOC(1;�tEN"I'S City !'rq/ect Nu. 023�55
Revised July I, 201 I
oi ��,00-a
PRODUC"C STORACiE AND f IANI�I.INCi RE�iJIRCM�N�'S
Pnge 4 of F4
Revision Log
DATE NAME SUMMARY OF Cl-[ANGE
CITY OP FORT WORTH 6i�ater nnd Sanrlwy Sewer Replac•¢nrerrt C�ontract 20/d, GUS,i�1-[)
STANDARD CONS"I RUC"1'ION SPECIFICAl'lON UOCUMENTS Ciry Project No. 02385
Revised JuIV i, 201 (
01 70 00 - I
MC�t�[LI7.,A1'ION AND RGMODILJ7..ATION
PaK� I of4
2
3 PARTt- GENERAL
SECTION 01 70 00
MOF3ILIZAT[ON AND REMOBIL[ZATION
4 l.l SUMMARY
5 A. Section Includes:
6
7
8
9
lU
11
12
13
l�
IS
16
t7
18
t9
20
21
22
23
24
25
26
27
28
29
30
3t
32
33
34
35
36
37
38
39
40
41
42
43
44
45
l. Mobilization and Demobilization '
a. Mobilizatian
l) Transportation of Contractor's personnel, eq�upment, and operating supplies
to the Site
2) Establishment of necessary general facilities for the Contractor's operation
at the Site
3) Premiums paid for performance and payrnent bonds
4) Transportation of Contractor's personnel, equipment, and operating supplies
to another lacation within the designated Site
S) Ralocation of necessary general facilities for the Contractor's operation
fi�om 1 location to attother location on the Site.
b. Demobilization
1) Transpartation of Cantractor's personnel, equipment, and operating supplies
away from the Site including disassembly
2) Site Clean-up
3) Rernoval of all buildin�s and/or other facilities assembled at the Site for this
Contract
c. Ntobilization and Demohilization do not include activities for specific items of
work that are for which payment is provided elsewhere in the contract.
2. Remobilization
a. Remobilization for Suspension of Work specifically required in the Contract
Documents or as required by City includes:
1) Demobilization
a) Transportatian of Contractor's personnel, eyuipment, and operating
supplies from the Site including disassembly or temporarily sec��ring
equipment, supplies, and other Facilities as designated by the Contract
Documents necessaiy to suspend the Work.
b) Site Clean-up as designated in the Contract Documents
2) Remc�bilizakion
a) 'i'ransportation of Contractor's personnel, equipment, and operating
supplies to the Site necessary to resume the Work.
b} Establishment of necessary genera! facilities for the Contractor's
aperation at the Site necessary to resume the Work.
3) No Payments will be made for:
a) Mobilization and Demobilization fram one location to another on the
Site in the narmal pro�•ess of perf'orming the Work.
b) Stand-by or idle time
c) I.ost prot7ts
3. Mobilizations and Demobilization for Miscellaneous Projects
a. Mobilization and Demobilization
C("I`Y OF f�C�t2'1' W(�R"t'H Gffuter crird:ianitan� Soivzr /replr�c:errrent Cantr•nct 2Ol l, bi�SA�I-(7
S'fANDARll C{)NS"ClttiC7'lON SPECIF(C'A'I"fON DOCUMEN'I5 City Pruject ;Vu. �72365
Revised Dcccmbcr �4, 2012
oi �ooa-z
M(>F3tl.f7,ATION f�ND (<BMOCi1LIZA'CION
Page 2 of 4
t
2
3
4
5
6
7
8
9
10
11
12
13
14
IS
16
17
1$
1) Mobilization shall cansist of the activities and cost on a Work Order basis
necessary for:
a) Transportation of Contractoc's peisonnel, equipment, and operating
supplies to the Site for the issued Work Order.
b) Establishment of necessary general facilities for the Contf•actor's
aperation at the Site for the issued Work Order
2) Dernobilization shall consist of the activities and cost necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly for each issued Work
Order
b) Site Clean-up for each issued Work Order
c) Removal of all buildings or other facilities assembled at the Site For
each Work Oder
b. Mobilization and Demobilization do not include activities far specific items of
work for which payment is provided elsewhere in the contract.
4. Emergency Mobilizations and Demobilization for Misce(laneous Projects
a. A Mobilizakion for Misce(laneous Projects when directed by the C.ity and the
rnobilization occurs within 24 hours of the issuance of the Work Order.
19 B. Devi3tions from this City of Fort Worth Standard Specitication
20 1. None.
21 C. Related Specification Sections include, but are not necessarily limiked to:
22 1. Division 0— Bidding Requirements, Cont►•act Forms and Conditions of the Contract
23 2. Division 1— General Requirements
24 1.2 PRICE AND YAYMENT PROCEDURES
25 A. Measurement and Payment
26 1. Mobilization and Demobilization
27 a. Measure
28 l) This Item is considered subsidiary to the various ltems bid.
29 b. Payment
30 1) The work perfot•med and materials fiirnished in accordance with this Item
31 are subsidia�y to the various Items bid and no other cotnpensation will be
32 allowed.
33
34
35
36
37
38
39
40
41
a2
43
44
45
46
2. Remobilization f'or suspension of Work as specifically eequired in the Contract
Documents
a. Measi�rement
]) Measurement for this [te�n shall be per each remobilizakion performed.
b. Paymcnt
1) The work pei•formed and materials furnished in acc�rdance with this [tem
and measured as provided undcr "Measurement" will be paid for at the unit
price per each "Specified Remobilization" in accardance with Contract
Documents.
c. The price shall include:
(} Demobilization as described in Section 1.1.A.2,a.1)
2) Remobilization as described in Section (.i.A.2.a.2)
d. No payments wiil be made for standby, idle time, or lost protits associated this
[tem.
CI'I'Y OF FORT 4VC)RT! I li'cztcr nrir! Sanrlrny Setiver Kcp(acenuenl Cont�•�vct wU/�J, l3�SLI-D
5CANUA[tD C:ONSTRUCT((7N SPECIF[CA"I'ION DOCU�IFNTS Ciry Prc�ject Na, �?385
Rev;sed Decemt7er 2{l, 2012
01 70 00 - 3
h10E31LI"I.A"1'ION AND REMOBILI"I.A"fION
Page 3 oC4
t
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
I8
l9
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
3�
36
3
4.
Remobilization for suspension of Work as required by City
a. Measurement and Payment
1) This shall be submitted as a Contract Claim in accardance with Article 10
of Sectipn 00 72 00.
2) No payments will be made for standby, idle time, or (ost profits assuciated
with this Item,
Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this [tem shall be far each Mobilization and
Uemobilization required by the Contract Documents
b. Payment
t) The W�rk performed and materials furnished in accordance with this ftem
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Mobilization" in accordance with Contract
Documents. Demobilizati�n shali be considered subsidiary to mobilization
and shall not be paid for separatety.
c. The price shall include:
1) Mobilization as described in Section l.t.A.3.a.1)
2) Demobilization as described in Section t.I.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
(tem.
5. Emergency Mobilizations and Demobi(izations for Miscel(aneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Fayment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at khe unit
price per each "Work Order Emergency Mobilization" in accordance with
Contract Documents. Demobilization shal( be considered subsidiary to
m�biliration and shap not be paid for separately.
c. The price shall include
1) Mobilization as described in Section I.l.A.4.a)
2) Demobilization as described in Section I.l.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
37 1.3 REFERENCES [NOT USEll]
38 1.4 ADMINISTRATNE ItE�UIR.�MENTS [NOT USED]
39 1.5 SUBMITTALS [NC?T USEDJ
40 1.6 INFORMATIONAL SUBYIITTALS [NOT USEDj
41 1.7 CLOSEOUT SUBMITTALS [NOT USED)
42 1.8 MAINTENANCE 1VIATERIAL SUBMITTALS �NOT USED]
43 L9 QUALITY ASSURANCE [NOT USED�
44 1.10 DELIVERY, STORAGF, AND HANDLING [NOT USED]
CITYOF P�)RT WC)Rl'H tl4atarar�dSnnrraryScwer RcplacemenrCor�tracr20J�1, N;SiL1-I)
STAND��RD CQivSTRUCTfON SPGCIFICATION DOC[;M}sN"i'S C'itv Projec� No. P=3N5
Revised December 20, 2012
oi �000-<�
NiOH[I.IZA'CtUN AND REMUB[L[ZATION
Page 4 af4
1 1.11 FIELD [SITE] CONDTTIONS [NOT USEll]
2 1.12 WARRANTY (NOT USED]
3 PART 2- PRODUC'TS (NOT USEll]
4 PART 3- EXECUTION [NOT USEU]
5 END OF SGCTION
6
Revision Log
[�A"i'E NAME SUMMARY OF CHANGE
C(TY Of �OR"(' W C)[t'I'[i tGi7ter nrrd Sanitary Sewer Repincenie�rt Cnntr�uct 2FIt 4, WSM-!�
S'CANDARU CONS'1'KLtC'I'IOiV SPGC(CICA7'lON DOCU�i1GN'1'S Crry Prqject No. fl?3N5
Revis:d 17ecembcr20, 2012
017123-1
CONSTRUCTION S"CAKING AND SCiRVBY
Page i oi'4
I
2
3 PART1- GENERAL
SECTION 01 71 23
CONSTRUCT[ON STAKING AND SURVEY
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Requirements for construction staking and construction survey
7 B. Deviations from this City af Fort Worth Standard Specification
8 1. None.
9 C. Retated Specification Sectians inelude, but are not necessarity limited to:
10 I. Division 0— Bidding Requirements, Contract Forrns and Conditions of the Contract
1 l 2. Division 1— General Requirements
t2 1Z PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 i. Construction Staking
iS a. Measurement
l6 1) This [tem is considered subsidiary to the various Items bid.
t 7 b. Payment
18 1) The work performed and the materials furnished in accordance with this
19 Item are subsidiary to the various Items bid and no other compensation will
20 be allowed.
2l 2. Construction Survey
22 a. Measurement
23 I) This Item is considered subsidiary to the variaus Items bid.
24 b. Payment
25 1) The work performed and the materials Fiirnished in accordance with this
26 Item are subsidiary to the various Items bid and no other campensation will
27 be alfowed.
28 1.3 REFF,REPiCES [NOT USED]
29 1.4 ADMINISTRATIVF. REQUIREMENTS [NOT USED]
30 1.5 SUBMITTALS
31 A. Submittals, if required, shall be in accordance with Section Ol 33 00.
32 B. All submittals shall be approved by the City prior to delivery.
33 2.6 AC'T[ON SUBMITTALS/INFORMATIONAL SUBMITTALS
34 A. Certi�cates
35 1. Provide certificate certifying that elevations and locations of irnprovemants are in
36 conformance or non-conformance with requirements oF the Contract Documents.
37 a. Certificate must be sealed by a registered prafessional land surveyor in the
38 Stat�e of Texas.
CCTY C)F FORT WC)R"(�H 1Yater arrd Sanrtary 5emer Rep(acenrent Cnr�trac� 20ld, li!SiYt-D
STANL?ARU CONS"IRUC'i70N SFf�CIP[CATION DOClli4IiNTS Ci,ry ProjeG Nu 023J5
[tcvised Decemi�er2�, �Of2
01 71 23-2
CONS'CRIJCPfUN S'i'AKING AND tiURVF.Y
T'�gu 2 of4
B. Field Quality Control Submittals
2 1. Documentation verifying accuracy of tield engineering work.
3 1.7 CLOSEOUT SUBMITTALS �NOT USED�
4 1.8 MAINTF.NANCE MATERIAL SUBMITTALS [NOT USED]
5 1.9 QUALITY ASSCJRAIYCF
6 A. Canstruction Staking
7 l. Construction staking will be performed by the City.
8
9
10
ll
t2
13
14
IS
16
17
18
l9
20
21
22
23
24
25
26
?7
28
29
30
31
32
33
34
35
36
37
38
39
40
4l
42
43
44
4.5
2. Coordination
a. Contact City's Project Representative at (east 2 weeks in advance for
scheduling of Construction Staking.
b. [t is the Contractor's responsibility to coordinate staking such that construction
activities are not delayed or negatively impacted.
3. General
a. Contractor is responsible for preserving and maintaining stakes furnished by
City.
b. If in the opinion of the City, a sufficient number of stakes or martcings have
been lost, destroyed or disturbed, by Cantractor's neglect, such that the
cantracted Work cannot take place, then the Contractor will be required to pay
the City for new staking with a 25 per•cent markup. The cost for staking wilt be
deducted from the payment due to the Contractor for the Project.
B. Construction Survey
l. Construction Survey wil( be performed by the City.
�
3.
Coordination
a. Contractor to verify that control data established in the design survey remains
intact.
b. Coordinate with the City priar to field investigation to determine which
horizontal and vertical control data will be required for construction st�rvey.
a[t is the Contractor's responsibility to coordinate Construction Survey such that
coi�struction activities are not delayed or negative(y impacted.
d. Notify City if any control data needs to be restored or replaced due to damage
caused during construction operations.
I) City shall perform replacements and/or restorations.
General
a. Construction survey w'rll be performed in order to maintain complete and
accurate logs of control and survey work as it progresses for Project Records.
b. The Contractor will need to ensure coordination is maintained with the City to
perform construction siirvey to obtain canstruction features, inciuding but not
limited to the following:
1) All Utiliky Lines
a) Rim and flowline elevations and coordinates for each manho(e or
junction structure
2) Water Lines
a) Top of pipe elevations and coc�rdinates for waterlines at the following
locations:
(1) Every 250 (inear feet
CCCY OF P(7R'C WOR"I'ti GYa1er aitd Sur�itury Setver /Zep/vice�ncnt Gonlract l�ld, 4✓5Nl-(J
STA�NDARD i:ONSTRUC'1'ION SPECIFICATH�N PO('UMEiV'PS CiN Project,No. 023<SS
Revised Oecember 2U, 2U 12
01 71 23 - 3
CONSTRUCTION STAKING AND SURVEY
Page 3 oE'4
i
2
3
4
5
6
7
8
9
10
11
12
(3
14
IS
16
l7
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
4l
42
43
44
45
46
47
48
.
F�
(2) 1[orizontal and vertical points of inflection, curvature, ekc. (All
F i ttings)
(3) Cathodic protection test stations
(4) Sa►npling stations
(S) Metcr boxeslvauits (All sizes)
(6) Pire lines
(7) Fire hydrants
(8) Gate valves
(9) Plugs, stubouts, dead-end lines
(10} Air Release valves (Manhole rim and vent pipe)
(1 1) Blow off valves (Manhole rim and valve lid)
(12) Pressure plane valves
(13) Cleaning wyes
(14) Casing pipe {each end)
b) Storm Sewer
(1} Top of pipe elevations and coordinates at the following locatians:
(a) Fvery 250 (inear feet
(b) Horizontal and vertical points of inflection, curvature, etc.
c) Sanitary Sewer
(1) 'I'op of pipe etevatians and coordinates for sanitary sewer lines at
the fallowing lacations:
(a) Every 250 linear teet
(b) Horizontal and vertical points of 'rnflection, curvature, etc.
(c) Cleanouts
Construction survey will be performed in order ta maintain complete and
accurate logs of cantrot and survey work associated with meeting or exceeding
the line and �ade required by these Specifications.
'I'he Contractor will need to ensure coardination is maintained with the City to
perform construction survey and to verify contro( data, including but not
limited to the fallowing:
1) Established benchmarks and contral points provided for tlle Contractor's
use are accurate
2) Benchmarks were usect to furnish and maintain all reference lines and
grades For tunneling
3) Lines and grades were used to establish the (ocation of the pipe
4) Submit to the City copies of field notes used to establish all lines and
grades and allow the City to check guidance system setup prior to
beginning each tunneling drive.
5) Provide access for the City to verify the guidance systern and the line and
grade of the cal�rier pipe on a daily basis.
6) 7'he Contractor remains fully responsible for the accuracy of the work and
the correction of it, as required.
7) Monitor (ine and grade continuously during constructioil.
8) Record deviation with respect to design line and grade once at each pipe
joint and submit daity records to City.
9} If the installation does not meet the specified talerances, immediately notify
the City and correct the instatlation in accordance with the Contract
Documents.
49 110 DGLIVERY, STORAGE, AI�TD HANDLINC [NOT USED]
CITY(�F FORT WORTFf K�aterandSani[arySeiverReplac�euienlContract,?D(4, :f:SiYf-D
STANDr1RD CONSTRUCTION SPECI�IC,1"1'It�N iJOCUMEN'I'S City P�'�ject No. 01385
Rev:sed December �t?, 2G12
01 71 23 -4
C1�NS'I'RUC'1'ION Sl'AK1NG AND SURVF;Y
Pngc d ui4
I 1.11 F[ELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRAfYTY [NOT US�D�
3 PART 2- PRODUCTS [NOT US�D)
4 PART 3 - EXECUTION
5
6
7
8
9
t0
1!
12
13
i4
l5
16
17
18
l9
20
2t
�Z
23
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATIOIY [NOT USED�
3.3 PREPARATION [NOT USED)
3.4 APPLICATION
3.5 REPAIR / RESTORATION [NOT USED�
3.6 RE-INSTALLATIOI�t [NOT tISFDj
3.7 FIELD [oRj SITE QUALiTY CONTROL
A. It is the Contractor's responsibility to maintain a(1 stakes and control data placed by the
City in accordance with this Specification.
B. Do not change or relocate stakes or control data without approval from the City.
3.8 SYSTEM STARTUP [NnT USED]
3.9 ADJUSTING [NOT USED�
3.10 CLEANING [NOT USED]
311 CLOSEOUT ACTNITIES [NOT US�D]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANC� (NOT USEDJ
3.t4 ATTACHMENTS [NOT USED�
k;NU OE' SECTIOIY
Revision Log
DA`I'E N,4MF. SUNIMARY OF CNANGE
R/31/2012 D. Johnson
24
Cl1'Y OE FOR1' 4VUIt'['k{ {i�atar unclSunitary Seiver lteplaceu:eru C'vntraer 2014, 4YS,bf-l�
S'I'tINDARU CONS'IRUCCION tiPGC(f�(CA"1'ION DOCI!MF,N"I'S Ciry Project No. U?3X5
Revisect 17c�:ernber 2U, 20 f 2
01 74 23 - 1
Cf:F,ANfNG
Page l of4
�
2
3 PART 1 - GENERAL
sECT�orr ol �� z3
CLEANING
4 1.1 SUMMARY
5 A. Section Includes:
6 l. [nte��mediate and tinal cleaning for Work not including special cleaning of closed
7 systems specified elsewhere
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. None.
10 C. Related Specification Sections include, but are not necessarily (imited to;
11 1. Division 0— Bidding Requirements, Contract Forms and Conditions of'the Contract
12 2. Division 1— General Requirements
13 3. Section 32 92 13 — Hydro-Mulching, Seeding and Sodding
t4 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1. Wark assaciated with this Item is considered subsidiary to the various Items bid.
l7 No separate payment will be allowed for this Item.
l8 1.3 REFERENCES [NOT USEDj
19 1.4 ADMIIYISTRATIVE REQUIREMENTS
20 A. Scheduling
21 I. Schedule cleaning operations so that dust and other contaminants disturbed by
22 cleaning process will nat fall on newly painted surFaces.
23 2. Schedule final cleaning upon completion of Work and immediately prior to Fnal
24 inspection.
25 1.5 SUBMITTALS [NOT USED]
26 1.6 ACTION SUBMITTALS/INFORMATIOIVAL SUBMITTALS (NOT USED]
27 1.'1 CLnSEOUT SUBMITTALS [N(?T USFD]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NO'T USF.DJ
29 1.9 QUALI'['Y ASSURANCE [NOT USED]
30 1.10 STORAGE, AND HANDLING
31 A. Storage and Handling Requirements
32 l. Store cleaning products and cleaning wastes in containers specificaily designed for
33 those materials.
CITY OF ['C)R"1' WC)it"t"f 1 IG'uter� and S�uiitmy Se.ver Replucement Cartract ?0/4, 4{�Sr41-D
S"CANDARD CONS"TRUC'I[ON SP[CIFIC:�TION DOCU?vt6�NCS CitvYrajnot No. �?385
Revised Ju(y 1, 20l I
O17423-2
CLEANING
Pa�e 2 of4
t 1.11 FIELD [SITE] CONDITfONS [NOT USED)
2 1.12 WARRANTY [NOT US�D]
3 PART 2 - PRODUCTS
4 2.1 OWN�R-�[TRNISHED [oe] OWNF.R-SUPPLIEDPRODUCTS [NOT USED]
5 2.2 MATERIALS
6 A. Cleaning Agents
7 l. Compatible with surface being cleaned
8 2. New and uncontaminated
9 3. For manuf'actured surfaces
I O a. Material recommended by manufactui•er
11 2.3 ACCESSOR[�S [NOT USEDI
12 2.4 SOURC� QUALITY CONTROL [NOT USEDJ
13 PART 3 - EXECUTION
14 3.1 INSTALLERS [NOT USED)
I S 3.2 EXAMINATION jNOT USED]
IG 3.3 PRF,PAI2ATION [NOT USEnJ
17 3.4 APPLICATION [NOT USED)
18 3.5 REPAIR / RF.STORATION [NOT USED]
t9 3.6 RF,-INSTALLATION [NOT USED]
20 3.7 FIELD (oa] SITE QUALI'TY CONTROL [1YOT USED�
21 3.8 SYSTEM 5TARTUP [NOT USED]
22 3,9 ADJUSTING [NUT US�D)
23 3.10 CLEANIN(G
24 A. General
25 1. Prevent accumulation of wastes that ct•eate hazardous conditions.
26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of
27 govez-ning aathorities.
28 3. Do not dispose of vo(atile wastes such as mineral spirits, oil or paint thinner in
29 storm or sanitary drains or sewers.
3U 4. Dispose of degradable debris at an approved solid waste disposal site.
31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
32 alternate manner approved by City and regulatory agencies.
C;1'CY UF PORT W(7RTEf 144rter nrid Sanrtnry Se}ver /ieptacenrent CO)lh'Gc( ZOI�J, 6i;SA4-1J
S'I'.�NI")ARI) CONSTRUCT[ON SPECIFICA"1'ION t)OCUY1ffN'I'S Crry Project 1Vo, �23d5'
Revised July I, 20I 1
o�-razs-3
CL6ANING
t'age 3 of4
t
2
3
4
5
6
7
8
9
t0
It
(2
t3
14
15
ib
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
�t t
42
b. Handle materials in a controlled manner with as few handlings as possible.
7. Thorough(y c(ean, sweep, wash and polish all Work and equipment associated with
this project.
8. Remove all signs of temporary construction and activities incidental to construction
of required permanent Work.
9. If project is not cieaned to the satisfaction of the City, the City reserves the right to
have the c(eaning comp(eted at the expense of the Contractor.
10. Do not burn on-site.
B. Intermediate Cleaning durin�; Construction
1. Keep Work areas clean so as not to hinder health, safety or convenience of
persannel in existing facility operations.
2. At maximum weekly intervals, dispose of waste materiats, debris and rubbish.
3. Confine construction debris dai(y in strategically [ocated container(s):
a. Cover to prevent blowing by wind
b. Store debris away from construction or operational activities
c. I Iauf from site at a minimum of once per week
4. Vacuum clean interior areas when ready to receive finish painting.
a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance.
5. Prior to storm events, thoroughty clean site of ali loase or unsecured items, which
may become airborne or transported by flowing water during the storm.
C. Interior Final Cleaning
1. Rernove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other
foreign materials from sight-exposed surfaces.
2. Wipe all [ighting fixture reflectors, lenses, iamps and trims clean.
3. Wash and shine glazing and mirrors.
4. Polish glossy surfaces to a clear shine.
5. Ventilating systems
a. Clean permanent filters and rep(ace disp�sable filters if units were operated
during construction.
b. Clean ducts, blowers and coils if units were ope►�ated without filters during
construction.
b. Replace all burned out lamps.
7. Broom ciean process area f7oors.
8. Mop o�ce and controt room floors.
D. Exterior (Site or Ri�ht of Way) Final Cleaning
1. Remove trash and debris containers from site,
a. Re-seed areas disturbed by location of trash and debris containers in accor•dance
with Section 32 92 13.
2. Swcep roadway to remove all rocks, pieces of asphalt, concrete or any other object
that may hinder or disrupt the flaw of traffic along the roadway.
3. Clean any interior areas including, but not limitec3 ta, vaults, manho(es, structures,
junction boxes and inlets.
C["fY OF FOR"I WORT'H GYater nnd Sanitnn� Seivei• Replacernent Conlrucl2(JI d, i3�Sh4-1�
STAND:IRD CC?NSTRUCT(ON SPF.'C(t�ICA"P[ON DOCtJMEN'1'S Crry Project r4o. f�2385
Revised Julv I. 201 1
01 74 2.3 - 4
CLEANING
Puge 4 of 4
1 4. If no longer required for maintenance of erosion facilities, and upon approva] by
2 City, remove erosion control from site.
3 5. Clean signs, (ights, signa(s, etc.
4 3.11 CLOSEOUT ACTIVITIL+'S [NO'I' USED]
5 3.12 PROTECTION [NOT USED]
6 3.13 MAIN'TENANCE [IYOT USED]
7 3.14 ATTACHMENTS [NOT USED]
8
9
CND OF SECTION
Revision Log
DATE PvA�tE SUMMARY QF CHANGE
io
1
Ctl'`1 OE E�ORT WC)R'Ct [ Wa1vr rand Scirri(ary Se�ver Replacement C'ontracf 201 d, }�SA�f-D
S'1'ANDARU CC>NS'CRUC'1'[ON SPGC;IPICATfON DOCUMF'N'1'S Citp Prnject No. �23N5
Revised July I, 201 1
U17714-1
CLOSGOUT RCiQIJTREMEN'CS
Page i ol'3
I
�
3 PART1- GENERAL
S�CTION 0177 t9
CL,OSEOUT REQUIREMENTS
4 1.1 SUMMARY
5 A. Section Includes:
6 1. The procedure for closing out a contract
7 B. Deviations from this City of Fort Worth Standard Specification
8 I . None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1— General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measut•ement and Payment
14 l. Work associated with this [tem is considered subsidiary to the various Items bid.
IS No separate payment wili be allowed for this Item.
lb 1.3 REFERENCES (NOT U5ED]
l7 1.4 ADMINISTRATNE REQUIREMENTS
l8 A. Guarantees, Bonds and Affidavits
19 1. No application for final payment will be accepted until all guarantees, bonds,
20 certificates, licenses and affidavits required for Work or equipment as specified are
21 satisfactorily filed with the City.
22 B. Re(ease of Liens or Claims
23 1. No application for final payment will be accepted until satisfactory evidence of
24 release of liens has been submitted to the City.
25 1.5 SUBMITTALS
26 A. Submit all required documentation to City's Project Representative.
CITY OP POR'I' W()RTFI 6Ynter and,Sanirnry Seivc.r R<�ptacement Cauract 'UI !, t6:SM-D
STAi�CDAKD CONSTRUCTION SP6CIF[C�i'1'(ON DOCUMEN'1'S Ciry Yrojeet No. (J23&S
Revised Jtdy I, 261 I
QI 77 19-2
C(.(:)SF:QU`l' RLQUlRGMEN'I'S
Page 2 0l'3
t 1.6 INFORMATI0IVAL SUBMITTALS [NOT USF.D)
2 1.7 CL�SEOUT SUBMITTALS [NOT USED]
3 PART 2- PRODUCTS [NC?T USED]
4 PART 3 - EXECUTION
5 3.1 INSTALLERS [NO'C USEll]
6 3.2 EXAMINATIOIY [NOT USED]
7
8
3.3 PREPARATI0IV [NOT USEDI
3.4 CLOSEOUT PROCEDURE
9 A. Prior to requesting Finat [nspection, submit:
]0 1. Project Record Documents in accordance with Sectior� U1 78 39
i I 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23
12 B. Prior to requesting Final Inspection, perform finai cleaning in accordance with Section
13 O1 74 23.
14 C. Finallnspection
15 1. After final cleaning, provide notice to the City f'roject Representative that the Work
16 is completed.
17 a. The City wiil make an initial Final Inspection with the Contractor present.
18 b, Upon completion of this inspection, the City wil) notify the Contractor, in
19 writing within 10 business days, of any particulars in which this inspectian
20 reveals that the Work is defective or incomplete.
2l 2. [Ipon receiving written notice from the City, immediately undertake the Wor[c
22 required to remedy deficiencies and complete the Work to the satisfaction of the
23 City.
24 3. Upon completion of Work associated with the items listed in the City's written
25 notice, inform the City, that the required Wark has been completed. Upon receipt
26 of this notice, the City, in the pceseace of the Contractor, will make a subsequent
27 Final [nspection of the project.
28 4. Provide all special accessories required to place each 'rtem of equipment in full
�9 operation, These special accessoty items include, but are not limited to:
30 a. Specified spare parts
31 b. Adequate oil and grease as required for the tirst lubrication of the equipment
32 a Initial f`ill up of all chemical tanks and fuel tanks
33 d. Light bulbs '
34 e. Fuses
3S f. Vault keys
36 g. Handwheels
37 h. (ather expendable items as required for initial start-up and operation of ail
38 equipment
39 D. Notice of Project Completion
C(TY OF FOR'f Wt:)K'CI [ GYaler und Sui+itc�ry,5'etin�r krrplucreirten! Contract 20/4, {4/S�L1-D
ST'AN DAItD CC)N S'CRUC7'[ON SYF,C'I �ICA"CION [�OGUMGNTS C'rt�� Yrajec� Nn, 02385
RcviseJ July 1, 2U11
1
2
3
4
5
b
7
8
9
10
ll
12
13
14
t5
16
t7
l8
I9
20
21
22
23
24
25
26
27
28
01 77 19 - 3
CLOSEOUT REQUIREMEN'C'S
Page 3 of 3
l. Once the City Project Representative finds the Work subsequent to Fina( Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Reprasentative to complete the fot(owing
additiona( forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Retease of Liens
d. Consent of Surety ta Final Payment
e. Pipe Report (if required)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
I. Upon review and acceptance of Notice of Project Compietion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATIOIY (tYOT USED�
3.6 RE-INSTALLATION [NOT USED)
3.7 F'IELD (oR] SITE QUALITY CONTROL (NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTIiYG [NOT USED]
3.10 CLF.ANING [NOT USEDJ
3.11 CI.OSE�UT ACTNITIF.S [NOT USED]
3.12 PROTECTION [NC)T USED]
3.13 MAINTEPIANCE [N�T USEDJ
3.14 ATTACHM�NTS [IYOT USED]
END OF SECTION
Revision Log
D,�'FF_. NAME SUM�IAitY OF CHANGE
�g
CITY OF FOR't' WORTFi YYa1ar and Sanrtary Seiver tteplacernent Con[ract <0! l, GYSA� n
S"I'ANDARD CONSTRUC"CIUN 1VECIFICA"I'tON DOCU�bTF.N"CS Ciry Pr�Ject No. 02385
Revised Juiy I, 201 f
01782:3-I
()Pk:RA7'tC7N ANL) ivtAlN'1'ENAIVCE UATA
Page t of 5
�
3 PART 1 - GENEI2AL
SECTION Ot 78 23
OPERATION AND MAINTENANCE DATA
4 1.1 SUMMARY
5 A. Section Includes: '
6 1. Product data and related information appropriate for City's maintenance and
7 operation of products furnished under Contract
8 2. Such products may inc(ude, but are not limited to:
9 a. Traffic Controllers
10 b. Irrigation Controllers (to be operated by the City)
t i c. Butterfly Valves
12 B. Deviations from this City of Fort Worth Standard Specification
13 l. None.
l�t C. Related Specification Sections include, but are not necessarily limited to:
t5 1. Division 0— Bidding Requirements, Contract Farms and Conditions of the Contract
16 2. Division 1— General Requirements
17 1.2 PRICE AND PAYMENT PROCElltJRF.S
18 A. Measurement and Payment
19 1. Wo►•k associated with this Item is considered subsidiary to the various Items bid.
20 No separate payment wi11 be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMGNTS
23 A. Schedule
24 l. Submit manuals in final farm to the City within 30 calendar days of praduct
25 shipment to the project site.
26 1.5 SUBMITTALS
27 A. Submittals shall be in accordance with Section Ol 33 00 . All submittals shall be
28 approved by the City prior to delivery.
29 1.6 INFORMATIONAL SUBMITTALS
30 A. Submittal Form
3 I 1. Prepare data in forrn of an instructional manuat for use by City personnel.
32 2. Format
33 a. Size: 8'/2 inches x 11 inches
34 b. Paper
35 1) 40 pound minimum, white, for typed pa�es
36 2) Holes reinforced with plastic, cloth or rnetal
37 c. 1'e:ct: Manufacturer's printed data, or neatly typewritten
Cl"1'Y Ol FURT 4VORTH liQiter nnd.Sanr[ur}r,Setirer Replucernen! Cnnh•trct 2014, WS,4!-D
S'I'ANDARD CONSTRUCTICII�! SPF,CIP'[CATION DOCUMI;N'I'S C!!y Yro/ir,t,Nn. 02.iH5
Revised neccitrbcr 20, 2012
01 78 23 - 2
OPERATION AND MA[NTENANCE DA"fA
Page 2 of S
i d. Drawings
2 1) Provide reinf'orced punched binder tab, bind in with text
3 2) Reduce Iarger dcawings and fold to size of text pages.
4 e. Provide fly-leaf for each separate product, or each piece of operating
5 equipment.
6 l) Provide typed description of product, and major component parts of
7 equipment.
8 2) Provide indexed tabs.
9 £ Cover
10 ]) Cdentify each volume with typed or printed title "OPERATING AND
1 l MAlNTENANCE INSTRUCTIONS".
12 2) List:
l3 a) Title of t'roject
14 b) [dentity of separate structure as applicable
(5 c) fdentity of general subject matter covered in the manual
t6 3. Binders
l7 a. Commercial quality 3-ri��g binders witE� durabie and cleanable pfastic covers
18 b. When multiple binders are used, correlate the data into related consistent
19 groupings.
20
�
4. [f available, provide an electronic form af the O&M Manua[.
B. Manual Content
22 1. Neatly typewritten table of contents for each volume, arranged in systematic order
23 a. Contractor, name of responsible principal, address and telephone numbei•
24 b. A list of each product required to be inctuded, indexed to cantent of the volume
25 c. List, with each product:
26 1) The name, address and telephone number of the subcont►•actor or installer
27 2) A list of each product required to be included, indexed to content of the
28 volume
29 3) [dentify area of responsibility of each
30 4) Local source of supply for parts and replacement
31 d. Identify each product by product name and other identifying symbo(s as set
32 focth in Contract Documents.
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
2. Product Data
a. Inciude only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identrfy data applicable to installation
3) Delete references to inapplicabte information
3. Drawings
a. Supplement product data with drawings as necessary to clear(y i(lustrate:
1) Relations of component parks of equipment and systems
2) Control and flow diagrams
b. Coordinate drawings with information in Project Record Documents to assure
correct illustration of completed installation.
c. Do not use Project Record Grawings as maintenance drawitigs.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent format under separate headings for dit�'erent procedures.
b. Provide logical sequence of instructions of each procedure.
(;1'fY C)F FORT Vd(�R"CH P✓c�ter arid SUrri�ary Se�ver Rep(auenrenl <;orstract 20f 4, WSM-U
STANDAR[) Cl)NSTR(iC'I'1(7N SPt;CIP'[CA't'Iflid DC)CUMT'sTvTS Citv ('ro/ect Aio. D23$5
Revised D¢cember 20. 2Q 12 �
01 7R �3 - 3
OPFi(L}i`CION ANL) i�tAINTENr�NCE DAT:1
Paoe3 0!"5
1 5. Copy of each war•ranty, bond and service contract issued
2 a. Provide information sheet for City personnel giving:
3 1) Propei• procedures in event of failure
4 2) Instancas which might affect validity of warranties or bonds
5 C. Manual for Materials and Finishes
6 l. Submit 5 capies of complete manual in final form.
7 2. Content, for architectural products, applied materiais and finishes:
8 a. Manufacturer's data, giving full informatian on products
4 i) Catalog number, size, composition
t0 2) Color and texture designations
11 3) Information required for reordering special manufactured products
12 b. Instructior�s for care and maintenance
13 1) Manufacturer's recommendation for types of cleaning agents and methods
14 2) Calations against cleaning agents and methods which are detrimental to
15 product
l6 3) Recommended schedule far, cleaning and maintenance
17 3. Content, For moisture protection and weather exposure products:
IS a. Manufacturer's data, giving full information on products
19 1} Applicable standards
20 2} Chemical c�mposition
21 3) Details of instaltation
22 b. Instructions for inspection, maintenance and repair
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in finat form.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and companent parts
I) Function, normal operating characteristies and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Opeeating procedures
1} Start-up, break-in, routiae and normal operating inst��uctions
2) Regulation, control, stopping, shut-down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjustin� and checking
d. Servicing and (ubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence �f operation by control manufacturer
t) Predicted (ife of'parts subject t� wear
2) [tems recommended to be stacked as spare parts
g. As installed control diagrams by controls manuFacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CC['Y OP �l�R"I' WORTtI Wir�er a��d Sar�rfa�y Se,ver Re��lncefneut Cnntr�rc( ZfJ!?, {i:S,v1-D
STrltti`DARD CONS"I'[Zl1C"I'IQ[Y SE'G(:'(PfC:AT10t+I DOCUMENCS Cily Frn�ect No. 02385
Revised December 20, 2Q I?
017H2:3-4
OFERA"CtON AND MA[N7ENANC'.E pA'I�A
Pnge 4 of 5
t
2
3
4
5
6
7
8
9
t0
((
12
l3
14
15
16
17
!8
[9
20
21
22
23
24
25
26
27
28
29
i. Charts oF valve tag numbers, with (ocation and funckion of each valve
j. List of original manufacturer's spare pa�•ts, manufacturer's current prices, and
recommended quantities to be maintained in storage
k, Other data as required under pertinent Sections of Specifications
3. Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1} Punction, normal operating characteristics, and lim'rting conditions
2} Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit c#irectot�ies of panelboards
1) Etectrical service
2) Controls
3) Communications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassem6ly
4) Adjustment and checking
f. Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
4. Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
3U 1.7 CLOSEOUT SUBMITTALS [1VOT USED�
3 t 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USEDj
32 1.9 QUALITY ASSURANCF.
33 A. Provide operation and maintenance data by personnel with the following criteria:
34 1. Trained and experiet7ced in maintenance and operation of described products
35 2. Skilled as technical writer to the extent required to communicate �ssential data
36 3. Skilled as draftsman competent to prepare required drawings
CITYt�f fORT WOIt'C�i 11�atern�u�iSanrlurySeiverRep/ncerne�rfCarHrar.�201�1, 61:S�L1-�
S'I'ANDARn CONS'f(tUC"I'ION SP�CIPIG\TION DOCUMENTS Citv Yrnject No. 03385
Revised Dec;e.mhcr 2�), '7,(112
t); 7u23-5
OPF,I2A1'lON AND ;�tA[N"I'GNANCE Dnl'A
Page 5 of �
l 1.1Q DELIVERY, STORAGE, AND HANDLING (NOT USED]
2 1.11 FIELD [SI'TE] CONDITIONS [NOT USED]
3 1.12 WARRA,NTY [NOT USED]
4 PART 2- PRODUCTS [NOT USED]
5 PART 3- EXECUTION [NOT USEDj
6 END OF SECTION
7
Revision Log
DATE NAME SUMMARY OF CHANGE
8(31/20t2 D. Johnson 1.S.A.1 title ofsection removed
8
C:ITY OP EORT 1�Ot2'1'It YPater nnd Snnitary Sesver Repla�erner:i C'ontract �01;, 6S'SM-D
STANIIARD CONS"CKUC7'ION SPECIFICA�C1bN I�OCUMF,NTS Ciry Proj�ct Nn. 0'1,38.5
fieviseci Decemher 2f), 20 t 2
O1 7839- i
PRQ3FCT RF.CORD DOCUi43BNTS
Pagc 1 oF4
1
2
3 PART1- GENERAL
�;
5
6
7
8
9
]0
ll
12
13
14
15
l6
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
SECTION 0178 34
PROJECT RECORD DOCUMENTS
1.1 SUMMARY
A. Section Includes:
l. Work associated with the documenting the project and recording changes to project
documents, including:
a. Record Drawings
b. Water Meter Sei•vice Keports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
l. None.
C. Related Specification Sections include, but are not necessarily limited to:
l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this [tem is considered subsidiary to the various Items bid.
No separate payrnent �vill be allowed far this Item.
1.3 REFERENCES [NOT USEllJ
2.4 ADMINISTRATIVE REQUIREMENTS (NOT USEll]
1.5 SUBMITTALS
A. Prior to submitting a request for Final Inspecti�n, deliver Project Record Documents to
City's Project Representative.
1.6 ACTION SUBMITTALS/INFORYIATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEt?UT SUBMITTALS [NOT USED�
1.8 MAINTENAIVCE MATERIAL SUBMITTALS (NOT USED]
1.9 QUALITY ASSURANC�
A. Accuracy of Records
1. Thoroughly coordinate changes within the Record Dacuments, making adequate
and proper entries on each pa�;e of Specifications and each sheet of Drawings and
other pocuments where such entry is required to show the change properly.
2. Accuracy of records shall be sl�ch that future search for items shown in the Contract
Documents rnay reiy reasonably on information obtained from the approved Project
Record Documents.
CtTY OP �OKT LVORTH {Yater atrd Sanrtay Sewer Itep(ucemen! Cuntract 2U1�J, IVS�IQ-U
STA[VUARD CUNSTRUCTION SPECIFIC:'1T1ON DO(;UivtBNTS City I'rr�ject No, (72395
ilCVl!:Ct�.Itl�J �,?�� �
1
2
3
4
5
6
7
S
9
10
tl
12
13
l4
15
16
�t 7839-2
PROJI'CT RGI.ORD �OCUMEN'('S
Page 2 of'4
3. To facilitate accuracy of records, make entries within 24 hours after receipt of
information that the chan�e has occurred.
4. Provide factual information regarding all aspects of the Work, both concealed and
visible, to enabte future modification of the Work to proceed without lengthy and
expensive site measurement, investigation and examination.
1.10 STORAGE AND flANDLING
A. Storage and Handling Requirements
1. Maintain the job set ok Record Documents completely protected from deterioration
and from loss and damage until completion of the Work and transfer of all recorded
data to the tinal Project Record Documents.
Z. In the event of loss of recorded data, use means necessary to again secure the data
to the City's approval.
a. In such case, provide replacements to the standards originally required by the
Contract Documents.
1.11 FICLD [SITEj CONDITIt�NS [NOT USEDJ
1.12 WARRANTY [I�iOT USF,D�
17 PART 2 - PRODUCTS
t8 2.1 OWNER-FURNISHED (ors] OWNCR-SUPPLIED PRODUCTS [NOT US�D]
(9
20
2t
?2
23
24
25
26
27
2.2 RECORD DOCUMENTS
A. 1ob set
1. Pramptly fallowing receipt of`the Notice to Proceed, secure from the City, at no
charge to the Contractor, 1 complete set of all Documents comprising the Contract.
B. Final Record Uocuments
1. At a time nearing the completion of the Work and prio�• to Final Inspection, p�•ovide
the City l complete set of all Final Record Drawings in the Contract.
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USEDj
28 PART 3 - EXECUTION
29 3.1 INSTALLERS [NOT USEDj
30 3.2 EXAMINAT10P1 jNOT USED�
31
32
33
34
35
3.3 PREPARATIOIY [NOT USED]
3.4 MAINTENANCE DOCUMENTS
A. Maintenance of Job Set
I. Immediately upon receipt of the job set, identify each of the D�cuments with the
title, "R�C,ORD DOCUMFNTS - JOB SET".
C[TY O[� E�OR'f WUftTFE GVat¢r a+td Sanil�n7�,Sewer Replucurrrend Co�tlrc�ct 2014, {YSd4-U
STAN[}ARD C;ONSTRl1CTIqN SPGCIPlCAT[(?N Dt�CIlLiF.N'1'S Crry Prqjsc�trVo. D23�45
(2evised July l, 201 I
01 7839-3
P[tOJ6C"1' R6'CO[ZD DC)CUM�;AITS
Page 3 oi d
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable methad for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for revie4v
by the City, until start of transfer oFdata to final Project Record Docu►nents.
c. Maintain the job set at the site of work.
9
10
I1
12
13
14
l5
16
17
18
19
20
3. Coordination with Construction Survey
a. At a minimum, in accordance with the intervals set forth in Section Ol 71 23,
clear(y mark any deviations from Contract Documents associated with
installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations fi•om Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil}, clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a"claud" drawn around the area or areas affected.
e. tn the event of overlapping changes, use different colors #or the �vet•lapping
changes.
21 5. Conversion of schematic layouts
22 a. In some cases on the Urawings, arrangements of conduits, circuits, piping,
23 ducts, and simi[ar items, are shown schematically and are not intended to
24 portray precise physical layout.
25 1) Final physical arrangement is determined by the Contractor, subject to the
26 City's approval.
27 2) However, design of future moditications of tlle facility may require
28 accurate inFormation as to the final physical layout of items which are
29 shown only schematically on the Drawings.
3U b. Show on the job set of Record Drawings, by dimension accurate to within 1
3I inch, the centerline of each run of items.
32 1) Final physical arrangement is determined by the Contractor, subject to the
33 City's approval.
34 2) Show, by symbol ar note, the vertica) location of the [tem ("under slab", "in
35 ceiling ptenum", "exposed", and the like).
36 3) Make all identification suf�7ciently descriptive that it may be related
37 reliabiy to the Speeifications.
38 c. The City may waive the requirements for conversion of schematic layouts
39 where, in the City's judgment, conversion serves no useful purpase. However,
40 do not rely upan waivers being issued except as specifically issued in writing
41 by thc City.
42 B. Final Project Record Documents
43 t. Transfer of data to Drawin�s
44 a. Carefiilly transfer change data shown on the job set of Record Drawings to tlle
45 c�rresponding final documents, coordinating the changes as required.
46 b. Clearly indicate at each affected detail and other Urawing a fufl description of
47 changes made during construction, and the actual locatian of items.
Cf"CY UF F{1R1' WC)K"1; H Water and Sanitmy Sewer keplucement CaTtrac! Z111 J, 6VSM-U
S'I'.4NDARD CONS"t'RCIC1'10N 5PECC['CCa,TIQN DOCL;MFNTS Ciry t'r�je�1 Nr1. U2,i85
Revised July l, 20t f
01 78 39 - 4
PROJCCT RGCORD DOCUMENTS
Page 4 of 4
1
2
3
4
5
6
7
8
9
10
11
l2
13
14
c. Call attention to each entry by drawing a"cloud" around the area oi• areas
affected.
d. Make changes neatly, consistently and with the proper media to assure
(ongevity and clear reproduction.
2. Transfer of data to other pocuments
a. If the Docaments, other than Drawings, have been kept clean during progress of
the Woek, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Urawin�;s, will be accepted as final
Record Documents.
b. [f any such Dc�cument is not so approved by the City, seeure a new copy of that
Document from the City at the City's usual charge for reproduction and
handlin�;, and ca�•efully transfer the change data to the new copy to the approval
of the City.
3.5 R�PAIR / RESTORATION [NOT USrD�
15 3.6 RE-INSTALLATCOIY (NOT USEDJ
16 3.7 FIELD (oR] SITE QUA[.ITY CONTROL [NOT USED]
17 3.8 SYSTEM STARTUP [NOT USGD]
18
19
20
21
22
23
24
25
3.9 AD,IUSTING (NOT USED)
3.10 CLEANING (NOT USED�
3.11 CLOSEOUT ACTIVITIES [NOT US�D]
3.12 PKOTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END Or SECTION
Revision Log
DA"I'E NAN1E SUMMARY OF CHANGE
26
Cf1'Y OF FORT WOft"PN 1Vater artd Sartllary Sewer /teplacw�nvnt Co�r(rcrct 201 �1, 6VS�LI-D
S'I'r1NDA1tU Ct7NS'CRCI(;'I'ION SPF,CI FICA'I'ION nOCI!MCNTS Ciry Yroject No. 023H5
Revisud Julv �, 201 I
y9 99 00
Ternporary Asphalt Sidewaiks, C)riveways, and Burrier �ree Ramps
Yage l oE'S
1
�
SFCTION 99 99 00
TEMPORARY ASPHALT SIDEWAGKS, DRIVEWAYS AND BARRIER FREE RAMPS
3 PART2- GENERAL
4 1.1 SUMMARY
S A. Section Includes:
6 L Temporary Asphalt sidewalks
7 2. Temporary Asphalt Driveways
8 3. Temporary Asphalt Barrier free ramps
9 B. Deviations from this City of Fort Warth Standard Specification
t0 1. Placement of temporary aspha(t sidewalks, driveways and barrier free ramps for
! t utility construckion prior to street, curb and gutter, sidewalk and driveway
t2 reconstruction. Materials and construction means and methods shall be per Section
l3 32 12 16 Asphalt Paving.
l4
1�
16
17
l8
19 1.2
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
C. Related Specification Sections inchtde, but are not necessa��ily limited to:
1. Division 0- Bidding Req�tirements, Contraet Forms, and Conditions oFthe Contrack
2. Division 1- General Requirements
3. Section 02 41 13 - Selective Site Demolition
�. Section 32 12 i6 - Asphalt Paving
PRICE A1vD PAYM�NT PROCEDURES
A. Measurement and Fayment
i. Sidewalk
a. Measurement
1) Measurement fo�� this [te►n shall be by the square foot of cornpleted and
accepted Sidewalk in its final position for various:
a) Thicknesses
b) Types
b. Payment
1) The work perfarmed and materials furnished in accardance with tliis Item
and rneasured as provided under "Measurement" will be paid for at the unit
price 6id per sc{uare f'oat of Sidewalk.
c. 'I'he price bid shall include:
i) Excavating and preparing the subgrade
2) Furnishing and placing al( materials
2. Driveway
a. Measurement
1) Measurement for this ltem shall be by tt�e square foot of completed and
accepted Driveway in its final position for vacious:
a) 'I'hicknesses
b) Types
2) Dimensions will be taken from the back �f the p►•ojected curb, including tlle
area of the curb radii and wilf extend to the limits specified in the
Drawings.
CI"PY OP F01�'C WOR"C! t Wa[er and Surrtary Se�vcr Replaeement Contrnct 201 •+i, WSM-C
SGANDARI) CONS"PRl1CCtC)N SPECIPtC:ATfON DOCUMEtJ'PS CC'N 02384
Revised April 3U, 20 f 3
99 99 00
Teoiporary Asphalt Sidcwalks, Driveways, and Barrier Free Ramps
Pagc 2 of 5
I
2
3
4
5
6
7
8
9
10
II
l2
13
14
IS
16
17
18
19
?0
2t
22
23
24
3) Sidewalk portion of drive will be included in driveway measurement.
4) Curb on drive will be included in the driveway measurement.
b. Payment
1) The work performed and materials furnished in accordanc� with this Itern
and measured as provided under "Measurement" will be paid for ai the unit
price bid per square foot of Dciveway.
c. The price bid shall include:
t) Excavating and preparing the subgrade
2) Furnishing and placing �11 matcrials
3. Barrier Free Ramps
a. Measurement
t) Measurement foi• this Item shalf be per each Barrier Free Ramp completed
and accepted for various:
a) Types
6. Payment
1) The tivork performed and materials furnished in accordance with this Item
and �neasured as provided under "Measurement" wiU be paid for at the unit
price bid per each "Barrier Free Ramp" installed.
c. The price bid shail include:
1} Excavating and preparing the subgrade
2) Furnishing and placing all materiats
3) Curb Ramp
4) Landing and detectable warning surface as shown on the Drawings
5) Adjacent flares or side curb
25 1.3 R�rERENCES
26
27
28
29
30
3t
32
33
34
35
36
37
38
39
40
4t
�2
43
44
45
46
A. Abbreviations and Acronyms
i. [ZAP (recfaimed asphalt pavement)
2. SAC (surface aggregate classification)
3. BRSQC (Bituminous Rated Source Quafity Catalog)
4. AQMP (Aggregate Quality Monitoring Program)
5. H.M.A.C. (Hot Mix Asphalt Coz�crete)
6. WMA (Wacm Ntix Aspha(t)
B. Reference Standards
�
3
4
Reference standards cited in this specification refer to the current reference standard
published at the time of the latest revision date logged at the end of this
specification, unless a date is specifically cited.
National Institute of Standards and Technotogy (NIST)
a. Handbook 44 - 2007 Edition: Specifications, Toierances, and Other Technical
Recluirements f'or Weighing and Measuring Devices
ASTM International (ASTM):
a. ASTM D6084 - 06 Standard Test Method for Elastic Recoveiy of Bituminaus
Materials by Ductilometer
American Association of State E-fighway and Transportation Officials
a. MP2 Standard Specitication for Superpave Volumetric Mih Design
b. PP28 Standard Practice for Superpave Volumetric Design for Hot Mix Asphalt
(HNfA)
C'ITY t?P POF(T WOIZ'CH Water i�nd Sanitary Sewer Replacement Contrtict 2014, bVSMd'
S'I'ANDAttll CC�NS'I'KUC�IOiY SFECTfICn't'iON DOCUVC�NTS CI'iY �2384
Revised rlpril 30, 2013
V9 4� (i0
Tem�rary Asphult Side�i�alks, Uriveway,, and Barrier Free Ramps
P��ge 3 of S
1
2
3
4
5
6
7
8
9
l0
1t
12
l3
14
i5
16
17
18
19
20
21
22
23
24
25
26
27
2S
29
30
31
32
33
34
35
36
37
38
G
c. T 20}, Kinematic Viscosity of Asphalts (Bitumens)
d. T 202 Standard Method of'T'est for Viscosity of Asphalts by Vacuum Capillary
Viscometer
e. T 316 Standard Methad of Test for Viscosity Determination of Asphalt Binder
Using Rotationa( Viscometer
ti. TP 1-93 Test Method for Determining the Flexural Creep Stiffness of Asphalt
Binder Using the Bending Beam Rhe�meter (BBR)
Texas Department of Transportation
a. Bituminous Rated Source Quality Catafog (BRSQC)
b. TEX 100-E, Surveying and Sampling Soiis for Highways
c. Tex 106-E, Calculating the Plasticity Index of S�ils
d. Tex 107-E, Determining the Bar Linear Shrinkage of Soils
e. Tex 200-F, Sieve Ana(ysis oF Fine and Coarse Aggregates
f. Tex 2U3-F, Sand Equivalent Test
g. Tex-204-F, Design of Bituminous Mixtures
h. 'I'ex-207-F, Uetermining Uensity of Compacted 8ituminous Mixtures
i, Tex 217-F, Determining Deleterious Material and Decantation Test for Coarse
Aggregates
j. Tex-226-F, Indirect Tensile Strength Test
k. Tex-227-F, Theoretical Maximum Specific Gravity of Bituminous Mixtures
L Tex-2�3-F, Tack Coat Adhesion
m. Tex-244-F, Thermaf profite of Hot Mix Asphalt
n. Tex 280-F, Determination of Flat and Elongated Particles
o. Tex �06-A, Material Finer Than 75 µm (No. 200} Sieve in Mineral Aggregates
(Uecantation Test for Conerete Aggregates)
p. Tex 40$-A, Organic [mpurities in Fine Aggregate for Concrete
q. Tex 416-A, Abrasion of Coarse Aggregate using the Los Ange{es Machine
r. Tex 4l 1-A, Soundness of Aggregate by Using Sodium Sutfate oz• Magnesium
s. Tex 460-A, Determining Crushed Face Particle Count
t. Tex 461-A, Degradation af Coarse Aggre�;ate by Micro-Deval Abrasion
u. Sulfate
v. Tex-530-C, Effect of Water on Bituminous Paving Mixtures
w. Tex-540-C, Nieasurement of Polymer Separation on �ieating in Modified
Asphalt Systems
x. Tex-541-C, Rolting Thin Film Oven Test for Asphalt Binders
y. TeY-920-K, Verifying tl�e Accuracy of Drum Mix Plant Belt Scales
z. Tex-R21-K, Verifying the Accuracy of Hot Mix Plant Asphalt Meters
aa. Tex 923-K, Verifyin�; the Accuracy of Liquid Additive Metaring Systems
39 1.4 ADMINISTRATNE REQUIREMENT5 [NOT USED)
40 1.S SUBMITTALS [NOT USEDJ
41 1.6 ACTI4N SUBMITTALS/INFORMATIOIYAL SUBMITZ'ALS
42
43
44
A. Mix Desi�;n: submit f'or approval. Section 32 12 16
B. Product Data: submit product data and sampte for pre-cast detectabte warning for
barrier free ramp.
45 1.7 CLOSEOUT SUBMITTALS [NOT USI+;n]
46 1.8 MAINTF,NANCE MATERIAL SUBMITTALS [NOT USED]
CCl'Y oF FOR't' WOft'CH bVater and Sanitary Sewer Repl��eement Cantr�ct 2U1 d, WSfvl-C
STANCJARD CONSTRUC'I'I(7N zii'ECtt�1CATION DOCCIMER'TS CPN 0238q
Aevised t\pril 30, 201.1
99 99 b0
'I'empnrary Asphalt Sidewaiks, Driveways, and Barrier Prea Ramps
I'age 4 nf 5
1 1.9 QUALITY ASSURANCE [NOT USED�
2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
3 1.11 FIELD CONDITIONS
4 A. Weather Conditions: Placemer�t of asphalt shall be as specitled in Section 32 12 16.
5 1.12 WARRANTY [NOT USED�
6 PART2- PRODUCTS
7 2.1 OWNER-F[IRNISHED PRODiJCTS (NOT USF,D)
8 2.2 GQUIPMENT AND MATERIALS
9 As specified in Section 32 l2 16
10 2.3 ACCESSORIES [NOT USEDj
11 2.4 SOURCF. QUALITY CONTROL (NOT USED]
12 PART 3 - EXFCUTION
13 3.1 INSTALLERS [NOT USED]
l4 3.2 EXAMINATION (NOT USED]
l5 3.3 PREPARATION
16 As specified in Section 32 12 16.
17 3.4 INSTALLATION
18 A. General
19 1. Sidewalks shall have a minimum thickness of 4 inches.
20 2. Sidewalks constructed in driveway approach sections shall have a minimum
21 thickness equal to that of driveway approach or as called for by Urawings and
22 specifications within the limits of the driveway approach.
23 3. Driveways sha(1 have a minimum thickness of 6 inches
24 4. All pedestrian facilities shall comply with provisions of TAS including location,
25 slope, width, shapes, texture and coloring. Pedestrian facilities installed by the
26 Contractor and nat meeting TAS must be removed and replaced to meet TAS {no
27 separate pay).
28 I3. Fortns: Forms shall be securely staked to line and grade and maintained in a true
29 position during the depositing of concrete.
30 C. Placetttent: see Section 32 12 l6.
3 ( D, Finishing
32 1. Temporary asphalt sidewalks, driveways and ba►rier free ramps shall be finished to
33 a true, even surface.
34 E, Jnints
35 Not applicable
36 F. Barrier Free Ramp
G"1'Y OI� ('OR"P WOR"P(I Watcr and Sanitary' Sewer Replacemcnt Caniract 20?4, WSM-C
STANfa.qRL7 CONS"PRIiCTION SPEC[h'[CATION L)OCLMb`N'I'S CYN 0238�1
ltevised �1�rit 30, 2013
99 49 UO
Tempor<try Asphalt Sidewaiks, [?rivetvays, and Barricr Free Ramps
Page 5 vt S
t l. Furnish and install brick red color pre-cast detectable warning Dome=I'ile,
2 manufactured by StrongGo tndustries o�• approved equal by the City.
3 2. Detectable warning surface shall be a minimum of 24-inch in depth in the directian
4 of pedestrian travel, and extend to a minimum of 48-inch along the curb ramp or
5 landing where the pedestrian access route enters the street.
6 3. Locate detectable warning surface so that the edge nearest the curb line is a
7 minimum of 6-inch and ma:cimum of 8-inch from the e:ctension of the face of the
8 curb.
9 4. Detectable warning Dome-Tile surface may be curved along the corner radius.
10 5. Insta(l detectable warning surface according to manufacturer's instructions.
I i 3.5 R�PAIR/RESTORAT[ON [NOT USF,Dj
12 3.6 RE-INSTALLATION [NOT USED]
l3 3.7 FIELD QUALITY CONTROL [NOT USED]
14 3,8 SYSTEM 5TARTUP [NOT USEDj
15 3.9 ADJUSTING [NOT USEDJ
IG 3.10 CLEANING [NOT USED]
l7 3.11 CLOSEOUT AC'I'IVITIES (NOT USEDj
18 3.12 PROT�CTION [NOT USEDJ
19 313 MAINTENANCE [NOT USEDj
20 3.14 ATTACHMENTS [NOT USEDj
21
END OF S�CTION
� _ _. __._ _ ._. _.______,__ --
� ____ __ w_�,_._ ____
i �
�xa
Cl"I'Y OF F'C?K"t' WO12�I'f 1 Water and Suilitary Se�ver Repiacement ContreGt 2Q 14, WS:Lt-C
STANF�ARp COA<STftUCTION SPF,C;II'tCAT[(7N DOCIIMEN9'S CPN i)7,384
Revised April 3�}, 2013
99 99 0 I- i
TBMPORARY ASPHAL'P CURH ANU GU'['f'ERS
Pagc I of 3
I
2
3
SECTION 99 99 Oi
TEMPORARY ASFHAGT C,URB 8c GUTTERS
a PART i - G�NERaL
5 11 SUMMARY
6
7
8
9
t0
ll
12
13
l4
(5
16
l7
1$
19
20
21
22
23
24
25
26
27
28
29
30
3l
A. Section Inctudes:
l. Temporary Asphait Curbs and Gutters
B. Deviations from this City of Fort Worth Standard SpeciFication
1. Placement of temporary cu�•b and gutter for utility constructian prior to street, curb
and gutter, sidewatk and driveway reconstruction. Materiats and construction
means and methods shall be per Section 32 12 16 Asphalt Paving.
C. Related Specification Sections include, but are not necessarily limited t�:
I. Division 0- Bidding Requirements, Contract Forms, and Conditions of the Contract
2. Division 1- General Requirements
3. Section 02 41 13 - Selective Site Demalition
4. Section 32 12 16 - Asphalt Paving
PRICE AND PAYMENT PROCEDURES
1.2
A. Vieasurement and Payment
1. Concrete Curb and Gutter
a. Measurement
1) Measurement for this Item shall be by the linear foot of Concrete Curb and
Gutter.
b. Payment
1) The work performed and materials fiirnished in accordance with this [tem
and measured as provided under "Measurement" will be paid for at the unit
price bid per linear foot of Concrete Curb and Gutter complete and in place
by curb height,
a The price bid shaU include:
1 } Preparing the subgrade
2) Furnishing and placing all materia[s, including foundation course,
reinforcing steel, and expansion material
CI'CY OF FO[Z"C' WOK"Ct�i [Imert Project Namej
STANDARD ('OhS'CRtJC"I'IOY SPE('iFICA"1'tOtr' DOCUiv1EN"1'S [Insert Prnjeut NumberJ
Revised December 20, 2012
9999pt -2
7'6MP0(2ARY ��SPI(ALT CIIRB AND GUTTGRS
P�ge 2 o f 3
I 1.3 RErERFNCES [NOT USEDJ
2 1.4 ADMINISTRATIVE R�QUIREMEIYTS [NOT USED]
3 1.5 ACTION SUBMITTALS (NOT USED]
4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [1vOT USED]
5 1.7 CLOSEOUT SUBMiTTALS [NOT USED]
6 1.8 MAINTF.NAIVCE MATERIAL SUBMITTALS �NOT USEDj
7 19 QUALITY ASSURAI�TCE (NOT USED�
8 1.10 DELIVERY, STORAGE, AND HANDLING (NOT USED]
9 1.11 I+IELD CONDITIONS
10 A. Weather Conditions: See Section 32 13 l3.
! l 112 WARRANTY [N�T USEDJ
t2 PART 2 - PRODUCTS
13 2.1 OWNER FURNISHED PRODUCTS [NOT USED]
14 2.2 �QUIPMENT AND MATERIALS
15 A. Forms: See Section 32 13 13.
l6 B. Asphalt: See Section 32 12 l6.
l7 2.3 ACCESSORIES [NOT USEDJ
l8 2.4 SOURCE QUALITY CONTROL (NOT USED)
19 PART 3 - EXECUTION
20 3.1 INSTALL�RS [NOT US�DJ
21 3.2 EXAMINATIOIY [NO'T USED]
22 3.3 PREPARATION
23 A. Dernolition / Removal: See Section 02 41 13.
24 3.4 INSTALLATION
25 A. Forms
26 1. Extend forms the full depth of asphalt.
27 2. Metal Forms: a gauge that shall provide equivalent rigidity and strength
28 3. Use acceptable metal forms for curves with a radius of less than 250 feet.
29 4. All forms showing a deviation of 1/8 inch in 10 feet fi�om a straight line shall be
30 rejected.
Cf'CY OF fY7I2T WORTH (Inseit Project Nrirria]
S'I'ANDARD CONS'1'R�fC"I'tON SPGCIPICA7 tOAi DOCUMENTS [[nsert Yroject �lumberJ
Revised t)ecember 2t7, 2t) I 2
y9���oi -s
'I'EbiPORARY tlSPHACf CURB AND GIJTTHftS
Pagc3 of3
t
2
3
4
S
6
7
8
9
l0
11
12
13
14
l5
16
17
18
19
20
21
22
23
B. Placement
1. Deposit asphalk to rnaintain a horizontal surface.
2. Work asphalt into all spaces to form a dense mass free from voids.
3. Work coarse a�,negate away from contact with the farms
4. Hand-Laid Curb and gutter
a. Shape and compact subgrade match existing as removed
b. Lightfy sprinkle subgrade material immediately before asphalt placement.
a Deposit asphalt into forms.
d. Strike off with a tempiate 1/4 to 3!8 inch ]ess than the dimensions of the
finished curb, unless otherwise approved.
C. Curing: see Section 32 12 16.
3.5 REPAIIt/RESTORATION [NOT USED)
3.6 RE-INSTALLATION [NOT USED]
3.7 FIELD QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USEllj
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
_ ' Revision Log
i7r�"1'E NAME SLMiY1ARY OF Ct�ANGE
?4
CITY OF' E'OK'1' WGR"CH
5I'AND!�RD CONST[iUC"f[ON SPGC1FfCAl'ION DOCUMEN"CS
Revised [)eeernber20.2012
(Insert Pra�ect NameJ
jlnsert Project iVumberj
APPENDIX
..
' GC-4.02 Subsurface and Physical Conditions
�r n nn r r„ao,.,...,.,,,,a �.,,.;i:�:o�
�, �, -.. �
r-�r n n� u a � , i n ,a•�• � c•,
GC-6.06.D Minority and Women Owned Business Enterprise Compliance
GG6.07 Wage Rates
rr � n� ve..,�,:�� ,,.,a rT,:i:�:,,..
GC-6.24 Nondiscrimination
GR-01 60 00 Product Requirements
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City ProjectNo. 02385
Revised July I, 20l I
GC-4.02 Subsurface and Physical Conditions
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02385
Revised July I, 20 t I
�
CITY OF �OR`.I.' GV{�aR`.if�
- -�. _.. � � �T�t
SOIL L13WSERVTCES
�.,ABQR1?TOR" �;�?��(:JL,`I.'S i�'OR
TE>T �-IULE AI�ID �I�kti `i'TC�TY INL+�X
I_'tCj ec�� b�eVATER&Sv�lv��'� :tE',}?_`_,I�C;F: CCa1�1T LOl �`v�i,`�ti1-I"
Pt.�ojr�c��# 023�5
DO� A1c: ;'311
Fund �;ade : 0 3
C::ntrac.to��:
,�� _. _� _ ____ �, �t.v�..�.._� ��� �. �_ �..�� __ � �� - — .�� �.__e � � . _. �_�_
HO�,r 1 Dahlen St
LO�A`I'IO�I ; l20' NW of Lyndon Dr TIL/4
��.� �r ._�.__ ��.�.__�---- A_��_�,W -
1 . 5 0 " HI��1C` -- __. _ - �. ._______. _ --
1� . 50" '�� Bro�rn Sa-zdy C1ay v�?l��r_ave l.
4.00" B.r_e�:,�r Sariciy C:1ay WJ<�ravE:l
__ ��._.. ,.. �_..,._ _� __�.�-��,,--.--... - - �� _ _ .. �_____ _
l-�� PERBJR(, LZ_�IT.� LL ?.£3 . 6 _T� c /' 7� � �� �T ��� �... _.
n, r . ,l' . . . _ C T � . '� ..) . '3 i _ . 1. .� , 2 ,� H?. ti.'... . �
l�iL1N�ELT, �,�LC�I� t;H:�RT: 1G `t�: > �1 � gal� �rc�dan �ati�i� �.�1�,=��
�-,�,�.� _ �_� _..wW �� _.�.� -� � ���� �
_ _.___ _ - . �
HO.:=»� 2
LO�.A'�':LUi�i: ?ti;29 D��hlen :>t Si�]/sl
..�-- _W � __ _�� �� v _--- ____ e .
--�� . �_____�- - _ .- —�_� __ ---- - -
1.50" HM�1��
1.0.00" I,T Browri Sar._dy t:1.�y r,�/�Irav�l
4.50" Grayish Dar� Brown C1ay
..�� �� , _.._�_ _� � - -� �--- � �� ,.,� �
� ..__� -- _ _ . . .._.___., _ __ ._
r'1TTER�U�'(7 L1[�1I:`1'S ; �.� , PL a �'1 : :�iIE:I{r :
Nir)N�EC,�, �;��G�R �HART; 1? '�'x.
--- —_= w��,.--u-_
w__ _..�«_.-�,.— —� -�_�.
H OT: F': 3 ____._
L�OCATIt�N: 166C� L�ahl.en S;� N� /�
— ..�- r��a�. _�..�.�� ----- .._.�._ ��_ _. � _� . ---�- -.__.___ �—=.� . �.�..�_ ..,__ --._ __ _..—�
]_.50" H�iZ�C.
11.00" �t �3r�wra �av�dy Clay +:ti�jg�avel
3.50" 8:r..ot.�r Sant:1� t l�y `
�r. _,.--__ __._ _— �..�,__... �_._. ��.� -.T._
x, __.
_. — _ . _
� A�TERBUR.C� L, a �`I:`I'�� : LL : PL : PI : :,,HkK �` : '
� t�ICIN��LT., �t`��,C:?R LCF�AR�': l� �`�:,
�- __ ---- �� y� � -,.� � T- �-_�.� . � � � � � - -�� -
� __ _ �_�, _
��-i0.,i� 1 Ew3.ng Ave
LUC�1`1'ION: 7304 Ewing Ave S/4
_ _ _ w�� ._�. x� ., ._.. __.,� � _ ..� .�, __ _.. - -,. � � _. _
1. 5 0 " F-1Pf1� �. � - _ . ..� ._ _ _T :
9.50" L:-. Src_:rrri Sarldy �`.1ay `vvi����rrel
5 . 00" }3��c��wn � �ndy C:lay
.� _ �_ _ __. � n�,.w �.� - � � �� __�_ _� -- _ � . �r� , _ _�,.. --
Al"�'r �BIJ'�G LIM=TS . I.I,: 3�1 . 0 PL a 19 . � PI . 1.5 .;: `7IiR.itG. 8. U
[ti'�t���l���,� (,�c��,��, ��HAR`i' ��? `c� �ar��_ T�� P�`t,t�ttli`�i�M^Gx��r__f 1.�t� __,- :
HOL�4 � ��,.����_� � . � _ .,e� �.. _ _ __ _ _ , w� . . _
L,OC�11'.I':7:0��1: 73�? �.�rir�g I�ve �114
�:V � _.__:,.. _
�.,. �. �._�
,�� w. _ , ,� wmT. �. .N. . : _ - _�, ��_ _ �__� �. .__ -� --
1 . 50,� ��r?��.. � -
9.50" Lt Bro=�+n Sr�n<:�y t:yl�y Vdlg��avel
5.00" I3r�wn r
,_�an�,v �1�� �
�a
- � �,- Lw � � __ .� _ �
�� ,� _._.w M .. �._
�: ,� _N= ��.�� _ ..� . __ _-�-� � . ..�
ATTF�:��?�{, I.�ZMt_S. LL. ?L. PI. `�H�I{G: �
I�9f.1AI�ET,�, �.�'�.'Li.�R t,H11�.`I'; �.Q '1�.
�� _�:,� �,�._�_.�_�,� ---_ ____�., _���.,,_ �__ ,_�w �7_ . ,---- �.:�:_: �_.�. �,. �. �,,r.,.__ . __.� -_
_ _ _.
HO�� ? Gilbext Dr
r.,0(;�`TI0�1; 5080 Gilber� Dr NE/4
�� �. _ _-_ ,�.�,�-- � ��---- - -= � � .� _. r-�,� � �
9.00" YL�IAC � _�..�r..�-�> .- - x- -
3. f v" Broc�rn ��rid�,J �. � r, ��'
`la� tJ �raT..y
9.Oi�" I:)ar.k B�c;4��r ��'lay
AT I H_RR� �� � _ ��.z � .�d� .. _ ,�-_ �_�,• w � >�,_ �t , ,�,-�, . _ __
�il�tC L�.IM:T�. LL.57. 8 PT,, 32.�0 PT:25. 8�HRKG: 16, 0�
MUNSEL�L C't�LC�R ��-��k�T: 1Q ir 4/1 i���r;� �ra� �la.-
w � � . � �--- �_?� � �m�__ .,_ a ��._ .��. ���__.
��. s.u.b �,�._. �_���- _ __�._�.__ _
--
HGI..��; 2 -- --
e., C1 C',1� `I' I C)'�I :� 0 c`� G i 1�.� e L t D r `v5� J 4'
�-m� .. �-_ -- 4 ,.��.�.�. �-�--_. . � __, v.__- _�.�� -� _� �_ _�_ __� �-� -
- --- _ _..
2, 5 0" f iP�•1r� C
r? . 5�" f3rown ��nc;.y C�a_y W/Gravel_
� g 0 0" [� l:� }. '� r c tid �l �:1 r� y
i.���-> ��__ �.�.. �-. _�� :,_ —. —__ _ _ __..v � ��-�> ��_ ._.. ---
�T`I'F HP[r�C, L T�viTT�� : LT : PL �! ,HH.{� . . _., ___ __ —
_ _
�.�SU�d��.,C,�, �`�T,�� f�HA��': �,t� `�x _
_�. � a .-�. -x, � _
F�I C) li ;' 3 . ... _� . — - -__ � �_ � . � � �� � _ _--
��C��ATIO?�T. �0�5 C�-1i�r-�rt Lr E1�
__1.00" .F:�IP�. ��._�_�--�-- ��_ _. �_�.v..�,-�_--���.._�__._ -
7.OQ" ."�t: t��r..c�wn �andv Cluy t�?Ir.�i�aue:l_
t3 . 00" �ar. k Br�>w�� t"lay
�,,�. �. _ � _�, � u., _ h.=� � �.�. .�_ . _,_� �. _ __�_--_ -=
-- _ ---- __ z � _ _ . .
RTTH.��Bi1i?+�� r�CI�1ITS: LLa PL: �I. `�HRI�G:
iITJN:�L� �'t����E� (�k1Ak`l': 1.�? �'a:.
��.___ _._�� � _..���_
H(�LE 4 -� - .� � ._�,�.a __.�... ___-�_-----
�,OC'A`.I.':i_C�I�t: �C70�1 C;il}:;ert Dr t�Vf��
v�_� - -.___ _ _.�-_____-_ ---..- _�
1. 2 5 " :��1AC; �-_� ��, � � � _� � �-, r �..t
9. 75" Lt Sr���a.�i San,�y .,���y th�/r.r Avt=�:l
5.00" Dark I3r�wn Clay
,._.,�. _�- -�.. .r� _. -� ____ __ -�- - �-__
ATTERLC�I?!�- ZIP�Ii`�'S; LL,: PT�. FI: S�1h�Ca: -�
PfIUi�1SELL ::GI,C7� C;�-IAP�`I_': ]_0 Yr�.
—� _ �
� _ � _ �_ _�. �� � � .. � ._ _. __ - _ F
F? C; L E 7 � ..� � __ _ . _.
L:�C'AT:T.GN: 4�329 C�i..l.k�e.r.�: Dr �I4
�� . __ _ ___ � __ — _.� _ ��� _a .. .w �,-._ —
, y . 50" HM�C - �� _. �_._ . ��___ — --� _
9.00" I�t Br�wt� Sand�= Clay P:�/c��.�avel..
5. 5�J" ��'o�,r�n S�ndy i:' a�r
� __ _ _. � _ ._ - : __
!1 r' 1'�nB JR�, T,IMITt� : LI, . 1'l� -' SI:RI{{1:
� �(7TI �L� � ���C�R CI�AR�L': �0 Y7 � �.���.t_�_��r4 __LL _. _ -
� _ m . A � � -_ - �
[-�C)T �i
i�)c �lIUN 4�(i0 vi �e G Tr 6}71j -
� . �N.n. _ � __ _. � . �� �,. -.. _ __
_ ,_ . _ . �_ — �� . rt� �, __ �_._ �
1.25" E..��S�C ��.�v.._�_
8,'75" vt 3r:�wn Sandv i��_�=�y tit�/gr��ve].
6. C 0" i_� �.r_ )c B L�:. c�; n C 1 a y
. �_.� ��a , � .��F� . _ .�, � � :;H�� v., .. . �,. � ,, - � ___ - --� _ �. �_�, ,_
A'I'IIA,R�I,R�_ Z,II�IITS, L,�, �'1�: PI.-. YF4Ca:
MUi�1S�:L�I: :;CiLOR C�-Ii"-�FZ`I': lt� Y�.
��.-���__.. —__w_.�� �,.,��- �.��,�..., �.____ __ __
�-��-� _ � �_��, ... _ _ .� .
�iC�LE 1 Dilworth St
LOCA`�'ION: 50"78 Dilworth St �1/4
� . ,..N_ � __�u� _, _�� - ,� �.�_,.v� ...���__ _��-� __. _���,� �� _.�, _._ra ���,�..x�.-,. �
2 . 5 0 " HMAC� � - � � ���
3.50" I:)ark Bro��ri Sa.ndy Cl..��.y rn�lg.r.a�r�l
8.00" Lt �rc•wn Sand_V Clay
2.007" �,`ark Brawn Clay
-- ff�-�_,�,�8,ti � �_.._. � �.. ���..;.�__ _ .�,�-.
ATTERBURG LINIITS. LL:3�.0 PL:20.Q PI;'9.� SHP.KG:�2.0
MUNSELL COLOR CHAR`I': 10 Yr. 6/2 Lt Brownish Gray Clay
��.. �. _ u.
--. �..�: �-,-
--, � ,,� _.
HCJLI^� 2
�_�OCA"I'I�N: 4Q`S of Osbun St� E/4
5 . 0 0 " H NII�C x � �, �,._ � �y - - -��.�� �--- --- � . �� --
8. v0" Ll: B:r.own Sand��r slar� Gvlgr:�vel �_ �
3.00" Dark Br<�wn r�a�j
- w � _ � �.. -- —
ATTER$URG LIMITS LI, PL PT ShR�G
MtT\SELL C"�LOR CH�1�`1' : 10 Yr
GC-6.06.D Minority and Women Owned Business
Enterprise Compliance
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUC710N SPECIFICATION DOCUMENTS City Project No. 02385
Revised July I, 201 I
p
WORK5
�id Date:
�
MBE REQUIRED DOCUMENTATION RECEIPT
Official Date and Time
�, ..,)�..�, �;�".y:ii j (j;lj
� ��.-�U
Project Name:
.�
,/l �, „ � �
_.
Project Manager. Q�'�1�--�.�f� 1
Forms Submitted Bv
Name:
Company:
Name:
Forms Received Bv:
.. , . �
;���
�/r . ��__ .��� C �. -U ,/LrS�4--.1.-
i I�
1 7—,7 ��. r „_ ATTACHMENT 1A
� E ��'��'�b' Q�jPage1of4
FQRT WORTI� City of Fort Worth
MBE Subcontractors/Suppliers Utilization Form
PRIME COMPANY NAME: Check applicable block to descrfbe prlme
Wood Contractors, Inc. Miwio�E g Noh�-�t�n�vo�E
PROJECT NAME:
BID DATE
Contract 2014 WSM-D Part 3 10-30-14
City's MBE ProJect Goal: Prime's MBE Project Commitment: PROJECT NUMBER
10 % 2.9 % 02385
Identify all subcontractors/suppliers you will use on fihis project
Failure to complete this form, in iks entirety with requested documentation, and received by the Managing
Department on ar before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date,
will result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s} listed in this uiilization
schedule, conditioned upon execufion of a contract with the City of Fort Worfh. The intentional and/or knowing
misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being
considered non-responsive to bid specifications
MBEs listed toward meeting the project goal must be locaied in the six (6) county marketplace at the time of
bid. Marketplace is the geographic area of Tarrant, Dallas, Denton, Johnson. Parker, and Wise counties.
Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct
payment from the prime contractor to a subcontractor is considered 1 S` tier, a payment by a subcontractor to
its supplier is considered 2"d tier
ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Certification means those firms, located within the Marketplace, thai have been determined to be a bondafide minority
business enterprise by fhe North Central Texas Regional Certification Agency (NCTRCA) or other certifying agencies
that the City may deem appropriate and accepted by the City of Fort Worth.
If hauling services are utilized, the prime will be given credit as long as the MBE listed owns and operates
at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from
another MBE firm, including MBE owner-operators, and receive full MBE credit. The MBE may lease trucks
from non-MBEs, including owner-operators, but will only receive credit for the fees and commissions earned
by the Mf3E as outlined in the lease agreement.
Rev. 5/30/12
1 }{-„4'-14 P03:48 OUT
Fokr W«e�rtr
�
ATTACHMENTtA
Page 2 of 4
Primes are required to identify ALL subcontractors/suppliers, regardiess of status; i.e., Minority and non-MBEs.
MBE firms are to be listed first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a
copy of the firm's SBE certification if they have not previously registered with the City's MN116E Office, which may be contacted for
verification. Please note that onl certified MBEs will be counted to meet an MBE oai.
Attach N
NCTRCA Certff(cate °
SUBCONTRACTORISUPPLIER T " Detail Detail
Company Name i Subcontracting SuppNes
Address e M W s M Work Purchased Dollar Amount
TelephonelFax � g B e B
E E E E
Cowtown Redi Mix
P. 0. Box 162327 Redi Mix
Ft Worth, Tx 76161 1,300.00
$17-759-1919 � � � Concrete
817-759-1716
Little JJ Trucking��2
3817 Chickasaw St
Fort Worrh, TX 76119 �❑ � Trucicing 20,000.00
817-996-1414
JM Material.s
P. 0. Box 496
Alvord, TX 76225 Rocic
940-427-2033 a ❑ X Sand 42,000.00
940-427-2789
Buyers Barricades
7409 Baker Blvd
Richland Hi11s,TX � ❑ X Barricades 8,500.00
817-535-393911$
817-831-7171
WOE Construction
941-B Avenue N
Grand Prairie, TX750 0❑� ❑ X Sawing 2,000.00
817-284-7401
McCrory Oil
P. 0. Box 7141
Ft Worth, TX 76111
817-626-4001 � � X Fuel 15,000.00
817-626-4002
Rev, 5/30/12
' 11-04� 4 P�3:4r3 Ot1i
FoKr Waa�rH
�
ATTACHMENT1A
Page 2 of 4
Primes are required to identify ALL subcontractors/suppliers, regardless of status; i,e., Minority and non-MBEs.
MBE firms are to be listed first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a
copy of the firm's SBE certification if they have not previously registered with the City's M/WBE Office, which may be contacted for
verification. Please note that onl certified MBEs will be counted to meet an MBE oal.
Attach N
NCTRCA Gerttf(cate °
SUBCONTRACTOR/SUPPLIER T " Detail Detafl
Company Name i Subcontracting Supplies
Address e M W S M Work Purchased pollar Amount
TelephonelFax r B B a e
E E E E
Utility & Environment
P. 0. Box 542015
Dallas, TX 75345 Pipeline 2,000.00
972-556-2913 � � � TV
J.L.B. Contracting
P. 0. Box 24131
Ft Worth, TX 76124
817-261-2991 � � � X Asphalt 30,000.00
817-261-3044
APAC Texas
P. 0. Box 1807
Ft Worth, TX 76101
817-336-0521 � � X Asphalt 10,000.00
Fortiline Waterworks
1705 Cypress St
Haltom City, TX 76028 Pipe &'
682-747-0879 � � X Fittings 130,000.00
682-747-2077
Hanson Pipe
1000 N. MacArthur ConcreCe 6,300.00
Grand Prairie, TX7505
972-263-2181 � � � X �
972-260-3618 Precas�
❑ ❑
Rev. 5l30/12
FORT WO R'CH
�
1 1- 0�� -14 PQ j; 4$���HMENT 1A
Page 4 of 4
Total Doilar Amount of MBE Subcontractors/Suppliers � 21, 300. 00
Total Dollar Amount of Non-MBE Subcontractors/Suppliers $ 245, 800. 00
TOTAL DOLLAR AMOUNT OF AL� SUBCONT'RACTORSISUPPLIERS
267,100.00
The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approvai
of the Minority and Women Business Enterprise Office through the submittal of a Request for Approval o
Change/Additlon form, Any unjustified change or deletion shall be a materiai breach of contract and may�
result in debarment in accord with the procedures outiined in the ordinance. The contractor shall submit a
detailed explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the
detail explanation is not submitted, it will affect the final compliance determination,
By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,
complete and accurate information regarding actual work performed by all subcontractors, including MBE(s)
and any special arrangements with MBEs, The Offeror alsa agrees to allow an audit and/or examination of
any books, records and files held by their company. The bidder agrees to ailow the t�ansmission of interviews
with owners, principals, officers, empfoyees and applicable subcontractorsJsuppliers participating on the
contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized
officer or empioyee of the City. Any intentional and/or knowing misrepresentation of facts will be graunds for
terminating the contract or debarment from City work for a period of not less than three (3) years and for
initiating action under Federal, State or Local laws concerning faise statements. Any failure to comply with this
ordinance creates a material breach of the contract and may result in a determination of an irresponsible
�fferor and debarment from participating in City work for a period of time not less than one (1) year,
Title
Woody Contractors, Inc.
Company Name
650 Tower Drive
Addross
Kennedale, TX 76060
City/StatelZip
Troy woodv
Printed Signature
Contact NamelTitle (!f different�
817-483-4787
Telephone andfor Fax
twoody2020@aol.com
E•maii Address
10-31-2014
Date
Rev. 5/30/12
1 ? ^� `V � � P�3 � 4 £3 Q�jT�ACHMENT 1C
Page 1 of 3
Fo�T WoRTH City of Fort Worth
MBE Good Faith Effort Form
PRIME COMPANY NAME: Check applicable biock to describe prtme
Wood Contractors Inc.
PROJECT NAME: MMllD[3E X NOt�I-P�1/MJU.P,E
Contract 2014 WSM-D Part 3 BID DATE
10- -1
City's MBE ProJect Goal: Prime's MBE Project Commitment: PROJECT NUMBER
10 % 2.9 % 02385
If the Offeror did not meet or exceed the MBE subcontractfng goal for this project, the Offeror must complete this
form.
If the Offeror's method of compliance with the MBE goal is based upon demonstration of a
"good faith effort", the Offeror will have the burden of correctly and accurately preparing and
submitting the documentation required by the City. Compliance with each item, 1 thru 11 below,
shall satisfy the Good Faith Effort requirement absent proof of fraud, intentionai and/or knowing
misrepresentation of the facts or intentional discrimination by the Offeror.
Failure to complete this form, in its entirety with supporting documentation, and it being submitted to and
received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening,
exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications.
1.} Please list each and every subcontracting and/or supplier opportunity for the completion of this
project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NO7 LIST NAMES OF
FIRMS On all projects, the Offeror must list each subcontracting and or supplier opportunity
regardless of tier.
(Use additional sheets, if necessary)
List of Subcontracting Opportunities List of Supplier Opportunities
Sawing . Redi-Mix Concrete
T. V. Sewer Rock.
Trucking Sand
Portable Toilets Barricades ,
Fuel �
Asphalt Mix
Pipe & Fittings
Concrete Precast
Rev. 5/30/12
11-pq-14 F�3:GB OilT
ATTACHMENT 1C
Page 2 of 3
2.) Obtain a current (not more than two (2) months old from the bid open date) list of MBE subcontractors
andlor suppliers from the City's M/WBE Office or the City's website.
Yes Date of Listing g_19--2014
No
3.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened?
� Yes (If yes, attach MBE mall listing to Inciude name of firm and address and a dated copy of letter malled.j
�No
4.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are
opened?
YeS (if yes, attach list to inciude name of MBE firtn, ep rson contacted, phone number a�d date and time of contact.)
No
5.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by facsimile (fax), exclusive of ihe day the bids are
opened?
�_Yes (If yes, attach list fo Include name of MBE firtn, fax number and date and time of contact, in addition, If the fax is
returned as undeliverable, then that "undeliverable confirtnatio�" received must be printed directiy from the
facsimile for proper documentatlon. Failure to submit confirmation and/or "undeHverable confirmation"
documentation may render the GPE non-responslve,)
�]_ No
6.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior ko bid opening by email, exclusive of the day the bids are opened?
�_Yes (ff yes, attach emafi confirmation to tnclude name of MBE firm, date and time. In addition, if an email is returned as
u�deliverable, then that "undellverable message" receipt must be printed dfrectly from the ematl system for proper
documentation. Faiiure to su6mit confirmation and/or "undeliverable message" documentation may render the
GFE non- responsive.)
_[�N o
NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method
must be applied to the applicable contract. The Offeror must document that either at least two attempts
were made using two of the four methods or that at least one successful contact was made using one of
the four methods in order to be deemed responsive to the Good Faith Effort requirement.
NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier
opportunitv to be in compliance with questions 3 through 6.
7.) Did you provide plans and specifications to potential MBEs?
�_Yes
_ X�,No
8.) Did you provide the information regarding the location of plans and specifications in order to assist
the MBEs?
�Yes
No
Rev. 5/30/12
ATTACHMENT1C
Page 3 of 3
9. Did yau prepare a quotation for the MBEs to bid on goodslservices specific to their skill set?
YeS (If yes, attach all copies of quotatfons.i
' No
10�Was ths contact information on any of the listings not valid?
_�Yes (If yes, attach the information that was not valid in order for the MNVBE Office to address the corrections
needed.) Civil Works address incorrect so emailed them for contact
�_N o
11,)Submit documentation if MBE quotes were rejected. The documentation submitted shouid be in the
forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting
documentation the Offeror wishes to be considered by the City. In the event of a bona iide dispute
concerning quotes, the Offeror will provide for confidential in-camera access to and inspection of any
relevant documentation by City personnel.
Please use additional sheets, ff necessa , and attach.
Com an Name Tele hone Contact Person Sco e of Work Reason for Re'ection
ADDITIONAL INFORMATION:
Please provide �additional information you feel will further explain your good and honest efforts to obtain
MBE participation on this project.
��
The Offeror further agrees to provide, directly to the City upon request, complete and
accurate information regarding actual work performed on this contract, the payment
thereof and any proposed changes to the original arrangements submitted with this bid.
The Offeror also agrees to allow an audit and/or examination of any books, records and
files held by their company that will substantiate the actual work performed on this
contract, by an authorized officer or employee of the City.
Any intentional and/or knowing misrepresentation of facts will be grounds for
terminating the contract or debarment from City work for a period af not less than three
(3) years and for initiating action under Federal, State or Local laws concerning faise
statements. Any failure to comply with this ordinance shall create a material breach of
Rev. 5/30/12
f
%
11-04-14 P03:49 OUT
ATTACHMENT1C
Page 4 of 3
contract and may result in a determination of an irresponsible offeror and debarment
from participating in City work for a period of time not less than one (1) year.
The undersigned certifies that the information provided and the MBE(sj listed was/were
contacted in good faith. It is understood that any MBE(s) listed in Attachment 1C wifl be
contacted and the reasons for nat using them wili be verified by the City's M/WBE
Office. _
�;G%-'t/ -- -
Troy Woody
t i ignature ,,%` Printed Signature
P ident ��
Titie Contact Name and Titie (if different)
Woody Contractors, Inc. 817-483-4787
Company Name Phone Number Fax Number
650 To�ver Drive twoody2020@aol.com
Address Email Address
Kennedale, TX 76060 10-31-2014
City/State/Zip Date
Rev. 8/30(12
WOODY CONTRACTORS INC.
October 10, 2014
INVITATION TO BID
i \
\
�� ��
�.:--
���
• -� •-
650 TOWER DRIVE
KENNEDALE,TEXAS 76060
OFFICE: 817-483-4767
FAX: 817-483-2048
- WOODY CONTRACTORS, INC., an equal opportunity employer, is seeking material
and/or subcontract quotations from DISADVANTAGED MINORITY BUSINESS
ENTERPRISES for the following projects
WATER & SANITARY SEWER REPLACEMENT CONTRACT 2014 WSM-E PART 1�
PROJECT # 02386
WATER & SANITARY SEWER REPLACEMENT CONTRACT 2014 WSM-D PART 2•
PROJECT # 02385
�WATER & SANITARY SEWER REPLACEMENT CONTRACT 2014 WSM-D PART 3
PROJECT # 02385
WATER & SANITARY SEWER REPLACEMENT CONTRACT 2014, WSM-E PART 2;
PROJECT # 02386
BID DATE: OCTOBER 23, 2014
NORWOOD DRIVE RECONSTRUCTION FROM TRENITY BLVD TO SH 10 UNIT 1& 2:
PR�JECT # 02180
BID DATE: �CTOBER 30, 2014
AI1 quotes should be received in our office by 12;00 Noon on the day before bid
date!!!!! .
Ail quotes should be addressed ta ATTN: Mr. Dan Woody, Woody Contractors, Inc.,
650 Tower Drive, Kennedale, Texas 76060.
Phone: 817-483-4787 Fax: 817-483-2048
PLANS AND SPECIFICATIONS CAN BE DOWNLOADED OR VIEWED �N THE CITY OF
FORT WORTH BUZZSAW SYSTEM. PLANS AND QUOTATION INFORMATION MAY
BE REVIEWED AT MY OFFICE MONDAY - FRIDAY, 9:00 AM TO 5:00 PM, BY
APPOINTMENT, QUOTATION INFORMATION MAY ALSO BE OBTAINED BY PHONE.
■�����������������r���r�r������r���������r��rr�����������������������������������■
- _ - --- - -- - - - ._ . _ _ -__ _ ---
JOB: !WA7�R & SANITARY SEWL r2EPLACEMENT CONTRACT 2014 WSII' PAR71 '
_ . ,_ _ _ ._ ----
JOB: ' WATER & SANITARY SEWER REPLACEMENT CONTRACT 2014 WSM-U PART 2
--- ---- - --- . . _._
JOB: ;WATER & SANITIARY SEWER REPLACEMENT CONTRACT 2014 WSM-D PART 3
- - - - __ ----- - -- - --- - - ------- . . .- -- _ . , ..._ � _ _ __.
JOB: WATER & SANITARY SEWER REPLACEMENT CONTRACT 2014 WSM-E PART 2 '.
----. :------ - -- -- - -. . - _ . .
-- , _ _ _ - ---
BID DATE: i 10l23/2014 '
--_ __ _ _- - -- - -- - ------ - --- --__- - - -- _
JOB: 'NORWOOD DRiVE RECONSTRUCTION FROM TRINITY BLVD TO SH 10 UNIT 1& 2
-- - --- -- - _ - _-- _-- . . . -- --- _ _ _-- - - _ __ _--
BID DATE 10/30/2014
- --- _ , - _ . .- --- ----- - --- -- __
- T BUSINESS ' PHONE # i MAILED ' �
- -.. _ __ _ _ _. _. .__.
_ - - _- __ _--.
- - 10t10/14 ---- -
CONCRETE CUTTWG, S
_ _ _ ___ _-- - --_ . . - ------ _ _- -----
AWING, CORING, and SEA�ING
__ _ .._.____ -__---- .._ __ _ --- -------
CORE CUT CONCRETE CORING&CUTTWG ' 214-802-3974
- -- - -- - -- -- ---- -----_ __-__�_--- __ , _-
�G & G SAW AND SEAL CONSTRUCTION I 214-882-0200 � ' '
- ---_ _-- -___ ..---- _ ._ __ . _ __ _.._
_ -- _ _- - _ - -- - - - -- . .
'GHR CONCRETE, INC ' 214-232-3622 I
- - _ , --- - - __. __ _ _ _ -- _ _ ,------ - -_ _ . -- - ---------
GRACE CAPITAL HOLDING, LLC ! 214-212-2618
- _ _ ---- _ _- -- . _ _ _ _---- - -- - . _--- - .. , - ----
I& H CONCRETE CUTTING, INC. ` 214-941-4332 !
� ._..-- ----- --- - -- _._ _ _ _- --- - - -- _
I � KDAT, LLC 469-853-5038
-- _ . = ----- - - - - --- --- - -- ---- . --
'MURILLO CONCRETE & CUTTING, LLC 214941-6336
_ --- ---- - -- - -- --
'OMEGA CONSTRUCTION GROUP, LLC ! 469-232-8715
__ - -- ---_ , -_ .
PONCE CONTRACTORS, INC. ' 817-868-9800 T
- - _. - -- ------ - --- --- _ .--
' SUPREME SAWING AND SEAL, INC 972-557-9858
__--------- --- - --- ___ _
EROSION CONTROL (INCLUDES GABION WORK) ___ __ ___
IBRADLEY DDUGLAS CONST SVC LLC i' 817-429-2443 �
.-_ - -- --- --- . --- -- _ _
> ', C GREEN SCAPING, LP 817-577-9299 ' '
_- - ._�_ ------- -----_._.. - _ -- -_ _---
CIVIL WORKS, INC ' 404-363-8727
------- --___ __ _ _ ._.---- __ --__�.. _. . -- -- __
ENVIRONMENTAL SAFETY SVCS INC 940-455-2660
-- _ -= -- -_ _ _ _- - -- -- -- ---- _ _
RODRIGUEZ CONCRETE CONST 214-275-4542 ;
-
---- ---___.._. __,.__. _
'A. MURILLO TRUCKING i 817-691-2154 '
- - - ---- --- -- --- _. --_ _ -.__ . . _. , _--- ---__ _ __---
> A.E.A. TRANSPORTATION 214-535-5495 '
_--- -- --- -- -- _ _ ---- __ __ _---- ____ _ ___ __ __ _ _ --
'ACU CONSTRUCTION, LLC 214-282-8987
_ - - --- _ - - -. . . -._ _- - ----- _ ___ _. , _ __ .__ _ - ---
,ATCO CONSTRUCTIC3N CO INC 817-713-1892 ;
_- - _ - --- -- — --- - --- - - --- . -- T_ --- ___ _ _ _ _ _. --. --- _ ___ _
; BIG SMITH TRUCKING COMPANY 817-714-2228
__- --- - - - - -- -; _ -- --- --_ _ , -- . -- _- ---
BUSSEY TRUCKING, INC. 214-630-5654 '
_._. _ _ . - -- - ---- --- -- - _- - -- -- - -- -_ - -- - ,_. _ -- -
CARRASCO TRUCKING, INC ' 214-316-7929
- - _ _ - -- . _ _ --- -- - _ -. - , --.. -
--
' CLEMONS TRUCKING COMPANY � 214-794-1645
--- --�-- - --- -- - _ __ -- -- - _ - ---- _---_ - :_ . _ _ _
D.C.T. TRUCKING 817-822-5989 �
_ ._ _ _ --- __ __ _ __ --- _ - -- _ . � - - - - -
DFW AGGREGATES, LLC 214-217-2107
_ _ _ -- - --- - _ _ _. . __ _ _ . _ __ _ _ _- _
E. McDAN1EL TRUCKING 817-454-1598
- -- _ _. _ _ -
> EARTH HAULERS, INC � 817-540-2777 �
� . -- -- - _- _ __ , . _ _ . .
GEMSTAR EXPRESS, LLC 214-935-1736
_ _ -- -- - ___ , --- - -_ . -- - - - -_ _ _
'GLL CORPORATION 972-821-2014
_ _---- _ _ - - - - _
GODFREY T�iOMPSON TRKG SVC 817-535-3984 ;
_ __ _ ; _ -- -- -- - - - -- , _. _ _ _ _ _
- --
GRANADOS 7RUCKING INC ' 817-568-1570
__ - -- - - _ , _-- _ . _ . _ _ _
J. RUBIO TRUCKING 817-300-0128
--_ _._ _. _ _ _ _.__ - _ _-- - _ __. _ _ _ _ _
J.D.'s TRUCKING, LLC 817-446-2060
_ _ _ _ _ --... - - ,_ . _ -- -- � __ _
J.P. CONSTRUCTION 817-201-9664 _ _ __
- -- - _ . - --- . .
JESUS MORALES TRUCKWG 214-597-3711
_ - -_ _ _ _ __
LARA HAULING COMPANY 972-263-3005
_ _ __ _
LARA TRUCKING 469-261-3241
. _
> LARRY RAMBO TRUCKING 817-$21-3704
-- - -- -
_ _ - _
LIFESTYLE CONSTRUGTION 817-808-8009
BUSINESS PHONE # ' MAILED '
-- . - - � . _ � __..---- _ -
_- � � -- --- -------- " 10/10/1
_ -- _ --- - -- -_. _ _ __ _ - -
LITTLE J.J. TRUCKING #2 � 817-996-1414
_. - --- _ ---_ _ _ __ _ . _------ _ __ _ _ ._ _ _.
�LUNA'S TRUCKING 817-834-$919
--__ - � --- _ - --__ _ . -----
; LUZ TRUCKING, INC 817-980-6493
- -- ___-_ ---__ ------ .__ _ _ . :. -----__ -
MIKO TRUCKING, INC ' 214-905-9202
-- - _ - - -- _ _ - - __ , ----- .
__.. _ _ _ - - �
'Q. ROBERTS TRUCKWG INC. ' 214-534-6557
-- -- -- _ _ _ � _ _ _ _ - : _. _. _ . --
SPEEDY HAULING � ' 817-626-6829
- - � _- -- ---- -- -- _ - ; - _ . - -
�TRANSPORT TRUST ' 817-401-9530 �
__ _--- - - -- - , ---.-._. . -- . _ _ - --
�UNLIMITED TRUCKING ' ' 817-228-2960
- -- ---- — - - _ _ _ _
_ __ __ _ __ _
VAZQUEZ TRUCKWG � 817-531-2930 '
-_._ __. __ . _ ___ ._. __ ---- . __ ___ --
'MANHOI.E CONSTRUCTION AND/OR REHAB
--._—.._. � - ---_ . __. _ _ _--- _ __
i GAR-TEX CONSTRUCTION CO INC 972-203-1700
i- ---- --- -- --- -- — - - - ------ - _ _. -- .._ _ _ - - --_ ,
� HAYDEN CAPITAL CORPORATION 817-478-3765 '
------- -- --. _
- -- . _-_ --- __... . _ �_-- __.
J. E. GUZMAN CONSTRUCTION INC 214-309-3955
- - � _-- ---- - _ _--- - ---- - - -- . _.__ -- -------
KLUTZ CONSTRUCTION, L.LC ! 817-561-5591
- - - --- - _- _----- _ _------ -- - _ - -- _ .. _ __ _ . - -,
;LAUGHLEY BRIDGE & CONST, INC ' 817-401-3306 '
-- --- -=- - - - --- __ _ _ ------ _ _-- __ _ - - _ --
_ ._ ____
� NTP PLUMBING & UTILITIES GONTRACTOR ' 817-483-6200
-- ; _ -- . — ------.. ._ _ — -- ___—
_ _- - _--
> ! RAMBO CONTRACTING, INC 817-426-1166 '
AGGREGATE. SAND, RO � .
__ ___
CK
--- _ _ _--�- - - _ _- _ _-�-
D �A.E.A. TRANSPORTATION 214-535-5495
__ - _-- --,-- --___ _- _ _._ _. _ , __ .-_ -- - - _ __ .-. --- -
D ; EARTH HAULERS, INC ; 817-540-2777 ,
- - - - — - — -- — _ -- _—_ _ _ - �— - ----- -- _ -- - -- . _ _-- -----.
D �LARRY RAMBO TRUCKING ! 817-821-3704 �
— �__-_ -- _ -- � — — _ _ _ _ ---- -- - - -- --- --- --_ . _ _--- _ - - -
--_ __-_ _.._
BARRICADES
- - --- - - -- --- _ _ .. -- — _ __ __ --- — - _ - -
-- -
ICOWTOWN TRAFFIC CONTROL, INC ; 817-924-4524 vn ,,�,,� ._-.__
,._ --- --- -- _-
CONCRETE, PREGAST ;
- ----- -- --- --- _----_ -- _ _ __ �_ _ _---. . --- . -- -
' BENU CONSTRUCTION INC 817-368-4245
- - -- - - -- _ . ,-- -- . -- --- -- � -- --- _ _ _
�CHOCTAW EREC70RS INC 972-790-2255 ; '
-- --�-- - - - -- - _ . - - ---- _ _ — . _ __ --- - -- _--
> F& K BUILDERS, INC. ! 214-213-1955
- __._. __. _ �.
CONCRETE REDI-MIX
-- -- _.-. --- - ---- -- _. -- ---_ — -
COWTOWN REDI MIX, INC 817-759-1919 '
_ _- _ _- --- - -
;
PIPE CULVERTS
_ _- ----- --__ - _ _ __ -- - - - - _ _
--- - --- _ _ _ _�_. __ . __ _____ __ . _- _ _
D RAMBO CONTRACTING, INC 817-426-1166
PIPE PIPE FITTINGS AND VALVES, ETC
-- _ __- - _ _ _._. --- --
-- - , _- - -- _ _ _. -- . _ _ _ -
INDUSTRY JUNCTION, INC 214-680-9655
_ -- - - -
PORTABLE TOILETS
_ - _ - -- _._ _ _ . - --. _ --
BLUEBONNE7 WASTE CONTROL., INC. 214-748-5221
_ -- -_ __.
HYDROMULCH AND SOD
_ _ __ _ _ _ _ ..__ _- - - -
D i C. GREEN SCAPING, LP , 817-577-9299
_ _ . . - - _ - - -- -- ----- _-- _ .. _. _. _ _-- - --_ � . _ -- --
COMBINATION PLUS BROKERS, INC ' 972-466-0410
_ . : _ - - -- — - - - -- _ _- • - - -.__ . _. . _ _ . . - - -
GRASS PERFECT CORPORATION � 817-881-9784
_ _ - - __-- __ _ --- __ _ - __ _ ._. _ -
HYDROTECH OF TEXAS , 817-784-1881 '
MAIN LIST
� A.E.A. Transportation
2300 Valley View Ln
Ste 226
Irving, TX 75062
/ Grace Capital Holding, LLC
8660 Drayton Drive
Irving, TX 75063
/ Choctaw Erectors, Inc
101 Josephine Lane
Grand Prairie, TX 75050
� Cowtown Redi-Mix, Inc.
3401 Bethlehem Avenue
Fort Worth, TX 76111
/ F & K Builders, Inc
713 Rankin Drive
Bedford, TX 76022
_�' Murillo Concrete&CuttingLLC
935 Dewitt Circle
Dallas, TX 75224
i Supreme Sawing & 5ea1 Inc
208 Heai�thstone Dr.
Sunnyvale, TX 75182
� KDAT, LLC
700 Chaffee Ct
Arlington, TX 76006
./ Rodriguez Concrete Const
2636 Kirven Street
Uallas, TX 75227
'' Bluebonnet Waste Control Inc
1600 Singleton Blvd
Dallas, TX 75212
� C, Green Scaping, LP
2401 Handley Ederville Road
Ft Worth, TX 76118
� Bradley Douglas Const Svc LLC
5001 Brentwood Stair Rd Ste 106
Fort Worth, "I'X 76112
�� Civil Works, Inc.
12200 Ford Rd, Ste 484
Dallas, TX 75234
✓ Core Cut Concrete Coring & Cutting ✓ Laughley Bridge&Const Inc
824 S. Tyler Street 1593 Hunterglenn Dr
Dallas, TX 75208 Aledo, TX 76008
� Cowtown Traffic Control, Inc
112 W. Jessamine St
Fort Worth, TX 76110
-- Earth Haulers, Inc.
11500 Mosier Valley Road
Fort Worth, TX 76040
� G& G Saw and Seal Construction
4008 Forest Lawn Drive
Balch Springs, TX 75180
/ Hayden Capital Corporation
5136 Vesta Farley
Fart Worth, TX 76119
� Industry Junction, Inc.
1010 Kent Brown
Garland, TX 75044
/ Grass Perfect Corp
4900 Wheelock Dr
Ft Worth, TX 76133
i Omega Const Group LLC
101 S. Railroad St, Ste C-3
Lewisville, TX 75057'
� Klutz Construction LLC
650 Tower Drive
Kennedale, TX 76060
✓Hydrotech of Texas
2004 W. Sublett Road
Arlington, TX 76017
� J,E. Guzman Construction Inc
8356 Lalce Anna Drive
Dallas, TX 75217
� Larry Rambo Trkg
501 Allison Lane
Fort Worth, TX 76140
./NTP Plumbing & Utilities
Conti•actors, Inc
P. O. Box 2110
Fort Worth, TX 76113
✓ Ponce Conta•actors, Inc.
3501 S. Hwy 157, Ste #101
Ft Worth, TX 76040
� Combination Plus Brokers Inc
' 1856 N. I-35 E
Carrolltot�, TX 75006
l Environmental Safety Svc Inc
2652 FM 407, Ste 235
Bartonville, TX 76226
� GHR Concrete, Inc.
2929 Mican
Dallas, TX 75212
,. Gar-Tex Construction Co Inc
441 IJS Highway 80 East
Sunnyvale, TX 75182
✓ Rambo Contracting, Inc.
1201 S. Hurst Rd
Bz�rleson, TX 76028
�/ Benu Const Inc
3900 German Pointer Way
Ft Worth, TX 76123
� I& H Concrete Cutting, Inc.
2628 S. Beckley Avenue
Dallas, TX 75224
HAULING BY DUMP TRUCK
� Lara Hauling Company
1105 E. Tarrant Rd
Gi•and Prairie, TX 75050
✓ Carcasco Trucking, Inc.
501 Hopkins Avenue
Seagoville, TX 75159
✓ Luna's Trucking
2100 N. Sylvania
Fort Wo►-th, 'I'X 76106
✓ ATCO Const Co Inc
3313 Sherwood St
Willow Park 76087
✓ Speedy Hau(ing
2424 NW 24t1i Street
Fort Worth, TX 76106
� Transport Trust
405 W. Aurora Vista Trail
Aurora, TX 76078
,/ Little J.J. Trucking #2
3817 Chickasaw
Fort Worth, TX 76119
� Luz Trucking Inc
702 Glenn Drive
Ettless, TX 76039
� �
( Granados Tiucking, Inc.
9429 Crowley Road
Fort Worth, TX 76134
�� Clemons Trucking Company
7934 S. Lancaster Road
Dallas, TX 75241
/ Miko Trucking, Inc
1100 Crest Ridge Court
vving, TX 75061
'� E, McDaniel Trucking
9725 Salorn Drive
Crowley, TX 76036
� Larry Rambo Trkg
SOl Allisou Lane
Fort Worth, TX 76140
� Jesus Morales Trucking
I505 Juneau Street
Grand Prairie, "I'X 75050
� J. P. Coustruction
1505 Shilling Drive
Fort Workh, TX 76103
✓ ,I. Rubio Trucking
9000 Country Rd 513
A(varado, TX �6009
i
✓ Bussey Trucking, Inc.
3726 Toronto Street
Dallas, TX 75212
� Lara Trucking
6322 Penway
Dal(as, TX 75217
,i DFW Aggregates, LLC
10580 C F Hawn Freeway
Dallas, TX 75217
�% Earth Haulers, Inc.
11500 Mosier Valley Road
Fort Worth, 'I'X 76040
�
-� Q. Roberts Trucking Inc.
5787 S. Hampton Rd Ste 390
Dallas, TX 75232
� A. Murillo Trucking
3609 N. Elm Street
Fort Warth, TX 76106
� ACU Const LLC
3044 Old Denton Rd
Ste 111-113
Carro(Iton, TX 75007
� J. D.'s Trucking LLC
5001 Brentwood Stair Rd, # 204
Fort Worth, TX 76112
� Lifestyle Consh•uction ✓ Vazquez Trucking � A.E.A, 'Cransportation
7489 Red Bud Lane 4700 Nolan Street 2300 Vailey View Ln, Ste 226
Fort Worth, TX 76135 Fort Worth, TX 76119 Irving, TX 75062
i Big Smith Trucking Co r D.C.T, Trucking � GEMSTAR Express, LLC
4337 Quails Lane 4727 Hope Street 5057 Keller Springs Rd Ste 300
Fort Worth, TX 76119 Fort Worth, TX 76114 Addison, TX 75001
' GLL Corporation ,� Godfrey'Thompson Trkg Svc ,/ Unlimited Trucking
5934 Hai•bor Glen Drive 3340 Sydney Streat 5800 Old Hemphill Road
Dallas, TX 75249 Fort Worth, TX 76119 Fort Worth, TX 76134
Gmail - Invitation to Bid re: 10/23/14 ?�� 10/30/14
�
�� � � �_._. . � �
�
� i:,(��� ,:I��
Invitation to Bid re: 10l23/14 and 10/30/14
1 message
Sharon Riddle <sharonwcinc@gmail.com>
To: wmarshall@gacivilworks.com, jtarpeh@gaci�ilworks_cam
(under Erosion Control)
�
' _ 001.Jp9
413K
file:///C:/Users/Sharon/AppData/Local/"I'emp/Low/PDX7M907.htrn
Page 1 of 1
Sharon Riddle <sharonwcinc@gmail.com>
7hu, Oct 9, 2014 at 11:32 AM
10/9/2014
, , , � m
-..�-_,: 4 .�r..
� ji
=�-
S�ptember. 19, 2Q14 y
Troy Woody ��"" �°� _�N
Woody Contractors, Inc. �� � �� �9�
650 Tower Drive '� � �
Kennedale, TX 76060
Dear Mr. Woody,
This is in response to your request for the attached listings ta assist your company in seeking and
utilizing MBE sub-contractors and/or suppliers:
Contractor Opportunities Requested
Asphalt Paving
Boring
Concrete Paving
Concrete except Paving
�Concrete Cufters
Concrete Reinforcement
�/Erasion Control
Excavation
�ence Consiruction
Guard Rai) Construction
Hazardous Waste Disposai
,iHauling by Dump Truck
Inlet Construction
�Manhole Constructian
fVtanhole Rehab or Coating
Pipe Bursting
Pipeline Clean and T.V.
piumbing Construction
Striping/Marl<ers
Traffic Signals
Water Taps
Contractor Opportunities Provided
Asphalt Paving �
Boring and Drilling Construction
Concrete Services (Paving, Repair, etc.)
Concrete Curb and Gutter Construction
Concrefe Removal and Excavation
Goncrete Sidewaiks, Driveways, Wheelchair Rarnps
Concrete Specialty Work
Concrete Cutting, Sawing, Coring and Sealing
Reinforcing Steel and Post Tension Installation
Erosion Control Services/Devices (moivaes cabion work)
EXCaVaflon Woi'k Gf ading (Land Clearing/Site Deve�opment)
F'ence Material, Insta�lation and/or Ornamental Work
Guard Rail Construction
Hazardous Waste Transport, pisposal
Hauling by Dump Truck
inlef Construction
�Manhole Construction and/or Rehabilitation
See above Manhole Construction and/or Rehabilitation
No MBE Firms Provided
` No M8E`Firms Provided -
Plumbing Contractors
Striping/Markers
No MBE Firms Provided
No MB� Flrms Provided
5upplier Opportunities Requested
✓ Aggregate, Sand, Rock
qsphalt and Asphait Mix
✓Barricades
�/�oncrete-Precast
� �oncrete Ready Mix
=uel Suppiiers
/'ipe
Supplier Opportunities Provided
Aggregate; Sancl/Gravel/Dirt/Topsoil, etc.
✓ No'MBE Firms Provlded �
Barricades, Traffic Cones and Other Devices
Concrete, Precast
Concrete/Masonry Products (Reai-Mix Pour or aayged�
�� No MBE Firms Provided '
Pipe Cuiverts
HOUSIIYC AND �CON01�I[C DCVELOPNi�1�IT DEPARTNIENT
NIINORITY/WOIviFN Bt7SINESS ENTERPRISE
CHE C['CY Of� FUR"r WORTH � 100� TFIIZOC[CMO[LTUN STREF,T * FOR`f' WO[tT(-[, T�:XAS 76102
Alioue (817) 21?-2G7d �` Fax (8 f 7) 212-2fi8 �
�Pipe Fittings and Vaives
✓Portable Toilets
Precast MH's
Puiverization
Cathodic Protection
✓Hydromulch and Sod
Pipe - No MBE Firms Provided
Pipe Fittings and Vaives
Portable Toilet Rental
No MBE Firr»s Provided
No MBE Firms Provlded
Cathodic Protection Services
Seedillg and SOdding (including Synthetic! Arlificial Tur�
The attached listings can be utilized up to twa months from the date of this (efter, per
�ity of Fort Worth's Business Diversity Enterprise Ordinance #20020-12-2011. If
�dditional commodities are needed within this 2-month period, please contact this office
�nd your request will be processed immediately, Thank you for your interest and if
viNVBE Office can be of further assistance feel free to contact at (817) 212-2674.
3incerely,
��CIi �%�1�
�dministrative Technician
�ousing and Economic Development Dept.
�inorityNVomen Business Enterprise Office
�COtISIVG AND TCONONIIC DEV�LOPNI�NT' DCYAR'I'IVI�NT
MINORITY/WOIviEN BUSINESS ENTEIZPIZISE
(E CITY OP FORT WORT'H " 1000 TNROCI<N10RTON STREET * FORT WORTF-{, TEXAS 76103
Phone (817) 212-2F74 " Fax (817) 2( 2-268 I
11/06/2014 11;28 F�11
WOODY CON1"RACTORS lNC,
( f�J 0 O 1
�
w000v
CONTRACTORS
650 TOW�Fi DRIVE
KENNEDAL�,TEXAS 76060
�FFICE: 817-483-4787
FAX; 817•483-2048
Noveknbcr 6, Zlit 4
Littic J.J. Trucking #2
381,7 C6ickasuw
Fort'Wo�rtl►, TX'16�19
Ite: Contract 2014 WSM-p Part 3, �'ruject # 02385
Letter of InCent
�cone uf Wvrk
Naut Off
,� �
� C�� �. /1�.=���..�'�
Little �. 'Crucking #2
Dollur A►t�ount
$ 2U,400.00
�
Woo y Contruc
Ftom;Cowtawn Ready Mix
817 759 1716 11106f_�14 14:31 #758 P.0011001
WOODY CONTRACTORS INC.
November 6, 2014
Cowtown Redi-Mix, Inc
�'. O. Box 162327
Fort V�''ort�,'�� 76xd�.
�e: Comtx�ct 2d14 WSM-D part 3, Project # 02385
'. I�etter of Iutent
3cobe o� Work Do�aX ,A,uxou�at
_ Redi-IY.Cix Comexete $ 1,300,00
f
i"` /
^ owto �a �ted�- �x
�
w000Y
CONTRACTORS
B60 TOWEq DRIVE
KENN�DALE,TEXAS i6060
OpFICE; 817•483•A787
FAX:817•483•2048
GC-6.07 Wage Rates
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTN Waterand SanitarySewerReplacement Contract2014, WSM-D
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02385
Revised July I, 201 I
2013 PREVAILING WAGE RATES
(Heavy and Highway Construction Projects)
CLASSIFICATION DESCRIPTION
Asphalt Distributor Operator
Asphalt Paving Machine Operator
Asphalt Raker
Broom or Sweeper Operator
Concrete Finisher, Paving and Structures
Concrete Pavement Finishing Machine Operator
Concrete Saw Operator
Crane Operator, Hydraulic 80 tons or less
Crane Operator, Lattice Boom 80 Tons or Less
Crane Operator, Lattice Boom Over 80 Tons
Crawler Tractor Operator
Electrician
Excavator Operator, 50,000 pounds or less
Excavator Operator, Over 50,000 pounds
Flagger
Form Builder/Setter, Structures
Form Setter, Paving & Curb
Foundation Drill Operator, Crawler Mounted
Foundation Drill Operator, Truck Mounted
Front End Loader Operator, 3 CY or Less
Front End Loader Operator, Over 3 CY
Laborer, Common
Laborer, Utility
Loader/Backhoe Operator
Mechanic
Milling Machine Operator
Motor Grader Operator, Fine Grade
Motor Grader Operator, Rough
Off Road Hauler
Pavement Marking Machine Operator
Pipelayer
Reclaimer/Pulverizer Operator
Reinforcing Steel Worker
Roller Operator, Asphalt
Roller Operator, Other
Scraper Operator
Servicer
Small Slipform Machine Operator
Spreader Box Operator
Truck Driver Lowboy-Float
Truck Driver Transit-Mix
Truck Driver, Single Axle
Truck Driver, Single or Tandem Axle Dump Truck
Truck Driver, Tandem Axle Tractor with Semi Trailer
Welder
Work Zone Barricade Servicer
Wage Rate
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
15.32
13.99
12.69
11.74
14.12
16.05
14.48
18.12
17.27
20.52
14.07
19.80
17.19
16.99
10.06
13.84
13.16
17.99
21.07
13.69
14.72
10.72
12.32
15.18
17.68
14.32
17.19
16.02
12.25
13.63
13.24
11.01
16.18
13.08
11.51
12.96
14.58
15.96
14.73
16.24
14.14
12.31
12.62
12.86
14.84
11.68
The Davis-Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by
the United States Department of Labor and current as of September 2013. The titles and descriptions for the
classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway,
Heavy, Utilities, and industrial Construction in Texas.
Page 1 of 1
2013 PREVAILING WAGE RATES
(Commercial Construction Projects)
CLASSIFICATION DESCRIPTION
AC Mechanic
AC Mechanic Helper
Acoustical Ceiling Installer
Acoustical Ceiling Installer Helper
Bricklayer/Stone Mason
Bricklayer/Stone Mason Trainee
Bricklayer/Stone Mason Helper
Carpenter
Carpenter Helper
Concrete Cutter/Sawer
Concrete Cutter/Sawer Helper
Concrete Finisher
Concrete Finisher Helper
Concrete Form Builder
Concrete Form Builder Helper
Drywall Mechanic
Drywall Helper
Drywall Taper
Drywall Taper Helper
Electrician (Journeyman)
Electrician Apprentice (Helper)
Electronic Technician
Floor layer
Floor Layer Helper
Glazier
Glazier Helper
Insulator
Insulator Helper
Laborer Common
Laborer Skilled
Lather
Metal Building Assembler
Metal euilding Assembler Helper
Metal Installer (Miscellaneous)
Metal Installer Helper (Miscellaneous)
Metal Stud Framer
Meta) Stud Framer Helper
Painter
Painter Helper
Pipefitter
Pipefitter Helper
Plasterer
Plasterer Helper
Plumber
Plumber Helper
Reinforcing Stee) Setter
Wage Rate
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
25.24
13.67
16.83
12.70
19.45
13.31
10.91
17.75
14.32
17.00
11.00
15.77
11.00
15.27
11.00
15.36
12.54
15.00
11.50
19.63
15.64
20.00
18.00
10.00
21.03
12.81
16.59
11.21
10.89
14.15
12.99
16.00
12.00
13.00
11.00
16.12
12.54
16.44
9.98
21.22
15.39
16.17
12.85
21.98
15.85
12.87
Page 1 of 2
Reinforcing Stee) Setter Nelper
Roofer
Roofer Helper
Sheet Metal Worker
Sheet Metal Worker Helper
Sprinkler System Installer
Sprinkler System Installer Helper
Steel Worker Structural
Steel Worker Structural Helper
Waterproofer
Equipment Operators
Concrete Pump
Crane, Clamsheel, Backhoe, Derrick, D'Line Shovel
Forklift
Foundation Drill Operator
Front End Loader
Truck Driver
Welder
Welder Helper
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
11.08
16.90
11.15
16.35
13.11
19.17
14.15
17.00
13.74
15.00
18.50
19.31
16.45
22.50
16.97
16.77
19.96
13.00
The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted
and published by the North Texas Construction Industry (Fall 2012) Independently compiled by the Lane Gorman
Trubitt, PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's (The
Construction Association) website. www.texoassociation.org/Chapter/wagerates.asp
Page 2 of 2
GC-6.24 Nondiscrimination
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City ProjectNo. 02385
Revised July i, 201 I
GR-Ol 60 00 Product Requirements
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH Water and Sanitary Sewer Replacement Contract 2014, WSM-D
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pioject No. 02385
Revised July l, 201 I
CITY
OF
FORT WORTH WATER DEPARTMENT'S UPDATED:2-29�2012
STANDARD PRODUCTS IIST
Appeavat Spec No. Cla�sssffication NIanufaeturgr Model'No. NaEional Spec Size '
, _ WASTEWATER _ _ _
__ _ ;
'Manhole [nseRs ' ' '
_ ci-ia �i.��,6�i�e„�n w,�n�w,Em«P�>�. _ ni;�de��oN«.vi:�u� _ ,�sru�izax ; �-�,�aa�di.�. _
« . �:. E(-Id =�. M1lanhole In�ert : .. . ... ��. �. Swth 1Vcstem Paeknging . . .'. � A7ude to Orckr - Piaatic .�. ...�. � ASTM D 12J8 � � '�� For 2d" dia �.'
' EL IJ '�. \funhole 6nen � NoFlu�v-6illaw �' Al�de w Order Plnstic � ASTM D 1248 For _>d" Jin.
'........ �.. ......_ ......... .. .. ..... .... ..... . ....... . ...: .. .. .. ... . ... . ....... . . .... . .. . ...... ... . . . . .... . _ .. _.. '�... . . . .. ....... i .... ...... ..._ _ . .
U9123/96 ' EI-IJ �'�.\Innholelnsen Suuth�walemPuckingRSr.Js.lnc. '�, Lit S rer-Stninlc.sS�cel -:. For3J"dia.
_.____ __.___ _____ ..... __.__ __ .__ ___. ..___ ..___ ._.__ ..... ... _._._ _____� _.__ ___._ .__.._
(IH/'_3/9G FI-Id \fanhole 6isen Sout6wrsiem PecAing �. Seals, Ine. Teih<rLaA Slain�ess Steel ... .�, Ibr?4" di,i
........ . . ...... ......... ....... .. ......... .... . ... .._. .... ....... ....... ........ , ..._. ........ .. ... _. ....... .. ....... .... ......... ......
.._.. ...... .._.. ..._ __. _.._ ..._. ..._. _.__.. _.._ . _____ _..... ..._ .__. ..... ._.... _______ _...--
iManhotes & Bases/Frames & Covers/Rectangular ' ', '
' \hmhole!§anhs andCo�en Nectem lron WrnAs. B.us � Haya Foundry IIHII �, ?3"¢�t0" \YD
•.___ . _.._.. \fanhnl�Fr3n�c.�andCowrti..__.. .___ ._. _.._VulcanFnundry ..... . ..._... 6750 ._..._ _..... ...._.. .. �4"rJ0"WD .....
....... ........ ....... ......... ....... .__. ......... ...._. ..._. ._.... ...._. .__ ....... ......... ....... ...... ...._ .........
._..... . _...._ _.._ _..... ...... _... .._.. _.... .._.. __. .._. ._.._ ._.... , ..._.. ......... ,-.._ ___. .__.
Manholes & Bases/Frames & Covers/Standurd (Round) '
" EI-14 \tunhole Franuti aixl Cu�er. We+tem Iron \VarAti, �a s S Ha� c FounJq�, 1(N)�d 2d" Uia. .
..._. , _... ._.__ _.__ .._... .__. _._.. .._.... .._.._ ._. . . .._... ._.. .__.. ._._ .__. :._... ......_ .._..
° EI-1J \InnholeFmm��u�Co�on NcKinley[ronWorbine. A2JA\I 2d"Dia.
... ... _ . . ......... .._ __. ....... ...... . .. ........ �........ _... ..... ... .._ . _ .. ... ... .. ... _.. ... ...... ...... ........ ;..... .....__...... . .
� EI-id '�.M:mholefr,mhsnn�Covm � Ncen:ihCnstioe 2J"Dia.
_�....... __... ......... ......_. ........ ...... �,.. .... ......_ ......-. ......... ........ ......... .._.... ._..... ........ I... .._._. .........
* EI-I4 Ibianhoie Pranxs:md Crn�ers '. Vul<un FamAq� � Ud2 �. AST�I A JR 23" Diu.
_._.. .._. ..._ ...._ __. .._... .__ ._._- .__ ___ . _... .._. __.. . ....... _._. __.. __. _...
' L'I-14 IhfunhofaPmnws;mdCorc�s SigmaCorpomtion ; MH-141�
��. . �. . . . . _._ ._.. ...... .._. ..._. _.._ ._..
..... .._. . __. _._ . _.... ....... _... ..... .._. ..... ......... . . . ,
F.I-13 �.\Ianh�i Fr�mel�nJC� rs �� SignaC qwratinn J(H IJ}N '��.
__... ___.__ ___._ ___.___ ___._. __.__ ._____ __.__ ... _.. .... .._. •.___ - _____ _..____
EI-13 ��.\I;mhul�Fr�mc�.mdCu��n � P�ntA\Imis.un ..... GTti-STn .... .... .. 2�"dia.
' EI-Id ��LmholeFr.mie:.mdCoeers � Ntn,�hCastine ��' 2d"dia.
......... . ._. ..._ ......_. _...._ _....... ...... �,_.... ..._._ ._.... ....__ . ..._.. ._.._ .._._ . ......... .._._ i_.. ._.... .__..
7/2il113 EI-14 J1unh i F�anxs.mJ Co�crs � Samt-Gobain Pipelmes (Pnmrex/rteus/ REi?-RHPS j 10" Dia.
... _... ......... ......... ....... . .. .. ... .. ... . I_ .. _....... _.._. _... . ........ ....... ........ ....... ......... . ,. . .........._ ._ ..
, �I'�r"L1��,1�,lu_;�i.JtYrsa z:�tit�� la.�`.\�,:.r:. �, 1'I >._,.udYi I.r.,r� ,��LSEII�)hi3(i�tll ,<<'ih��
) i"i:t! �': Ei�:i .
:...._.. . ......... .�....... . - ...... . ...... . . ........ . �: ..... ........ ......... ... ... . . . ....... ... ....... ,... ... ..... .. .... .... ;. .. ....... .... ....
III0271U EI-la 30'UIR1HRingnndCmcr SigmnCnr}�orution i1H165tFNNl�IH16502 ?0'pia
._.._ , .__.. . _.... ..._ ._.._ __. _.._. .__. ..._. ._... ...._. ...._. _.._. .__. _..._. .__.. _._. _......
07/IY/II GI-I4 �i30"DIA1HRing�nilCm�er StnrYipePnxiuc�s D�IH33P1`\\'SS-CX' 3n"Diu
_..... .._.._ ........ ......... _...... ........ ........ ._._. ..._.. ....... . ......_. ......... ......... :... ..... ....... i..... ..._.. ........
O;t7fll/� t � F:1-id �1311' DI NH Rin; nn:f {�„���r :accu.ast ' 221AIh! H-u�y Dwr i�rth (�i}kct Ring ' 30` Uia
___- __..._ .....___ _...___. ._..._... ______. ___.___. ________ . _._- ___. - _ - - __ __.___. .-___-. ___.._. ..._.. .._.. _.....__ ......_ .._..___- -- __
Manholes & Bases(Frames & Covers/Water Tight R, Pressure Tieht
.. . LL14 \InnholePr,mhcundCorars . .... ... PontA\luuscou .. .. Pa�miyht .. .. .. ?4"Diu.
.__. . __. . __. -_ ___ ._. ._. ..__. __. .... , ..... .._ ___ . __. _-_ ._.. __ __.
." �'., EI-14 'I\1anholeFramz.}andCoccrs '� Nc�nahCasling ' 21'Di:i.
..... ... . _... .._... ......... ....... . .. . ... ... ��...... ........ ......... .... ..... ....... . ... ... ... ... . .. . . .... ...... ... '�, . ._... . .....
�' EI-IJ "'�.MunholeFr:urasmiJCoven � VulcanFuundp• �� 2342 '� ASTMAd% '� 21"Din.
°__.. ..__ _..__ .. _._ ... _.. .._._ ....._ .__ ....._ ......... . ... _. ....._. ... _.. ._... _..... ....._ __.. _.....
�*� EI-IJ '�.\I.mhc I� Frn�, nnd Co�cr. Nc�lcm Iron Wud.s.l3ms R H:�y. Fomidry 30U-�4P ' 2J" Din.
...... . ....... ......... ......... ..... .. ....... ........ __. _... _ .. . ..... ._.. ....... . ....... ... .... ..... _..... . .. ....
�� EI-14 '�,\lanholePnnnsandCnrers � AlcKinlsytronWorkslnc. ', WPA24A\t � 24"Uia.
'.__.. . .._.... , ......_ _.._ ..._ ..... .___ .__.. .._.. .__ . .__ __._ _._ _.._ .__ .__ ___ _._.
03/08/00 �' ELid !\tanhole Frames nnd Cuvers Aaucast �' RC-21 W ' .15T�1 A 4R 2d" Dia.
� _ _ ___- . . - __-___ _. �__.._. . . . _..... . .__. .. .... _.____ '.__—_ �
0-l/20/OI EI-IJ �'.M;mhoie Frmnes and Co�em S�r mporc GMu mes Pma�c LW. 3(H)-2J43.75 Ring and Cuecr ASTM11 A iN Yd" Din.
__.__ .___. '�____ .__. ___. ____ ___ ___ ___ ..__ ' _._ .._._. _.._. ._._. __.. :.__ -____. ._.__
'Manholes & Bases/New/Components '
0723l97 ' .... Ureth ne H�Araphihc Waterctap.... . .. As�hi K e)o FCK .. . ...... 1de{.� Ullrn-Seal P�20I ... ASTN D22-0U/D-liJU792 . ... .
__._ ___. ' _ .__ ' ____ _ _- ._. ___ ___ _.__ - ____
OA/36/(M/ '�. �,OFfectloinlfur�'Diam.AlH ...... .... HansonConcrcteRuJucts '. Drawm�,�'o.35-IXNS-I�l .
0-t/2(i!(Nl '�. IPrniil� GnsAct for4' Di:un. MH. � 1'ress-Scal Gaskm Corp. � 251F�G Gmkct '�. AST\I C-�W3lC-361 �'�, SS D1H . .
_____ . .-___. ...._ . _____ . _ __ .
1/16/')`) ... HDPC Ainnhulc ndjustnknt Rine... ... ... ... Lidt��ch. lnc... ... ... HOPC AJjiumunt Rmg ... ... ... .\oo-tmffic arta
.__. . .. .___ .._ _. ... ._ _ ._ ... ... _.._ ... .. ... ._ ..__.. ..
5if ;r.i• '�� �',�I.;nti��l� f.:..�ri'.�I-,1�r:i;, �� t. u �� C3.: ..� �r;�LSr, i tl �i. r.: �',i�i�. n S.':.�::i; ����. �'
_.. .._. .._. ._.. _... ....... ..._.. .__. uv ....... _... .._. .,....... .�_. . ..._. _... .':. . ._.... .......
__._ _.._.. .._..... __._ ._.. ....... _._. ___ ____ .__ ___ _._. _..... ..._.. ....... .l__ .._... .__.
' Manholes & Bases/NewlPrecast Cona�ete ' '
.....s . ....GI-id b(nnhol�.['rt.utConcretc.... . _... .... .. ... .. .HydmC�ndwtCnrp ......... ._.... SPLJtcmNJ)......... ....... AST\ICJ7R � . aS��... ......
___ . ___. . _.._ _._ .__ _._. __.. .__ ._.. .__ . ._._ ._.. .__ _._ ___. `___ .._. ____.
'� ' EI-14 '�. Rfunholc. Prtcnst CancTcic ' Nall Concmtc Pi�x Co. lnc. ASTAt C-td3 J8"
_... . ..... . ..._ ..... ..._ ._.. _._. ..... .._. .._. . _... ...... .__ __. ..._. .._.. .._. _...
' EI-IJ \Ianhole.PaY,�.tCncrzlc Hanso��llmncdyCif(ordHdil AST\1Cd73 dR'.
_____. ..__- . _____. _.__ _... __. _ ..._ ..__. _... _.__ ___.. ..... ..... __. ....... ..._. ___.... .___.
0-t/26l00 '� G14 �'�.AIH, Sin_IeOfieet Se:d )aint ���, Hmison Type F De�g 35-(Nt18-(N/l ���, AS'C\I C 478 4R" Diam \IH
U9/23/9( �' EI-Id �I Ataohule. Precast Concrete ' Concrete Prcduct (nc. a8" I.D. hlanhule w/ 3?.. Cone ' A57'\I C a78 �' J8' �e132" cone
___.. . ._._ .___. ___. .__ __. ...... ..__. ._..... ._... .._..... ....__ __. _.._ ._.... ,..... ......... ...._..
',IY:7(i:;it, [.i :-t '-Sl:i�ihil�.i �.i.i.tC. i�.i,.t�.: , .i'x f.�iiiC�.::;,:r�v �'' {:i'li).\1.i:1�.�::.� _J i..��.�::: �� .,�{-i`:IC�1":i '. 1x:.
....... __.. ...... ._... .._._. ..... ._. .:..... ....... ___ ...._._ _.._. .._.... ...__ ........ _._. .'.... ._._ ._.....
I;".'7i��fi ' f-.i. '�:l�:inh�l�., i.�:t:�.�n<��i�l: (Ii�i��-i..i.<<�.i.tir�::. �'' �IH It).�I�.i.i-�i,:�� � i ���� :Si'AiC'!":1 '' ...1'ltir.�:
, . . - - „��x�.
......_ .__ ._ -__ . __.... . ... _ . ___- -_-__ -_____ , _ - __- . _' — �.-__-- _ _ . . _- . -�- - - -
U(J09/III F7-U '�.Atanhnle.Fnc,�d(Rmmr�eP��hixriC��n.rete [,IS('�mpariePipc � RrmlorcnlPolyn�.rConu-cic � AST\7C-76 dK'to72"
....... ....... _... ........ .._. _._.. .__ ...... .._.. ..... ....._ ........ ....... ........ ........ k..... ....... ..._..
_ Manholes & Bases/New/Fiberalass _ _
1R6/`)9 . .-...- fibe yl.�x \t.mhole ....- .-... ..... Fluid Comainnkm. Ine. ..... ..... Plmvute .... ..... AST6137?3 Non-�n(fic arra ..
_...__ .._..... ..,...... ._..... ......... . ....... ......... ......... .__.. ......... . ......... ......... ....._.. ......... .__... ..<... ._.._.. ........
")Y�IU:UI� F i:� 1i�i :,i.: €_f �1 .t ci�.i:!i = t� t iiic:�,:.
..... . ..... . .._. .._.. ...._ .._.. ..___ ..._ _-____ ..____ . _____ ..... ..... ._... ..__ __._ _._.-. _.__
......... . ......... ,....... .... ..... ......... ......... ....... ......... ......... .... ..... ......... ......... ........ . ...._... ........ .-'�,... ......... .......
'Manholes & Bases{Rehab S�ems/Cementitious ' ' '
........ ...F:I-I� Jlanh ric Rchnb Sgttcux ..._.... .__.. _ ....... .. ..... _ Quader .. . .. ....... . ..... _ .. . . .... .. ...... . .._ _ .. _.... . _ .... .. . _ .
..__ .._. ........ ..._ ...... .._... ..... ...... .._. ._.. ..... ..... ......... .._.. ...._. .__. ..... .....
l}123/lll '' F.I-IJ ���.\lanholcR.•hubS}'alCnu SlnnJarJCenknlM1lutcrinls.lnc. � RCIIncfA1SV '. '.
...... . ....... .._... ..._. ....... ....... ...._. _._ _... ._.. ...... .._. ........ . ....... ..._. �,.._ _.... .._..
'. GI-Id '.Mnnhoie R.6ab Systems ' AP/\t Permafunn ' ��.
__. . ___ ..... ._.. .__ ..._ ..... ._._ ..__ ..._ . ..... ..._. .._.. .._. __. .__ ..... ...._
�20/01 I EI-14 '�,\9mihole Re6ab Systcm �, Strong -Scal Systenu Stmng Senl �IS2A Rehub Syntem ' �'
S/IJ03 EL14 \tunhuluRehabSyaem Puly-t �I•<Tcx�hnolugice AlHrcpaieprafucuoaw�mfiltttaiun ASTAIDSgl1 ;
._... . __. .._... _. _._. ._...... ......... _. ..__.. ....._. ...._.. ......... _..._. ..._.. ..... ...... __... ........
flY.'�/1(� �� �'�.t�ili ..li.l'�-il�c2i�i::1f �� i'�n\ii��li�.tr�l�.l.i�..�l.� ..; :': . i �IV':'-f�'.i1��..1.�'.11�'.hl S��lt.�l'.i-
Manhotes & B�ses/Rehab Systems/NonCementitious .
osr�ciive F i i � �����n,�i� e�n,,n s}�<<�„s si>��>�«{. sp��y �wu roi�-��«m.n�� c.,.�n��r nsrnt asvio�nn
'� F.L14 '�.�tunhuleRehahSystenu � SunCoust ��. '.
° ....... . ........ :....... ...._... ......_. ._.._.. ��:..... ....... ......... ......... ......._ ......... ........ _..__. ........ ....��.. ....._.. ...__..
lr7}';t1L ' �.ctr�a� � :<<..;n � -t.ai.ia ��. ( < <;a�� �-::v'��',}iB,51.S2 '� :1.WRi.�� �n:.'P.v ' rA�,�6�..G�,us
�v G�,q �'o.it . t� t��.n, >n n i..� �n Y;::r...i 1 r ��mn..�r�.�l . sf,. ni:dA; "rp. � `, er.�Tylio�li �ns
�Y,.(r.'i�ii; . ....... .(_:�;ii,.i�rC.r.�..�ii�r�,�i..._. ....... ....... ...... �;i.:lcl..... ......... ........ �IS .i;;,:i �.,.i.,....... . ..... ......... ,, � tii ��l��,lic:��:ii,.,..
......... ......... ...... ......... . .... .. ......... ......... .... ..... ......... .. .... .... ...... ........ . ........ ........ ........ .. �,... ........ ......
. .. . . . . .. . ... . ... '�..... .. .. . . . .. .. ... ...... ..... . . .. . ��.. .. . ......... .. .. ..... ... .. ... . .. .. ... ... ... ...... ....... . . ��.. ..... . . ........ . �'',.. . . .. ..... ..... ....
jPipelNe�v/Centrifu�xllv Cas[ Fiberglass Reinforced Pipe/Polymer Modified Concrete ', '
7/3 V97 Cent Ca+t Pihcrgl,�« . Hub,�� Pipe USA, Inc H�bas Pipz (Non-Pretsurcl � AST�I D3262/D475-i
III/30/03 . ..... _.. �Elu«�itc ...... . . .... _. ......... .... ... .. .. .. .. Amu��h USd ...... ... .. ....... . .. . . . .. ..... .. _. .... . _...... ... ...... ... ...
Prepared 2/29i2012 Page 1
CITY
OF
FORT WORTH WATER DEPARTMENT'S UPDATED:2-29�2012
STANDARD PRODUCTS LIST
Appraval Spec No. ClasssiCcafion NlnnuFacturer hTodeCNo. National Spec Sizc
0�/'_'/IU I�ibergLusPipc Amaon 6ondstrandRPMPPpe ASfMD4'_62/U375J
___ _.. ._ _. __ _.... � �,t _ t 7 - __.._. - _--157 �1 t . � . ,. f ,^� __.._._� i i i'.[� ..
ll��:i,< ....... I`ol� \f �I�f�_dC ,.�.I�r. � .h i Ii1,SA � I1 �rt� rr, .:�..V
__- _- -. - - _ -- _- - _ ___- __. --- _ _._— . . . - __ __
O6/U9110 ' GI �� �'�, Rcinforc rl Polymcr Conacto Pi�x US Cmnpo.iic Pip� � RcintmaYi Pnlynmr (`uncntr P�p� ' Ati'I'M G7fi I.
.___ . _._ _.._. .___. __. ___ .___. .__. ___ _._ ' ...._. .__. ___ _._ ____ ..__ .___ ..__..
' Pioes/New/Concrete '
f ci-a c�,�� r��. a��„i�,�r� w;,u c< �,�Ri� v�p� c�,. m�. _ ,�sTn� c �F
. . -_
" � EI-W �,Conc.Pipc.R�inforced .... .... .... HydroCoaduitCo�pom�ion ..... , ClacslflT�G,SPLI1cmN77.... ASTMC7G
t El-0� Cone Pipe.ILcinlorerA H:msw C �Ie Prtxi�cn SPL llem #95 Alanholc M9A Pipe AS'f\I C 7(
..... ..... ..... .._.. ..... ..... ..... _... __.__ ..... . ..._ _.._ _._ _.... ..... .._.. .._..
' El-IU Cunc. Yipc lieinfurcal Concntq V�� l Pruducts Cu. lnc. ASTJ1 C 76
......... . ....._ _._.. __.. ....._ .__.... ......._ _ . ..... ..._.... . ._..... ......... ......... ......_ ...... ;_... ....... ..... ...
'�es/New/Ductile L'on '
�' ' EL(Hi �Ductiic imn Pi�. .. .. ....... .. �. ... . Griflin Pi� Pcaiucts. Co. I Super f3c11-Titc Du<tilc Irai Prcssurc P��:. I. ANWA C ISp. C�51 .� . . 3" Wm 24"
......... .. ... _ ..:.. _. _ ..... .. .. ... .. . . .. .... . _. ...... ...... ... ......._ ._ . _ . . . _... . .. . ......_. ... .. . ... . .... .... ........ I.... ......... . ........
i
'� CI-IX �'�.Uuctile Iron Pipe � Ankrican Ductile Iron Pipe Co. Anxrican F:iStite Pipe �' AW WA C ISq ClSI '� 4". 5" S 10"
`..... . EI-1Ni DuctilelmnPipe..... -.... .-... ..-.. O.S.Pipe.md�<wndryCo. ..... � ..... ..... ...... . .AWWACISO.�CISI ....- ..... .
._... .__ . ._.. .._.. __. __. ._.. _... ..... _._ _... .__ ._.. ._.. .__ ....... _.._ _....
' ' GI-Ofi '�,DuctilrlrnnPipu J1cWaneCa+tirunPipeCo. ' � .UVWACISO.CI51 �'
IPipes(New/PVC (Pressure)
I'!U'JI�I EI-31 DR-IAVVCPr.asurePipe ..... ..... .-... VipeLfeJenlrr�m ..... ..... PVCPrescumPipe ..... . ..... A\Y1VAC9(N) �...- d"Ihmt2;' -
......... ._... ........ ........ ......... ........ ........ ........ ..._. ......... . ......... ....... ........ . _..... .. ........... .. :.... ... ..... ...... .
......... ........ ......_ ......... ...... . ..._.. ....._. ......... ........ ........ . ..._ ... ......... . ........ ......... _...... ....:_. ......... _.......
Pipes/New/HDPE (Pipe Burstin� Slipiinin ' '
'___ ......... Hiohd�m�iypol�elhylenepi�..._.. _...... ._.. Phillip�DnunpiFx,Lic. ..._ � Opti� reDucul.Polycih}IcneP�� ...._.. ASTM1�D13J8 .. 8".._ ...
.. ....... ......... . _.... .._... ........ ........ ........ ....... ..... ........ ........ ....... ........ ...... ... ....... ........ ......... .. ....
� ''.,iilF�t-�2I\�Il)'�10�\'Cl�l)�C�f�IInC N�i'.<b�liC. ' I�S�r���)���iY H"
� ...... . ....... ....... .... ..._ ...... :...... . ..... ...... ........ ........ ....... ....... . .. ...... ....... �:... . ......... .........
s ..Aigbienit7pol}_et6�l�nepipe ._____ ._______PII�P{rc.Inc. \STilID12J8 h'
..____ . .._.. _. _ . .. ..__. _.._ _ . . _..__ _..__ ....__ .._.. .__.. .____. ..... ...._ ..._
'�.,Higio-density pnly�ethylene piFx: ' CSR lfydru ConduiUPipcline Sys�¢nss ; �IcCanncll PiEm Enlarycment ' AS'PRf D 123A
___ _._. .._.. ...... ._._ .._.. . .._.. _._ .__ _._ _._ ..._ .._.. .__ ..._ ..__. ..... .__.
' Pipes/New/P V C'r '
11/(M/l8 .. . E1-31 PVC Cnrtugutttl Scnrr Pi�x.. .. . ... .... .. ..... Conlcc6 Conqmction Prociucts. Inc ... .. .... Cann�h A-_'(HN) Se�tir f'i�.... ..... . ASTDI F 949 -� 8" thm 36"... .. ..
__. . .._. ._.. __._ _... ._._ .__ _.___ ..... __. _ _.._ .__ __. ___ ...._ :___ _.._ ._..
�' EId 1 '�.PVC CorruoalcA Scu�cr Pipe � Uponor Bl'I Cumpany Uhn cort ' AST\t F 9dY 21" to 3G" Only
Ui/1i1/09 � . . F.I-31 PVC ( mi�,n�d S��ecr Pi� . . . . .. ���� � DinmonA Pl,i ucy Coq�orutinn . �. . . CORft 2I �.. . ASP?I P 9.t9 '� _1 io 36`nniy .
' -.._-_. ..-__ .-_.____ __._. .______ ._______.__-- _ _— _-.___-__- __.__ _____. ___._ ___._._._—___. .___ __-_.__. ______
61 �5 �,PVC SexerPi� Can-Ter, Indusvies ASTM U i033 � J" thru 12"
'...... ___ �.._.. ..._.. ..__.. ....... ._. .._. ....... ....... __.... ....._. ....... ....... ..__ !.... .._.... ......
° F.1-25 PVC S� er P�pe_ .._.... Cenain TaYI Pnduct.s Cory ... _... ASTA1 D 3112; d' ihm U'
_ __.-.__ . ._._.. ....____ .... .. _.__.._. . ..... _ ....... ...._. .....__ _....__._ _....... .__.__.. ..
° EI-2i PVCSc�euPipe.... .... ...- � Nupcu\Imu(auurmyCvrp ..... .. .. ASTh(D30;J,D17ft1 d l8"
....._.. . ._.._ .__. __.... .._... ..._. __.. .__. ..._._ ....._ __.. .._... __.... .._._ ..._ .......... ......_ ........
w EI?5 �!PVCScacrPipe �� 7-Jl�i:muiuciurin�Crnnpany.lnc. ' � ASTAID3034 , 4"-IS"
i2/23/Y7 ` GI-27 PVC Se��er P�pa Di�inond PI,�s�i�ti Curporuiun SDR ?6 anJ SDR 49 AST\1 F 7R). AST\f U iOtJ 4" thm li
._... ._._ ..._. .__ ___ __. ___ _.__ ._ _._ , ...._. __. .__. _._. __. __.. __. _.._...
* GL27 ;PYC Se�ecr Pi�x I [.:un un Vyl<m Pi�: : ' .1ST\I F 739 i J" ihm IS..
.. _'. . ... .EI-b -.PVCSu�<rPipe . . ... .. . �.. ..LixwsionlYhnologies,(nc . � . . . . .� � ASTMD303d , . ...kS...10"
...._... ....... ......_.. .... _. .. . _. .... ......_. ........ ......... ......... . _.... ... ... .. .._.... ... ..... _.... ... .__.. ..: . ............ . ..
II/IIh)F ' 8I?N '�.PVCSeaerPipe ' DiamnndPl:uticsCurporation "S"Gra��iry�Se��trPipc ' ASTJfEb79 13"�u27,•
_... . ._... _... __. .. _. _._ .__ _... ..... .._. . .. _. . __ ....... .._._ .._ :..... ..... ._..
'. EI-2R '.PVCSmrerPi� 1-\fRlanu(acturingCampnny.lnc. ' ASl'MF679 IR" 27•.
'._... .._. . ..._ ._.. ._.. .__ .._. _.._ ..... .._. . __. .__ .__ .__ ._.. :..... .__ ._..
1I/12/'19 �' FL29 '�.PVCTmssPi� ' CunttthConstnictinnProclucts.Inc Contc�hPVCTmssPipe ' ASTA1D2G30 8"ihrou�hlS"
___._ _____- ____ ____. __..__ _..__ ______ -______ __.__ _.__. ___. ____ '..._ _'__. __.__._
p926/91 F.IIR) > �.Clos��cl Rofile PVC Pipe ..... Lum�nn Vylon Pipe ..-.. Cadon Vylun H.0 Uo>e Prulile AST\I F 7)Y I N"to JA..
t V V/H9 ' EIlH12 I'�.Closed P�atile PVC Pipe �� UimnunA Plnstics Cuiperrntion '� ' AST\I I RU3/fr/94 �' 18" to a8,.
..._.._ ___.. .___ ._.... _.... ___. _._. _..... __.... _...... ...__ ..._.. _._. _._ ._.._ :__. ........ _.. _..
ti��UG/Ui tSt-..3 '�.PV�'Y ::i1V�il Pi�>e � D.r:ord F� b,-�C�,.rw::.rr.n � ' Pti d6AS7:�.11'-(',p ' IA ir.<�6'
....... . ......._ , ...... _.._, .. _.. . ....._. .._.. . �..... ......... . ...... . .. . ...... ...... .. ......... ... ...... ......... '';...... .. .._. _ ... . ..
ftil'_�i�)h �� t:i-� -I'Vl.ti '� Il..i:t„i '� tl�n:o 3D€:-�L,:nIIScIR3`I�,�.I.:.l:tt.El�: �� ,\ttilSCl_t11a.1J�i'�tl.t4c ' -
: u
*�: .�.�. EI-?5 :��.�PVCScwerFiltings .. .. . '.�.' PlasucTrnds.L�.c .... :.�. GasketMPVCSe��rrRiainFttings ��' ASTMD303J . .. ....
',Pipes/New/Ribbed Open Profile LmQe Diame[er '
ll)/2C/91 EI00-2 PVCSu��rPipe.RibbYl ...... ....... .......... L.mi.onV�lonPipe ........ CadonVylonH.GCin¢cYlPro�i�e.Pip<. ....... ASTAIF67) � IS"Io�}A".....
._. .. .. . . . . . ..... ... . ..... . .. . . . . . . . .. . .
0926/91 GI(N) 2 PVC Se�+er P�pe. Ribbcvl Ettmsiun Te+•hnulugizs, Inc. Ultrn Rib Open,Pmt�i Sexer Pipe AST\I F 679 �, 1 S' �0 48"
..__ . .._.._ __.... ......_ __.. ..._ _._._ _...... _.. ..__ . ..__. ._. .. . ......_ .___. ....._ ___ _._..
; [IUO 2 �. PVC S er Pi�x. Ribbed ��,.. . Upo ior ETf Comp:my '�..
...... . . .... ,...... ........ ... .... ....... ... ..... ....... ....... ........ ........ . .. ...... �,.. . ... ....... .... ....... . . ...
IIfIU/IU (L<IlN1�) Polypropvlene(PF)4�rarPipe.UaubleNrdl... .... AdEsnmlllrom;�g�5ystenu(AUSi ... S.�ni�ileHP(k�ublellilliCrrugme:4 ......... ASCM('2736 ',..... ;ti'-i0" ....
II/10/IV tFIOU^.i Pohqrop�IcacIPP�SuurPiEm.T�iplcN'llll... . Ad�,mc:xiD,uu..o.S�-t�m.t�\DS).. .....SuniTnvHPTriplcW.,UFipc � AS"C\iF27(,l ' i0'toh0"
._.. . .__ ._. ._, __. ..__ __.. ..... ..... ..... . ...._ _... __. ..... ._.. __.. ..... .........
p5/ib/II ' 'titcelRcinCoreedPol�ethylenePipe � Cun"CaehConstruc�ionYnx7u<ts '' Dunnaex � ASIbIF2%2 ' Z�1"tn72'.
_... ..... .__.__ ..... ..__. ...._ ._.._ _.____ _.__ _._.. , _..._ .._.. ..... ____ __.__ -__ __. ...._
_..... . --....__ _..._' ________
___..___. .__.._ ......... _____.. ____._
Pioes/Rehab/C[PP
..j._. ......... CurcdmPlacePiEx ..._.. .. ....._.. _...._ ...GuimfumiTczurk.Inc _..._.. . ......_. ._.. .... ... _.... ....... ASTAIE121! . . _....._ ... ...
..._. . ...._... ......_ ..._._ _._... _..._. .___ _.__. .____ ____ . ._..... ._..... .._.... ..._. ___. .;._.. ..._... .... _..
OS/03!)9 '�.Curcd in Placz Pipe � NnliunW 8nrim0.Yh Group � �ationul Lincr. ISPLI Icem #27 ' AST�t P� 1216/D-S813
.... ..... t..... .. �....... ......... ..... . ... .. .. .... . _...... ......... ........ ..._... .... .. ... ......... ....... . . _....... ......... .. I .. ..... _ .. .. ..
OS/29/96 � �ICuralinPhicaPipc � Rep�uld.elncQnlinerT�hnnlg��QnlinorUSA) ' 6ilinerTwhnulo�y �� AST\IF13�6
..... ..... ._... ...._ ..... ._... ..... .._. ._._ ..... . __. ..... ..._ .._. ._.. :._. __. __.
Pipes/Rehab/Fold & Fonn ' ' '
� ..... ..._ FuldandE'onnPipe ..... .... . .._. Cu1lumPipi.S�stems.tnc. .._. . ...... .._.. _._ ._.. .._. _.... __. .
........ . ......... __...... ......._ ......... _....... .._.... ..._.. ...._.. .... ... ......._ ......_ ...._... .... .... ........ .:_.. .._.... .. . ....
II/03l98 '�, IFoldundParmPipe ' InsiluformTn�hnolneiec,luc. '�, Invi�u(orm"NuPI�x" � AST\IF-ISf}i I.
PoW an� Pomi Pipe Anwric�n Pipe S Pii�sucti. Ine. � Demu. Parpote Only. .
_....... _...... _..__ .. .. _._... ._..... .._._. .___ .._.. ._ .... . ......... ......._ .._.._. ......... ......... I._ ....... ..
I'_/(N/00 ' �IFold;mdPormPipc � Ulmdincr UhralincrPVCAIIoyPi�wlincr �� ASTbIRI501,1ri71.1ft(7 '
06/09/Ot Pold ,md fom� Pipe .. .. .. �tiller PiFrehne Curp. ES Aleth��J AST�[ P I50a, F� 1917 Up tu IS' 4iamzter
..: _. . _.. . _. _.. .... ._. ._. .__ . .._. ._ __. ._ __. __ _.. ._..
IPipe Enlxr�ment System (Method) '
_... .._. PIM System _._ _... .._. .._. .-Pthl Co�or.uion ..._ . .__ Polycthylcnc _... PIAI Lorp.. P� c,n,i�\Kry, M1J ......�ppro«d Pnuoudy_..
_.... ..__.. McC nnellSyatem� ._...._ ........ ._. DleLntConumcunn .._... ......_. Po�}ethyle� .._.... ._. Houston.Tae.n Appro�crlPrevwu�Iy
'. TRS S�.tenu _...... ' 'Pmnchles� Riplec�nxnt Sys�em �' Palye�hylene ' .. Calo�ry. Gm;�dn _....Appro�eA Pr<�ioutty...
_...... ...... ...._. ...... .._.. ...... ..... ..__ _._. ....._ ......_ .._... ..._.. .._... .._.. .!.... ...... ._..
' P�e C�sin�Spacers ' '
I t/OJ/O2 '. . ... .IStee113 md Cusin� Spacers . . . ' . Advnnc�rl P«lucts and Sp..tem.. Lic Curtwn Sicel 5pa�er.v. \laiel SI �: .
......... .._..... __._. .._... ......... .._.._ �..__... ...__ _.._. ........ .__.. ....._. ..._.. _...... __.. '�..... ..._ .... . ........
0'_/02/13 '� �IS�.iinl<at SRiI Casing Spacer ' Advunc<d Praluct, und Systems. Ine. Stiinlcss Steel Spucer. MoJel SSI � ��
tU/22/87 ��� ��:Cnsi �y tipucers . .. C �scado N�teraurAs �lanu(ncturing Casiiig Spa�in �. . .
.._.. ..... . _.._ .._. ..__ ..._ _.._ ..._. ._... ..._ . _._ .._. ..._ .__ _._ __. ._._ __.
09/1�1/10 IS�ainlnr� Steel C.iving Sp, cer � Pipeli 5� �I und Imoluwr St i il: s Sir:l Cutui� Spa�ee '� Cp �od8' <I><b
d�i/IJllfi : ... �:�Connd �CcalGiyin Spactirs . .. .. . .. . ... �. .. Pipelin� S�al �nd lit. ulntor . . . . _e.u.�t�d ��e�tGi,in Sp.�un . � .. . . . .. . . . �; Cp tuJR" <b<^_>
Uiiiil/II ....__.. .Slaink.�S�n�IC.isii�tip.iu��...... ........ :.... ...._.. I��ii.n<;iV.... ......... ..._... .1810P�mm�b�kA........ ........ ...._... .,.'.. Lpi�.lis"<i><'_>
...... . COFIIIII£S . ......... .. ....... ......... �:...... .... ..... ...... .. ...... ... ......... . . . ... ... . ... .. . .. . ... .. . ....... . . ........ ........
02/>5/02 .__ F..ox� Linme S�stcm .._. .__ __. . _..Snu�ru en, hu _._ ...... . b����d;�rJ 2111RS ....... ...LA Cuum � #210 133 s.... . _.. .
Prepared 2/29/2012 Page 2
CITY
OF
FORT WORTH WATER DEPARTMENT'S UPDATED:2-29-2012
STANDARD PRODUCTS LIST
Approval Spec No, Classsification 14tanufacturer NTodel No. Netional Spec Size
12/la/01 C:Pu�y t ining SZq<m . Ri iA�c �tafcmJ� FJt�roh 2030 and 21(NI Serm, �.
ti�; i :i�t; '. .intc . U.��11., ::� i F � ( �.�.iae � . � - n�.i � m � - I .��t��.-!o tUl �- I ,AC i Ai If-I :' �. I .d I , . Pira un:y.
..._._. . ......... �,_ .. ..__.. ._._ __.._ ......_ .._..._ ......... _...... .._._.. ...._... ......... . _ ..._ . ......... �''�..... ..._.... ._......
WATER '
PipesNalves & FittinPs/Combination Air Release _
-.... . .. GI i l Combm rtion Air 2cluix Vnlce... ......... ........ ....GA I dutitne., inc. ....... . Empirc A nd Vaumm V,il �. \I�xk1935 AST\t A 12( Clasc Li. AS"1'\L4 .. I.0 ^" ......
....... ......... . ....... ._ _.... ......... ....... .. .�,...._ .._..... ......... ......... ......... ...... _ ......... ._... .... ......... .:.... ..... . ... ..
" . HI-I I '�.Combinatiu� Air Relcme V�lre � hluhiples AW�mGreWring Co. �'�. Crispin Air mid Vacuum Vah�es, btaicl No. ��. '� 12". i'• C T'
......... ,_..... . ... .�.._. ...._... ....._... .. .... .. ��....... ......... .....__ .._.. ... ......._ ..._.... ....._.. ...,_ .. ... .... .. .. ..'... .......... .
° EI li CmnbinationAirReleawVnive Val�e�ndPnmerCnr�>. APCOu141C.NI�SCand#147C '�, t'.?"�C'3'
......... . ..._.. ..__ ___. _... ___. _._. ._._ .._.._ .._.... . .._.. ..._. ___.. ....... ___ .... .___ ___..
PipesN.dves & Fittin�s/Ductile [ron Fittin�s
07/37192 �� 61-U7 �:Ducnl. Unn Piltinos ..... .... ...... . . .. �:. . . . . Smr Pi� Pmduct,c 6ic. � Mcch.micaUnint Futings ` �UV\VA C U3 & C� (0 �: . . . .
._..._ ',. ..... .:..... ......... ...._... ......... ..��..... ..._.. ...... ......... ....... .. ...._.. ......... ......... ......_ .�I.. ......... .........
* EI U7 Duct 1 1 n Fltines Grilfin Pipe Prewluct�. Co. \Iechanicnl Jomt FNme� i114'lVA C I 10 '�,
. ._... ..__ . ____: ___ __ .__._ ____... ....._ .. . ._.. . . .__ _. . _._ __. ..
'� EI 07 Ducnla Irmi Fittingc McR nncll'yler Pipr/ Union U� I h s Urvivon M1lsham<nI tomt Fittiny}, SSB Ch� s 15(1 A\VWA C �53. C 110. C I i I i
_... __. • __. ._._ _._ _._ .._. _.._ .._.. ...... .._. ...... ..... ...... ........ ..:... ....... ._..
OS/IJ/98 ' EI-07 '��.Ductilelronfitiin�a ' Uni-[lange SerieslS(�CircieL�x�APi�Ravraints ��
__.___ _._._ _.__ .___— _ _____. _ ..._.. .__.
Oft/10/9R EI-07 '�.A�Jfiumon ..... Siym.i,Ca.. --... � Class350GI5i\OFntings-. ..... AIVWACI53 J"-21" .....-
OS/N/9R ' EI-07 '�,UuctilelronJuintRestrnints .. �' Foiil\Ic�.rBoxCo. Uni-Fl,mecSenzsl5(XlCircle-L�x�k � AW\VACIIUCIi3 �' �t"tui2"
__.. . _.... ......... ._...... ....... ...... :........ ..._ ......_ .__. . .__.. � ...._. .__. ._._ .._._ .',_.. ._.._ _....
IUO�/(N ' F:1-07 �IDuctilelronluintRes�r.untx ' OneBull.tnc. OnefiultRcstmina(JointFiving � qW{YAC(II/CIIb/CU3 �' d"tol'"
......... __.... . ,...... .._._. ...... _ ......... _.�,.... ........ ......... ........ .... _... ......... ......... ....... ......... . ..!... ..........._...
U"29/1^_ ... 33-II ii .,Du�tleLiinF�pe\le h i callii � \�ie 4 �/ AW'L�:aClll/Ciifir(:i�l �' 3 t�i-�2"
_/
urt [t� tn�int... .... ._. ... C[3AA iruu.6�� .... . .... �, � u, Senzs l llor Pi„ ,
0229Ji2 ...��-11 II ��.PVCPipc11a6amcaUim.k<:traint .. ....FB.1AImn.6ic. ....�ic�_d�EScncs2(HN�(forPVCPi�n) q\VIV.�('IIVCIihr(:t53 ' 4'tn2J"..
._...... ...... .,__... ....._ .._. ._... .__.. ...._ _.._ ._... ...._ ........ ....._. ........ .._.... ....L.. ..................
ONlOS/(µ '�. GI W �i\fah:micallointR tainzrGinnl. �� Sigma.Co. Si�maOno-LukD(clmniculJomtRe�lr�iner'.. �U4�YACiiI/CIi3 '�, d"Lo'_'J"
. ..: .. . ... ... . ....... .. .. .. .. '. ......... . ...... .. .... ... . . . ... .
'. � '. �(iulldog Sy:irnsl UinmuriJ Lx+k 91 C 1\I '�, ;
III/1�10 ' Gt^_4 slntedorRcltniincyilnintSS':iem 5&ft"Pe�hr.cLJRaiuc�s En�•leLix4tH); ' AS'1'\(P-(G2,4 �' d'fol^_..
):{iliiC�(i '� Eift' '�,\Itt'II�.n.t..�11��.Iri�u�;11�s ��� Sf{I.I��:;It�e. .I,..h��st.'.�11i F'IfiEi�< �� .�tt'l4"nCl`. ' 4�'[��2-t..
_._.. � ........ ....... _._. .._.. ....._ :...... ...... ........ ........ ...... ...... -.._... � ..__.. .__.. ..'�,.. ..._._. ___.
......... :.. ..... I..... ........ ...._ ... ........ ..:........... .. ........ ..�..._. ......... ......... .... ..... ....... .. ......... .;.. ....... .........
,Pipes(Valves & Fittines/Resilient Seated Gate Va(veX '
.. . ... ..... �ResiLint WeJg.A 6ate V,dee w/no Cirarrt ........ . .. ...Anxni.in Flow Control Series �500 Dra��ing # 94-20?d7 . .... . . . . . � . . . . . 16" . . . ..
.._._. . ...._. ..__. ._.._. _._ ..__. ._.._ ......._ ..._.... ...... .._... ....... ___ .__ _.__. �'.. .._.. ....._..
12/I tl02 '� �'�.Resilicn[ \Vc¢i�e Gate Valre '� Americon Fiuw Contrnl Serir,'_'S30 and Serias 2536 ' AW\\'A C515 � 30" nnJ 36'
..... . .._. ...... ...... ..._. ...... ._.. .._. ._... .._. . ._.. ..._ _.._ .._. _._. :_. ..._ ......
ON/31/')9 ' �IResilienlW�eeGateVal��e �� Anx:ricanFla��Cnnln�l Scric.'_5>_U&'S2�(SU')4-20?551 �� A\VWAC515 20"and24..
.__ .._. � _... _._ ._... ...... ..._ .._. .._. ...... . ._.. ..._. .__ _... _._ �:.. .__ .._..
OS/1&/9') ' '�.Re.,ilient\VedgeGmzVnh�e ' elnmricnnFimvControi � Serie.c?516SD`)�-�02d7) ' A\VWAC515 16"
__— _—_ ___- .__ ._.__ _______. ._.__ _ _ ____— _. _.___.__ .__.__ _-_.__._ _..__ _...___.. .._ ..
102J/(Nl EI2( '�.Resdi<ntWedoeGateVulve Amen�anFlowContml . �� Scries�5(NI iUVWAGOJ �t"to12•'
ORlOS/(U '�, ResilieN Wcvige Gute Vul�v �� Ameriean Flow Control ' J2" and-13" AFC 25p0 AN'WA C515 � A�" and-IB,.
........ . _.__. .___ .__. .__.. ._..._ .._... ......_ ........ ........ . _..... _...._. .._..... ..._.. ........ 1... ._._. ._...
pg/2;/91 GI2C Re�diemWdgeG�teVahe Anxic.mAVKCompan}'... AnmricmiAVKResihentSendvlGV �, AWWACSIri �' d"tuI?"
....... ........ ,...... _..... ..._ .... . ........ ,...._ ...... _. ...... .. . .._ ..... ... ....... ... ...... .._ . .. ........ '�... ....... ....... .
OU2J/0� EI-26 '�,ResihentWeilgeG.�ieV:il�e � Amm�canAVKCuinpnny � '� 20"andsmnller
_..._ ..._... ._.. .__ . .. .._.. .. ... _.._ ��.. _. ......... ......... ._...... ....... ....... .. ......._ .. _.... ......... '�,.. ........_....
t� ' EI-?6 ���: Resilicnt Seatai Gatc Vxive Kenindy ��. ��' 1.. - 12"
._. . -__.. ...._.. .._... ._.... .._._. __ _._. ____ ___. .____ ._.._ .___ . _... .___. ..':.. ___. ...__.
' '� GI-'_'6 �iRezilient Sca�ed Gate Vnke �ISH �'� �' J" _ 12"
. . .' ���; El 26 �Rec Lent Scaad G�te V:de. ... . . . . . _ . . \lvelier Ca : � �'' � �4" - 12"
__—.__..._ ._.___ - .r _ ..__ ___._.. _._..___. _..._____ ____ _— _ _.__.._
I1/08lKJ '�.ResilientNulgeGaieVake \tuellerCu. SenesA23Gl(SD6617) ...... AWWAC515 �, 16'.
...... � ...... _... ._.. ....... ...._.. ........ _..... ..._. .... .... . ......... ....... ........ ....... _._. ...,.. ._.... .._.
OV23l03 �' �'�.RecilirntWttlgeGateValre � MocllerCo. Sc�izcA?360foriR'-34"(SDfi7(ri) ' AN'1V�aC515 ' 2J"�unlsnialicr
..... . ._.. _.._. ..___ .__ ._... . ..._ __.. _.... ..__ _... ___ .._. .._.. ..._. ''•._ .__ _...
(}5/137f)5 '� ''�Iteti1l..:t'iv�•iLc:�.1(el�cl`.e �� ...1�.�.rl.�. ��i�.11°r3f1"ti3(,.C->!5 ' �.�.CSlS ;U':InJ3o'
..._.... ........ .. ....... ....,._.. ......... _.._... �,...... ......... ....... .....__ ......... ........ ..:..... ......... . .. ....:. .i .. ... ... ... .. .
�7[13.;7(; ' �IRt:�1�.t�.�d,i.Um:�6c ' AL_:t�tl. A9�JIi,r�_ �4.' l_-i15 �' Al�'10'AC515 4 ..
. : .:ia..,�
OV28/RS ... ..EI26 '�ResdiemNedoeGaaVnh�e . .. . �.� . ...._.ClonVu�eeCo... . . �,. ........ ... .. .. �' . . .\WN'AC>(19 .� 4-12' .
__.. ....__ ._.__ ___ _._ _._ .__ .__ ___ ___ __._ ._._. ._.... ___ ...__. :_. .._. _._..
10/01/Y4 '�,Rcsilicnt Wnlge Gnte Vah�c ' Clnw Valce Co. 16" RS GV (SD D-2(N195) A�YK'A C515 16"
IU04!'JI ...E1�6 Retidicnt�VvleeGateV.�he ... .. . ..CIo�eVaheCo. Ctm�RWVaIre1SUU2165?� AWWACSIi I 21"�ndsmailer
._.. ..... ._ _ ._. .__ ....._ .__ ....... ......_ _.._... ....... :..... ........ ...... .... __. ..._..
?'��'-"�. '�.Re.ilie��KV�lgrF+m�4�:r Nou<3> ���� Eki�vW�k�eLr. ' fk�t(:'-E-3�5 � ,�W1V.1-�il3 3H'=nnel3Er'
.__ ....._ _._ ..... .._. ..__ �:...... ....... ...._ _.... ....... ..._ ..... _... ._.. _'. ._.. .......
UG2111U � �fR.>ili�ntWtnipaGnteValer ' C;lomb'nl�oCo. Cl �VeleeDlate12G3R � AWLVACi15 �U"tu�FY"
.__ . .__ _.__ .___ ..... ..._. _ _.._ __... ..__ ...... .__ .__... .__ _... ._._ !_. .__. .__.
05lOH/91 ' EI-26 '�.Re,ilientScatedCi.�IeVulve ' SlaAhumVal��es&�inings ' ��nw�cncs�rtnrvsu�n..s�n.nsr����� y.��-
______ '______ _._... ... __ ..__ ._...__ �____ __ .___ ________ __-___ -______..._____.___ __.____ ____.__.
:." . [31-Z( .Revhenl5unedGateValre. ...... U.S.Rpe�.mdfwmdryCo. �Iev.�al_5p.rtyunnxn�+5P1a71 ��, , i tolG'
.__. . ..._. .__ ___ .__. .__ ___ __.. _._ ...__ __... ..._.. .__. ........ __.. .�!... __. .._._
'Pipes/Vnlves & Fittines/Rabber Seated Buttertly Valve ' '
- . _ . . .
`�� � 8130 �RubMr Srat YI Uutterily Vakc ��� Hcnry Prau Cu. AW WA G50-t 24"��
.._.... . ....._. ,..._. ......._ _..__ ..._... ......... ......... ...._ ....... ........ ...._... __.._ .._.._. ._..... __.�,.. _.... ......
' �' El-3D �''�.RubtrerScnteeiButlertlyVnlve ���, 11uellerC��. ��. AW\l'AG501 '�, 21..
Vll/99 L130 RubtierScatedUuvertivVnhe DezunkVnkesCn. A\V'N.1G501 '�. 24",mdiurger
_._. __. ..__ __... .__. ....._. �........ ........ ...__ ..__ . ._.. .__. __. ___ ___ :.... _.._.. ........
OG/l^J03 EI-30 �, V�I � t� Airancan 6uttrrFly Valee ' V.�hnunc V,ihe and ilianutucmring Corp. Valm,me Amencan �uuerfly Vnlva ' .�\1'R'A C-5(U Up to dd" Jiameier
....._.. . . ...... ,... ......... . ..... ... . ... . .. .:..... . ........ ........ ......... .. ... .... ......... ...... . ..��_ .. .. ......... .. ..j ......_ . ...... ..
t}1/Q61Ui �' EI3U �'�RublxrSentalHuuerOyV�ica � \IAHV�ive �' ,�I�HStcle-�strilfil4.ip ' AVV4\'�Gi04 34"to.lfl"
. ..... . .. ... ... ... :. _ .. .. . ... ... ......... .... .... '�_ .... ... ... .. ..... . ..... .. . :. . . ... . . .. . . . . . . . . . .. . . .; .. . .. . . . .. .... . .. i.. ..... . .. .. . ... .
Sampling Slation '
1/I2/96 ... Na� rSnmplmgStnuon .. ... ... .. WnterPlin. . ..620lVaterSunpline5l.eion.. ... ... . .... . . . .
.... . ._. .._ ... .._ ... ... .... ._.. .... .... ._. .._ .._ .. _.. ._. __. _...
_ Dry Barrel Fire Hydrants _ _ _ _ _ _ _
. --- . ._ _ . - __
iuii�iis� r:-i-iz ;nryn,��mir���Fiyd�:��n .���K ���o,��n���v�n� o�;��������,,.vn-ixras,�t-fsseo r�ww,�csm_
Ol/31/H8 E-L14 ':Drv�3�rtelFiicHydmm ' AmricanDadin,Valee S6opDra�ungNo.94-I879i � AWNAGi02 �'.
_._. . ..... ___. __._ _... ..._ _... .._._ _.._ ..... . ._.. _.. ._.. ._.. ..._ ..... ..... .._.
09/Ip/Y7 8-112 �,Dryl3umlPlroHy�tanl ....._.. ........ . .. Ciu�lCorporalion ........ ......SI pD ��'ui��:lti.Dl)N95.. ......... �\WWAG50? �� ......... ......
OUIJ93 ....G�1-12 ��,Ury[3ufrelFireHydr.mt ' Amem.mA\KCumpany Dliu1e127U0 ..... ' .\\YNAC-502 '.
........ .. ... . .... ... .... . ..... ....... . ... . . . . . . . . . . .. '.. . .. .. .. . .. .. .. .... ... . . . ... S ... . . .... ..... .. . . .... . . . .. �,. ...... . . . .. . ', .. .. . . . . . ... . .. .
OSCJ/riM . & 1 12 �, Ury li mel I'irr H}drant .. .... . . ... .... �. .. . _ .. Clo�� Curpuratiun .. . ... Uunvm�s D21}175. U2W i(, kS20506 , . . .. AR'\VA G502 � . . . . . . . . . . . ..
... . E-I I2 UryDart�IFirt:tl}drant ...flTKem�edaV:Jve �: ShipUr.¢�ingYo.D-80783F1V ' A�i'WAC-50' '.
09/2d/N7 �. G-I-I2 ,.Dry t3artel F'im Hydrant _.._.. ._..... ... ��IKH Vah�c Coinpany . . ....... ... . .... Shup Drnxing No. i id7(...... ......_. AW WA G502 �, .. _...._ . .. ...
.._.. ....... ... _..... ...... ... ... ........ .. �,.. ... ... .... .. ._..... ........ ....... .. .._. ...... ... .. ..... ........ .. '�... ........ . . .... .
. ` '. '., Shop Dr wines �u.6a(t ' �'..
10/I4/ft7 Ed I^_ Dry{3arzelFim_H}drau _... _._ ._.. ._\li IlerCompan� ..... ..... A423Centurion ._.. .__. AW1VAGi02 �, .... ...
__. _. .. ... . . .. , __.. . _ .. ._. ..... ....
��. . '�, Shop Dr;nving PH-L I '
01/IS/NR '�. 81-I? '�Dq[inml��rcFiydr;mt '� \[cllcrCompuny '�, 1-J^_75uperCeNunun2lN1 �� ,\N\VAC-502
IIII09/87 C-I 12 Diy Ba�rel Pire H}dmnt IJ S Pqk & FounAry � Shup Dcmung Yu_ 9(0250 ' . AW WA G503 '
._.. .... ... .__. ..._ _._ ..... ..._ ..._ ._.. . ...... ..... ._.. ._.. _..- '�__. _... ._..
09/IG/R7 ' E-I-I^_ '�.DryUarrslPireFlydrnm W,�tarausComp;my ShopDra�wng�n.SK7A0S03 ' AW�4AC-502 -
._._.. , ..._... .:..... ..._.. ....__ _._.. .,.._ ._.._ ......... ......_. ......... ....... .._... .... ._. ...._... ...�:. ......... .. .....
Water Appurtenances
OX/03l0? , � L't 18A �Plas�i� N�0.Bosc� . .. . ... .. .. .. ..... �' � Paut Jnnian tron Wod}, inc.. .. . . � . . . . \fcter Rox (Pl,nne) w/ CI lid - .. . . . . . Claes A. (3. C . .
OS/?8/U2 �' �'�.Uouble Slrap Saddle ' Smiih 13luir #317 Cont�el Double Sirnp Saddle ..
........ ..... ... . ... . .�. . .. ... ..... . .. .... .. . .. .. .. .. . ... �: ... . . . . .... . .... ... . . .. . ... ... :.. .... .. ........ .. ....... ... :. . .. . . .. _ .. . ..!. .... . .... ...... . .
OU?6/lX) �ISS T�ppin� Saddic � 1C\I Iiidaqrias. Inc. #4UG fMubl. l3�nd SS S:iddle � ' I"�o 12" aips
01/30/01 ..... Tappmc Saddlc -. .... ..... ... ..JCAt Lidu.lnes�.�lnc. ..... . .... N�70$ CoakYl T, p� m, Suddle . ..... ..... ,. I"tu 12"�iap�
q5/IOII 1 4T�3pp ug Slce�e lSr i.i, S�ecl) '. Pournr.d ,' i190AS IF I�ingcl Fi 3J90�AU ' '�, d�S" vud 16`
02/3Y1� 2 13..1 _ 25 'I'li SI���,. (,Ccr.it��l Sterf) ....... .... _.. ft��ln.ii... . ..... ... . [� I:S 2J0 ..... ...... .\1�15'rl C�221 ;.. l, E, Iti 4?' w/'_J' Oul..
PV ��b
U^R9:1'_ ' 23J2'S �7r �ineSlarveiS6unI�,�S�rel). _.... Runmc - '' SSl'StaiulewSt�wi ' A���WAG2?; ' IJ tu�.�a�/21'_'Out...
Prepared 2/29I2012 Page 3
CITY
OF
FORT WORTH WATER DEPARTMENT'S UPDATED:2-29-2012
STANDARD PRODUCTS LIST
Prepared 2/2912012 Page 4